RENCANA KEBUTUHAN ANGGARAN BIAYA ( URGENT )

BIAYA PRODUKSI PASIR COR CIDADAP

NO URAIAN SATUAN VOLUME HARGA JUMLAH JUMLAH


SATUAN HARGA TOTAL

A BIAYA PRODUKSI
1 SEWA EXCAVATOR termasuk MOB de Mob Bulan 1,0 50.000.000 50.000.000
2 HONOR OPERATOR EXAVATOR Unit 1,0 8.750.000 8.750.000
3 BON BORONGAN MESIN SEDOT Ls 1,0 112.000.000 112.000.000
4 SOLAR INDUSTRI Lt 5.000,0 9.000 45.000.000
5 BIAYA KOORDINASI Ls 1,0 12.000.000 12.000.000
6 BIAYA KONSESI KE DESA Ls 1,0 74.909.400 74.909.400
7 INFRA KANTOR Ls 1,0 30.000.000 30.000.000
8 INFRA PENUNJANG Ls 1,0 30.000.000 30.000.000
9 GAJI KARYAWAN LS 1,0 32.500.000 32.500.000
10 BON BIAYA OPERASIONAL PENGELOLA LS 1,0 20.000.000 20.000.000
11 KAS KECIL LS 1,0 10.000.000 10.000.000
Jumlah 425.159.400

B BIAYA LAIN - LAIN


1 PEMBAYARAN SISA KEWAJIBAN KE LS 1,0 97.000.000 97.000.000
PENAMBANG / P NUNU Cs
Jumlah 97.000.000

JUMLAH TOTAL 522.159.400

JUMLAH TOTAL DIBULATKAN 523.000.000