JADWAL PENYELESAIAN SISA PEKERJAAN CISUMDAWU SEKSI 3

Volume JULI 2020


No Item Item Pekerjaan Sub Kontraktor Unit Progres Sisa Keterangan
BQ Awal 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
DIVISI 6 DRAINASE
6.06(3) Saluran U, Tipe DS-3 m1 3,139.00 1,242.40 1,400.60
6.06(8) Saluran U, Tipe DS-8 m1 6,645.00 9,965.77 34.23
4,440.56 559.44
Saluran U, Tipe DS-13 m1 -
1,441.60 3,558.40
6.07(4) Saluran Pasangan Batu Mortar, Type DS-5 - 1,498.41 1.59
2,351.15 148.85
4,521.03 78.97
m1 1,194.74 305.26
2,527.59 172.41
361.64 1,138.36
989.35 210.65
Saluran U, Uk. 1,0 x 1,0 precast m1 2,478.00 590.40
DIVISI 9 PEKERJAAN PERKERASAN -
9.04 Bituminous Prime Coat m2 14,655.60 16,118.00 2,953.25
9.05 Bituminous Tack Coat m2 11,311.29 2,551.00 10,805.75
9.07(1) Asphalt Concrete - Base Course ton 3,076.39 1,405.35
9.07(2) Asphalt Concrete - Binder Course ton 3,370.79 1,056.75 1,184.12
9.07(3) Asphalt Concrete Wearing Course ton 2,612.01 535.20 198.50
9.08(1) Perkerasan Beton rigid m2 89,505.23 67,157.00 11,143.00
57,519.58 6,104.43
9.08(3) Perkerasan Beton single wiremesh m2 36,854.47 4,877.20 122.80
9.09 Wet Lean Concrete (t = 10 cm) m2 132,661.60 60,219.62 1,780.38
DIVISI 10 STRUKTUR BETON -
10.10(1) Sambungan Ekspansi Tipe A m1 215.20 83.31 114.69
Sambungan Ekspansi Tipe B m1 85.33 112.67
DIVISI 12 PEKERJAAN LAIN-LAIN -
12.01(1) Solid Sodding m2 336,828.62 75,855.71 4,144.29
7,500.00 -
63,897.65 11,102.35
Perlindungan Lereng dengan Blok Beton m2 1,120.00 834.08 83.92
1,619.52 73.48
Perlindungan Lereng dengan Pasangan Batu Kali m2 6,686.27 37.45
6,717.65 6.07
7,623.44 0.28
4,864.86 358.86
3,622.68 256.06
2,419.50 80.50
2,500.00 -
12.06(1) Guardrail m1 4,250.00 5,000.00 5,000.00
12.06(11) Bagian Ujung Guardrail buah 66.00 33.00 33.00
12.07(1) Rambu Pengaturan dan Peringatan, Tipe A-1 buah 35.00 106.00
12.07(2) Rambu Pengaturan dan Peringatan, Tipe A-2 buah 20.00 14.00
12.07(3) Rambu Pengaturan dan Peringatan, Tipe B-1 buah 16.00 11.00
12.08(1) Rambu Petunjuk Tipe A-1 buah 3.00 22.00 2.00
12.08(3) Rambu Petunjuk Tipe A-3 buah 19.00 8.00 6.00
12.08(4) Rambu Petunjuk Tipe A-4 buah 2.00 2.00
12.08(10) Rambu Petunjuk Tipe C buah 4.00 3.00 1.00
12.09(1) Marka Jalan, Tipe A m2 3,902.46 4,913.01
12.09(4) Rumble Strip configuration t = 10 mm m2 139.20 139.20
12.12(1) Kerb Beton Tipe A buah 940.60 900.00 850.00
12.15(1) Concrete Barrier tipe A m1 882.00 330.50 48.50
83.00 -
12.15(2) Concrete Barrier tipe B m1 4,050.00 2,926.00 1,840.00
12.19(5) Patok Kilometer buah 27.00 27.00
12.20(1) Pagar Rumija, Tipe 1 (Panel Beton) m1 10,679.00 3,440.00 1,560.00
5,482.40 17.60
1,022.50 477.50
12.22 Shotcrete m2 - 6,265.07 2.88

Sumedang, 30 Juni 2020

Ekwan Yulianto, ST
General Manager