PERHITUNGAN TC

TYPE TC YIXIN QTZ 100 - TC 6016


COUNTER WEIGHT 17 TON
MAX ANGKUT 6 TON
PANJANG JIB 60 METER
MAX BEBAN UJUNG 1,6 TON
JARAK MAX ANGKUT 20,57 METER
PANJANG COUNTER WEIGHT 14,1 METER
LEBAR SECTION TC 1,8 METER
MUTU BETON FC' 30 Mpa
MUTU BAJA fy 520 Mpa
LEBAR PONDASI 5 METER
PANJANG PONDASI 5 METER
TINGGI PONDASI 1,6 METER

BEBAN TC (BROSUR)
KONDISI DALAM KEADAAN OPERASI TON KNm
MOMEN BEKERJA 185,6 1856
GAYA HORIZONTAL 2,29 22,9
GAYA VERTIKAL 68,7 687
MOMEN TORSI 26,5 265
PERENCANAAN PONDASI TC
BERAT PONDASI 96000 KG
96 TON

TOTAL GAYA VERTIKAL/AXIAL YANG BEKERJA (V)


BERAT TC+BERAT PONDASI 164,7 TON

KONTROL TERHADAP GAYA GESER


TEGANGAN AKIBAT BEBAN TERFAKTOR
P =V 98,82 TON
988,2 KN
𝑃
= 39,528 KN/m2
𝐴

GESER DUA ARAH


𝑉𝑣 = 𝐿 𝑥 𝐵 − 𝐶1 + 𝐶2 𝑥 845,8992 KN

𝐶1
𝐵𝑐 = 1
𝐶2

𝐵𝑜 = (C1 + C2) x 2 7,2 METER

2 1
𝑉𝑐 = 1 + 𝑥 𝑓𝑐 𝑥 𝐵𝑜 𝑥 𝑑 31.548.819 N
𝐵𝑐 6

31.548,82 KN
1
𝑉𝐶 = 𝑓𝑐 𝑥 𝐵𝑜 𝑥 𝑑 21032546,21 N
3

21.032,55 KN
𝑉𝐶 > 𝑉𝑣 AMAN
PERHITUNGAN TULANGAN POER
𝑀𝑉 = Momen yang bekerja x 60% 1113,6 KNm
b 5 METER

75+40
𝑑 = 1,6 - 1,485 METER
1000

𝑀𝑣
𝑅𝑛 = 126,2456212 KN/m2
0,8𝑏𝑑 2

0,126245621 N/mm2
𝑓𝑦
𝑚 = 20,39215686
0,85𝑓𝑐

1 2. 𝑚. 𝑅𝑛
𝜌𝑝𝑒𝑟𝑙𝑢 = 1 − 1− -0,945998413
𝑚 𝑓𝑦
ρ_perlu

0,7
𝜌𝑚𝑖𝑛 = 0,001346154
𝑓𝑦

𝜌𝑝𝑒𝑟𝑙𝑢 < 𝜌𝑚𝑖𝑛 dipakai 𝜌𝑚𝑖𝑛

As = P.b.d 9.995 mm2

tulangan D 19
1 2
𝐴= 𝜋𝑑 283,385 mm2
4

Jumlah Tulangan

𝐴𝑠
N= 35,2707 btg
𝐴

36 btg

Jarak Tulangan 138,8888889 mm


150 mm
Perhitungan Tulangan Puntir
𝑀𝑉 = Momen torsi x 60% 159 KNm
0,7
𝜌𝑚𝑖𝑛 = 0,001346154
𝑓𝑦

As = P.b.d 9.995 mm2

tulangan D 19

1
𝐴 = 𝜋𝑑 2 283,385 mm2
4

Jumlah Tulangan

𝐴𝑠
N= 35,2707 btg
𝐴

36 btg

Jarak Tulangan 138,8888889 mm


150 mm