JENIS PEKERJAAN : MOBILISASI
A. Sewa Tanah
Sewa Tanah untuk Base Camp M2 200.00 30,000.00 6,000,000.00
B. PERALATAN
Periksa lembar 1.2-2 LS 1.00 96,000,000.00
E. MOBILISASI LAINNYA
E.1 PEKERJAAN DARURAT
E.2 LAIN-LAIN
1 Print A3 Warna Beserta Refill Unit 1.00 7,000,000.00 7,000,000.00
(Business Ink Jet, Max Resolusi 5760, Max Besaran Kertas A3+,
Konektivitas USB, Kec. Cetak Warna 5.5ipm dan Infuse Ink Jet)
2 Print A4 Lasserjet Warna Beserta Refill Unit 1.00 2,500,000.00 2,500,000.00
Paper Size A4, 5760 x 1440 dpi, Color 38 ppm, USB, Wireless & Infuse Refill
B. PERALATAN
1 Excavator Min 145 HP Unit 10.00 2,500,000.00 25,000,000.00
2 Wheel Loader Min 3,8 M3 Unit 5.00 2,500,000.00 12,500,000.00
3 Bulldozer Min 4,5 M3 Unit 5.00 2,500,000.00 12,500,000.00
4 Dump Truck Min 6-10 M3 Unit 20.00 500,000.00 10,000,000.00
5 Landfill Compactor Min 3,5 Ton Unit 3.00 3,500,000.00 10,500,000.00
6 Motor Grader Min 135 HP Unit 1.00 2,500,000.00 2,500,000.00
7 Tamping Roller Min 8 Ton Unit 2.00 3,500,000.00 7,000,000.00
8 Pick Up Min 1 M3 Unit 2.00 500,000.00 1,000,000.00
9 Truk Crane Min 3,6 Ton Unit 1.00 2,000,000.00 2,000,000.00
10 Vibro Roller Min 6 Ton Unit 4.00 2,500,000.00 10,000,000.00
11 Theodolit - Unit 1.00 250,000.00 250,000.00
12 Tangki Air Min 4 M3 Unit 1.00 1,000,000.00 1,000,000.00
13 Genset Min 25 KVA Unit 1.00 500,000.00 500,000.00
14 Beton Molen Min 0,35 M3 Unit 1.00 500,000.00 500,000.00
15 Stamper Min 80 kg Unit 1.00 500,000.00 500,000.00
16 Pompa Air - Unit 1.00 250,000.00 250,000.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
-
-
-
-
-
Sub jumlah I -
II BAHAN
1 Uitzet dengan water pass/ ls 1.0000 25,000,000.00 25,000,000.00
theodolit -
-
-
-
Jenis Pekerjaan : Direksi kit (Kontainer) 20 ft lengkap dengan perlengkapan kantor (meja, kursi, AC dll)
No. Mata Pembayaran : -
Satuan : unit
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
-
-
-
-
-
Sub jumlah I -
II BAHAN
1 Kontainer 20 ft + perlengkapan unit 1.0000 77,727,500.00 77,727,500.00
-
-
-
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 1.00000 73,500.00 73,500.00
2 Tukang Kayu oh 1.00000 84,000.00 84,000.00
3 Kepala Tukang oh 0.10000 101,500.00 10,150.00
4 Tukang cat dan tulis oh 1.00000 84,000.00 84,000.00
5 Mandor oh 0.10000 101,500.00 10,150.00
Jenis Pekerjaan : Galian sampah dengan alat berat / m3 ( dengan pemindahan > 50m )
No. Mata Pembayaran : -
Satuan : m3
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Operator oh 0.03199 129,500.00 4,142.42
2 Mekanik oh 0.01599 122,500.00 1,959.25
3 Mandor oh 0.01599 101,500.00 1,623.38
Sub jumlah II -
III PERALATAN
1 Excavator Jam 0.0283 395,000.00 11,178.50
2 Dump Truck Jam 0.1000 175,000.00 17,500.00
Jenis Pekerjaan : Galian sampah dengan alat berat / m3 ( dengan pemindahan < 50m )
No. Mata Pembayaran : -
Satuan : m3
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Operator oh 0.02500 129,500.00 3,237.50
2 Mekanik oh 0.01500 122,500.00 1,837.50
3 Mandor oh 0.01500 101,500.00 1,522.50
Sub jumlah II -
III PERALATAN
1 Excavator Jam 0.0133 395,000.00 5,243.59
2 Dump Truck Jam 0.1000 175,000.00 17,500.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.04000 73,500.00 2,940.00
2 Operator oh 0.02000 129,500.00 2,590.00
3 Mandor oh 0.00400 101,500.00 406.00
Sub jumlah II -
III PERALATAN
1 Bulldozer jam 0.0147 375,000.00 5,512.50
2 Vibro Roller jam 0.0044 295,000.00 1,298.00
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.10000 73,500.00 7,350.00
2 Mandor oh 0.01000 101,500.00 1,015.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.10000 73,500.00 7,350.00
2 Mandor oh 0.01000 101,500.00 1,015.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.15000 73,500.00 11,025.00
2 Mandor oh 0.01500 101,500.00 1,522.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.10000 73,500.00 7,350.00
2 Mandor oh 0.01000 101,500.00 1,015.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.06500 73,500.00 4,777.50
2 Mandor oh 0.00650 101,500.00 659.75
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.10000 73,500.00 7,350.00
2 Mandor oh 0.01000 101,500.00 1,015.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja penganyam oh 1.1400 73,500.00 83,790.00
2 Tukang penganyam oh 0.3800 84,000.00 31,920.00
3 Pekerja pengisi batu oh 0.3250 73,500.00 23,887.50
4 Mandor oh 0.2980 101,500.00 30,247.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.0750 73,500.00 5,512.50
2 Tukang Batu oh - 84,000.00 -
3 Mandor oh 0.0075 101,500.00 761.25
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.1000 73,500.00 7,350.00
2 Tukang oh 0.0100 84,000.00 840.00
3 Mandor oh 0.0100 101,500.00 1,015.00
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.1000 73,500.00 7,350.00
2 Tukang oh 0.0100 84,000.00 840.00
3 Mandor oh 0.0100 101,500.00 1,015.00
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.1000 73,500.00 7,350.00
2 Tukang oh 0.0100 84,000.00 840.00
3 Mandor oh 0.0100 101,500.00 1,015.00
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.1000 73,500.00 7,350.00
2 Tukang oh 0.0100 84,000.00 840.00
3 Mandor oh 0.0100 101,500.00 1,015.00
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.3000 73,500.00 22,050.00
2 Mandor oh 0.0100 101,500.00 1,015.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.2500 73,500.00 18,375.00
2 Tukang Batu oh 0.2500 84,000.00 21,000.00
3 Kepala Tukang oh 0.0250 101,500.00 2,537.50
4 Mandor oh 0.0030 101,500.00 304.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0010 101,500.00 101.50
2 Kepala Tukang Batu oh 0.0250 101,500.00 2,537.50
3 Tukang Batu oh 0.0500 84,000.00 4,200.00
4 Pekerja oh 0.0500 73,500.00 3,675.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0750 101,500.00 7,612.50
2 Kepala Tukang Batu oh 0.0750 101,500.00 7,612.50
3 Tukang Batu oh 0.7500 84,000.00 63,000.00
4 Pekerja oh 1.5000 73,500.00 110,250.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0150 101,500.00 1,522.50
2 Kepala Tukang Batu oh 0.0150 101,500.00 1,522.50
3 Tukang Batu oh 0.1500 84,000.00 12,600.00
4 Pekerja oh 0.3000 73,500.00 22,050.00
Jenis Pekerjaan : Urugan Limestone t.60cm Jalan Oprasional elevasi +108 Zona B
No. Mata Pembayaran : -
Satuan : m3
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.1000 73,500.00 7,350.00
2 Mandor oh 0.0100 101,500.00 1,015.00
Jenis Pekerjaan : Urugan Limestone t.60cm Jalan kerja elevasi +100 Zona B
No. Mata Pembayaran : -
Satuan : m3
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.1000 73,500.00 7,350.00
2 Mandor oh 0.0100 101,500.00 1,015.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Opertor oh 0.2500 129,500.00 32,375.00
2 Mandor oh 0.0250 101,500.00 2,537.50
Sub jumlah II -
III PERALATAN
1 Excavator Jam 0.0286 395,000.00 11,281.20
2 Dumptruck Jam 0.0374 175,000.00 6,541.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja penganyam oh 1.1400 73,500.00 83,790.00
2 Tukang penganyam oh 0.3800 84,000.00 31,920.00
3 Pekerja pengisi batu oh 0.3250 73,500.00 23,887.50
4 Mandor oh 0.2980 101,500.00 30,247.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.0750 73,500.00 5,512.50
2 Tukang batu oh - .0 84,000.00 -
3 Mandor oh 0.0075 101,500.00 761.25
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0960 101,500.00 9,744.00
2 Tukang Pipa oh 0.4790 84,000.00 40,236.00
3 Pekerja oh 0.9570 73,500.00 70,339.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 1.0960 73,500.00 80,556.00
2 Tukang Pipa oh 0.5480 84,000.00 46,032.00
3 Mandor oh 0.1100 101,500.00 11,165.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 1.0960 73,500.00 80,556.00
2 Tukang Pipa oh 0.5480 84,000.00 46,032.00
3 Mandor oh 0.1100 101,500.00 11,165.00
Jenis Pekerjaan : Pek Media kerikil 10-20 cm ( Sepanjang perletakan Pipa Lindi )
No. Mata Pembayaran : -
Satuan : m3
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.3000 73,500.00 22,050.00
2 Mandor oh 0.0100 101,500.00 1,015.00
Jenis Pekerjaan : Pek Media kerikli 30-50 cm ( Sepanjang perletakan Pipa Lindi )
No. Mata Pembayaran : -
Satuan : m3
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.3000 73,500.00 22,050.00
2 Mandor oh 0.0100 101,500.00 1,015.00
Jenis Pekerjaan : Pek Media kerikil 50-70 cm ( Sepanjang perletakan Pipa Lindi )
No. Mata Pembayaran : -
Satuan : m3
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.3000 73,500.00 22,050.00
2 Mandor oh 0.0100 101,500.00 1,015.00
Jenis Pekerjaan : Galian dan perataan sampah dengan alat berat / m3 (dengan pemindahan < 50m )
No. Mata Pembayaran : -
Satuan : m3
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Operator oh 0.0540 129,500.00 6,998.18
2 Mekanik/Pekerja Terampil oh 0.0108 122,500.00 1,320.55
3 Mandor oh 0.0053 101,500.00
Sub jumlah II -
III PERALATAN
1 Excavator Jam 0.0286 395,000.00 11,281.20
2 Dumptruck Jam 0.0374 175,000.00 6,541.50
Jenis Pekerjaan : Pasang Geotextile nonwoven 450gr loading area rencana puncak Zona A
No. Mata Pembayaran : -
Satuan : m2
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.0750 73,500.00 5,512.50
2 Tukang batu oh - .0 84,000.00 -
3 Mandor oh 0.0075 101,500.00 761.25
Jenis Pekerjaan : Uragan Limestone t.60cm dipadatkan loading area rencana puncak Zona Apuncak Zona A
No. Mata Pembayaran : -
Satuan : m3
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.1000 73,500.00 7,350.00
2 Mandor oh 0.0100 101,500.00 1,015.00
Jenis Pekerjaan : Pekerjaan tutup saluran precast beton U ditch HD (0,80 x 1,00)
No. Mata Pembayaran : -
Satuan : bh
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.1000 73,500.00 7,350.00
2 Tukang oh 0.0100 84,000.00 840.00
3 Mandor oh 0.0100 101,500.00 1,015.00
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Operator oh 0.0320 129,500.00 4,142.42
2 Mekanik/Pekerja Terampil oh 0.0160 122,500.00 1,959.25
3 Mandor oh 0.0160 101,500.00 1,623.38
-
Sub jumlah II -
III PERALATAN
1 Excavator jam 0.0286 395,000.00 11,281.20
2 Dump Truck Jam 0.1000 175,000.00 17,500.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.4000 73,500.00 29,400.00
2 Mandor oh 0.0400 101,500.00 4,060.00
-
Sub jumlah II -
III PERALATAN
1 Alat Bantu ls 1.0000 1,000.00 1,000.00
Jenis Pekerjaan : Pasang pipa gas pipa pvc SNI S 10 Ø 150 mm (perforeted)
No. Mata Pembayaran : -
Satuan : m1
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0060 101,500.00 609.00
2 Tukang Pipa oh 0.0310 84,000.00 2,604.00
3 Pekerja oh 0.0620 73,500.00 4,557.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.0750 73,500.00 5,512.50
2 Tukang Pipa oh 0.0170 84,000.00 1,428.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.0750 73,500.00 5,512.50
2 Tukang Pipa oh 0.0170 84,000.00 1,428.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.0750 73,500.00 5,512.50
2 Mandor oh 0.0170 84,000.00 1,428.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.3000 73,500.00 22,050.00
2 Mandor oh 0.0100 101,500.00 1,015.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.1000 73,500.00 7,350.00
2 Mandor oh 0.0500 101,500.00 5,075.00
Sub jumlah II -
III PERALATAN
1 Alat Bantu ls 1.0000 1,000.00 1,000.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.3330 73,500.00 24,475.50
2 Mandor oh 6.6670 101,500.00 676,700.50
Sub jumlah II -
III PERALATAN
1 Alat Bantu ls 1.0000 1,000.00 1,000.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 13.3340 73,500.00 980,049.00
2 Mandor oh 0.6660 101,500.00 67,599.00
Sub jumlah II -
III PERALATAN
1 Alat Bantu ls 1.0000 1,000.00 1,000.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.3330 73,500.00 24,475.50
2 Mandor oh 6.6670 101,500.00 676,700.50
Sub jumlah II -
III PERALATAN
1 Alat Bantu ls 1.0000 1,000.00 1,000.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.7500 73,500.00 55,125.00
2 Mandor oh 0.0250 101,500.00 2,537.50
Sub jumlah II -
III PERALATAN
1 Alat Bantu ls 1.0000 1,000.00 1,000.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.2500 73,500.00 18,375.00
2 Mandor oh 0.0083 101,500.00 842.45
Sub jumlah II -
III PERALATAN
1 Alat Bantu ls 1.0000 1,000.00 1,000.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.5000 73,500.00 36,750.00
2 Mandor oh 0.0500 101,500.00 5,075.00
Sub jumlah II -
III PERALATAN
1 Alat Bantu ls 1.0000 1,000.00 1,000.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.1650 101,500.00 16,747.50
2 Kepala Tukang Batu oh 0.0280 101,500.00 2,842.00
3 Tukang Batu oh 0.2750 84,000.00 23,100.00
4 Pekerja oh 1.6500 73,500.00 121,275.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0830 101,500.00 8,424.50
2 Kepala Tukang oh 0.0280 101,500.00 2,842.00
3 Tukang Batu oh 0.2750 84,000.00 23,100.00
4 Pekerja oh 1.6500 73,500.00 121,275.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0004 101,500.00 40.60
2 Kepala Tukang Besi oh 0.0007 101,500.00 71.05
3 Tukang Besi oh 0.0070 84,000.00 588.00
4 Pekerja oh 0.0070 73,500.00 514.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0260 101,500.00 2,639.00
2 Kepala Tukang Kayu oh 0.0260 101,500.00 2,639.00
3 Tukang Kayu oh 0.2600 84,000.00 21,840.00
4 Pekerja oh 0.5200 73,500.00 38,220.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0330 101,500.00 3,349.50
2 Kepala Tukang Kayu oh 0.0330 101,500.00 3,349.50
3 Tukang Kayu oh 0.3300 84,000.00 27,720.00
4 Pekerja oh 0.6600 73,500.00 48,510.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0330 101,500.00 3,349.50
2 Kepala Tukang Kayu oh 0.0330 101,500.00 3,349.50
3 Tukang Kayu oh 0.3300 84,000.00 27,720.00
4 Pekerja oh 0.6600 73,500.00 48,510.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0260 101,500.00 2,639.00
2 Kepala Tukang Kayu oh 0.0260 101,500.00 2,639.00
3 Tukang Kayu oh 0.2600 84,000.00 21,840.00
4 Pekerja oh 0.5200 73,500.00 38,220.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0150 101,500.00 1,522.50
2 Kepala Tukang Batu oh 0.0100 101,500.00 1,015.00
3 Tukang Batu oh 0.1000 84,000.00 8,400.00
4 Pekerja oh 0.3200 73,500.00 23,520.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.3000 73,500.00 22,050.00
2 Tukang Batu oh 0.1500 84,000.00 12,600.00
3 Kepala Tukang oh 0.0150 101,500.00 1,522.50
4 Mandor oh 0.0150 101,500.00 1,522.50
Jenis Pekerjaan : Pemasangan plat besi stainless steel tebal 10 mm (penyangga mixer)
No. Mata Pembayaran : -
Satuan : kg
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.0100 73,500.00 735.00
2 Mandor oh 0.0010 101,500.00 101.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.0100 73,500.00 735.00
2 Mandor oh 0.0010 101,500.00 101.50
-
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
-
-
-
-
Sub jumlah I -
II BAHAN
1 Mixer dan Aksesorinya unit 1.0000 7,350,000.00 7,350,000.00
-
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Ongkos kerja pemasang m1 3.1400 17,535.00 55,059.90
-
-
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Ongkos kerja pemasang m1 3.1400 17,535.00 55,059.90
-
-
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0070 101,500.00 710.50
2 Kepala Tukang Besi oh 0.0070 101,500.00 710.50
3 Tukang Besi oh 0.0670 84,000.00 5,628.00
4 Pekerja oh 0.1400 73,500.00 10,290.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.0070 73,500.00 514.50
2 Tukang Besi oh 0.0070 84,000.00 588.00
3 Kepala Tukang oh 0.0007 101,500.00 71.05
4 Mandor oh 0.0004 101,500.00 40.60
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.0100 73,500.00 735.00
2 Mandor oh 0.0010 101,500.00 101.50
-
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.0600 73,500.00 4,410.00
2 Tukang Besi oh 0.0600 84,000.00 5,040.00
3 Kepala Tukang oh 0.0060 101,500.00 609.00
4 Mandor oh 0.0030 101,500.00 304.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
-
-
-
-
Sub jumlah I -
II BAHAN
1 Tangki kimia Ø 1,1 m tinggi 1,3 bh 1.0000 2,835,000.00 2,835,000.00
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0200 101,500.00 2,030.00
2 Kepala Tukang Cat oh 0.0800 101,500.00 8,120.00
3 Tukang Cat oh 0.8000 84,000.00 67,200.00
4 Pekerja oh 0.4000 73,500.00 29,400.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0330 101,500.00 3,349.50
2 Kepala Tukang Kayu oh 0.0330 101,500.00 3,349.50
3 Tukang Kayu oh 0.3300 84,000.00 27,720.00
4 Pekerja oh 0.6600 73,500.00 48,510.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0120 101,500.00 1,218.00
2 Tukang Pipa oh 0.0590 84,000.00 4,956.00
3 Pekerja oh 0.1180 73,500.00 8,673.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0040 101,500.00 406.00
2 Kepala Tukang oh 0.0135 101,500.00 1,370.25
3 Tukang Pipa oh 0.1350 84,000.00 11,340.00
4 Pekerja oh 0.0810 73,500.00 5,953.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Tukang Pipa oh 0.0750 84,000.00 6,300.00
2 Pekerja oh 0.0170 73,500.00 1,249.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Tukang Pipa oh 0.0170 84,000.00 1,428.00
2 Pekerja oh 0.0750 73,500.00 5,512.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Tukang Pipa oh 0.0170 84,000.00 1,428.00
2 Pekerja oh 0.0750 73,500.00 5,512.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.0600 73,500.00 4,410.00
2 Tukang Pipa oh 0.0300 84,000.00 2,520.00
3 Kepala Tukang oh 0.0030 101,500.00 304.50
4 Mandor oh 0.0030 101,500.00 304.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
1 Pekerja oh 0.0600 73,500.00 4,410.00
2 Tukang Pipa oh 0.0300 84,000.00 2,520.00
3 Kepala Tukang oh 0.0030 101,500.00 304.50
4 Mandor oh 0.0030 101,500.00 304.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.0200 73,500.00 1,470.00
2 Tukang Cat oh 0.0630 84,000.00 5,292.00
3 Kepala Tukang oh 0.0060 101,500.00 609.00
4 Mandor oh 0.0030 101,500.00 304.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.2500 73,500.00 18,375.00
2 Mandor oh 0.0210 101,500.00 2,131.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.3000 73,500.00 22,050.00
2 Tukang Besi oh 0.1000 84,000.00 8,400.00
3 Kepala Tukang oh 0.0100 101,500.00 1,015.00
4 Mandor oh 0.0100 101,500.00 1,015.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Ongkos kerja pemasangan m1 3.1400 17,535.00 55,059.90
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Tukang Besi oh 0.1000 84,000.00 8,400.00
2 Kepala Tukang oh 0.0100 101,500.00 1,015.00
-
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.3000 73,500.00 22,050.00
2 Mandor oh 0.0100 101,500.00 1,015.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Ongkos kerja pemasangan m1 3.1400 17,535.00 55,059.90
Jenis Pekerjaan : Baut skrup roofing panjang 2,5 cm untuk atap polycarbonat
No. Mata Pembayaran : -
Satuan : BH
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 -
-
Sub jumlah I -
II BAHAN
1 Baut skrup roofing p = 2,5 cm bh 1.0000 1,000.00 1,000.00
atap polycarbonat
Jenis Pekerjaan : Water profing semen lantai dan dinding bagian dalam setara MU, yang terkena air
No. Mata Pembayaran : -
Satuan : M2
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0150 101,500.00 1,522.50
2 Kepala Tukang Batu oh 0.0200 101,500.00 2,030.00
3 Tukang Batu oh 0.2000 84,000.00 16,800.00
4 Pekerja oh 0.3000 73,500.00 22,050.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0040 101,500.00 406.00
2 Kepala Tukang oh 0.0135 101,500.00 1,370.25
3 Tukang Batu oh 0.1350 84,000.00 11,340.00
4 Pekerja oh 0.0810 73,500.00 5,953.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.3000 73,500.00 22,050.00
2 Mandor oh 0.0100 101,500.00 1,015.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.3000 73,500.00 22,050.00
2 Mandor oh 0.0100 101,500.00 1,015.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Pekerja oh 0.3000 73,500.00 22,050.00
2 Mandor oh 0.0100 101,500.00 1,015.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Ongkos kerja pemasangan m1 2.9438 17,535.00 51,619.53
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Ongkos kerja pemasangan m1 2.9438 17,535.00 51,619.53
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Ongkos kerja pemasangan m1 2.9438 17,535.00 51,619.53
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Ongkos kerja pemasangan m1 1.4719 17,535.00 25,809.77
-
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0200 101,500.00 2,030.00
2 Kepala Tukang Cat oh 0.0800 101,500.00 8,120.00
3 Tukang Cat oh 0.8000 84,000.00 67,200.00
4 Pekerja oh 0.4000 73,500.00 29,400.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0070 101,500.00 710.50
2 Kepala Tukang Besi oh 0.0070 101,500.00 710.50
3 Tukang Besi oh 0.0670 84,000.00 5,628.00
4 Pekerja oh 0.1400 73,500.00 10,290.00
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0004 101,500.00 40.60
2 Kepala Tukang Besi oh 0.0007 101,500.00 71.05
3 Tukang Besi oh 0.0070 84,000.00 588.00
4 Pekerja oh 0.0070 73,500.00 514.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
1 Mandor oh 0.0004 101,500.00 40.60
2 Kepala Tukang Besi oh 0.0007 101,500.00 71.05
3 Tukang Besi oh 0.0070 84,000.00 588.00
4 Pekerja oh 0.0070 73,500.00 514.50
No. Uraian Satuan Koefisien Harga Satuan (Rp) Harga (Rp) Ket.
(1) (2) (3) (4) (5) (6) (7)
I UPAH
-
-
-
-
Sub jumlah I -
II BAHAN