Action Plan 10 July
Action Plan 10 July
Hari : Kamis
Tanggal : 9 Juli 2020
Lokasi : Harrach - Baraki
2 Pekerjaan Cat Interior ramdan T5 Zakaria 4 Vynil, Laque (Sub) Ada Pekerjaan Cat Interior Naufal 3,5 Mokadem Rabah 6 Vynil, Laque (Sub) Ada Pekerjaan Plester Interior Sunar 17 Heta Building 5 Semen (wika), pasir (sub) Ada
3 Pekerjaan Cat Griffi Fasad ramdan T5 Yakoub 3 Grifee (Sub) Ada Pekerjaan Cat Exterior Naufal T3,4 Mokadem Rabah 6 Grifee (Sub) Ada Pekerjaan Plester Interior Sunar 15 Heta Building 5 Semen (wika), pasir (sub) Ada
4 Pekerjaan Instalasi Listrik Zaldy T17 & T18 S.I.C.G 10 Kabel Accessories (Wika) ada Pekerjaan Plester Exterior Fasad Sunar 13 Heta Building 3 Semen (wika), pasir (sub) Ada
5 Pekerjaan Bata Adji 33 Abdelkader 6 Bata (Sub) Ada Pekerjaan Pasang Bata Joko 23 Heta Building 6 Bata (Sub) Ada
6 Pekerjaan PPR Zaldy T4 S.I.C.G 7 Pipa (Wika) Tidak ada Pekerjaan Cat Eksterior Joko 24 Mokadem Rabah 5 Grifee (Sub) Ada
7 Pekerjaan Instalasi Listrik Zaldy T13 S.I.C.G 5 Alat Bor ada Pekerjaan Taskforce persiapan pek.pintu Andri 19 TS Daud 5 Fixator (Wika) Ada
No. SUBKON HARRACH JUMLAH SUBKON BARAKI 1 JUMLAH SUBKON BARAKI 2 JUMLAH NO LOKASI JUMLAH