BEBAN TC (BROSUR)
KONDISI DALAM KEADAAN OPERASI TON KNm
MOMEN BEKERJA 185,6 1856
GAYA HORIZONTAL 2,29 22,9
GAYA VERTIKAL 68,7 687
MOMEN TORSI 26,5 265
PERENCANAAN PONDASI TC
BERAT PONDASI 96000 KG
96 TON
𝐶1
𝐵𝑐 = 1
𝐶2
2 1
𝑉𝑐 = 1 + 𝑥 𝑓𝑐 𝑥 𝐵𝑜 𝑥 𝑑 31.548.819 N
𝐵𝑐 6
31.548,82 KN
1
𝑉𝐶 = 𝑓𝑐 𝑥 𝐵𝑜 𝑥 𝑑 21032546,21 N
3
21.032,55 KN
𝑉𝐶 > 𝑉𝑣 AMAN
PERHITUNGAN TULANGAN POER
𝑀𝑉 = Momen yang bekerja x 60% 1113,6 KNm
b 5 METER
75+40
𝑑 = 1,6 - 1,485 METER
1000
𝑀𝑣
𝑅𝑛 = 126,2456212 KN/m2
0,8𝑏𝑑 2
0,126245621 N/mm2
𝑓𝑦
𝑚 = 20,39215686
0,85𝑓𝑐
1 2. 𝑚. 𝑅𝑛
𝜌𝑝𝑒𝑟𝑙𝑢 = 1 − 1− -0,945998413
𝑚 𝑓𝑦
ρ_perlu
0,7
𝜌𝑚𝑖𝑛 = 0,001346154
𝑓𝑦
tulangan D 19
1 2
𝐴= 𝜋𝑑 283,385 mm2
4
Jumlah Tulangan
𝐴𝑠
N= 35,2707 btg
𝐴
36 btg
tulangan D 19
1
𝐴 = 𝜋𝑑 2 283,385 mm2
4
Jumlah Tulangan
𝐴𝑠
N= 35,2707 btg
𝐴
36 btg