1 PEKERJAAN UMUM
1.1 Mobilisasi
4.1
4.2
4.3
4.4
5 Pekerjaan Struktur
5.1
5.2
Quantity
Aktivitas Site Manager Quality Engineer Engineer
Pekerjaan Umum
Mobilisasi A I I
1.1.1 Pembuatan Papan Nama Proyek I C C
1.1.2 Direksikeet I C C
1.1.3 Pengukuran dan Pematokan A C C
1.1.4 Mobilisasi dan Demobilisasi R C C
Management dan Keselamatan Lalu lintas A R C
Management Mutu A R C
Pekerjaan Drainase
Gorong – Gorong Box Curvert A R R
Pekerjaan Tanah Dan Geosintetik
Galian Biasa A I R
Timbunan Pilihan A I R
Timbunan Biasa Dari Galian A I R
Timbunan Pilihan Dari Galian A I R
Penyiapan Badan Jalan A C C
I
R C
R C
R C
C C
R I
I
R C I
R
R
R
R
R C
R C
R C
R C
R C
R C
R C
They show the following over the past 8 weeks:
Reason For Defective Shipments
No of
No of Shipments Incorrect Bill Of Incorrect Truck Damaged
Week Shipmens With Defects Leading Load Product
1 23 5 2 2 1
2 31 8 1 4 1
3 28 6 2 3 1
4 37 11 4 4 1
5 35 10 3 4 2
6 40 14 5 6 3
7 41 12 3 5 3
8 44 15 4 7 1
A reviewof his turnover over the past 8 weeks shows the following:
N = 100
p UCL LCL
0.02 0.062 0.000
0.04 0.099 0.000
0.06 0.131 0.000
0.08 0.161 0.000
0.10 0.190 0.010
p Chart
Perhitungan Menengah
Jumlah ukuran subkelompok
Jumlah subkelompok yang diambil
Ukuran sampel / subkelompok rata-rata
Proporsi rata-rata item yang tidak sesuai
Tiga penyimpangan standar
p Chart
Perhitungan Menengah
Jumlah ukuran subkelompok
Jumlah subkelompok yang diambil
Ukuran sampel / subkelompok rata-rata
Proporsi rata-rata item yang tidak sesuai
Tiga penyimpangan standar
Truck Late
2
1
1
2
Shipments
Truck Late
2
1
1 50 120.00
2 45
8 100.00
40
35
80.00
30
50 120.00
45
100.00
40
35
80.00
30
25 60.00
20
40.00
15
10
20.00
5
0 0.00
s ad g t e
en Lo in uc at
ip
m k ead ro
d
ckL
Sh uc fL P
Tr
u
f Tr O ed
o ct ill ag
No r re ct
B m
co r re Da
In co
In
of subgroup sizes
ber of subgroups taken
age sample/subgroup sizes
age proportion of nonconforming items
e standart deviations
UCL
0.126
0.126
0.126
0.126
0.126
0.126
0.126
0.126
0.126
0.126
1000
10
100
0.057
0.069
- 0,0126
0.057
0.126
UCL
0.142
0.142
0.142
0.142
0.142
0.142
0.142
0.142
0.142
0.142
0.142
0.142
0.142
1300
13
100
0.067
0.075
-0,008
0.067
0.142
120.00
100.00
80.00
120.00
100.00
80.00
60.00
40.00 Jumlah
Komulatif %
20.00
0.00
e
at
ckL
u
Tr
https://grandpaperwriters.com/question-answer-the-results-of-an-inspection-of-dna-samples-taken-over-the-p
-samples-taken-over-the-past-10-days-are-given/
No. Akun Jumlah
1 Persediaan 500,000
2 Akumulasi Penyusutan 3,800,000
3 Beban umum dan administrasi 100,000
4 Saham biasa 5,000,000
5 Beban bunga 120,000
6 Harga pokok penjualan 600,000
7 Bangunan dan peralatan 12,000,000
8 Pajak 130,000
9 Kas 1,100,000
10 Utang jangka pendek 75,000
11 Beban penyusutan 60,000
12 Utang jangka panjang ???
13 Penjualan 1,300,000
14 Piutang 1,000,000
15 Utang dagang 500,000
16 Saldo laba 1,025,000
16,500,000
6,950,000
PT Dolanmalulu
NERACA
(Dalam Rupiah)
Aset Kewajiban
Aset lancar Utang jangka pendek
Persediaan 500,000 Utang jangka panjang
Kas 1,100,000 Beban umum dan adm
Piutang 1,000,000 Beban bunga
Penjualan 1,300,000 Pajak
Harga pokok penjualan 600,000 Utang dagang
Aset tetap
Bangunan dan peralan 12,000,000 Modal
Beban Penyusutan - 60,000 Saldo laba
Akumulasi Penyusutan - 3,800,000 Saham biasa
PT. DOLANMALULU
Laporan Laba Rugi
Pendapatan :
Persediaan 500,000
Saham biasa 5,000,000
Harga pokok penjualan 600,000
Kas 1,100,000
Penjualan 1,300,000
Piutang 1,000,000
Saldo laba 1,025,000
Laba Kotor 10,525,000
Beban Operasi :
Beban bunga 120,000
Harga pokok penjualan 600,000
Pajak 130,000
Utang jangka pendek 75,000
Utang jangka panjang 5,690,000
Utang dagang 500,000
Saldo laba 1,025,000
Operasional 8,140,000
Laba Bersih 2,385,000
75,000
5,690,000
100,000
120,000
130,000
500,000
1,025,000
5,000,000
12,640,000