Pekerjaan :
PEMBANGUNAN SPAM DI KAWASAN RAWAN AIR KWS. KILWARU, KAB. SERAM BAGIAN TIMUR
Lokasi :
KWS. KILWARU, KAB. SERAM BAGIAN TIMUR
Disetujui Oleh :
Kepala Satuan Kerja Pengembangan Sistem
Penyediaan Air Minum Provinsi Maluku
SATUAN
SATUAN KERJA
KERJA SISTYM
SISTEM
PENYEDIAAN
PENYEDIAAN AIR
AIRMINUM
MINUM
PROVINSIMALUKU
PROVINSI MALUKU
LAUT Output
LAUT
LAUT
LAUT
SATKER
LAUT
LAUT
LAUT
LAUT KEMENTERIAN PU & PR
DIREKTORAT JENDERAL CIPTA KARYA
SATUAN KERJA PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM PROVINSI MALUKU
Jl. D. I. Pandjaitan No. 2, Telp. (0911) 315060 - Ambon
Sub Output
LAUT Lokasi
LAUT
DESA KILWARU
KAB. SERAM BAGIAN TIMUR
Direncanakan
PSPAM
DESA KILWARU
L A UT
L A UT
LAUT PULAU SERAM LAUT PROVINSI MALUKU
L A UT
PVC Ø 63mm
L = 270M'
LAUT
PVC Ø 63mm
L = 270M'
Diperiksa
L A UT
PVC Ø 63mm
L = 270M' PVC Ø 63mm
L = 270M'
L A UT
PVC Ø 63mm
L = 270M'
L A UT
PERENCANA
L A UT
L A UT
L A UT
PVC Ø 63mm
L = 270M'
L A UT
PVC Ø 63mm
L A UT L = 270M'
PVC Ø 63mm MESJID
L = 270M'
PVC Ø 63mm
L = 270M'
PVC Ø 63mm
L = 270M'
LORDY. F. de Wanna, ST. MT
L A UT
L A UT
PVC Ø 63mm
L = 270M'
INTAKE
L A UT
RESERVOIR KAP. 50 M3
L = 270M'
± 140 M'
Kepala Satuan Kerja
DESA NAMALOMIN
PVC Ø 63mm
L = 270M'
LAUT
LAUT
LAUT
LAUT
Output
KEMENTERIAN PU & PR
DIREKTORAT JENDERAL CIPTA KARYA
SATUAN KERJA PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM PROVINSI MALUKU
Jl. D. I. Pandjaitan No. 2, Telp. (0911) 315060 - Ambon
Sub Output
DESA KILWARU
KAB. SERAM BAGIAN TIMUR
GIP Ø 75 mm
L = 900 M'
Direncanakan
RENC.
PSPAM
GIP Ø 100 mm
RESERVOIR KAP. 50 M3 PROVINSI MALUKU
± 140 M'
L = 180 M'
DESA NAMALOMIN
Diperiksa
PERENCANA
GIP Ø 75 mm
L = 240 M'
REDUCER
GIP Ø 100 mm - GIP Ø 75 mm
LORDY. F. de Wanna, ST. MT
NIP. 19730218 200801 1 008
Mengetahui / Menyetujui
KETERANGAN
Kepala Satuan Kerja
Pengembangan Sistim Penyediaan
Air Minum Provinsi Maluku
GIP Ø 100 mm = 180 M'
GIP Ø 75 mm = 240 M'
GIP Ø 75 mm = 900 M' (T. SURYA)
GIP Ø 50 mm = 300 M'
HDPE Ø 90 mm = 400 M'
PVC Ø 63 mm = 1.200 M' A. L. LABOBAR, ST, Msi
PVC Ø 50 mm = 900 M' NIP. 19650402 199403 2 008
KETERANGAN
KEMENTERIAN PU & PR
= RENC. RESERVOIR KAP. 50 M3 DIREKTORAT JENDERAL CIPTA KARYA
-1 UNIT SATUAN KERJA PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM PROVINSI MALUKU
Jl. D. I. Pandjaitan No. 2, Telp. (0911) 315060 - Ambon
Lokasi
DESA KILWARU
KAB. SERAM BAGIAN TIMUR
Direncanakan
LAUT
PSPAM
HDPE Ø 90 mm PROVINSI MALUKU
L = 400 M'
Diperiksa
PERENCANA
LAUT
KEMENTERIAN PU & PR
PVC Ø 50 mm
L = 100 M' KU DIREKTORAT JENDERAL CIPTA KARYA
SATUAN KERJA PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM PROVINSI MALUKU
Jl. D. I. Pandjaitan No. 2, Telp. (0911) 315060 - Ambon
PVC Ø 63 mm
L = 270 M'
Sub Output
KU
LAUT
PEMBANGUNAN SPAM DI KAWASAN
PVC Ø 63 mm RAWAN AIR KWS. KILWARU
L = 100 M' PVC Ø 50 mm
L = 60 M'
KU LAUT
Lokasi
DESA KILWARU
PVC Ø 63 mm KU KAB. SERAM BAGIAN TIMUR
L = 150 M'
LAUT
Direncanakan
PVC Ø 50 mm
L = 380 M' LAUT
KU PSPAM
PVC Ø 63 mm
L = 90 M'
PROVINSI MALUKU
KU
LAUT KU
PVC Ø 50 mm LAUT Diperiksa
L = 90 M'
PVC Ø 63 mm PERENCANA
L = 90 M'
PVC Ø 63 mm
L = 100 M' PVC Ø 50 mm
L = 90 M'
REKAPITULASI
SATUAN KERJA : PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN SPAM DI KAWASAN RAWAN AIR KWS. KILWARU, KAB. SERAM BAGIAN TIMUR
LOKASI : KWS. KILWARU, KAB. SERAM BAGIAN TIMUR
TAHUN ANGG. : 2016
JUMLAH HARGA
NO URAIAN PEKERJAAN
( Rp. )
III. PENGAD./PEMAS. PIPA DAN ACCESSORIES GIP dia. 100 MM Sep. = 1.020 M' Rp. 446,390,258.69
IV. PENGAD./PEMAS. PIPA DAN ACCESSORIES GIP dia. 75 MM Sep. = 1.500 M' Rp. 427,500,714.82
V. PENGAD./PEMAS. PIPA DAN ACCESSORIES GIP dia. 50 MM Sep. = 2.070 M' Rp. 495,208,355.14
HARGA JUMLAH
No. URAIAN PEKERJAAN SAT VOL SATUAN HARGA
( Rp.) ( Rp.)
1 Pekerjaan Persiapan
1 Pembersihan Seluruh Lokasi Pekerjaan LS 1.00 2,000,000.00 2,000,000.00
2 Pengukuran dan Pemasangan Bouwplak LS 1.00 750,000.00 750,000.00
3 Mobilisasi Demobilisasi Peralatan dan Bahan-Bahan LS 1.00 21,862,000.00 21,862,000.00
24,612,000.00
2 Pekerjaan Tanah
1 Galian Tanah M3 10.36 25,920.00 268,531.20
2 Timbunan Tanah Kembali M3 2.09 12,426.00 25,970.34
3 Timbunan Pasir diBawah Pondasi M3 2.80 529,560.00 1,482,768.00
1,777,269.54
3 Pek. Pasangan Batu Kali, Beton Plesteran dan Pengecatan
1 Pasangan Batu Kosong M3 5.76 486,000.00 2,799,360.00
2 Pasang Batu Kali camp. 1pc : 4ps M3 6.95 980,849.00 6,818,862.25
3 Pengecoran Slof, Kolom dan Rring balok Camp 1 : 1,5 : 2,5 ( 110 kg/M3 ) M3 0.90 7,098,675.26 6,388,807.73
4 Pengecoran Dinding Camp, 1 : 1,5 : 2,5 ( 110 Kg / M3 ) M3 2.20 7,098,675.26 15,617,085.57
5 Pengecoran Lantai Camp 1 : 1,5 : 2,5 ( 85 kg/M3 ) M3 1.71 5,981,225.26 10,227,895.19
6 Pengecoran Plat Penutup Camp 1 : 2 : 3 ( 85 kg/M3 ) M3 1.11 5,981,225.26 6,639,160.04
7 Beton Rabat camp 1pc : 3ps : 5kr M3 0.78 1,452,846.00 1,133,219.88
8 Plesteran Dinding Camp : 1pc : 3ps M2 112.00 31,512.90 3,529,444.80
9 Acian Dinding luar dan dalam bak M2 72.69 14,845.00 1,079,083.05
10 Pengecatan Broncatering M2 33.12 33,702.00 1,116,210.24
55,349,128.76
4 Pek. Pengadaan Pemasangan Pipa dan Accessories
1 Pipa Inlet dan Outlet GIP Medium dia 100 MM M 6.00 377,479.42 2,264,876.54
2 Pipa Penguras dan Overflow GIP dia 100 mm M 6.00 377,479.42 2,264,876.54
3 Bend Flange GIP dia 100 mm x 90 drj Bh 2.00 210,000.00 420,000.00
4 Bend Flange GIP dia 100 mm x 45 drj Bh 2.00 210,000.00 420,000.00
5 Flange Las GIP dia 100 mm Bh 4.00 180,000.00 720,000.00
6 Gate Valve Flange dia 100 mm Bh 2.00 3,500,000.00 7,000,000.00
7 Paking Karet dia 100 mm Bh 2.00 30,000.00 60,000.00
8 Baut dan Moer dia 5/8" Bh 80.00 6,000.00 480,000.00
13,629,753.08
5 Pekerjaan Lain - lain
1 Manhole Plat = 3 mm 60 x 60 cm Unit 1.00 500,000.00 500,000.00
3 Pipa Vent dia 50 mm Unit 1.00 200,000.00 200,000.00
700,000.00
I. PENGUMPULAN
PEMBANGUNAN BRONCAPTERING KAP. 5 L/Det = 1 UNIT
1 Pekerjaan Persiapan Rp. 24,612,000.00
2 Pekerjaan Tanah Rp. 1,777,269.54
3 Pek. Pasangan Batu Kali, Beton Plesteran dan Pengecatan Rp. 55,349,128.76
4 Pek. Pengadaan Pemasangan Pipa dan Accessories Rp. 13,629,753.08
5 Pekerjaan Lain - lain Rp. 700,000.00
1 Pekerjaan Persiapan
1 Pengukuran dan Pemasangan Bouwplank LS 1.00 750,000.00 750,000.00
750,000.00
2 Pekerjaan Tanah
1 Galian Tanah Pond, Reservoir & Rumah Pengaman Gate Valve M3 23.51 27,400.00 644,064.40
2 Urugan Tanah Kembali M3 6.58 13,135.00 86,428.30
3 Urugan Pasir Dibawah Lantai Pondasi M3 4.79 408,850.00 1,957,217.89
2,687,710.59
3 Pekerjaan Pasangan Batu Kali / Karang & Batu Bata
1 Pas, Pondasi Batu Kali/Karang camp : 1pc : 4ps M3 25.66 750,171.00 19,250,888.20
2 Pas, Batu Bata Pengaman Rumah Gate Valve camp : 1pc : 4ps M3 2.20 750,171.00 1,648,875.86
3 Pas, Ventilasi Batu Angin 25 x 25 Cm Camp : 1pc : 4ps Bh 11.20 25,000.00 280,000.00
21,179,764.06
4 Pekerjaan Beton
1 Beton Tumbuk dibawah Lantai Reservoir, Rumah Pengaman Camp : 1 : 3 : 5 M3 12.00 1,160,604.00 13,927,248.00
2 Slof , Ring Balok dan Kolom Reservoir Camp : 1 : 1.5 : 2.5 ( 168 Kg/M3 ) M3 3.20 9,466,417.91 30,292,537.31
3 Pengecoran Plat Lantai Reservoir Camp : 1 : 1.5 : 2.5 ( 97 Kg/M3 ) M3 6.20 6,286,469.91 38,976,113.44
4 Pengecoran Plat Dinding Reservoir Camp : 1 : 1.5 : 2. 5 ( 120 Kg/M3 ) M3 12.75 7,316,593.91 93,296,815.58
5 Pengecoran Plat Penutup Reservoir Camp : 1 : 2 : 3 (168 kg/M3 ) M3 7.84 9,466,417.91 74,169,384.32
250,662,098.66
5 Pekerjaan Plesteran, Acian dan Pengecatan
1 Plesteran Dinding Luar, Dalam, Lantai & Plat Penutup Camp : 1pc : 3ps M2 304.57 21,240.50 6,469,219.09
2 Acian dinding Luar dan Dalam Reservoir M2 287.63 14,867.50 4,276,339.03
3 Pengecetan Diding Luar Reservoir dengan cat Auaprof 2x M2 207.49 34,005.00 7,055,833.47
17,801,391.58
6 Pekerjaan Pengadaan Pemasangan Pipa GIP dan Accesories
1 Pipa Inlet dia 100 MM M 6.00 404,411.46 2,426,468.77
2 Pipa Overflow & Penguras dia 100 MM M 6.00 377,479.42 2,264,876.54
3 Pipa Outlet dia 100 mm M 6.00 377,479.42 2,264,876.54
4 Tee GIP dia 100 mm x 100 mm Bh 1.00 195,000.00 195,000.00
5 Gate Valve Flange dia 100 mm Bh 2.00 3,000,000.00 6,000,000.00
6 Flange Las dia 100 mm Bh 4.00 180,000.00 720,000.00
7 Bend Socket Gip dia 100 mm x 90 drj Bh 2.00 210,000.00 420,000.00
8 Bend Socket Gip dia 100 mm x 45 drj Bh 2.00 210,000.00 420,000.00
9 Pipa vent dia 50 mm Unit 1.00 200,000.00 200,000.00
10 Kunci Gembok Bh 1.00 35,000.00 35,000.00
11 Pembuatan tangga kontrol Cor Besi Beton dia 22 mm Unit 1.00 1,000,000.00 1,000,000.00
12 Pembuatan manhole 60 cm x 60 cm Unit 4.00 500,000.00 2,000,000.00
17,946,221.85
7 Pekerjaan Kayu dan Pengecatan
1 Kusen Pintu Kayu Kls I Uk. 6 / 12 M3 0.16 4,750,000.00 760,000.00
2 Pintu Lapis Teakwood 3 mm M2 11.90 385,000.00 4,581,500.00
3 Kunci Tanam Dua Slag Bh 2.00 134,000.00 268,000.00
4 Enges Pintu 4" Psng 6.00 23,500.00 141,000.00
5 Pegecatan Kusen Pintu, Daun Pintu M2 11.04 112,000.00 1,236,480.00
6,986,980.00
1 PENGUMPULAN
PEMBANGUNAN RESERVOIR KAP. 100 M3 - 1 Unit
1 Pekerjaan Persiapan RP. 750,000.00
2 Pekerjaan Tanah RP. 2,687,710.59
3 Pekerjaan Pasangan Batu Kali / Karang & Batu Bata RP. 21,179,764.06
4 Pekerjaan Beton RP. 250,662,098.66
5 Pekerjaan Plesteran, Acian dan Pengecatan RP. 17,801,391.58
6 Pekerjaan Pengadaan Pemasangan Pipa GIP dan Accesories RP. 17,946,221.85
7 Pekerjaan Kayu dan Pengecatan RP. 6,986,980.00
III. PENGAD./PEMAS. PIPA DAN ACCESSORIES GIP dia. 100 MM Sep. = 1.020 M'
III. PENGUMPULAN
PENGAD./PEMAS. PIPA DAN ACCESSORIES GIP dia. 100 MM Sep. = 1.020 M'
1 PENGADAAN PIPA GIP DIA 100 MM DAN ACCES Rp. 338,395,900.00
2 PEMASANGAN PIPA DAN ACCESSORIES Rp. 106,299,690.22
3 PEKERJAAN LAIN - LAIN Rp. 1,694,668.47
IV. PENGAD./PEMAS. PIPA DAN ACCESSORIES GIP dia. 75 MM Sep. = 1.500 M'
a PENGADAAN PIPA
- Pipa GIP dia.75 mm M 1,500.00 191,500.00 287,250,000.00
287,250,000.00
b PENGADAAN ACCESSORIES
- Socket Gip dia 75 mm Bh 210.00 75,000.00 15,750,000.00
- Gate Valve GIP dia. 75 mm Bh 1.00 2,000,000.00 2,000,000.00
- Reducer GIP dia.75 mm x 50 mm Bh 4.00 102,500.00 410,000.00
- Bend GIP dia.75 mm x 90 drj Bh 4.00 130,000.00 520,000.00
- Bend GIP dia.75 mm x 45 drj Bh 2.00 130,000.00 260,000.00
- Tee GIP dia.75 x 75 mm Bh 2.00 150,200.00 300,400.00
- Water Moer 75 mm Bh 2.00 99,500.00 199,000.00
- Gilbaut Joint 75 mm Bh 2.00 112,500.00 225,000.00
19,664,400.00
2 PEMASANGAN PIPA DAN ACCESSORIES
IV. PENGUMPULAN
PENGAD./PEMAS. PIPA DAN ACCESSORIES GIP dia. 75 MM Sep. = 1.500 M'
1 PENGADAAN PIPA GIP DIA 75 MM DAN ACCESSORIES Rp. 306,914,400.00
2 PEMASANGAN PIPA DAN ACCESSORIES Rp. 118,893,916.50
3 PEKERJAAN LAIN - LAIN Rp. 1,692,398.32
a PENGADAAN PIPA
- Pipa GIP dia.50 mm M 2,070.00 159,000.00 329,130,000.00
329,130,000.00
b PENGADAAN ACCESSORIES
- Socket Gip dia 50 mm Bh 345.00 58,000.00 20,010,000.00
- Gate Valve dia.50 mm Bh 6.00 950,000.00 5,700,000.00
- Bend GIP dia.50 mm x 90 drj Bh 4.00 98,500.00 394,000.00
- Bend GIP dia.50 mm x 45 drj Bh 4.00 98,500.00 394,000.00
- Tee GIP dia.50 x 50 mm Bh 4.00 110,000.00 440,000.00
- Water Moer 50 mm Bh 2.00 59,150.00 118,300.00
- Gilbaut Joint 50 mm Bh 2.00 85,000.00 170,000.00
27,226,300.00
2 PEMASANGAN PIPA DAN ACCESSORIES
V. PENGUMPULAN
PENGAD./PEMAS. PIPA DAN ACCESSORIES GIP dia. 50 MM Sep. = 2.070 M'
1 PENGADAAN PIPA GIP DIA 50 MM DAN ACCESSORIES Rp. 356,356,300.00
2 PEMASANGAN PIPA DAN ACCESSORIES Rp. 131,009,853.92
3 PEKERJAAN LAIN - LAIN Rp. 7,842,201.23
1 Pekerjaan Persiapan
a Pengukuran dan pemasangan bouwplak Ls 1.00 1,500,000.00 1,500,000.00
1,500,000.00
2 Pekerjaan Tanah
a Galian tanah untuk pondasi hidran umum M3 4.70 27,400.00 128,780.00
b Urugan tanahkembali bekas galian M3 1.70 13,135.00 22,329.50
c Urugan pasir dibawah pondasi M3 1.94 452,850.00 880,340.40
1,031,449.90
3 Pekerjaan Pasangan Dan Beton
a Pasangan batu Kali camp 1 : 4 M3 2.06 750,171.00 1,545,352.26
b Pengecoran Lantai kerja camp 1 : 3 : 5 M3 0.40 1,160,604.00 464,241.60
c Pengecoran beton tumbuk camp 1 : 2 : 3 M3 0.40 1,135,076.00 454,030.40
d Pengecoran Plat lantai Dudukan tengki camp. 1 : 2 : 3 (K. 98 kg) M3 1.49 6,237,142.91 9,323,281.22
e Plesteran dinding pondasi dan lantai camp 1 ; 4 M2 13.60 16,086.20 218,772.32
12,005,677.80
4 Pekerjaan Pengadaan / Pemasangan Tangki Hidran Umum
a Pengadaan / Pemasangan Profil Tangki kap 2.000 Liter Unit 2.00 5,117,000.00 10,234,000.00
10,234,000.00
5 Pekerjaan Pengadaan / Pemasangan Pipa Dan Accessories
a Pengadaan / Pemasangan Pipa GIP dia 3/4" M 90.00 70,367.24 6,333,051.15
b Socket GIP dia 3/4" Bh 15.00 22,000.00 330,000.00
c Tee Socket GIP dia 3/4" Bh 2.00 28,000.00 56,000.00
d Kney GIP dia 3/4" Bh 16.00 28,000.00 448,000.00
e Nepel GIP dia 3/4" Bh 8.00 31,000.00 248,000.00
f Water Mur GIP dia 3/4" Bh 4.00 60,000.00 240,000.00
g Stop Kran Handel dia 3/4 mm Bh 8.00 60,000.00 480,000.00
h Gate Valve Socket dia 3/4 mm Bh 2.00 182,500.00 365,000.00
i Stop Kran Pelampung dia 3/4 mm Bh 2.00 61,500.00 123,000.00
8,623,051.15
6 Pekerjaan Akhir
a Pembersihan Terakhir Seluruh Lokasi Pekerjaan Ls 1.00 1,606,000.00 1,606,000.00
1,606,000.00
VII. PENGUMPULAN
PEMBANGUNAN KRAN UMUM SISTIM CABANG 10 UNIT
1 Pekerjaan Persiapan Rp. 1,500,000.00
2 Pekerjaan Tanah Rp. 1,031,449.90
3 Pekerjaan Pasangan Dan Beton Rp. 12,005,677.80
4 Pekerjaan Pengadaan / Pemasangan Tangki Hidran Umum Rp. 10,234,000.00
5 Pekerjaan Pengadaan / Pemasangan Pipa Dan Accessories Rp. 8,623,051.15
6 Pekerjaan Akhir Rp. 1,606,000.00