Monitoring Pekan 52 (EDIT - JO)
Monitoring Pekan 52 (EDIT - JO)
- 2/11/2021 2/13/2021 3
- 2/14/2021 3/21/2021 36
- 2/14/2021 2/15/2021 2
- 2/16/2021 3/16/2021 29
- 3/17/2021 5/6/2021 51
- 3/24/2021 3/31/2021 8
- 4/1/2021 4/24/2021 24
- 4/25/2021 5/9/2021 15
LATING WEIR
RENCANA
Jan-21 Feb-21 Mar-21
3 4 5 6 7 8 9 10 11 12
375.00 53.57
570.40
647.31 710.62 571.11 162.66 35.68
384.30
290.02 235.35 171.40 71.76 27.06
1,970.18
Mar-21
Apr-21 May-21
13 14 NO ITEM PEKERJAAN
I LEFT CONCRETE WALL
II LEFT MOORING
Stone Pitching
Pemasangan Kayu
III PEMASANGAN BERONJONG
TIMBUNAN COFFERDAM
IV
STAGE
GALIAN2COFFERDAM
V
STAGE 2
VI PENGECORAN STAGE 2
Block 10 - Block 12
Galian
Pengecoran
VII PENGECORAN STAGE 2
Block 13 - Block 16
Galian
Pengecoran
3,447.81 1,970.18 ### 2,955.26 VI TIMBUNAN STAGE 2
PEMASANGAN
110.00 110.00 VII
BERONJONG
PEMBONGKARAN KANAN
### VII
COFFERDAM STAGE 2
272.00 408.00 VIII ROAD WORK
PERMASALAHAN
Gagal cor 1 kali karena ada orang meninggal di area lingkungan proyek
Koordinasi dengan supplier untuk mempercepat pendatangan dengan perjanjian pembayaran yang lebih cepat
PIC
PPC/ SEM
PPC/ SEM
NO SUMBER DAYA
I ALAT
Excavator
SUB TOTAL ( I )
II BAHAN / MATERIAL
A Concrete
B Rebar
C Phynol Film 12 mm
D Batu Kali
SUB TOTAL ( II )
III TENAGA / MAN POWER
A Man Power
SUB TOTAL ( III )
IV ALAT BANTU
SUB TOTAL ( IV )
VOLUME
RENCANA
SUMBER DAYA SEBELUM SATUAN PENDATANGAN
RENCANA EKSISTING DEVIASI
PERCEPATAN
2 1 2 0 unit
SUB TOTAL ( I ) 2 1 2 0 unit
BAHAN / MATERIAL
Ready
Continue
Phynol Film 12 mm Continue
120 158.37 38.37 m3 Continue
SUB TOTAL ( II )
TENAGA / MAN POWER
Man Power 16 8 18 2 person
SUB TOTAL ( III ) 16 8 18 2 person
ALAT BANTU
SUB TOTAL ( IV ) 0 0 0 0
PERMASALAHAN RENCANA TINDAK LANJUT
VOLUME RENCANA REALISASI
NO ITEM PEKERJAAN SAT
TOTAL PEKAN 50 PEKAN 50
I GALIAN
Earth Work Sta. 2+010 till Sta. 3+200 m3 40,462.44 - -
II FOOTHPATH m 2400 - -
III WASHING STEP unit 27 - -
IV REPLACEMENT OF BRIDGE Ls 1 - -
MONITORING PEKERJAAN RIVER CHANNEL IMPROVEM
DURASI
DEVIASI START FINISH Dec-20 Jan-21
(HARI)
51 52 53 1 2 3
- 2/10/2021 5/11/2021 91
- 2/24/2021 5/10/2021 76
- 2/24/2021 7/24/2021 151
- 2/24/2021 7/24/2021 151
CHANNEL IMPROVEMENT
RENCANA
Jan-21 Feb-21 Mar-21
4 5 6 7 8 9 10 11 12 13
Belum ada kepastian terkait pekerjaan tersebut dari PLN, PU, Pemda
Belum ada kepastian terkait pekerjaan tersebut dari PLN, PU, Pemda
RENCANA TINDAK LANJUT
Bersurat ke PLN untuk menanyakan kepastian pekerjaan tersebut atau untuk scoping pekerjaan
Bersurat ke PLN untuk menanyakan kepastian pekerjaan tersebut atau untuk scoping pekerjaan
VOLUME
NO SUMBER DAYA SEBELUM
RENCANA EKSISTING DEVIASI
PERCEPATAN
I ALAT
SUB TOTAL ( I ) 0 0 0 0
II BAHAN / MATERIAL
SUB TOTAL ( II )
III TENAGA / MAN POWER
A Man Power
SUB TOTAL ( III ) 0 0 0 0
IV ALAT BANTU
SUB TOTAL ( IV ) 0 0 0 0
RENCANA
SATUAN PENDATANGAN PERMASALAHAN RENCANA TINDAK LANJUT
unit
person
person
VOLUME RENCANA REALISASI
NO ITEM PEKERJAAN SAT
TOTAL PEKAN 50 PEKAN 50
DURASI
DEVIASI START FINISH Dec-20 Jan-21
(HARI)
51 52 53 1 2
(2,470.59) 12/1/2020 1/4/2021 35 2,470.59 2,470.59 1,764.71 1,411.76
- 2/12/2021 3/10/2021 27
- 3/11/2021 3/26/2021 16
- 3/11/2021 4/10/2021 31
- 4/11/2021 4/20/2021 10
- 4/21/2021 5/5/2021 15
N ATASANGIN
RENCANA
Jan-21 Feb-21 Mar-21
3 4 5 6 7 8 9 10 11 12
1,466.67
23.68 82.90 82.90 82.90 47.37
88.40 206.27
2,021.40 4,716.60
NO ITEM PEKERJAAN
Mar-21
Apr-21 May-21
13 14 I ACCESS ROAD
II ABUTMENT & PIER WORK
Galian
Pengecoran
IV SUPER STRUCTURE
Erection s/d Cor Slab
V RETAINING WALL
Pengecoran
147.33 VI EMBANKMENT WORK
4,716.60 2,021.40 6,738.00 VII GABION
265.00 VIII ROAD WORK
703.29 390.71
EM PEKERJAAN PERMASALAHAN
ORK
RENCANA TINDAK LANJUT PIC
Follow Up kepada Engineer dan PLN terkait pembebasan lahan tsb SEM/SOM
VOLUME RENCANA
PERMASA
NO SUMBER DAYA SATUAN PENDATA
RENCANA EKSISTING DEVIASI NGAN LAHAN
I ALAT
Excavator 2 2 0 unit
Dumptruck 10 10 0 unit
SUB TOTAL ( I ) 2 2 0 unit
II BAHAN / MATERIAL
A
SUB TOTAL ( II )
III TENAGA / MAN POWER
A Man Power
SUB TOTAL ( III ) 0 0 0
IV ALAT BANTU
SUB TOTAL ( IV ) 0 0 0
RENCANA
TINDAK
LANJUT
MONITORING PEKERJAAN NO.1 DIVERSION W
RENCANA REALISASI
VOLUME
NO ITEM PEKERJAAN SAT S/D PEKAN S/D PEKAN
TOTAL
50 50
I CONCRETE STAGE 1
Crest Bridge unit 16.00 5.00 4.00
DURASI
DEVIASI START FINISH Dec-20 Ja
(HARI)
51 52 53 1
12/9/2020 12/21/2020
(0.83) 13 5.77 40.38 11.54
- 2/7/2020 3/7/2020 30
- 1/3/2020 1/24/2020 22 25.64
- 1/5/2020 1/19/2020 15 24.00
-
- 5/6/2021 5/20/2021 15
- 5/21/2021 6/16/2021 27
-
- 6/17/2021 7/1/2021 15
- 6/22/2021 9/3/2021 74
- 9/4/2021 9/29/2021 26
- 9/30/2021 10/14/2021 15
RENCANA
Jan-21 Feb-21 Mar-21
2 3 4 5 6 7 8 9 10 11
7,000.00
8,461.54 11,538.46
2,345.00
497.33 1,492.00 1,541.73
NO ITEM PEKERJAAN
Sep-21 Oct-21
I CONCRETE STAGE 1
Crest Bridge
E STAGE 1
ridge Kekurangan man power
coran
NG
ORK
RENCANA TINDAK LANJUT PIC
Submit Metode untuk Menggunakan Area Concrete Block dan samping wall
sebagai Lahan Produksi SE
Percepatan pekerjaan pengeboran (tools sudah on site) Log
Pendatangan Lebih Lanjut, diskusi dengan Mandor SEM, PPC
NO SUMBER DAYA
I ALAT
Excavator
SUB TOTAL ( I )
II BAHAN / MATERIAL
A Concrete
A Rebar
B Phynol Film 12 mm
SUB TOTAL ( II )
III TENAGA / MAN POWER
A Man Power
SUB TOTAL ( III )
IV ALAT BANTU
A Alat Bor Beton
SUB TOTAL ( IV )
VOLUME
RENCANA
SUMBER DAYA SEBELUM SATUAN
RENCANA PENDATANGAN
PERCEPATAN EKSISTING DEVIASI
1 0 1 0 unit
SUB TOTAL ( I ) 1 0 1 0 unit
BAHAN / MATERIAL
Ready
Continue
Phynol Film 12 mm Continue
SUB TOTAL ( II )
TENAGA / MAN POWER
Man Power 15 6 16 1 orang
SUB TOTAL ( III ) 15 6 16 1 orang
ALAT BANTU
Alat Bor Beton 2 0 3 1 unit
SUB TOTAL ( IV ) 2 0 3 1 unit
PERMASALAHAN RENCANA TINDAK LANJUT
VOLUME RENCANA
NO ITEM PEKERJAAN SAT
TOTAL S/D 13 DES
2 Wall
Block HW 37, 38,39,40 m3 36.46
Block HW 23
m3 91.68
PENGECORAN
20.00
46.04
Mar-21
11 12 13 14 April May
190 150
NO ITEM PEKERJAAN
I GALIAN
A Headpond Wall and Slab
II HEADPOND
A Wall HW 37, 38,39,40
PENGECORAN
PENGECORAN
Wall ( HW 17, HW 18, HW 19, HW 20, HW 21, HW 22,
C
HW 33, HW 34, HW 35, HW 36)
PENGECORAN
PERMASALAHAN RENCANA TINDAK LANJUT PIC
NO
I
A
SUB TO
II
A
B
C
D
SUB TO
III
A
SUB TOT
IV
SUB TOT
MINGGU INI
SUMBER DAYA SEBELUM SATUAN
KEBUTUHAN EKSISTING DEVIASI
PERCEPATAN
ALAT
Excavator 2 1 2 0
SUB TOTAL ( I ) 2 1 2 0 unit
BAHAN / MATERIAL
Rebar Kg
Concrete m3
Phynol Film 12 mm Lembar
Hollow 50 0 100 50 btg
SUB TOTAL ( II ) 50 0 100 50
TENAGA / MAN POWER
Man Power 15 8 20 5 person
SUB TOTAL ( III ) 15 8 20 5 person
ALAT BANTU
Vibrator machine 2 1 1 -1 unit
Cutting well 1 1 1 0 unit
Compressor 1 1 1 0 unit
Water jet 1 1 1 0 unit
Travo las 2 1 1 -1 unit
SUB TOTAL ( IV ) 7 5 5 -2 unit
RENCANA PERMASALAHAN
PENDATANGAN
Continue
Ready
Continue
1 INLET OF WORK
INLET BLOCK 1
Concrete Placing m3 750
INLET BLOCK 2
Concrete Placing 3431 3431
INLET BLOCK 3
Concrete Placing 3073 3073 270.00 270.00
INLET BLOCK 4
INLET BLOCK 5
Concrete Placing 674 674
2/1/2021 4/29/2021 87
2/1/2021 4/29/2021 87
4/26/2021 5/19/2021 23
RENCANA
Jan-21 Feb-21 Mar-21
3 4 5 6 7 8 9 10 11 12
183.10 117.61
60.48
NO ITEM PEKERJAAN PERMASALAHAN
I INLET BLOCK 1
PENGECORAN
II INLET BLOCK 2
PENGECORAN
III INLET BLOCK 3 Kurangnya man power untuk stage 2
PENGECORAN Material hollow dan pipa black steel yang kurang
IV INLET BLOCK 4
PENGECORAN
V INLET BLOCK 5
PENGECORAN
RENCANA TINDAK LANJUT
NO SUMBER DAYA
I ALAT
SUB TOTAL ( I )
II BAHAN / MATERIAL
A Rebar
B Concrete
C Phynol Film 12 mm
D Hollow
SUB TOTAL ( II )
III TENAGA / MAN POWER
A Man Power
SUB TOTAL ( III )
IV ALAT BANTU
Vibrator machine
Cutting well
Compressor
Water jet
Travo las
SUB TOTAL ( IV )
MINGGU INI
RENCANA
SEBELUM SATUAN PENDATANGAN
KEBUTUHAN EKSISTING DEVIASI
PERCEPATAN
0 0 0 0 unit
Kg Continue
m3 Ready
Lembar Continue
300 300 0 btg
10 10 8 -2 person
10 10 8 -2 person
4 2 2 -2 unit 12/24/2020
2 1 1 -1 unit 12/24/2020
1 1 1 0 unit
3 1 3 0 unit
2 1 1 -1 unit 12/24/2020
12 6 8 -4 unit
PERMASALAHAN RENCANA TINDAK LANJUT
Vibrator digunakan secara bergantian di lokasi lain Penambahan vibrator di lokasi inlet
Kuranganya alat bantu Penambahan alat bantu
1 EXCAVATED
Upperpart Penstock m3 12,625.00
II CONCRETE PLACING
A Right Side Wall m3 1236.96 - -
C Slab m3 227
- -
D Saddle Pier 230 - -
G FENCE m3 462
AN UPPER PENSTOCK
3/30/2021 4/14/2021 15
1/15/2021 3/16/2021 60 42
RENCANA
Jan-21 Feb-21 Mar-21
3 4 5 6 7 8 9 10 11 12
309.00 309.00
309.00 309.00
42 42 42 42 42 42 42 42 42 42
NO ITEM PEKERJAAN
Mar-21 I GALIAN
April
13 14 A Upperpart Penstock
II PENGECORAN
A Right Side Wall
B Left Side Wall
C Slab
D Saddle Pier
E Anchor Block 1
F Anchor Block 2
G PAGAR
22.50
2.24 3.60 86
364.53
PERMASALAHAN RENCANA TINDAK LANJUT PIC
NO SUMBER DAYA
I ALAT
Excavator
Dozer
SUB TOTAL ( I )
II BAHAN / MATERIAL
A Rebar
B Concrete
C Phynol Film 12 mm
D Hollow
SUB TOTAL ( II )
III TENAGA / MAN POWER
A Man Power
SUB TOTAL ( III )
IV ALAT BANTU
Vibrator machine
Cutting well
Compressor
Travo las
SUB TOTAL ( IV )
MINGGU INI
RENCANA
SUMBER DAYA SEBELUM SATUAN
KEBUTUHAN EKSISTING DEVIASI PENDATANGAN
PERCEPATAN
4 2 3 -1 unit 12/22/2020
1 0 1 0 unit
SUB TOTAL ( I ) 5 2 4 -1 unit
BAHAN / MATERIAL
Kg Continue
m3 Ready
Phynol Film 12 mm Lembar Continue
10 0 100 90 btg
SUB TOTAL ( II ) 10 0 100 90
TENAGA / MAN POWER
Man Power 9 0 4 -5 person 12/21/2020
SUB TOTAL ( III ) 9 0 4 -5 person
ALAT BANTU
Vibrator machine 1 1 1 0 unit
Cutting well 1 1 1 0 unit
Compressor 1 1 1 0 unit
1 1 1 0 unit
SUB TOTAL ( IV ) 4 4 4 0 unit
PERMASALAHAN RENCANA TINDAK LANJUT
-
2,400.00 - 1/6/2021 1/17/2021 12
2,500.00 2/22/2021 3/5/2021 12
-
1,055.00 - - - 12/2/2020 12/7/2020 6
218.87 16.32 19.36 3.04 12/8/2020 1/23/2021 47
-
-
-
256.23 - - - 1/18/2021 3/14/2021 56
-
192.42 - - - 3/15/2021 5/1/2021 48
-
-
256.23 - - - 1/18/2021 3/14/2021 56
-
192.42 - - - 3/15/2021 5/1/2021 48
-
-
66.28 - - - 2/8/2021 2/25/2021 18
-
95.57 - - - 3/6/2021 3/26/2021 21
-
24.55 - - - 2/14/2021 3/14/2021 29
-
18.29 - - - 3/15/2021 4/8/2021 25
-
-
116.28 - - - 2/8/2020 3/14/2020 36
-
77.52 - - - 3/15/2020 4/9/2020 26
-
-
1,200.00 1,100.00 500.00 (600.00) 12/14/2020 12/19/2020 6
-
-
51.56 - - - 12/20/2020 1/22/2021 34
-
-
-
62.73 - - - 1/23/2021 1/30/2021 8
EKERJAAN LOWER PENSTOCK
RENCANA
Dec-20 Jan-21 Feb-21
53 53-TOTAL 1 2 3 4 5 6 7
1,200.00 1,200.00
24.30
- 600.00
- 12.97
31.36 31.36
RENCANA
Feb-21 Maret 2021 2021
8 9 10 11 12 13 14 April Mei
1,300.00 1,200.00
24.30 17.69
AN TANAH
elum Culvert Bridge
lah Culvert Bridge
VERT BRIDGE
ULVERT BRIDGE
RAN
NTARA ANCHOR BLOCK 2 - ANCHOR BLOCK 3
RET. WALL ANTARA ANCHOR BLOCK 2 DAN ANCHOR BLOCK 3
LOK 9
RAN
LOK 4
RAN
T RET. WALL ANTARA ANCHOR BLOCK 2 DAN ANCHOR BLOCK 3
LOK 9
RAN
LOK 4
RAN
DAN STAIR ANTARA ANCHOR BLOCK 2 DAN ANCHOR BLOCK 3
LAB 6
RAN
LAB 3
RAN
6 - STAIR ST 11
RAN
1 - STAIR ST 5
RAN
DLE PIER ANTARA ANCHOR BLOCK 2 DAN ANCHOR BLOCK 3
IER SP 3 - SP 5
RAN
IER SP 1 - SP 2
RAN
NTARA ANCHOR BLOCK3 - ANCHOR BLOCK 5
ANAH
NCHOR BLOCK 5
RET. WALL ANTARA ANCHOR BLOCK 3 DAN ANCHOR BLOCK 5
K1
RAN
DAN STAIR ANTARA ANCHOR BLOCK 3 DAN ANCHOR BLOCK 5
LAB 6
RAN
NAL SLAB (T=15 CM)
RAN
DLE PIER ANTARA ANCHOR BLOCK 3 DAN ANCHOR BLOCK 5
IER 6
RAN
HOR BLOCK 5 (INITIAL CONCRETE)
RAN
PERMASALAHAN RENCANA TINDAK LANJUT
I ALAT
Continue
Continue
RENCANA
Jan-21 Feb-21
1 2 3 4 5 6 7 8
50.00
RJAAN POWER HOUSE
21 Mar-21
9 10 11 12 13 14 April Mei
300.00
300.00
RENCANA
2021
Jun Jul Aug Sept Oct Nov Dec Jan
250.00
300.00
100.00 200.00
100.00 200.00
300.00 600.00
6,400.00 6,400.00 6,400.00 6,400.00 6,400.00
0.25 0.25 0.25 0.25
2022
Feb Mar April Mei Jun Jul
SWA
SWA
RENCANA TINDAK LANJUT
Berdiskusi dengn tim Ahli dari ITB untuk meninjau masalah tanah, akan melakukan investigasi tanah
Berdiskusi dengn tim Ahli dari ITB untuk meninjau masalah tanah, akan melakukan investigasi tanah
VOLUME
NO SUMBER DAYA SEBELUM EKSISTING DEVIASI SATUAN
RENCANA
PERCEPATAN
I ALAT
A Excavator (standard) 0 3 3 3 unit
B Dumptruck (<10 ton) 0 7 7 7 unit
C Dozer (D-6) 0 1 1 1 unit
SUB TOTAL ( I ) 0 11 11 11 unit
II BAHAN / MATERIAL
A Rebar Kg
B Phynol Film 12 mm Lembar
SUB TOTAL ( II )
III TENAGA / MAN POWER
A Man Power 0 0 0 0 person
SUB TOTAL ( III ) 0 0 0 0 person
IV ALAT BANTU
G Generator (min 125 kVA) 1 1 1 0 unit
H Submersible pump 3" 1 1 1 0 unit
I Submersible pump 6" 0 1 1 1 unit
SUB TOTAL ( IV ) 2 3 3 1 unit
RENCANA
PERMASALAHAN RENCANA TINDAK LANJUT
PENDATANGAN
Continue
Continue
RENCANA REALISASI
VOLUME
NO ITEM PEKERJAAN SAT S/D PEKAN S/D PEKAN
TOTAL
51 51
I PEK. GALIAN TANAH
Area BL 1-3 m3 1,500.00 1,500.00 -
II TAILRACE CONDUIT BL 1 - BL 3
Pengecoran m3 2,109.74 - -
III RETAINING WALL BL 4 - BL 6
Pengecoran m3 717.96 - -
IV PEK. TIMBUNAN m3 4,200.00 - -
VI PEK. STONE PITCHING m2 735.00 - -
VIII PEK. PAGAR m' 110.00 - -
VII PEK. JALAN (GRAVEL SURFACING) m3 118.00 - -
MONITORING PEKERJAAN TAILRACE CONDUIT
DURASI RENCANA
DEVIASI START FINISH
(HARI) Des-2020 Jan-21
- 53 53 - Total 1 2 3
(1,500.00) 12/14/2020 12/23/2020 10 - 1,500.00
- 12/24/2020 3/30/2021 97
- 12/24/2020 3/30/2021 97 168.88 168.88 - 236.43 253.32
- 3/31/2021 4/29/2021 30
- 3/31/2021 4/29/2021 30
- 5/13/2021 5/20/2021 8
- 12/27/2020 3/26/2021 90 60.00 60.00
- 2/10/2021 3/26/2021 45
- 5/21/2021 5/27/2021 7
ONDUIT
RENCANA RENCANA
Jan-21 Feb-21 Maret-21
4 5 6 7 8 9 10 11 12 13
253.32 253.32 111.46 53.71 80.56 150.39 88.59 132.88 132.88 167.49
60.00 60.00 60.00 60.00 60.00 60.00 65.00 65.00 65.00 60.00
20.00 20.00 20.00 20.00 20.00 10.00
RENCANA NO ITEM PEKERJAAN
1 April Mei
14 April Mei I PEK. GALIAN TANAH
Area BL 1-3
II TAILRACE CONDUIT BL 1 - BL 3
26.51 Pengecoran
III RETAINING WALL BL 4 - BL 6
717.96 Pengecoran
4,200.00 IV PEK. TIMBUNAN
VI PEK. STONE PITCHING
VIII PEK. PAGAR
118.00 VII PEK. JALAN (GRAVEL SURFACING)
PERMASALAHAN
NO SUMBER DAYA
I ALAT
Excavator
SUB TOTAL ( I )
II BAHAN / MATERIAL
SUB TOTAL ( II )
III TENAGA / MAN POWER
A Man Power
SUB TOTAL ( III )
IV ALAT BANTU
SUB TOTAL ( IV )
VOLUME 51
SATUAN RENCANA
SEBELUM PENDATANGAN
RENCANA EKSISTING DEVIASI
PERCEPATAN
2 0 1 -1 unit 12/22/2020
2 0 1 -1 unit
0 0 0 0
0 0 0 0
0 0 0 0
493000
16600
PERMASALAHAN RENCANA TINDAK LANJUT
-
(11.10) 11/14/2020 1/28/2021 75 - 11.10 13.57 -
- 1/29/2021 2/8/2021 10 29.10 30.00
- -
- 2/9/2021 2/15/2021 6
- 2/13/2021 2/23/2021 10
- 12/20/2020 1/19/2021 30 400.00 400.00 100.00 500.00
- 1/20/2021 2/4/2021 15
ET
RENCANA RENCANA
Jan-21 Feb-21 Maret 2021
April
3 4 5 6 7 8 9 10 11 12 13 14
8.25 8.25
40.00 40.00
500.00 500.00
55.00 50.00
NA NO ITEM PEKERJAAN
Mei
Kekurangan manpower
RENCANA TINDAK LANJUT PIC
NO SUMBER DAYA
I ALAT
A Excavator
SUB TOTAL ( I )
II BAHAN / MATERIAL
SUB TOTAL ( II )
III TENAGA / MAN POWER
A Man Power
SUB TOTAL ( III )
IV ALAT BANTU
SUB TOTAL ( IV )
MINGGU 51
RENCANA
SATUAN
KEBUTUHAN SEBELUM EKSISTING DEVIASI PENDATANGAN
PERCEPATAN
1 0 1 0 unit 12/17/2020
1 0 1 0 unit
10 2 4 -6 person 12/16/2020
10 2 4 -6 person
0 0 0 unit
493000
16600
PERMASALAHAN RENCANA TINDAK LANJUT
- 12/20/2020 1/26/2021 37
III
IV
ITEM PEKERJAAN PERMASALAHAN RENCANA TINDAK LANJUT
GALIAN
Foundation and Drain Pit Tidak alat excavator Pendatangan excavator
TIMBUNAN
Foundation and Drain Pit
PENGECORAN
Foundation and Drain Pit Kurangnya man power Penambahan man power
PAGAR Lahan yang terbatas Membuka area penambahan kerja
PIC
SEM, PPC
SEM, PPC
SOM
MINGGU INI
NO SUMBER DAYA SEBELUM
KEBUTUHAN EKSISTING
PERCEPATAN
I ALAT
Excavator 1 0 1
SUB TOTAL ( I ) 1 0 1
II BAHAN / MATERIAL
A Rebar
B Concrete
C Phynol Film 12 mm
SUB TOTAL ( II )
III TENAGA / MAN POWER
A Man Power 10 4 20
SUB TOTAL ( III ) 10 4 20
IV ALAT BANTU
Vibrator machine 2 1 2
Cutting well 1 1 1
Compressor 1 1 1
SUB TOTAL ( IV ) 4 3 4
INI
SATUAN RENCANA PENDATANGAN PERMASALAHAN
DEVIASI
unit
0 unit
Kg Continue
m3 Ready
Lembar Continue
10 person
10 person
0 unit
0 unit
0 unit
0 unit
RENCANA TINDAK LANJUT
VOLUME RENCANA REALISASI
NO ITEM PEKERJAAN SAT
TOTAL PEKAN 51 PEKAN 51
3 No.1 Powerhouse m3 -
RENCANA
Jan-21 Feb-21 Mar-21
3 4 5 6 7 8 9 10 11 12
8.00 8.96 8.00 8.00 16.96 8.00 8.00 8.00
20.00 30.00 23.90 30.00 30.00 30.00 50.37 18.00 18.00 18.00
8.00 11.65 8.00 8.00 8.20 8.00 8.00
8.49 18.17
RENCANA
Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22
33.40 24.49
MINGGU INI
NO SUMBER DAYA KEBUTUHAN SEBELUM PERCEPATAN
I ALAT
Warehouse Right Mooring
Excavator 0 0
Warehouse Left Mooring
Excavator 1 0
Control House RW
Excavator 0 0
Warehouse OS 1
Excavator 0 0
Control Building OS 1
Excavator 1 0
Control House DW 2
Excavator 0 0
Control House OS 2
Excavator 1 0
SUB TOTAL ( I ) 3 0
IIBAHAN / MATERIAL
Warehouse Right Mooring
Rebar
Concrete
Phynol Film 12 mm 30 0
Scaffolding 12 5
Hollow 100
Warehouse Left Mooring
Rebar
Concrete
Phynol Film 12 mm 0 0
Scaffolding 0 0
Hollow 0 0
Control House RW
Rebar
Concrete
Phynol Film 12 mm 30 0
Scaffolding 0 0
Hollow 100
Warehouse OS 1
Rebar
Concrete
Phynol Film 12 mm 30 0
Scaffolding 0 0
Hollow 100 0
Control Building OS 1
Rebar
Concrete
Phynol Film 12 mm 0 0
Scaffolding 0 0
Hollow 0 0
Control House DW 2
Rebar
Concrete
Phynol Film 12 mm 10 0
Scaffolding 14 0
Hollow 80 0
Control House OS 2
Rebar
Concrete
Phynol Film 12 mm 50 0
Scaffolding 20 0
Hollow 150 0
SUB TOTAL ( II )
TENAGA
III / MAN POWER
Warehouse Right Mooring
Man Power 5 3
Warehouse Left Mooring
Man Power 0 0
Control House RW
Man Power 5 3
Warehouse OS 1
Man Power 6 4
Control Building OS 1
Man Power 0 0
Control House DW 2
Man Power 5 4
Control House OS 2
Man Power 12 5
SUB TOTAL ( III ) 33 19
IV ALAT BANTU
Warehouse Right Mooring
Vibrator machine 1 1
Cutting well 1 1
Compressor 1 1
Warehouse Left Mooring
Vibrator machine 0 0
Cutting well 0 0
Compressor 0 0
Control House RW
Vibrator machine 1 1
Cutting well 1 1
Compressor 1 1
Warehouse OS 1
Vibrator machine 1 1
Cutting well 1 1
Compressor 1 1
Control Building OS 1
Vibrator machine 1 1
Cutting well 1 1
Compressor 1 1
Control House DW 2
Vibrator machine 1 1
Cutting well 1 1
Compressor 1 1
Control House OS 2
Vibrator machine 1 1
Cutting well 1 1
Compressor 1 1
SUB TOTAL ( IV ) 18 18
RENCANA TINDAK LANJUT PIC
Diskus dengan Mandor Terkait
Pendatangan Man Power dan Segera SEM, PPC
Mendatangkan Material
MINGGU INI
EKSISTING DEVIASI SATUAN RENCANA PENDATANGAN PERMASALAHAN
0 0 unit
0 -1 unit
0 0 unit
0 0 unit
1 0 unit
0 0 unit
1 0 unit
2 -1 unit
Kg Continue
m3 Ready
25 -5 Lembar Continue
12 0 Set
100 0 Batang
Kg Continue
m3 Ready
0 0 Lembar Continue
0 0 Set
0 0 Batang
Kg Continue
m3 Ready
25 -5 Lembar Continue
0 0 Set
100 0 Batang
Kg Continue
m3 Ready
30 0 Lembar Continue
0 0 Set
100 0 Batang
Kg Continue
m3 Ready
0 0 Lembar Continue
0 0 Set
0 0 Batang
Kg Continue
m3 Ready
10 0 Lembar Continue
14 0 Set
80 0 Batang
Kg Continue
m3 Ready
50 0 Lembar Continue
20 0 Set
150 0 Batang
4 -1 person
0 0 person
3 -2 person
4 -2 person
0 0 person
5 0 person
12 0 person
28 -5 person
1 0 unit
1 0 unit
1 0 unit
0 0 unit
0 0 unit
0 0 unit
1 0 unit
1 0 unit
1 0 unit
1 0 unit
1 0 unit
1 0 unit
1 0 unit
1 0 unit
1 0 unit
1 0 unit
1 0 unit
1 0 unit
1 0 unit
1 0 unit
1 0 unit
18 0 unit
RENCANA TINDAK LANJUT
MONITORING MANPOWER UNTIL 15 DECEMBER 2020
Manpower
No Location Total Until Total Until Last Additional Plan
November 2020 Week This Week
1 Regulating Weir 8 14 2
2 River Channel Improvement 0 0 0
3 Atasangin Bridge 0 0 0
4 No.1 Diversion Weir 6 8 7
5 No.1 Swithcyard 0 4 0
6 No.2 Diversion Weir 5 5 0
7 Headpond 8 12 3
8 Inlet 0 10 0
9 Upper Penstock 0 0 9
10 Lower Penstock 9 12 7
11 Power House 0 0 0
12 Tailrace Conduit 0 0 0
13 Tailrace Outlet 2 4 6
14 No.2 Switchyard 4 4 2
TOTAL 42 73 36
Manpower
No Location Total Until Total Until Last Additional Plan
November 2020 Week This Week
1 Regulating Weir
- Excavator 1 2 0
- Dump Truck 0 6 4
2 River Channel Improvement 0 0 0
3 Atasangin Bridge
- Excavator 2 0 0
- Dump Truck 10 0 0
4 No.1 Diversion Weir 7
- Excavator 0 1 0
5 No.1 Swithcyard
- Excavator 0 1 0
- Dump Truck 0 1 0
6 No.2 Diversion Weir 0 0 0
7 Headpond
- Excavator 1 1 1
- Dump Truck 3 3 7
8 Inlet
- Excavator 1 0 0
9 Upper Penstock
- Excavator 2 3 1
- Dozer 1 1 0
10 Lower Penstock 0 0 7
11 Power House
- Excavator 3 0 0
- Dump Truck 7 0 0
12 Tailrace Conduit
- Excavator 0 0 1
13 Tailrace Outlet
- Excavator 0 0 1
14 No.2 Switchyard
- Excavator 0 0 1
Arsitektur
November Sebelum percepatan Desember
RW Ware House Right 3 3 5
Control House 3 3 5
DW2 Control House 3 3 5
SW1 Ware House 0 0 6
OS1 0 0 0
SW2 Control House 6 6 12
15 15 33
REAKAPITULASI MAN POWER
Struktur
Lokasi
Uraian NovemberSebelum Percepatan Desember
RW 6 8 8 Regulating Weir
DW 8 6 11 No.1 Diversion Weir
RCI 0 0 0 River Channel Improvement
HP 12 8 20 Headpond
Inlet 0 10 8 Inlet
Up PL 0 0 0 Upper Penstock
Lw PL 25 9 27 Lower Penstock
PH 0 0 0 No.2 Power House
TC 0 0 0 Tailrace Conduit
TO 3 2 5 Tailrace Outlet
OS2 10 4 14 No.2 Outdoor Switchyard
64 47 93 TOTAL
REAKAPITULASI MAN POWER
Jumlah (man power)
Sebelum Percepatan Eksisting
14 18
6 11
0 0
8 20
10 8
0 0
20 27
0 0
0 0
2 5
10 26
70 115 No.2 Diversion Weir 3 5
Control Building No.1 0 6