2 GALIAN TANAH
- Galian Biasa (Mekanik) 110.48 m3 27,344.00 3,020,965.12
3 PEKERJAAN PASANGAN
- Pasangan Batu Kali Camp. 1 PC:4 PP 261.83 m3 1,330,826.32 348,450,255.37
- Siar Mortar Jenis PC-PP Tipe S Camp. 1 PC:3 PP 344.39 m2 90,578.82 31,194,439.82
4 PEKERJAAN BETON
- Beton Mutu, f’c = 16,9 MPa (Molen) 11.07 m3 1,390,558.71 15,393,484.92
- Pembesian Besi Polos/Ulir 1424.37 kg 19,033.60 27,110,888.83
- Bekisting Beton Multiflex 12 - 18 mm (5 Kali Pakai) 21.46 m2 254,750.88 5,466,329.58
JUMLAH HARGA
PPN (10%)
TOTAL
DIBULATKAN