TENAGA KAPASITAS
No. Nama Alat KODE ALAT ALAT
ALAT
(HP) -
HP Cp
1 ASPHALT MIXING PLANT E01 150 50.0
2 ASPHALT FINISHER E02 30 6.0
3 ASPHALT SPRAYER E03 15 1,000.0
4 BULLDOZER 100-150 HP E04 100 100-150
5 AIR COMPPRESSOR E05 25 175.0
6 CONCRETE MIXER 0.3-0.6 M3 E06 15 500.0
7 DUMP TRUCK 3 Ton E08 60 3.5
8 DUMP TRUCK 5 Ton E09 80 10.0
9 EXCAVATOR 80-140 HP E10 90 0.5
10 GENERATOR SET E12 200 125.0
11 MOTOR GRADER 166 HP E13 166 166
12 WHEEL LOADER 1.2 M3 E15 80 1.2
13 TIRE ROLLER 8-10 Ton E16 50 8-10
14 TANDEM ROLLER 6-9 T. E17 40 10.0
15 VIBRATORY ROLLER 20 T. E19 60 6-7
16 WATER PUMP 70-100 mm E21 6 4"
17 WATER TANKER 4000-8000 L. E22 120 8,000.0
18 ALAT PENGECAT MARKA E23 11 1.0
19 STAMPER E24 5 0.5
20 JACK HAMMER E25 3 3.1
21 PILE DRIVING HAMMER E26 250 4.5
22 CONCRETE PUMP E31 125 40.0
23 WELDING SET E35 10 450
RALATAN PER JAM KERJA
BIAYA
SEWA ALAT
PER
JAM KERJA
DIBULATKAN
L
1,750,000.00
200,000.00
75,000.00
220,000.00
100,000.00
80,000.00
175,000.00
200,000.00
286,069.60
60,000.00
170,000.00
175,000.00
183,295.14
150,000.00
165,000.00
65,000.00
140,000.00
80,000.00
50,000.00
25,041.36
690,837.77
188,024.15
67,923.67
DAFTAR HARGA SATUAN DASAR BAHAN
Kegiatan : Perencanaan Jalan Rembang - Bulu Sta 112 +407 S/d 114 +507
Tahun Anggaran : 2011
HARGA
No. SATUAN SATUAN
( Rp )
1 Pasir Urug m³ 100,000.00
2 Pasir Pasang m³ 125,000.00
3 Pasir Beton m³ 160,000.00
4 Agregat Kasar untuk LPA m³ 170,000.00
5 Agregat Kasar untuk LPB m³ 155,000.00
6 Agregat Kasar untuk AC / Beton m³ 160,000.00
7 Agregat Halus untuk LPA m³ 165,000.00
8 Agregat Halus untuk LPB m³ 160,000.00
9 Agregat Halus untuk AC m³ 170,000.00
10 Agregat Kelas A m³ 169,583.33
11 Agregat Kelas B m³ 159,060.00
12 Filler Kg 1,000.00
13 Batu Belah m³ 133,635.34
14 Batu Pecah 5/7 m³ 155,000.00
15 Tanah Urug m³ 48,675.00
16 Tanah Padas (Pilihan) m³ 65,668.59
17 Aspal drum Kg 7,333.00
18 Aspal Emulsi Kg 5,200.00
19 ATB ton 791,500.28
20 Beton K-175 m³ 613,800.00
21 Aspal Polimer Kg 3,800.00
22 Kerosin Liter 6,500.00
23 Semen ( PC ) zak 45,000.00
24 Kawat Bendrat Kg 16,000.00
25 Baja Tulangan U-24 (Polos) Kg 10,000.00
26 Baja Tulangan U-32 (Ulir) Kg 13,000.00
27 Paku Kg 45,406.00
28 Kayu Perancah m³ 1,688.15
29 Pelumas Liter 38,500.00
30 Thinner Liter 14,580.00
31 Cat Besi Kg 34,870.00
32 Cat kayu Kg 30,500.00
33 Cat Marka Kg 65,000.00
34 Glassbit Kg 58,000.00
35 Rambu Jalan Lengan Tunggal Buah 280,500.00
36 Rambu Jalan Lengan Ganda Buah 280,500.00
37 Rambu Jalan Engineering Grade Buah 316,000.00
38 Kerb L=60 cm Buah 150,000.00
39 Paving Block m² 59,250.00
40 Pipa Galvanis Ø 3" m1 528,500.00
41 Cerucuk Kayu (dolken) m1 10,188.09
42 Rel Pengaman m1 369,000.00
43 Kawat Bronjong Kg 13,500.00
44 Premium Liter 6,000.00
45 Theodolit jam 30,000.00
46 Solar Liter 6,250.00
47 Alat bantu set 34,650.00
48 Pipa PVC dia 3" m 153,175.02
49 Kayu meranti 5/7 m³ 3,300,000.00
50 Cat Kg 30,500.00
51 Minyak cat Liter 17,500.00
52 Buis Beton Diameter 800 mm m 250,000.00
Sumber AHS 2011 Kota Rembang
N DASAR BAHAN
u Sta 112 +407 S/d 114 +507
KETERANGAN
REKAPITULASI AKHIR
RENCANA ANGGARAN BIAYA
PERENCANAAN JALAN REMBANG - BULU Sta 112+407 S/d 114+507
JAWA TENGAH
No. Uraian
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN TANAH
III. PEKERJAAN PERKERASAN JALAN
IV. PEKERJAAN PERLENGKAPAN JALAN
V. PEKERJAAN DRAINASE
JUMLAH TOTAL
PPN 10 %
TOTAL BIAYA
DIBULATKAN
Terbilang :
KAPITULASI AKHIR
ANA ANGGARAN BIAYA
REMBANG - BULU Sta 112+407 S/d 114+507
JAWA TENGAH
Jumlah Harga (Rp.)
78,567,531.23
3,569,002,307.11
5,573,578,315.37
3,613,274,968.70
805,695,432.77
13,640,118,555.18
1,364,011,855.52
15,004,130,410.70
15,004,130,000.00
REKAPITULASI AWAL
RENCANA ANGGARAN BIAYA
PERENCANAAN JALAN REMBANG - BULU Sta 112+407 S/d 114+507
JAWA TENGAH
No. Uraian Satuan Volume
I. UMUM
1.1 Pengukuran m² 1.00
1.2 Papan Nama Proyek buah 2.00
1.3 Direksi Keet LS 1.00
1.4 Pengaturan dan Pengendalian Lalu Lintas LS 1.00
1.5 Pengujian Labolatorium dan Lapangan LS 1.00
1.6 Mobilisasi dan Demobilisasi LS 1.00
1.7 Listrik dan Air LS 1.00
1.8 Dokumentasi LS 1.00
1.9 Asuransi dan Administrasi LS 1.00
Jumlah
II. PEKERJAAN TANAH
2.1 Pembersihan lapangan m² 42,000.00
2.2 Penggalian Tanah m³ 23,554.59
2.3 Pembungan Tanah Sisa Galian m³ 17,082.34
2.4 Urugan Tanah Dari Tanah Galian m³ 6,472.25
Jumlah
III. PEKERJAAN PERKERASAN JALAN
3.1 Lapis Pondasi Agregat Kelas B m³ 11,025.00
3.2 Bahu Jalan Sirtu m³ 1,680.00
3.3 Lapis Pondasi Agregat Kelas A m³ 6,300.00
3.4 Lapis Prime Coat liter 31,500.00
3.5 Lapis Laston m³ 4,173.75
Jumlah
IV. PEKERJAAN PERLENGKAPAN JALAN
4.1 Marka Jalan m² 84.00
4.2 Patok Kilometer buah 2.00
4.3 Rambu Lalu Lintas buah 10
4.4 Rel Pengaman m' 5,900.00
4.5 Gebalan Rumput m² 10,006.56
Jumlah
V PEKERJAAN DRAINASE
5.1 Galian Drainase m³ 13,261.50
5.2 Pasangan batu dengan mortar (mekanis) m³ 168.00
5.3 Plesteran m³ 1,932.00
5.4 Gorong -gorong buah 20.00
Jumlah
APITULASI AWAL
NA ANGGARAN BIAYA
EMBANG - BULU Sta 112+407 S/d 114+507
JAWA TENGAH
Harga Satuan Jumlah Harga
(Rp) (Rp)
15,483.86 15,483.86
526,023.69 1,052,047.37
20,000,000.00 20,000,000.00
7,500,000.00 7,500,000.00
15,000,000.00 15,000,000.00
8,000,000.00 8,000,000.00
5,000,000.00 5,000,000.00
2,000,000.00 2,000,000.00
20,000,000.00 20,000,000.00
mlah 78,567,531.23
28,166.11 1,182,976,663.89
43,043.89 1,013,881,022.37
43,043.89 735,290,404.98
98,397.73 636,854,215.87
mlah 3,569,002,307.11
249,096.69 2,746,291,056.20
148,490.36 249,463,803.02
262,987.49 1,656,821,187.25
11,506.86 362,466,013.14
133,821.21 558,536,255.76
mlah 5,573,578,315.37
123,402.46 10,365,806.82
122,019.48 244,038.96
311,520.41 3,115,204.11
593,155.62 3,499,618,156.55
9,986.63 99,931,762.26
mlah 3,613,274,968.70
54,844.38 727,318,724.00
466,528.03 78,376,708.77
525,828.11 1,015,899,910.67
447,203.99 8,944,079.81
mlah 805,695,432.77
5.3 Biil Of Quantity
BILL OF QUANTITY
Item Uraian Satuan Volume
I DIVISI 1 UMUM
1.2 Mobilisasi LS 1.00
1.2 Papan Nama Proyek buah 2.00
1.3 Direksi Keet LS 1.00
1.4 Pengaturan dan Pengendalian Lalu Lintas LS 1.00
1.5 Pengujian Laboratorium dan Lapangan LS 1.00
1.6 Mobilisasi dan Demobilisasi LS 1.00
1.7 Instalasi Listrik dan Air LS 1.00
1.8 Dokumentasi LS 1.00
1.9 Asuransi dan Administrasi LS 1.00
II. PEKERJAAN TANAH
2.1 Pembersihan lapangan m² 42000.00
2.2 Penggalian Tanah m³ 23554.59
2.3 Pembungan Tanah Sisa Galian m³ 17,082.34
2.4 Urugan Tanah Dari Tanah Galian m³ 6472.25
III. PEKERJAAN PERKERASAN JALAN
3.1 Lapis Pondasi Agregat Kelas B m³ 11025.00
3.2 Bahu Jalan Sirtu m³ 1680.00
3.3 Lapis Pondasi Agregat Kelas A m³ 6300.00
3.4 Lapis Prime Coat liter 31500.00
3.5 Lapis Laston m³ 4173.75
IV. PEKERJAAN PERLENGKAPAN JALAN
4.1 Marka Jalan m² 84.00
4.2 Patok Kilometer buah 2.00
4.3 Rambu Lalu Lintas buah 10.00
4.4 Rel Pengaman (Guardrail) m' 5900.00
4.5 Gebalan Rumput m² 10006.56
V PEKERJAAN DRAINASE
5.1 Galian Drainase m³ 13261.50
5.2 Pasangan batu dengan mortar (mekanis) m³ 168.00
5.3 Plesteran m³ 1932.00
5.4 Gorong-gorong buah 20.00
TABEL TIMBUNAN DAN GALIAN
LUAS PENAMPANGLUAS
m2 RATA-RATA m2Jarak Volume m3
NO STA CUT FILL CUT FILL m CUT
1 112+407 0.532 4.9224
0.2662 5.73385 50 13.31
2 112+457 0 6.5453
0 4.70675 50 0
3 112+507 0 2.868
4.28405 1.4341 50 214.203
4 112+557 8.5681 0
11.4411 0 50 572.055
5 112+607 14.3141 0
12.90855 0 50 645.428
6 112+657 11.503 0
9.46035 0 50 473.018
7 112+707 7.4177 0
5.38565 0 50 269.283
8 112+757 3.3536 0
1.6768 1.40955 50 83.84
9 112+807 0 2.8191
0 3.87865 50 0
10 112+857 0 4.9382
0 5.57225 50 0
11 112+907 0 6.2063
0 4.6647 50 0
12 112+957 0 3.1231
0.35855 1.85775 50 17.9275
13 113+007 0.7171 0.5924
3.3451 0.2962 50 167.255
14 113+057 5.9731 0
8.61455 0 50 430.728
15 113+107 11.256 0
6.44195 3.28435 50 322.098
16 113+157 1.6279 6.5687
3.15345 3.28435 50 157.673
17 113+207 4.679 0
3.1916 1.53645 50 159.58
18 113+257 1.7042 3.0729
0.8521 2.89455 50 42.605
19 113+307 0 2.7162
5.0066 1.3581 50 250.33
20 113+357 10.0132 0
12.1804 0 50 609.02
21 113+407 14.3476 0
10.6465 0 50 532.325
22 113+457 6.9454 0
12.598 0 50 629.9
23 113+507 18.2506 0
15.6097 0 50 780.485
24 113+557 12.9688 0
8.98345 0.58705 50 449.173
25 113+607 4.9981 1.1741
3.4078 3.3922 50 170.39
26 113+657 1.8175 5.6103
0.90875 9.55655 50 45.4375
27 113+707 0 13.503
0 14.88755 50 0
28 113+757 0 16.272
1.49805 8.8323 50 74.9025
29 113+807 2.9961 1.3923
1.49805 8.08885 50 74.9025
30 113+857 0 14.785
0 16.5283 50 0
31 113+907 0 18.271
0 14.6526 50 0
32 113+957 0 11.034
0.14635 8.1697 50 7.3175
33 114+007 0.2927 5.3054
1.51635 2.74545 50 75.8175
34 114+057 2.74 0.1855
7.02435 0.09275 50 351.218
35 114+107 11.3087 0
12.6325 0 50 631.625
36 114+157 13.9563 0
18.6559 0 50 932.795
37 114+207 23.3555 0
29.5223 0 50 1476.12
38 114+257 35.6891 0
39.6686 0 50 1983.43
39 114+307 43.6481 0
45.1808 0 50 2259.04
40 114+357 46.7135 0
49.557 0 50 2477.85
41 114+407 52.4005 0
52.81285 0 50 2640.64
42 114+457 53.2252 0
44.45715 0 50 2222.86
43 114+507 35.6891 0
26.20025 0 50 1310.01
JUMLAH 23554.6
SELISIH 17082.34
Volume m3
FILL
286.693
235.338
71.705
0
0
0
70.4775
193.933
278.613
233.235
92.8875
14.81
0
164.218
164.218
76.8225
144.728
67.905
0
0
0
29.3525
169.61
477.828
744.378
441.615
404.443
826.415
732.63
408.485
137.273
4.6375
0
0
0
0
0
0
0
6472.25
17082.34
Pekerjaan : Papan Nama Proyek
Harga Satuan : Rp. 526,023.69
Satuan Pembayara: Buah
A Tenaga
1 Pekerja Jam 7 5,662.00 39,634.00
2 Tukang Kayu Jam 3.5 7,078.00 24,773.00
Jumlah Harga Tenaga 64,407.00
B Bahan
1 Semen zak 0.02 45,000.00 900.00
2 Batu Pecah 0.006 160,000.00 960.00
5/7 m³
3 Pasir Pasang m³ 0.04 125,000.00 5,000.00
4 Cat Kg 0.3787 30,500.00 11,550.35
5 Paku Kg 1 45,406.00 45,406.00
6 Kayu 5/7 m³ 0.035 3,300,000.00 115,500.00
7 Kayu 2/20 m³ 0.0576 3,550,000.00 204,480.00
Jumlah Harga Bahan 383,796.35
C Peralatan Ls 1 30,000.00 30,000.00
A Tenaga
1 Juru Ukur Jam 0.014 5,000.00 70.00
2 Pemb. Juru Jam 0.028 4,300.00 120.40
Ukur
Jumlah Harga Tenaga 190.01
B Bahan
1 Paku Kg 0.00025 45,406.00 11.35
2 Kayu 5/7 m³ 3.5E-05 3,300,000.00 115.50
3 Cat Kg 0.00625 30,500.00 190.63
4 Minyak Cat liter 0.0005 17,500.00 8.75
Jumlah Harga Bahan 326.23
C Peralatan
1 Theodolit Jam 0.002 30,000.00 60.00
2 Alat bantu set 1 13,500.00 13,500.00
Jumlah Harga Peralatan 13,560.00
D Total ( A + B + C ) 14,076.23
E Overhead dan keuntungan 10 % x D 1,407.62
F Harga Satuan Pekerjaan 15,483.86
Pengaturan
dan
1 LS 1 7,500,000.00 7,500,000.00
Pengendalian
Lalu Lintas
Jumlah (termasuk Biaya Umum)
7,500,000.00
Harga Satuan Diluar PPN
Pengujian
Laboratorium
1 LS 1 15,000,000.00 15,000,000.00
dan
Lapangan
Jumlah (termasuk Biaya Umum)
15,000,000.00
Harga Satuan Diluar PPN
Mobilisasi
1 dan LS 1 8,000,000.00 8,000,000.00
Demobilisasi
Jumlah (termasuk Biaya Umum)
8,000,000.00
Harga Satuan Diluar PPN
Instalasi
1 Listrik LS 1 5,000,000.00 5,000,000.00
dan Air
Jumlah (termasuk Biaya Umum) 5,000,000.00
Harga Satuan Diluar PPN
Pekerjaan : Dokumentasi
Harga Satuan : Rp. 2,000,000.00
Satuan Pembayara : Lump Sump
Perkiraan Harga Jumlah Harga
N Satua
Komponen Kuantitas Satuan ( Rp )
o. n
( Rp )
1 Dokumentasi LS 1 2,000,000.00 2,000,000.00
Asuransi dan
1 LS 1 20,000,000.00 20,000,000.00
Administrasi
Jumlah (termasuk Biaya Umum)
20,000,000.00
Harga Satuan Diluar PPN
5.4.5 Pekerjaan Drainase
Pekerjaan : Galian Selokan Drainase dan Saluran Air (mekanis)
Harga Satuan : Rp. 54,844.38
Satuan Pembayaran : m³
A Tenaga
1 Pekerja Jam 0.2789 5,662.00 1,578.95
2 Mandor Jam 0.0697 7,550.00 526.36
Jumlah Harga Tenaga 2,105.31
B Bahan
A Tenaga
1 Pekerja Jam 9.3333 5,662.00 52,845.33
2 Tukang Jam 2.6667 7,078.00 18,874.67
3 Mandor Jam 0.4444 7,550.00 3,355.56
Jumlah Harga Tenaga 75,075.56
B Bahan
1 Batu m³ 1.080 155,000.00 167,400.00
2 Semen zak 5.040 45,000.00 226,800.00
3 Pasir m³ 0.420 125,000.00 52,500.00
Jumlah Harga Bahan 446,700.00
C Peralatan
1 Concrete Mixer Jam 0.4444 80,000.00 35,555.56
2 Alat bantu Ls 1 1,500 1,500
Jumlah Harga Peralatan 37,055.56
D Total ( A + B + C ) 558,831.11
E Overhead dan keuntungan 10 % x D 55,883.11
F Harga Satuan Pekerjaan 614,714.22
Pekerjaan : Plesteran
Harga Satuan : Rp. 525,828.11
Satuan Pembayaran : m³
A Tenaga
1 Pekerja Jam 9.3333 5,662.00 52,845.33
2 Tukang Jam 2.6667 7,078.00 18,874.67
3 Mandor Jam 0.4444 7,550.00 3,355.56
Jumlah Harga Tenaga 75,075.56
B Bahan
2 Semen zak 6.098 45,000.00 274,410.00
3 Pasir m³ 0.483 160,000.00 77,264.00
Jumlah Harga Bahan 351,674.00
C Peralatan
1 Concrete Mixer Jam 0.6222 80,000.00 49,776.00
2 Alat bantu Ls 1 1,500 1,500
Jumlah Harga Peralatan 51,276.00
D Total ( A + B + C ) 478,025.56
E Overhead dan keuntungan 10 % x D 47,802.56
F Harga Satuan Pekerjaan 525,828.11
A. Tenaga
1 Pekerja Jam 0.49 5,662.00 2,774.38
2 Mandor Jam 0.098 7,550.00 739.90
Jumlah Harga Tenaga 3,514.28
B Bahan
1 Buis Beton buah 1 250,000.00 250,000.00
2 Pasir urug m³ 0.05 100,000.00 5,000.00
3 Siar 1 : 3 m³ 0.25 20,000.00 5,000.00
Jumlah Harga Bahan 260,000.00
C Peralatan
1 exavator set 0.5 286,069.60 143,034.80
Jumlah Harga Peralataan 143,034.80
D Total ( A + B + C ) 406,549.08
E Overhead dan keuntungan 10 % x D 40,654.91
F Harga Satuan Pekerjaan 447,203.99
an Saluran Air (mekanis)
5.4.2 Pekerjaan Tanah
Pekerjaan : Pembersihan Lapangan
Harga Satuan : Rp. 28,166.11
Satuan Pembayaran : m²
A Tenaga
1 Pekerja Jam 142.8571 5,662.00 808,856.90
2 Mandor Jam 24 7,550.00 181,200.00
3 Operator Jam 39.3283 7,078.00 278,365.71
4 Pem. Operator Jam 39.3283 6,134.00 241,239.79
5 Sopir Jam 142.8571 7,078.00 1,011,142.55
6 Pem. Sopir Jam 142.8571 5,662.00 808,856.90
Jumlah Harga Tenaga 2,520,804.95
B Bahan
A Tenaga
1 Pekerja Jam 0.0251 5,662.00 142.12
2 Mandor Jam 0.005 7,550.00 37.75
3 Operator Jam 0.0036 7,078.00 25.48
4 Pem. Operator Jam 0.0036 6,134.00 22.08
5 Sopir Jam 0.0215 7,078.00
6 Pembantu Sopir Jam 0.0215 5,662.00
Jumlah Harga Tenaga 227.43
B Bahan
A Tenaga
1 Pekerja Jam 0.0225 5,662.00 127.40
2 Mandor Jam 0.0038 7,550.00 28.69
3 Operator Jam 0.0053 7,078.00 37.51
4 Pem. Operator Jam 0.0053 6,134.00 32.51
5 Sopir Jam 0.0034 7,078.00 24.07
6 Pem. Sopir Jam 0.0034 5,662.00 19.25
Jumlah Harga Tenaga 250.17
B Bahan
1 Tanah Padas m³ 1.2 65,668.59 78,802.31
Jumlah Harga Bahan 78,802.31
C Peralatan
1 Motor Grader Jam 0.019 170,000.00 3,230.00
2 Vibrator Roller Jam 0.018 165,000.00 2,970.00
3 Water Tanker Jam 0.03 140,000.00 4,200.00
4 Alat bantu Ls 1 1,500.00 1,500.00
Jumlah Harga Peralatan 10,400.00
D Total ( A + B + C ) 89,452.48
E Overhead dan keuntungan 10 % x D 8,945.25
F Harga Satuan Pekerjaan 98,397.73
Pekerjaan : Penyiapan Tanah Dasar
Harga Satuan : Rp. 4,178.87
Satuan Pembayaran : m²
A Tenaga
1 Pekerja Jam 2.5 5,662.00 14,155.00
2 Operator Jam 0.022 7,078.00 155.72
3 Mandor Jam 0.031 7,550.00 234.05
Jumlah Harga Tenaga 14,544.77
B Bahan
A Tenaga
1 Pekerja Jam 4.6667 5,662.00 26,422.86
2 Mandor Jam 0.1876 7,550.00 1,416.38
Jumlah Harga Tenaga 27,839.24
B Bahan
1 Sirtu m3 1.2 82,850.00 99,420.00
Jumlah Harga Bahan 99,420.00
C Peralatan
1 Tandem Roller Jam 0.0198 150,000.00 2,970.00
2 Water Tank Truck Jam 0.0233 140,000.00 3,262.00
3 Alat bantu Ls 1 1,500.00 1,500.00
Jumlah Harga Peralatan 7,732.00
D Total ( A + B + C ) 134,991.24
E Overhead dan keuntungan 10 % x D 13,499.12
F Harga Satuan Pekerjaan 148,490.36
5.4.3 Pekerjaan Perkerasan Jalan
A Tenaga
1 Pekerja Jam 4.6667 5,662.00 26,422.86
2 Mandor Jam 0.1887 7,550.00 1,424.69
Jumlah Harga Tenaga 27,847.54
B Bahan
1 Agregat Kelas B m³ 1.2 159,060.00 190,872.00
Jumlah Harga Bahan 190,872.00
C Peralatan
1 Tandem Roller Jam 0.0198 150,000.00 2,970.00
2 Water Tank Truck Jam 0.0233 140,000.00 3,262.00
3 Alat bantu Ls 1 1,500.00 1,500.00
Jumlah Harga Peralatan 7,732.00
D Total ( A + B + C ) 226,451.54
E Overhead dan keuntungan 10 % x D 22,645.15
F Harga Satuan Pekerjaan 249,096.69
A Tenaga
1 Pekerja Jam 4.6667 5,662.00 26,422.86
2 Mandor Jam 0.1887 7,550.00 1,424.69
Jumlah Harga Tenaga 27,847.54
B Bahan
1 Agregat Kelas A m³ 1.2 169,583.33 203,500.00
Jumlah Harga Bahan 203,500.00
C Peralatan
1 Tandem Roller Jam 0.0198 150,000.00 2,970.00
2 Water Tank Truck Jam 0.0233 140,000.00 3,262.00
3 Alat bantu Ls 1 1,500.00 1,500.00
Jumlah Harga Peralatan 7,732.00
D Total ( A + B + C ) 239,079.54
E Overhead dan keuntungan 10 % x D 23,907.95
F Harga Satuan Pekerjaan 262,987.49
Pekerjaan : Lapis Laston
Harga Satuan : Rp. 133,821.21
Satuan Pembayaran : m²
Satua Perkiraan Harga Satuan Jumlah Harga
No Komponen
n Kuantitas (Rp) (Rp)
A Tenaga
1 Pekerja Jam 0.056 5,662.00 317.07
2 Mandor Jam 0.08 7,550.00 604.00
3 Tukang Jam 0.0005 7,078.00 3.54
4 Jam
Pem. Operator 0.0005 6,134.00 3.07
A Tenaga
1 Pekerja Jam 0.0762 5,662.00 431.44
2 Mandor Jam 0.0152 7,550.00 114.76
Jumlah Harga Tenaga 546.20
B Bahan
1 Aspal drum Kg 0.6294 7,333.00 4,615.39
2 Kerosine Liter 0.4445 6,500.00 2,889.25
Jumlah Harga Bahan 7,504.64
C Peralatan
1 75,000.00
Aspalt Sprayer Jam 0.0076 570.00
Air
2 Jam 0.0042 76,175.00 319.94
Compressor
3 Dump Truck Jam 0.0076 200,000.00 1,520.00
Jumlah Harga Peralatan 2,409.94
D Total ( A + B + C ) 10,460.78
E Overhead dan keuntungan 10 % x D 1,046.08
F Harga Satuan Pekerjaan 11,506.86
5.4.4 Pekerjaan Pelengkap Jalan
Pekerjaan : Marka Jalan
Harga Satuan : Rp. ###
Satuan Pembayaran : m²
Perkiraan Harga Jumlah Harga
No. Komponen Satuan
Kuantitas Satuan (Rp) (Rp)
A Tenaga
1 Pekerja Jam 0.00613 5,662.00 34.71
2 Tukang Jam 0.0153 7,078.00 108.29
3 Mandor Jam 0.0061 7,550.00 46.06
Jumlah Harga Tenaga 189.06
B Bahan
1 Cat Marka Jalan Kg 0.55 65,000.00 35,750.00
2 Thinner Liter 0.25 14,580.00 3,645.00
3 Glass Bit Kg 0.45 58,000.00 26,100.00
Jumlah Harga Bahan 65,495.00
C Peralatan
1 Compressor Jam 0.25 100,000.00 25,000.00
2 Alat Pengecat Marka Jam 0.25 80,000.00 20,000.00
3 Alat bantu set 1 1,500.00 1,500.00
Jumlah Harga Peralatan 46,500.00
D Total ( A + B + C ) 112,184.06
E Overhead dan keuntungan 10 % x D 11,218.41
F Harga Satuan Pekerjaan 123,402.46
A Tenaga
1 Pekerja Jam 0.75 5,662.00 4,246.50
2 Tukang Jam 0.75 7,078.00 5,308.50
3 Mandor Jam 0.75 7,550.00 5,662.50
Jumlah Harga Tenaga 15,217.50
B Bahan
1 Beton K-175 m3 0.091 613,800.00 55,855.80
2 Cat Kg 0.487 30,500.00 14,853.50
Jumlah Harga Bahan 70,709.30
C Peralatan
1 Dump Truck Jam 0.125 200,000.00 25,000.00
Jumlah Harga Peralatan 25,000.00
D Total ( A + B + C ) 110,926.80
E Overhead dan keuntungan 10 % x D 11,092.68
F Harga Satuan Pekerjaan 122,019.48
Pekerjaan : Rambu
Harga Satuan : Rp. ###
Satuan Pembayaran : Buah
A Tenaga
1 Pekerja Jam 0.143 5,662.00 809.67
2 Tukang Jam 0.036 7,078.00 254.81
3 Mandor Jam 0.018 7,550.00 135.90
Jumlah Harga Tenaga 1,200.37
B Bahan
1 Plat Rambu (40x40) Bh 1 280,500.00 280,500.00
cm
Jumlah Harga Bahan 280,500.00
C Peralatan
1 Alat Bantu Set 1 1,500.00 1,500.00
Jumlah Harga Peralatan 1,500.00
D Total ( A + B + C ) 283,200.37
E Overhead dan keuntungan 10 % x D 28,320.04
F Harga Satuan Pekerjaan 311,520.41
A Tenaga
1 Pekerja Jam 1.56 5,662.00 8,857.63
2 Tukang Jam 0.3911 7,078.00 2,768.21
3 Mandor Jam 0.1956 7,550.00 1,476.78
Jumlah Harga Tenaga 13,102.62
B Bahan
1 Rel Pengaman m' 1 369,000.00 369,000.00
2 Patok beton K-175 buah 0.0929 906,111.55 84,177.76
3 Baja Tulangan buah 4.6452 10,000.00 46,452.00
A Tenaga
1 Pekerja Jam 0.25 5,662.00 1,415.50
2 Mandor Jam 1.015 7,550.00 7,663.25
Jumlah Harga Tenaga 9,078.75
D Total ( A + B + C ) 9,078.75
E Overhead dan keuntungan 10 % x D 907.88
F Harga Satuan Pekerjaan 9,986.63
5.2 Calculation Sheet
No Uraian Satuan Volume
I. PEKERJAAN PERSIAPAN
1.1 Pengukuran
20
2100
Luas = 2100 x 20
= 42000 m2 42000
Patok kayu dipasang tiap 50 m
Patok dari Kayu Meranti 5/7, panjang 50 cm
Kebutuhan patok = (2100 x 2)/50 = 84
Total kebutuhan = 0.05 x 0.07 x 0.50 x 84
= 0.147 m3 0.147
1.2 Papan Nama Proyek
Jumlah 2 buah buah 2
120
cm 10 cm
Multipleks 100 cm
Multipleks
10 cm
Multipleks 20 cm
Beton K-175
50 cm
30 cm 30 cm
a. Papan 2/20
Volume = (1.2 x 1 x 0.2) + (1.2 x 0.2 x 0.2)*2
= 0.0576 m3 m3 0.5760
3 4 7
2
1 6
6
1 : Pos Keamanan = 2 x 3 = 6 m
2 : Tempat Parkir = 4 x 5 = 20 m
3 : Ruang staf = 4 x 3 = 12 m
4 : Ruang Direksi = 4 x 3 = 12 m
5 : Ruang pertemuan = 4 x 3 = 12 m
6 : Mushola = 4 x 3 = 12 m
7 : Toilet = 3 x 3 = 9 m
Total = 83 m
1.4 Pengaturan dan Pengendalian Lalu lintas LS 1
1.5 Pengujian Lapangan dan Laboratorium LS 1
1.6 Mobilisasi dan Demobilisasi LS 1
1.7 Listrik dan Air LS 1
1.8 Dokumentasi LS 1
1.9 Asuransi dan Administrasi LS 1
II. PEKERJAAN TANAH
2.1 Pembersihan Lapangan
Tebal Pengupasan = 20 cm
20
2
1
0
0
2
1
0
Panjang
0 jalan = 2100
Daerah manfaat jalan = 20 m
Luas = 2100 x 20
= 42000 m2 42000
2.2 Galian Tanah
Volume Galian 23554.585 m3 23554.59
2.3 Timbunan Tanah
Volume Timbunan 6472.245 m3 6472.245
Rincian pada Tabel Perhitungan Galian dan Timbunan
2.4 Persiapan Tanah Dasar (Sub Grade)
CBR Tanah dasar = 13,9 %
Lebar = 15 m + 4 m = 19 m
Volume = (2100 x 19)
= 39.900 m2 m2 39900
III. PEKERJAAN PERKERASAN JALAN
Laston MS 744
Prime Coat
Batu Pecah kelas A
Sirtu Kelas B
12
cm
150 cm 150 cm 150 cm
15 cm
I II 75 cm
III 10 cm
40 cm
Pipa galvanis Ø 2”
200 cm
40 cm
30 cm
Jumlah 10 buah
Pipa Galvanis = 2.40 x 10
= 24 m m 24
Plat = 0.4 x 0.4 x 10
= 1,6 m2 m2 1.600
Volume Beton = 0.3 x 0.3 x 0.4 x10
= 0.360 m3 m3 0.360
V. PEKERJAAN DRAINASE
5.1 Pekerjaan Galian Drainase
Panjang saluran = 2100 m
d = 0.2 m
w = 0.3 m
h = 0.5 m
d = 0.3 m
0.2 m
Lantai Kerja
( pasir,tebal 5 cm ) 0.3 m
d = 0.2 m
w = 0.3 m
h = 0.5 m
d = 0.3 m
0.2 m
Lantai Kerja
( pasir,tebal 5 cm ) 0.3 m
d = 0.2 m
w = 0.3 m
h = 0.8 m
d = 0.3 m
0.2 m
Lantai Kerja
( pasir,tebal 5 cm ) 0.3 m
1m
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Berat Isi Material Bim
Waktu siklus Ts1
- Menggali / memuat T1
- Lain-lain T2
Ts1
Koefisien = 1 : Q2 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Rp. 58,071.05 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Perbandingan Pasir & Semen : - Volume Semen Sm
: - Volume Pasir Ps
7 Perbandingan Batu & Mortar :
- Batu Bt
- Mortar (campuran semen & pasir) Mr
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1
- Batu D2
- Adukan (mortar) D3
- Pasir D4
- Semen Portland D5
1. BAHAN
1.a. Batu -- {(Bt x D1 x 1 M3) : D2} x 1.20 (M02)
1.b. Semen - Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 (M12)
x {D5 x (1000 : 40)} (M12)
1.c. Pasir --- Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01)
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V
Faktor Efisiensi Alat Fa
Waktu sikl(T1 + T2 + T3 + T4)
- Memuat T1
- Mengaduk T2
- Menuang T3
- Tunggu, dll. T4
Ts1
Kap. Prod. V x Fa x 60 Q1
1000 x Ts1
Koefisien = 1 : Q1 (E06)
ITEM PEMBAYARAN NO. : 2.2
JENIS PEKERJAAN : PASANGAN BATU DENGAN MORTAR (mekanik)
SATUAN PEMBAYARAN : M3
3. TENAGA
Produksi Pas. Batu yang mene ( Prod. C. Mixer ) Q1
Produksi Pasangan Batu dalam 1 hari = Tk x Q1 Qt
Kebutuhan- Mandor M
- Tukang Batu Tb
- Pekerja P
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03)
- Tukang = (Tk x Tb) : Qt (L02)
- Pekerja = (Tk x P) : Qt (L01)
Rp. 466,528.03 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Tebal gorong-gorong tg
7 Diameter Rata-rata d
2. ALAT
2.a. TAMPER (E25)
Kecepatan v
Efisiensi alat Fa
Lebar pemadatan Lb
Banyak lintasan n
Tebal lapis hamparan tp
Koefisien = 1 : Q1 x Vp (E25)
Koefisien = 1 : Q2 (E08)
3. TENAGA
Produksi Gorong-gorong / hari Qt
Kebutuhan tenaga :
- Pekerja P
- Tukang T
- Mandor M
KOEF. SATUANKETERANGAN
KEGIATAN
PEKERJAAN
TAHUN ANGGARAN
PROPINSI
ITEM PEMBAYARAN NO.
7.00 jam JENIS PEKERJAAN
1.20 - SATUAN PEMBAYARAN
NO. KOMPONEN
A. TENAGA
5.00 Km 1. Pekerja
2. Mandor
B. BAHAN
C. PERALATAN
0.500 M3
0.90 - 1. Excavator
0.75 - 2. Dump Truck
0.850 - 3. Alat Bantu
menit
0.500 menit
0.500 menit
1.000 menit D. JUMLAH HARGA TENAGA, B
E. OVERHEAD & LABA
14.34 M3 / jam F. HARGA SATUAN PEKERJAA
Note : 1 SATUAN dapat berdasarkan ata
berat untuk bahan-bahan.
0.0697 Jam 2 Kuantitas satuan adalah kuantita
mata pembayaran.
3 Biaya satuan untuk peralatan sud
4 Biaya satuan sudah termasuk pe
yang dibayar dari kontrak) dan b
10.00 M3
0.75 -
40.00 Km/Jam
60.00 Km/Jam
7.50 menit
5.00 menit
41.83 menit
0.50 menit
54.83 menit
Bersambung
4_ Analisa EI-21
KOEF. SATUANKETERANGAN
6.84 M3 / Jam
0.1462 Jam
Lump Sump
14.34 M3/Jam
100.41 M3
4.00 orang
1.00 orang
0.2789 Jam
0.0697 Jam
4_ Analisa EI-22
MORTAR (mekanik)
URAIAN ANALISA HARGA SATUAN
PER
KOEF. SATUANKETERANGAN
KEGIATAN
PEKERJAAN
TAHUN ANGGARAN
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
10.0 KM SATUAN PEMBAYARAN
7.00 jam
25 % Spec. 7.3.2.(2) b
75 % Spec. 7.3.2.(2) b
NO. KOMPONEN
60 %
40 %
B. BAHAN
1. Batu Belah
2. Semen (PC)
3. Pasir
1.0800 M3 Lepas
0.1400 M3
5.0400 zak
0.4200 M3 C. PERALATAN
1. Concrete Mixer
2. Alat Bantu
5,000.00 Liter
0.75 -
3.00 menit
4.00 menit
1.00 menit
2.00 menit
10.00 menit D. JUMLAH HARGA TENAGA, B
E. OVERHEAD & LABA
22.500 M3 F. HARGA SATUAN PEKERJAA
Note : 1 SATUAN dapat berdasarkan ata
berat untuk bahan-bahan.
0.0444 jam 2 Kuantitas satuan adalah kuantita
mata pembayaran.
3 Biaya satuan untuk peralatan sud
4 Biaya satuan sudah termasuk pe
Bersambung yang dibayar dari kontrak) dan b
4_ Analisa EI-22
MORTAR (mekanik)
0.00
Lanjutan
KOEF. SATUANKETERANGAN
Lump Sum
22.50 M3/Jam
157.50 M3
1.00 orang
6.00 orang
21.00 orang
0.0444 jam
0.0444 jam
0.9333 jam
FORMULIR STANDAR UN
Diameter >100 cm PEREKAMAN ANALISA MASING - MASI
KOEF. SATUANKETERANGAN
A. PEKERJA
1. Pekerja
2. Tukang
0.5 m 3. Mandor
B. MATERIAL
1. Beton K-125
2. Baja Tulangan
3. Pasir Urug
0.4082 m
44.9020 Kg
0.3500 M3 C. PERALATAN
1. Tamper
2. Dump Truck
0.5 Km / Jam 3. Alat bantu
0.83 -
0.4 M
10 lintasan
0.2 M
3.32 M3 / Jam
KOEF. SATUANKETERANGAN
0.1506 jam
Lump Sump
10 M'
6 orang
2 orang
1 orang
4.2 jam
1.4 jam
0.7 jam
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN KUANTITAS
ong-gorong Pipa Beton Bertulang JUMLAH HARGA
Diameter dalam 100 cm % THD HARGA PEK.
HARGA JUMLAH
PERKIRAAN
SAT SATUAN HARGA
KUANTITAS
( Rp ) ( Rp )
berdasarkan atas jumlah jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau
uk bahan - bahan
adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
uk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
ah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN
i kontrak ) dan biaya - biaya lainnya
4_ Analisa EI-21
23,554.59
1,013,881,022.37
7.43
JUMLAH
HARGA
(Rp.)
1,578.95
526.36
2,105.31
0.00
19,943.85
29,242.70
1,500.00
50,686.55
52,791.86
5,279.19
58,071.05
96.01
4_ Analisa EI-22
168.00
78,376,708.77
0.57
JUMLAH
HARGA
(Rp.)
5,284.53
314.58
335.56
5,934.67
144,326.17
226,800.00
42,000.00
413,126.17
3,555.56
1,500.00
5,055.56 1.19
424,116.39
42,411.64
466,528.03
ITEM PEMBAYARAN NO. : 3.1 (1) 4_ Analisa EI-311
JENIS PEKERJAAN : GALIAN BIASA
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.75 -
Berat isi material Bim 0.85 -
Waktu siklus Ts1 menit
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q4 14.34 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 100.41 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1394 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0697 Jam
Rp. 57,007.07 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.15 M
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi Alat Fa 0.75 -
Waktu sklus Ts1 menit
- Muat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kapasitas Produksi Lh
/ Jam
x b x t x Fa x 60 Q3 147.27 M3
n x Ts3
3. TENAGA
Produksi menentukan : WHELL LOADER Q1 16.88 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 118.13 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2370 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0593 Jam
Rp. 121,154.60 / M3
I. ASUMSI
1 Pekerjaan dilaksanakan pada hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi Jalan : jelek / belum padat
5 Jam kerja efektif per-hari Tk 7.00 Jam
2. ALAT
2.a. MOTOR GRADER (E13)
Panjang operasi grader sekali jalan Lh 50.00 M
Lebar Efektif kerja Blade b 2.40 M
Faktor Efisiensi Alat Fa 0.75 -
Kecepatan rata-rata alat v 2.00 Km / Jam
Jumlah lintasan n 6.00 lintasan
Waktu siklus Ts1
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 1.50 menit
- Lain-lain T2 1.00 menit
Ts1 2.50 menit
Koefisien tenaga / M2
- Pekerja = (Tk x P) : Qt (L01) 0.0178 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0044 Jam
Rp. 4,920.41 / M2
KETERANGAN
PERKIRAANHARGA JUMLAH
NO. KOMPONEN SATUANKUANTITASSATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
4_ Analisa EI-311
KETERANGAN
Lump Sump
KETERANGAN
PERKIRAANHARGA JUMLAH
NO. KOMPONEN SATUANKUANTITASSATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
Borrow Pit Material timbunan (M1 M3 1.2000 ### 78,000.00
C. PERALATAN
1. Excavator (E10) Jam 0.0593 ### 16,952.27
2. Dump Truck (E08) Jam 0.0391 ### 7,822.22
3. Motor Grader (E13) Jam 0.0068 ### 1,154.32
3. Vibro Roller (E19) Jam 0.0111 ### 1,833.33
4. Water Tanker (E23) Jam 0.0078 ### 1,088.89
5. Alat Bantu Ls 1.0000 1,500.00 1,500.00
KETERANGAN
Baik
Lump Sump
Bersambung
4_ Analisa EI-321
KETERANGAN
KETERANGAN
TAHUN ANGGARAN : 2010
PROPINSI : Jawa Tengah
ITEM PEMBAYARAN NO. : 3.3 PERKIRAAN KUAN: #REF!
JENIS PEKERJAAN : PENYIAPAN BADAN JALAN TOTAL HARGA (Rp: #REF!
SATUAN PEMBAYARAN : M2 % HARGA JML.SE : #REF!
PERKIRAANHARGA JUMLAH
NO. KOMPONEN SATUANKUANTITASSATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Motor Grader (E13) jam 0.0028 ### 472.22
2. Vibro Roller (E19) jam 0.0044 ### 733.33
3. Water Tanker (E23) jam 0.0117 ### 1,633.33
4. Alat Bantu Ls 1.0000 1,500.00 1,500.00
KETERANGAN
Baik
Lump Sump
97.46
27.56
97.00
ITEM PEMBAYARAN NO. : 4.1 (2)
JENIS PEKERJAAN : LAPIS PONDASI AGREGAT KELAS B
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 10.0
5 Tebal lapis Agregat padat t 0.15
6 Faktor kembang material (Padat-Lepas) Fk 1.20
7 Jam kerja efektif per-hari Tk 7.00
8 Lebar bahu jalan Lb 6.00
1. BAHAN
Material Agregat Kelas B hasil produksi di Base Camp
Setiap 1 M3 Agregat padat diperlukan : 1 x Fk (M27) 1.20
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.20
Faktor bucket Fb 0.90
Faktor Efisiensi alat Fa 0.75
Waktu siklus Ts1
- Muat T1 0.50
- Lain-lain T2 0.50
Ts1 1.00
Kap.Prod. Lh x b x t x Fa x 60 Q3 77.14
n x Ts3
Koefisien = 1 : Q3 (E13) 0.0130
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 40.50
Produksi Agregat / hari = Tk x Q1 Qt 283.50
Kebutuhan tenaga :
- Pekerja P 7.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1728
- Mandor = (Tk x M) : Qt (L03) 0.0247
SATUANKETERANGAN
A. TENAGA
B. BAHAN
M3 Agregat lepas
Jam
JUMLAH HARGA PERALATAN 28,298.77
SATUANKETERANGAN
M3
Jam
M
M
-
KM / Jam
lintasan 3 x pp
menit
menit
menit
M3
Jam
KM / Jam
M
lintasan
-
M3
Jam
M3 Lump Sum
M3
kali
-
M3
Jam
4_ Analisa EI-412
SATUANKETERANGAN
M3/Jam
M3
orang
orang
Jam
Jam
ITEM PEMBAYARAN NO. : 4.1 (2)
JENIS PEKERJAAN : LAPIS PONDASI AGREGAT KELAS B
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 5.0
5 Tebal lapis Agregat padat t 0.15
6 Faktor kembang material (Padat-Lepas) Fk 1.20
7 Jam kerja efektif per-hari Tk 7.00
8 Lebar bahu jalan Lb 1.00
1. BAHAN
Material Agregat Kelas B hasil produksi di Base Camp
Setiap 1 M3 Agregat padat diperlukan : 1 x Fk (M27) 1.20
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.20
Faktor bucket Fb 0.90
Faktor Efisiensi alat Fa 0.75
Waktu siklus Ts1
- Muat T1 0.50
- Lain-lain T2 0.50
Ts1 1.00
Kap.Prod. Lh x b x t x Fa x 60 Q3 77.14
n x Ts3
Koefisien = 1 : Q3 (E13) 0.0130
2.d. TANDEM ROLLER (E17)
Kecepatan rata-rata v 3.00
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 8.00
Faktor Efisiensi alat Fa 0.75
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 40.50
Produksi Agregat / hari = Tk x Q1 Qt 283.50
Kebutuhan tenaga :
- Pekerja P 7.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1728
- Mandor = (Tk x M) : Qt (L03) 0.0247
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 10.0
5 Tebal lapis agregat padat t 0.20
6 Faktor kembang material (Padat-Lepas) Fk 1.20
7 Jam kerja efektif per-hari Tk 7.00
1. BAHAN
Material Agregat Kelas A hasil produksi di Base Camp
Setiap 1 M3 Agregat padat diperlukan : 1 x Fk (M26) 1.2000
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.20
Faktor bucket Fb 0.90
Faktor Efisiensi alat Fa 0.75
Waktu Siklus : Ts1
- Muat T1 0.50
- Lain-lain T2 0.50
Ts1 1.00
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 40.50
Produksi agregat / hari = Tk x Q1 Qt 283.50
Kebutuhan tenaga :
- Pekerja P 7.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1728
- Mandor = (Tk x M) : Qt (L03) 0.0247
SATUAN KETERANGAN
A. TENAGA
B. BAHAN
M3 Agregat lepas
Jam
JUMLAH HARGA PERALATAN 20,293.54
SATUAN KETERANGAN
M3
Jam
M
M
-
KM / Jam
lintasan 3 x pp
menit
menit
menit
M3
Jam
KM / Jam
M
lintasan
-
M3
Jam
M3 Lump Sum
M3
kali
-
M3
Jam
4_ Analisa EI-412
SATUAN KETERANGAN
M3/Jam
M3
orang
orang
Jam
Jam
4_ Analisa EI-511 4_ Analisa EI-511
SATUAN KETERANGAN
A. TENAGA
B. BAHAN
M3 Agregat lepas
4_ Analisa EI-511
SATUAN KETERANGAN
M3
jam
M
M
-
KM/jam
lintasan 3 x pp
menit
menit
menit
M3
jam
KM/jam
M
lintasan
-
M3
jam
KM/jam
M
lintasan
-
M3
jam
M3
M3
kali
- Baik
M3
jam
Bersambung
4_ Analisa EI-511
SATUAN KETERANGAN
Lump Sum
M3/jam
M3
orang
orang
jam
jam
ITEM PEMBAYARAN NO. : 6.1 (1)
JENIS PEKERJAAN : LAPIS RESAP IKAT
SATUAN PEMBAYARAN : LITER URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 10.0
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fh 1.10
6 Komposisi campuran :
- Aspal AC-10 atau AC-20 As 56
- Minyak Flux / Pencair K 44
7 Berat jenis bahan :
- Aspal AC-10 atau AC-20 D1 1.05
- Minyak Flux / Pencair D2 0.80
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC 1.10
2. ALAT
2.a. ASPHALT SPRAYER (E03)
Kapasitas alat V 1,000.00
Faktor efisiensi alat Fa 0.83
Waktu Siklus (termasuk proses pemanasan) Ts 2.00
3. TENAGA
Produksi menentukan : ASPHALT FINISHER Q4 415.00
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 2,905.00
Kebutuhan tenaga :
- Pekerja P 10.00
- Mandor M 2.00
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 10.0
5 Tebal Lapis (AC) padat t 0.04
6 Jam kerja efektif per-hari Tk 7.00
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10
- Aspal Fh2 1.05
8 Komposisi campuran AC (spesifikasi) :
- Coarse Agregat 30 - 50 % CA 61.15
- Fine Agregat 39 - 59 % FA 27.00
- Fraksi Filler 4.5 - 7.5 % FF 4.85
- Asphalt minimum 6.7 % As 7.00
9 Berat jenis bahan :
- AC D1 2.25
- Coarse Agregat & Fine Agregat D2 1.80
- Fraksi Filler D3 2.00
- Asphalt D4 1.03
1. BAHAN
1.a. Agregat Kasar = (CA x (D1 x tM3) x Fh1) : D2 (M03) 0.0336
1.b. Agregat Halus = (FA x (D1 x tM3) x Fh1) : D2 (M04) 0.0149
1.c. Filler = (FF x (D1 x tM3) x Fh1) (M05) 4.802
1.d. Aspal = (AS x (D1 x tM3) x Fh2) (M10) 6.615
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.20
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu Siklus Ts1
- Muat T1 1.50
- Lain lain T2 0.50
Ts1 2.00
3. TENAGA
Produksi menentukan : ASPHALT MIXING PLANT (AMP) Q2 361.11
Produksi AC / hari = Tk x Q2 Qt 2,527.78
Kebutuhan tenaga :
- Pekerja P 10.00
- Mandor M 1.00
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0277
- Mandor = (Tk x M) / Qt (L03) 0.0028
Rp. 83,524.70 / M2
SATUANKETERANGAN
% 100 bagian
% 80 bagian PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
Kg / liter (Rp.) (Rp.)
Kg / liter
A. TENAGA
B. BAHAN
Kg. C. PERALATAN
Liter
1. Asphalt Sprayer (E03) Jam 0.0024 75,000.00 180.72
2. Compressor (E05) Jam 0.0031 100,000.00 312.50
3. Dump Truck (E08) Jam 0.0024 200,000.00 481.93
liter
- Baik
Jam
liter
JUMLAH HARGA PERALATAN 975.15
Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 10,586.46
E. OVERHEAD & LABA 10.0 % x D 1,058.65
M2 / Jam F. HARGA SATUAN PEKERJAAN ( D + E ) 11,645.11
liter / M2 Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
liter 2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
Jam 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
Bersambung yang dibayar dari kontrak) dan biaya-biaya lainnya.
4_ Analisa EI-611
SATUANKETERANGAN
liter
Jam
liter
liter
orang
orang
Jam
Jam
SATUANKETERANGAN
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0019 175,000.00 325.38
2. AMP (E01) Jam 0.0028 1,750,000.00 4,846.15
3. Genset (E12) Jam 0.0028 60,000.00 166.15
4. Dump Truck (E09) Jam 0.0112 200,000.00 2,240.96
M3 5. Asphalt Finishe (E02) Jam 0.0231 200,000.00 4,615.38
M3 6. Tandem Roller (E17) Jam 0.0021 150,000.00 307.69
Kg 7 P. Tyre Roller (E18) Jam 0.0029 183,295.14 537.13
Kg 8 Alat Bantu Ls 1.0000 1,500.00 1,500.00
SATUANKETERANGAN
M3
Jam
ton / Jam
- Normal
M2
Jam
M2
Jam
M3
-
KM / Jam
KM / Jam
ton
menit
menit
menit
menit
menit
menit
M2
Jam
ton / jam
- Normal
M2
Jam
Km / Jam
M
lintasan
- Normal
4_ Analisa EI-634
SATUANKETERANGAN
M2
Jam
KM / jam
M
lintasan
- Baik
M2
Jam
Lump Sum
M2 / Jam
M2
orang
orang
Jam
Jam
Q 3
1
3 10
B 1
2
1 10
0 A D
10
0 4
0 10 10
49
C 5
3 25
5 10
No kegiatan
D 19 E 37
5 6
9 19 18 37
aling cepat)
T
R.S
F.G 43 H 54 I
7 8
6 43 11 54 6
49
L
9
4
KETERANGAN
A : DIREKSI KEET
B : PAPAN NAMA PROYEK
C : PENGUKURAN
D : PEMBERSIHAN LAPANGAN
E : GALIAN TANAH
F : URUGAN TANAH DAN PEMADATAN
G : PENYIAPAN TANAH DASAR
H : LAPIS PONDASI BAWAH
I : LAPIS PONDASI ATAS
O 56
2 13 25
84
J 66
12
6 80
60 K 80 Q
10 15
60 20 80 4
58 M 59 N 81
25 11 25 16 25
58 1 80 1 84
P 55
14 25
1 84
81
25
84