JUMLAH
No. URAIAN PEMASUKKAN TANGGAL HARGA
(Rp)
1 2 3 4
JUMLAH 1.185.000.000,00
TERBILANG:
REKAPITULASI SEMENTARA
JUMLAH
No. URAIAN BIAYA HARGA
(Rp)
1 2 3
B. BIAYA UPAH
BIAYA UPAH TUKANG
1 21/09/2019 Biaya Pengukuran 570.000
2 09/10/2019 ANGKUTAN KAYU 700.000
3 09/10/2019 Jasa Pemotongan kayu 1.896.500
4 26/10/2019 Upah Pekerjaan Drainase 1.200.000
5 26/10/2019 Upah Pekerjaan Bouplank 630.000
6 26/10/2019 Upah Pekerjaan Instalasi air 300.000
7 26/10/2019 Upah Pekerja Pekerjaan Instalasi listrik mess 200.000
8 26/10/2019 bang ajad (pemasangan meteran) 100.000
9 26/10/2019 gaji pak him 10 hari 500.000
10 26/10/2019 ops pak him 10 hari ( trasnpot) 250.000
11 28/10/2019 Jasa Potong Kayu Ibrahim 3.000.000
12 28/10/2019 Bayar Upah Kayu Pak Sawal 5.000.000
13 01/11/2019 Biaya Gaji dan Trasnport Pak Rahim 750.000
14 01/11/2019 biaya upah kayu dan konsumsi tukang (pak ibrahim) 800.000
15 02/11/2019 Biaya upah tukang 2.720.000
16 06/11/2019 Biaya untuk Pak Ibrahim 500.000
06/11/2019 Biaya ops pengawas 2x 50.000
17 09/11/2019 Upah Pekerja 5.190.000
12/11/2019 Biaya ops pengawas 2x 50.000
18 16/11/2019 Biaya Trasnportasi Pak A. Rahim (12 hari) 300.000
19 16/11/2019 Upah Pekerja 5.300.000
20 18/11/2019 Biaya ops pengawas 2x 50.000
21 20/11/2019 DP Pengeboran 4.000.000
22 23/11/2019 Biaya Trasnportasi Pak A. Rahim (6 hari) 150.000
23 23/11/2019 Upah Pekerja 5.580.000
24 23/11/2019 Bayar Bor Termin 2 2.500.000
25 27/11/2019 Pembayaran Pelunasan Bor 6.000.000
26 29/11/2019 biaya pekerjaan kayu 13.200.000
NO TANGGAL URAIAN SATUAN DEBIT
27 30/11/2019 Biaya Trasnportasi Pak A. Rahim (6 hari) 150.000
28 30/11/2019 Pembayaran Upah Tukang 5.380.000
29 02/12/2019 Gaji Pak Him 1.500.000
30 02/12/2019 Pembayaran Potong Kayu 5.000.000
31 07/12/2019 Biaya Trasnportasi Pak A. Rahim (6 hari) 150.000
32 07/12/2019 Pembayaran upah tukang 5.340.000
33 07/12/2019 Pembayaran potong kayu 8.000.000
34 10/12/2019 Pelunasan Pemotongan kayu 1.200.000
35 14/12/2019 Biaya Trasnportasi Pak A. Rahim (6 hari) 150.000
36 14/12/2019 Pembayaran upah tukang 5.230.000
37 21/12/2019 Biaya Trasnportasi Pak A. Rahim (6 hari) 150.000
38 21/12/2019 Pembayaran upah tukang 4.450.000
39 28/12/2019 pembayaran upah tukang 5.190.000
40 03/01/2020 Gaji Pak A. Rahim 1.500.000
41 03/01/2020 Fee Pak Ibrahim 1.000.000
42 04/01/2020 gaji tukang 5.160.000
43 11/01/2020 bayar upah tukang 5.430.000
44 11/01/2020 uang harian/mingguan 150.000
45 18/01/2020 bayar upah tukang 5.190.000
46 18/01/2020 uang harian/mingguan 150.000
47 25/01/2020 bayar upah tukang 5.430.000
48 25/01/2020 uang harian/mingguan 150.000
49 01/02/2020 gaji pak him 1.500.000
50 01/02/2020 bayar upah tukang 4.860.000
51 01/02/2020 bayar upah serkel kayu 1.900.000
52 01/02/2020 uang harian/mingguan 150.000
53 08/02/2020 bayar upah tukang 4.860.000
54 08/02/2020 bayar uang harian/ mingguan 150.000
55 15/02/2020 bayar upah tukang 2.460.000
56 15/02/2020 uang harian/mingguan 150.000
57 22/02/2020 bayar upah tukang 2.640.000
58 22/02/2020 uang harian atau mingguan 150.000
59 29/02/2020 bayar tukang 3.660.000
60 29/02/2020 uang harian atau mingguan 150.000
61 07/03/2020 gaji pak him 1.500.000
62 07/03/2020 bayar upah tukang 3.570.000
63 07/03/2020 bayar uang harian/ mingguan 150.000
64 14/03/2020 upah tukang 2.860.000
65 14/03/2020 uang harian atau mingguan 150.000
66 21/03/2020 bayar upah tukang 2.460.000
67 21/03/2020 uang harian atau mingguan 150.000
68 28/03/2020 bayar upah tukang 2.460.000
69 28/03/2020 uang harian atau mingguan 150.000
70 04/04/2020 gaji pak him 1.500.000
71 04/04/2020 bayar upah tukang 2.460.000
72 04/04/2020 bayar preskot upah kusen 1.000.000
73 04/04/2020 uang harian/ mingguan 150.000
74 11/04/2020 bayar upah kusen/persop 1.500.000
75 11/04/2020 bayar upah listrik ajad 1.200.000
76 11/04/2020 bayar upah tukang 2.880.000
77 11/04/2020 uang harian/ mingguan 150.000
78 18/04/2020 bayar perskot ajat 1.000.000
79 18/04/2020 bayar pelunasan kusen 2.660.000
80 18/04/2020 bayar upah tukang 2.880.000
81 18/04/2020 uang harian atau mingguan 150.000
82 25/04/2020 bayar upah tukang 2.500.000
83 25/04/2020 bayar uang harian/ mingguan 150.000
84 02/05/2020 gaji pak him 1.500.000
85 02/05/2020 bayar upah tukang 3.000.000
86 02/05/2020 bayar uang harian/ mingguan 150.000
87 09/05/2020 bayar tukang 2.910.000
88 16/05/2020 gaji tukang 2.890.000
89 16/05/2020 bayar uang harian/ mingguan 150.000
90 21/05/2020 gaji tukang 2.000.000
91 21/05/2020 bayar uang harian/ mingguan 150.000
92 06/06/2020 upah tukang 3.840.000
93 06/06/2020 upah pak him 1.000.000
TOTAL 201.386.500