KONTRAK AWAL
HARGA SATUAN
NO. URAIAN SAT.
(Rp.) JUMLAH HARGA BOBOT
VOLUME VOLUME
(Rp.) (%)
DIVISI 1. UMUM
1.2 Mobilisasi Ls   50,100,000.00   1.00   50,100,000.00   0.689   1.00
DIVISI 2. DRAINASE   50,100,000.00   0.689   -
2 .1 Galia n U nt uk Selokan Draina se da n Saluran Air  M³   37,888.00   2,000.00   75,776,000.00   1.042   1,849.33
2 .3 .5 Goron g-go ro ng Pip a Baja Berge lo mb an g Ton   37,703,990.35   1.50   56,555,985.53   0.778   0.15
DIVISI 3. PEKERJAAN TANAH   132,331,985.53   1.820   -
3.1.1 Galian Biasa M³   24,003.00   1,250.94   30,026,312.82   0.413   -
3.2.1 Timbunan Biasa M³   71,022.00   2,000.00   142,044,000.00   1.953   511.46
3.2.2 Timbunan Pilihan M³   106,227.00   1,221.83   129,791,335.41   1.785   2,900.74
3.3.1 Penyiapan Badan Jalan M²   2,922.00   27,900.00   81,523,800.00   1.121   25,840.15
DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN   383,385,448.23   5.272   -
4.2.2 Lapis Pondasi Agregat Klas B M³   455,605.00   1,860.00   847,425,300.00   11.652   1,289.79
DIVISI 5. PERKERASAN BERBUTIR   847,425,300.00   11.652   -
5.1.1 Lapis Pondasi Agregat Klas A M³   526,671.00   2,790.00   1,469,412,090.00   20.204   2,906.64
5.1.2 Lapis Pondasi Agregat Klas B M³   449,249.00   3,720.00   1,671,206,280.00   22.979   3,875.52
DIVISI 6. PERKERASAN ASPAL   3,140,618,370.00   43.184   -
6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair  Liter   11,249.00   13,950.00   156,923,550.00   2.158   14,691.41
6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar) Ton   521,662.00   2,027.22   1,057,523,639.64   14.541   2,134.97
http://slide pdf.c om/re a de r/full/monthly-c e r tific a te -proye k-a c e h 1/10
6.3.8.a Aspal Ton   10,809,425.00   126.20   1,364,149,435.00   18.757   132.91
6 .3. 10 B ah an P en gi si ( Fi ll er ) Ta mb ah an Kg   1,206.85   41,371.98   49,929,774.06   0.687   43,570.79
 

5/27/2018 Monthly Ce r tific a te Proye k Ac e h - slide pdf.c om

KONTRAK AWAL
Keterangan
JUMLAH HARGA BOBOT
(Rp.) (%)

  50,100,000.00   0.689
  50,100,000.00   0.689
  70,067,415.04   0.963
  5,655,598.55   0.078
  75,723,013.59   1.041
  -   -
  36,324,772.13   0.499
  308,136,907.98   4.237
  75,504,918.30   1.038
  419,966,598.41   5.775
  587,634,772.95   8.080
  587,634,772.95   8.080
  1,530,842,995.44   21.049
  1,741,073,484.48   23.940
  3,271,916,479.92   44.989
  165,263,671.09   2.272
  1,113,732,720.14   15.314
http://slide pdf.c om/re a de r/full/monthly-c e r tific a te -proye k-a c e h 2/10
  1,436,680,676.75   19.754
  52,583,407.91   0.723
 

5/27/2018 Monthly Ce r tific a te Proye k Ac e h - slide pdf.c om

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN
MONTHLY CERTIFICATE (MC)
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 1 dari 8
N OM OR K ON TR AK AD D- I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

NILAI KONTRAK  JUMLAH PEMBAYARAN


NOMOR MATA
URAIAN PEKERJAAN S/D S/D BOBOT (%) BOBOT (%)
PEMBAYARAN KONTRAK AWAL (Rp.) KONTRAK ADD-I (Rp.) BULAN INI
BULAN LALU BULAN INI S/D BULAN INI ITEM PEKERJAAN
1 2 3 4 5 6 7 8 9
1 UMUM   50,100,000.00   50,100,000.00   35,070,000.00   -   35,070,000.00 0.48% 0.48%
2 DRAINASE   132,331,985.53   75,723,013.59   70,067,415.04   -   70,067,415.04 0.96% 0.96%
3 PEKERJAAN TANAH   383,385,448.23   419,966,598.41   412,262,257.92   3,731,361.63   415,993,619.55 5.72% 5.72%
4 PELEBARAN DAN PERKERASAN BAHU JALAN   847,425,300.00   587,634,772.95   -   -   - 0.00% 0.00%
5 PERKERASAN BERBUTIR   3,140,618,370.00   3,271,916,479.92   3,156,422,772.12   50,655,135.00   3,207,077,907.12 4 4.10% 44.10%
6 PERKERASAN ASPAL   2,628,526,398.70   2,768,260,475.89   1,335,260,814.58   1,192,109,315.68   2,527,370,130.26 3 4.75% 34.75%
7 STRUKTUR   90,339,780.00   99,125,941.69   99,125,941.69   -   99,125,941.69 1.36% 1.36%

A SUB TOTAL   7,272,727,282.46   7,272,727,282.46   5,108,209,201.35   1,246,495,812.31   6,354,705,013.66 S/D BULAN INI

B PPN (10%) X A   727,272,728.25   727,272,728.25   510,820,920.13   124,649,581.23   635,470,501.37 87.38% 87.38%


C JUMLAH TOTAL A + B   8,000,000,010.70   8,000,000,010.70   5,619,030,121.48   1,371,145,393.54   6,990,175,515.02
D DIBULATKAN C   8,000,000,000.00   8,000,000,000.00   5,619,030,000.00   1,371,145,000.00   6,990,175,000.00 BULAN INI
E MATERIAL ON SITE (MOS)
17.14%
F J UM LA H K OT OR SE RT IF IK AT B UL AN I NI
G POTONGAN - POTONGAN S/D BULAN LALU
1 SERTIFIKAT S/D BULAN LALU (KOMULATIF)   4,214,272,500.00
70.24%
2 5 % JAMINAN PEMELIHARAAN ( 5% X D )   349,508,750.00
3 20 % PENGEMBALIAN UANG MUKA   1,398,035,000.00
H JUMLAH POTONGAN ( 1 + 2 + 3 )   5,961,816,250.00
I JUMLAH BERSIH SERTIFIKAT BULAN INI TERMASUK PPN 10% (F-H)   1,028,358,750.00
 J DIBULATKAN   1,028,358,750.00
Terbilang : satu milyar dua puluh delapan juta tiga ratus lima puluh delapan ribu tujuh ratus lima puluh rupiah

DIAJUKAN OLEH : DIPERIKSA/DISETUJUI OLEH : MENYETUJUI OLEH :


PENYEDIA BARANG/JASA KONSULTANSUPERVISI PPTK
PT. FLAMBOYANT HUMA ARTA PT. CIPTA JAYA UTAMA KONSULTAN PEMBANGUNAN JALAN DAN JEMBATAN
WILAYAH XI (SIMEULUE)

ALWIN ABDULLAH  LINDUNG NAINGGOLAN Ir. ZULKARNEN, MT. 


DIREKTUR UTAMA SITE ENGINEER Nip. 19640516 199703 1 001

MENGETAHUI OLEH :
KUASA PENGGUNA ANGGARAN / KUASA PENGGUNA BARANG
KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN
DINAS BINA MARGA DAN CIPTA KARYA ACEH

Ir. FAJRI, MT
PEMBINA
NIP. 19640831 199203 1 005

http://slide pdf.c om/re a de r/full/monthly-c e r tific a te -proye k-a c e h 3/10


 

5/27/2018 Monthly Ce r tific a te Proye k Ac e h - slide pdf.c om

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 2 dari 8
N OM OR K ON TR AK A DD -I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 1. UMUM JUMLAH KONTRAK ADD-I Rp 50,100,000.00

NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. KONTRAK KONTRAK ADD-I JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
(Rp.)
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I (Rp.) (Rp.) (Rp.)
1 2  3 4 5 6 7=5x6 8 9=6x8 10 11 = 6 x 10 12 = 8 + 10 13 = 9 + 11  

1.2 Mobilisasi Ls   1.00   1.00   50,100,000.00   50,100,000.00   0.70   35,070,000.00   -   -   0.70   35,070,000.00

TOTAL HARGA    50,100,000.00   -   -   -


DIVISI 1. UMUM  TOTAL PEMBAYARAN   -   35,070,000.00   -   35,070,000.00

PERSENTASE 100.00% 70.00% 0.00% 70.00%

DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :


PEMBANTU PPTK KONSULTAN SUPERVISI PENYEDIA BARANG/JASA
PEMBANGUNAN JALAN DAN JEMBATAN PT. CIPTA JAYA UTAMA KONSULTAN PT. FLAMBOYANT HUMA ARTA
WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST  LINDUNG NAINGGOLAN SYAHRIZAL, ST. 


Nip. 19830706 201001 1029 SITE ENGINEER GENERALSUPERINTENDENT

http://slide pdf.c om/re a de r/full/monthly-c e r tific a te -proye k-a c e h 4/10


 

5/27/2018 Monthly Ce r tific a te Proye k Ac e h - slide pdf.c om

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 3 dari 8
N OM OR K ON TR AK A DD -I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 2. DRAINASE JUMLAH KONTRAK ADD-I Rp 75,723,013.59

NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. KONTRAK KONTRAK ADD-I JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
(Rp.)
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I (Rp.) (Rp.) (Rp.)
1 2  3 4 5 6 7=5x6 8 9=6x8 10 11 = 6 x 10 12 = 8 + 10 13 = 9 + 11  

2.1 Gali an Untuk Selokan Drainase dan Saluran Air    M³   2,000.00   1,849.33   37,888.00   70,067,415.04   1,849.33   70,067,415.04   -   -   1,849.33   70,067,415.04

2.3.5 Gorong-Gorong Pipa Baja Bergelombang Ton   1.50   0.15   37,703,990.35   5,655,598.55   -   -   -   -   -   -

TOTAL HARGA    75,723,013.59   -   -   -


DIVISI 2. DRAINASE  TOTAL PEMBAYARAN   -   70,067,415.04   -   70,067,415.04

PERSENTASE 100.00% 92.53% 0.00% 92.53%

DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :


PEMBANTU PPTK KONSULTAN SUPERVISI PENYEDIA BARANG/JASA
PEMBANGUNAN JALAN DAN JEMBATAN PT. CIPTA JAYA UTAMA KONSULTAN PT. FLAMBOYANT HUMA ARTA
WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST  LINDUNG NAINGGOLAN SYAHRIZAL, ST. 


Nip. 19830706 201001 1029 SITE ENGINEER GENERALSUPERINTENDENT

http://slide pdf.c om/re a de r/full/monthly-c e r tific a te -proye k-a c e h 5/10


 

5/27/2018 Monthly Ce r tific a te Proye k Ac e h - slide pdf.c om

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 4 dari 8
N OM OR K ON TR AK A DD -I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 3. PEKERJAAN TANAH JUMLAH KONTRAK ADD-I Rp 419,966,598.41

NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. KONTRAK KONTRAK ADD-I JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
(Rp.)
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I (Rp.) (Rp.) (Rp.)
1 2  3 4 5 6 7=5x6 8 9=6x8 10 11 = 6 x 10 12 = 8 + 10 13 = 9 + 11  

3.1.1 Galian Biasa   M³   1,250.94   -   24,003.00   -   -   -   -   -   -   -

3.2.1 Timbunan Biasa   M³   2,000.00   511.46   71,022.00   36,324,772.13   493.17   35,025,919.74   11.96   849,423.12   505.13   35,875,342.86

3.2.2 Timbunan Pil ihan   M³   1,221.83   2,900.74   106,227.00   308,136,907.98   2,840.44   301,731,419.88   27.13   2,881,938.51   2,867.57   304,613,358.39

3.3 Penyiapan Badan jalan   M²   27,900.00   25,840.15   2,922.00   75,504,918.30   25,840.15   75,504,918.30   -   -   25,840.15   75,504,918.30

TOTAL HARGA    419,966,598.41   -   -   -


DIVISI 3. PEKERJAAN TANAH  TOTAL PEMBAYARAN   -   412,262,257.92   3,731,361.63   415,993,619.55

PERSENTASE 100.00% 98.17% 0.89% 99.05%

DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :


PEMBANTU PPTK KONSULTAN SUPERVISI PENYEDIA BARANG/JASA
PEMBANGUNAN JALAN DAN JEMBATAN PT. CIPTA JAYA UTAMA KONSULTAN PT. FLAMBOYANT HUMA ARTA
WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST  LINDUNG NAINGGOLAN SYAHRIZAL, ST. 


Nip. 19830706 201001 1029 SITE ENGINEER GENERALSUPERINTENDENT

http://slide pdf.c om/re a de r/full/monthly-c e r tific a te -proye k-a c e h 6/10


5/27/2018 Monthly Ce r tific a te Proye k Ac e h - slide pdf.c om

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 5 dari 8
N OM OR K ON TR AK A DD -I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN JUMLAH KONTRAK ADD-I Rp 847,425,300.00

NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. KONTRAK KONTRAK ADD-I JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
(Rp.)
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I (Rp.) (Rp.) (Rp.)
1 2  3 4 5 6 7=5x6 8 9=6x8 10 11 = 6 x 10 12 = 8 + 10 13 = 9 + 11  

4.2.2 Lapis Pondasi Aggregat Klas B   M³   1,860.00   1,289.79   455,605.00   587,634,772.95   -   -   -   -   -   -

TOTAL HARGA    587,634,772.95   -   -   -


DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN  TOTAL PEMBAYARAN   -   -   -   -

PERSENTASE 69.34% 0.00% 0.00% 0.00%

DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :


PEMBANTU PPTK KONSULTAN SUPERVISI PENYEDIA BARANG/JASA
PEMBANGUNAN JALAN DAN JEMBATAN PT. CIPTA JAYA UTAMA KONSULTAN PT. FLAMBOYANT HUMA ARTA
WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST  LINDUNG NAINGGOLAN SYAHRIZAL, ST. 


Nip. 19830706 201001 1029 SITE ENGINEER GENERALSUPERINTENDENT

http://slide pdf.c om/re a de r/full/monthly-c e r tific a te -proye k-a c e h 7/10

 
5/27/2018 Monthly Ce r tific a te Proye k Ac e h - slide pdf.c om

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 6 dari 8
N OM OR K ON TR AK A DD -I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 5. PERKERASAN BERBUTIR JUMLAH KONTRAK ADD-I Rp 3,271,916,479.92

NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. KONTRAK KONTRAK ADD-I JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
(Rp.)
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I (Rp.) (Rp.) (Rp.)
1 2  3 4 5 6 7=5x6 8 9=6x8 10 11 = 6 x 10 12 = 8 + 10 13 = 9 + 11  

5.1.1 Lapis Pondasi Agregat Kla s A   M³   2,790.00   2,906.64   526,671.00 1 ,5 30 ,8 42 ,9 95 .4 4   2 ,8 04 .0 4 1,476,806,550.84   45.00   23,700,195.00   2,849.04 1,500,506,745.84

5.1.2 Lapis Pondasi Agregat Kla s B   M³   3,720.00   3,875.52   449,249.00 1 ,7 41 ,0 73 ,4 84 .4 8   3 ,7 38 .7 2 1,679,616,221.28   60.00   26,954,940.00   3,798.72 1,706,571,161.28

TOTAL HARGA  3,271,916,479.92   -   -   -


DIVISI 5. PERKERASAN BERBUTIR  TOTAL PEMBAYARAN   - 3,156,422,772.12   50,655,135.00 3,207,077,907.12

PERSENTASE 100.00% 96.47% 1.55% 98.02%

DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :


PEMBANTU PPTK KONSULTAN SUPERVISI PENYEDIA BARANG/JASA
PEMBANGUNAN JALAN DAN JEMBATAN PT. CIPTA JAYA UTAMA KONSULTAN PT. FLAMBOYANT HUMA ARTA
WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST  LINDUNG NAINGGOLAN SYAHRIZAL, ST. 


Nip. 19830706 201001 1029 SITE ENGINEER GENERALSUPERINTENDENT

http://slide pdf.c om/re a de r/full/monthly-c e r tific a te -proye k-a c e h 8/10

 
5/27/2018 Monthly Ce r tific a te Proye k Ac e h - slide pdf.c om

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 7 dari 8
N OM OR K ON TR AK A DD -I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 6. PERKERASAN ASPAL JUMLAH KONTRAK ADD-I Rp 2,768,260,475.89

NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. ADD-I
KONTRAK KONTRAK (Rp.) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I (Rp.) (Rp.) (Rp.)
1 2  3 4 5 6 7=5x6 8 9=6x8 10 11 = 6 x 10 12 = 8 + 10 13 = 9 + 11  

6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter   13,950.00   14,691.41   11,249.00   165,263,671.09   7,490.93   84,265,471.57   6,687.48   75,227,462.52   14,178.41   159,492,934.09

6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar) Ton   2,027.22   2,134.97   521,662.00 1 ,1 13 ,7 32 ,7 20 .1 4   1 ,0 86 .5 9   566,832,830.68   970.05   506,038,223.10   2,056.64 1,072,871,053.78

6.3.8.a Aspal Ton   126.20   132.91   10,809,425.00 1,436,680,676.75   60.82   657,400,259.24   54.30   586,951,777.50   115.12 1,244,352,036.74

6.3.10 Bahan Pengisi (Filler) Tambahan Kg   41,371.98   43,570.79   1,206.85   52,583,407.91   22,175.29   26,762,253.08   19,796.87   23,891,852.56   41,972.16   50,654,105.64

TOTAL HARGA  2,768,260,475.89   -   -   -


DIVISI 6. PERKERASAN ASPAL  TOTAL PEMBAYARAN   - 1,335,260,814.58 1,192,109,315.68 2,527,370,130.26

PERSENTASE 100.00% 48.23% 43.06% 91.30%

DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :


PEMBANTU PPTK KONSULTAN SUPERVISI PENYEDIA BARANG/JASA
PEMBANGUNAN JALAN DAN JEMBATAN PT. CIPTA JAYA UTAMA KONSULTAN PT. FLAMBOYANT HUMA ARTA
WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST  LINDUNG NAINGGOLAN SYAHRIZAL, ST. 


Nip. 19830706 201001 1029 SITE ENGINEER GENERALSUPERINTENDENT

http://slide pdf.c om/re a de r/full/monthly-c e r tific a te -proye k-a c e h 9/10

 
5/27/2018 Monthly Ce r tific a te Proye k Ac e h - slide pdf.c om

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 06 (ENAM)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : SEPTEMBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 SEPTEMBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 8 dari 8
N OM OR K ON TR AK A DD -I : 1 3. I/ SP PK /P BJ /D BC /A PB A/ VI I/ 20 12
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 7. STRUKTUR JUMLAH KONTRAK ADD-I Rp 99,125,941.69

NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. KONTRAK KONTRAK ADD-I JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
(Rp.)
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I (Rp.) (Rp.) (Rp.)
1 2  3 4 5 6 7=5x6 8 9=6x8 10 11 = 6 x 10 12 = 8 + 10 13 = 9 + 11  

7 .9 P as an ga n Ba tu   M³   80.00   161.57   613,517.00   99,125,941.69   161.57   99,125,941.69   -   -   161.57   99,125,941.69

7.10 (3) Bronjong   M³   70.00   -   589,406.00   -   -   -   -   -   -   -

TOTAL HARGA    99,125,941.69   -   -   -


DIVISI 7. STRUKTUR  TOTAL PEMBAYARAN   -   99,125,941.69   -   99,125,941.69

PERSENTASE 100.00% 100.00% 0.00% 100.00%

DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :


PEMBANTU PPTK KONSULTAN SUPERVISI PENYEDIA BARANG/JASA
PEMBANGUNAN JALAN DAN JEMBATAN PT. CIPTA JAYA UTAMA KONSULTAN PT. FLAMBOYANT HUMA ARTA
WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST  LINDUNG NAINGGOLAN SYAHRIZAL, ST. 


Nip. 19830706 201001 1029 SITE ENGINEER GENERALSUPERINTENDENT