Anda di halaman 1dari 152

REKAPITULASI ANGGARAN BIAYA

PEKERJAAN :
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2020

No. URAIAN PEKERJAAN JUMLAH HARGA

I.
II.
III.
IV.
V.

I JUMLAH TOTAL Rp -
II PPN 10% Rp -
III ( JUMLAH I + II ) Rp -
IV DIBULATKAN Rp -
TERBILANG : SERATUS ENAM PULUH TIGA JUTA SEMBILAN RATUS RIBU RUPIAH
ESTIMATE ENGINEER'S (EE)
REKAPITULASI

Pekerjaan : PEMBANGUNAN RPS SMK 1 BANAWA


KABUPATEN DONGGALA
Lokasi :
TA : 2018

NO. URAIAN JML HARGA


1 2 3
A. PEKERJAAN PENDAHULUAN Rp. 100,000
B. PEKERJAAN TANAH Rp. 15,107,501
C. PEKERJAAN PONDASI Rp. Err:509
D. PEKERJAAN BETON Rp. Err:509
E. PEKERJAAN PASANGAN DINDING DAN PLESTERAN Rp. Err:509
F. PEKERJAAN PENUTUP LANTAI DAN DINDING Rp. Err:509
G. PEKERJAAN LANGIT-LANGIT (PLAFOND) Rp. Err:509
H. PEKERJAAN ATAP Rp. Err:509
I. PEKERJAAN KUSEN PINTU, JENDELA, & VENTILASI Rp. Err:509
J. PEKERJAAN PENGECATAN Rp. 141,079,780
L. PEKERJAAN LISTRIK Rp. Err:509
M. PEKERJAAN LAIN - LAIN Rp. 500,000

I. REAL COST Rp. Err:509


II. PEMBULATAN Rp. Err:509

Terbilang : Lima Ratus Delapan Puluh Delapan Juta Sembilan Ratus Tujuh Puluh Ribu Rupiah

Donggala, 10 Mei 2018


Mengetahui, Dibuat Oleh
KEPALA SMKN 1 BANAWA TIM PERENCANA DAN PENGAWAS

H. HAMKA, S.Pd MUH. MUNQIZ, ST


Nip. 19690624 199103 1 007
ESTIMATE ENGINEER'S (EE)
JL. KAMATA NO. 30, KEL. G.BALE
KECAMATAN BANAWA
Pekerjaan : PEMBANGUNAN RPS SMK 1 BANAWA
KABUPATEN DONGGALA
Lokasi :
TA : 2018

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5
A. PEKERJAAN PENDAHULUAN
1 Pek. Pengukuran dan Pemasangan Bouwplank 1.00 Ls 100,000 100,000
100,000
B. PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi Batu Kali dan Poer 51.23 M3 70,125 3,592,293
2 Pek. Urugan Kembali Bekas Galian 12.81 M3 20,031 256,532
3 Pek. Urugan Sirtu Bawah Lantai 109.80 M3 - -
4 Pek. Timbunan Pasir Bawah Lantai 32.40 M3 347,490 11,258,676
15,107,501
C. PEKERJAAN PONDASI
1 Pek. Pondasi Batu Kosong / Aanstamping 10.07 M3 - -
2 Pek. Pondasi Batu Kali 1 : 5 34.05 M3 Err:509 Err:509
Err:509
D. PEKERJAAN BETON
1 Pek. Lantai Beton K.100, T = 7 Cm (Dalam Bangunan) 11.63 M3 Err:509 Err:509
2 Pek Poer Plat 3.18 M3 - -
3 ### 0.86 M3 Err:509 Err:509
4 Pek. Sloof Beton 15 x 20 (1 Pc ; 2 Ps ; 3 Kr) 2.49 M3 Err:509 Err:509
5 Pek. Kolom Praktis (KP) 15 x 15 Cm (1 Pc ; 2 Ps ; 3 Kr) 0.58 M3 Err:509 Err:509
6 Pek. Kolom Beton (K1) 25 x 30 Cm (1 Pc ; 2 Ps ; 3 Kr) 6.40 M3 Err:509 Err:509
7 Pek. Balok Beton 15 x 20 (1 Pc ; 2 Ps ; 3 Kr) 3.60 M3 Err:509 Err:509
Err:509
E. PEKERJAAN PASANGAN DINDING DAN PLESTERAN
1 Pek. Pas. Dinding Bata Merah 1 Pc : 5 Psr 224.39 M2 Err:509 Err:509
2 Pek. Plesteran Dinding 1 Pc : 5 Psr 423.18 M2 Err:509 Err:509
3 Pek. Plesteran Kolom Beton 1 Pc : 3 Psr 13.97 M2 Err:509 Err:509
4 Pek. Plesteran Balok Beton 1 Pc : 3 Psr 7.19 M2 Err:509 Err:509
5 Pek. Acian Semen 444.34 M2 Err:509 Err:509
6 Pek.Pas. Profil Dinding/Batu Alam 25.60 M2 125,000 3,200,000
Err:509
F. PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pemasangan Lantai Keramik 60 x 60 Cm, (Setara Roman) 216.00 M2 Err:509 Err:509
2 Pek. Pas. Keramik Anti Slip 60 x60 cm 54.00 M2 Err:509 Err:509
3 Pemasangan Alucopan dgn Rangka Siku 3/3 13.88 M2 Err:509 Err:509
Err:509
G. PEKERJAAN LANGIT-LANGIT (PLAFOND)
1 Pek. Pas. Plafond Gypsum 9 mm (Ruang Dalam) + Rangka Metal Furing 216.00 M2 Err:509 Err:509
Err:509

Page 3
H. PEKERJAAN ATAP
2 Pek. Pas. Penutup Atap Soka Spandek + Baja Ringan 435.00 M2 195,000 84,825,000
3 Pek. Lisplank GRC 0,8 mm, L. 0,20 Cm 111.50 M' Err:509 Err:509
Err:509
I. PEKERJAAN KUSEN PINTU, JENDELA, & VENTILASI
1.1 Pekerjaan Kusen Pintu, Jendela, & VentilasiKayu & Besi
1 Pek. Pas. Pintu sliding Besi 2.00 Set 1,500,000 3,000,000
2 Pek. Kusen Pintu dan Ventilasi Kayu 8.28 m3 Err:509 Err:509
Pek.Pas. Daun Pintu Panil 3.60 m2 Err:509 Err:509
3 Pek.Pas. Daun Jendela 2.80 m2 Err:509 Err:509
4 Pek Pas. Kaca 5 mm 48.46 m2 Err:509 Err:509
1.2 Pekerjaan Kusen Pintu, Jendela, & Ventilasi Aluminium

1 Kusen Almunium + Pintu Kaca Tempered 10 mm, (Type P1) Include Terpasang 1.00 Unit Err:509 Err:509
Pek. Kusen Almunium + Pintu Frameless Kaca Tempered 5 mm (Type P1) Include
2 2.00 Unit Err:509 Err:509
Terpasang
Err:509
J. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Tembok Dalam 444.34 M2 126,268 56,105,721
2 Pek. Pengecatan Tembok Luar 444.34 M2 126,268 56,105,721
3 Pek. Pengecatan Lisplank GRC 111.50 M2 14,300 1,594,450
4 Pek. Pengecatan Plafond 216.00 M2 126,268 27,273,888
141,079,780
L. PEKERJAAN LISTRIK
1 Pek. Instalasi Titik Penerangan 68.00 Titik 277,390 18,862,520
2 Pek. Instalasi Titik Stop Kontak 24.00 Titik 277,390 6,657,360
3 Pek. Pas. Armature Downlight SL 15 W 55.00 Bh 146,900 8,079,500
4 Pek. Pas. Lampu TL 56 Watt 13.00 Bh Err:509 Err:509
5 Pek. Pas. Armature LED 16.00 Bh 569,250 9,108,000
6 Pek. Pas. Saklar Tunggal 18.00 Bh 45,950 827,100
7 Pek. Pas. Stop Kontak 24.00 Bh 54,400 1,305,600
8 Pek. Panel
a. MCB 3 Phasa 25 A 3.00 Bh Err:509 Err:509
Err:509
M. PEKERJAAN LAIN - LAIN
1 Pembersihan Akhir 1.00 Ls 500,000 500,000
500,000

Page 4
ESTIMATE ENGINEER'S (EE)

Kegiatan : RPS SMK N 1 POSO PESISIR


Pekerjaan : RPS SMK N 1 POSO PESISIR
Lokasi : AMPANA
TA : 2017

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5
PEMBANGUNAN GEDUNG PENGELOLA TERMINAL
A. PEKERJAAN PENDAHULUAN
1 Pek. Pengukuran dan Pemasangan Bouwplank 1.00 Ls 500,000 500,000
500,000
B. PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi Batu Kali dan Poer #REF! M3 70,125 #REF!
2 Pek. Urugan Kembali Bekas Galian #REF! M3 20,031 #REF!
3 Pek. Urugan Sirtu Bawah Lantai #REF! M3 - #REF!
4 Pek. Timbunan Pasir Bawah Lantai #REF! M3 347,490 #REF!

#REF!
C. PEKERJAAN PONDASI
1 Pek. Pondasi Batu Kosong / Aanstamping #REF! M3 - #REF!
2 Pek. Pondasi Batu Kali 1 : 5 #REF! M3 Err:509 Err:509

#REF!
D. PEKERJAAN BETON
1 Pek. Lantai Beton K.100, T = 7 Cm (Dalam Bangunan) #REF! M3 Err:509 Err:509
2 Pek Poer Plat #REF! M3 - #REF!
3 ### #REF! M3 Err:509 Err:509
4 Pek. Sloof Beton 15 x 20 (1 Pc ; 2 Ps ; 3 Kr) #REF! M3 Err:509 Err:509
5 Pek. Kolom Praktis (KP) 15 x 15 Cm (1 Pc ; 2 Ps ; 3 Kr) #REF! M3 Err:509 Err:509
6 Pek. Kolom Beton (K1) 25 x 30 Cm (1 Pc ; 2 Ps ; 3 Kr) #REF! M3 Err:509 Err:509
7 Pek. Balok Beton 15 x 20 (1 Pc ; 2 Ps ; 3 Kr) #REF! M3 Err:509 Err:509
Err:509
E. PEKERJAAN PASANGAN DINDING DAN PLESTERAN
1 Pek. Pas. Dinding Bata Merah 1 Pc : 5 Psr #REF! M2 Err:509 Err:509
2 Pek. Plesteran Dinding 1 Pc : 5 Psr #REF! M2 Err:509 Err:509
3 Pek. Plesteran Kolom Beton 1 Pc : 3 Psr #REF! M2 Err:509 Err:509
4 Pek. Plesteran Balok Beton 1 Pc : 3 Psr #REF! M2 Err:509 Err:509
6 Pek. Acian Semen #REF! M2 Err:509 Err:509
Err:509
F. PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pemasangan Lantai Keramik 60 x 60 Cm, (Setara Roman) #REF! M2 Err:509 #REF!
2 Pas. Lantai Keramik Km/Wc 25 x 25 Cm (Standar) 35.00 M2 Err:509
3 Pas. Dinding Keramik Km/Wc 25 x 25 Cm (Standar) 42.00 M2 Err:509
4 Pas. Dinding Keramik 30 x 30 Cm (Standar) 33.44 M2 Err:509
5 Pemasangan Alucopan dgn Rangka Siku 3/3 301.96 M2 Err:509
#REF!
G. PEKERJAAN LANGIT-LANGIT (PLAFOND)
1 Pek. Pas. Plafond Gypsum 9 mm (Ruang Dalam) + Rangka Metal Furing #REF! M2 Err:509 #REF!
#REF!

Page 5
H. PEKERJAAN ATAP
2 Pek. Pas. Penutup Atap Spandek 420.50 M2 Err:509 Err:509
3 Pek. Lisplank GRC 0,8 mm, L. 0,20 Cm 87.00 M' Err:509 Err:509
Err:509
I. PEKERJAAN KUSEN PINTU, JENDELA, & VENTILASI
1.1 Pekerjaan Kusen Pintu, Jendela, & Ventilasi Kayu
1 Pek. Kusen Pintu dan Ventilasi Kayu 0.23 m3 Err:509
2 Pek. Pasang Daun Pintu Panel 1.68 m2 Err:509
1.2 Pekerjaan Kusen Pintu, Jendela, & Ventilasi Aluminium
Kusen Almunium + Pintu Dobel Jendela Frameless Kaca Tempered 10 mm, (Type PJ1)
1 2.00 Unit Err:509
Include Terpasang
Pek. Kusen Almunium, Jendela Kaca dan Pintu Kaca Tempered (Type PJ2) Include
2 1.00 Unit Err:509
Terpasang
Pek. Kusen Almunium, Jendela Kaca dan Pintu Kaca Tempered (Type PJ3) Include
3 2.00 Unit Err:509
Terpasang
Pek. Kusen Almunium + Pintu Frameless Kaca Tempered 12 mm (Type P1) Include
4 2.00 Unit Err:509
Terpasang
5 Pek. Pintu PVC (Type P3/KM) Include Terpasang 3.00 Unit Err:509
6 Pek. Kusen + Jendela Almunium, Kaca 5 mm (Type J1) Include Terpasang 1.00 Unit Err:509
7 Pek. Kusen + Jendela Almunium, Kaca 5 mm (Type J2) Include Terpasang 1.00 Unit Err:509
8 Pek. Kusen + Jendela Almunium, Kaca 5 mm (Type J3) Include Terpasang 4.00 Unit Err:509
9 Pek. Kusen + Jendela Almunium, Kaca 5 mm (Type JL1) Include Terpasang 1.00 Unit Err:509
10 Pek. Kusen + Jendela Almunium, Kaca 5 mm (Type JL2) Include Terpasang 1.00 Unit Err:509
11 Pek. Kusen + Jendela Almunium, Kaca 5 mm (Type JL3) Include Terpasang 1.00 Unit Err:509
-
J. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Tembok Dalam #REF! M2 126,268 #REF!
2 Pek. Pengecatan Tembok Luar #REF! M2 126,268 #REF!
3 Pek. Pengecatan Lisplank GRC 87.00 M2 14,300 1,244,100
4 Pek. Pengecatan Plafond #REF! M2 126,268 #REF!
5 Pek. Pengecatan Kayu 12.60 M2 57,713 727,184
#REF!
K. PEKERJAAN SANITASI
1 Pek. Closet Duduk 3.00 Bh Err:509
2 Pek. Kran Toilet Hand 3.00 Bh Err:509
3 Pek. Tissue Holder 3.00 Bh Err:509
4 Pek. Towel Holder 3.00 Bh Err:509
5 Pek. Urinoir 2.00 Bh Err:509
6 Pek. Wastafel + Cermin 4.00 Bh Err:509
7 Pek. Floor Drain Stainles 3.00 Bh Err:509
8 Pek. Pipa Air Bersih Diameter 1/2" 120.00 M' Err:509
9 Pek. Pipa Pembuangan Air Kotor Diameter 2" 44.00 M' Err:509
10 Pek. Pipa Pembuangan Tinja Diameter 3" 45.00 M' Err:509
11 Pek. Septictank + Resapan 2.00 Unit Err:509
-
L. PEKERJAAN LISTRIK
1 Pek. Instalasi Titik Penerangan 68.00 Titik 277,390 18,862,520
2 Pek. Instalasi Titik Stop Kontak 25.00 Titik 277,390 6,934,750
3 Pek. Pas. Armature Downlight SL 15 W 55.00 Bh 146,900 8,079,500
4 Pek. Pas. Lampu TL 56 Watt 13.00 Bh Err:509 Err:509
5 Pek. Pas. Armature LED 17.00 Bh 569,250 9,677,250
6 Pek. Pas. Saklar Tunggal 18.00 Bh 45,950 827,100
7 Pek. Pas. Stop Kontak 25.00 Bh 54,400 1,360,000
8 Pek. Panel
a. MCB 3 Phasa 25 A 3.00 Bh Err:509 Err:509
9 Penyambungan Listrik PLN Daya 13200 VA (3 Pasha) 1.00 Ls 20,000,000 20,000,000
Err:509
M. PEKERJAAN LAIN - LAIN
1 Pembersihan Akhir 1.00 Ls 500,000 500,000
500,000

Page 6
ESTIMATE ENGINEER'S (EE)
REKAPITULASI

Kegiatan : RPS SMK N 1 POSO PESISIR


Pekerjaan : RPS SMK N 1 POSO PESISIR
Lokasi : AMPANA
TA : 2017

NO. URAIAN JML HARGA


1 2 3
PEMBANGUNAN GEDUNG PENGELOLA TERMINAL
A. PEKERJAAN PENDAHULUAN Rp. 500,000
B. PEKERJAAN TANAH Rp. #REF!
C. PEKERJAAN PONDASI Rp. #REF!
D. PEKERJAAN BETON Rp. Err:509
E. PEKERJAAN PASANGAN DINDING DAN PLESTERAN Rp. Err:509
F. PEKERJAAN PENUTUP LANTAI DAN DINDING Rp. Err:509
G. PEKERJAAN LANGIT-LANGIT (PLAFOND) Rp. #REF!
H. PEKERJAAN ATAP Rp. Err:509
I. PEKERJAAN KUSEN PINTU, JENDELA, & VENTILASI Rp. -
J. PEKERJAAN PENGECATAN Rp. #REF!
K. PEKERJAAN SANITASI Rp. -
L. PEKERJAAN LISTRIK Rp. Err:509
M. PEKERJAAN LAIN - LAIN Rp. 500,000

I. REAL COST Rp. #REF!


II. PEMBULATAN Rp. #REF!

Terbilang : ....................................
ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan : PEMBANGUNAN RPS SMK 1 BANAWA
KABUPATEN DONGGALA
Lokasi :
TA : 2018

HARGA JUMLAH
HARGA HARGA
BAHAN HARGA
NO. URAIAN PEKERJAAN SATUAN UPAH
( Rp ) ( Rp )
( Rp ) ( Rp )
1 2 3 4 5 6

A. PEKERJAAN PENDAHULUAN
1) SNI 6.4 1 m1 Pengukuran dan Pemasangan Bouwplank
0.012 M³ Kayu 5/7 3,577,500.00 42,930.00 42,930.00
0.020 Kg Paku 2" - 5" 35,000.00 700.00 700.00
0.007 M³ Papan 3/20 3,577,500.00 25,042.50 25,042.50
0.100 Oh Pekerja 80,000.00 8,000.00 8,000.00
0.100 Oh Tukang 125,000.00 12,500.00 12,500.00
0.010 Oh Kepala Tukang 150,000.00 1,500.00 1,500.00
0.005 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 68,672.50 Err:509
HARGA PENAWARAN

KEGIATAN : REHAB WC SALENA


PEKERJAAN : REHAB WC SALENA
ORGANISASI : DINAS PARIWISATA KOTA PALU
LOKASI : DUSUN SALENA, KELURAHAN BULURI, KECAMATAN ULUJADI, KOTA PALU
THN ANGGARAN : 2020

JUMLAH HARGA
NO URAIAN PEKERJAAN
Rp.

I PEKERJAAN PERSIAPAN 1,300,000.00


II PEKERJAAN PEMASANGAN WASTAFEL DAN PERLENGKAPAN LAINNYA 3,900,000.00
III PEKERJAAN PASANGAN DAN PLESTERAN 3,360,000.00
IV PEKERJAAN LISTRIK 1,590,000.00
V PEKERJAAN PENGECETAN 2,780,000.00
VI PEKERJAAN PEMBERSIHAN AKHIR 750,000.00
TOTAL PEKERJAAN C 13,680,000.00
JUMLAH TOTAL 13,680,000.00
PPN 10% Rp 1,368,000.00
###
( JUMLAH I + II ) 15,048,000.00
###
DIBULATKAN Rp 15,000,000.00
TERBILANG : LIMA BELAS JUTA RUPIAH

Palu, 03 November 2020


Dibuat Oleh :
CV. Bika Sejahtera

Bobbyanto
Direktur
KONTRAKTOR PELAKSANA DARI TANGGAL S/D TANGGAL

DINAS PARIWISATA KOTA PALU CV. BIKA SEJAHTERA


NOMOR KONTRAK
20 November 2020 S/D 26 November 2020
MINGGU KE : I
01.f/SPK/PARIWISATA_KONSTRUKSI/XI/2020
PEKERJAAN : REHAB WC SALENA NILAI KONTRAK I PERTAMA
ORGANISASI : DINAS PARIWISATA KOTA PALU
LOKASI : DUSUN SALENA, KELURAHAN BULURI, KECAMATAN ULUJADI, KOTA PALU
Rp14,800,000.00

TAHUN ANGGARAN : 2020 TANGGAL SPMK BULAN KE : I


20 November 2020
KONSULTAN PENGAWAS I NOVEMBER
CV. SETUNGGAL ABADI KONSULTAN
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOLUME SAMPAI MINGGU LALU MINGGU INI SAMPAI MINGGU INI
BOBOT (%)
Bobot Terhadap Seluruh Bobot Terhdap Item Bobot Terhadap Seluruh Bobot Terhdap Item Bobot Terhadap Bobot Terhdap Item
Volume Pekerjaan (%) Pekerjaan (%) Volume Pekerjaan (%) Pekerjaan (%) Volume Seluruh Pekerjaan (%) Pekerjaan (%)
a b c d
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan LokasI Ls 1.00 2.193 1.00 2.193 100.00 1.00 2.193 100.00
2 Pek. Pembongkaran Ls 1.00 3.655 1.00 3.655 100.00 1.00 3.655 100.00
3 Mobilisasi dan Demobilisasi Ls 1.00 3.655 1.00 3.655 100.00 1.00 3.655 100.00
Jumlah ………..I)
II PEKERJAAN PEMASANGAN WASTAFEL DAN PERLENGKAPAN LAINNYA
1 Pek. Pemasangan Wastafel + Pemasangan Instalasi Ls 1.00 25.585
2 Pek. Handel Pintu Buah 2.00 2.924
Jumlah …………II )
III PEKERJAAN PASANGAN DAN PLESTERAN 0.000
1 Pek. Pemasangan Tegel Dinding M2 12.00 21.930
2 Pek. Plesteran Dinding M2 6.00 1.754
3 Pek. acian Dinding M2 6.00 0.877
Jumlah ………..III)
IV PEKERJAAN LISTRIK 0.000
1 Pek. Pemasangan Skalar Ganda Buah 1.00 1.681
2 Pek. Pemasangan Stop Kontak Buah 2.00 2.924
3 Pek. Pemasangan Skalar Tunggal Buah 1.00 1.170
4 Pek. Pemasangan Lampu Pijar 15 Watt Buah 4.00 5.848
Jumlah ………..IV)
V PEKERJAAN PENGECETAN
1 Pek. Pengecetan Dinding M2 24.00 16.667
2 Pek. Pengecetan Pintu Ls 1.00 3.655
Jumlah ………..IV)
VI PEKERJAAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir Ls 1.00 5.482
Jumlah ………..VIII)
100.000 0.000 9.503 9.503

Disetujui Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

ANDI AMRAN, S.SOS


NIP. 19800405 201001 1 013 SYAFRUDDIN, ST BOBBYANTO, T.
Direktur Direktur
RINCIAN RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN GAZEBO TIPE 02

ORGANISASI : DINAS PARIWISATA KOTA PALU


LOKASI : HUTAN KOTA PALU
TAHUN ANGGARAN : 2020

PEKERJAAN 1 UNIT GAZEBO TIPE 02

NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN JUMLAH HARGA


a b c d e f=dxe
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan LokasI Ls 1.00 Rp 300,000.00 Rp 300,000.00
2 Mobilisasi dan Demobilisasi Ls 1.00 Rp 500,000.00 Rp 500,000.00
Jumlah ………..I) Rp 800,000.00
II PEKERJAAN TANAH, GALIAN DAN PONDASI
1 Pek. Galian Tanah Pondasi M³ Err:509 Rp 58,833.50 Err:509
2 Pek. Urugan Tanah Bekas Galian M³ Err:509 Rp 20,031.00 Err:509
3 Pek. Urugan Pasir dibawah lantai ( di Padatkan ) M³ Err:509 Rp 347,490.00 Err:509
4 Pek. Tanah Urug M³ Err:509 Rp 339,471.00 Err:509
Pek. Pondasi Setempak Beton Bertulang mutu, f’c = 19,3 MPa (K225), slump (12±2) cm, w/c = 0,58
5 M³ Err:509 Rp 4,536,502.38 Err:509
Manual
6 Pek. Pondasi Rolag Bata M2 Err:509 Rp 186,273.34 Err:509
Jumlah ………..II) Err:509
III PEKERJAAN BETON DAN PLESTERAN
Pek. Kolom 20/20 Meja Beton Bertulang mutu, f’c = 19,3 MPa (K225), slump (12±2) cm, w/c = 0,58
1 M³ Err:509 Rp 6,498,294.24 Err:509
Manual

2 Pek. Meja Beton Bertulang mutu, f’c = 19,3 MPa (K225), slump (12±2) cm, w/c = 0,58 Manual M³ Err:509 Err:509 Err:509

Pek. Pengecoran Dudukan Kolom Besi Hollow Beton mutu, f’c = 19,3 MPa (K225), slump (12±2) cm,
3 M³ Err:509 Rp 1,080,771.21 Err:509
w/c = 0,58 Manual Tanpa Tulangan
4 Pek. Plesteran Pondasi Rolag Bata M2 Err:509 Rp 66,489.72 Err:509
5 Pek. Acian Pondasi Rolag Bata dan Dudukan Besi Hollow M2 Err:509 Rp 39,655.00 Err:509
Jumlah ………..III) Err:509
IV PEKERJAAN LANTAI
1 Pek. Scred Lantai Beton fc' ~ 7,4 MPa (K-100) atau setara 1PC : 2PB : 3Kr M³ Err:509 Rp 882,979.90 Err:509
2 Pek. Lantai Ubin Teraso Uk. 30 cm x 30 cm M2 Err:509 Rp 207,145.10 Err:509
Jumlah ………..IV) Err:509
V PEKERJAAN KOLOM BESI DAN RANGKA ATAP
1 Pek. Tiang Kolom Besi Hollow Galvanis 4/8 M' Err:509 Rp 123,626.25 Err:509
Jumlah ………..V) Err:509
VI PEKERJAAN ATAP
1 Pek. Rangka Atap Besi Hollow Galvanis 4/4 M' Err:509 Rp 98,202.50 Err:509
2 Pek. Penutup Atap Genteng Bitumen Bergelombang 3mm Uk. 106cm x 40cm M2 Err:509 Rp 259,905.80 Err:509
3 Pek. Nok Genteng Onduline M' Err:509 Rp 179,063.50 Err:509
Jumlah ………..VI) Err:509
VII PEKERJAAN PENGECATAN KOLOM BESI
1 Pek. Pengecatan Kolom, Rangka Atap dan Jalusi Besi Dgn. Cat Besi M2 Err:509 Rp 66,212.85 Err:509
Jumlah ………..VII) Err:509
VIII PEKERJAAN PERABOT
1 Pek. Bangku Kotak Gabion Fin. Kayu Solid Unit 4.00 Rp 660,000.00 Rp 2,640,000.00
2 Pek Fin. Meja Beton Kayu Solid Unit 1.00 Rp 400,000.00 Rp 400,000.00
3 Pek Lapisan Gabion Kolom Utk. Meja Beton Unit 1.00 Rp 550,000.00 Rp 550,000.00
Jumlah ………..VIII) Rp 3,590,000.00
IX PEKERJAAN LANSEKAP
1 Pek. Plat Pelintas Beton fc' ~ 7,4 MPa (K-100) atau setara 1PC : 2PB : 3Kr M³ Err:509 Rp 861,529.90 Err:509
Jumlah ………..IX) Err:509
A JUMLAH TOTAL 1 UNIT Err:509
B PPN 10% Err:509
C ( JUMLAH A + B ) Err:509
D DIBULATKAN Err:509
CV. BIKA SEJAHTERA
LAPORAN HARIAN
TANGGAL : 20 NOVEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pembersihan LokasI 1.00 Ls
2 Pek. Pembongkaran 1.00 Ls
3 Mobilisasi dan Demobilisasi 1.00 Ls

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana 1 CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 1
8 Tukang
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 21 NOVEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pembersihan LokasI 1.00 Ls
2 Pek. Pembongkaran 1.00 Ls
3 Mobilisasi dan Demobilisasi 1.00 Ls

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana 1 CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 2
8 Tukang 1
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 22 NOVEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pembersihan LokasI 1.00 Ls
2 Pek. Pembongkaran 1.00 Ls
3 Mobilisasi dan Demobilisasi 1.00 Ls

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 23 NOVEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pembersihan LokasI 1.00 Ls
2 Pek. Pembongkaran 1.00 Ls
3 Mobilisasi dan Demobilisasi 1.00 Ls

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST
NIP. 19800405 2010 01 1 013 Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 24 NOVEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pembersihan LokasI 1.00 Ls
2 Pek. Pembongkaran 1.00 Ls
3 Mobilisasi dan Demobilisasi 1.00 Ls

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 25 NOVEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pembersihan LokasI 1.00 Ls
2 Pek. Pembongkaran 1.00 Ls
3 Mobilisasi dan Demobilisasi 1.00 Ls

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 6
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST
NIP. 19800405 2010 01 1 013 Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 26 NOVEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pembersihan LokasI 1.00 Ls
2 Pek. Pembongkaran 1.00 Ls
3 Mobilisasi dan Demobilisasi 1.00 Ls

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 6
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
KONTRAKTOR PELAKSANA DARI TANGGAL S/D TANGGAL

DINAS PARIWISATA KOTA PALU CV. BIKA SEJAHTERA


NOMOR KONTRAK
27 November 2020 S/D 3 Desember 2020
MINGGU KE : II
01.f/SPK/PARIWISATA_KONSTRUKSI/XI/2020
PEKERJAAN : REHAB WC SALENA NILAI KONTRAK II KEDUA
ORGANISASI : DINAS PARIWISATA KOTA PALU
LOKASI : DUSUN SALENA, KELURAHAN BULURI, KECAMATAN ULUJADI, KOTA PALU
Rp14,800,000.00

TAHUN ANGGARAN : 2020 TANGGAL SPMK BULAN KE : I


20 November 2020
KONSULTAN PENGAWAS I NOVEMBER - DESEMBER
CV. SETUNGGAL ABADI KONSULTAN
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOLUME SAMPAI MINGGU LALU MINGGU INI SAMPAI MINGGU INI
BOBOT (%)
Bobot Terhadap Seluruh Bobot Terhdap Item Bobot Terhadap Seluruh Bobot Terhdap Item Bobot Terhadap Bobot Terhdap Item
Volume Pekerjaan (%) Pekerjaan (%) Volume Pekerjaan (%) Pekerjaan (%) Volume Seluruh Pekerjaan (%) Pekerjaan (%)
a b c d
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan LokasI Ls 1.00 2.193 1.00 2.193 100.00 1.00 2.193 100.00
2 Pek. Pembongkaran Ls 1.00 3.655 1.00 3.655 100.00 1.00 3.655 100.00
3 Mobilisasi dan Demobilisasi Ls 1.00 3.655 1.00 3.655 100.00 1.00 3.655 100.00
Jumlah ………..I)
II PEKERJAAN PEMASANGAN WASTAFEL DAN PERLENGKAPAN LAINNYA
1 Pek. Pemasangan Wastafel + Pemasangan Instalasi Ls 1.00 25.585 0.50 12.792 50.00 0.50 12.792 50.00
2 Pek. Handel Pintu Buah 2.00 2.924
Jumlah …………II )
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pemasangan Tegel Dinding M2 12.00 21.930 3.60 6.579 30.00 3.60 6.579 30.00
2 Pek. Plesteran Dinding M2 6.00 1.754 3.00 0.877 50.00 3.00 0.877 50.00
3 Pek. acian Dinding M2 6.00 0.877
Jumlah ………..III)
IV PEKERJAAN LISTRIK 0.000
1 Pek. Pemasangan Skalar Ganda Buah 1.00 1.681
2 Pek. Pemasangan Stop Kontak Buah 2.00 2.924
3 Pek. Pemasangan Skalar Tunggal Buah 1.00 1.170
4 Pek. Pemasangan Lampu Pijar 15 Watt Buah 4.00 5.848
Jumlah ………..IV)
V PEKERJAAN PENGECETAN
1 Pek. Pengecetan Dinding M2 24.00 16.667
2 Pek. Pengecetan Pintu Ls 1.00 3.655
Jumlah ………..IV)
VI PEKERJAAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir Ls 1.00 5.482
Jumlah ………..VIII)
100.000 9.503 20.249 29.751

Disetujui Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

ANDI AMRAN, S.SOS


NIP. 19800405 201001 1 013 SYAFRUDDIN, ST BOBBYANTO, T.
Direktur Direktur
CV. BIKA SEJAHTERA
LAPORAN HARIAN
TANGGAL : 27 NOVEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.51 M2
2 Pek. Plesteran Dinding 0.43 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana 1 CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 1
8 Tukang
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 28 NOVEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.51 M2
2 Pek. Plesteran Dinding 0.43 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana 1 CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 2
8 Tukang 1
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 29 NOVEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.51 M2
2 Pek. Plesteran Dinding 0.43 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 30 NOVEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.51 M2
2 Pek. Plesteran Dinding 0.43 M2
3 Pek. Pemasangan Wastafel + Pemasangan Instalasi 0.13 Ls

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST
NIP. 19800405 2010 01 1 013 Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 1 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.51 M2
2 Pek. Plesteran Dinding 0.43 M2
3 Pek. Pemasangan Wastafel + Pemasangan Instalasi 0.13 Ls

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 2 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.51 M2
2 Pek. Plesteran Dinding 0.43 M2
3 Pek. Pemasangan Wastafel + Pemasangan Instalasi 0.13 Ls

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 6
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST
NIP. 19800405 2010 01 1 013 Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 3 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.51 M2
2 Pek. Plesteran Dinding 0.43 M2
3 Pek. Pemasangan Wastafel + Pemasangan Instalasi 0.13 Ls

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 6
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
KONTRAKTOR PELAKSANA DARI TANGGAL S/D TANGGAL

DINAS PARIWISATA KOTA PALU CV. BIKA SEJAHTERA


NOMOR KONTRAK
4 Desember 2020 s/d 10 Desember 2020
MINGGU KE : III
01.f/SPK/PARIWISATA_KONSTRUKSI/XI/2020
PEKERJAAN : REHAB WC SALENA NILAI KONTRAK III KETIGA
ORGANISASI : DINAS PARIWISATA KOTA PALU
LOKASI : DUSUN SALENA, KELURAHAN BULURI, KECAMATAN ULUJADI, KOTA PALU
Rp14,800,000.00

TAHUN ANGGARAN : 2020 TANGGAL SPMK BULAN KE : I


20 November 2020
KONSULTAN PENGAWAS I DESEMBER
CV. SETUNGGAL ABADI KONSULTAN
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOLUME SAMPAI MINGGU LALU MINGGU INI SAMPAI MINGGU INI
BOBOT (%)
Bobot Terhadap Seluruh Bobot Terhdap Item Bobot Terhadap Seluruh Bobot Terhdap Item Bobot Terhadap Bobot Terhdap Item
Volume Pekerjaan (%) Pekerjaan (%) Volume Pekerjaan (%) Pekerjaan (%) Volume Seluruh Pekerjaan (%) Pekerjaan (%)
a b c d
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan LokasI Ls 1.00 2.193 1.00 2.193 100.00
2 Pek. Pembongkaran Ls 1.00 3.655 1.00 3.655 100.00
3 Mobilisasi dan Demobilisasi Ls 1.00 3.655 1.00 3.655 100.00
Jumlah ………..I)
II PEKERJAAN PEMASANGAN WASTAFEL DAN PERLENGKAPAN LAINNYA
1 Pek. Pemasangan Wastafel + Pemasangan Instalasi Ls 1.00 25.585 0.50 12.792 50.00 0.50 12.792 50.00 1.00 25.585 100.00
2 Pek. Handel Pintu Buah 2.00 2.924
Jumlah …………II )
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pemasangan Tegel Dinding M2 12.00 21.930 3.60 6.579 30.00 3.60 6.579 30.00 7.20 13.158 60.00
2 Pek. Plesteran Dinding M2 6.00 1.754 3.00 0.877 50.00 3.00 0.877 50.00 6.00 1.754 100.00
3 Pek. acian Dinding M2 6.00 0.877
Jumlah ………..III)
IV PEKERJAAN LISTRIK 0.000
1 Pek. Pemasangan Skalar Ganda Buah 1.00 1.681
2 Pek. Pemasangan Stop Kontak Buah 2.00 2.924
3 Pek. Pemasangan Skalar Tunggal Buah 1.00 1.170
4 Pek. Pemasangan Lampu Pijar 15 Watt Buah 4.00 5.848
Jumlah ………..IV)
V PEKERJAAN PENGECETAN
1 Pek. Pengecetan Dinding M2 24.00 16.667
2 Pek. Pengecetan Pintu Ls 1.00 3.655
Jumlah ………..IV)
VI PEKERJAAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir Ls 1.00 5.482
Jumlah ………..VIII)
100.000 20.249 20.249 50.000

Disetujui Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

ANDI AMRAN, S.SOS


NIP. 19800405 201001 1 013 SYAFRUDDIN, ST BOBBYANTO, T.
Direktur Direktur
CV. BIKA SEJAHTERA
LAPORAN HARIAN
TANGGAL : 4 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.51 M2
2 Pek. Plesteran Dinding 0.43 M2
3 Pek. Pemasangan Wastafel + Pemasangan Instalasi 0.17 Ls

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana 1 CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 1
8 Tukang
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 5 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.51 M2
2 Pek. Plesteran Dinding 0.43 M2
3 Pek. Pemasangan Wastafel + Pemasangan Instalasi 0.17 Ls

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana 1 CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 2
8 Tukang 1
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 6 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.51 M2
2 Pek. Plesteran Dinding 0.43 M2
3 Pek. Pemasangan Wastafel + Pemasangan Instalasi 0.17 Ls

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 7 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.51 M2
2 Pek. Plesteran Dinding 0.43 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST
NIP. 19800405 2010 01 1 013 Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 8 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.51 M2
2 Pek. Plesteran Dinding 0.43 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 9 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.51 M2
2 Pek. Plesteran Dinding 0.43 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 6
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST
NIP. 19800405 2010 01 1 013 Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 10 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.51 M2
2 Pek. Plesteran Dinding 0.43 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 6
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
KONTRAKTOR PELAKSANA DARI TANGGAL S/D TANGGAL

DINAS PARIWISATA KOTA PALU CV. BIKA SEJAHTERA


NOMOR KONTRAK
11 Desember 2020 s/d 17 Desember 2020
MINGGU KE : IV
01.f/SPK/PARIWISATA_KONSTRUKSI/XI/2020
PEKERJAAN : REHAB WC SALENA NILAI KONTRAK IV KE EMPAT
ORGANISASI : DINAS PARIWISATA KOTA PALU
LOKASI : DUSUN SALENA, KELURAHAN BULURI, KECAMATAN ULUJADI, KOTA PALU
Rp14,800,000.00

TAHUN ANGGARAN : 2020 TANGGAL SPMK BULAN KE : I


20 November 2020
KONSULTAN PENGAWAS I DESEMBER
CV. SETUNGGAL ABADI KONSULTAN
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOLUME SAMPAI MINGGU LALU MINGGU INI SAMPAI MINGGU INI
BOBOT (%)
Bobot Terhadap Seluruh Bobot Terhdap Item Bobot Terhadap Seluruh Bobot Terhdap Item Bobot Terhadap Bobot Terhdap Item
Volume Pekerjaan (%) Pekerjaan (%) Volume Pekerjaan (%) Pekerjaan (%) Volume Seluruh Pekerjaan (%) Pekerjaan (%)
a b c d
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan LokasI Ls 1.00 2.193 1.00 2.193 100.00
2 Pek. Pembongkaran Ls 1.00 3.655 1.00 3.655 100.00
3 Mobilisasi dan Demobilisasi Ls 1.00 3.655 1.00 3.655 100.00
Jumlah ………..I)
II PEKERJAAN PEMASANGAN WASTAFEL DAN PERLENGKAPAN LAINNYA
1 Pek. Pemasangan Wastafel + Pemasangan Instalasi Ls 1.00 25.585 0.50 12.792 50.00 1.00 25.585 100.00
2 Pek. Handel Pintu Buah 2.00 2.924
Jumlah …………II )
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pemasangan Tegel Dinding M2 12.00 21.930 3.60 6.579 30.00 4.80 8.772 40.00 12.00 21.930 100.00
2 Pek. Plesteran Dinding M2 6.00 1.754 3.00 0.877 50.00 6.00 1.754 100.00
3 Pek. Acian Dinding M2 6.00 0.877 6.00 0.877 100.00 6.00 0.877 100.00
Jumlah ………..III)
IV PEKERJAAN LISTRIK
1 Pek. Pemasangan Skalar Ganda Buah 1.00 1.681
2 Pek. Pemasangan Stop Kontak Buah 2.00 2.924
3 Pek. Pemasangan Skalar Tunggal Buah 1.00 1.170
4 Pek. Pemasangan Lampu Pijar 15 Watt Buah 4.00 5.848
Jumlah ………..IV)
V PEKERJAAN PENGECETAN
1 Pek. Pengecetan Dinding M2 24.00 16.667 12.00 8.333 50.00 12.00 8.333 50.00
2 Pek. Pengecetan Pintu Ls 1.00 3.655
Jumlah ………..IV)
VI PEKERJAAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir Ls 1.00 5.482
Jumlah ………..VIII)
100.000 20.249 17.982 67.982

Disetujui Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

ANDI AMRAN, S.SOS


NIP. 19800405 201001 1 013 SYAFRUDDIN, ST BOBBYANTO, T.
Direktur Direktur
CV. BIKA SEJAHTERA
LAPORAN HARIAN
TANGGAL : 11 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.69 M2
2 Pek. Acian Dinding 0.86 M2
3 Pek. Pengecetan Dinding 1.71 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana 1 CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 1
8 Tukang
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 12 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.69 M2
2 Pek. Acian Dinding 0.86 M2
3 Pek. Pengecetan Dinding 1.71 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana 1 CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 2
8 Tukang 1
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 13 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.69 M2
2 Pek. Acian Dinding 0.86 M2
3 Pek. Pengecetan Dinding 1.71 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 14 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.69 M2
2 Pek. Acian Dinding 0.86 M2
3 Pek. Pengecetan Dinding 1.71 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST
NIP. 19800405 2010 01 1 013 Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 15 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.69 M2
2 Pek. Acian Dinding 0.86 M2
3 Pek. Pengecetan Dinding 1.71 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 16 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.69 M2
2 Pek. Acian Dinding 0.86 M2
3 Pek. Pengecetan Dinding 1.71 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 6
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST
NIP. 19800405 2010 01 1 013 Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 17 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Tegel Dinding 0.69 M2
2 Pek. Acian Dinding 0.86 M2
3 Pek. Pengecetan Dinding 1.71 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 6
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
KONTRAKTOR PELAKSANA DARI TANGGAL S/D TANGGAL

DINAS PARIWISATA KOTA PALU CV. BIKA SEJAHTERA


NOMOR KONTRAK
18 Desember 2020 s/d 24 Desember 2020
MINGGU KE : V
01.f/SPK/PARIWISATA_KONSTRUKSI/XI/2020
PEKERJAAN : REHAB WC SALENA NILAI KONTRAK V KE LIMA
ORGANISASI : DINAS PARIWISATA KOTA PALU
LOKASI : DUSUN SALENA, KELURAHAN BULURI, KECAMATAN ULUJADI, KOTA PALU
Rp14,800,000.00

TAHUN ANGGARAN : 2020 TANGGAL SPMK BULAN KE : II


20 November 2020
KONSULTAN PENGAWAS II DESEMBER
CV. SETUNGGAL ABADI KONSULTAN
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOLUME SAMPAI MINGGU LALU MINGGU INI SAMPAI MINGGU INI
BOBOT (%)
Bobot Terhadap Seluruh Bobot Terhdap Item Bobot Terhadap Seluruh Bobot Terhdap Item Bobot Terhadap Bobot Terhdap Item
Volume Pekerjaan (%) Pekerjaan (%) Volume Pekerjaan (%) Pekerjaan (%) Volume Seluruh Pekerjaan (%) Pekerjaan (%)
a b c d
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan LokasI Ls 1.00 2.193 1.00 2.193 100.00
2 Pek. Pembongkaran Ls 1.00 3.655 1.00 3.655 100.00
3 Mobilisasi dan Demobilisasi Ls 1.00 3.655 1.00 3.655 100.00
Jumlah ………..I)
II PEKERJAAN PEMASANGAN WASTAFEL DAN PERLENGKAPAN LAINNYA
1 Pek. Pemasangan Wastafel + Pemasangan Instalasi Ls 1.00 25.585 1.00 25.585 100.00
2 Pek. Handel Pintu Buah 2.00 2.924 2.00 2.924 100.00 2.00 2.924 100.00
Jumlah …………II )
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pemasangan Tegel Dinding M2 12.00 21.930 4.80 8.772 40.00 12.00 21.930 100.00
2 Pek. Plesteran Dinding M2 6.00 1.754 6.00 1.754 100.00
3 Pek. acian Dinding M2 6.00 0.877 0.88 0.877 100.00 6.00 0.877 100.00
Jumlah ………..III)
IV PEKERJAAN LISTRIK
1 Pek. Pemasangan Skalar Ganda Buah 1.00 1.681
2 Pek. Pemasangan Stop Kontak Buah 2.00 2.924
3 Pek. Pemasangan Skalar Tunggal Buah 1.00 1.170
4 Pek. Pemasangan Lampu Pijar 15 Watt Buah 4.00 5.848
Jumlah ………..IV)
V PEKERJAAN PENGECETAN
1 Pek. Pengecetan Dinding M2 24.00 16.667 12.00 8.333 50.00 12.00 8.333 50.00 24.00 16.667 100.00
2 Pek. Pengecetan Pintu Ls 1.00 3.655 1.00 3.655 100.00 1.00 3.655 100.00
Jumlah ………..IV)
VI PEKERJAAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir Ls 1.00 5.482
Jumlah ………..VIII)
100.000 17.982 14.912 82.895

Disetujui Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

ANDI AMRAN, S.SOS


NIP. 19800405 201001 1 013 SYAFRUDDIN, ST BOBBYANTO, T.
Direktur Direktur
CV. BIKA SEJAHTERA
LAPORAN HARIAN
TANGGAL : 25 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pengecetan Dinding 2.40 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana 1 CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 1
8 Tukang
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 19 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pengecetan Dinding 2.40 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana 1 CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 2
8 Tukang 1
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 20 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pengecetan Dinding 2.40 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 21 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pengecetan Dinding 2.40 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST
NIP. 19800405 2010 01 1 013 Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 22 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pengecetan Dinding 2.40 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 23 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pengecetan Pintu 0.50 Ls
2 Pek. Handel Pintu 1.00 Buah

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 6
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST
NIP. 19800405 2010 01 1 013 Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 24 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pengecetan Pintu 0.50 Ls
2 Pek. Handel Pintu 1.00 Buah

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 6
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
KONTRAKTOR PELAKSANA DARI TANGGAL S/D TANGGAL

DINAS PARIWISATA KOTA PALU CV. BIKA SEJAHTERA


NOMOR KONTRAK
25 Desember 2020 s/d 30 Desember 2020
MINGGU KE : VI
01.f/SPK/PARIWISATA_KONSTRUKSI/XI/2020
PEKERJAAN : REHAB WC SALENA NILAI KONTRAK VI KE ENAM
ORGANISASI : DINAS PARIWISATA KOTA PALU
Rp14,800,000.00
LOKASI : DUSUN SALENA, KELURAHAN BULURI, KECAMATAN ULUJADI, KOTA PALU
TAHUN ANGGARAN : 2020 TANGGAL SPMK BULAN KE : II
20 November 2020
KONSULTAN PENGAWAS II DESEMBER
CV. SETUNGGAL ABADI KONSULTAN
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOLUME SAMPAI MINGGU LALU MINGGU INI SAMPAI MINGGU INI
BOBOT (%)
Bobot Terhadap Seluruh Bobot Terhdap Item Bobot Terhadap Seluruh Bobot Terhdap Item Bobot Terhadap Bobot Terhdap Item
Volume Pekerjaan (%) Pekerjaan (%) Volume Pekerjaan (%) Pekerjaan (%) Volume Seluruh Pekerjaan (%) Pekerjaan (%)
a b c d
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan LokasI Ls 1.00 2.193 1.00 2.193 100.00
2 Pek. Pembongkaran Ls 1.00 3.655 1.00 3.655 100.00
3 Mobilisasi dan Demobilisasi Ls 1.00 3.655 1.00 3.655 100.00
Jumlah ………..I)
II PEKERJAAN PEMASANGAN WASTAFEL DAN PERLENGKAPAN LAINNYA
1 Pek. Pemasangan Wastafel + Pemasangan Instalasi Ls 1.00 25.585 1.00 25.585 100.00
2 Pek. Handel Pintu Buah 2.00 2.924 2.00 2.924 100.00 2.00 2.924 100.00
Jumlah …………II )
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pemasangan Tegel Dinding M2 12.00 21.930 12.00 21.930 100.00
2 Pek. Plesteran Dinding M2 6.00 1.754 6.00 1.754 100.00
3 Pek. acian Dinding M2 6.00 0.877 6.00 0.877 100.00
Jumlah ………..III)
IV PEKERJAAN LISTRIK
1 Pek. Pemasangan Skalar Ganda Buah 1.00 1.681 1.00 1.681 100.00 1.00 1.681 100.00
2 Pek. Pemasangan Stop Kontak Buah 2.00 2.924 2.00 2.924 100.00 2.00 2.924 100.00
3 Pek. Pemasangan Skalar Tunggal Buah 1.00 1.170 1.00 1.170 100.00 1.00 1.170 100.00
4 Pek. Pemasangan Lampu Pijar 15 Watt Buah 4.00 5.848 4.00 5.848 100.00 4.00 5.848 100.00
Jumlah ………..IV)
V PEKERJAAN PENGECETAN
1 Pek. Pengecetan Dinding M2 24.00 16.667 12.00 8.333 50.00 12.00 8.333 50.00 24.00 16.667 100.00
2 Pek. Pengecetan Pintu Ls 1.00 3.655 1.00 3.655 100.00 1.00 3.655 100.00
Jumlah ………..IV)
VI PEKERJAAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir Ls 1.00 5.482 1.00 5.482 100.00 1.00 5.482 100.00
Jumlah ………..VIII)
100.000 14.912 19.956 100.000

Disetujui Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

ANDI AMRAN, S.SOS


NIP. 19800405 201001 1 013 SYAFRUDDIN, ST BOBBYANTO, T.
Direktur Direktur
CV. BIKA SEJAHTERA
LAPORAN HARIAN
TANGGAL : 25 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pengecetan Dinding 3.00 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana 1 CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 1
8 Tukang
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 26 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pengecetan Dinding 4.00 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana 1 CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 2
8 Tukang 1
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 27 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pengecetan Dinding 4.00 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 28 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pengecetan Dinding 4.00 M2

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST
NIP. 19800405 2010 01 1 013 Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 29 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pemasangan Skalar Ganda 1.00 Buah
2 Pek. Pemasangan Stop Kontak 2.00 Buah
3 Pek. Pemasangan Skalar Tunggal 1.00 Buah
4 Pek. Pemasangan Lampu Pijar 15 Watt 4.00 Buah

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 5
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T
NIP. 19800405 2010 01 1 013 Direktur Direktur

CV. BIKA SEJAHTERA

LAPORAN HARIAN
TANGGAL : 30 DESEMBER 2020
PEKERJAAN : REHAB WC SALENA
LOKASI : HUTAN KOTA PALU

A. PEKERJAAN B. TIBA MUTASI : PERALATAN DAN BAHAN KONSTRUKSI/POKOK


Jumlah
No. Jenis Pekerjaan Volume No. Jenis Lokasi Lokasi Tujuan
Volume
1 Pek. Pembersihan Akhir 1.00 Ls

C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Palu Martil Besar 2

D. PERSONEL PROYEK PENGAWAS KONTRAKTOR


No. Tugas/Jabatan Cacah Aktif Cuaca
1 Pelaksana CERAH
2 Pengawas Pelaksana/Mandor 1
3 Pengawas Lapangan 1
4 Asisten Pimpro
5 Operator
6 Sopir
7 Pekerja 6
8 Tukang 2
9 Kepala Tukang 1

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. SETUNGGAL ABADI CV. BIKA SEJAHTERA

Andi Amran, S.Sos Syafruddin, ST Bobbyanto, T


NIP. 19800405 2010 01 1 013 Direktur Direktur
HARGA SATUAN BAHAN DAN UPAH

PEKERJAAN : REHAB WC SALENA

ORGANISASI : DINAS PARIWISATA KOTA PALU

LOKASI : KOTA PALU


TAHUN ANGGARAN : 2020

HARGA SATUAN
NO U RAI AN SATUAN KETERANGAN
(Rp.)
1 2 3 4 5
I. UPAH KERJA DAN ALAT

1 Pekerja Org/Hari Rp. 80,000.00


2 Tukang Batu / Kayu / Besi / Cat Org/Hari Rp. 125,000.00
3 Kepala Tukang Org/Hari Rp. 150,000.00
4 Mandor Org/Hari Rp. 150,000.00
5 Mesin Trowel m2 Rp. 21,450.00

II. BAHAN MATERIAL


1 Pasir Urug M³ Rp. 242,000.00
2 Pasir Pasang M³ Rp. 185,800.00 Rp 132.71 Kg
3 Pasir Beton M³ Rp. 242,000.00 Rp 172.86 Kg
4 Sirtu M³ Rp. 167,000.00
5 Kerikil Sungai M³ Rp. 417,500.00 Rp 309.26 Kg
6 Batu Pecah 1 - 2 M³ Rp. 930,000.00
7 Batu Pecah 2 - 3 M³ Rp. 930,000.00
8 Batu Pecah 3 - 5 M³ Rp. 930,000.00
9 Batu Pecah 3 - 8 M³ Rp. 930,000.00
10 Batu Pecah 1 - 2 Manual M³ Rp. 693,100.00
11 Batu Pecah 2 - 3 Manual M³ Rp. 326,900.00 Rp 242.15 Kg
12 Batu Pecah 3 - 5 Manual M³ Rp. 417,500.00
13 Batu Belah M³ Rp. 205,800.00
14 Kerikil Beton M³ Rp. 162,000.00 Rp 120.00 Kg
15 Bata Merah Besar Bh Rp. 1,500.00
16 Bata Merah Kecil Bh Rp. 1,300.00
17 Batako Pres Bh Rp. 4,500.00
18 Batako Biasa Bh Rp. 2,700.00
19 Paving Blok 6 cm Bh Rp. 2,200.00 Rp 99,000.00 /m2
20 Paving Blok 8 cm Bh Rp. 4,500.00 Rp 202,500.00 /m2

III BAHAN PEREKAT


1 Semen Portland (50 Kg) Zak Rp. 70,000.00 Rp 1,400.00 /Kg
2 Semen Putih Zak Rp. 162,000.00
3 Semen Warna Kg Rp. 30,100.00
4 Air Kerja Ltr Rp. 100.00

IV. BAHAN KAYU


1 Kayu Klas I M3 Rp. 3,900,000.00
2 Kayu Klas II M3 Rp. 3,577,500.00
3 Kayu Klas III M3 Rp. 1,600,000.00
4 Kayu Klas IV M3 Rp. 1,300,000.00
4 Dolken Kayu Galam Ø 8 - 10 P = 4 m Btg Rp. 15,000.00
5 Balok Kayu Kaso 5/7 Btg Rp. 15,000.00 Rp 1,500,000.00 /m3

V. BAHAN BESI, ALMUNIUM DAN BAJA RINGAN


1 Besi Beton Polos Ø6 Btg Rp. 42,500.00 Rp 15,977.44 /Kg
2 Besi Beton Polos Ø8 Btg Rp. 68,400.00 Rp 14,430.38 /Kg
3 Besi Beton Polos Ø10 Btg Rp. 104,100.00 Rp 14,067.57 /Kg
4 Besi Beton Polos Ø12 Btg Rp. 145,800.00 Rp 13,626.17 /Kg
6 Besi Beton Polos Ø16 Btg Rp. 274,500.00 Rp 14,447.37 /Kg
10 Kawat Beton Kg Rp. 32,400.00
11 Gavanis Hollow 20.20. 1,2mm Btg Rp. 78,775.00 Rp 13,129.17 /m
12 Gavanis Hollow 20.40. 1,2mm Btg Rp. 105,600.00 Rp 17,600.00 /m
13 Gavanis Hollow 40.40. 2mm Btg Rp. 205,000.00 Rp 34,166.67 /m
14 Gavanis Hollow 40.80. 1,7mm Btg Rp. 324,500.00 Rp 54,083.33 /m
15 Gavanis Hollow 50.100. 2mm Btg Rp. 390,000.00 Rp 65,000.00 /m
16 Kusen Aluminium Uk. 4" Warna coklat Btg Rp. 612,200.00 Rp 102,033.33 /m

VI. BAHAN LANGIT-LANGIT, PLAYWOOD & LAPISAN


1 Tripleks Uk. 120 x 240 x 3,0mm Lbr Rp. 69,900.00
2 Tripleks Uk. 120 x 240 x 5,0mm Lbr Rp. 111,800.00
3 Tripleks Uk. 120 x 240 x 4,0mm Lbr Rp. 131,800.00
4 Tripleks Uk. 120 x 240 x 9,0mm Lapis Aluminium Lbr Rp. 132,700.00

Page 99
5 Tripleks Uk. 120 x 240 x 9,0mm Lbr Rp. 122,600.00
6 Teakwood Uk. 120 x 240 x 4,0mm Lbr Rp. 162,000.00
7 Gypsum 9mm Lbr Rp. 88,800.00

Page 100
8 List Gypsum Profil m1 Rp. 18,200.00
9 Plywood 9 mm Lbr Rp. 150,000.00
10 Kalsiboard 6mm 120 x 240 cm Lbr Rp. 145,500.00
11 Multipleks Uk. 120 x 240 x 5,0mm Lbr Rp. 105,300.00 Rp 36,562.50 /m2
12 Multipleks Uk. 120 x 240 x 9,0mm Lbr Rp. 190,000.00 Rp 65,972.22 /m2
13 Multipleks Uk. 120 x 240 x 12,0mm Lbr Rp. 232,800.00 Rp 80,833.33 /m2
14 Multipleks Uk. 120 x 240 x 15,0mm Lbr Rp. 337,500.00 Rp 117,187.50 /m2

VII. BAHAN PENUTUP LANTAI DAN DINDING


1 Keramik 40 x 40 cm ( Polos/Standar) Dos Rp. 85,000.00 Rp 12,820.51 /Bh
2 Ubin Teraso Gray 30 x 30 cm Dos Rp. 74,000.00 Rp 6,727.27 /Bh

VIII. BAHAN PENGGANTUNG

1 Bahan Kunci
1 Kunci Tanam Set Handle U/ Pintu 1 Daun (Biasa) Bh Rp. 160,000.00
2 Kunci Tanam U/ Pintu 2 Daun Bh Rp. 217,000.00
3 Engsel Pintu Bh Rp. 15,000.00
4 Engsel Jendela Bh Rp. 30,000.00
5 Kait Angin Panjang Psg Rp. 120,000.00 60,000.00 Bh
6 Tarikan Jendela Bh Rp. 25,000.00
7 Grandle kecil Bh Rp. 31,000.00
8 Grandle sedang Bh Rp. 35,000.00

2. Paku-Pakuan
1 Paku Tripleks Kg Rp. 35,000.00
2 Paku 1 s/d 3 cm Kg Rp. 35,000.00
3 Paku 5 s/d 12 cm Kg Rp. 35,000.00
4 Paku 8 s/d 10 cm Kg Rp. 35,000.00
5 Paku Biasa Kg Rp. 25,000.00
6 Paku Skrup Kg Rp. 97,680.00 Rp 976.80 /Bh
7 Paku Spandek Kg Rp. 38,000.00
8 Baut Screw driver Bh Rp. 400.00
9 Screw Onduline Bh Rp. 10,500.00
10 Screw Gipsum / GRC / Papan Lisplank Kg Rp. 50,000.00
11 Angker Baut Ø 16 - 45 cm Kg Rp. 30,250.00
12 Moor Baut Ø 16 - 7cm Kg Rp. 100,000.00

IX. BAHAN FINISHING


1 Kertas Pasir M1 Rp. 5,200.00
2 Cat Kayu Kg Rp. 65,000.00
3 Cat Tembok Avitek/Dulux Kaleng Rp. 317,200.00 Rp 63,440.00 /Kg
4 Cat Plafond Dulux Pentalite Ceiling Putih Kaleng Rp. 755,000.00 Rp 107,857.14 /Kg
5 Cat Besi Kg Rp. 74,200.00
6 Meni Kayu Kg Rp. 41,800.00
7 Meni Besi Kg Rp. 46,800.00
8 Lem Kayu Kg Rp. 22,500.00
9 Lem Putih Kg Rp. 18,000.00
10 Lem Gypsum Kg Rp. 27,000.00
11 Lem Walpaper Kg Rp. 49,400.00
12 Dempul Kayu Kg Rp. 28,000.00
13 Plamur Kayu Kg Rp. 32,000.00
14 Plamur Tembok Kg Rp. 16,560.00
15 Dempul Kg Rp. 45,500.00
16 Minyak Cat Kg Rp. 65,000.00
17 Minyak Bekisting Ltr Rp. 13,500.00
18 Residu / Ter Ltr Rp. 18,000.00
19 Formite Bh Rp. 16,000.00
20 Kuas Bh Rp. 13,800.00
21 Minyak Pelumas Ltr Rp. 12,000.00
22 Solar Ltr Rp. 6,000.00
23 Amplas Kayu Lbr Rp. 6,268.00
24 Amplas No.80 Lbr Rp. 11,500.00
25 Amplas No.100 Lbr Rp. 14,500.00
26 Thiner Liter Rp. 43,350.00
27 Wood Filler Kg Rp. 71,300.00
28 Sealant Tube Rp. 60,000.00

X. BAHAN LISTRIK

1 NYM 3 x 1.5 mm Putih Rol Rp. 414,000.00 8,280.00 /M


2 Stop Kontak (Broco Setara) Bh Rp. 15,000.00
3 Fitting Biasa Bh Rp. 18,000.00
4 Pipa Listrik/Conduit AW Btg. Rp. 8,000.00
5 Saklar Tunggal Bh Rp. 20,000.00
6 Saklar Seri Bh Rp. 28,000.00
7 MCB 6 A Bh Rp. 88,000.00

Page 101
8 Klem Bh Rp. 400.00
9 T Dus Bh Rp. 5,000.00

Page 102
10 L Bow Bh Rp. 3,500.00
11 Mangkok Bh Rp. 8,000.00
12 Lasdop Bh Rp. 1,000.00
13 Lampu Hemat LED energi 20 Watt Bh Rp. 68,000.00
14 Lampu Hemat LED energi 11 Watt Bh Rp. 30,000.00
15 Fisher + skrup Bh Rp. 500.00

XI. BAHAN ATAP


1 Atap Metal Gelombang Lbr Rp. 80,000.00
2 Nok Metal ( sultan Crystal ) bh Rp. 22,500.00
3 Seng Plat Bjls 0.18/ 30 cm Lbr Rp. 15,200.00
4 Seng Gelombang Lbr Rp. 56,000.00
5 Spandek C- Deck 680 mm m2 Rp. 85,000.00
6 Seng Soka Lbr Rp. 85,000.00
7 Bubungan Genteng Metal bh Rp. 30,000.00
8 Genteng Bitumen Bergelombang Monolayer 3 mm Uk. 200cm x 95cm Lbr Rp. 160,000.00
9 Genteng Bitumen Bergelombang Monolayer 3 mm Uk. 106cm x 40cm Lbr Rp. 51,800.00
10 Nok / Ridge Onduline Lbr Rp. 85,000.00

XII. BAHAN PLUMBING

1 Pintu WC aluminium + Pasang Bh Rp. 800,000.00


2 Urinoir Bh Rp. 1,700,000.00
3 Closet Jongkok Standar Ex. INA Bh Rp. 250,000.00
4 Floor drain Bh Rp. 35,000.00
5 Kran Air Kristal 1/2" Bh Rp. 35,000.00
6 Pipa PVC 1/2" 4 M Btg Rp. 64,800.00 16,200.00 /M
7 Pipa PVC 3" 4 M Btg Rp. 84,300.00 21,075.00 /M
8 Pipa PVC 4" 4 M Btg Rp. 238,000.00 59,500.00 /M
9 Ember Sedang Bh Rp. 120,000.00
10 Closet Duduk Standar Ex. INA Bh Rp. 1,520,000.00

Page 103
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR

I PEKERJAAN PERSIAPAN

A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1 Rp 80,000.00 Rp 8,000.00
Tukang kayu L.02 OH 0.1 Rp 125,000.00 Rp 12,500.00
Kepala tukang L.03 OH 0.01 Rp 150,000.00 Rp 1,500.00
Mandor L.04 OH 0.005 Rp 150,000.00 Rp 750.00
JUMLAH TENAGA KERJA Rp 22,750.00
B BAHAN
Kayu Balok 5/7 ( kelas III ) M3 0.012 Rp 1,600,000.00 Rp 19,200.00
Paku 2'' Biasa Kg 0.020 Rp 35,000.00 Rp 700.00
Kayu Papan 3/20 ( kelas III) M3 0.007 Rp 1,600,000.00 Rp 11,200.00

JUMLAH HARGA BAHAN Rp 31,100.00


C JUMLAH (A+B) Rp 53,850.00
D Overhead & Profit (10%) Rp 5,385.00
E Harga Satuan Pekerjaan (C+D) Rp 59,235.00

II PEKERJAAN TANAH/GALIAN
T.06.a.1) 1 m3 galian tanah biasa sedalam ≤ 1 m

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.563 Rp 80,000.00 Rp 45,040.00
Mandor L.04 OH 0.056 Rp 150,000.00 Rp 8,445.00

JUMLAH TENAGA KERJA Rp 53,485.00


B BAHAN

JUMLAH HARGA BAHAN Rp -


C JUMLAH (A+B) Rp 53,485.00
D Overhead & Profit (10%) Rp 5,348.50
E Harga Satuan Pekerjaan (C+D) Rp 58,833.50

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.300 Rp 80,000.00 Rp 24,000.00
Mandor L.04 OH 0.010 Rp 150,000.00 Rp 1,500.00

JUMLAH TENAGA KERJA Rp 25,500.00


B BAHAN
Pasir Urug M³ 1.200 Rp 242,000.00 Rp 290,400.00

JUMLAH HARGA BAHAN Rp 290,400.00


C JUMLAH (A+B) Rp 315,900.00
D Overhead & Profit (10%) Rp 31,590.00
E Harga Satuan Pekerjaan (C+D) Rp 347,490.00
A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.192 Rp 80,000.00 Rp 15,360.00
Mandor L.04 OH 0.019 Rp 150,000.00 Rp 2,850.00

JUMLAH TENAGA KERJA Rp 18,210.00


B BAHAN

JUMLAH HARGA BAHAN Rp -


C JUMLAH (A+B) Rp 18,210.00
D Overhead & Profit (10%) Rp 1,821.00
E Harga Satuan Pekerjaan (C+D) Rp 20,031.00

Har
1 m3 Pengurugan dengan tanah urug ga Juml
Sat ah
No. Uraian Kode Satuan Koefisien
uan Harg
(Rp a
A TENAGA ) (Rp)
Pekerja L.01 OH 0.192 Rp 80,000.00 Rp 15,360.00
Mandor L.04 OH 0.019 Rp 150,000.00 Rp 2,850.00

JUMLAH TENAGA KERJA Rp 18,210.00


B BAHAN
Tanah Urug M³ 1.200 Rp 242,000.00 Rp 290,400.00

JUMLAH HARGA BAHAN Rp 290,400.00


C JUMLAH (A+B) Rp 308,610.00
D Overhead & Profit (10%) Rp 30,861.00
E Harga Satuan Pekerjaan (C+D) Rp 339,471.00

A.2.3.1.14. Pengurugan 1 m3 sirtu padat

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.250 Rp 80,000.00 Rp 20,000.00
Mandor L.04 OH 0.025 Rp 150,000.00 Rp 3,750.00

JUMLAH TENAGA KERJA Rp 23,750.00


B BAHAN
Tanah Urug M³ 1.200 Rp 167,000.00 Rp 200,400.00

JUMLAH HARGA BAHAN Rp 200,400.00


C JUMLAH (A+B) Rp 224,150.00
D Overhead & Profit (10%) Rp 22,415.00
E Harga Satuan Pekerjaan (C+D) Rp 246,565.00
III PEKERJAAN PASANGAN
A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.780 Rp 80,000.00 Rp 62,400.00
Tukang Batu L.02 OH 0.390 Rp 125,000.00 Rp 48,750.00
Kepala Tukang L.03 OH 0.039 Rp 150,000.00 Rp 5,850.00
Mandor L.04 OH 0.039 Rp 150,000.00 Rp 5,850.00
JUMLAH TENAGA KERJA Rp 122,850.00
B BAHAN
Batu Belah M³ 1.200 Rp 930,000.00 Rp 1,116,000.00
Pasir Urug M³ 0.432 Rp 242,000.00 Rp 104,544.00
JUMLAH HARGA BAHAN Rp 1,220,544.00
C JUMLAH (A+B) Rp 1,343,394.00
D Overhead & Profit (10%) Rp 134,339.40
E Harga Satuan Pekerjaan (C+D) Rp 1,477,733.40

A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.150 Rp 80,000.00 Rp 12,000.00
Tukang Batu L.02 OH 0.750 Rp 125,000.00 Rp 93,750.00
Kepala Tukang L.03 OH 0.075 Rp 150,000.00 Rp 11,250.00
Mandor L.04 OH 0.075 Rp 150,000.00 Rp 11,250.00
JUMLAH TENAGA KERJA Rp 128,250.00
B BAHAN
Batu Kali M³ 1.200 Rp 205,800.00 Rp 246,960.00
Semen Portland Kg 163.000 Rp 1,400.00 Rp 228,200.00
Pasir Pasang M³ 0.520 Rp 185,800.00 Rp 96,616.00
JUMLAH HARGA BAHAN Rp 571,776.00
C JUMLAH (A+B) Rp 700,026.00
D Overhead & Profit (10%) Rp 70,002.60
E Harga Satuan Pekerjaan (C+D) Rp 770,028.60

IV PEKERJAAN BETON

B.01.c.a Manual Tipe-3: menggunakan campuran beton fc' ~ 7,4 MPa (K-100) atau setara 1PC : 2PB : 3Kr

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 1.650 Rp 80,000.00 Rp 132,000.00
Tukang Batu L.02 OH 0.275 Rp 125,000.00 Rp 34,375.00
Kepala Tukang L.03 OH 0.028 Rp 150,000.00 Rp 4,200.00
Mandor L.04 OH 0.165 Rp 150,000.00 Rp 24,750.00
JUMLAH TENAGA KERJA Rp 195,325.00
B BAHAN
Semen Portland Kg 227.000 Rp 1,400.00 Rp 317,800.00
Pasir Beton M3 0.618 Rp 242,000.00 Rp 149,556.00
Kerikil M3 0.744 Rp 162,000.00 Rp 120,528.00
JUMLAH HARGA BAHAN Rp 587,884.00
C JUMLAH (A+B) Rp 783,209.00
D Overhead & Profit (10%) Rp 78,320.90
E Harga Satuan Pekerjaan (C+D) Rp 861,529.90
1 m³ Beton mutu, f’c = 19,3 MPa (K225), slump (12±2) cm, w/c = 0,58 Manual

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 1.650 Rp 80,000.00 Rp 132,000.00
Tukang Batu L.02 OH 0.275 Rp 125,000.00 Rp 34,375.00
Kepala Tukang L.03 OH 0.028 Rp 150,000.00 Rp 4,200.00
Mandor L.04 OH 0.165 Rp 150,000.00 Rp 24,750.00
JUMLAH TENAGA KERJA Rp 195,325.00
B BAHAN
Semen Portland Kg 371.000 Rp 1,400.00 Rp 519,400.00
Pasir Beton Kg 698.000 Rp 172.86 Rp 120,654.29
Kerikil Kg 1047.000 Rp 120.00 Rp 125,640.00
Air Kerja Kg 215.000 Rp 100.00 Rp 21,500.00

JUMLAH HARGA BAHAN Rp 787,194.29


C JUMLAH (A+B) Rp 982,519.29
D Overhead & Profit (10%) Rp 98,251.93
E Harga Satuan Pekerjaan (C+D) Rp 1,080,771.21
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.070 Rp 80,000.00 Rp 5,600.00
Tukang Batu L.02 OH 0.070 Rp 125,000.00 Rp 8,750.00
Kepala Tukang L.03 OH 0.007 Rp 150,000.00 Rp 1,050.00
Mandor L.04 OH 0.004 Rp 150,000.00 Rp 600.00
JUMLAH TENAGA KERJA Rp 16,000.00
B BAHAN
Besi Beton Ø8 Kg 10.500 Rp 15,977.44 Rp 167,763.16
Kawat Beton Kg 0.150 Rp 32,400.00 Rp 4,860.00

JUMLAH HARGA BAHAN Rp 172,623.16


C JUMLAH (A+B) Rp 188,623.16
D Overhead & Profit (10%) Rp 18,862.32
E Harga Satuan Pekerjaan (C+D) Rp 207,485.47
F Untuk 1 Kg Pekerjaan Pembesian Rp 20,748.55

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.070 Rp 80,000.00 Rp 5,600.00
Tukang Batu L.02 OH 0.070 Rp 125,000.00 Rp 8,750.00
Kepala Tukang L.03 OH 0.007 Rp 150,000.00 Rp 1,050.00
Mandor L.04 OH 0.004 Rp 150,000.00 Rp 600.00
JUMLAH TENAGA KERJA Rp 16,000.00
B BAHAN
Besi Beton Ø10 Kg 10.500 Rp 14,067.57 Rp 147,709.46
Kawat Beton Kg 0.150 Rp 32,400.00 Rp 4,860.00

JUMLAH HARGA BAHAN Rp 152,569.46


C JUMLAH (A+B) Rp 168,569.46
D Overhead & Profit (10%) Rp 16,856.95
E Harga Satuan Pekerjaan (C+D) Rp 185,426.41
F Untuk 1 Kg Pekerjaan Pembesian Rp 18,542.64

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.070 Rp 80,000.00 Rp 5,600.00
Tukang Batu L.02 OH 0.070 Rp 125,000.00 Rp 8,750.00
Kepala Tukang L.03 OH 0.007 Rp 150,000.00 Rp 1,050.00
Mandor L.04 OH 0.004 Rp 150,000.00 Rp 600.00
JUMLAH TENAGA KERJA Rp 16,000.00
B BAHAN
Besi Beton Ø12 Kg 10.500 Rp 13,626.17 Rp 143,074.77
Kawat Beton Kg 0.150 Rp 32,400.00 Rp 4,860.00

JUMLAH HARGA BAHAN Rp 147,934.77


C JUMLAH (A+B) Rp 163,934.77
D Overhead & Profit (10%) Rp 16,393.48
E Harga Satuan Pekerjaan (C+D) Rp 180,328.24
F Untuk 1 Kg Pekerjaan Pembesian Rp 18,032.82
A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk Kolom

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.660 Rp 80,000.00 Rp 52,800.00
Tukang Batu L.02 OH 0.330 Rp 125,000.00 Rp 41,250.00
Kepala Tukang L.03 OH 0.033 Rp 150,000.00 Rp 4,950.00
Mandor L.04 OH 0.033 Rp 150,000.00 Rp 4,950.00
JUMLAH TENAGA KERJA Rp 103,950.00
B BAHAN
Kayu Kelas III M³ 0.040 Rp 1,600,000.00 Rp 64,000.00
Paku 5 cm - 12 cm Kg 0.400 Rp 35,000.00 Rp 14,000.00
Minyak Bekisting Ltr 0.200 Rp 13,500.00 Rp 2,700.00
Balok Kayu Kelas III M³ 0.015 Rp 1,600,000.00 Rp 24,000.00
plywood tebal 9 mm Lbr 0.350 Rp 150,000.00 Rp 52,500.00
Dolken Kayu Ø 8 - 10 P = 4 m Btg 2.000 Rp 15,000.00 Rp 30,000.00

JUMLAH HARGA BAHAN Rp 187,200.00


C JUMLAH (A+B) Rp 291,150.00
D Overhead & Profit (10%) Rp 29,115.00
E Harga Satuan Pekerjaan (C+D) Rp 320,265.00
F Untuk 2 x Pakai (Jumlah F/2) 160,132.50

A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.520 Rp 80,000.00 Rp 41,600.00
Tukang Batu L.02 OH 0.260 Rp 125,000.00 Rp 32,500.00
Kepala Tukang L.03 OH 0.026 Rp 150,000.00 Rp 3,900.00
Mandor L.04 OH 0.026 Rp 150,000.00 Rp 3,900.00
JUMLAH TENAGA KERJA Rp 81,900.00
B BAHAN
Kayu Kelas III M³ 0.045 Rp 1,600,000.00 Rp 72,000.00
Paku 5 cm - 10 cm Kg 0.300 Rp 35,000.00 Rp 10,500.00
Minyak Bekisting Ltr 0.100 Rp 13,500.00 1,350.00

JUMLAH HARGA BAHAN Rp 83,850.00


C JUMLAH (A+B) Rp 165,750.00
D Overhead & Profit (10%) Rp 16,575.00
E Harga Satuan Pekerjaan (C+D) Rp 182,325.00
F Untuk 2 x Pakai (Jumlah F/2) 91,162.50

B.21.b 1 m² bekisting lantai beton biasa dengan multiflex 12 mm atau 18 mm (TP)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.200 Rp 80,000.00 Rp 16,000.00
Tukang Batu L.02 OH 0.100 Rp 125,000.00 Rp 12,500.00
Kepala Tukang L.03 OH 0.010 Rp 150,000.00 Rp 1,500.00
Mandor L.04 OH 0.020 Rp 150,000.00 Rp 3,000.00
JUMLAH TENAGA KERJA Rp 33,000.00
B BAHAN
Multiflex 12 mm Lbr 0.128 Rp 232,800.00 Rp 29,798.40
Kaso 5/7 cm m3 0.005 Rp 1,500,000.00 Rp 7,500.00
Paku 5 cm dan 7 cm Kg 0.220 Rp 35,000.00 Rp 7,700.00
Minyak bekisting Ltr 0.200 Rp 13,500.00 Rp 2,700.00

JUMLAH HARGA BAHAN Rp 47,698.40


C JUMLAH (A+B) Rp 80,698.40
D Overhead & Profit (10%) Rp 8,069.84
E Harga Satuan Pekerjaan (C+D) Rp 88,768.24
F Untuk 2 x Pakai (Jumlah F/2) 44,384.12
1 M3 Membuat Sloof Beton 15/20 Bertulang + Bekisting

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K- 225 M³ 1.000 Rp 1,080,771.21 Rp 1,080,771.21


2 Besi Beton Ø6 Kg 59.184 Rp 20,748.55 Rp 1,227,982.03
3 Besi Beton Ø10 Kg 82.200 Rp 18,542.64 Rp 1,524,205.05
3 Bekisting Sloof (2 Kali pakai) M² 13.333 Rp 91,162.50 Rp 1,215,500.00

JUMLAH Rp 5,048,458.29

1 M3 Membuat Kolom 20/20 Meja Beton

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K - 225 M³ 1.000 Rp 1,080,771.21 Rp 1,080,771.21


2 Besi Beton Ø6 Kg 29.592 Rp 20,748.55 Rp 613,991.01
3 Besi Beton Ø12 Kg 88.776 Rp 18,032.82 Rp 1,600,882.01
4 Bekisting Kolom (2 Kali pakai) M² 20.000 Rp 160,132.50 Rp 3,202,650.00

JUMLAH Rp 6,498,294.24

1 M3 Kolom beton 40/20 + Bekisting tanpa tulangan

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton 1PC : 2PB : 3Kr M³ 1.000 Rp 861,529.90 Rp 861,529.90


2 Bekisting Kolom(2 Kali pakai) M² 15.000 Rp 160,132.50 Rp 2,401,987.50

JUMLAH Rp 3,263,517.40

1 M3 Membuat Pondasi Setempat Beton 50 x 50 Bertulang + Bekisting

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K-225 M³ 1.000 Rp 1,080,771.21 Rp 1,080,771.21


2 Besi Beton Ø8 Kg 73.651 Rp 18,542.64 Rp 1,365,687.73
3 Bekisting Kolom (2 Kali pakai) M² 10.667 Rp 160,132.50 Rp 1,708,080.00

JUMLAH Rp 4,154,538.94

1 M3 Membuat Pondasi Setempat Beton 70 x 70 Bertulang + Bekisting

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K-225 M³ 1.000 Rp 1,080,771.21 Rp 1,080,771.21


2 Besi Beton Ø10 Kg 104.120 Rp 18,542.64 Rp 1,930,659.73
3 Bekisting Kolom (2 Kali pakai) M² 9.524 Rp 160,132.50 Rp 1,525,071.43

JUMLAH Rp 4,536,502.38

1 M3 Membuat Scred Lantai Beton Finishing Floor Hardener

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K-225 M³ 1.000 Rp 861,529.90 Rp 861,529.90


2 Sewa Alat Trowel Kg 1.000 Rp 21,450.00 Rp 21,450.00
JUMLAH Rp 882,979.90
1 M3 Membuat Kolom 20/20 Meja Beton

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K - 225 M³ 1.000 Rp 1,080,771.21 Rp 1,080,771.21


2 Besi Beton Ø10 Kg 42.110 Rp 18,542.64 Rp 780,838.01
3 Bekisting Lantai Beton (1 Kali pakai) M² Err:509 Rp 88,768.24 Rp Err:509

JUMLAH Rp Err:509

V PEKERJAAN RANGKA BESI

A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.250 Rp 80,000.00 Rp 20,000.00
Tukang Batu L.02 OH 0.250 Rp 125,000.00 Rp 31,250.00
Kepala Tukang L.03 OH 0.025 Rp 150,000.00 Rp 3,750.00
Mandor L.04 OH 0.130 Rp 150,000.00 Rp 19,500.00
JUMLAH TENAGA KERJA Rp 74,500.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 3.500 Rp 34,166.67 Rp 119,583.33
Assesoris (perkuatan, las dll) Ls 1.000 Rp 170,000.00 Rp 170,000.00

JUMLAH HARGA BAHAN Rp 289,583.33


C JUMLAH (A+B) Rp 364,083.33
D Overhead & Profit (10%) Rp 36,408.33
E Harga Satuan Pekerjaan (C+D) Rp 400,491.67

An. Praktis Pemasangan 1 m' rangka besi hollow 1x40.40.2mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.120 Rp 80,000.00 Rp 9,600.00
Tukang Batu L.02 OH 0.120 Rp 125,000.00 Rp 15,000.00
Kepala Tukang L.03 OH 0.012 Rp 150,000.00 Rp 1,800.00
Mandor L.04 OH 0.080 Rp 150,000.00 Rp 12,000.00
JUMLAH TENAGA KERJA Rp 38,400.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 1.050 Rp 34,166.67 Rp 35,875.00
Assesoris (perkuatan, las dll) Ls 1.000 Rp 15,000.00 Rp 15,000.00

JUMLAH HARGA BAHAN Rp 50,875.00


C JUMLAH (A+B) Rp 89,275.00
D Overhead & Profit (10%) Rp 8,927.50
E Harga Satuan Pekerjaan (C+D) Rp 98,202.50
An. Pemasangan 1 m' rangka besi hollow 1x50.100.2mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.150 Rp 80,000.00 Rp 12,000.00
Tukang Batu L.02 OH 0.150 Rp 125,000.00 Rp 18,750.00
Kepala Tukang L.03 OH 0.015 Rp 150,000.00 Rp 2,250.00
Mandor L.04 OH 0.080 Rp 150,000.00 Rp 12,000.00
JUMLAH TENAGA KERJA Rp 45,000.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 1.050 Rp 65,000.00 Rp 68,250.00
Assesoris (perkuatan, las dll) Ls 1.000 Rp 15,000.00 Rp 15,000.00

JUMLAH HARGA BAHAN Rp 83,250.00


C JUMLAH (A+B) Rp 128,250.00
D Overhead & Profit (10%) Rp 12,825.00
E Harga Satuan Pekerjaan (C+D) Rp 141,075.00

An. Praktis Pemasangan 1 m' rangka besi hollow 1x20.40.1,5mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.110 Rp 80,000.00 Rp 8,800.00
Tukang Batu L.02 OH 0.110 Rp 125,000.00 Rp 13,750.00
Kepala Tukang L.03 OH 0.011 Rp 150,000.00 Rp 1,650.00
Mandor L.04 OH 0.080 Rp 150,000.00 Rp 12,000.00
JUMLAH TENAGA KERJA Rp 36,200.00
B BAHAN
Rangka metal hollow 20.40. 1,2 mm M1 1.050 Rp 17,600.00 Rp 18,480.00
Assesoris (perkuatan, las dll) Ls 1.000 Rp 15,000.00 Rp 15,000.00

JUMLAH HARGA BAHAN Rp 33,480.00


C JUMLAH (A+B) Rp 69,680.00
D Overhead & Profit (10%) Rp 6,968.00
E Harga Satuan Pekerjaan (C+D) Rp 76,648.00

An. Praktis Pemasangan 1 m' rangka besi hollow 1x40.80.1,7mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.130 Rp 80,000.00 Rp 10,400.00
Tukang Batu L.02 OH 0.130 Rp 125,000.00 Rp 16,250.00
Kepala Tukang L.03 OH 0.013 Rp 150,000.00 Rp 1,950.00
Mandor L.04 OH 0.080 Rp 150,000.00 Rp 12,000.00
JUMLAH TENAGA KERJA Rp 40,600.00
B BAHAN
Rangka metal hollow 20.40. 1,2 mm M1 1.050 Rp 54,083.33 Rp 56,787.50
Assesoris (perkuatan, las dll) Ls 1.000 Rp 15,000.00 Rp 15,000.00

JUMLAH HARGA BAHAN Rp 71,787.50


C JUMLAH (A+B) Rp 112,387.50
D Overhead & Profit (10%) Rp 11,238.75
E Harga Satuan Pekerjaan (C+D) Rp 123,626.25
ANALISA HARGA SATUAN PEKERJAAN MEKANIKAL & ELEKTRIKAL

I PEKERJAAN INSTALASI LISTRIK

A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Upah % Rp Rp 80,000.00
JUMLAH TENAGA KERJA Rp 80,000.00
B BAHAN
Pipa Listrik 5/8" Btg 3.000 Rp 8,000.00 Rp 24,000.00
Kabel M 24.000 Rp 8,280.00 Rp 198,720.00
T Dus Bh 3.000 Rp 5,000.00 Rp 15,000.00
L Bow Bh 4.000 Rp 3,500.00 Rp 14,000.00
Las Dop Bh 3.000 Rp 1,000.00 Rp 3,000.00
Klem Bh 24.000 Rp 400.00 Rp 9,600.00
Mangkok Bh 1.000 Rp 8,000.00 Rp 8,000.00
Saklar Bh 1.000 Rp 20,000.00 Rp 20,000.00
Fiiting Bh 1.000 Rp 18,000.00 Rp 18,000.00

JUMLAH HARGA BAHAN Rp 310,320.00


C JUMLAH (A+B) Rp 390,320.00
D Overhead & Profit (10%) Rp 39,032.00
E Harga Satuan Pekerjaan (C+D) Rp 429,352.00

A.8.4.6.1 (K3) Pemasangan 1 buah MCB

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Upah % 80,000.00

JUMLAH TENAGA KERJA Rp 80,000.00


B BAHAN
Pipa Listrik 5/8" Btg 3.000 Rp 8,000.00 Rp 24,000.00
Kabel M 5.000 Rp 8,280.00 Rp 41,400.00
T Dus Bh 1.000 Rp 5,000.00 Rp 5,000.00
L Bow Bh 2.000 Rp 3,500.00 Rp 7,000.00
Klem Biasa Bh 24.000 Rp 400.00 Rp 9,600.00
MCB Bh 1.000 Rp 88,000.00 Rp 88,000.00

JUMLAH HARGA BAHAN Rp 175,000.00


C JUMLAH (A+B) Rp 255,000.00
D Overhead & Profit (10%) Rp 25,500.00
E Harga Satuan Pekerjaan (C+D) Rp 280,500.00
An. Praktis Pemasangan 1 buah Stop Kontak

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Upah L.01 % Rp 80,000.00
JUMLAH TENAGA KERJA Rp 80,000.00
B BAHAN
Pipa listrik 5/8” Btg 3.000 Rp 8,000.00 Rp 24,000.00
Kabel M 8.000 Rp 8,280.00 Rp 66,240.00
T Dus Bh 1.000 Rp 5,000.00 Rp 5,000.00
L Bow Bh 2.000 Rp 3,500.00 Rp 7,000.00
Las Dop Bh 1.000 Rp 1,000.00 Rp 1,000.00
Klem Bh 10.000 Rp 400.00 Rp 4,000.00
Mangkok Bh 1.000 Rp 8,000.00 Rp 8,000.00
Stop Kontak Bh 1.000 Rp 15,000.00 Rp 15,000.00

JUMLAH HARGA BAHAN Rp 130,240.00


C JUMLAH (A+B) Rp 210,240.00
D Overhead & Profit (10%) Rp 21,024.00
E Harga Satuan Pekerjaan (C+D) Rp 231,264.00

II PEKERJAAN PLUMBING

A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ”

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.036 Rp 80,000.00 Rp 2,880.00
Tukang Batu L.02 OH 0.060 Rp 125,000.00 Rp 7,500.00
Kepala Tukang L.03 OH 0.006 Rp 150,000.00 Rp 900.00
Mandor L.04 OH 0.002 Rp 150,000.00 Rp 300.00
JUMLAH TENAGA KERJA Rp 11,580.00
B BAHAN
Pipa PVC 1/2" 4 METER M1 1.200 Rp 16,200.00 Rp 19,440.00
Perlengkapan % 35.000 Rp 16,200.00 Rp 5,670.00

JUMLAH HARGA BAHAN Rp 25,110.00


C JUMLAH (A+B) Rp 36,690.00
D Overhead & Profit (10%) Rp 3,669.00
E Harga Satuan Pekerjaan (C+D) Rp 40,359.00

A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.081 Rp 80,000.00 Rp 6,480.00
Tukang Batu L.02 OH 0.135 Rp 125,000.00 Rp 16,875.00
Kepala Tukang L.03 OH 0.014 Rp 150,000.00 Rp 2,025.00
Mandor L.04 OH 0.004 Rp 150,000.00 Rp 600.00
JUMLAH TENAGA KERJA Rp 25,980.00
B BAHAN
Pipa PVC 3/4" M1 1.200 Rp 21,075.00 Rp 25,290.00
Perlengkapan % 35.000 Rp 21,075.00 Rp 7,376.25

JUMLAH HARGA BAHAN Rp 32,666.25


C JUMLAH (A+B) Rp 58,646.25
D Overhead & Profit (10%) Rp 5,864.63
E Harga Satuan Pekerjaan (C+D) Rp 64,510.88
BACK-UP DATA
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
Pek. Tanah Galian

Panjang Lebar Tinggi/Tebal Jumlah Volume


(Meter) (Meter) (Meter) Unit JUMLAH

1 Galian Tanah
V-1 0.65 0.90 1.50 4.00 3.51 m3
V-2 0.90 0.90 1.50 2.00 2.43 m3

TOTAL VOLUME 5.94 m3


2 Pasir Urug
V -1 0.65 0.90 0.05 4.00 0.12 m3
V -2 0.90 0.90 0.05 2.00 0.08 m3

TOTAL VOLUME 0.20 m3


3 Pondasi Poorplat
V -1 0.65 0.90 0.05 4.00 0.12 m3
V -2 0.90 0.90 0.05 2.00 0.08 m3

V -1 0.20 0.35 1.20 4.00 0.34 m3


V -2 0.20 0.35 1.20 2.00 0.17 m3

TOTAL VOLUME 0.70 m3

BACK-UP DATA
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
Pek. Beton
Panjang Lebar Tinggi/Tebal Jumlah Volume
(Meter) (Meter) (Meter) Unit JUMLAH

1 Sloof
S-1 5.50 0.20 0.25 2.00 0.55 m3
S-2 2.50 0.20 0.25 1.00 0.13 m3
S-3 3.00 0.20 0.25 1.00 0.15 m3
S-4 7.00 0.20 0.25 1.00 0.35 m3

TOTAL VOLUME 1.18 m3


2 Kolom
S -1 0.30 0.30 6.00 5.00 2.70 m3
S -2 0.30 0.30 6.00 6.00 3.24 m3

TOTAL VOLUME 5.94 m3


3 Balok Lantai
Vertikal
S -1 8.50 0.15 0.30 1.00 0.38 m3
S -2 0.80 0.15 0.30 1.00 0.04 m3
S -3 0.95 0.15 0.30 1.00 0.04 m3
S -4 3.00 0.15 0.30 3.00 0.41 m3
S -5 5.50 0.15 0.30 1.00 0.25 m3
S -6 2.50 0.15 0.15 1.00 0.06 m3
S -7 1.75 0.15 0.15 1.00 0.04 m3
S -8 3.00 0.15 0.15 1.00 0.07 m3

Horizontal
S -1 7.00 0.15 0.30 1.00 0.32 m3
S -2 3.00 0.15 0.30 1.00 0.14 m3
S -3 2.50 0.15 0.30 1.00 0.11 m3
S -4 1.50 0.15 0.30 1.00 0.07 m3
S -5 3.00 0.15 0.30 2.00 0.27 m3
S -6 4.00 0.15 0.30 1.00 0.18 m3

TOTAL VOLUME 2.36 m3


4 Plat Lantai
V -1 3.00 3.75 0.15 1.00 1.69 m3
V -2 1.75 3.00 0.15 1.00 0.79 m3
V -3 3.00 3.00 0.15 1.00 1.35 m3
V -4 3.00 2.50 0.15 1.00 1.13 m3
V -5 3.50 2.50 0.15 1.00 1.31 m3
V -6 1.50 3.00 0.15 1.00 0.68 m3

TOTAL VOLUME 6.94 m3


5 Plat Lantai
Anak Tangga 0.80 0.30 0.20 13.00 0.62 m3
Bordes 1.75 0.60 0.18 1.00 0.19 m3

TOTAL VOLUME 0.81 m3


BACK-UP DATA
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
Pek. Dinding

Panjang Lebar Tinggi/Tebal Jumlah Volume


(Meter) (Meter) (Meter) Unit JUMLAH
Lt. 1
1 Dinding Bata
Vertikal
P-1 8.50 3.50 1.00 29.75 m2
P-2 3.00 3.50 2.00 21.00 m2
P-3 3.75 3.50 2.00 26.25 m2
P-4 2.00 3.50 2.00 14.00 m2
P-5 2.75 3.50 2.00 19.25 m2
P-6 7.50 3.50 2.00 52.50 m2

Horizontal
P-1 7.00 3.50 1.00 24.50 m2
P-2 3.00 3.50 4.00 42.00 m2
P-3 3.50 3.50 2.00 24.50 m2

Lt. 2
2 Dinding Bata
Vertikal
P-1 8.50 3.50 1.00 29.75 m2
P-2 3.00 3.50 3.00 31.50 m2
P-3 3.75 3.50 1.00 13.13 m2
P-4 5.50 3.50 1.00 19.25 m2

Horizontal
P-1 7.00 3.50 1.00 24.50 m2
P-2 3.00 3.50 2.00 21.00 m2
P-3 1.50 3.50 1.00 5.25 m2
P-3 4.00 3.50 1.00 14.00 m2

TOTAL LUASAN DINDING 412.13 m2

1 Pintu
P-1 0.80 2.10 2.00 3.36 m2

2 Jendela
J-1 1.55 0.38 2.00 1.18 m2
J-2 1.60 0.90 4.00 5.76 m2

2 Kaca Blok
KB - 1 0.35 0.35 4.00 0.49 m2

TOTAL VOLUME BUKAAN 10.79 m2


LUASAN DINDING - TOTAL VOLUME BUKAAN 401.34 m2
ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
TA : 2018

HARGA
HARGA HARGA JUMLAH
SATUAN
NO. URAIAN PEKERJAAN BAHAN UPAH HARGA
( Rp ) ( Rp ) ( Rp )
( Rp )
1 2 3 4 5 6

A. PEKERJAAN PERSIAPAN
1) 1 M³ Pembongkaran Kolom
0.667 Oh Pekerja 80,000.00 80,000.00 80,000.00
0.333 Oh Mandor 150,000.00 150,000.00 150,000.00
Jumlah Harga 230,000.00
Overhead 10% 23,000.00
Jumlah Total 253,000.00

2) 1 M³ Pek. Bongkar batu kali (tebal kurang dari 50 cm)


1.500 Oh Pekerja 80,000.00 120,000.00 120,000.00
0.075 Oh Mandor 150,000.00 11,250.00 11,250.00
Jumlah Harga 131,250.00
Overhead 10% 13,125.00
` 144,375.00

3) 1 M³ Pembongkaran dinding 1/2 Bata


0.073 Oh Pekerja 80,000.00 5,840.00 5,840.00
0.004 Oh Mandor 150,000.00 600.00 600.00
Jumlah Harga 6,440.00
Overhead 10% 644.00
Jumlah Total 7,084.00
3) 1 M² Pembongkaran Atap Seng
0.050 Oh Pekerja 80,000.00 4,000.00 4,000.00
0.025 Oh Mandor 150,000.00 3,750.00 3,750.00
Jumlah Harga 7,750.00
Overhead 10% 775.00
Jumlah Total 8,525.00
4) 1 M² Pembongkaran Plesteran
0.075 Oh Pekerja 80,000.00 6,000.00 6,000.00
0.005 Oh Mandor 150,000.00 750.00 750.00
Jumlah Harga 6,750.00
Overhead 10% 675.00
Jumlah Total 7,425.00
5) 1 M² Pembongkaran Kaso Reng kayu
0.100 Oh Pekerja 80,000.00 8,000.00 8,000.00
0.005 Oh Mandor 150,000.00 750.00 750.00
Jumlah Harga 8,750.00
Overhead 10% 875.00
Jumlah Total 9,625.00
6) 1 M³ Pembongkaran Kuda-kuda dan Loteng Kayu
4.000 Oh Pekerja 80,000.00 320,000.00 320,000.00
0.400 Oh Mandor 150,000.00 60,000.00 60,000.00
Jumlah Harga 380,000.00
Overhead 10% 38,000.00
Jumlah Total 418,000.00
7) 1 M² Pembongkaran Rangka Plafond Kayu
0.100 Oh Pekerja 80,000.00 8,000.00 8,000.00
0.005 Oh Mandor 150,000.00 750.00 750.00
Jumlah Harga 8,750.00
Overhead 10% 875.00
Jumlah Total 9,625.00
8) 1 M² Pembongkaran Penutup Plafond
0.030 Oh Pekerja 80,000.00 2,400.00 2,400.00
0.003 Oh Mandor 150,000.00 450.00 450.00
Jumlah Harga 2,850.00
Overhead 10% 285.00
Jumlah Total 3,135.00
9) 1 M² Pembongkaran Lantai
0.030 Oh Pekerja 80,000.00 2,400.00 2,400.00
0.003 Oh Mandor 150,000.00 450.00 450.00
Jumlah Harga 2,850.00
Overhead 10% 285.00
Jumlah Total 3,135.00
ESTIMASI ANGGARAN MATERIAL/BAHAN

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Kayu Balok 5/7 ( kelas III ) 0.01 #REF! #REF! m3 Rp. 1,600,000.00 Rp. #REF!
2 Paku 2'' Biasa 0.02 #REF! #REF! Kg Rp. 35,000.00 Rp. #REF!
3 Kayu Papan 3/20 ( kelas III) 0.01 #REF! #REF! m3 Rp. 1,600,000.00 Rp. #REF!

###
No. Bahan Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Total Harga

1 Pasir Urug 1.20 #REF! #REF! m3 #REF! Ret Rp. 242,000.00 Rp. #REF!

###
No. Bahan Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Total Harga

1 Pasir Urug 1.20 #REF! #REF! m3 #REF! Ret Rp. 242,000.00 Rp. #REF!

###
No. Bahan Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Total Harga

1 Tanah Urug 1.20 #REF! #REF! m3 #REF! Ret Rp. Err:509 Rp. #REF!

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Batu Kali 1.20 #REF! #REF! m3 #REF! Ret Rp. 930,000.00 Rp. #REF!
2 Pasir urug 0.43 #REF! #REF! m3 #REF! Ret Rp. 242,000.00 Rp. #REF!

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Batu Kali 1.20 #REF! #REF! m3 #REF! Ret Rp. 930,000.00 Rp. #REF!
2 Semen Portland 163.00 #REF! #REF! Kg #REF! Sak Rp. Err:509 Rp. #REF!
3 Pasir Pasang 0.52 #REF! #REF! m3 #REF! Ret Rp. 185,800.00 Rp. #REF!

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Batu Bata Merah Err:509 #REF! Err:509 Buah Rp. 1,500.00 Rp. Err:509
2 Semen Portland Err:509 #REF! Err:509 Kg Err:509 Sak Rp. Err:509 Rp. Err:509
3 Pasir Pasang Err:509 #REF! Err:509 m3 Err:509 Ret Rp. 185,800.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Semen Portland Err:509 #REF! Err:509 Kg Err:509 Sak Rp. Err:509 Rp. Err:509
2 Pasir Pasang Err:509 #REF! Err:509 m3 Err:509 Ret Rp. 185,800.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Semen Portland Err:509 #REF! Err:509 Kg Err:509 Sak Rp. Err:509 Rp. Err:509
2 Pasir Pasang Err:509 #REF! Err:509 m3 Err:509 Ret Rp. 185,800.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Semen Portland Err:509 #REF! Err:509 Kg Err:509 Sak Rp. Err:509 Rp. Err:509
2 Pasir Pasang Err:509 #REF! Err:509 m3 Err:509 Ret Rp. 185,800.00 Rp. Err:509
###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Semen Portland Err:509 #REF! Err:509 Kg Err:509 Sak Rp. Err:509 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Semen Portland Err:509 #REF! Err:509 Kg Err:509 Sak Rp. Err:509 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Semen Portland Err:509 #REF! Err:509 Kg Err:509 Sak Rp. Err:509 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Batu Bata Merah Err:509 #REF! Err:509 Buah Rp. 1,500.00 Rp. Err:509
2 Semen Portland Err:509 #REF! Err:509 Kg Err:509 Sak Rp. Err:509 Rp. Err:509
3 Pasir Pasang Err:509 #REF! Err:509 m3 Err:509 Ret Rp. 185,800.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Batu Bata Merah Err:509 #REF! Err:509 Buah Rp. 1,500.00 Rp. Err:509
2 Semen Portland Err:509 #REF! Err:509 Kg Err:509 Sak Rp. Err:509 Rp. Err:509
3 Pasir Pasang Err:509 #REF! Err:509 m3 Err:509 Ret Rp. 185,800.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Semen Portland Err:509 #REF! Err:509 Kg Err:509 Sak Rp. Err:509 Rp. Err:509
2 Pasir Beton Err:509 #REF! Err:509 m3 Err:509 Ret Rp. 185,800.00 Rp. Err:509
3 Kerikil Err:509 #REF! Err:509 m3 Err:509 Ret Rp. 417,500.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Semen Portland Err:509 #REF! Err:509 Kg Err:509 Sak Rp. Err:509 Rp. Err:509
2 Pasir Beton Err:509 #REF! Err:509 m3 Err:509 Ret Rp. 185,800.00 Rp. Err:509
3 Kerikil Err:509 #REF! Err:509 m3 Err:509 Ret Rp. 417,500.00 Rp. Err:509

Pek. Sloof 15/20 f’c = 9,8 Mpa (K 125) ( analisa gabungan )


No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

Pembesian dengan besi Ø8 Polos / 1Kg


1 Besi Beton Ø8 Err:509 Err:509 Err:509 Kg Err:509 Btg Rp. 68,400.00 Rp. Err:509
2 Kawat Beton Err:509 Err:509 Err:509 Kg Rp. 32,400.00 Rp. Err:509
Pembesian dengan besi Ø12 Polos / 1Kg
1 Besi Beton Ø12 Err:509 Err:509 Err:509 Kg Err:509 Btg Rp. 42,500.00 Rp. Err:509
2 Kawat Beton Err:509 Err:509 Err:509 Kg Rp. 32,400.00 Rp. Err:509
Membuat 1 m3 beton mutu f’c = 9,8 Mpa (K 125)
1 Semen Portland Err:509 #REF! Err:509 Kg Err:509 Sak Rp. Err:509 Rp. Err:509
2 Pasir Beton Err:509 #REF! Err:509 Kg Err:509 Ret Rp. 172.86 Rp. Err:509
3 Kerikil Err:509 #REF! Err:509 Kg Err:509 Ret Rp. 309.26 Rp. Err:509
4 Air Err:509 #REF! Err:509 Ltr Rp. 100.00 Rp. Err:509
Pemasangan 1 m2 bekisting untuk sloof ( Dua Kali Pakai )
1 Kayu Kelas III Err:509 Err:509 Err:509 m3 Rp. 1,600,000.00 Rp. Err:509
2 Paku 5 cm - 10 cm Err:509 Err:509 Err:509 Kg Rp. 35,000.00 Rp. Err:509
3 Minyak Bekisting Err:509 Err:509 Err:509 Ltr Rp. 13,500.00 Rp. Err:509
Pek. Kolom 20/20 f’c = 19,3 Mpa (K 225)
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

Pembesian dengan besi Ø8 Polos / 1Kg


1 Besi Beton Ø8 Err:509 Err:509 Err:509 Kg Err:509 Btg Rp. 68,400.00 Rp. Err:509
2 Kawat Beton Err:509 Err:509 Err:509 Kg Rp. 32,400.00 Rp. Err:509
Pembesian dengan besi Ø12 Polos / 1Kg
1 Besi Beton Ø12 Err:509 Err:509 Err:509 Kg Err:509 Btg Rp. 42,500.00 Rp. Err:509
2 Kawat Beton Err:509 Err:509 Err:509 Kg Rp. 32,400.00 Rp. Err:509
Membuat 1 m3 beton mutu f’c = 19,3 Mpa (K 225)
1 Semen Portland Err:509 #REF! Err:509 Kg Err:509 Sak Rp. Err:509 Rp. Err:509
2 Pasir Beton Err:509 #REF! Err:509 Kg Err:509 Ret Rp. 172.86 Rp. Err:509
3 Kerikil Err:509 #REF! Err:509 Kg Err:509 Ret Rp. 309.26 Rp. Err:509
4 Air Err:509 #REF! Err:509 Ltr Rp. 100.00 Rp. Err:509
Pemasangan 1 m2 bekisting untuk Kolom ( Dua Kali Pakai )
1 Kayu Kelas III Err:509 #REF! Err:509 m3 Rp. 1,600,000.00 Rp. Err:509
2 Paku 5 cm - 10 cm Err:509 #REF! Err:509 Kg Rp. 35,000.00 Rp. Err:509
3 Minyak Bekisting Err:509 #REF! Err:509 Ltr Rp. 13,500.00 Rp. Err:509
4 Balok Kayu Kelas III Err:509 #REF! Err:509 m3 Rp. 1,600,000.00 Rp. Err:509
5 plywood tebal 9 mm Err:509 #REF! Err:509 Lbr Rp. Err:509 Rp. Err:509
6 Dolken Kayu Ø 8 - 10 P = 4 m Err:509 #REF! Err:509 Btg Rp. 15,000.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

Pembesian dengan besi Ø8 Polos / 1Kg


1 Besi Beton Ø8 Err:509 Err:509 Err:509 Kg Err:509 Btg Rp. 68,400.00 Rp. Err:509
2 Kawat Beton Err:509 Err:509 Err:509 Kg Rp. 32,400.00 Rp. Err:509
Pembesian dengan besi Ø12 Polos / 1Kg
1 Besi Beton Ø12 Err:509 Err:509 Err:509 Kg Err:509 Btg Rp. 42,500.00 Rp. Err:509
2 Kawat Beton Err:509 Err:509 Err:509 Kg Rp. 32,400.00 Rp. Err:509
Membuat 1 m3 Ring balk mutu f’c = 9,8 Mpa (K 125)
1 Semen Portland Err:509 #REF! Err:509 Kg Err:509 Sak Rp. Err:509 Rp. Err:509
2 Pasir Beton Err:509 #REF! Err:509 Kg Err:509 Ret Rp. 172.86 Rp. Err:509
3 Kerikil Err:509 #REF! Err:509 Kg Err:509 Ret Rp. 309.26 Rp. Err:509
4 Air Err:509 #REF! Err:509 Ltr Rp. 100.00 Rp. Err:509
Pemasangan 1 m2 bekisting untuk Ring Balk ( Dua Kali Pakai )
1 Kayu Kelas III Err:509 #REF! Err:509 m3 Rp. 1,600,000.00 Rp. Err:509
2 Paku 5 cm - 10 cm Err:509 #REF! Err:509 Kg Rp. 35,000.00 Rp. Err:509
3 Minyak Bekisting Err:509 #REF! Err:509 Ltr Rp. 13,500.00 Rp. Err:509
4 Balok Kayu Kelas III Err:509 #REF! Err:509 m3 Rp. 1,600,000.00 Rp. Err:509
5 plywood tebal 9 mm Err:509 #REF! Err:509 Lbr Rp. Err:509 Rp. Err:509
6 Dolken Kayu Ø 8 - 10 P = 4 m Err:509 #REF! Err:509 Btg Rp. 15,000.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Baja ringan C75 Err:509 #REF! Err:509 m1 Err:509 Btg Rp. Err:509 Rp. Err:509
2 Baja Ringan Reng 0.35 Err:509 #REF! Err:509 m1 Err:509 Btg Rp. Err:509 Rp. Err:509
3 Err:509 Err:509 #REF! Err:509 Bh Rp. 10,500.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Genteng Metal Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
2 Paku Biasa 1/2"-1" Err:509 #REF! Err:509 Kg Rp. 35,000.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Nok Genteng metal Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
2 Paku Biasa 1/2"-1" Err:509 #REF! Err:509 Kg Rp. 35,000.00 Rp. Err:509
###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Papan Kayu Kelas II Err:509 #REF! Err:509 m3 Rp. 3,577,500.00 Rp. Err:509
2 Paku 5 dan 7 cm Err:509 #REF! Err:509 Kg Rp. 35,000.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Baja Ringan Hollow 40.40.2mm Err:509 #REF! Err:509 m1 Err:509 Btg Rp. Err:509 Rp. Err:509
2 Assesoris Err:509 #REF! Ls Rp. 7,500.00 Rp. #REF!

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Nok Genteng metal Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
2 Paku Biasa 1/2"-1" Err:509 #REF! Err:509 Kg Rp. 35,000.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Gypsum Board 9mm Err:509 #REF! Err:509 Lbr Rp. Err:509 Rp. Err:509
2 Paku Skrup Err:509 #REF! Err:509 Kg Rp. 97,680.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 List Gypsum Profil Err:509 #REF! Err:509 m1 Rp. Err:509 Rp. Err:509
2 Paku Err:509 #REF! Err:509 Kg Rp. 25,000.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 tegel keramik 40x40 Err:509 #REF! Err:509 Buah Rp. 12,820.51 Rp. Err:509
2 Semen Portland Err:509 #REF! Err:509 Kg Err:509 Sak Rp. Err:509 Rp. Err:509
3 Pasir Pasang Err:509 #REF! Err:509 m3 Err:509 Ret Rp. 185,800.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Balok Kayu Kelas II Err:509 #REF! Err:509 m3 Rp. 3,577,500.00 Rp. Err:509
2 Paku 10 cm Err:509 #REF! Err:509 Kg Rp. 35,000.00 Rp. Err:509
3 lem kayu Err:509 #REF! Err:509 Kg Rp. 22,500.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 papan kayu Kelas II Err:509 #REF! Err:509 m3 Rp. 3,577,500.00 Rp. Err:509
2 lem kayu Err:509 #REF! Err:509 Kg Rp. 22,500.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 papan kayu Kelas II Err:509 #REF! Err:509 m3 Rp. 3,577,500.00 Rp. Err:509
2 lem kayu Err:509 #REF! Err:509 Kg Rp. 22,500.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Kaca Tebal 5 mm Err:509 #REF! Err:509 m2 Rp. Err:509 Rp. Err:509


2 lem kayu Err:509 #REF! Err:509 Kg Rp. 22,500.00 Rp. Err:509
###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Err:509 Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Engsel pintu Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Engsel pintu Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Grandel sedang Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Grandel Kecil Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Err:509 Err:509 #REF! Err:509 Psg Rp. Err:509 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Plamur Err:509 #REF! Err:509 Kg Rp. 16,560.00 Rp. Err:509


2 Cat Dasar Err:509 #REF! Err:509 Kg Rp. 317,200.00 Rp. Err:509
3 Cat Penutup Err:509 #REF! Err:509 Kg Rp. 317,200.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Cat menie Err:509 #REF! Err:509 Kg Rp. 41,800.00 Rp. Err:509


2 Plamur Kayu Err:509 #REF! Err:509 Kg Rp. 32,000.00 Rp. Err:509
3 Cat dasar ( Wood Filler ) Err:509 #REF! Err:509 Kg Rp. 71,300.00 Rp. Err:509
4 Cat Penutup Err:509 #REF! Err:509 Kg Rp. 65,000.00 Rp. Err:509
5 Kuas Err:509 #REF! Err:509 Buah Rp. 13,800.00 Rp. Err:509
6 Pengencer ( Tiner ) Err:509 #REF! Err:509 Kg Rp. 43,350.00 Rp. Err:509
7 Amplas Err:509 #REF! Err:509 Lbr Rp. 6,268.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Pipa Listrik 5/8" Err:509 #REF! Err:509 Btg Rp. Err:509 Rp. Err:509
2 Kabel NYA 2,5 mm2 ( 100 m/rol) eterna Err:509 #REF! Err:509 M Err:509 Rol Rp. Err:509 Rp. Err:509
3 T Dus Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
4 L Bow Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
5 Las Dop Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
6 Mangkok Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
7 Fiiting Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Pipa listrik 5/8” Err:509 #REF! Err:509 Btg Rp. Err:509 Rp. Err:509
2 Kabel NYA 2,5 mm2 ( 100 m/rol) eterna Err:509 #REF! Err:509 m Err:509 Rol Rp. Err:509 Rp. Err:509
3 T Dus Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
4 L Bow Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
5 Las Dop Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
6 Klem Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
7 Mangkok Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
8 Stop Kontak Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Mangkok Err:509 #REF! Err:509 Buah Rp. 16,560.00 Rp. Err:509


2 Fisher + skrup Err:509 #REF! Err:509 Buah Rp. 317,200.00 Rp. Err:509
3 Saklar Ganda Err:509 #REF! Err:509 Buah Rp. 317,200.00 Rp. Err:509

###
No. Uraian Koefisien (A) Volume (B) Total Bahan (A x B) Sat. Keterangan Harga Satuan Total Harga

1 Pipa Listrik 5/8" Err:509 #REF! Err:509 Btg Rp. Err:509 Rp. Err:509
2 Kabel NYA 2,5 mm2 ( 100 m/rol) eterna Err:509 #REF! Err:509 M Err:509 Rol Rp. Err:509 Rp. Err:509
3 T Dus Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
4 L Bow Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
5 Klem Biasa Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
6 MCB Err:509 #REF! Err:509 Buah Rp. Err:509 Rp. Err:509
ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
TA : 2018

HARGA HARGA HARGA JUMLAH


NO. URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6

A. PEKERJAAN TANAH DAN PASIR


1) A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
0.750 Oh Pekerja 80,000.00 60,000.00 60,000.00
0.025 Oh Mandor 150,000.00 3,750.00 3,750.00
Jumlah Harga 63,750.00
Overhead 10% 6,375.00
Jumlah Total 70,125.00
2) A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug
1.200 M³ Pasir Urug 242,000.00 290,400.00 290,400.00
0.300 Oh Pekerja 80,000.00 24,000.00 24,000.00
0.010 Oh Mandor 150,000.00 1,500.00 1,500.00
Jumlah Harga 315,900.00
Overhead 10% 31,590.00
Jumlah Total 347,490.00
3) A.2.3.1.14. Pengurugan 1 m3 sirtu padat

4) A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah


0.192 Oh Pekerja 80,000.00 15,360.00 15,360.00
0.019 Oh Mandor 150,000.00 2,850.00 2,850.00
Jumlah Harga 18,210.00
Overhead 10% 1,821.00
Jumlah Total 20,031.00
5) A.2.3.1.10. Pemadatan tanah 1 m3 tanah
ANALISA HARGA SATUAN PEKERJAAN
### :
### :
PEKERJAA : 2018

HARGA
HARGA HARGA JUMLAH HARGA
SATUAN
NO. URAIAN PEKERJAAN UPAH BAHAN ( Rp
( Rp ) ( Rp ) )
( Rp )
1 2 3 4 5 6

B. PEKERJAAN PONDASI
1) A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)
1.200 M³ Batu Kali 930,000.00 1,116,000.00 1,116,000.00
0.432 M³ Pasir Urug 242,000.00 104,544.00 104,544.00
0.780 Oh Pekerja 80,000.00 62,400.00 62,400.00
0.390 Oh Tukang 125,000.00 48,750.00 48,750.00
0.039 Oh Kepala Tukang 150,000.00 5,850.00 5,850.00
0.039 Oh Mandor Jumlah Harga 1,337,544.00
Overhead 10% 133,754.40
Jumlah Total 1,471,298.40
2) A.3.2.1.3. Pemasangan 1 m3 pondasi batu kali campuran 1SP : 5PP
1.200 M³ Batu Kali 930,000.00 1,116,000.00 1,116,000.00
136.000 Kg Semen Portland Err:509 Err:509 Err:509
0.544 M³ Pasir Pasang 185,800.00 101,075.20 101,075.20
0.150 Oh Pekerja 80,000.00 12,000.00 12,000.00
0.750 Oh Tukang 125,000.00 93,750.00 93,750.00
0.075 Oh Kepala Tukang 150,000.00 11,250.00 11,250.00
0.075 Oh Mandor Jumlah Harga Err:509
Overhead 10% Err:509
Jumlah Total Err:509
C. PEKERJAAN PASANGAN DINDING
1) A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP
70.000 Bh Batu Merah 1,500.00 105,000.00 105,000.00
9.680 Kg Semen Portland Err:509 Err:509 Err:509
0.045 M³ Pasir Pasang 185,800.00 8,361.00 8,361.00
0.300 Oh Pekerja 80,000.00 24,000.00 24,000.00
0.100 Oh Tukang batu 125,000.00 12,500.00 12,500.00
0.010 Oh Kepala tukang 150,000.00 1,500.00 1,500.00
0.015 Oh Mandor 150,000.00 2,250.00 2,250.00
Jumlah Harga Err:509
Overhead 10% Err:509
Jumlah Total Err:509
D. PEKERJAAN PLESTERAN
1) A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm
5.184 Kg Semen Portland Err:509 Err:509 Err:509
0.026 M³ Pasir Pasang 185,800.00 4,830.80 4,830.80
0.300 Oh Pekerja 80,000.00 24,000.00 24,000.00
0.150 Oh Tukang 125,000.00 18,750.00 18,750.00
0.015 Oh Kepala Tukang 150,000.00 2,250.00 2,250.00
0.015 Oh Mandor 150,000.00 2,250.00 2,250.00
Jumlah Harga Err:509
Overhead 10% Err:509
Jumlah Total Err:509
2) A.4.4.2.27. Pemasangan 1 m2 acian
3.250 Kg Semen Portland Err:509 Err:509 Err:509
0.200 Oh Pekerja 80,000.00 16,000.00 16,000.00
0.100 Oh Tukang 125,000.00 12,500.00 12,500.00
0.010 Oh Kepala Tukang 150,000.00 1,500.00 1,500.00
0.010 Oh Mandor 150,000.00 1,500.00 1,500.00
Jumlah Harga Err:509
Overhead 10% Err:509
Jumlah Total Err:509

Page 134
ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
TA : 2018

HARGA HARGA HARGA JUMLAH


NO. URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6

E. PEKERJAAN BETON
1) A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 Mpa
276.000 Kg Semen Portland Err:509 Err:509 Err:509
0.591 M³ Pasir Beton 185,800.00 109,887.43 109,887.43
0.750 M³ Kerikil Biasa 417,500.00 312,970.37 312,970.37
215.000 Ltr Air 100.00 21,500.00 21,500.00
1.650 Oh Pekerja 80,000.00 132,000.00 132,000.00
0.250 Oh Tukang 125,000.00 31,250.00 31,250.00
0.028 Oh Kepala Tukang 150,000.00 4,200.00 4,200.00
0.083 Oh Mandor 150,000.00 12,450.00 12,450.00
Jumlah Harga Err:509
Overhead 10% Err:509
Jumlah Total Err:509
2) A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 Mpa
299.000 Kg Semen Portland Err:509 Err:509 Err:509
0.571 M³ Pasir Beton 185,800.00 106,038.71 106,038.71
0.753 M³ Kerikil Biasa 417,500.00 314,516.67 314,516.67
215.000 Ltr Air 100.00 21,500.00 21,500.00
1.650 Oh Pekerja 80,000.00 132,000.00 132,000.00
0.275 Oh Tukang 125,000.00 34,375.00 34,375.00
0.028 Oh Kepala Tukang 150,000.00 4,200.00 4,200.00
0.083 Oh Mandor 150,000.00 12,450.00 12,450.00
Jumlah Harga Err:509
Overhead 10% Err:509
Jumlah Total Err:509

3) A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir


10.700 Kg Besi Beton Polos 12 mm Err:509 Err:509 Err:509
0.150 Kg Kawat Ikat Beton / Bendrat 32,400.00 4,860.00 4,860.00
0.070 Oh Pekerja 80,000.00 5,600.00 5,600.00
0.070 Oh Tukang besi 125,000.00 8,750.00 8,750.00
0.007 Oh Kepala tukang 150,000.00 1,050.00 1,050.00
0.004 Oh Mandor 150,000.00 600.00 600.00
Jumlah Harga Err:509
Overhead 10% Err:509
Jumlah Total Err:509
Err:509

4) A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof


0.045 M³ Kayu Klas IV 1,600,000.00 72,000.00 72,000.00
0.300 Kg Paku 5 cm - 10 cm 35,000.00 10,500.00 10,500.00
0.100 Liter Minyak Bekisting 13,500.00 1,350.00 1,350.00
0.520 Oh Pekerja 80,000.00 41,600.00 41,600.00
0.260 Oh Tukang besi 125,000.00 32,500.00 32,500.00
0.026 Oh Kepala tukang 150,000.00 3,900.00 3,900.00
0.026 Oh Mandor 150,000.00 3,900.00 3,900.00
Jumlah Harga 165,750.00
Overhead 10% 16,575.00
Jumlah Total 182,325.00

5) A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom


0.040 M³ Kayu kelas IV 1,600,000.00 64,000.00 64,000.00
0.400 Kg Paku 5 cm - 10 cm 35,000.00 14,000.00 14,000.00
0.200 Liter Minyak bekisting 13,500.00 2,700.00 2,700.00
0.015 M³ Balok kayu kelas II 3,900,000.00 58,500.00 58,500.00
0.350 Lbr Plywood 9 mm Err:509 Err:509 Err:509
2.000 Btg Dolken kayu ø (8-10)cm, panjang 4 m 15,000.00 30,000.00 30,000.00
0.660 Oh Pekerja 80,000.00 52,800.00 52,800.00
0.330 Oh Tukang besi 125,000.00 41,250.00 41,250.00
0.033 Oh Kepala tukang 150,000.00 4,950.00 4,950.00
0.033 Oh Mandor 150,000.00 4,950.00 4,950.00
Jumlah Harga Err:509
Overhead 10% Err:509
Jumlah Total Err:509

6) A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok


0.040 M³ Kayu kelas IV 1,600,000.00 64,000.00 64,000.00
0.400 Kg Plywood 9 mm Err:509 Err:509 Err:509
0.200 Liter Minyak bekisting 15,000.00 3,000.00 3,000.00
0.015 M³ Balok kayu kelas II Err:509 Err:509 Err:509
0.350 Lbr Plywood 9 mm Err:509 Err:509 Err:509
2.000 Btg Dolken kayu ø (8-10)cm, panjang 4 m Err:509 Err:509 Err:509
0.660 Oh Pekerja 80,000.00 52,800.00 52,800.00
0.330 Oh Tukang besi 125,000.00 41,250.00 41,250.00
0.033 Oh Kepala tukang 150,000.00 4,950.00 4,950.00
0.033 Oh Mandor 150,000.00 4,950.00 4,950.00
Jumlah Harga Err:509
Overhead 10% Err:509
Jumlah Total Err:509

Page 135
Page 136
9) 1 m3 Sloof Beton 11 x 20 Cm, Mutu Beton f’c = 9,8 Mpa
1.000 M³ Beton f’c = 9,8 Mpa Err:509 Err:509 Err:509
141.384 Kg Besi Beton Err:509 Err:509 Err:509
13.333 M² Bekisting Sloof (2 Kali pakai) Err:509 Err:509 Err:509
Jumlah Harga Err:509
Overhead 10% Err:509
Jumlah Total Err:509

10) 1 m3 Kolom Beton (K1) 20 x 20 Cm, Mutu Beton f’c = 9,8 Mpa
1.000 M³ Beton f’c = 9,8 Mpa Err:509 Err:509 Err:509
221.463 Kg Besi Beton Err:509 Err:509 Err:509
10.000 M² Bekisting Kolom (2 Kali pakai) Err:509 Err:509 Err:509
Jumlah Harga Err:509
Overhead 10% Err:509
Jumlah Total Err:509

14) A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm


0.002 M³ Kayu kelas IV 1,600,000.00 3,200.00 3,200.00
0.010 Kg Paku 5 cm - 12 cm 35,000.00 350.00 350.00
3.000 Kg Besi beton polos Err:509 Err:509 Err:509
0.045 Kg Kawat beton 32,400.00 1,458.00 1,458.00
4.000 Kg semen Err:509 Err:509 Err:509
0.006 M³ Pasir 185,800.00 1,114.80 1,114.80
0.009 M³ Batu Kerikil 417,500.00 3,757.50 3,757.50
0.180 Oh Pekerja 80,000.00 14,400.00 14,400.00
0.020 Oh Tukang Batu 125,000.00 2,500.00 2,500.00
0.020 Oh Tukang kayu 125,000.00 2,500.00 2,500.00
0.020 Oh Tukang Besi 125,000.00 2,500.00 2,500.00
0.006 Oh Kepala tukang 150,000.00 900.00 900.00
0.009 Oh Mandor 150,000.00 1,350.00 1,350.00
Err:509
Err:509
Err:509
15) SNI 6.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
0.003 M³ Kayu kelas III 1,600,000.00 4,800.00 4,800.00
0.020 Kg Paku 5 cm - 12 cm 35,000.00 700.00 700.00
3.600 Kg Besi beton polos Err:509 Err:509 Err:509
0.050 Kg Kawat beton 32,400.00 1,620.00 1,620.00
5.500 Kg semen Err:509 Err:509 Err:509
0.009 M³ Pasir 185,800.00 1,672.20 1,672.20
0.015 M³ Batu Kerikil 417,500.00 6,262.50 6,262.50
0.297 Oh Pekerja 80,000.00 23,760.00 23,760.00
0.033 Oh Tukang Batu 125,000.00 4,125.00 4,125.00
0.033 Oh Tukang kayu 125,000.00 4,125.00 4,125.00
0.033 Oh Tukang Besi 125,000.00 4,125.00 4,125.00
0.010 Oh Kepala tukang 150,000.00 1,500.00 1,500.00
0.015 Oh Mandor 150,000.00 2,250.00 2,250.00
Err:509
Err:509
Err:509

Page 137
ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan : 0
Lokasi : 0
TA : 2018

HARGA HARGA HARGA JUMLAH


NO. URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6

G. PEKERJAAN LANGIT - LANGIT (PLAFOND)


1) 1 M2 Pasang Plafond GRC / Kalsiboard 4 mm Uk. (120 x 240) + Rangka Hollow 4/4. 2/4
0.364 Lbr Kalsiboard GRC 120 x 240 T = 4 mm Err:509 Err:509 Err:509
4.600 M1 Besi Hollow 20x40. 40x40 Err:509 -
0.110 Kg Screw 50,000.00 5,500.00 5,500.00
0.250 Kg Kawat Penggantung Err:509 Err:509 Err:509
0.100 Oh Pekerja 80,000.00 8,000.00 8,000.00
0.050 Oh Tukang 125,000.00 6,250.00 6,250.00
0.005 Oh Kepala Tukang 150,000.00 750.00 750.00
0.005 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

2) 1 M2 Pasang Plafond Gipsumboard 9 mm Uk. (120 x 240) + Rangka Hollow 4/4. 2/4
0.364 Lbr Gipsumboard 9 mm 120 x 240 Err:509 Err:509 Err:509
4.600 M1 Besi Hollow 20x40. 40x40 Err:509 Err:509 Err:509
0.110 Kg Screw 50,000.00 5,500.00 5,500.00
0.250 Kg Kawat Penggantung Err:509 Err:509 Err:509
0.100 Oh Pekerja 80,000.00 8,000.00 8,000.00
0.050 Oh Tukang 125,000.00 6,250.00 6,250.00
0.005 Oh Kepala Tukang 150,000.00 750.00 750.00
0.005 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

3) Memasang 1 M' List Langit-langit Gypsum 10 cm


1.050 M' List Gypsum / GRC Uk. 1 x 10 cm Err:509 Err:509 Err:509
0.020 Kg Screw 50,000.00 1,000.00 1,000.00
0.050 Oh Pekerja 80,000.00 4,000.00 4,000.00
0.050 Oh Tukang 125,000.00 6,250.00 6,250.00
0.005 Oh Kepala tukang 150,000.00 750.00 750.00
0.030 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

H. PEKERJAAN PENUTUP ATAP


1 Memasang 1 M' Bubungan Atap Metal
1.000 Lbr Bubungan Atap Metal Err:509 Err:509 Err:509
6.000 Bh Baut Screw driver 400.00 2,400.00 2,400.00
0.008 Oh Pekerja 80,000.00 640.00 640.00
0.150 Oh Tukang 125,000.00 18,750.00 18,750.00
0.070 Oh Kepala tukang 150,000.00 10,500.00 10,500.00
0.006 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

2 Memasang 1 M2 Rangka Atap Baja Ringan dan Genteng Metal Multi Roof
3.700 M¹ Baja Ringan C 100/50 Err:509 Err:509 Err:509
5.400 M¹ Baja Ringan Reng 0,45 Err:509 Err:509 Err:509
38.000 Bh Baut SDS 10,500.00 399,000.00 399,000.00
1.600 Bh Dinabolt Err:509 Err:509 Err:509
1.420 Lbr Genteng metal Err:509 Err:509 Err:509
0.200 Kg Paku Genteng metal Err:509 Err:509 Err:509
0.200 Oh Pekerja 80,000.00 16,000.00 16,000.00
0.450 Oh Tukang 125,000.00 56,250.00 56,250.00
0.010 Oh Kepala tukang 150,000.00 1,500.00 1,500.00
0.050 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

3 Memasang 1 M' Lisplank Papan GRC / Kalsiplank L= 20 Cm


0.333 Lbr Papan GRC/Kalsiplank L = 20 Cm Err:509 Err:509 Err:509
0.100 Kg Screw 50,000.00 5,000.00 5,000.00
0.100 Oh Pekerja 80,000.00 8,000.00 8,000.00
0.200 Oh Tukang 125,000.00 25,000.00 25,000.00
0.025 Oh Kepala tukang 150,000.00 3,750.00 3,750.00
0.025 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

4 Memasang 1 M' Jurai Atap


1.050 Lbr Jurai Atap Metal Err:509 Err:509 Err:509
6.000 Bh Baut Screw driver 400.00 2,400.00 2,400.00
0.200 Oh Pekerja 80,000.00 16,000.00 16,000.00
0.400 Oh Tukang 125,000.00 50,000.00 50,000.00
0.025 Oh Kepala Tukang 150,000.00 3,750.00 3,750.00
0.010 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

Page 138
ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
TA : 2018

HARGA HARGA HARGA JUMLAH


NO. URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp )

1 2 3 4 5 6

F. PEKERJAAN LANGIT - LANGIT (PLAFOND)


1) A.4.5.1.5. Pemasangan 1m2 langit-langit tripleks ukuran (120x240)cm tebal 3 mm, 4mm & 6 mm
0.375 Lbr Triples 3 mm Err:509 Err:509 Err:509
0.030 kg Paku tripleks 35,000.00 1,050.00 1,050.00
0.100 Oh Pekerja 80,000.00 8,000.00 8,000.00
0.100 Oh Tukang 125,000.00 12,500.00 12,500.00
0.010 Oh Kepala Tukang 150,000.00 1,500.00 1,500.00
0.005 Oh Mandor 150,000.00 750.00 750.00
Jumlah Harga Err:509
Overhead 15% Err:509
Jumlah Total Err:509

2) A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50x100)cm, kayu kelas IV


0.0154 m3 Kaso 3x4 cm 1,600,000.00 24,640.00 24,640.00
0.200 Kg Paku biasa 1" - 2" 35,000.00 7,000.00 7,000.00
0.150 Oh Pekerja 80,000.00 12,000.00 12,000.00
0.300 Oh Tukang 125,000.00 37,500.00 37,500.00
0.030 Oh Kepala tukang 150,000.00 4,500.00 4,500.00
0.075 Oh Mandor 150,000.00 11,250.00 11,250.00
Jumlah 65,250.00 31,640.00 96,890.00

3) A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil


1.050 m' Kayu Profil kecil Err:509 Err:509 Err:509
0.200 Kg Paku biasa 1" - 2" 35,000.00 7,000.00 7,000.00
0.021 Oh Pekerja 80,000.00 1,680.00 1,680.00
0.021 Oh Tukang 125,000.00 2,625.00 2,625.00
0.002 Oh Kepala tukang 150,000.00 300.00 300.00
0.002 Oh Mandor 150,000.00 300.00 300.00
Jumlah Harga Err:509
Overhead 15% Err:509
Jumlah Total Err:509

G. PEKERJAAN PENUTUP ATAP


1 An. Praktis Pemasangan 1 m2 seng gelombang
1.20 m2 Err:509 Err:509 Err:509 Err:509
0.02 kg Paku Seng 50,000.00 1,000.00 1,000.00
0.20 Oh Pekerja 80,000.00 16,000.00 16,000.00
0.10 Oh Tukang 125,000.00 12,500.00 12,500.00
0.01 Oh Kepala tukang 150,000.00 1,500.00 1,500.00
0.001 Oh Mandor 150,000.00 150.00 150.00
Jumlah 30,150.00 Err:509 Err:509

2 A.4.5.2.37. Pemasangan 1 m1 nok genteng metal


1.10 M² Nok Ratu kc Err:509 Err:509 Err:509
0.05 kg Paku biasa 1" - 2" 35,000.00 1,750.00 1,750.00
0.25 Oh Pekerja 80,000.00 20,000.00 20,000.00
0.15 Oh Tukang 125,000.00 18,750.00 18,750.00
0.015 Oh Kepala tukang 150,000.00 2,250.00 2,250.00
0.013 Oh Mandor 150,000.00 1,950.00 1,950.00
Jumlah 42,950.00 Err:509 Err:509

3 A.4.6.1.21. Pemasangan 1 m1 Listplank 2(3x20) cm, kayu kelas III


0.0108 m3 Kayu Klas II 1,600,000.00 17,280.00 17,280.00
0.100 Kg Paku biasa 1" - 2" 35,000.00 3,500.00 3,500.00
0.100 Oh Pekerja 80,000.00 8,000.00 8,000.00
0.200 Oh Tukang 125,000.00 25,000.00 25,000.00
0.020 Oh Kepala tukang 150,000.00 3,000.00 3,000.00
0.005 Oh Mandor 150,000.00 750.00 750.00
Jumlah 36,750.00 20,780.00 57,530.00

4 A.4.6.1.13. Pemasangan 1m3 konstruksi kuda-kuda konvensional, kayu kelas IV bentang 6 s/d 9 meter
1.1000 M3 Balok Kayu kelas IV 1,600,000.00 1,760,000.00 1,760,000.00
15.000 Kg Besi Strip Err:509 Err:509 Err:509
5.600 Kg Paku biasa 2,5" - 3,5" 35,000.00 196,000.00 196,000.00
4.00 Oh Pekerja 80,000.00 320,000.00 320,000.00
12.00 Oh Tukang 125,000.00 1,500,000.00 1,500,000.00
1.20 Oh Kepala tukang 150,000.00 180,000.00 180,000.00
0.20 Oh Mandor 150,000.00 30,000.00 30,000.00
Jumlah 2,030,000.00 Err:509 Err:509

5 A.4.6.1.15. Pemasangan 1 m3 Konstruksi gordeng, kayu kelas IV


1.1000 M3 Balok Kayu Kelas IV 1,600,000.00 1,760,000.00 1,760,000.00
3.000 Kg Paku biasa 2,5" - 3,5" 35,000.00 105,000.00 105,000.00
6.70 Oh Pekerja 80,000.00 536,000.00 536,000.00
20.10 Oh Tukang 125,000.00 2,512,500.00 2,512,500.00
2.01 Oh Kepala tukang 150,000.00 301,500.00 301,500.00
0.335 Oh Mandor 150,000.00 50,250.00 50,250.00
Jumlah 3,400,250.00 1,865,000.00 5,265,250.00
ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
TA : 2018

HARGA HARGA HARGA JUMLAH


NO. URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6

H. PEKERJAAN KAYU
1) SNI 6.2 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kelas II
1.200 M³ Kayu Kelas III 3,577,500.00 4,293,000.00 4,293,000.00
1.250 Kg Paku Biasa 2" - 5" 35,000.00 43,750.00 43,750.00
6.000 Oh Pekerja 80,000.00 480,000.00 480,000.00
18.000 Oh Tukang Kayu 125,000.00 2,250,000.00 2,250,000.00
2.000 Oh Kepala Tukang 150,000.00 300,000.00 300,000.00
0.300 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 4,336,750.00 Err:509

2) SNI 6.10 1 M2 Pasang Daun Pintu / Jendela Kaca Kayu Kelas III
0.035 M³ Kayu Kelas III 3,577,500.00 125,212.50 125,212.50
0.500 Kg Lem Kayu 35,000.00 17,500.00 17,500.00
1.000 Oh Pekerja 80,000.00 80,000.00 80,000.00
3.000 Oh Tukang kayu 125,000.00 375,000.00 375,000.00
0.300 Oh Kepala tukang 150,000.00 45,000.00 45,000.00
0.050 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 125,212.50 Err:509

3) SNI. 6.17 1 M2 Pasangan Kaca Tebal 5 mm


1.100 M² Kaca Bening 5 mm Err:509 Err:509 Err:509
0.150 Oh Pekerja 80,000.00 12,000.00 12,000.00
0.150 Oh Tukang kayu 125,000.00 18,750.00 18,750.00
0.015 Oh Kepala tukang 150,000.00 2,250.00 2,250.00
0.001 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509
ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
TA : 2018

HARGA HARGA HARGA JUMLAH


NO. URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6

I. PEKERJAAN PENUTUP LANTAI


1) Memasang 1 M2 Lantai Keramik Uk. 40 X 40
6.630 Bh Keramik Uk. 40 X 40 12,820.51 85,000.00 85,000.00
9.800 Kg Semen Portland Err:509 Err:509 Err:509
0.045 M³ Pasir Pasang 185,800.00 8,361.00 8,361.00
1.300 Kg Semen Warna Err:509 Err:509 Err:509
0.250 Oh Pekerja 80,000.00 20,000.00 20,000.00
0.120 Oh Tukang 125,000.00 15,000.00 15,000.00
0.012 Oh Kepala Tukang 150,000.00 1,800.00 1,800.00
0.013 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

Page 142
ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan : 0
Lokasi : 0
TA : 2018

HARGA HARGA HARGA JUMLAH


NO. URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6

K. PEKERJAAN SANITASI
1) SNI 6.1. Memasang 1 Unit Closed Duduk Manual
1.000 Unit Closed Duduk Mono Block Err:509 Err:509 Err:509
0.060 % Perlengkapan Err:509 Err:509 Err:509
3.300 Oh Pekerja 80,000.00 264,000.00 264,000.00
1.100 Oh Tukang 125,000.00 137,500.00 137,500.00
0.001 Oh Kepala tukang 150,000.00 150.00 150.00
0.160 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

2) Memasang 1 Bh Closet Jongkok Standart


1.000 Unit Kloset Jongkok Err:509 Err:509 Err:509
0.060 % Perlengkapan ( 6% Harga Kloset ) Err:509 Err:509 Err:509
1.000 Oh Pekerja 80,000.00 80,000.00 80,000.00
1.500 Oh Tukang 125,000.00 187,500.00 187,500.00
1.500 Oh Kepala tukang 150,000.00 225,000.00 225,000.00
0.160 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

3) Memasang 1 Bh Kitchen Zink (1 Lubang)


1.000 Unit Kitchen zink (1 lubang) Err:509 Err:509 Err:509
0.060 % Perlengkapan ( 6% Harga ) Err:509 Err:509 Err:509
2.300 Oh Pekerja 80,000.00 184,000.00 184,000.00
1.100 Oh Tukang 125,000.00 137,500.00 137,500.00
0.001 Oh Kepala tukang 150,000.00 150.00 150.00
0.160 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

4) Memasang 1 Bh Kitchen Zink (1 lubang + Tiris)


1.000 Unit Kitchen zink (1 lubang) Err:509 Err:509 Err:509
0.060 % Perlengkapan ( 6% Harga ) Err:509 Err:509 Err:509
2.300 Oh Pekerja 80,000.00 184,000.00 184,000.00
1.100 Oh Tukang 125,000.00 137,500.00 137,500.00
0.001 Oh Kepala tukang 150,000.00 150.00 150.00
0.160 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

5) Memasang 1 Set Wastafel


1.000 Unit Wastafel Err:509 Err:509 Err:509
0.120 % Perlengkapan Err:509 Err:509 Err:509
6.000 Kg Semen Portland Err:509 Err:509 Err:509
0.010 M³ Pasir Pasang 185,800.00 1,858.00 1,858.00
1.200 Oh Pekerja 80,000.00 96,000.00 96,000.00
1.450 Oh Tukang 125,000.00 181,250.00 181,250.00
0.150 Oh Kepala tukang 150,000.00 22,500.00 22,500.00
0.100 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

6) Memasang 1 Bh Kran Dinding, Dia. 3/4" atau 1/2"


1.000 Unit Kran Air 3/4" atau 1/2" Stainless Steel Err:509 Err:509 Err:509
0.025 Kg Seal Tape Err:509 Err:509 Err:509
0.010 Oh Pekerja 80,000.00 800.00 800.00
0.100 Oh Tukang 125,000.00 12,500.00 12,500.00
0.010 Oh Kepala tukang 150,000.00 1,500.00 1,500.00
0.005 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

7) Memasang 1 Bh Kran Toilet Hand Shower


1.000 Unit Kran Hand Shower Err:509 Err:509 Err:509
0.025 Kg Seal Tape Err:509 Err:509 Err:509
0.010 Oh Pekerja 80,000.00 800.00 800.00
0.100 Oh Tukang 125,000.00 12,500.00 12,500.00
0.010 Oh Kepala tukang 150,000.00 1,500.00 1,500.00
0.005 Oh Mandor Err:509 Err:509 Err:509

Page 143
Jumlah Err:509 Err:509 Err:509

Page 144
8) Memasang 1 Bh Kran Wastafel
Pemasangan 1 buah kran diameter 1/2" atau 3/4"
1.000 Unit Kran air Err:509 Err:509 Err:509
0.025 Kg Sealtape Err:509 Err:509 Err:509
0.010 Oh Pekerja 80,000.00 800.00 800.00
0.400 Oh Tukang 125,000.00 50,000.00 50,000.00
0.040 Oh Kepala tukang 150,000.00 6,000.00 6,000.00
0.005 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

9) Memasang 1 Bh Kran, Dia. 3/4" atau 1/2" Kitchen zink


1.000 Unit Kran Air 3/4" atau 1/2" Stainless Steel Err:509 Err:509 Err:509
0.025 Kg Seal Tape Err:509 Err:509 Err:509
0.010 Oh Pekerja 80,000.00 800.00 800.00
0.100 Oh Tukang 125,000.00 12,500.00 12,500.00
0.010 Oh Kepala tukang 150,000.00 1,500.00 1,500.00
0.005 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

10) Pekerjaan Pipa Air diameter 1/2"


Pemasangan 1M' Pipa PVC tipe AW diameter 1/2"
1.200 Unit PVC Ø 1/2" P = 4 m Err:509 Err:509 Err:509
35.000 % Harga Pipa ( Perlengkapan ) Err:509 Err:509 Err:509
0.360 Oh Pekerja 80,000.00 28,800.00 28,800.00
0.060 Oh Tukang 125,000.00 7,500.00 7,500.00
0.006 Oh Kepala tukang 150,000.00 900.00 900.00
0.002 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

11) Memasang 1 M1 Pipa PVC Ø 1"


1.200 Unit PVC Ø 1" P = 4 m Err:509 Err:509 Err:509
0.350 % Harga Pipa ( Perlengkapan ) Err:509 Err:509 Err:509
0.081 Oh Pekerja 80,000.00 6,480.00 6,480.00
0.135 Oh Tukang 125,000.00 16,875.00 16,875.00
0.135 Oh Kepala tukang 150,000.00 20,250.00 20,250.00
0.0041 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

12) Memasang 1 M1 Pipa PVC Ø 1 1/2"


1.200 M¹ PVC Ø 1 1/2" P = 4 m Err:509 Err:509 Err:509
0.350 % Harga Pipa ( Perlengkapan ) Err:509 Err:509 Err:509
0.081 Oh Pekerja 80,000.00 6,480.00 6,480.00
0.135 Oh Tukang 125,000.00 16,875.00 16,875.00
0.135 Oh Kepala tukang 150,000.00 20,250.00 20,250.00
0.0041 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

13) Memasang 1 m1 Pipa Penguapan


1.200 M¹ Pipa T Penguapan Septictank Err:509 Err:509 Err:509
0.350 % Harga Pipa ( Perlengkapan ) Err:509 Err:509 Err:509
0.081 Oh Pekerja 80,000.00 6,480.00 6,480.00
0.135 Oh Tukang 125,000.00 16,875.00 16,875.00
0.135 Oh Kepala tukang 150,000.00 20,250.00 20,250.00
0.0041 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

14) Analisa Terapan 1 Unit Septic Tank dan Peresapan


SEPTICK TANK
17.972 M³ Galian Tanah 36,500.00 655,978.00 655,978.00
0.090 M³ Urugan Pasir 175,925.00 15,833.25 15,833.25
0.960 M³ Timbunan Tanah 17,487.50 16,788.00 16,788.00
0.150 M³ Beton Cor 1: 2 : 3 T = 5 cm Err:509 Err:509 Err:509
0.000 M² Pas. Batako 1 Pc : 5 Psr Err:509 Err:509 Err:509
13.000 M² Plesteran 1 Pc : 3 Psr ( Trasram ) Err:509 Err:509 Err:509
13.000 M² Acian Semen 11,821.00 153,673.00 153,673.00
0.172 M³ Beton Plat Penutup T = 8 cm 7,641,137.86 1,314,275.71 1,314,275.71
1.500 M' PVC Ø 4" Err:509 Err:509 Err:509
0.450 M' Pipa Penguapan Err:509 Err:509 Err:509
PERESAPAN
36.780 M³ Galian Tanah 36,500.00 1,342,471.17 1,342,471.17
0.300 M³ Lapisan Kerikil 181,625.00 54,487.50 54,487.50
1.125 M³ Lapisan Karang 276,075.00 310,584.38 310,584.38
0.715 M³ Lapisan Ijuk 94,687.50 67,701.56 67,701.56
1.000 M' PVC Ø 4" Err:509 Err:509 Err:509
0.300 M³ Urugan Kembali 17,487.50 5,246.25 5,246.25

Page 145
Jumlah Err:509 Err:509

15) Memasang 1 Bh Floor Drain


1.000 Unit Floor Drain Err:509 Err:509 Err:509
0.010 Oh Pekerja 80,000.00 800.00 800.00
0.100 Oh Tukang 125,000.00 12,500.00 12,500.00
0.010 Oh Kepala tukang 150,000.00 1,500.00 1,500.00
0.005 Oh Mandor Err:509 Err:509 Err:509
Jumlah 13,300.00 Err:509 Err:509

16) Memasang 1 M1 Pipa PVC Ø 2"


1.200 Unit PVC Ø 2" P = 4 m Err:509 Err:509 Err:509
0.350 % Harga Pipa ( Perlengkapan ) Err:509 Err:509 Err:509
0.081 Oh Pekerja 80,000.00 6,480.00 6,480.00
0.135 Oh Tukang 125,000.00 16,875.00 16,875.00
0.135 Oh Kepala tukang 150,000.00 20,250.00 20,250.00
0.0041 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

17) Memasang 1 M1 Pipa PVC Ø 3"


1.200 Unit PVC Ø 3" P = 6 m Err:509 Err:509 Err:509
0.350 % Harga Pipa ( Perlengkapan ) Err:509 Err:509 Err:509
0.081 Oh Pekerja 80,000.00 6,480.00 6,480.00
0.135 Oh Tukang 125,000.00 16,875.00 16,875.00
0.014 Oh Kepala tukang 150,000.00 2,025.00 2,025.00
0.0041 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

18) Memasang 1 Bh Tissue Holder


1.000 Unit Tissue Holder Err:509 Err:509 Err:509
0.016 Oh Pekerja 80,000.00 1,280.00 1,280.00
0.065 Oh Tukang 125,000.00 8,125.00 8,125.00
Jumlah 9,405.00 Err:509 Err:509

19) Memasang 1 Bh Towel Holder


1.000 Unit Towel Holder Err:509 Err:509 Err:509
0.016 Oh Pekerja 80,000.00 1,280.00 1,280.00
0.065 Oh Tukang 125,000.00 8,125.00 8,125.00
Jumlah 9,405.00 Err:509 Err:509

20) Memasang 1 Bh Urinoir


1.000 Unit Urinoir Err:509 Err:509 Err:509
0.300 % Harga Urinoir ( Perlengkapan ) Err:509 Err:509 Err:509
6.000 Kg Semen Portland Err:509 Err:509 Err:509
0.010 M³ Pasir Pasang 185,800.00 1,858.00 1,858.00
1.000 Oh Pekerja 80,000.00 80,000.00 80,000.00
1.000 Oh Tukang 125,000.00 125,000.00 125,000.00
0.100 Oh Kepala tukang 150,000.00 15,000.00 15,000.00
0.001 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

21) Memasang 1 Set Wastafel + cermin


1.000 Unit 1 Set Wastafel + Cermin Err:509 Err:509 Err:509
0.120 % Perlengkapan Err:509 Err:509 Err:509
6.000 Kg Semen Portland Err:509 Err:509 Err:509
0.010 M³ Pasir Pasang Err:509 Err:509 Err:509
1.200 Oh Pekerja 80,000.00 96,000.00 96,000.00
1.450 Oh Tukang 125,000.00 181,250.00 181,250.00
0.150 Oh Kepala tukang 150,000.00 22,500.00 22,500.00
0.100 Oh Mandor Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509

Page 146
ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
TA : 2018

HARGA HARGA HARGA JUMLAH


NO. URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6

J. PEKERJAAN PENGECATAN
1) Mengecat 1 M2 Tembok Baru
(1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
0.100 Kg Plamir 16,560.00 1,656.00 1,656.00
0.100 Kg Cat Dasar 317,200.00 31,720.00 31,720.00
0.260 Kg Cat Penutup 317,200.00 82,472.00 82,472.00
0.020 Oh Pekerja 80,000.00 1,600.00 1,600.00
0.063 Oh Tukang Cat 125,000.00 7,875.00 7,875.00
0.006 Oh Kepala Tukang 150,000.00 945.00 945.00
0.003 Oh Mandor - -
Jumlah 10,420.00 115,848.00 126,268.00

2) Mengecat 1 M2 Bidang Tembok Lama


(1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
0.120 Kg Cat Dasar 317,200.00 38,064.00 38,064.00
0.180 Kg Cat Penutup 317,200.00 57,096.00 57,096.00
0.028 Oh Pekerja 80,000.00 2,240.00 2,240.00
0.042 Oh Tukang Cat 125,000.00 5,250.00 5,250.00
0.004 Oh Kepala Tukang 150,000.00 630.00 630.00
0.003 Oh Mandor - - -
Jumlah 8,120.00 95,160.00 103,280.00

3) Mengecat 1 M2 Bidang Kayu Baru


(1 Lapis Plamir, 1 Lapis Cat Dasar, 3 Lapis Cat Penutup)
0.200 Kg Cat Meni 41,800.00 8,360.00 8,360.00
0.150 Kg Plamir 32,000.00 4,800.00 4,800.00
0.170 Kg Cat Dasar 65,000.00 11,050.00 11,050.00
0.170 Kg Cat Penutup 65,000.00 11,050.00 11,050.00
0.010 Bh Kuas 13,800.00 138.00 138.00
0.030 Kg Pengencer 65,000.00 1,950.00 1,950.00
0.200 Lmbr Amplas 5,200.00 1,040.00 1,040.00
0.070 Oh Pekerja 80,000.00 5,600.00 5,600.00
0.105 Oh Tukang Cat 125,000.00 13,125.00 13,125.00
0.004 Oh Kepala Tukang 150,000.00 600.00 600.00
0.003 Oh Mandor - - -
Jumlah 19,325.00 38,388.00 57,713.00

K. PEKERJAAN KUNCI & ALAT PENGGANTUNG


1) Memasang 1 Set Kunci Tanam + Handle Pintu 1 Daun
1.000 Set Kunci Tanam + Handle Err:509 Err:509 Err:509
0.060 Oh Pekerja 80,000.00 4,800.00 4,800.00
0.600 Oh Tukang Kayu 125,000.00 75,000.00 75,000.00
0.060 Oh Kepala Tukang 150,000.00 9,000.00 9,000.00
0.003 Oh Mandor - - -
Jumlah 88,800.00 Err:509 Err:509

4) Memasang 1 Bh Engsel Pintu


1.000 Bh Engsel Pintu Err:509 Err:509 Err:509
0.015 Oh Pekerja 80,000.00 1,200.00 1,200.00
0.150 Oh Tukang Kayu 125,000.00 18,750.00 18,750.00
0.015 Oh Kepala Tukang 150,000.00 2,250.00 2,250.00
0.001 Oh Mandor - - -
Jumlah 22,200.00 Err:509 Err:509

Page 147
5) Memasang 1 Bh Engsel Jendela
1.000 Bh Engsel Jendela Err:509 Err:509 Err:509
0.020 Oh Pekerja 80,000.00 1,600.00 1,600.00
0.200 Oh Tukang Kayu 125,000.00 25,000.00 25,000.00
0.020 Oh Kepala Tukang 150,000.00 3,000.00 3,000.00
0.010 Oh Mandor - - -
Jumlah 29,600.00 Err:509 Err:509

6) Memasang 1 Psg Kait Angin


1.000 psg Kait Angin Err:509 Err:509 Err:509
0.015 Oh Pekerja 80,000.00 1,200.00 1,200.00
0.150 Oh Tukang Kayu 125,000.00 18,750.00 18,750.00
0.015 Oh Kepala Tukang 150,000.00 2,250.00 2,250.00
0.001 Oh Mandor - - -
Jumlah 22,200.00 Err:509 Err:509

7) Memasang 1 Bh Pegangan/Tarikan Jendela


1.000 Bh Handle Jendela Err:509 Err:509 Err:509
0.015 Oh Pekerja 80,000.00 1,200.00 1,200.00
0.150 Oh Tukang Kayu 125,000.00 18,750.00 18,750.00
0.015 Oh Kepala Tukang 150,000.00 2,250.00 2,250.00
0.001 Oh Mandor - - -
Jumlah 22,200.00 Err:509 Err:509

8) Memasang 1 Bh Grendel Jendela (Grandle Kodok)


1.000 Bh Grendel Jendela Spring Kniif Err:509 Err:509 Err:509
0.015 Oh Pekerja 80,000.00 1,200.00 1,200.00
0.150 Oh Tukang Kayu 125,000.00 18,750.00 18,750.00
0.015 Oh Kepala Tukang 150,000.00 2,250.00 2,250.00
0.001 Oh Mandor - - -
Jumlah 22,200.00 Err:509 Err:509

9) Memasang 1 Bh Grendel Pintu


1.000 Bh Grendel Pintu Staenlees Err:509 Err:509 Err:509
0.015 Oh Pekerja 80,000.00 1,200.00 1,200.00
0.150 Oh Tukang Kayu 125,000.00 18,750.00 18,750.00
0.015 Oh Kepala Tukang 150,000.00 2,250.00 2,250.00
0.001 Oh Mandor - - -
Jumlah 22,200.00 Err:509 Err:509

Page 148
ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
TA : 2018

HARGA HARGA HARGA JUMLAH


NO. URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6

L. PEKERJAAN LISTRIK
1) 1 Ttk Pemasangan Instalasi Penerangan Dalam
9.000 M' NYA 2x 2,5 mm2 13,960.00 125,640.00 125,640.00
4.000 M' Pipa / Conduit 6,500.00 26,000.00 26,000.00
1.000 Ls Peralatan bantu 10,000.00 10,000.00 10,000.00
0.250 Oh Pekerja 80,000.00 20,000.00 20,000.00
0.550 Oh Tukang 125,000.00 68,750.00 68,750.00
0.18 Oh Kepala Tukang 150,000.00 27,000.00 27,000.00
0.050 Oh Mandor - -
Jumlah 115,750.00 161,640.00 277,390.00

2) 1 Bh Pemasangan Stop Kontak


1.000 Bh Stop Kontak 38,000.00 38,000.00 38,000.00
1.000 Ls Peralatan bantu 2,500.00 2,500.00 2,500.00
0.030 Oh Pekerja 80,000.00 2,400.00 2,400.00
0.080 Oh Tukang 125,000.00 10,000.00 10,000.00
0.01 Oh Kepala Tukang 150,000.00 1,500.00 1,500.00
0.010 Oh Mandor - - -
Jumlah 13,900.00 40,500.00 54,400.00

3) 1 Bh Pemasangan Saklar Tunggal


1.000 Bh Saklar Single 30,800.00 30,800.00 30,800.00
1.000 Ls Peralatan bantu 2,500.00 2,500.00 2,500.00
0.030 Oh Pekerja 80,000.00 2,400.00 2,400.00
0.070 Oh Tukang 125,000.00 8,750.00 8,750.00
0.01 Oh Kepala Tukang 150,000.00 1,500.00 1,500.00
0.010 Oh Mandor - - -
Jumlah 12,650.00 33,300.00 45,950.00
4) 1 Bh Pemasangan Saklar Ganda
1.000 Bh Saklar Serie 37,400.00 24,500.00 24,500.00
1.000 Ls Peralatan bantu 2,500.00 1,000.00 1,000.00
0.030 Oh Pekerja 80,000.00 2,400.00 2,400.00
0.070 Oh Tukang 125,000.00 8,750.00 8,750.00
0.01 Oh Kepala Tukang 150,000.00 1,500.00 1,500.00
0.010 Oh Mandor - - -
Jumlah 12,650.00 25,500.00 38,150.00

Page 149
ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan : 0
Lokasi : 0
TA : 2018

HARGA HARGA HARGA JUMLAH


NO. URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6

P. PEKERJAAN ALMUNIUM
1) 1 M2 Membuat dan Memasang Pintu Multipleks Rangkap
2.000 Lbr Multipleks Tebal 180 mm 7,500.00 15,000.00 15,000.00
0.500 Kg Lem Kayu 28,000.00 14,000.00 14,000.00
0.700 Oh Pekerja 75,000.00 52,500.00 52,500.00
2.100 Oh Tukang Batu 112,500.00 236,250.00 236,250.00
0.210 Oh Kepala Tukang 137,500.00 28,875.00 28,875.00
0.035 Oh Mandor 162,500.00 5,687.50 5,687.50
Jumlah 323,312.50 29,000.00 352,312.50
2) Anl. Praktis, 1 m² Pek. Pasang Lapisan HPL (High Pressure Laminate) Tebal 2 mm
1.200 M2 HPL (High Pressure Laminate) 285,000.00 342,000.00 342,000.00
1.050 M¹ Amplas/Kertas Pasir - - -
0.250 Kg Lem Fox 22,500.00 5,625.00 5,625.00
0.350 Oh Pekerja 75,000.00 26,250.00 26,250.00
0.175 Oh Tukang 112,500.00 19,687.50 19,687.50
0.017 Oh Kepala tukang 137,500.00 2,337.50 2,337.50
0.002 Oh Mandor 162,500.00 325.00 325.00
Jumlah 48,600.00 347,625.00 396,225.00

3) Memasang 1 M1 Kusen Aluminium 4" x 1,3/4'


1.100 M1 Profil Aluminium 4" x 1,3/4' (Hitam) - - -
2.000 Bh Skrup Fixer 81,000.00 162,000.00 162,000.00
0.060 Tube Sealent 167,000.00 10,020.00 10,020.00
0.043 Oh Pekerja 75,000.00 3,225.00 3,225.00
0.043 Oh Tukang 112,500.00 4,837.50 4,837.50
0.004 Oh Kepala tukang 137,500.00 591.25 591.25
0.002 Oh Mandor 162,500.00 341.25 341.25
Jumlah 8,995.00 172,020.00 181,015.00

4) Memasang 1 M1 Slimar Almunium 3/8"'


1.100 M1 Slimar Aluminium 3/8 (Hitam) 91,666.67 100,833.33 100,833.33
2.000 Bh Skrup Fixer 81,000.00 162,000.00 162,000.00
0.060 Tube Sealent 167,000.00 10,020.00 10,020.00
0.043 Oh Pekerja 75,000.00 3,225.00 3,225.00
0.043 Oh Tukang 112,500.00 4,837.50 4,837.50
0.004 Oh Kepala tukang 137,500.00 591.25 591.25
0.002 Oh Mandor 162,500.00 341.25 341.25
Jumlah 8,995.00 272,853.33 281,848.33
5) Memasang 1m1 Sealent (Karet Kaca)
1.100 M1 Sealent (Karet Kaca) 167,000.00 183,700.00 183,700.00
0.037 Oh Pekerja 75,000.00 2,775.00 2,775.00
0.030 Oh Tukang 112,500.00 3,375.00 3,375.00
0.006 Oh Kepala tukang 137,500.00 825.00 825.00
0.003 Oh Mandor 162,500.00 487.50 487.50
Jumlah 7,462.50 183,700.00 191,162.50

6) 1 Unit Kusen + Pintu Dobel Jendela Frameless Kaca Tempered 10 mm,


(Type PJ1)
11.800 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 2,135,977.00 2,135,977.00
0.580 M1 Pas. Slimar Almunium 3/8" (Hitam) 281,848.33 163,472.03 163,472.03
4.800 M2 Pas. Kaca Flat Tempered T = 10 mm Err:509 Err:509 Err:509
2.475 M2 Pas. Kaca Bening t = 10 mm Err:509 Err:509 Err:509
18.000 M1 Pas. Sealent (Karet Kaca) 191,162.50 3,440,925.00 3,440,925.00
2.000 Set Pas. Kunci Pintu Tanam + Hendle Err:509 Err:509 Err:509
2.000 Set Pas. Engsel Pintu Almunium Err:509 Err:509 Err:509
4.000 Bh Pas. Engsel Jendela dan Ventilasi Almunium Err:509 Err:509 Err:509
4.000 Bh Pas. Friction Stay Jendela dan Ventilasi 346,200.00 1,384,800.00 1,384,800.00
2.000 Set Spring Knip 135,187.50 270,375.00 270,375.00
Jumlah Err:509 Err:509

7) 1 Unit Kusen + Pintu Jendela, Frameless Kaca Tempered 10 mm, (Type PJ2)
12.150 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 2,199,332.25 2,199,332.25
0.570 M1 Pas. Slimar Almunium 3/8" (Hitam) 281,848.33 160,653.55 160,653.55
1.440 M2 Pas. Kaca Flat Tempered T = 10 mm Err:509 Err:509 Err:509
2.450 M2 Pas. Kaca Bening t = 10 mm Err:509 Err:509 Err:509
20.200 M1 Pas. Sealent (Karet Kaca) 191,162.50 3,861,482.50 3,861,482.50
1.000 Set Pas. Kunci Pintu Tanam + Hendle Err:509 Err:509 Err:509
1.000 Set Pas. Engsel Pintu Almunium Err:509 Err:509 Err:509
4.000 Bh Pas. Engsel Jendela dan Ventilasi Almunium Err:509 Err:509 Err:509
4.000 Bh Pas. Friction Stay Jendela dan Ventilasi 346,200.00 1,384,800.00 1,384,800.00
2.000 Set Spring Knip 135,187.50 270,375.00 270,375.00
Jumlah Err:509 Err:509

8) 1 Unit Kusen + Pintu Jendela, Frameless Kaca Tempered 10 mm, (Type PJ3)
11.100 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 2,009,266.50 2,009,266.50
0.550 M1 Pas. Slimar Almunium 3/8" (Hitam) 281,848.33 155,016.58 155,016.58
1.600 M2 Pas. Kaca Flat Tempered T = 10 mm Err:509 Err:509 Err:509
2.310 M2 Pas. Kaca Bening t = 10 mm Err:509 Err:509 Err:509
15.000 M1 Pas. Sealent (Karet Kaca) 191,162.50 2,867,437.50 2,867,437.50
1.000 Set Pas. Kunci Pintu Tanam + Hendle Err:509 Err:509 Err:509
1.000 Set Pas. Engsel Pintu Almunium Err:509 Err:509 Err:509
4.000 Bh Pas. Engsel Jendela dan Ventilasi Almunium Err:509 Err:509 Err:509
4.000 Bh Pas. Friction Stay Jendela dan Ventilasi 346,200.00 1,384,800.00 1,384,800.00
2.000 Set Spring Knip 135,187.50 270,375.00 270,375.00
Jumlah Err:509 Err:509

9) 1 Unit Kusen + Pintu Double Frameless Kaca Tempered 12 mm (Type P1)


5.500 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 995,582.50 995,582.50
0.500 M1 Pas. Slimar Almunium 3/8"(Hitam) 281,848.33 140,924.17 140,924.17
1.520 M2 Pas. Kaca Flat Tempered T = 10 mm Err:509 Err:509 Err:509
0.000 M2 Pas. Kaca Bening t = 10 mm Err:509 Err:509 Err:509
9.200 M1 Pas. Sealent (Karet Kaca) 191,162.50 1,758,695.00 1,758,695.00
1.000 Set Pas. Kunci Pintu Tanam + Hendle Err:509 Err:509 Err:509
1.000 Set Pas. Engsel Pintu Almunium Err:509 Err:509 Err:509
Jumlah Err:509 Err:509

10) 1 Unit Kusen + Pintu Frameless Kaca Tempered 12 mm (Type P3)


8.500 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 1,538,627.50 1,538,627.50
0.851 M1 Pas. Slimar Almunium 3/8" (Hitam) 281,848.33 239,909.30 239,909.30
1.014 M2 Pas. Kaca Flat Tempered T = 10 mm Err:509 Err:509 Err:509
0.825 M2 Pas. Kaca Bening t = 10 mm Err:509 Err:509 Err:509
8.840 M1 Pas. Sealent (Karet Kaca) 191,162.50 1,689,876.50 1,689,876.50
2.000 Set Pas. Kunci Pintu Tanam + Hendle Err:509 Err:509 Err:509
2.000 Set Pas. Engsel Pintu Almunium Err:509 Err:509 Err:509
Jumlah Err:509 Err:509

11) 1 Unit Kusen + Pintu Frameless Kaca Tempered 10 mm (Type P3)


5.500 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 995,582.50 995,582.50
0.411 M1 Pas. Slimar Almunium 3/8" (Hitam) 281,848.33 115,896.03 115,896.03
0.898 M2 Pas. Kaca Flat Tempered T = 10 mm Err:509 Err:509 Err:509
4.540 M1 Pas. Sealent (Karet Kaca) 191,162.50 867,877.75 867,877.75
2.000 Set Pas. Kunci Pintu Tanam + Hendle Err:509 Err:509 Err:509
2.000 Set Pas. Engsel Pintu Almunium Err:509 Err:509 Err:509
Jumlah Err:509 Err:509

13) 1 Unit Kusen + Jendela Mati Almunium Kaca 5 mm, (Type J1)
8.550 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 1,547,678.25 1,547,678.25
0.510 M1 Pas. Slimar Almunium 3/8" (Hitam) 281,848.33 143,742.65 143,742.65
1.170 M2 Pas. Kaca Bening t = 10 mm Err:509 Err:509 Err:509
5.100 M1 Pas. Sealent (Karet Kaca) 191,162.50 974,928.75 974,928.75
2.000 Bh Pas. Engsel Jendela dan Ventilasi Almunium Err:509 Err:509 Err:509
2.000 Bh Pas. Friction Stay Jendela dan Ventilasi 346,200.00 692,400.00 692,400.00
1.000 Set Spring Knip 135,187.50 135,187.50 135,187.50
Jumlah Err:509 Err:509

14) 1 Unit Kusen + Jendela Almunium Kaca 5 mm, (Type J2)


11.800 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 2,135,977.00 2,135,977.00
0.510 M1 Pas. Slimar Almunium 3/8" (Hitam) 281,848.33 143,742.65 143,742.65
2.340 M2 Pas. Kaca Bening t = 10 mm Err:509 Err:509 Err:509
10.200 M1 Pas. Sealent (Karet Kaca) 191,162.50 1,949,857.50 1,949,857.50
2.000 Bh Pas. Engsel Jendela dan Ventilasi Almunium Err:509 Err:509 Err:509
2.000 Bh Pas. Friction Stay Jendela dan Ventilasi 346,200.00 692,400.00 692,400.00
1.000 Set Spring Knip 135,187.50 135,187.50 135,187.50
Jumlah Err:509 Err:509

15) 1 Unit Kusen + Jendela Almunium, Kaca 5 mm (Type J3)


6.290 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 1,138,584.35 1,138,584.35
10.232 M1 Pas. Slimar Almunium 3/8" (Hitam) 281,848.33 2,883,731.22 2,883,731.22
1.214 M2 Pas. Kaca Bening t = 10 mm Err:509 Err:509 Err:509
7.580 M1 Pas. Sealent (Karet Kaca) 191,162.50 1,449,011.75 1,449,011.75
4.000 Bh Pas. Engsel Jendela dan Ventilasi Almunium Err:509 Err:509 Err:509
4.000 Bh Pas. Friction Stay Jendela dan Ventilasi 346,200.00 1,384,800.00 1,384,800.00
2.000 Set Spring Knip 135,187.50 270,375.00 270,375.00
Jumlah Err:509 Err:509

16) 1 Unit Kusen + Jendela Almunium Kaca 5 mm, (Type JL1)


23.750 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 4,299,106.25 4,299,106.25
1.188 M1 Pas. Slimar Almunium 3/8" (Hitam) 281,848.33 334,694.90 334,694.90
3.120 M2 Pas. Kaca Bening t = 10 mm Err:509 Err:509 Err:509
36.000 M1 Pas. Sealent (Karet Kaca) 191,162.50 6,881,850.00 6,881,850.00
0.000 Bh Pas. Engsel Jendela dan Ventilasi Almunium Err:509 Err:509 Err:509
0.000 Bh Pas. Friction Stay Jendela dan Ventilasi 346,200.00 - -
0.000 Set Spring Knip 135,187.50 - -
0.870 Louvre Grill Alu 1.00 0.87 0.87
Jumlah Err:509 Err:509

17) 1 Unit Kusen + Jendela Almunium Kaca 5 mm, (Type JL2)


10.610 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 1,920,569.15 1,920,569.15
0.621 M1 Pas. Slimar Almunium 3/8" (Hitam) 281,848.33 174,971.45 174,971.45
2.099 M2 Pas. Kaca Bening t = 10 mm Err:509 Err:509 Err:509
11.120 M1 Pas. Sealent (Karet Kaca) 191,162.50 2,125,727.00 2,125,727.00
0.000 Bh Pas. Engsel Jendela dan Ventilasi Almunium Err:509 Err:509 Err:509
0.000 Bh Pas. Friction Stay Jendela dan Ventilasi 346,200.00 - -
0.000 Set Spring Knip 135,187.50 - -
1.875 Louvre Grill Alu 1.00
Jumlah Err:509 Err:509

19) 1 Unit Kusen + Jendela Almunium Kaca 5 mm, (Type JL3)


7.280 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 1,317,789.20 1,317,789.20
0.677 M1 Pas. Slimar Almunium 3/8" (Hitam) 281,848.33 190,754.95 190,754.95
1.076 M2 Pas. Kaca Bening t = 10 mm Err:509 Err:509 Err:509
7.860 M1 Pas. Sealent (Karet Kaca) 191,162.50 1,502,537.25 1,502,537.25
0.000 Bh Pas. Engsel Jendela dan Ventilasi Almunium Err:509 Err:509 Err:509
0.000 Bh Pas. Friction Stay Jendela dan Ventilasi 346,200.00 - -
0.000 Set Spring Knip 135,187.50 - -
0.878 Louvre Grill Alu 1.00
Jumlah Err:509 Err:509

20) 1 Unit Kusen + Ventilasi Almunium, Kaca 5 mm (Type V1)


2.400 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 434,436.00 434,436.00
0.240 M2 Pas. Kaca Flat Tempered T = 10 mm Err:509 Err:509 Err:509
2.200 M1 Pas. Sealent (Karet Kaca) 191,162.50 420,557.50 420,557.50
Jumlah Err:509 Err:509

21) 1 Unit Kusen + Ventilasi Almunium, Kaca 5 mm (Type V2)


4.420 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 800,086.30 800,086.30
0.480 M2 Pas. Kaca Flat Tempered T = 10 mm Err:509 Err:509 Err:509
4.400 M1 Pas. Sealent (Karet Kaca) 191,162.50 841,115.00 841,115.00
Jumlah Err:509 Err:509
22) 1 Unit Kusen + Ventilasi Almunium, Kaca 5 mm (Type V3)
7.200 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 1,303,308.00 1,303,308.00
1.740 M2 Pas. Kaca Bening t = 10 mm Err:509 Err:509 Err:509
7.000 M1 Pas. Sealent (Karet Kaca) 191,162.50 1,338,137.50 1,338,137.50
Jumlah Err:509 Err:509
23) 1 Unit Kusen + Ventilasi Almunium, Kaca 5 mm (Type V4)
14.900 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 2,697,123.50 2,697,123.50
3.489 M2 Pas. Kaca Bening t = 10 mm Err:509 Err:509 Err:509
15.440 M1 Pas. Sealent (Karet Kaca) 191,162.50 2,951,549.00 2,951,549.00
Jumlah Err:509 Err:509
24) 1 Unit Kusen + Ventilasi Almunium, Kaca 5 mm (Type CW1)
33.800 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 6,118,307.00 6,118,307.00
10.930 M2 Pas. Kaca Bening t = 10 mm Err:509 Err:509 Err:509
57.200 M1 Pas. Sealent (Karet Kaca) 191,162.50 10,934,495.00 10,934,495.00
Jumlah Err:509 Err:509
25) 1 Unit Kusen + Ventilasi Almunium, Kaca 5 mm (Type CW2)
25.000 M1 Pas. Kusen Aluminium 4" x 1,3/4' (Hitam) 181,015.00 4,525,375.00 4,525,375.00
10.010 M2 Pas. Kaca Bening t = 10 mm Err:509 Err:509 Err:509
46.400 M1 Pas. Sealent (Karet Kaca) 191,162.50 8,869,940.00 8,869,940.00
Jumlah Err:509 Err:509

26) Anl. Praktis 1 M1 Upah Kerja Pengelasan Pipa Stainless Stell


0.006 Kg Elektroda Baja 76,500.00 459.00 459.00
0.021 Hari Welding (min. 5 Jam) 90,000.00 1,890.00 1,890.00
0.080 Oh Pekerja 75,000.00 6,000.00 6,000.00
0.060 Oh Tukang 112,500.00 6,750.00 6,750.00
0.000 Oh Mandor 162,500.00 48.75 48.75
Jumlah 12,798.75 2,349.00 15,147.75

27) Anl. Praktis 1m1 Upah Kerja Pengelasan Pipa Ø 2 1/2" Stainless Stell
1.100 M¹ Pipa Stainless Stell Ø 2 1/2" P = 6 m 123,666.67 136,033.33 136,033.33
0.350 % Assesories Pipa Stainless Stell 123,666.67 43,283.33 43,283.33
1.100 M2 Upah Kerja Pengelasan Stainless Stell 13,277.50 14,605.25 14,605.25
Jumlah 14,605.25 179,316.67 193,921.92

28) Anl. Praktis 1m1 Upah Kerja Pengelasan Pipa Ø 1" Stainless Stell
1.100 M¹ Pipa Stainless Stell Ø 1" P = 6 m 76,500.00 84,150.00 84,150.00
0.350 % Assesories Pipa Stainless Stell 76,500.00 26,775.00 26,775.00
1.100 M2 Upah Kerja Pengelasan Stainless Stell 13,277.50 14,605.25 14,605.25
Jumlah 14,605.25 110,925.00 125,530.25