Data Perencanaan

Mutu beton (fc’) : 22 Mpa

Mutu baja (fy) : 362 Mpa

Berat jenis beton : 2400 kg/m³ = 24 KN/m³

Beban hidup : 300 kg/m² = 3,0 KN/m²

Selimut beton (Sn) : 40 mm (SNI 03-2847-2002 pasal 9.7.2)

Selimut beton (ds) : 40 mm (SNI 03-2847-2002 pasal 9.7.2)

Dimensi balok anak : 20/35 cm

Wu pelat lantai : 9,112 KN/m²

Wu pelat balkon : 11,512 KN/m²

Wu pelat kamar mandi : 10,61 KN/m²

PERHITUNGAN BALOK ANAK

2,5

0,98

1,5

1,5

1,01
1,49

1,99

x z

y
1.5

45°
5
Sin 45⁰ = 1,5/y cos 45⁰ = z/y

½ √2 = 1,5/y ½ √2 = z/2,14

Y = 1,5/0,70 z = 0,70/2,14

Y = 2,14 z = 1,49

Maka x = 5 (2 x 1,49)

= 5 x 2,98

= 2,02

Q₁ = ½ x 1,5 x 1,49 x 6,81 = 7,61 KN

Q₂ = 1,01 x 1,5 x 6,81 = 10,31 KN

Q₃ = ½ x 1,5 x 1,49 x 6,81 = 7,61 KN

Q₄ = 1,01 x 1,5 x 6,81 = 10,31 KN

R₁ = R₂ = Q₁ + Q₂ + Q₃ + Q₄

= 7,61 + 10,31 + 7,61 + 10,31

= 35,84 KN

Mmaks = (R₁ x 2,5) – (Q₁ x 0,98) – (Q₂ x 1,89) – (Q₃ x 0,98) – (Q₄ x 1,89)

= (35,84 x 2,5) – (7,61 x 0,98) – (10,31 x 1,89) – (7,61 x 0,98) – (10,31 x


1,89)

= 89, 6 – 7,45 – 20,51 – 7,45 – 20,51

= 33,68 KN

Untuk balok yang ditumpu bebas pada kedua tepinya :

Mmaks = 1/8 x Wu x L²

Wu = Mmaks x 8 / L²

= 33,68 x 8 / 5²

= 10,77
Wu total = Wu + berat sendiri balok

=10,77 + (0,2 x 0,25 x 24)

= 11,97

Beban akibat tembok

Q = 150 x 1,5 m

3 = 225 kg/m

1,5 = 2,25 KN/m

Beban Kombinasi

Kombinasi beban pada analisa struktur memakai

Wu = 1,2 WD + 1,6 WL + 1,2 Wwall

= 1,2 x 3,68 + 1,6 x 1,50 + 1,2 x 2,25

= 4,41 + 2,4 + 2,7

= 9,51 KN/m²

PERHITUNGAN MOMEN

→ Geometrik balok anak


5

→ akibat beban plat dan berat sendiri

5m

1,50 kN/m

→ akibat beban tembok


Momen tumpuan = 99, 46 KNm

Lap. = 52,66

PERHITUNGAN PENULANGAN BALOK

Data Perencanaan :

Diameter tulangan utama : D 10 mm

Luas tulangan : 78, 54 mm²

Diameter tulangan sengkang : D 10 mm

Luas tulangan : 78,54 mm²

Selimut beton (P) : 40 mm

Bentang Ly : 300 cm

h = 1/16 x L = 1/16 x 300 = 18,75 ∞ 25 cm

b = 2/3 x h = 2/3 x 25 = 16,60 ∞ 20 cm

jadi ukuran balok induk 20 x 25 cm

Bentang Lx : 500 cm

h = 1/16 x L = 1/16 x 500 = 31,25 ∞ 35 cm

b = 2/3 x h = 2/3 x 35 = 23,3 ∞ 25 cm

jadi ukuran balok anak 25 x 35 cm

PENENTUAN TINGGI EFEKTIF

Digunakan balok anak ukuran 25 x 35 cm

d = h – p – Ø tulangan sengkang – ½ D tulangan pokok

d = 350 – 40 – 10 – ½ x 10

d = 300 – 5

d = 295 mm
Asmin = 1,4/fy x b x d

= 1,4/360 x 250 x 295

= 286,80 mm²

PERHITUNGAN TULANGAN POKOK

Tulangan tumpuan balok

Mlx = 99,46 KNm

k = Mu/Øxbxd

= 99,46 x 10⁶ / 1 x 250 x 295²

= 4,57 N/mm²

k = P x 0,8 x fy (1-0,588 P x fy/fc)

4,75 = P x 0,8 x 360 (1-0,588 P x 360/22)

0 = 4,75 – 288P + 2771P²

Dengan rumus ABC didapatkan

P₁,₂ = b ± √-b² - 4ac / 2a

= 288 ± √(288)² - 4 x 2,771 x 4,57 / 2 x 2771

P₁ = 0,01 P₂ = 0,08

Pmin = 1,4/fy = 1,4/360 = 0,0038

Karena Phit > Pmin , maka Phit = 0,01 yang dipakai

As ada Lx = Phit x b x d

= 0,01 x 250 x 295

= 737,5 mm²

Maka jumlah tulangan

n = As ada Lx / Δ tulangan = 737,5 / 78,54 = 9 buah

maka tulangan yang dipakai 9 Ø 10 mm


TULANGAN LAPANGAN BALOK

Mlx = 52,66 KNm

k = Mlx / Ø x b x d

= 52,66 x 10⁶ / 1 x 250 x 295²

= 2,42 Nmm²

k = P x 0,8 x fy (1-0,588P fy/fc)

2,42 = P x 0,8 x fy (1- 0,588P 360/22)

0 = 2,42 – 288P +2771P²

Dengan rumus ABC didapatkan

P₁,₂ = b ± √-b² - 4ac / 2a

= 288 ± √(288)² - 4 x 2,771 x 2,42 / 2 x 2771

P₁ = 0,009 P₂ = 0,09

Pmin = 1,4/fy = 1,4/360 = 0,0038

Karena Phit > Pmin , maka Phit = 0,09 yang dipakai

As ada Lx = Phit x b x d

= 0,009 x 250 x 295

= 663,75 mm²

Maka jumlah tulangan

n = As ada Lx / Δ tulangan = 663,75 / 78,54 = 8 buah

maka tulangan yang dipakai 8 Ø 10 mm


PERHITUNGAN TULANGAN SENGKANG

112,32

-112,32

Vu = 112,32 KN = 112320 N

MENGHITUNG GAYA GESER BERFAKTOR

Faktor Reduksi geser ( Ø ) = 0,75

- Ø Vc = Ø 1/6√ f c ' x b x d
= 0,75 x 1/6 √ 222x 250 x 295
= 43239,77 N
- Ø Vc / 2 = 43239,77 / 2
= 21619,88

Karena Vu > Ø Vc maka balok anak harus diberi tulangan geser


(sengkang/beugel) 112,32

Ø Vc 43239,77 kN
Ø Vc 21619,88 kN
Ø Vc 21619,88 kN
Ø Vc 43239,77 kN

-112,32

Pembagian daerah tulangan geser

MENGHITUNG GAYA GESER YANG DITAHAN BEUGEL

Dimana jumlah kaki sengkang (n) =2

S = 1000

Diameter tulangan sengkang (dp) = 10 mm


Vs = (Vu – Ø Vc ) / Ø

= ( 112320 – 43239,77 ) / 0,75

= 69080,23 / 0,75

= 92106,97

Av.u = Vs x S / fy x d

= 92106,97 x 1000 / 360 x 295

= 92106970 / 106200

= 867,29 mm² (SNI 03-2847-2002 pasal 18.5.6.2 )

Av.u = b x s / 3 x fy

= 250 x 1000 / 3 x 360

= 231,48 mm² (SNI 03-2847-2002 pasal 18.5.5.3 )

Av.u = 75 √ fc 'c' b x s /1200 x fy

= 75 √ 222x 250 x 1000 / 1200 x 360

= 203,57 mm² (SNI 03-2847-2002 pasal 13.5.5.3 )

Diambil nilai terbesar maka Av,u = 867,29 mm²

MENGHITUNG JARAK TULANGAN SENGKANG

S = n x ¼ x π x dp² x s / Δv,u

= 2 x ¼ x 3,14 x 10² x 1000 / 867,29

= 157000 / 867,29

= 181,02 mm
KONTROL SPASI BEUGEL

Vs < 1/3 √ fc 'c' b x d , maka S ≤ d/2 dan S ≤ 600 mm

1/3 √ 222x 250 x 295 = 115306,05 N > 92106,97 N

S = d/2 S = 295/2

= 147,5 mm

Dipakai nilai terkecil S = 147,5 mm ≈ 150 mm

Jadi tulangan sengkang yang digunakan ialah Ø 10 – 150 mm