Anda di halaman 1dari 5

RENCANA ANGGARAN BIAYA

Pekerjaan : Interior Coffe Toffee


Lokasi : Sangata

HARGA
NO URAIAN PEKERJAAN SPESIFIKASI VOLUME
SATUAN

A PEKERJAAN PERSIAPAN
1 Marking 1.00 Ls 500,000.00
2 Pembersihan Lokasi 1.00 Ls 500,000.00
4 Mobilisasi dan Demobilisasi 1.00 Ls 3,500,000.00
5 Akomodasi 1.00 Ls 3,000,000.00
B PEKERJAAN MEUBEL
1 Outlet Coffe Toffee Exclude blender box,Espresso machine,Knock box,Kulkas
Rak outlet Bahan multipleks fin.HPL Taco,Panjang 7,99M2 1.00 Set 22,430,000.00
Zink 1 Lobang bentuk persegi 45x45cm 1.00 Unit 700,000.00
Kran air 1.00 Unit 400,000.00
Instalasi listrik Kabel NYM 2x2,5 3x2,5 Eterna,Fitting ; Panasonic 7.00 Titik 200,000.00
Instalasi air Pipa PVC Ex.Wavin/setara 1.00 Ls 500,000.00
Pasang mozaik Mozaik 30x30cm ex.Bella / Venus 4.62 M2 850,000.00
Papan menu Bahan multipleks fin.HPL Taco,exclude sticker 5.00 Unit 170,000.00
2 Sofa Single Bahan suede/beludru ex.Amorist,rangka meranti 13.00 Unit 1,750,000.00
3 Sofa Duoble Bahan suede/beludru ex.Amorist,rangka meranti 5.00 Unit 2,500,000.00
4 Sofa Puff Bahan suede/beludru ex.Amorist,rangka meranti 9.00 Unit 500,000.00
5 Meja Sofa Bundar ± 90 cm 7.00 Unit 1,500,000.00
6 Meja Sofa Kotak Dimensi 80x50x50cm 3.00 Unit 1,000,000.00
7 Kursi Rotan 31.00 Unit 1,750,000.00
8 Meja Kaca 10.00 Unit 2,500,000.00
9 Rak Majalah & Merchand Bahan multipleks fin.HPL Taco,exclude sticker 1.00 Pcs 1,700,000.00
10 Condiment Cart Bahan multipleks fin.HPL Taco,exclude sticker 2.00 Pcs 2,205,000.00
11 Pembatas Tanaman Dimensi 60x20x40cm 5.00 Pcs 400,000.00
12 Backdrop Kaca Bahan multipleks fin.HPL Taco,exclude sticker,kaca 8mm clear 10.03 M2 550,000.00
C PEKERJAAN SEKAT & PLAFON
1 Sekat Gypsum 2 Sisi + Cat Hollo 4/4,2/4,papan gyp elepht/setara,cat ex.catilax/setara 42.40 M2 275,000.00
2 Plafon Drop Ceiling + Cat Hollo 4/4,2/4,papan gyp elepht/setara,cat ex.catilax/setara 139.62 M2 198,000.00
3 Ornamen Dinding gypsum Hollo 4/4,2/4,papan gyp elepht/setara,cat ex.catilax/setara 9.60 M2 275,000.00
RENCANA ANGGARAN BIAYA
Pekerjaan : Interior Coffe Toffee
Lokasi : Sangata

HARGA
NO URAIAN PEKERJAAN SPESIFIKASI VOLUME
SATUAN
4 Partisi Kaca Non Frame,kaca 10mm clear 71.21 M2 495,000.00
5 Pintu Kaca Frameles 10mm clear 3.00 M2 3,650,000.00
D PEKERJAAN INSTALASI LISTRIK
1 Titik Lampu, MCB & Stop Kontak Kabel NYM 2x2,5 3x2,5 Eterna,Fitting ; Panasonic 45.00 Titik 220,000.00
2 Downlight 5" 16.00 Unit 85,000.00
3 Neonstick Drop Ceiling 55.00 Unit 85,000.00
4 Instalasi AC Kabel NYM 3x2,5 Eterna,Fitting ; Panasonic 7.00 Titik 1,100,000.00
5 Instalasi Genset ex. German 1.00 Ls 3,850,000.00
E LAIN-LAIN
1 Laminate Floor & leveling ex.kendo,level floor with meranti wood and multipleks 27.50 M2 900,000.00
2 Wallcover Biji Kopi Laminate printed/wallpaper 20.00 M2 350,000.00
3 Sticker Sandblast Cutting sticker 23.53 M1 200,000.00
4 Poster Ukuran Besar 60x120cm 3.00 Lbr 120,000.00
5 Poster Ukuran Sedang 50x70cm 4.00 Lbr 170,000.00
6 Sticker Backdrop Kaca cuting sticker 4.69 M2 135,000.00
7 Neonbox Pintu Masuk Acrilic 5mm fin ducco cat backlight lampu TL,huruf t=45cm 1.00 Ls 8,500,000.00
8 Neonbox Bulat Coffe Toffe No Specification 1.00 Ls
9 Letter Timbul Outlet Acrilic 5mm fin ducco cat non backlight 1.00 Ls 2,000,000.00
10 Sticker Logo Coffe Toffe Di Outlet Digital print 1.00 Ls 550,000.00

TOTAL

Note : - Harga dapat berubah sesuai dengan perubahan spesifikasi dan volume
JUMLAH
(Rp)

500,000.00
500,000.00
3,500,000.00
2,500,000.00

22,430,000.00
700,000.00
400,000.00
1,400,000.00
500,000.00
3,927,000.00
850,000.00
22,750,000.00
12,500,000.00
4,500,000.00
10,500,000.00
3,000,000.00
54,250,000.00
25,000,000.00
1,700,000.00
4,410,000.00
2,000,000.00
5,516,500.00

11,660,000.00
27,644,760.00
2,640,000.00
JUMLAH
(Rp)
35,248,950.00
10,950,000.00

9,900,000.00
1,360,000.00
4,675,000.00
7,700,000.00
3,850,000.00

24,750,000.00
7,000,000.00
4,706,000.00
360,000.00
680,000.00
633,150.00
8,500,000.00

2,000,000.00
550,000.00

341,141,360.00
ALTERNATIF 1
NO URAIAN TOTAL
1 Pekerjaan A 7,000,000.00
2 Pekerjaan B 176,333,500.00
3 Pekerjaan C 88,143,710.00
4 Pekerjaan D 27,485,000.00
5 Pekerjaan E 49,179,150.00
TOTAL 348,141,360.00
PREDIKSI COST 232,094,240.00
MARGIN HOPE (50%) 116,047,120.00

ALTERNATIF 2 - Pekerjaan B & C di discount


NO URAIAN TOTAL
1 Pekerjaan A 7,000,000.00
2 Pekerjaan B 146,944,583.33
3 Pekerjaan C 73,453,091.67
4 Pekerjaan D 27,485,000.00
5 Pekerjaan E 49,179,150.00
TOTAL 304,061,825.00
PREDIKSI COST 232,094,240.00
MARGIN HOPE 71,967,585.00

ALTERNATIF 2 - harga paling aman


NO URAIAN TOTAL
1 Pekerjaan A 7,000,000.00
2 Pekerjaan B 135,641,153.85
3 Pekerjaan C 73,453,091.67
4 Pekerjaan D 27,485,000.00
5 Pekerjaan E 49,179,150.00
TOTAL 292,758,395.51
PREDIKSI COST 232,094,240.00
MARGIN HOPE 60,664,155.51

ALTERNATIF 4 - Banting harga


NO URAIAN TOTAL
1 Pekerjaan A 7,000,000.00
2 Pekerjaan B 135,641,153.85
3 Pekerjaan C 67,802,853.85
4 Pekerjaan D 27,485,000.00
5 Pekerjaan E 49,179,150.00
TOTAL 287,108,157.69
PREDIKSI COST 232,094,240.00
MARGIN HOPE 55,013,917.69