HARGA BASE

PEKERJAAN : JALAN AKSES SIAK IV

PT. AMRI PRATAMA KONTRAKTOR

PADAT TERHAMPAR
GEMBUR GEMBUR
DENGAN PEMADATAN
NO MATERIAL
HARGA HARGA HARGA
SAT SATUAN SAT SATUAN SAT SATUAN
(RP) (RP) (RP)

1 BASE A ( PI/ BERTANAH) TON 190.000,00 M3 323.000,00 M3 445.000,00


BASE A ( NON PI) TON 215.000,00 M3 365.000,00 M3 513.000,00
2 BASE B ( PI/ BERTANAH) TON 180.000,00 M3 306.000,00 M3 440.000,00
BASE B ( NON PI) TON 205.000,00 M3 348.000,00 M3 490.000,00
3 SIRTU TON 100.000,00 M3 M3
4 BASE C ( KOMPOSISI 30% DAN 70%) TON 95.000,00 M3 162.000,00 M3 250.000,00

TOTAL HARGA

PEKERJAAN : JALAN AKSES SIAK IV

NEGOSIASI
PADAT TERHAMPAR
GEMBUR GEMBUR
DENGAN PEMADATAN
NO MATERIAL
HARGA HARGA HARGA
SAT SATUAN SAT SATUAN SAT SATUAN
(RP) (RP) (RP)

1 BASE A ( PI/ BERTANAH) TON 165.000,00 M3 280.500,00 M3 378.550,00


BASE A ( NON PI) TON 185.000,00 M3 314.500,00 M3 415.950,00
2 BASE B ( PI/ BERTANAH) TON 155.000,00 M3 263.500,00 M3 359.850,00
BASE B ( NON PI) TON 165.000,00 M3 280.500,00 M3 378.550,00
3 SIRTU TON
4 BASE C ( KOMPOSISI 30% DAN 70%) TON

TOTAL HARGA

BASE A = 768 M3
BASE B = 1.034 M3