PEMERINTAH ACEH
DINAS BINA MARGA DAN DIPTA KARYA
SUMBER DANA : KEGIATAN DANA OTONOMI KHUSUS KAB. SIMEULUE DINAS BINA MARGA DAN CIPTA KARYA ACEH
: -
:
:
K ON TR AK TO R : PT . S EL AM AT JAY A AB ADI
KONSULTAN : PT. NUSVEY Ass. CV. ALPHA ENGINEERING CONSULTANT
LOKASI : KABUPATEN SIMUELUE
KONTRAK AWAL
HARGA SATUAN
NO. URAIAN SAT.
(Rp.) JUMLAH HARGA BOBOT
VOLUME VOLUME
(Rp.) (%)
DIVISI 1. UMUM
1.2 Mobilisasi Ls 50,100,000.00 1.00 50,100,000.00 0.689 1.00
DIVISI 2. DRAINASE 50,100,000.00 0.689 -
2 .1 Galia n U nt uk Selokan Draina se da n Saluran Air M³ 37,888.00 2,000.00 75,776,000.00 1.042 1,849.33
2 .3 .5 Goron g-go ro ng Pip a Baja Berge lo mb an g Ton 37,703,990.35 1.50 56,555,985.53 0.778 0.15
DIVISI 3. PEKERJAAN TANAH 132,331,985.53 1.820 -
3.1.1 Galian Biasa M³ 24,003.00 1,250.94 30,026,312.82 0.413 -
3.2.1 Timbunan Biasa M³ 71,022.00 2,000.00 142,044,000.00 1.953 511.46
3.2.2 Timbunan Pilihan M³ 106,227.00 1,221.83 129,791,335.41 1.785 2,900.74
3.3.1 Penyiapan Badan Jalan M² 2,922.00 27,900.00 81,523,800.00 1.121 25,840.15
DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN 383,385,448.23 5.272 -
4.2.2 Lapis Pondasi Agregat Klas B M³ 455,605.00 1,860.00 847,425,300.00 11.652 1,289.79
DIVISI 5. PERKERASAN BERBUTIR 847,425,300.00 11.652 -
5.1.1 Lapis Pondasi Agregat Klas A M³ 526,671.00 2,790.00 1,469,412,090.00 20.204 2,906.64
5.1.2 Lapis Pondasi Agregat Klas B M³ 449,249.00 3,720.00 1,671,206,280.00 22.979 3,875.52
DIVISI 6. PERKERASAN ASPAL 3,140,618,370.00 43.184 -
6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter 11,249.00 13,950.00 156,923,550.00 2.158 14,691.41
6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar) Ton 521,662.00 2,027.22 1,057,523,639.64 14.541 2,134.97
http://slide pdf.c om/re a de r/full/monthly-c e r tific a te -proye k-a c e h 1/10
6.3.8.a Aspal Ton 10,809,425.00 126.20 1,364,149,435.00 18.757 132.91
6 .3. 10 B ah an P en gi si ( Fi ll er ) Ta mb ah an Kg 1,206.85 41,371.98 49,929,774.06 0.687 43,570.79
KONTRAK AWAL
Keterangan
JUMLAH HARGA BOBOT
(Rp.) (%)
50,100,000.00 0.689
50,100,000.00 0.689
70,067,415.04 0.963
5,655,598.55 0.078
75,723,013.59 1.041
- -
36,324,772.13 0.499
308,136,907.98 4.237
75,504,918.30 1.038
419,966,598.41 5.775
587,634,772.95 8.080
587,634,772.95 8.080
1,530,842,995.44 21.049
1,741,073,484.48 23.940
3,271,916,479.92 44.989
165,263,671.09 2.272
1,113,732,720.14 15.314
http://slide pdf.c om/re a de r/full/monthly-c e r tific a te -proye k-a c e h 2/10
1,436,680,676.75 19.754
52,583,407.91 0.723
PEMERINTAH ACEH
SERTIFIKAT BULANAN
MONTHLY CERTIFICATE (MC)
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 1 dari 8
N OM OR K ON TR AK AD D- I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
A SUB TOTAL 7,272,727,282.46 7,272,727,282.46 5,108,209,201.35 1,246,495,812.31 6,354,705,013.66 S/D BULAN INI
MENGETAHUI OLEH :
KUASA PENGGUNA ANGGARAN / KUASA PENGGUNA BARANG
KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN
DINAS BINA MARGA DAN CIPTA KARYA ACEH
Ir. FAJRI, MT
PEMBINA
NIP. 19640831 199203 1 005
PEMERINTAH ACEH
SERTIFIKAT BULANAN
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 2 dari 8
N OM OR K ON TR AK A DD -I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. KONTRAK KONTRAK ADD-I JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
(Rp.)
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7=5x6 8 9=6x8 10 11 = 6 x 10 12 = 8 + 10 13 = 9 + 11
1.2 Mobilisasi Ls 1.00 1.00 50,100,000.00 50,100,000.00 0.70 35,070,000.00 - - 0.70 35,070,000.00
PEMERINTAH ACEH
SERTIFIKAT BULANAN
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 3 dari 8
N OM OR K ON TR AK A DD -I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. KONTRAK KONTRAK ADD-I JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
(Rp.)
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7=5x6 8 9=6x8 10 11 = 6 x 10 12 = 8 + 10 13 = 9 + 11
2.1 Gali an Untuk Selokan Drainase dan Saluran Air M³ 2,000.00 1,849.33 37,888.00 70,067,415.04 1,849.33 70,067,415.04 - - 1,849.33 70,067,415.04
2.3.5 Gorong-Gorong Pipa Baja Bergelombang Ton 1.50 0.15 37,703,990.35 5,655,598.55 - - - - - -
PEMERINTAH ACEH
SERTIFIKAT BULANAN
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 4 dari 8
N OM OR K ON TR AK A DD -I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. KONTRAK KONTRAK ADD-I JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
(Rp.)
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7=5x6 8 9=6x8 10 11 = 6 x 10 12 = 8 + 10 13 = 9 + 11
3.2.1 Timbunan Biasa M³ 2,000.00 511.46 71,022.00 36,324,772.13 493.17 35,025,919.74 11.96 849,423.12 505.13 35,875,342.86
3.2.2 Timbunan Pil ihan M³ 1,221.83 2,900.74 106,227.00 308,136,907.98 2,840.44 301,731,419.88 27.13 2,881,938.51 2,867.57 304,613,358.39
3.3 Penyiapan Badan jalan M² 27,900.00 25,840.15 2,922.00 75,504,918.30 25,840.15 75,504,918.30 - - 25,840.15 75,504,918.30
PEMERINTAH ACEH
SERTIFIKAT BULANAN
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 5 dari 8
N OM OR K ON TR AK A DD -I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN JUMLAH KONTRAK ADD-I Rp 847,425,300.00
NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. KONTRAK KONTRAK ADD-I JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
(Rp.)
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7=5x6 8 9=6x8 10 11 = 6 x 10 12 = 8 + 10 13 = 9 + 11
5/27/2018 Monthly Ce r tific a te Proye k Ac e h - slide pdf.c om
PEMERINTAH ACEH
SERTIFIKAT BULANAN
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 6 dari 8
N OM OR K ON TR AK A DD -I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. KONTRAK KONTRAK ADD-I JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
(Rp.)
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7=5x6 8 9=6x8 10 11 = 6 x 10 12 = 8 + 10 13 = 9 + 11
5.1.1 Lapis Pondasi Agregat Kla s A M³ 2,790.00 2,906.64 526,671.00 1 ,5 30 ,8 42 ,9 95 .4 4 2 ,8 04 .0 4 1,476,806,550.84 45.00 23,700,195.00 2,849.04 1,500,506,745.84
5.1.2 Lapis Pondasi Agregat Kla s B M³ 3,720.00 3,875.52 449,249.00 1 ,7 41 ,0 73 ,4 84 .4 8 3 ,7 38 .7 2 1,679,616,221.28 60.00 26,954,940.00 3,798.72 1,706,571,161.28
5/27/2018 Monthly Ce r tific a te Proye k Ac e h - slide pdf.c om
PEMERINTAH ACEH
SERTIFIKAT BULANAN
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 7 dari 8
N OM OR K ON TR AK A DD -I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. ADD-I
KONTRAK KONTRAK (Rp.) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7=5x6 8 9=6x8 10 11 = 6 x 10 12 = 8 + 10 13 = 9 + 11
6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter 13,950.00 14,691.41 11,249.00 165,263,671.09 7,490.93 84,265,471.57 6,687.48 75,227,462.52 14,178.41 159,492,934.09
6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar) Ton 2,027.22 2,134.97 521,662.00 1 ,1 13 ,7 32 ,7 20 .1 4 1 ,0 86 .5 9 566,832,830.68 970.05 506,038,223.10 2,056.64 1,072,871,053.78
6.3.8.a Aspal Ton 126.20 132.91 10,809,425.00 1,436,680,676.75 60.82 657,400,259.24 54.30 586,951,777.50 115.12 1,244,352,036.74
6.3.10 Bahan Pengisi (Filler) Tambahan Kg 41,371.98 43,570.79 1,206.85 52,583,407.91 22,175.29 26,762,253.08 19,796.87 23,891,852.56 41,972.16 50,654,105.64
5/27/2018 Monthly Ce r tific a te Proye k Ac e h - slide pdf.c om
PEMERINTAH ACEH
SERTIFIKAT BULANAN
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 8 dari 8
N OM OR K ON TR AK A DD -I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. KONTRAK KONTRAK ADD-I JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
(Rp.)
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7=5x6 8 9=6x8 10 11 = 6 x 10 12 = 8 + 10 13 = 9 + 11