B. Pekerjaan Dinding Bata Ringan Area R. Packing creamer Line 1&2 Torabika 5,513,832 C. Pekerjaan Dinding Sandwich Panel 393,321,000 D. Pekerjaan Spandex R. Free Flow Dosing 92,250,000 SUB TOTAL 512,084,832 JASA 7% 35,845,938 TOTAL 547,930,770 DIBULATKAN 547,930,000