L'ENTREPRISE

SCHEDULE HARIAN EL-HARRACH

DURASI MANPOWER SEPTEMBER OKTOBER


TOWER ITEM PEKERJAAN KET. QTY. TOTAL DURASI
(HARI) Tukang Kenek 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
ARCH Pekerjaan Pintu Hunian + Pintu Masuk Unit 2 8 4 Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Kitchen Table 1 Supplier Per Lantai 6 6 RDC 1 2 3 4 5
MEP Pekerjaan Instalasi Pipa Gas 2 Subkon Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
01 ARCH Pekerjaan Cat Interior 3 4 2 Per Lantai 6 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
MEP Pekerjaan Tangki Air 1 1 1 Per Tower 1 1
MEP Pekerjaan Instalasi Bak Kontrol 3 1 2 Per Tower 1 3
ARCH Pekerjaan Cat Eksterior 14 Subkon Per Tower 1 14
ARCH Pekerjaan Pintu Hunian + Pintu Masuk Unit 2 8 4 Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
MEP Pekerjaan Instalasi Pipa Gas 3 Subkon Per Lantai 6 18 RDC RDC 1 1 2 2 3 3 4 4 5 5
02 MEP Pekerjaan Tangki Air 1 1 1 Per Tower 1 1
MEP Pekerjaan Instalasi Bak Kontrol 3 1 2 Per Tower 1 3
ARCH Pekerjaan Cat Eksterior 14 Subkon Per Tower 1 14
ARCH Pekerjaan Etancheite 12 Subkon Per Tower 1 12
ARCH Pekerjaan Marmer Tangga 2 2 2 Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Pintu Jendela PVC 2 8 4 Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
MEP Pekerjaan Instalasi Pipa Air Bersih 4 2 2 Per Lantai 3 12 3 3 3 3 4 4 4 4 5 5 5 5
ARCH Pekerjaan Kitchen Table 1 Supplier Per Lantai 6 6 RDC 1 2 3 4 5
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 3 2 2 Per Lantai 6 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
03
ARCH Pekerjaan Pintu Hunian + Pintu Masuk Unit 2 8 4 Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
MEP Pekerjaan Instalasi Pipa Gas 2 Subkon Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Cat Interior 3 4 2 Per Lantai 6 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
MEP Pekerjaan Tangki Air 1 1 1 Per Tower 1 1
MEP Pekerjaan Instalasi Bak Kontrol 3 1 2 Per Tower 1 3
ARCH Pekerjaan Cat Eksterior 14 Subkon Per Tower 1 14
ARCH Pekerjaan Etancheite 12 Subkon Per Tower 1 12
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 4 16 8 Per Lantai 6 24 RDC RDC RDC RDC 1 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5
ARCH Pekerjaan Marmer Tangga 2 2 2 Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Pintu Jendela PVC 2 8 4 Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 4 2 2 Per Lantai 6 24 RDC RDC RDC RDC 1 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5
ARCH Pekerjaan Kitchen Table 1 Supplier Per Lantai 6 6 RDC 1 2 3 4 5
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 3 1 1 Per Lantai 6 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
04
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 3 2 2 Per Lantai 6 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Pintu Hunian + Pintu Masuk Unit 2 8 4 Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
MEP Pekerjaan Instalasi Pipa Gas 2 Subkon Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Cat Interior 3 4 2 Per Lantai 6 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
MEP Pekerjaan Tangki Air 1 1 1 Per Tower 1 1
MEP Pekerjaan Instalasi Bak Kontrol 3 1 2 Per Tower 1 3
ARCH Pekerjaan Cat Eksterior 14 Subkon Per Tower 1 14
ARCH Pekerjaan Etancheite 12 Subkon Per Tower 1 12
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 4 16 8 Per Lantai 3 12 RDC RDC RDC RDC 1 1 1 1 2 2 2 2
ARCH Pekerjaan Marmer Tangga 2 2 2 Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Pintu Jendela PVC 2 8 4 Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 4 2 2 Per Lantai 6 24 RDC RDC RDC RDC 1 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5
ARCH Pekerjaan Kitchen Table 1 Supplier Per Lantai 6 6 RDC 1 2 3 4 5
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 3 1 1 Per Lantai 6 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
05
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 3 2 2 Per Lantai 6 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Pintu Hunian + Pintu Masuk Unit 2 8 4 Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
MEP Pekerjaan Instalasi Pipa Gas 2 Subkon Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Cat Interior 3 4 2 Per Lantai 6 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
MEP Pekerjaan Tangki Air 1 1 1 Per Tower 1 1
MEP Pekerjaan Instalasi Bak Kontrol 3 1 2 Per Tower 1 3
ARCH Pekerjaan Cat Eksterior 14 Subkon Per Tower 1 14
ARCH Pekerjaan Etancheite 12 Subkon Per Tower 1 12
ARCH Pekerjaan Marmer Tangga 2 2 2 Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Pintu Jendela PVC 2 8 4 Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Kitchen Table 1 Supplier Per Lantai 6 6 RDC 1 2 3 4 5
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 3 2 2 Per Lantai 6 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
06 ARCH Pekerjaan Pintu Hunian + Pintu Masuk Unit 2 8 4 Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
MEP Pekerjaan Instalasi Pipa Gas 2 Subkon Per Lantai 6 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Cat Interior 3 4 2 Per Lantai 6 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
MEP Pekerjaan Tangki Air 1 1 1 Per Tower 1 1
MEP Pekerjaan Instalasi Bak Kontrol 3 1 2 Per Tower 1 3
ARCH Pekerjaan Cat Eksterior 14 Subkon Per Tower 1 14
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Dinding Bata 24 Subkon Per Tower 1 24 RDC RDC RDC RDC RDC RDC RDC 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4 4 4 4 4 5 5 5 5 5 5 5
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
07
ARCH Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
MEP Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
STR Pekerjaan Tunnel Formwork 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Dinding Bata 42 Subkon Per Tower 1 42 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4 4 4 4 4 5 5 5
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10
08
L'ENTREPRISE

SCHEDULE HARIAN EL-HARRACH

DURASI MANPOWER SEPTEMBER OKTOBER


TOWER ITEM PEKERJAAN KET. QTY. TOTAL DURASI
(HARI) Tukang Kenek 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
08
ARCH Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12
MEP Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
09
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
10
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
11
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
12
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Dinding Bata 35 Subkon Per Tower 1 35 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4 4 4 4 4 5 5 5 5 5 5 5
ARCH Pekerjaan Platre+Enduit 47 Subkon Per Tower 1 47 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
ARCH Pekerjaan Plester Interior 47 Subkon Per Tower 1 47 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
ARCH Pekerjaan Plester Eksterior 17 Subkon Per Tower 1 17 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 40 Subkon Per Tower 1 40 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
ARCH Pekerjaan Pintu Jendela PVC 20 Subkon Per Tower 1 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
13 MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 20 Subkon Per Tower 1 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
MEP Pekerjaan Instalasi Pipa Gas 20 Subkon Per Tower 1 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2 3 4 5 6 7 8 9 10 11 12 13
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
14
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
L'ENTREPRISE

SCHEDULE HARIAN EL-HARRACH

DURASI MANPOWER SEPTEMBER OKTOBER


TOWER ITEM PEKERJAAN KET. QTY. TOTAL DURASI
(HARI) Tukang Kenek 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
ARCH Pekerjaan Dinding Bata 7 Subkon Per Tower 1 30 1 1 1 1 1 1 1
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
15 MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 3 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 18 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 14 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Dinding Bata 35 Subkon Per Tower 1 35 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4 4 4 4 4 5 5 5 5 5 5 5
ARCH Pekerjaan Platre+Enduit 47 Subkon Per Tower 1 47 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
ARCH Pekerjaan Plester Interior 47 Subkon Per Tower 1 47 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
ARCH Pekerjaan Plester Eksterior 17 Subkon Per Tower 1 17 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 40 Subkon Per Tower 1 40 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
ARCH Pekerjaan Pintu Jendela PVC 20 Subkon Per Tower 1 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
16 MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 20 Subkon Per Tower 1 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
MEP Pekerjaan Instalasi Pipa Gas 20 Subkon Per Tower 1 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2 3 4 5 6 7 8 9 10 11 12 13
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Dinding Bata 35 Subkon Per Tower 1 35 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4 4 4 4 4 5 5 5 5 5 5 5 6 6 6 6 6 6 6 7 7 7 7 7 7 7 8 8 8 8 8 8 8
ARCH Pekerjaan Platre+Enduit 47 Subkon Per Tower 1 47 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Interior 47 Subkon Per Tower 1 47 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 17 Subkon Per Tower 1 17 1 2
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 40 Subkon Per Tower 1 40 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
ARCH Pekerjaan Pintu Jendela PVC 20 Subkon Per Tower 1 20 1 2 3 4
17 MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 20 Subkon Per Tower 1 20 1 2 3 4
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 24 Subkon Per Tower 1 24 1 2
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 24 Subkon Per Tower 1 24 1 2
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 24 Subkon Per Tower 1 24 1 2
MEP Pekerjaan Instalasi Pipa Gas 20 Subkon Per Tower 1 20 RDC RDC 1 1
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3
ARCH Pekerjaan Cat Interior 30 Subkon Per Tower 1 30 RDC RDC RDC 1 1 1 2 2 2 3
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Dinding Bata 14 Subkon Per Tower 1 14 1 1 1 1 1 1 1 2 2 2 2 2 2 2
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
18 MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2 3 4 5 6 7 8 9 10 11 12 13
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
19
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 18 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 12 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 3 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Dinding Bata 35 Subkon Per Tower 1 35 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4 4 4 4 4 5 5 5 5 5 5 5 6 6 6 6 6 6 6 7 7 7 7 7 7 7 8 8 8 8 8 8 8
ARCH Pekerjaan Platre+Enduit 47 Subkon Per Tower 1 47 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Interior 47 Subkon Per Tower 1 47 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 17 Subkon Per Tower 1 17 1 2
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 40 Subkon Per Tower 1 40 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
ARCH Pekerjaan Pintu Jendela PVC 20 Subkon Per Tower 1 20 1 2 3 4
20 MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 20 Subkon Per Tower 1 20 1 2 3 4
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 24 Subkon Per Tower 1 24 1 2
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 24 Subkon Per Tower 1 24 1 2
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 24 Subkon Per Tower 1 24 1 2
MEP Pekerjaan Instalasi Pipa Gas 20 Subkon Per Tower 1 20 RDC RDC 1 1
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3
ARCH Pekerjaan Cat Interior 30 Subkon Per Tower 1 30 RDC RDC RDC 1 1 1 2 2 2 3
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Dinding Bata 21 Subkon Per Tower 1 21 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10
L'ENTREPRISE

SCHEDULE HARIAN EL-HARRACH

DURASI MANPOWER SEPTEMBER OKTOBER


TOWER ITEM PEKERJAAN KET. QTY. TOTAL DURASI
(HARI) Tukang Kenek 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
21 MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2 3 4 5 6 7 8 9
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
22
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
23
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Dinding Bata 7 Subkon Per Tower 1 7 1 1 1 1 1 1 1
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
24 MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Eksterior 14 Subkon Per Tower 1 14 1 2 3 4 5 6 7 8 9
STR Pekerjaan Tunnel Formwork 34 Subkon Per Tower 1 34 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
ARCH Pekerjaan Dinding Bata 42 Subkon Per Tower 1 42 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4 4 4 4 4 5 5
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9
25
MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1
STR Pekerjaan Radier 6 Subkon Per Tower 1 6 1 2 3 4 5 6
26
STR Pekerjaan Tunnel Formwork 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9
STR Pekerjaan Galian 20 Subkon Per Tower 1 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
STR Pekerjaan BP 1 Subkon Per Tower 1 1 1
27
STR Pekerjaan Radier 6 Subkon Per Tower 1 6 1 2 3 4 5 6
STR Pekerjaan Tunnel Formwork 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7
STR Pekerjaan Tunnel Formwork 34 Subkon Per Tower 1 34 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
ARCH Pekerjaan Dinding Bata 42 Subkon Per Tower 1 42 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4 4 4 4 4
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7
28
MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC
STR Pekerjaan Tunnel Formwork 54 Subkon Per Tower 1 54 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54
ARCH Pekerjaan Dinding Bata 24 Subkon Per Tower 1 24 RDC RDC RDC RDC RDC RDC RDC 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4 4 4 4 4 5
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12
L'ENTREPRISE

SCHEDULE HARIAN EL-HARRACH

DURASI MANPOWER SEPTEMBER OKTOBER


TOWER ITEM PEKERJAAN KET. QTY. TOTAL DURASI
(HARI) Tukang Kenek 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8
29
ARCH Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12
MEP Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC
STR Pekerjaan Tunnel Formwork 52 Subkon Per Tower 1 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
ARCH Pekerjaan Dinding Bata 24 Subkon Per Tower 1 24 RDC RDC RDC RDC RDC RDC RDC 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3
30
ARCH Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12
MEP Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18
STR Pekerjaan Tunnel Formwork 43 Subkon Per Tower 1 43 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
ARCH Pekerjaan Dinding Bata 24 Subkon Per Tower 1 24 RDC RDC RDC RDC RDC RDC RDC 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12
31
ARCH Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12
MEP Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Dinding Bata 42 Subkon Per Tower 1 42 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4 4 4 4 4 5 5 5 5 5 5 5 6 6 6 6 6 6 6
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
32 MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Dinding Bata 42 Subkon Per Tower 1 42 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4 4 4 4 4 5 5 5 5 5 5 5 6 6 6 6 6 6 6
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
33 MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Dinding Bata 42 Subkon Per Tower 1 42 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4 4 4 4 4 5 5 5 5 5 5 5 6 6 6 6 6 6 6
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
34 MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2
MEP Pekerjaan Etancheite 14 Subkon Per Tower 1 14
ARCH Pekerjaan Dinding Bata 42 Subkon Per Tower 1 42 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4 4 4 4 4 5 5 5 5 5 5 5 6 6 6 6 6 6 6
ARCH Pekerjaan Platre+Enduit 30 Subkon Per Tower 1 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ARCH Pekerjaan Plester Interior 28 Subkon Per Tower 1 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
ARCH Pekerjaan Plester Eksterior 10 Subkon Per Tower 1 10 1 2 3 4 5 6 7 8 9 10
ARCH Pekerjaan Keramik Lantai, Dinding dan Marmer Threshold 24 Subkon Per Tower 1 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ARCH Pekerjaan Pintu Jendela PVC 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
35 MEP Pekerjaan Pintu Hunian + Pintu Masuk Unit 12 Subkon Per Tower 1 12 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Instalasi Pipa dan Aksesoris Air Dingin dan Hangat 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Aksesoris Listrik (Saklar, Stop Kontak, Fitting, Lampu, MCB) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Sanitare (Bathtub, Closet, Wastafel, Kran) 18 Subkon Per Tower 1 18 1 2 3 4 5 6 7 8 9 10 11 12
MEP Pekerjaan Instalasi Pipa Gas 12 Subkon Per Tower 1 12 RDC RDC 1 1 2 2 3 3 4 4 5 5
L'ENTREPRISE

SCHEDULE HARIAN EL-HARRACH

DURASI MANPOWER SEPTEMBER OKTOBER


TOWER ITEM PEKERJAAN KET. QTY. TOTAL DURASI
(HARI) Tukang Kenek 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
ARCH Pekerjaan Instalasi Bak Kontrol 3 Subkon Per Tower 1 3 1 2 3
ARCH Pekerjaan Cat Interior 18 Subkon Per Tower 1 18 RDC RDC RDC 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5
ARCH Pekerjaan Cat Interior 14 Subkon Per Tower 1 14 1 2
STR Pekerjaan Galian 20 Subkon Per Tower 1 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
36 STR Pekerjaan BP 1 Subkon Per Tower 1 1 1
STR Pekerjaan Radier 6 Subkon Per Tower 1 6 1 2 3 4 5 6
STR Pekerjaan Galian 20 Subkon Per Tower 1 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
37 STR Pekerjaan BP 1 Subkon Per Tower 1 1 1
STR Pekerjaan Radier 6 Subkon Per Tower 1 6
38 STR Pekerjaan Tunnel Formwork 50 Subkon Per Tower 1 50 1 2 3 4 5
39 STR Pekerjaan Tunnel Formwork 50 Subkon Per Tower 1 50 1 2 3 4 5