Anda di halaman 1dari 1

PT.

PLN (PERSERO)
UIP3B SUMATERA

REKAPITULASI MINGGUAN
PEKERJAAN :
1. PENGADAAAN DAN PEMASANGAN BAY TRAFO 150/20 kV TERMASUK KUBIKEL 20 kV SERTA PEMASANGAN TRAFO DAYA 150/20 kV DI GI MUARA SABAK
2. UPRATING BAY TRAFO 150/20 kV TERMASUK KUBIKEL 20 kV SERTA PEMASANGAN TRAFO DAYA 150/20 kV DI GI MUARO BUNGO
Periode :
MINGGU KE 36 = 26 Agustus 2019 s/d 01 September 2019

LOCAL AND TRANSPORTATION + INSTALLATION SERVICES


MATERIAL PRICE CIVIL AND FOUNDATION WORK
INSURANCE (ERECTION) OR WIRING
No. DESCRIPTION QUANTITY UNIT S/D S/D S/D S/D REALISASI TERPASANG
MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU
MINGGU MINGGU MINGGU MINGGU
YG LALU INI YG LALU INI YG LALU INI YG LALU INI
INI INI INI INI

A EXTENSION M/E 150 KV TRAFO BAY AT SABAK SUBSTATION 1 LOT - 20.238 20.238 - 1.182 1.182 0.083 - 0.083 21.503 0.083

B CIVIL WORK AT 150 kV MUARA SABAK SUBSTATION 1 LOT 4.558 - 4.558 4.558 4.558

C UPRATING M/E 150 KV TRAFO BAY AT MUARO BUNGO SUBSTATION 1 LOT - - - - - - 0.143 - 0.143 0.143 0.143

D CIVIL WORK AT 150 kV MUARO BUNGO SUBSTATION 1 LOT 1.515 - 1.515 1.515 1.515
REALISASI - 20.238 20.238 - 1.182 1.182 6.073 - 6.073 0.226 - 0.226 27.719 6.299
RENCANA
DEVIASI (+/-) 6.299
diperiksa & disetujui oleh, Dibuat oleh :
PT. PLN (PERSERO) UIP3BS KONTRAKTOR PELAKSANA
DIREKSI LAPANGAN PT. YUDITHA NUGRAHA KARYA

Wegig Agus Triyogo INDRA LASMANA


MANAGER UPT JAMBI PROJECT MANAGER