Qty Qty
Material Qty Ordera Satuan Material Qty Ordera Satuan
n n
PEKERJAAN BETON SEPTIC TANK
Semen @ 40 Kg 1905 163 Zak Besi D 8 112 kg
Pasir Beton (1400 kg/m3) 129 19 m³ Bekisting 50 m²
Kerikil (1350 kg/m3) 180 18 m³ Beton 7 m³
PEKERJAAN BESI Pasangan Dinding Bata 85 m²
Besi Ø12mm - 12 m 5107 3996 Kg Pasir Urug 2.3 m³
Besi Ø10mm - 12 m 7890 281 Kg KUSEN PINTU JENDELA
Besi Ø8mm - 12 m 4837 124 Kg Pintu PU 14 Unit
Besi Ø6mm - 12 m 4112 869 Kg Pintu PB 14 Unit
Kawat Beton 3277 5 Kg Pintu PK 34 Unit
PEKERJAAN BATU BATA Pintu PBN 14 Unit
Batu Bata 241693 Buah Detail Jendela J1 14 Unit
Semen @ 40 Kg 2151 Zak Detail Jendela J2 14 Unit
Pasir (1400 kg/m3) 296 m³ Detail Jendela J3 22 Unit
PEKERJAAN BEKISTING Detail Jendela J5 6 Unit
Kayu Kelas III (Borneo/dll) 119 m³ PIPA SANITASI AIR
Paku Biasa 5 cm - 10 cm 1135 243 Kg Pipa Air Bersih PVC D 0,5" 282 m
Minyak Bekesting 536 Liter Pipa Air Kotor PVC D 3" 438 m
Kayu Kelas II (Kamper/Kruing/dll) 39 m³ Pipa Air Tinja PVC D 4" 235 m
Multipleks 861 237 Lembar
Kayu Dolken Ø 8-10/400 cm 7098 1004 Batang
Kayu 5/7 6 m³
PEKERJAAN ATAP
Atap Genteng 555 m²
Rabung 86 m²
Kanal C Baja Ringan 0,7 555 m²
Reng Baja Ringan 0,35 555 m²
Cor Dak 12 m³
Rekap Kebutuhan Material Bulan September
Qty Qty
Material Qty Ordera Satuan Material Qty Ordera Satuan
n n
PEKERJAAN BETON SEPTIC TANK
Semen @ 40 Kg 1905 362 Zak Besi D 8 112 kg
Pasir Beton (1400 kg/m3) 129 50 m³ Bekisting 50 m²
Kerikil (1350 kg/m3) 180 48 m³ Beton 7 m³
PEKERJAAN BESI Pasangan Dinding Bata 85 m²
Besi Ø12mm - 12 m 5107 1279 Kg Pasir Urug 2.3 m³
Besi Ø10mm - 12 m 7890 2396 Kg KUSEN PINTU JENDELA
Besi Ø8mm - 12 m 4837 Kg Pintu PU 14 9 Unit
Besi Ø6mm - 12 m 4112 392 Kg Pintu PB 14 10 Unit
Kawat Beton 3277 24 Kg Pintu PK 34 10 Unit
PEKERJAAN BATU BATA Pintu PBN 14 Unit
Batu Bata 241693 32000 Buah Detail Jendela J1 14 Unit
Semen @ 40 Kg 2151 100 Zak Detail Jendela J2 14 Unit
Pasir (1400 kg/m3) 296 16 m³ Detail Jendela J3 22 Unit
PEKERJAAN BEKISTING Detail Jendela J5 6 Unit
Kayu Kelas III (Borneo/dll) 119 m³ PIPA SANITASI AIR
Paku Biasa 5 cm - 10 cm 1135 216 Kg Pipa Air Bersih PVC D 0,5" 282 97 m
Minyak Bekesting 536 Liter Pipa Air Kotor PVC D 3" 438 171 m
Kayu Kelas II (Kamper/Kruing/dll) 39 m³ Pipa Air Tinja PVC D 4" 235 m
Multipleks 861 Lembar
Kayu Dolken Ø 8-10/400 cm 7098 Batang
Kayu 5/7 6 m³
PEKERJAAN ATAP
Atap Genteng 555 m²
Rabung 86 m²
Kanal C Baja Ringan 0,7 555 m²
Reng Baja Ringan 0,35 555 m²
Cor Dak 12 m³
Rekap Kebutuhan Material Bulan Oktober
Qty Qty
Material Qty Ordera Satuan Material Qty Ordera Satuan
n n
PEKERJAAN BETON SEPTIC TANK
Semen @ 40 Kg 1905 225 Zak Besi D 8 112 kg
Pasir Beton (1400 kg/m3) 129 32 m³ Bekisting 50 m²
Kerikil (1350 kg/m3) 180 8 m³ Beton 7 m³
PEKERJAAN BESI Pasangan Dinding Bata 85 m²
Besi Ø12mm - 12 m 5107 Kg Pasir Urug 2.3 m³
Besi Ø10mm - 12 m 7890 Kg KUSEN PINTU JENDELA
Besi Ø8mm - 12 m 4837 531 Kg Pintu PU 14 5 Unit
Besi Ø6mm - 12 m 4112 Kg Pintu PB 14 4 Unit
Kawat Beton 3277 131 Kg Pintu PK 34 4 Unit
PEKERJAAN BATU BATA Pintu PBN 14 Unit
Batu Bata 241693 51700 Buah Detail Jendela J1 14 Unit
Semen @ 40 Kg 2151 145 Zak Detail Jendela J2 14 Unit
Pasir (1400 kg/m3) 296 24 m³ Detail Jendela J3 22 Unit
PEKERJAAN BEKISTING Detail Jendela J5 6 Unit
Kayu Kelas III (Borneo/dll) 119 m³ PIPA SANITASI AIR
Paku Biasa 5 cm - 10 cm 1135 122 Kg Pipa Air Bersih PVC D 0,5" 282 46 m
Minyak Bekesting 536 Liter Pipa Air Kotor PVC D 3" 438 m
Kayu Kelas II (Kamper/Kruing/dll) 39 m³ Pipa Air Tinja PVC D 4" 235 m
Multipleks 861 Lembar
Kayu Dolken Ø 8-10/400 cm 7098 540 Batang
Kayu 5/7 6 m³
PEKERJAAN ATAP
Atap Genteng 555 m²
Rabung 86 m²
Kanal C Baja Ringan 0,7 555 m²
Reng Baja Ringan 0,35 555 m²
Cor Dak 12 m³
Monitoring Kebutuhan Material Natural Harmoni