Jan-18 92.41
Feb-18 91.80
Mar-18 90.57
Apr-18 88.85
May-18 81.86
Jun-18 81.48
Jul-18 71.92
Aug-18 72.67
Sep-18 65.79
Oct-18 64.80
Nov-18 66.27
Dec-18 66.30
HBA yang digunakan 77.89
RATA-RATA 78
Keterangan
Data Input
100.00
90.00
80.00
70.00
60.00
HBA (US$/TON)
50.00
40.00
30.00
20.00
10.00
0.00
Nov-17 Dec-17 Feb-18 Apr-18 May-18 Jul-18 Sep-18 Oct-18 Dec-18 Feb-19
Bulan
TABEL
ESTIMASI HARGA ALAT
JUMLAH UNIT
NO ACTIVITIES HARGA (Rp) Total harga (Rp)
DI BELI
1 Computer System 20 9,000,000 180,000,000.00
2 Water Truck 1 640,000,000.00 640,000,000.00
3 Survey Equipment 2 31,000,000.00 62,000,000.00
4 Office Equipment 1 11,000,000.00 11,000,000.00
5 Handy Talky 28 300,000.00 8,400,000.00
6 Mobil Operasional 14 430,000,000.00 6,020,000,000.00
7 Bus Karyawan 5 252,000,000.00 1,260,000,000.00
8 Compactor 1 350,000,000.00 350,000,000.00
9 Motor Grader 1 437,255,000.00 437,255,000.00
10 Excavator OB 2 6,250,106,130.00 12,500,212,260.00
11 Excavator BB 1 830,135,986.00 830,135,986.00
12 Dump Truck OB 8 1,650,000,000.00 13,200,000,000.00
13 Dump Truck BB 13 505,000,000.00 6,565,000,000.00
14 Sump Pump 2 210,000,000 420,000,000.00
15 Dozer Pit 1 254,160,000 254,160,000.00
16 Dozer Disposal 1 254,160,000 254,160,000.00
17 Dewatering Pompa Pontoon 1 335,000,000 335,000,000.00
18 Diesel Genset 1 95,415,360 95,415,360.00
19 Tower Lamp 8 26,000,000 208,000,000.00
20 Pipe HDPE 71 1,977,000 140,367,000.00
21 Fuel Truck 1 465,000,000 465,000,000.00
Total 13,037,509,476 44,236,105,606.00
Keterangan
Input
ESTIMASI PEMAKAIAN BBM DAN OLI
Konsumsi
Bahan Bakar
NO NAMA ALAT Activity
Liter/ Jam
Keterangan :
Data Input
LAMA PEMAKAIAN Biaya BBM Rupiah / Biaya Oli Rupiah /
Konsumsi Oli Jumlah Alat
(Jam) Tahun Tahun
29
Rp 229,590,233,404
Rp 9,266,305,205
Rp 238,856,538,609
LAMA PEMAKAIAN Biaya BBM Rupiah / Biaya Oli Rupiah / LAMA PEMAKAIAN
Jumlah Alat
(Jam) Tahun Tahun (Jam)
23
Biaya BBM Rupiah / Biaya Oli Rupiah / LAMA
Jumlah Alat Jumlah Alat
Tahun Tahun PEMAKAIAN (Jam)
27 23
Biaya BBM Rupiah / Biaya Oli Rupiah /
Tahun Tahun
Tahun -4 Tahun -4
4,103,728,509 120,616,370
1,641,491,404 24,123,274
1,641,491,404 15,507,819
1,641,491,404 15,507,819
2,462,237,105 51,692,730
4,267,877,649 51,692,730
26,674,235,309 1,344,010,980
4,924,474,211 310,156,380
1,094,874,766 17,230,910
738,671,132 15,507,819
607,351,819 15,507,819
2,462,237 5,169,273
13,131,931 27,569,456
5,745,220 12,061,637
7,386,711 15,507,819
49,826,650,811 2,041,862,835
SUPPORTING & GENERAL
1 Mobil Operasional 14
2 Bus Karyawan 5
3 Compactor 1
4 Motor Grader 1
5 Excavator BB 1
6 Excavator OB 2
7 Dump Truck OB 13
8 Dump Truck BB 8
9 Sump Pump 2
10 Dozer Pit 1
11 Dozer Disposal 1
12 Tower Lamp 5
13 Water Truck 1
14 Fuel Truck 1
15 Diesel Genset 1
SUB TOTAL
LAMA PEMAKAIAN = WAKTU EFEKTIF ALAT BEKERJA DALAM SATUAN JAM SETIAP 1 TAHUN
PRESENTASE BIAYA BIAYA REPAIR &
LAMA PEMAKAIAN (JAM) REPAIR DAN MAINTENANCE
MAINTENANCE (10%) (Rupiah)
SETIAP 1 TAHUN
SUPPORTING & GENERAL
1 Mobil Operasional 14
2 Bus Karyawan 5
3 Compactor 1
4 Motor Grader 1
5 Excavator BB 1
6 Excavator 0B 1
7 Dump Truck OB 13
8 Dump Truck BB 3
9 Sump Pump 2
10 Dozer Pit 1
11 Dozer Disposal 1
12 Tower Lamp 8
13 Water Truck 1
14 Fuel Truck 1
15 Diesel Genset 1
SUB TOTAL
LAMA PEMAKAIAN = WAKTU EFEKTIF ALAT BEKERJA DALAM SATUAN JAM SETIAP 1 TAHUN
LAMA PEMAKAIAN (JAM) PRESENTASE BIAYA REPAIR BIAYA REPAIR &
DAN MAINTENANCE (10%) MAINTENANCE (Rupiah)
PRESENTASE
LAMA
NO NAMA ALAT JUMLAH ALAT PEMAKAIAN BIAYA REPAIR DAN
MAINTENANCE
(JAM)
(10%)
LAMA PEMAKAIAN = WAKTU EFEKTIF ALAT BEKERJA DALAM SATUAN JAM SETIAP 1 TAHUN
BIAYA REPAIR &
MAINTENANCE
(Rupiah)
430,000,000
50,400,000
35,000,000
43,725,500
625,010,613
166,027,197
656,500,000
990,000,000
42,000,000
25,416,000
25,416,000
201,000,000
9,541,536
2,600,000
64,000,000
3,366,636,846
SUPPORTING & GENERAL
LAMA PEMAKAIAN
NO NAMA ALAT JUMLAH ALAT
(JAM)
LAMA PEMAKAIAN = WAKTU EFEKTIF ALAT BEKERJA DALAM SATUAN JAM SETIAP 1 TAHUN
PRESENTASE BIAYA
REPAIR DAN BIAYA REPAIR &
MAINTENANCE MAINTENANCE (Rupiah)
(10%)
0.1 430,000,000
0.1 50,400,000
0.1 35,000,000
0.1 43,725,500
0.1 625,010,613
0.1 83,013,599
0.1 656,500,000
0.1 495,000,000
0.1 42,000,000
0.1 25,416,000
0.1 25,416,000
0.1 268,000,000
0.1 9,541,536
0.1 2,600,000
0.1 64,000,000
2,855,623,248
M SETIAP 1 TAHUN
ESTIMASI BIAYA PRA PENAMBANGAN
NO URAIAN
1 Biaya Perijinan
2 Biaya Kegiatan Eksplorasi
3 Biaya Studi AMDAL
4 Biaya Studi Kelayakan
5 Biaya Jaminan Reklamasi (60.000.000/Ha)
TOTAL
NO URAIAN
1 Pembangunan Kantor, Pos Security, Laboratorium dan Mess
2 Fasilitas dan perlengkapan kantor
3 Pembangunan Workshop
4 Pembangunan Stasiun Bahan Bakar
5 Port dan Fasilitas Pengolahan Batubara
6 Pembangunan Jalan ( 24km)
TOTAL
Keterangan
BIAYA (Rp) Satuan Unit AMORTISASI (Rp)
120,000,000 1 Unit 120,000,000
545,000,000 1 Unit 545,000,000
250,000,000 1 Unit 250,000,000
700,000,000 1 Unit 700,000,000
60,000,000 385.00 Hektar 23,100,000,000.00
1,675,000,000 24,715,000,000
FRASTRUKTUR
57,035,000,000
Input
NO DESCRIPTION TOTAL GAJI PERBULAN
II ENGINEERING
Kabag. Engineering 1 12,800,000
Spv. Mine Plan 2 11,000,000
Helper Survey 4 3,250,000.00
Spv. Pit Control 1 10,500,000
Spv. Survey 1 10,500,000
Spv. Cost Control 1 10,500,000
SUB TOTAL II 10
III HR & GA
Kabag. HR & GA 1 12,800,000
Spv. Finance & Administration 1 10,500,000
Spv. HR 1 10,500,000
Spv. Marketting 1 10,500,000
Staf Administration 2 3,800,000
Security 2 3,250,000
SUB TOTAL III 8
Biaya Pertahun
Biaya Pertahun
Biaya Pertahun
Biaya Pertahun
TOTAL UPAH & TOTAL UPAH &
FASILITAS FASILITAS
KARYAWAN KARYAWAN (PER
(PER BULAN) TAHUN)
Rp Rp
60,943,200 731,318,400.00
36,751,200 441,014,400.00
36,751,200 441,014,400.00
23,618,400 283,420,800.00
23,618,400 283,420,800.00
42,972,000 515,664,000.00
224,654,400 2,695,852,800
19,194,720 230,336,640.00
30,495,600 365,947,200.00
21,724,800 260,697,600.00
16,015,200 192,182,400.00
16,015,200 192,182,400.00
16,015,200 192,182,400.00
119,460,720 1,433,528,640
19,194,720 230,336,640.00
16,015,200 192,182,400.00
16,015,200 192,182,400.00
16,015,200 192,182,400.00
12,498,480 149,981,760.00
11,123,700 133,484,400.00
90,862,500 1,090,350,000
19,471,200 233,654,400.00
15,324,000 183,888,000.00
10,498,800 125,985,600.00
15,324,000 183,888,000.00
22,758,000 273,096,000.00
83,376,000 1,000,512,000
19,194,720 230,336,640.00
29,245,800 350,949,600.00
40,836,480 490,037,760.00
14,998,080 179,976,960.00
22,758,000 273,096,000.00
127,033,080 1,524,396,960
19,194,720 230,336,640.00
26,409,600 238,809,600
16,915,440 137,275,440
15,498,000 132,998,000
17,997,600 158,997,600
96,015,360 898,417,280
295,501,200 3,546,014,400.00
1,036,903,260 12,189,072,080
LAMA
NO DESCRIPTION TOTAL GAJI PERBULAN TOTAL GAJI KERJA
(Bulan)
II ENGINEERING
Kabag. Engineering 1 12,800,000 12,800,000 12
Spv. Mine Plan 2 11,000,000 22,000,000 12
Helper Survey 4 3,250,000.00 13,000,000 12
Spv. Pit Control 1 10,500,000 10,500,000 12
Spv. Survey 1 10,500,000 10,500,000 12
Spv. Cost Control 1 10,500,000 10,500,000 12
SUB TOTAL II 10 79,300,000
III HR & GA
Kabag. HR & GA 1 12,800,000 12,800,000 12
Spv. Finance & Administration 1 10,500,000 10,500,000 12
Spv. HR 1 10,500,000 10,500,000 12
Spv. Marketting 1 10,500,000 10,500,000 12
Staf Administration 2 3,800,000 7,600,000 12
Security 2 3,250,000 6,500,000 12
SUB TOTAL III 8 58,400,000
Rp
731,318,400.00
441,014,400.00
441,014,400.00
283,420,800.00
283,420,800.00
515,664,000.00
2,695,852,800
230,336,640.00
365,947,200.00
260,697,600.00
192,182,400.00
192,182,400.00
192,182,400.00
1,433,528,640
230,336,640.00
192,182,400.00
192,182,400.00
192,182,400.00
149,981,760.00
133,484,400.00
1,090,350,000
233,654,400.00
183,888,000.00
125,985,600.00
183,888,000.00
273,096,000.00
1,000,512,000
230,336,640.00
350,949,600.00
490,037,760.00
179,976,960.00
273,096,000.00
1,524,396,960
230,336,640.00
238,809,600
137,275,440
132,998,000
158,997,600
898,417,280
2,657,973,600.00
11,301,031,280
NO DESCRIPTION TOTAL GAJI PERBULAN
II ENGINEERING
Kabag. Engineering 1 12,800,000
Spv. Mine Plan 2 11,000,000
Helper Survey 4 3,250,000.00
Spv. Pit Control 1 10,500,000
Spv. Survey 1 10,500,000
Spv. Cost Control 1 10,500,000
SUB TOTAL II 10
III HR & GA
Kabag. HR & GA 1 12,800,000
Spv. Finance & Administration 1 10,500,000
Spv. HR 1 10,500,000
Spv. Marketting 1 10,500,000
Staf Administration 2 3,800,000
Security 2 3,250,000
SUB TOTAL III 8
Biaya Pertahun
TOTAL UPAH & TOTAL UPAH &
FASILITAS FASILITAS
KARYAWAN (PER KARYAWAN (PER
BULAN) TAHUN)
Rp Rp
60,943,200 731,318,400.00
36,751,200 441,014,400.00
36,751,200 441,014,400.00
23,618,400 283,420,800.00
23,618,400 283,420,800.00
42,972,000 515,664,000.00
224,654,400 2,695,852,800
19,002,720 228,032,640.00
30,165,600 361,987,200.00
21,529,800 258,357,600.00
15,857,700 190,292,400.00
15,857,700 190,292,400.00
15,857,700 190,292,400.00
118,271,220 1,419,254,640
19,194,720 230,336,640.00
16,015,200 192,182,400.00
16,015,200 192,182,400.00
16,015,200 192,182,400.00
12,498,480 149,981,760.00
11,123,700 133,484,400.00
90,862,500 1,090,350,000
19,471,200 233,654,400.00
15,324,000 183,888,000.00
10,498,800 125,985,600.00
15,324,000 183,888,000.00
22,758,000 273,096,000.00
83,376,000 1,000,512,000
19,194,720 230,336,640.00
29,245,800 350,949,600.00
40,836,480 490,037,760.00
14,998,080 179,976,960.00
22,758,000 273,096,000.00
127,033,080 1,524,396,960
19,194,720 230,336,640.00
26,409,600 238,809,600
16,915,440 137,275,440
15,498,000 132,998,000
17,997,600 158,997,600
96,015,360 898,417,280
270,067,800 3,240,813,600.00
1,010,280,360 11,869,597,280
Rincian Karyawan
1 Direktur 1 -
2 Manager Proyek 1 -
3 Manager General 1 -
4 Manager Keuangan 1 -
5 Sekretaris General 1 -
6 Sekretaris Keuangan 1 -
7 Manajer Tambang (KTT) 1 -
8 Kabag. Engineering 1 Engineering
9 Spv. Mine Plan 2 Engineering
10 Helper Survey 4 Engineering
11 Spv. Pit Control 1 Engineering
12 Spv. Survey 1 Engineering
13 Spv. Cost Control 1 Engineering
14 Kabag. HR & GA 1 HR & GA
15 Spv. Finance & Administration 1 HR & GA
16 Spv. HR 1 HR & GA
17 Spv. Marketting 1 HR & GA
18 Administration 2 HR & GA
19 Security 3 HR & GA
20 Kabag. HSE & Comdev 1 HSE & Comdev
21 Spv. Comdev 1 HSE & Comdev
22 Safety Officer 2 HSE & Comdev
23 Spv. HSE 1 HSE & Comdev
24 Staff HSE 3 HSE & Comdev
25 Kabag. Mine Production 1 Mine Production
26 Spv. Mine Production 2 Mine Production
27 Foreman Operasi Produksi 4 Mine Production
28 Adm. Produksi 2 Mine Production
29 Checker 4 Mine Production
30 Kabag. Repair & Maintenance 1 Repair & Maintenance
31 Mekanik 4 Repair & Maintenance
32 Helper Mekanik 4 Repair & Maintenance
33 Electric 2 Repair & Maintenance
34 Foreman Maintenance 2 Repair & Maintenance
35 Operator 22 Mine Operation
82
NO DESCRIPTION
I Manager Proyek
Manager General
Manager Keuangan
Sekretaris General
Sekretaris Keuangan
Manajer Tambang (KTT)
SUB TOTAL I
II ENGINEERING
Kabag. Engineering
Spv. Mine Plan
Helper Survey
Spv. Pit Control
Spv. Survey
Spv. Cost Control
SUB TOTAL II
III HR & GA
Kabag. HR & GA
Spv. Finance & Administration
Spv. HR
Spv. Marketting
Staf Administration
Security
SUB TOTAL III
V Mine Production
Kabag. Mine Production
Spv. Mine Production
Foreman Operasi Produksi
Adm. Produksi
Checker
SUB TOTAL V
BPJS
Biaya
Ketenagakerjaan Asuransi Konsumsi Rp
(1,74% dari Gaji
(Rp/Bulan)
Pokok) (Rp/Bulan)
Rp
731,318,400.00
441,014,400.00
441,014,400.00
283,420,800.00
283,420,800.00
515,664,000.00
2,695,852,800
230,336,640.00
365,947,200.00
260,697,600.00
192,182,400.00
192,182,400.00
192,182,400.00
1,433,528,640
230,336,640.00
192,182,400.00
192,182,400.00
192,182,400.00
149,981,760.00
133,484,400.00
1,090,350,000
233,654,400.00
183,888,000.00
125,985,600.00
183,888,000.00
273,096,000.00
1,000,512,000
230,336,640.00
350,949,600.00
490,037,760.00
179,976,960.00
273,096,000.00
1,524,396,960
230,336,640.00
238,809,600
137,275,440
132,998,000
158,997,600
898,417,280
2,657,973,600.00
11,301,031,280
DEPRESIASI PERALATA
Jumlah Tahun Depresiasi Alat = 4 Tahun
Keterangan
Input
TABEL
DEPRESIASI PERALATAN PERTAHUN & NILAI SISA PERALATAN
Tahun Tahun
URAIAN
1 2
Produksi (MT) 402,324 429,041
Pendapatan (Rupiah) 276,573,288,701 294,939,601,807
Tahun Tahun
3 4
400,383 419,697
275,238,969,214 288,516,169,922
BIAYA PRODUKSI OVERBURDEN & BATUBARA
NO URAIAN TAHUN - 1
A Overburden Activity
I Overburden Removal 22,688,045,150
Sub Total 22,688,045,150
B Coal Activity
II Coal Hauling 30,653,625,041
II Coal Processing (Pengolahan Batubara) 8,046,480,000
SEQUENCE 1 SEQUENCE 2
NO URAIAN
TAHUN 1 TAHUN 2
1 Mobil Operasional 5,937,607,487 5,925,371,508
2 Bus Karyawan 4,180,600,130 4,171,984,920
3 Compactor 1,663,590,327 1,660,162,068
4 Motor Grader 1,663,590,327 1,660,162,068
5 Sump Pump 1,116,529,338 1,114,228,440
6 Dozer Pit 757,178,875 755,618,512
7 Dozer Disposal 625,337,209 624,048,540
8 Diesel Genset 7,661,866 7,646,077
9 Tower Lamp 25,539,554 40,779,077
10 Fuel Truck 17,877,688 17,840,846
11 Water Truck 22,985,599 22,938,231
TOTAL (Rupiah) 16,018,498,400 16,000,780,287
SEQUENCE 3 SEQUENCE 4
TAHUN 3 TAHUN 4
4,227,897,260 4,224,344,879
1,667,015,344 1,665,614,678
1,658,392,644 1,656,999,223
1,658,392,644 1,656,999,223
1,113,040,880 1,112,105,676
754,813,163 754,178,951
623,383,420 622,859,638
7,637,928 7,631,510
30,551,711 40,701,387
17,821,831 17,806,857
22,913,783 22,894,530
11,781,860,607 11,782,136,552
ESTIMASI KEBUTUHAN INVESTASI
No.
I.
-
-
-
-
-
Biaya Produksi
-
-
-
-
-
-
Uraian
MODAL TETAP
Biaya Pra penambangan
Biaya Perijinan IUP
Biaya Kegiatan Eksplorasi
Biaya Studi AMDAL
Biaya Studi Kelayakan
Biaya Jaminan Reklamasi 60,000,000/Ha x 388.70
Computer System
Water Truck
Survey Equipment
Office Equipment
Handy Talky
Mobil Operasional
Bus Karyawan
Compactor
Motor Grader
Excavator OB
Excavator BB
Dump Truck OB
Dump Truck BB
Sump Pump
Dozer Pit
Dozer Disposal
Dewatering Pompa Pontoon
Diesel Genset
Tower Lamp
Pipe HDPE
Fuel Truck
Biaya Pembangunan Fasilitas & Infrastruktur
Pembangunan Kantor, Pos Security, Laboratorium dan Mess
Fasilitas dan perlengkapan kantor
Pembangunan Workshop
Pembangunan Stasiun Bahan Bakar
Port dan Fasilitas Pengolahan Batubara
Pembangunan Jalan 30
Biaya Produksi
Biaya Awal Produksi OB
Biaya Awal Produksi BB
Biaya Awal Coal Processing
Biaya Awal Supporting & General
Upah Karyawan
Biaya Tidak Langsung ( Iuran, Royalty, dll)
Total Modal Tetap
120,000,000
545,000,000
250,000,000
700,000,000
23,100,000,000
24,715,000,000
180,000,000
640,000,000
62,000,000
11,000,000
8,400,000
6,020,000,000
1,260,000,000
350,000,000
437,255,000
12,500,212,260
830,135,986
13,200,000,000
6,565,000,000
420,000,000
254,160,000
254,160,000
335,000,000
95,415,360
208,000,000
140,367,000
465,000,000
620,000,000
180,000,000
245,000,000
275,000,000
3,000,000,000
28,000,000,000
22,688,045,150
30,653,625,041
8,046,480,000
16,018,498,400
11,301,031,280
14,852,502,750
229,546,288,227
91,818,515,291
91,818,515,290.67
137,727,772,936.00
5,853,430,350
235,399,718,576
Bunga Pinjaman Bank 10%/tahun
Item
1 USD
Harga 1 liter solar industri HSD
Harga 1 liter oli mesin & transmisi
Jumlah Jam Kerja Efektif
Jumlah Jam Kerja Per Shift
Harga Batubara
Luas IUP
Luas Area Kantor, Workshop, Gudang
Harga Alat
Mobil Operasional
Bus Karyawan
Compactor
Motor Grader
Excavator OB
Excavator BB
Dump Truck BB
Dump Truck OB
Sump Pump
Dozer Pit
Dozer Disposal
Dewatering Pompa Pontoon
Diesel Genset
Tower Lamp
Water Truck
Pipe HDPE
Fuel Truck
Fuel Consumption
Mobil Operasional
Bus Karyawan
Diesel Genset
Compactor
Motor Grader
Excavator BB
Excavator OB
Dump Truck BB
Dump Truck OB
Sump Pump
Dozer Pit
Dozer Disposal
Tower Lamp
Water Truck
Fuel Truck
Oil Consumption
Mobil Operasional
Bus Karyawan
Diesel Genset
Compactor
Motor Grader
Excavator OB
Excavator BB
Dump Truck BB
Dump Truck OB
Sump Pump
Dozer Pit
Dozer Disposal
Tower Lamp
Water Truck
Fuel Truck
Salary
Basic salary Project Manager
Basic salary Kepala Teknik Tambang
Basic Salary Manager
Basic salary Sekretaris
Basic salary Superintendent
Basic salary Supervisor
Basic salary Foreman
Basic salary mekanik
Basic salary surveyor
Basic salary helper
Basic salary security
Basic salary office boy / girl
Basic Salary Staf, etc
Target Produksi Dan Jarak
Target Over Burden
Target Over Burden Sequence 1
Target Over Burden Sequence 2
Target Over Burden Sequence 3
Target Over Burden Sequence 4
Jarak Overburden Sequence 1 (KE DISPOSAL)
Jarak Overburden Sequence 2 (KEDISPOSAL)
Jarak Overburden Sequence 3 (INPIT DUMP)
Jarak Overburden Sequence 4 (INPIT DUMP)
Target Coal (LOM)
Target Coal Sequence 1
Target Coal Sequence 2
Target Coal Sequence 3
Target Coal Sequence 4
Jarak Mine to CPP + Port (Sequence 1)
Jarak Mine to CPP + Port (Sequence 2)
Jarak Mine to CPP + Port (Sequence 3)
Jarak Mine to CPP + Port (Sequence 4)
Jarak Pit to Settling Pond sequence 1
Jarak Pit to Settling Pond sequence 2
Jarak Pit to Settling Pond sequence 3
Jarak Pit to Settling Pond sequence 4
Harga Pembelian Peralatan
Computer System
Engineering Software
Survey Equipment
Office Equipment
HT
Safety Equipment & Consumable
Biaya Tidak Langsung
Biaya Lingkungan, K3 dan Comdev
Iuran Tetap (KP Eksploitasi)
Iuran Pembangunan Daerah (US $ 0.5/ton)
PBB
Biaya Administrasi dan Lain-lain
ESTIMASI BIAYA PRA PENAMBANGAN
Biaya Perijinan
Biaya Kegiatan Eksplorasi
Biaya Studi AMDAL
Biaya Studi Kelayakan
Biaya Pembebasan Lahan ( Lokasi Tambang, Jalan, Stockpile, dll) 385 ha x Rp 10.000.000
BIAYA PEMBANGUNAN FASILITAS DAN INFRASTRUKTUR
Pembangunan Kantor
Fasilitas dan perlengkapan kantor
Pembangunan Workshop
Stasiun Bahan Bakar
Pembangunan Port + Coal Crushing Plant
PENGOLAHAN BATUBARA
Biaya Pengolahan Batubara
KEGIATAN PENUTUPAN TAMBANG
Pengelolaan lubang bukaan bekas tambang (void)
Reklamasi
Pembongkaran bekas fasilitas pengolahan
Pembongkaran bekas kolam pengendapan
Remidiasi tanah yang terkontaminasi minyak
Pembongkaran bekas jalan tambang
Pembongkaran bekas stockpile
Pembongkaran peralatan, mesin, dan tangki BBM
Pemantauan
SURVEY EQUIPMENT
Total Station
prisma
kompas
SAFETY EQUIPMENT
Safety Helm
Rompi
Safety Shoes
Masker
Safety Glasses
TOTAL
ASUMSI NILAI
42,500,000.00 Rp/Bulan
34,000,000.00 Rp/Bulan
26,000,000.00 Rp/Bulan
17,000,000.00 Rp/Bulan
14,000,000.00 Rp/Bulan
11,500,000.00 Rp/Bulan
6,200,000.00 Rp/Bulan
4,000,000.00 Rp/Bulan
4,000,000.00 Rp/Bulan
3,800,000.00 Rp/Bulan
3,400,000.00 Rp/Bulan
3,200,000.00 Rp/Bulan
3,000,000.00 Rp/Bulan
25,020,104 BCM
11,213,186 BCM
3,215,475 BCM
7,942,048 BCM
2,649,395 BCM
1,576 M
1,769 M
2,039 M
1,762 M
1,651,445 MT
402,324 MT
429,041 MT
400,383 MT
419,697 MT
23,160 m
22,885 m
23,464 m
23,262 m
40 m
60 m
70 m
80 m
9,000,000 Rp
30,000,000 Rp
31,000,000 Rp
11,000,000 Rp
300,000 Rp
35,000,000 Rp
0.75 US $/MT
0.11 US $ / Ha / tahun
0.50 US $/MT
0.10 US $ / Ha / tahun
6,000,000.00 Rp /tahun
120,000,000 Rp
545,000,000 Rp
250,000,000 Rp
700,000,000 Rp
3,850,000,000 Rp
620,000,000 Rp
180,000,000 Rp
245,000,000 Rp
275,000,000 Rp
3,000,000,000 Rp
20,000 Rp/MT
1,105,715,000 Rp
9,000,000,000 Rp
430,000,000 Rp
185,000,000 Rp
218,000,000 Rp
210,000,000 Rp
172,000,000 Rp
100,000,000 Rp
200,000,000 Rp
TOPCON 28,500,000 Rp
Sokkia 1,000,000 Rp
Brunton 650,000 Rp
48.72 USD/Ton
15 iter/kilo
276,573,288,701
BIAYA TIDAK LANGSUNG
URAIAN BIAYA $
Biaya Lingkungan dan Masyarakat
Biaya Lingkungan, K3 dan Comdev Tahun ke-1 900
Biaya Lingkungan, K3 dan Comdev Tahun ke-2 900
Biaya Lingkungan, K3 dan Comdev Tahun ke-3 900
Biaya Lingkungan, K3 dan Comdev Tahun ke-4 900
Iuran dan Royalti
Iuran Tetap (KP Eksploitasi) 4.00
PBB 0.50
Biaya Administrasi dan Lain-lain 1,000,000,000.00
Royalty Tahun ke 1(5% dari Penjualan) 5.00
Royalty Tahun ke 2(5% dari Penjualan) 5.00
Royalty Tahun ke 3(5% dari Penjualan) 5.00
Royalty Tahun ke 4(5% dari Penjualan) 5.00
TOTAL
A TIDAK LANGSUNG
Rp/MT 1 25,662
Rp/MT 1 27,366
Rp/MT 1 25,538
Rp/MT 1 26,770
US $ / Ha / TAHUN 1 21,729,400
US $ / Ha / TAHUN 1 2,108,915
Rp/TAHUN 1 1,000,000,000.00
% 1 13,828,664,435
% 1 14,746,980,090
% 1 13,761,948,461
% 1 14,425,808,496
IDR 57,787,345,133.38
URAIAN
- Produksi Overburden (BCM)
- Produksi Batubara (MT)
- SR
Biaya Produksi Overburden
Biaya Produksi Batubara
Total Biaya Produksi
Biaya Supporting & General
Upah Karyawan
Amortisasi
Pembangunan Infrastruktur
Depresiasi Peralatan
Repair and Maintenance
Safety Equipment
Nilai Sisa Peralatan
Biaya Tidak Langsung (Iuran, Royalty,dll)
Cicilan Pinjaman Bank
Biaya Reklamasi
Modal Pinjaman Bank
Modal Sendiri
Rp300,000,000,000
Rp250,000,000,000
Rp200,000,000,000
Rp150,000,000,000
Rp100,000,000,000
Rp50,000,000,000
Rp-
Rp150,000,000,000
Rp100,000,000,000
Rp50,000,000,000
Rp-
Rp(50,000,000,000)
Rp(100,000,000,000)
Rp(150,000,000,000)
sales
fixed cost Rp 102,937,349,961
variable cost Rp 687,439
CMR 0.999999394469691
BEP Sales Rp 102,937,412,293.13
BEP Units 149,740
Unit TAHUN 0 TAHUN 1
BCM 11,213,186
MT 402,324
Rp/BCM Rp 2,023
Rp/MT Rp 96,191
Rp Rp 98,215
Rp Rp 16,018,498,400
Rp Rp 12,189,072,080
Rp Rp 24,715,000,000 Rp -
Rp Rp 32,320,000,000
Rp Rp 7,741,318,481
Rp Rp 3,910,736,846
Rp Rp 20,377,000
Rp
Rp Rp 14,852,528,412
Rp Rp 48,204,720,528
Rp
Rp 137,727,772,936
Rp 91,818,515,291
Rp/MT Rp 687,439
Rp Rp 276,573,288,701
Rp Rp (229,546,288,227) 150,947,991,803.72
Rp Rp 45,284,397,541
Rp Rp (229,546,288,227) Rp 105,663,594,263
Rp Rp (229,546,288,227) Rp (123,882,693,964)
Rp 1
402,324
Tahun Rp 233,921,001,432
MT
PBP
Rp300,000,000,000
Rp250,000,000,000
Rp200,000,000,000
Rp150,000,000,000
Rp100,000,000,000
Rp50,000,000,000
Rp-
Rp150,000,000,000
Rp100,000,000,000
Rp50,000,000,000
Rp-
Rp(50,000,000,000)
Rp(100,000,000,000)
Rp(150,000,000,000)
PBP
1,135,268,029,644.00
Rp 102,142,390,871 Rp 97,770,421,785 Rp 97,354,977,023
Rp 687,439 Rp 687,439 Rp 687,439
0.999999394469691 0.999999394469691 0.999999394469691
Rp 102,142,452,721.16 Rp 97,770,480,988.28 Rp 97,355,035,974.32
148,584 142,224 141,620
TAHUN 2 TAHUN 3 TAHUN 4
3,215,475 7,942,048 2,649,395
429,041 400,383 419,697
429,041
326,071.16
BEP
1,800,000
1,600,000
1,400,000
1,200,000
1,000,000
800,000
600,000
400,000
200,000
1,000,000
800,000
600,000
400,000
200,000
BEP