Terbilang : Tiga Milyar Dua Ratus Delapan Juta Lima Ratus Dua Ribu Rupiah
REKAPITULASI
Pekerjaan : Detail Design Tersier D.I Rentang Kanan
Bagian Pelaksana Kegiata : PPK Perencanaan dan Program
Satuan Kerja : Balai Besar Wilayah Sungai (BBWS) Cimanuk Cisanggarung.
Propinsi : Jawa Barat
Tahun Anggaran : 2018
Paket : B.K 3 Ki 2
I Pekerjaan Saluran B Aw 2 Ki
1.1 Sal. B.K 3 Ki 2 (B.Sadap- T1) P= 1811 m 1,551,086,087.59
1.2 Sal. B.K 3 Ki 2 (Kuarter B2) P= 539 m 93,438,766.00
1.3 Sal. B.K 3 Ki 2 (T1-K2) P= 480 m 429,463,374.84
1.4 Sal. B.K 3 Ki 2 (Kuarter B4) P= 495 m 49,355,586.09
1.5 Sal. B.K 3 Ki 2 (Kuarter B3) P= 392 m 26,820,319.08
1.6 Sal. B.K 3 Ki 2 (Kuarter A1) P= 582 m 89,860,254.23
1.7 Sal. B.K 3 Ki 2 (Kuarter A2) P= 231 m 57,128,762.77
1.8 Sal. B.K 3 Ki 2 (Kuarter A4) P= 395 m 69,179,549.08
1.9 Sal. B.K 3 Ki 2 (T1-K1, Kuarter A4) P= 500 m 374,581,804.40
Terbilang : Tiga Milyar Dua Ratus Delapan Juta Lima Ratus Dua Ribu Rupiah
RENCANA ANGGARAN BIAYA
Pekerj : Detail Design Tersier D.I Rentang Kanan
Tahun : 2018
Paket : B.K 3 Ki 2
I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi LA.04 ls 1.00 50,600,000.00 50,600,000.00
142,114,070.96
II PEKERJAAN POKOK
Sal. B.K 3 Ki 2 (B.Sadap- T1) P= 1811 m
1,375,000.00
3.1.1 Pengadaan dan Pemasangan Nomen Klatur LM bh 11.00 125,000.00
1,375,000.00
A.6 PEKERJAAN PINTU AIR
Biaya pemasangan (jika harga pintu air belum termasuk harga pemasangan)
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.620
2 Tukang las L.02 OH 0.310
3 Kepala tukang L.03 OH 0.031
4 Mandor L.04 OH 0.062
Jumlah Harga Tenaga Ker
B Bahan
1 Besi Pengaku M.54.g kg 1.860
2 Kawat Las Listrik M.62 kg 0.413
3 Campuran beton fc'= 19,3 Mpa (K-225) B.07a m3 0.012
4 Pas. Bata, mortar tipe N (1pc : 4 pp) P.02b m3 0.025
Jumlah Harga Baha
C Peralatan
1 Pintu air **) M.69xx bh 1.000
2 Tackle/Tripod tinggi 4-5m E.45 Sewa-hari 0.093
3 Mesin las listrik 250A, diesel E.22 Sewa-hari 0.093
Jumlah Harga Peralata
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15%
F Harga Satuan Pekerjaan per - bh (D+E)
**) Harga disesuaikan dengan jenis atau tipe pintu air
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.620
2 Tukang las L.02 OH 0.310
3 Kepala tukang L.03 OH 0.031
4 Mandor L.04 OH 0.062
Jumlah Harga Tenaga Ker
B Bahan
1 Besi Pengaku M.54.g kg 1.860
2 Kawat Las Listrik M.62 kg 0.413
3 Campuran beton fc'= 19,3 Mpa (K-225) B.07a m3 0.012
4 Pas. Bata, mortar tipe N (1pc : 4 pp) P.02b m3 0.025
Jumlah Harga Baha
C Peralatan
1 Pintu air **) M.69xx bh 1.000
2 Tackle/Tripod tinggi 4-5m E.45 Sewa-hari 0.093
3 Mesin las listrik 250A, diesel E.22 Sewa-hari 0.093
Jumlah Harga Peralata
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15%
F Harga Satuan Pekerjaan per - bh (D+E)
**) Harga disesuaikan dengan jenis atau tipe pintu air
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.680
2 Tukang las L.02 OH 0.340
3 Kepala tukang L.03 OH 0.034
4 Mandor L.04 OH 0.068
Jumlah Harga Tenaga Ker
B Bahan
1 Besi Pengaku M.54.g kg 2.040
2 Kawat Las Listrik M.62 kg 0.453
3 Campuran beton fc'= 19,3 Mpa (K-225) B.07a m3 0.014
4 Pas. Bata, mortar tipe N (1pc : 4 pp) P.02b m3 0.027
Jumlah Harga Baha
C Peralatan
1 Pintu air **) M.69xx bh 1.000
2 Tackle/Tripod tinggi 4-5m E.45 Sewa-hari 0.102
3 Mesin las listrik 250A, diesel E.22 Sewa-hari 0.102
Jumlah Harga Peralata
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15%
F Harga Satuan Pekerjaan per - bh (D+E)
**) Harga disesuaikan dengan jenis atau tipe pintu air
an TR = 1050mm
Harga Satuan Jumlah
(Rp) (Rp)
6 7 A.6.1 Pintu Angkat
Kep
B H H1 TR Pekerja Tukang
Tuk
55,125.00 34,177.50
No. (mm) (mm) (mm) (mm) (OH) (OH) (O
68,906.00 21,360.86
(a). (b).
82,688.00 2,563.33
1. 200 250 500 1050 0,620 0,310 0,0
96,469.00 5,981.08
2. 250 300 600 1150 0,620 0,310 0,0
Jumlah Harga Tenaga Kerja 64,082.77
3. 300 300 600 1150 0,680 0,340 0,0
4. 300 400 800 1350 0,740 0,370 0,0
12,000.00 22,320.00
5. 300 500 1000 1550 0,750 0,375 0,0
24,750.00 10,221.75
6. 300 600 1200 1750 0,800 0,400 0,0
887,720.45 10,652.65
7. 350 300 600 1150 0,660 0,330 0,0
746,114.11 18,652.85
8. 350 350 700 1250 0,680 0,340 0,0
Jumlah Harga Bahan 61,847.25
9. 350 400 800 1350 0,720 0,360 0,0
10. 400 300 600 1150 0,670 0,335 0,0
-
11. 400 400 800 1350 0,730 0,365 0,0
450,000.00 41,850.00
12. 400 500 1000 1550 0,780 0,390 0,0
385,000.00 35,805.00
13. 400 600 1200 1750 0,840 0,420 0,0
Jumlah Harga Peralatan 77,655.00
14. 500 400 800 1350 0,770 0,385 0,0
203,585.01
15. 500 500 1000 1550 0,830 0,415 0,0
xD 30,537.75
16. 500 600 1200 1750 0,900 0,450 0,0
234,122.77
an TR = 1150mm
Harga Satuan Jumlah
(Rp) (Rp) A.6.1 Pintu Angkat
6 7 B H H1 TR Pekerja Tukang
an TR = 1150mm
Harga Satuan Jumlah
A.6.1 Pintu Angkat
(Rp) (Rp)
K
B H H1 TR Pekerja Tukang
6 7 T
No. (mm) (mm) (mm) (mm) (OH) (OH)
55,125.00 37,485.00 (a). (b).
68,906.00 23,428.04 1. 200 250 500 1050 0,620 0,310
82,688.00 2,811.39 2. 250 300 600 1150 0,620 0,310
96,469.00 6,559.89 3. 300 300 600 1150 0,680 0,340
Jumlah Harga Tenaga Kerja 70,284.32 4. 300 400 800 1350 0,740 0,370
5. 300 500 1000 1550 0,750 0,375
12,000.00 24,480.00 6. 300 600 1200 1750 0,800 0,400
24,750.00 11,211.75 7. 350 300 600 1150 0,660 0,330
887,720.45 12,428.09 8. 350 350 700 1250 0,680 0,340
746,114.11 20,145.08 9. 350 400 800 1350 0,720 0,360
Jumlah Harga Bahan 68,264.92 10. 400 300 600 1150 0,670 0,335
11. 400 400 800 1350 0,730 0,365
- 12. 400 500 1000 1550 0,780 0,390
450,000.00 45,900.00 13. 400 600 1200 1750 0,840 0,420
385,000.00 39,270.00 14. 500 400 800 1350 0,770 0,385
Jumlah Harga Peralatan 85,170.00 15. 500 500 1000 1550 0,830 0,415
223,719.24 16. 500 600 1200 1750 0,900 0,450
xD 33,557.89
257,277.13
Kepala Besi Kawat Camp. Pas. Tackle Mesin
TR Pekerja Tukang Mandor
Tukang Pengaku Las Beton Bata /Tripod Las
(mm) (OH) (OH) (OH) (OH) (kg) (kg) (m3) (m3) Sewa-hari Sewa-hari
(a). (b). (c). (d). (e). (f). (g). (h). (i). (j).
0 1050 0,620 0,310 0,0310 0,0620 1,860 0,413 0,012 0,025 0,093 0,093
0 1150 0,620 0,310 0,0310 0,0620 1,860 0,413 0,012 0,025 0,093 0,093
0 1150 0,680 0,340 0,0340 0,0680 2,040 0,453 0,014 0,027 0,102 0,102
0 1350 0,740 0,370 0,0370 0,0740 2,220 0,493 0,015 0,030 0,111 0,111
0 1550 0,750 0,375 0,0375 0,0750 2,250 0,500 0,015 0,030 0,113 0,113
0 1750 0,800 0,400 0,0400 0,0800 2,400 0,533 0,016 0,032 0,120 0,120
0 1150 0,660 0,330 0,0330 0,0660 1,980 0,440 0,013 0,026 0,099 0,099
0 1250 0,680 0,340 0,0340 0,0680 2,040 0,453 0,014 0,027 0,102 0,102
0 1350 0,720 0,360 0,0360 0,0720 2,160 0,480 0,014 0,029 0,108 0,108
0 1150 0,670 0,335 0,0335 0,0670 2,010 0,447 0,013 0,027 0,101 0,101
0 1350 0,730 0,365 0,0365 0,0730 2,190 0,487 0,015 0,029 0,110 0,110
0 1550 0,780 0,390 0,0390 0,0780 2,340 0,520 0,016 0,031 0,117 0,117
0 1750 0,840 0,420 0,0420 0,0840 2,520 0,560 0,017 0,034 0,126 0,126
0 1350 0,770 0,385 0,0385 0,0770 2,310 0,513 0,015 0,031 0,116 0,116
0 1550 0,830 0,415 0,0415 0,0830 2,490 0,553 0,017 0,033 0,125 0,125
0 1750 0,900 0,450 0,0450 0,0900 2,700 0,600 0,018 0,036 0,135 0,135
Tackle Mesin
/Tripod Las
Sewa-hari Sewa-hari
(i). (j).
0,093 0,093
0,093 0,093
0,102 0,102
0,111 0,111
0,113 0,113
0,120 0,120
0,099 0,099
0,102 0,102
0,108 0,108
0,101 0,101
0,102 0,102
0,111 0,111
0,113 0,113
0,120 0,120
0,099 0,099
0,102 0,102
0,108 0,108
0,101 0,101
0,110 0,110
0,117 0,117
0,126 0,126
0,116 0,116
0,125 0,125
0,135 0,135
Tackle Mesin
/Tripod Las
Sewa-hari Sewa-hari
(i). (j).
0,093 0,093
0,093 0,093
0,102 0,102
0,111 0,111
0,113 0,113
0,120 0,120
0,099 0,099
0,102 0,102
0,108 0,108
0,101 0,101
0,110 0,110
0,117 0,117
0,126 0,126
0,116 0,116
0,125 0,125
0,135 0,135
A.6 PEKERJAAN PINTU AIR
Biaya pemasangan (jika harga pintu air belum termasuk
Nama Saluran : Sal. B.K 3 Ki 2 (Kuarter B2) P= 539 m No. Ruas : Hm. 18+11 s/d 23+50
LUAS PENAMPANG (m2) VOLUME PEKERJAN
No. Profil Jarak (m) Galian Timbunan Siaran Kupasan Kupasan Kupasan +
Galian Timbunan Beton Siaran Kupasan (m') tanah tanah Beton 1pc :2pp
tanah tanah 1pc :2pp (m3) (m2) (m3) Timbunan
(m3) (m3) ( m2 ) (m3)
18+11 0.000 2.580 0.00 0.00 4.49
39 0.00 106.86 0.00 0.00 361.53 72.31 179.17
18+50 0.000 2.900 0.00 0.00 4.78
50 0.00 120.00 0.00 0.00 479 95.80 215.80
19 0.000 1.900 0.00 0.00 4.8
50 0.00 74.25 0.00 0.00 417.5 83.50 157.75
19+50 0.000 1.070 0.00 0.00 3.55
50 0.00 52.25 0.00 0.00 356.5 71.30 123.55
50 0.00 52.25 0.00 0.00 356.5 71.30 123.55
20 0.000 1.020 0.00 0.00 3.58
68 0.68 53.72 0.00 0.00 459 91.80 145.52
20+68 0.020 0.560 0.00 0.00 3.17
32 0.32 23.36 0.00 0.00 214.08 42.82 66.18
21 0.000 0.900 0.00 0.00 3.52
50 0.00 61.00 0.00 0.00 367 73.40 134.40
21+50 0.000 1.540 0.00 0.00 3.82
50 0.00 89.00 0.00 0.00 396.5 79.30 168.30
22 0.000 2.020 0.00 0.00 4.11
50 0.00 88.50 0.00 0.00 400 80.00 168.50
22+50 0.000 1.520 0.00 0.00 3.89
50 0.00 69.50 0.00 0.00 380 76.00 145.50
23 0.000 1.260 0.00 0.00 3.71
50 1.25 49.50 0.00 0.00 354.5 70.90 120.40
23+50 0.050 0.720 0.00 0.00 3.38
Nama Saluran : Sal. B.K 3 Ki 2 (T1-K2) P= 480 m No. Ruas : Hm. 0 s/d 4+80
LUAS PENAMPANG (m2) VOLUME PEKERJAN
No. Profil Jarak (m) Galian Timbunan Siaran Kupasan +
Galian Timbunan Siaran Kupasan tanah tanah Beton 1pc :2pp Kupasan Kupasan
tanah tanah Beton 1pc :2pp (m1) (m3) (m2) (m3) Timbunan
(m3) (m3) ( m2 ) (m3)
0 0.000 8.400 0.14 1.94 8.18
45 0.00 344.25 6.30 87.30 724.5 144.90 489.15
0+45 0.000 6.900 0.14 1.94 7.92
55 0.00 309.93 7.70 106.70 856.9 171.38 481.31
1 0.000 4.370 0.14 1.94 7.66
55 0.00 235.68 7.70 106.70 820.6 164.12 399.80
1+55 0.000 4.200 0.14 1.94 7.26
45 0.00 190.35 6.30 87.30 658.35 131.67 322.02
2 0.000 4.260 0.14 1.94 7.37
28 0.00 143.22 3.92 54.32 437.92 87.58 230.80
2+28 0.000 5.970 0.14 1.94 8.27
22 0.00 103.84 3.08 42.68 340.78 68.16 172.00
2+50 0.000 3.470 0.14 1.94 7.22
16 0.00 53.52 2.24 31.04 226.72 45.34 98.86
2+66 0.000 3.220 0.14 1.94 6.95
15 0.00 51.98 2.10 29.10 214.65 42.93 94.91
2+81 0.000 3.710 0.14 1.94 7.36
52 0.00 177.32 7.28 100.88 780.52 156.10 333.42
3+33 0.000 3.110 0.14 1.94 7.65
17 0.00 46.92 2.38 32.98 257.72 51.54 98.46
3+50 0.000 2.410 0.14 1.94 7.51
50 0.00 133.75 7.00 97.00 770.5 154.10 287.85
4+06 0.000 2.940 0.14 1.94 7.9
50 0.00 151.75 7.00 97.00 828.5 165.70 317.45
4+50 0.000 3.130 0.14 1.94 8.67
30 2.85 69.15 4.20 58.20 474.9 94.98 164.13
4+80 0.190 1.480 0.14 1.94 7.16
Nama Saluran : Sal. B.K 3 Ki 2 (Kuarter B3) P= 392 m No. Ruas : Hm. 0 s/d 3+92
LUAS PENAMPANG (m2) VOLUME PEKERJAN
No. Profil Jarak (m) Galian Timbunan Siaran Kupasan Galian Timbunan Beton Siaran Kupasan Kupasan Kupasan +
Beton tanah tanah 1pc :2pp Timbunan
tanah tanah 1pc :2pp (m1) (m3) (m3)
(m3)
( m2 ) (m2) (m3)
(m3)
0 0.500 0.000 0.00 0 0
50 25.00 0.00 0.00 0.00 0 0.00 0.00
0+50 0.500 0.000 0.00 0 0
50 25.00 0.00 0.00 0.00 0 0.00 0.00
1 0.500 0.000 0.00 0 0
50 24.75 0.00 0.00 0.00 0 0.00 0.00
1+50 0.490 0.000 0.00 0 0
50 24.50 0.00 0.00 0.00 0 0.00 0.00
2 0.490 0.000 0.00 0 0
18 8.82 0.00 0.00 0.00 0 0.00 0.00
2+18 0.490 0.000 0.00 0 0
7 3.43 0.00 0.00 0.00 0 0.00 0.00
2+25 0.490 0.000 0.00 0 0
25 12.38 0.00 0.00 0.00 0 0.00 0.00
2+50 0.500 0.000 0.00 0 0
50 25.00 0.00 0.00 0.00 0 0.00 0.00
3 0.500 0.000 0.00 0 0
44 22.00 0.00 0.00 0.00 0 0.00 0.00
3+44 0.500 0.000 0.00 0 0
48 23.52 0.00 0.00 0.00 0 0.00 0.00
3+92 0.480 0.000 0.00 0 0
Nama Saluran : Sal. B.K 3 Ki 2 (Kuarter A1) P= 582 m No. Ruas : Hm. 0+00 s/d 5+82
LUAS PENAMPANG (m2) VOLUME PEKERJAN
No. Profil Jarak (m) Kupasan Galian Timbunan Siaran Kupasan Kupasan
Galian Timbunan Beton Siaran tanah tanah Beton 1pc :2pp Kupasan +
tanah tanah 1pc :2pp (m1) (m3) (m3) (m3) ( m2 ) (m2) (m3) Timbunan
(m3)
0+00 0.000 0.000 0.00 0 0
41 0.00 14.76 0.00 0.00 136.94 27.39 42.15
0+41 0.000 0.720 0.00 0 3.34
29 0.00 17.11 0.00 0.00 186.76 37.35 54.46
0+70 0.000 0.460 0.00 0 3.1
22 0.00 12.87 0.00 0.00 148.5 29.70 42.57
0+92 0.000 0.710 0.00 0 3.65
42 0.00 27.09 0.00 0.00 246.54 49.31 76.40
1+34 0.000 0.580 0.00 0 2.22
16 0.00 7.68 0.00 0.00 62.24 12.45 20.13
1+50 0.000 0.380 0.00 0 1.67
50 0.00 30.00 0.00 0.00 256.5 51.30 81.30
2 0.000 0.820 0.00 0 3.46
31 0.00 29.14 0.00 0.00 218.86 43.77 72.91
2+31 0.000 1.060 0.00 0 3.6
45 0.00 44.33 0.00 0.00 316.35 63.27 107.60
2+76 0.000 0.910 0.00 0 3.43
49 0.00 60.03 0.00 0.00 367.5 73.50 133.53
3+25 0.000 1.540 0.00 0 4.07
25 0.00 38.25 0.00 0.00 202.5 40.50 78.75
3+50 0.000 1.520 0.00 0 4.03
50 0.00 86.50 0.00 0.00 415 83.00 169.50
4 0.000 1.940 0.00 0 4.27
50 0.00 98.25 0.00 0.00 421.5 84.30 182.55
4+50 0.000 1.990 0.00 0 4.16
50 0.00 93.75 0.00 0.00 422.5 84.50 178.25
5 0.000 1.760 0.00 0 4.29
50 0.00 104.75 0.00 0.00 437 87.40 192.15
5+50 0.000 2.430 0.00 0 4.45
32 0.00 57.44 0.00 0.00 207.36 41.47 98.91
5+82 0.000 1.160 0.00 0 2.03
Nama Saluran : Sal. B.K 3 Ki 2 (Kuarter A4) P= 395 m No. Ruas : Hm. 8+13 s/d 11+88
LUAS PENAMPANG (m2) VOLUME PEKERJAN
No. Profil Jarak (m) Galian Timbunan Siaran Kupasan +
Galian Timbunan Siaran Kupasan tanah tanah Beton 1pc :2pp Kupasan Kupasan
tanah tanah Beton 1pc :2pp (m1) (m3) (m2) (m3) Timbunan
(m3) (m3) ( m2 ) (m3)
8+13 0.760 0.470 0.00 0 3.16
37 27.57 32.56 0.00 0.00 266.03 53.21 85.77
8+50 0.730 1.290 0.00 0 4.03
32 23.36 40.48 0.00 0.00 256 51.20 91.68
8+82 0.730 1.240 0.00 0 3.97
14 10.22 16.94 0.00 0.00 110.04 22.01 38.95
8+96 0.730 1.180 0.00 0 3.89
12 8.76 12.30 0.00 0.00 91.2 18.24 30.54
9+8 0.730 0.870 0.00 0 3.71
25 18.25 22.63 0.00 0.00 185.5 37.10 59.73
9+33 0.730 0.940 0.00 0 3.71
17 10.37 15.81 0.00 0.00 125.97 25.19 41.00
9+50 0.490 0.920 0.00 0 3.7
50 30.50 50.25 0.00 0.00 375.5 75.10 125.35
10 0.730 1.090 0.00 0 3.81
37 27.01 34.23 0.00 0.00 278.24 55.65 89.87
10+37 0.730 0.760 0.00 0 3.71
46 33.58 38.41 0.00 0.00 343.62 68.72 107.13
10+83 0.730 0.910 0.00 0 3.76
55 40.15 55.83 0.00 0.00 424.05 84.81 140.64
11 0.730 1.120 0.00 0 3.95
17 10.63 21.76 0.00 0.00 137.53 27.51 49.27
11+53 0.520 1.440 0.00 0 4.14
53 26.77 44.79 0.00 0.00 319.06 63.81 108.60
11+88 0.490 0.250 0.00 0 1.88
Nama Saluran : Sal. B.K 3 Ki 2 (T1-K1, Kuarter A4) P= 500 m No. Ruas : Hm. 0+00 s/d 5
LUAS PENAMPANG (m2) VOLUME PEKERJAN
d3 0.15 x 0.72
d4 0.15 x 0.72
L1
Plesteran : lantai 1.50
dinding
d1 0.72
d2 0.72
d3 0.72
d4 0.72
Jarak penulangan Dinding 15 cm
Jarak penulangan Lantai 15 cm
P (cm) L (cm)
180 180
pembesian dinding horizontal = 11.00
pembesian dinding vertikal = 13
total pembesian dinding =
Grand Total Pembesian semua dinding =
P (cm) L (cm)
175 175
pembesian lantai arah X = 12
pembesian lantai arah Y = 12
total pembesian lantai =
P(cm) L(cm)
175 175
1.75 1.75
VOLUME BEKISTING
bekisting lantai = 0.70 + 0.70
TOTAL
2 B.K 3 Ki 2 (K1)
d3 0.15 x 0.52
d4 0.15 x 0.52
L1
Plesteran : lantai 1.50
dinding
d1 0.52
d2 0.52
d3 0.52
d4 0.52
Jarak penulangan Dinding 15 cm
Jarak penulangan Lantai 15 cm
P (cm) L (cm)
180 180
pembesian dinding horizontal = 11.00
pembesian dinding vertikal = 13
total pembesian dinding =
Grand Total Pembesian semua dinding =
P (cm) L (cm)
175 175
pembesian lantai arah X = 12
pembesian lantai arah Y = 12
total pembesian lantai =
TOTAL
3 B.K 3 Ki 2 (K2)
d3 0.15 x 0.63
d4 0.15 x 0.63
L1
Plesteran : lantai 1.50
dinding
d1 0.63
d2 0.63
d3 0.63
d4 0.63
Jarak penulangan Dinding 15 cm
Jarak penulangan Lantai 15 cm
P (cm) L (cm)
180 180
pembesian dinding horizontal = 11.00
pembesian dinding vertikal = 13
total pembesian dinding =
Grand Total Pembesian semua dinding =
P (cm) L (cm)
175 175
pembesian lantai arah X = 12
pembesian lantai arah Y = 12
total pembesian lantai =
P(cm) L(cm)
175 175
1.75 1.75
VOLUME BEKISTING
bekisting lantai = 0.70 + 0.70
TOTAL
Gal. Tanah Pas. Batu Plester Siaran Beton
( M3 ) ( M3 ) ( M2 ) ( M2 ) ( M3 )
panjang
x 1.80 = 2.33
tebal
x 0.15 = 0.34
(B0 x tebal beton)
x 1.90 = 0.21
x 1.90 = 0.21
(L1 x tebal beton)
x 1.90 = 0.21
x 1.90 = 0.21
B0 + Tebal beton x 2 1.16
x 1.90 = 2.85
x 1.90 = 2.74
x 1.90 = 2.74
x 1.90 = 2.74
x 1.90 = 2.74
h (cm)
150
bh 20 m
bh 20 m
39 m
157 m
62.09 kg
h (cm)
20
bh 20 m
bh 20 m
41 m
16.13 kg
= 78.22 kg
= ### kg
h(cm) t(cm)
150 20.00
1.5 0.2
= 1.40 m2
= 10.50 m2
= 11.90 m2
= 11.90 m2
2.33 13.79 2.32
44.32 262.09 44.02
x 1.90 = 1.98
x 1.90 = 1.98
x 1.90 = 1.98
x 1.90 = 1.98
h (cm)
150
bh 20 m
bh 20 m
39 m
157 m
62.09 kg
h (cm)
20
bh 20 m
bh 20 m
41 m
16.13 kg
= 78.22 kg
= ### kg
h(cm) t(cm)
150 20.00
1.5 0.2
= 1.40 m2
= 10.50 m2
= 11.90 m2
= 11.90 m2
1.68 10.75 1.86
32.01 204.33 35.35
panjang
x 1.80 = 2.04
tebal
x 0.15 = 0.34
(B0 x tebal beton)
x 1.90 = 0.18
x 1.90 = 0.18
(L1 x tebal beton)
x 1.90 = 0.18
x 1.90 = 0.18
B0 + Tebal beton x 2 1.06
x 1.90 = 2.85
x 1.90 = 2.39
x 1.90 = 2.39
x 1.90 = 2.39
x 1.90 = 2.39
h (cm)
150
bh 20 m
bh 20 m
39 m
157 m
62.09 kg
h (cm)
20
bh 20 m
bh 20 m
41 m
16.13 kg
= 78.22 kg
= ### kg
h(cm) t(cm)
150 20.00
1.5 0.2
= 1.40 m2
= 10.50 m2
= 11.90 m2
= 11.90 m2
2.04 12.43 2.11
38.78 236.09 40.12
Timbunan Bongkaran
( M3 ) ( M3 )
Total Beton
2.54 13.79
1.38
Timbunan Bongkaran
( M3 ) ( M3 )
Total Beton
2.01 10.75
1.08
Timbunan Bongkaran
( M3 ) ( M3 )
Total Beton
2.30 12.43
1.24
REKAPITULASI PERHITUNGAN BOQ SALURAN
Nama Saluran : Sal. B.Jw 3 Ka (WTA) No. Ruas : Hm. 0+00 s/d Hm. 7+09
LUAS PENAMPANG (m ) 2
VOLUME PEKERJAN
No. Jarak Galian Timbunan
Profil (m) Galian Timbunan Pas. Batu Pas. Batu Urugan tanah tanah Pas. Batu Plesteran Pas. Batu Urugan
Plesteran
tanah tanah kali Kali pasir
(m3) (m3) kali (m3) (m2) Kali (m2) pasir (m3)
7+09 0.00
0.49 0.00 0.00 0.00
41 0.00 24.60 0.00 0.00
0.00
7+50 0.71 0.00 0.00 0.00
50 0.00 38.00 0.00 0.00
8+00 0.00 0.81 0.00 0.00 0.00
50 0.00 29.75 0.00 0.00
8+50 0.00 0.38 0.00 0.00 0.00
50 0.00 24.75 0.00 0.00
9+00 0.00 0.61 0.00 0.00 0.00
50 0.00 34.00 0.00 0.00
9+50 0.00 0.75 0.00 0.00 0.00
50 0.00 30.00 0.00 0.00
10+00 0.00 0.45 0.00 0.00 0.00
50 0.00 22.00 0.00 0.00
10+50 0.00 0.43 0.00 0.00 0.00
50 0.00 20.75 0.00 0.00
11+00 0.00 0.40 0.00 0.00 0.00
50 8.00 15.25 0.00 0.00
11+50 0.16 0.21 0.00 0.00 0.00
50 0.00 17.75 0.00 0.00
12+00 0.00 0.50 0.00 0.00 0.00
28 0.00 14.14 0.00 0.00
12+28 0.00 0.51 0.00 0.00 0.00
0+14 0.00
0.00 0.00 0.00 0.00
18 0.00 0.63 0.00 0.00
0.00
0+32 0.07 0.00 0.00 0.00
18 0.00 1.62 0.00 0.00
0+50 0.00 0.11 0.00 0.00 0.00
50 20.00 2.75 0.00 0.00
1+00 0.40 0.00 0.00 0.00 0.00
50 22.50 0.00 0.00 0.00
1+50 0.45 0.00 0.00 0.00 0.00
50 25.00 0.00 0.00 0.00
2+00 0.50 0.00 0.00 0.00 0.00
50 32.50 0.00 0.00 0.00
2+50 0.65 0.00 0.00 0.00 0.00
50 17.50 0.00 0.00 0.00
3+00 0.35 0.00 0.00 0.00 0.00
50 20.00 0.00 0.00 0.00
3+50 0.40 0.00 0.00 0.00 0.00
50 16.00 9.50 0.00 0.00
4+00 0.32 0.38 0.00 0.00 0.00
50 9.00 12.00 0.00 0.00
4+50 0.18 0.10 0.00 0.00 0.00
50 2.00 11.25 0.00 0.00
5+00 0.04 0.35 0.00 0.00 0.00
50 48.50 8.75 0.00 0.00
5+50 0.97 0.00 0.00 0.00 0.00
50 59.00 0.00 0.00 0.00
6+00 1.18 0.00 0.00 0.00 0.00
50 60.00 0.00 0.00 0.00
6+50 1.20 0.00 0.00 0.00 0.00
50 60.75 3.50 0.00 0.00
7+00 1.23 0.14 0.00 0.00 0.00
7+00 1.23
0.14 0.00 0.00 0.00
50 7.50 3.50 0.00 0.00
0.15
7+50 0.00 0.00 0.00 0.00
50 80.00 0.00 0.00 0.00
8+00 1.60 0.00 0.00 0.00 0.00
50 83.50 0.00 0.00 0.00
8+50 1.67 0.00 0.00 0.00 0.00
0+00 0.00
0.32 0.00 0.00 0.00
50 0.00 36.50 0.00 0.00
0.00
0+50 1.14 0.00 0.00 0.00
50 0.00 56.00 0.00 0.00
1+00 0.00 1.10 0.00 0.00 0.00
50 0.00 55.00 0.00 0.00
1+50 0.00 1.10 0.00 0.00 0.00
50 0.00 52.50 0.00 0.00
2+00 0.00 1.00 0.00 0.00 0.00
50 0.00 50.75 0.00 0.00
2+50 0.00 1.03 0.00 0.00 0.00
50 0.00 51.50 0.00 0.00
3+00 0.00 1.03 0.00 0.00 0.00
50 0.00 50.25 0.00 0.00
3+50 0.00 0.98 0.00 0.00 0.00
50 0.00 48.75 0.00 0.00
4+00 0.00 0.97 0.00 0.00 0.00
50 0.00 49.25 0.00 0.00
4+50 0.00 1.00 0.00 0.00 0.00
38 0.00 34.96 0.00 0.00
4+88 0.00 0.84 0.00 0.00 0.00
56 0.00 48.16 0.00 0.00
5+44 0.00 0.88 0.00 0.00 0.00
56 0.00 48.16 0.00 0.00
6+00 0.00 0.84 0.00 0.00 0.00
50 0.00 40.75 0.00 0.00
6+50 0.00 0.79 0.00 0.00 0.00
50 0.00 39.00 0.00 0.00
7+00 0.00 0.77 0.00 0.00 0.00
47 0.00 35.02 0.00 0.00
7+47 0.00 0.72 0.00 0.00 0.00
0+00 0.00
0.69 0.00 0.00 0.00
50 0.00 31.25 0.00 0.00
0.00
0+50 0.56 0.00 0.00 0.00
50 0.00 29.75 0.00 0.00
1+00 0.00 0.63 0.00 0.00 0.00
50 0.00 31.50 0.00 0.00
1+50 0.00 0.59 0.00 0.00 0.00
50 0.00 29.50 0.00 0.00
2+00 0.00 0.50 0.00 0.00 0.00
50 0.00 26.25 0.00 0.00
2+50 0.00 0.55 0.00 0.00 0.00
50 0.00 28.75 0.00 0.00
3+00 0.00 0.60 0.00 0.00 0.00
50 0.00 28.75 0.00 0.00
3+50 0.00 0.55 0.00 0.00 0.00
50 11.00 27.25 0.00 0.00
4+00 0.22 0.54 0.00 0.00 0.00
50 0.00 26.75 0.00 0.00
4+50 0.00 0.53 0.00 0.00 0.00
38 5.70 22.61 0.00 0.00
5+00 0.15 0.66 0.00 0.00 0.00
56 14.00 36.12 0.00 0.00
5+50 0.25 0.63 0.00 0.00 0.00
56 19.60 35.00 0.00 0.00
6+00 0.35 0.62 0.00 0.00 0.00
50 13.50 27.25 0.00 0.00
6+50 0.27 0.47 0.00 0.00 0.00
50 13.00 23.75 0.00 0.00
7+00 0.26 0.48 0.00 0.00 0.00
47 12.22 24.44 0.00 0.00
7+50 0.26 0.56 0.00 0.00 0.00
47 7.29 19.51 0.00 0.00
7+92 0.05 0.27 0.00 0.00 0.00
0+00 0.00
0.00 0.00 0.00 0.00
50 0.00 9.25 0.00 0.00
0.00
0+50 0.37 0.00 0.00 0.00
50 16.00 24.75 0.00 0.00
1+00 0.32 0.62 0.00 0.00 0.00
50 11.00 28.50 0.00 0.00
1+50 0.22 0.52 0.00 0.00 0.00
50 10.50 27.50 0.00 0.00
2+00 0.21 0.58 0.00 0.00 0.00
50 9.00 27.50 0.00 0.00
2+50 0.18 0.52 0.00 0.00 0.00
50 8.50 24.00 0.00 0.00
3+00 0.17 0.44 0.00 0.00 0.00
50 9.00 20.50 0.00 0.00
3+50 0.18 0.38 0.00 0.00 0.00
50 17.00 22.75 0.00 0.00
4+00 0.34 0.53 0.00 0.00 0.00
50 15.00 24.50 0.00 0.00
4+50 0.30 0.45 0.00 0.00 0.00
50 14.00 20.50 0.00 0.00
5+00 0.28 0.37 0.00 0.00 0.00
50 9.00 18.50 0.00 0.00
5+50 0.18 0.37 0.00 0.00 0.00
50 14.50 18.75 0.00 0.00
6+00 0.29 0.38 0.00 0.00 0.00
50 14.00 21.25 0.00 0.00
6+50 0.28 0.47 0.00 0.00 0.00
50 14.00 24.25 0.00 0.00
7+00 0.28 0.50 0.00 0.00 0.00
50 11.75 23.75 0.00 0.00
7+50 0.19 0.45 0.00 0.00 0.00
0+00 0.00
1.02 0.00 0.00 0.00
50 9.50 37.75 0.00 0.00
0.19
0+50 0.49 0.00 0.00 0.00
50 9.00 26.50 0.00 0.00
1+00 0.18 0.57 0.00 0.00 0.00
50 8.50 28.25 0.00 0.00
1+50 0.17 0.56 0.00 0.00 0.00
50 8.00 29.00 0.00 0.00
2+00 0.16 0.60 0.00 0.00 0.00
50 8.50 30.75 0.00 0.00
2+50 0.17 0.63 0.00 0.00 0.00
50 8.50 30.50 0.00 0.00
3+00 0.17 0.59 0.00 0.00 0.00
50 8.00 30.25 0.00 0.00
3+50 0.16 0.62 0.00 0.00 0.00
50 7.50 32.25 0.00 0.00
4+00 0.15 0.67 0.00 0.00 0.00
50 7.50 26.75 0.00 0.00
4+50 0.15 0.40 0.00 0.00 0.00
50 9.00 25.75 0.00 0.00
5+00 0.18 0.63 0.00 0.00 0.00
50 10.00 28.25 0.00 0.00
5+50 0.20 0.50 0.00 0.00 0.00
50 9.00 28.75 0.00 0.00
6+00 0.18 0.65 0.00 0.00 0.00
50 7.50 30.25 0.00 0.00
6+50 0.15 0.56 0.00 0.00 0.00
50 12.50 30.75 0.00 0.00
7+00 0.25 0.67 0.00 0.00 0.00
50 11.50 35.00 0.00 0.00
7+55 0.21 0.73 0.00 0.00 0.00
0+00 0.00
0.00 0.00 0.00 0.00
50 48.50 0.00 0.00 0.00
0.97
0+50 0.00 0.00 0.00 0.00
50 51.00 0.00 0.00 0.00
1+00 1.02 0.00 0.00 0.00 0.00
50 40.00 0.00 0.00 0.00
1+50 0.80 0.00 0.00 0.00 0.00
50 60.00 0.00 0.00 0.00
2+00 1.20 0.00 0.00 0.00 0.00
50 105.00 0.00 0.00 0.00
2+50 2.10 0.00 0.00 0.00 0.00
50 145.00 0.00 0.00 0.00
3+00 2.90 0.00 0.00 0.00 0.00
50 96.00 0.00 0.00 0.00
3+50 1.92 0.00 0.00 0.00 0.00
50 155.00 0.00 0.00 0.00
4+00 3.10 0.00 0.00 0.00 0.00
50 49.00 0.00 0.00 0.00
4+50 0.98 0.00 0.00 0.00 0.00
50 70.00 0.00 0.00 0.00
5+00 1.40 0.00 0.00 0.00 0.00
50 77.50 0.00 0.00 0.00
5+50 1.55 0.00 0.00 0.00 0.00
50 86.00 0.00 0.00 0.00
6+00 1.72 0.00 0.00 0.00 0.00
50 47.50 0.00 0.00 0.00
6+50 0.95 0.00 0.00 0.00 0.00
50 37.50 0.00 0.00 0.00
7+00 0.75 0.00 0.00 0.00 0.00
50 41.00 0.00 0.00 0.00
7+50 0.89 0.00 0.00 0.00 0.00
7+50 0.89
0.00 0.00 0.00 0.00
50 40.00 0.00 0.00 0.00
0.80
8+00 0.00 0.00 0.00 0.00
50 39.50 0.00 0.00 0.00
8+50 0.79 0.00 0.00 0.00 0.00
50 40.00 0.00 0.00 0.00
9+00 0.80 0.00 0.00 0.00 0.00
50 65.00 0.00 0.00 0.00
9+50 1.30 0.00 0.00 0.00 0.00
50 51.50 0.00 0.00 0.00
10+00 1.03 0.00 0.00 0.00 0.00
50 54.00 0.00 0.00 0.00
10+50 1.08 0.00 0.00 0.00 0.00
50 59.00 0.00 0.00 0.00
11+00 1.18 0.00 0.00 0.00 0.00
50 57.50 0.00 0.00 0.00
11+50 1.15 0.00 0.00 0.00 0.00
50 65.00 0.00 0.00 0.00
12+00 1.30 0.00 0.00 0.00 0.00
50 70.00 0.00 0.00 0.00
12+50 1.40 0.00 0.00 0.00 0.00
50 78.00 0.00 0.00 0.00
13+00 1.56 0.00 0.00 0.00 0.00
50 77.00 0.00 0.00 0.00
13+50 1.54 0.00 0.00 0.00 0.00
50 70.00 2.75 0.00 0.00
14+00 1.40 0.11 0.00 0.00 0.00
50 66.00 5.00 0.00 0.00
14+50 1.32 0.09 0.00 0.00 0.00
50 68.00 11.00 0.00 0.00
15+00 1.40 0.35 0.00 0.00 0.00
50 63.75 40.00 0.00 0.00
15+50 1.15 1.25 0.00 0.00 0.00
15+50 1.15
1.25 0.00 0.00 0.00
50 85.00 48.75 0.00 0.00
1.70
16+00 0.70 0.00 0.00 0.00
50 71.50 42.25 0.00 0.00
16+50 1.43 0.99 0.00 0.00 0.00
24 15.60 11.88 0.00 0.00
16+74 0.65 0.00 0.00 0.00 0.00
1 2 Beton K225
1 L.A = ( 0.99 + 1.02 ) x 0.07 = 0.14 m2
L.B =( 0.40 + 0.46 ) x 0.07 / 2 = 0.03 m2
3 4 Panjang = 2.50
0.17 m2
Panjang = 2.50
Volume = 0.19 x 2.50 = 0.48 m3
Volume 1 = 0.37 x
0.15 x 0.3 = 0.02 m3
TOTAL = VOLUME + VOLUME 1 = 0.50 m3
CL Saluran
Panjang = 0.64
Volume = 0.12 x 0.64 = 0.075 m3
Volume 1 = 0.14 x
0.10 x 0.2 = 0.003 m3
TOTAL = VOLUME + VOLUME 1 = 0.078 m3
TYPE 2 B.
TYPE 1
L.A =( 0.15 x 0.50 ) = 0.08 m2
L.B =( 0.15 x 0.50 ) = 0.08 m2
L.C =( 0.15 x 0.50 ) = 0.08 m2
0.23 m2
Panjang = 2.42
Volume = 0.23 x 2.42 = 0.54 m3
TYPE 3 TYPE 4 A
C.
L.A =( 0.15 x 0.65 ) x 2.00 = 0.20 m2
0.20 m2
Panjang = 0.50
Volume = 0.20 x 0.50 = 0.10 m3
TYPE 4 B
5 BOKS
L.A = 1.8 x 1.60 x 0.15 = 0.43 m3
L.B = 0.7 x 1.80 x 0.15 = 0.19 m3
L.C = ( 0.7 x 1.30 x 0.15 ) = 0.12 m3
- ( 0.6 x 0.2 x 0.15 )
L.D = 0.7 x 1.80 x 0.15 = 0.14 m3
- ( 0.6 x 0.6 x 0.15 )
L.E = ( 0.6 x 0.60 ) / 2 x 0.15 x 2 = 0.05 m3
0.93 m3
TOTAL BETON = 3.19 m3
Bekisting
1. K.A = ( 0.99 x 2.00 ) + ( 1.02 x 2 ) = 4.88 m
+ 0.40 + 0.46
4.88 m
Panjang = 2.50
Volume = 4.88 x 2.50 = 12.20 m2
5. BOKS
K.A = 1.80 x 0.85 = 1.53 m2
K.B = ( 1.60 x 0.85 - 0.2 x 0.6 ) = 1.24 m2
K.C = ( 1.80 x 0.85 - 0.6 x 0.6 ) = 1.20 m2
K.D = 1.50 x 0.70 = 1.05 m2
K.E = ( 1.30 x 0.70 - 0.2 x 0.6 ) = 0.79 m2
K.F = ( 1.50 x 0.70 - 0.6 x 0.6 ) = 0.72 m2
K.G = 1.60 x 0.15 = 0.24 m2
K.H = 0.60 x 0.15 x 6 = 0.54 m2
K.I = 0.70 x 0.15 x 2 = 0.21 m2
K.J = 0.60 x 0.60 x 2 = 0.72 m2
TOTAL = 8.24 m2
Pembesian
1. Panjang Besi = 2.43 m'
Panjang = 2.50 m'
Volume = 2.43 x 2.50 x 34.76 / 11.34 = 18.62 Kg
5. Boks
a. Panjang Besi = 1.80 m'
Panjang = 1.60 m'
Volume = 1.80 x 1.60 x 34.76 / 11.34 = 8.83 Kg
b. Panjang Besi = 1.80 m'
Panjang = 0.85 m'
Volume = 1.80 x 0.85 x 34.76 / 11.34 = 4.69 Kg
2. Timbunan
a. Boks
Volume /m2 = 2.051 m2
Panjang Boks = 1.8 m
Volume = 2.051 x 1.8 = 3.69 m3
b. Saluran
Volume /m2 = 2.51 m2
Panjang Saluran = 2.5 m
Volume = 2.51 x 2.5 = 6.28 m3
REKAP PERHITUNGAN
1. Volume Beton = 3.19 m3
2
2. Volume Bekisting = 57.08 m
3. Volume Pembesian = 119.96 Kg
4. Volume Galian = 1.35 m3
5. Volume Timbunan = 21.48 m3
6. Nomenklatur = 1.00 bh
7. Pintu
a. Pintu Angkat B = 20 Cm, H = 60 Cm = 2 bh
b. Pintu Angkat B = 55 Cm, H = 60 Cm = 1 bh
Nama Bangunan : Box Tersier B.Aw 2Ki (T2)
No.
PROFIL SKET PENAMPANG MELINTANG URAIAN PERHITUNGAN
Beton K225
2
1 1. L.A = ( 0.81 + 0.78 ) x 0.07 = 0.11 m2
1 2.50
+5.07
0.15
0.15 1.50 0.15
2 +4.92
L.B =( 0.30 + 0.36 ) x 0.07 / 2 = 0.02
0.13
m2
m2
1:1
+4.52
1.50
0.30 +4.52 0.20 +4.27 +4.42 0.30
Panjang = 2.50
1:1
0.20
+5.07 0.15 +4.97
B
0.24
Volume = 0.13 x 2.50 = 0.34 m3
1:1
+4.47 0.20
1:1
R1.20
+4.97
3
1
2.80
2. L.A =( 0.71 + 0.68 ) x 0.07 = 0.10 m2
2
L.B =( 0.15 + 0.27 ) x 0.07 = 0.03 m2
L.C =( 0.44 + 0.30 ) x 0.15 / 2 = 0.06 m2
C
L Saluran
0.18 m2
Pintu Angkat
b = 0.20m
h = 0.20m
+5.07 +5.07
0.30
+4.77 +4.77
+4.92 +4.92 Panjang = 2.50
0.25 +4.62 +4.62 0.30
+4.52 +4.52 +4.42
0.07 +4.27
0.20
0.07
Volume = 0.18 x 2.50 = 0.46 m3
2.50 0.15
1.50 0.15 2.50
BETON K 225 DENGAN
Volume 1 = 0.36 x
0.15 x 0.3 = 0.02 m3
TULANGAN WIRE MESH M06
4. BOKS
L.A = 1.8 x 1.80 x 0.15 = 0.49 m3
L.B = 0.55 x 1.80 x 0.15 = 0.15 m3
L.C =( 0.55 x 1.50 x 0.15 ) = 0.11 m3
- ( 0.5 x 0.2 x 0.15 )
TYPE 1 TYPE 2
L.D = 0.55 x 1.50 x 0.15 = 0.11 m3
- ( 0.5 x 0.2 x 0.15 )
L.E =( 0.55 x 0.55 ) / 2 x 0.15 x 2 = 0.05 m3
0.90 m3
TOTAL BETON = 2.26 m3
Bekisting
TYPE 3 1. K.A = ( 0.78 x 2.00 ) + ( 0.81 x 2 ) = 3.84 m
+ 0.30 + 0.36
3.84 m
Panjang = 2.50
Volume = 3.84 x 2.50 = 9.60 m2
2
4. BOKS
K.A = 1.80 x 0.70 = 1.26 m2
K.B = ( 1.80 x 0.70 - 0.2 x 0.5 ) = 1.16 m2
K.C = ( 1.80 x 0.70 - 0.2 x 0.5 ) = 1.16 m2
K.D = 1.50 x 0.55 = 0.83 m2
K.E = ( 1.50 x 0.55 - 0.2 x 0.5 ) = 0.73 m2
K.F = ( 1.50 x 0.55 - 0.2 x 0.5 ) = 0.73 m2
K.G = 0.15 x 1.80 = 0.27 m2
K.H = 0.50 x 0.15 x 4 = 0.30 m2
K.I = 0.55 x 0.15 x 2 = 0.17 m2
K.J = 0.55 x 0.55 x 2 = 0.61 m2
2 TOTAL = 7.20 m2
Pembesian
1. Panjang Besi = 1.91 m'
Panjang = 2.50 m'
Volume = 1.91 x 2.50 x 34.76 / 11.34 = 14.64 Kg
4. Boks
a. Panjang Besi = 1.80 m'
Panjang = 1.80 m'
Volume = 1.80 x 1.80 x 34.76 / 11.34 = 9.93 Kg
b. Saluran
Volume /m2 = 0.51 m2
Panjang Saluran = 2.5 m
Volume = 0.51 x 2.5 = 1.28 m3
0.20
B
0.40
C Beton K225
3 3
1 L.A = ( 0.99 + 1.02 ) x 0.07 = 0.14 m2
L.B =( 0.40 + 0.46 ) x 0.07 / 2 = 0.03 m2
+5.59
1:1
+5.69
1: 1
+5.69
0.17 m2
4
2
+5.09
3
0.64
0.15
Panjang = 2.50
r,0.75m
0.50
2.50
+5.04
1
0.59 Volume = 0.17 x 2.50 = 0.43 m3
+5.84 +5.59
### 0.45
1:1
+5.14
+5.84 +5.59
1
2.50 0.15 1.50 0.15
2.50
1 2 L.A =( 0.71 + 0.74 ) x 0.07 = 0.10 m2
2
2
Pintu Angkat
b = 0.20m
h = 0.30m
POTONGAN A -A
Skala 50
CL Saluran 3 L.A =( 0.92 + 0.89 ) x 0.07 = 0.13 m2
Pintu Angkat
b = 0.20m
h = 0.30m L.B =( 0.15 + 0.27 ) x 0.07 = 0.03 m2
0.40 1.50 0.15
L.C =( 0.54 + 0.40 ) x 0.15 / 2 = 0.07 m2
+5.84
+5.54
+5.59
+5.29 0.30
0.23 m2
+5.14 0.10 +5.09 0.20
0.14
0.10
0.15 2.50
0.15 1.50
BETON K 225 DENGAN
TULANGAN WIRE MESH M06
Panjang = 2.50
POTONGAN A-B = 0.23 x 2.50 = 0.57 m3
Skala 50 Volume
C
L Saluran
Volume 1 = 0.37 x0.15 x 0.4 = 0.02 m3
Pintu Angkat
b = 0.45m
h = 0.30m TOTAL = VOLUME + VOLUME 1 = 0.59 m3
0.15 1.50 0.15
+5.84
+5.54 1
1 +5.69 4 A.
1:1
0.30
+5.39
5.14
0.15
+4.89
+5.04 0.35
0.07
L.A =( 0.26 + 0.20 ) x 0.07 / 2 = 0.02 m2
0.15 1.50 0.15 2.50 0.15 L.B =( 0.71 + 0.74 ) x 0.07 = 0.10 m2
BETON K 225 DENGAN
TULANGAN WIRE MESH M06 0.12 m2
POTONGAN A-C
Skala 1 : 50
Panjang = 0.64
Volume = 0.12 x 0.64 = 0.075 m3
Volume 1 = 0.14 x0.10 x 0.2 = 0.003 m3
TOTAL = VOLUME + VOLUME 1 = 0.078 m3
B.
L.A =( 0.15 x 0.50 ) = 0.08 m2
L.B =( 0.15 x 0.50 ) = 0.08 m2
L.C =( 0.15 x 0.50 ) = 0.08 m2
0.23 m2
Panjang = 2.42
C.
L.A =( 0.15 x 0.65 ) x 2 = 0.20 m2
0.20 m2
Panjang = 0.50
Volume = 0.20 x 0.50 = 0.10 m3
TYPE 3 TYPE 4 A
5 BOKS
L.A = 1.8 x 1.60 x 0.15 = 0.43 m3
L.B = 0.7 x 1.80 x 0.15 = 0.19 m3
L.C = ( 0.7 x 1.30 x 0.15 ) = 0.12 m3
- ( 0.6 x 0.2 x 0.15 )
L.D = 0.7 x 1.80 x 0.15 = 0.15 m3
TYPE 4 B
- ( 0.5 x 0.6 x 0.15 )
L.E = ( 0.6 x 0.60 ) / 2 x 0.15 x 2 = 0.05 m3
0.95 m3
TOTAL BETON = 2.98 m3
Bekisting
1. K.A = ( 0.99 x 2.00 ) + ( 1.02 x 2 ) = 4.88 m
+ 0.40 + 0.46
4.88 m
Panjang = 2.50
Volume = 4.88 x 2.50 = 12.20 m2
5. BOKS
K.A = 1.80 x 0.85 = 1.53 m2
K.B = ( 1.60 x 0.85 - 0.2 x 0.6 ) = 1.24 m2
K.C = ( 1.80 x 0.85 - 0.5 x 0.6 ) = 1.26 m2
K.D = 1.50 x 0.70 = 1.05 m2
K.E = ( 1.30 x 0.70 - 0.2 x 0.6 ) = 0.79 m2
K.F = ( 1.50 x 0.70 - 0.5 x 0.6 ) = 0.78 m2
K.G = 1.60 x 0.15 = 0.24 m2
K.H = 0.60 x 0.15 x 6 = 0.54 m2
K.I = 0.70 x 0.15 x 2 = 0.21 m2
K.J = 0.60 x 0.60 x 2 = 0.72 m2
TOTAL = 8.36 m2
Pembesian
1. Panjang Besi = 2.43 m'
Panjang = 2.50 m'
Volume = 2.43 x 2.50 x 34.76 / 11.34 = 18.62 Kg
5. Boks
a. Panjang Besi = 1.80 m'
Panjang = 1.60 m'
Volume = 1.80 x 1.60 x 34.76 / 11.34 = 8.83 Kg
b. Saluran
2
Volume /m2 = 2.74 m
Panjang Saluran = 2.5 m
Volume = 2.74 x 2.5 = 6.85 m3
2
Volume /m2 = 0.03 m
Panjang Saluran = 2.5 m
Volume = 0.03 x 2.5 = 0.08 m3
2. Timbunan
a. Saluran
2
Volume /m2 = 0.12 m
Panjang Saluran = 2.5 m
Volume = 0.12 x 2.5 = 0.30 m3
2
Volume /m2 = 0.42 m
Panjang Saluran = 2.5 m
Volume = 0.42 x 2.5 = 1.05 m3
REKAP PERHITUNGAN
1. Volume Beton = 2.98 m3
2
2. Volume Bekisting = 53.99 m
3. Volume Pembesian = 115.23 Kg
4. Volume Galian = 13.77 m3
3
5. Volume Timbunan = 2.47 m
6. Nomenklatur = 1.00 bh
7. Pintu
a. Pintu Angkat B = 20 Cm, H = 60 Cm = 2 bh
b. Pintu Angkat B = 45 Cm, H = 60 Cm = 1 bh
4 0.15
0.64
Beton K225
B
0.50 +4.48
0.59
1
0.15 1.50
2.50 0.15
+3.98 0.20 1 L.A = ( 0.92 + 0.95 ) x 0.07 = 0.13 m2
+4.68 r,0.75m +4.53
L.B =( 0.40 + 0.46 ) x 0.07 / 2 = 0.03 m2
1:1
1:1
+4.03
+4.03 0.45 +3.93 +3.93 0.30
0.16 m2
1:1
0.20
1:1
1
+4.68 +4.53
3 Panjang = 2.50
2.50
+3.98
r,0.50
2.50
2
2
+4.48
+4.48
1:1 1:1
0.20
CL Saluran 0.12 m2
B
Pintu Angkat
b = 0.45m
h = 0.25m
+4.68
0.30
+4.68
+4.38 +4.38 +4.53 +4.53 Panjang = 2.50
0.35 +4.23 +4.23 0.30
+4.03 +4.03
0.07 +3.78
+3.93 0.30
0.07 Volume = 0.12 x 2.50 = 0.294 m3
2.50 0.15
CL Saluran
3 L.A =( 0.85 + 0.82 ) x 0.07 = 0.12 m2
Pintu Angkat
b = 0.20m
h = 0.25m L.B =( 0.15 + 0.27 ) x 0.07 = 0.03 m2
0.40
0.15 1.50
L.C =( 0.44 + 0.30 ) x 0.15 / 2 = 0.06 m2
+4.68
0.30
+4.48
+4.18
+4.48
+4.18
+4.38 0.20 m2
0.20 +3.98 +4.03
0.14
0.10
2.50 0.15
1.50 0.15
BETON K 225 DENGAN
TULANGAN WIRE MESH M06
Panjang = 2.50
POTONGAN B-B Volume = 0.20 x 2.50 = 0.50 m3
Skala 1 : 50
C
L Saluran Volume 1 = 0.37 x0.15 x 0.3 = 0.02 m3
Pintu Angkat
b = 0.20m
h = 0.25m TOTAL = VOLUME + VOLUME 1 = 0.52 m3
+4.68
0.30 +4.38 +4.38 +4.48 +4.48 4 A.
0.35 +4.18 +4.18 0.30
+4.03 +4.03
0.15
+3.98 0.20 L.A =( 0.26 + 0.20 ) x 0.07 / 2 = 0.02 m2
2.50 0.15 1.50
0.15 2.50
L.B =( 0.71 + 0.74 ) x 0.07 = 0.10 m2
BETON K 225 DENGAN
TULANGAN WIRE MESH M06 0.12 m2
POTONGAN A-C
Skala 1 : 50
Panjang = 0.61
Volume = 0.12 x 0.61 = 0.072 m3
Volume 1 = 0.14 x0.10 x 0.2 = 0.003 m3
TOTAL = VOLUME + VOLUME 1 = 0.075 m3
B.
L.A =( 0.15 x 0.50 ) = 0.08 m2
L.B =( 0.15 x 0.50 ) = 0.08 m2
L.C =( 0.15 x 0.50 ) = 0.08 m2
0.23 m2
Panjang = 2.65
Volume = 0.23 x 2.65 = 0.60 m3
C.
L.A =( 0.15 x 0.65 ) x 2 = 0.20 m2
0.20 m2
Panjang = 0.50
Volume = 0.20 x 0.50 = 0.10 m3
5 BOKS
TYPE 1 TYPE 2 L.A = 1.8 x 1.60 x 0.15 = 0.43 m3
L.B = 0.65 x 1.80 x 0.15 = 0.18 m3
L.C = ( 0.65 x 1.30 x 0.15 ) = 0.09 m3
- ( 0.6 x 0.5 x 0.15 )
L.D = 0.65 x 1.80 x 0.15 = 0.16 m3
- ( 0.6 x 0.2 x 0.15 )
L.E = ( 0.65 x 0.65 ) / 2 x 0.15 x 2 = 0.06 m3
TYPE 3 TYPE 4 A 0.92 m3
TOTAL BETON = 2.91 m3
Bekisting
1. K.A = ( 0.95 x 2.00 ) + ( 0.92 x 2 ) = 4.60 m
+ 0.40 + 0.46
4.60 m
Panjang = 2.50
Volume = 4.60 x 2.50 = 11.50 m2
5. BOKS
K.A = 1.80 x 0.80 = 1.44 m2
K.B = ( 1.60 x 0.80 - 0.5 x 0.6 ) = 1.03 m2
K.C = ( 1.80 x 0.80 - 0.2 x 0.6 ) = 1.33 m2
K.D = 1.50 x 0.65 = 0.98 m2
K.E = ( 1.30 x 0.65 - 0.5 x 0.6 ) = 0.60 m2
K.F = ( 1.50 x 0.65 - 0.2 x 0.6 ) = 0.87 m2
K.G = 1.60 x 0.15 = 0.24 m2
K.H = 0.55 x 0.15 x 6 = 0.50 m2
K.I = 0.65 x 0.15 x 2 = 0.20 m2
K.J = 0.65 x 0.65 x 2 = 0.85 m2
TOTAL = 8.02 m2
Pembesian
1. Panjang Besi = 2.29 m'
Panjang = 2.50 m'
Volume = 2.29 x 2.50 x 34.76 / 11.34 = 17.55 Kg
5. Boks
a. Panjang Besi = 1.80 m'
Panjang = 1.60 m'
Volume = 1.80 x 1.60 x 34.76 / 11.34 = 8.83 Kg
b. Saluran
2
Volume /m2 = 0.11 m
Panjang Saluran = 2.5 m
Volume = 0.11 x 2.5 = 0.28 m3
2
Volume /m2 = 0.32 m
Panjang Saluran = 2.5 m
Volume = 0.32 x 2.5 = 0.80 m3
2. Timbunan
a. Boks
2
Volume /m2 = 0.058 m
Panjang Boks = 1.8 m
Volume = 0.058 x 1.8 = 0.10 m3
b. Saluran
2
Volume /m2 = 0.46 m
Panjang Saluran = 2.5 m
Volume = 0.46 x 2.5 = 1.15 m3
REKAP PERHITUNGAN
1. Volume Beton = 2.91 m3
2. Volume Bekisting = 51.64 m2
3. Volume Pembesian = 111.20 Kg
4. Volume Galian = 1.89 m3
3
5. Volume Timbunan = 3.13 m
6. Nomenklatur = 1.00 bh
7. Pintu
a. Pintu Angkat B = 20 Cm, H = 55 Cm = 2 bh
b. Pintu Angkat B = 45 Cm, H = 55 Cm = 1 bh
B Beton K225
1
m2
2.50 0.15 2.50
+3.51 0.15 1.50 +3.41 2
1. L.A = ( 0.85 + 0.88 ) x 0.07 = 0.12
+4.11 +4.01
A
0.40
+3.51
0.40
A L.B =( 0.30 + 0.36 ) x 0.07 / 2 = 0.02 m2
0.40
1
1 r,0.50 r,0.50 +3.41 Panjang = 2.50
+3.46
+3.51
2.50
+3.46 +3.46
+3.96
3
B
0.20
3 L.B =( 0.15 + 0.27 ) x 0.07 = 0.03 m2
L.C =( 0.44 + 0.30 ) x 0.15 / 2 = 0.06 m2
C
0.21 m2
L Saluran
Pintu Angkat
b = 0.45m
h = 0.25m
0.15 1.50
0.40
L.B =( 0.71 + 0.74 ) x 0.07 = 0.10 m2
+4.48 +4.48
+4.68 0.12 m2
+4.38
0.30 +4.18 +4.18
0.20 +3.98 +4.03
0.14
0.10
2.50 0.15 Panjang = 2.50
1.50 0.15
BETON K 225 DENGAN
TULANGAN WIRE MESH M06
Volume = 0.12 x 2.50 = 0.294 m3
Volume 1 = 0.14 x
0.10 x 0.2 = 0.003 m3
POTONGAN B-B
Skala 1 : 50 TOTAL = VOLUME + VOLUME 1 = 0.297 m3
4. BOKS
L.A = 1.8 x 1.60 x 0.15 = 0.43 m3
L.B = 0.6 x 1.80 x 0.15 = 0.16 m3
L.C =( 0.6 x 1.50 x 0.15 ) = 0.12 m3
- ( 0.6 x 0.2 x 0.15 )
L.D = 0.6 x 1.30 x 0.15 = 0.08 m3
- ( 0.6 x 0.4 x 0.15 )
L.E =( 0.6 x 0.60 ) / 2 x 0.15 x 2 = 0.05 m3
0.85 m3
TOTAL BETON = 2.04 m3
Bekisting
1. K.A = ( 0.85 x 2.00 ) + ( 0.88 x 2 ) = 4.12 m
+ 0.30 + 0.36
4.12 m
Panjang = 2.50
Volume = 4.12 x 2.50 = 10.30 m2
TYPE 3
4. BOKS
K.A = 1.80 x 0.75 = 1.35 m2
K.B = ( 1.80 x 0.75 - 0.2 x 0.6 ) = 1.24 m2
K.C = ( 1.60 x 0.75 - 0.4 x 0.6 ) = 0.98 m2
K.D = 1.50 x 0.60 = 0.90 m2
K.E = ( 1.50 x 0.60 - 0.2 x 0.6 ) = 0.79 m2
K.F = ( 1.30 x 0.60 - 0.4 x 0.6 ) = 0.56 m2
K.G = 0.15 x 1.60 = 0.24 m2
K.H = 0.55 x 0.15 x 4 = 0.33 m2
K.I = 0.60 x 0.15 x 2 = 0.18 m2
K.J = 0.60 x 0.60 x 2 = 0.72 m2
TOTAL = 7.29 m2
5
Pembesian
1. Panjang Besi = 2.05 m'
Panjang = 2.50 m'
Volume = 2.05 x 2.50 x 34.76 / 11.34 = 15.71 Kg
4. Boks
a. Panjang Besi = 1.80 m'
Panjang = 1.60 m'
Volume = 1.80 x 1.60 x 34.76 / 11.34 = 8.83 Kg
b. Saluran
2
Volume /m2 = 1.66 m
Panjang Saluran = 2.5 m
Volume = 1.66 x 2.5 = 4.15 m3
2
Volume /m2 = 1.66 m
Panjang Saluran = 2.5 m
Volume = 1.66 x 2.5 = 4.15 m3
2. Timbunan
a. Boks
Volume /m2 = 0.47 m2
Panjang Boks = 1.8 m
Volume = 0.47 x 1.8 = 0.85 m3
REKAP PERHITUNGAN
1. Volume Beton = 2.04 m3
2. Volume Bekisting = 38.29 m2
3. Volume Pembesian = 68.19 Kg
4. Volume Galian = 13.82 m3
3
5. Volume Timbunan = 0.85 m
6. Nomenklatur = 1.00 bh
7. Pintu
a. Pintu Angkat B = 20 Cm, H = 55 Cm = 1 bh
b. Pintu Angkat B = 40 Cm, H = 55 Cm = 1 bh
4 2.80 2
Beton K225
R1.20
+3.77
C
1 +3.32 2.50
+3.27 0.20
1:1
A
0.40 +3.92 0.24 +3.82
A
L.B =( 0.30 + 0.36 ) x 0.07 / 2 = 0.02 m2
+3.32
0.20
m2
0.30
0.30 +3.32
0.20
+3.22 +3.22 0.30
0.14
3
0.40 +3.92 0.15 1.50 0.15 2.50 +3.82
Panjang = 2.50
r,0.50
1 r,0.50 +3.58
+3.27
+3.32
= 0.14 x 2.50 = 0.36 m3
2.50
2
Volume
2
+3.77
+3.27 +3.27
+3.77
+3.92 +3.92
0.30 +3.62 +3.62
+3.82
+3.52
+3.82
+3.52 0.30
Panjang = 2.50
0.30 +3.32 +3.32 +3.22 0.30
0.07 +3.07 0.07 Volume = 0.12 x 2.50 = 0.294 m3
2.50 0.15
1.50 0.15 2.50 Volume 1 = 0.14 x 0.10 x 0.2 = 0.003 m3
BETON K 225 DENGAN
TULANGAN WIRE MESH M06
Pintu Angkat
Pintu Angkat
b = 0.20m
3 L.A =( 0.85 + 0.82 ) x 0.07 = 0.12 m2
b = 0.30m h = 0.20m
h = 0.20m
L.B =( 0.15 + 0.27 ) x 0.07 = 0.03 m2
+3.92
0.30
+3.92
+3.62 +3.62
+3.77 +3.77 L.C =( 0.44 + 0.30 ) x 0.15 / 2 = 0.06 m2
+3.47 +3.47 0.30
0.30 +3.32 +3.32
0.15
+3.27 0.20
0.20 m2
2.50
2.50 0.15 1.50 0.15
BETON K 225 DENGAN
TULANGAN WIRE MESH M06
POTONGAN A-B
Skala 1 : 50 Panjang = 2.50
C
L Saluran Volume = 0.20 x 2.50 = 0.50 m3
Pintu Angkat
Pintu Angkat
b = 0.20m
h = 0.20m
b = 0.20m
h = 0.20m Volume 1 = 0.37 x0.15 x 0.3 = 0.02 m3
TOTAL = VOLUME + VOLUME 1 = 0.52 m3
+3.92
+3.92 +3.77
+3.62 +3.77
0.30 +3.62
+3.47 +3.47 0.30
0.30 +3.32 +3.32 +3.27 0.20
0.15 4. L.A =( 0.26 + 0.20 ) x 0.07 / 2 = 0.02 m2
2.50
2.50 0.15 1.50 0.15 L.B =( 0.71 + 0.74 ) x 0.07 = 0.10 m2
BETON K 225 DENGAN
TULANGAN WIRE MESH M06
POTONGAN A-C
Skala 1 : 50
0.30 +3.32 +3.32 +3.27 0.20
0.15
2.50
2.50 0.15 1.50 0.15
BETON K 225 DENGAN
TULANGAN WIRE MESH M06
POTONGAN A-C 0.12 m2
Skala 1 : 50
Panjang = 4.92
Volume = 0.12 x 4.92 = 0.579 m3
Volume 1 = 0.14 x
0.10 x 0.2 = 0.003 m3
TOTAL = VOLUME + VOLUME 1 = 0.581 m3
5 BOKS
L.A = 1.8 x 1.60 x 0.15 = 0.43 m3
L.B =( 0.6 x 1.80 x 0.15 ) = 0.15 m3
- ( 0.2 x 0.5 x 0.15 )
L.C =( 0.6 x 1.30 x 0.15 ) = 0.09 m3
- ( 0.3 x 0.5 x 0.15 )
L.D = 0.6 x 1.80 x 0.15 = 0.15 m3
- ( 0.2 x 0.5 x 0.15 )
L.E =( 0.6 x 0.60 ) / 2 x 0.15 x 2 = 0.05 m3
0.87 m3
TOTAL BETON = 2.63 m3
Bekisting
1. K.A = ( 0.85 x 2.00 ) + ( 0.88 x 2 ) = 4.12 m
+ 0.30 + 0.36
4.12 m
Panjang = 2.50
Volume = 4.12 x 2.50 = 10.30 m2
TYPE 1 TYPE 2
2. K.A =( 0.71 x 2.00 ) + ( 0.74 x 2 ) = 3.36 m
+ 0.20 + 0.26
3.36 m
Panjang = 2.50
Volume = 3.36 x 2.50 = 8.40 m2
5. BOKS
K.A = ( 1.80 x 0.75 - 0.2 x 0.5 ) = 1.25 m2
K.B = ( 1.60 x 0.75 - 0.3 x 0.5 ) = 1.05 m2
K.C = ( 1.80 x 0.75 - 0.2 x 0.5 ) = 1.25 m2
6
K.D = ( 1.50 x 0.60 - 0.2 x 0.5 ) = 0.80 m2
K.E = ( 1.30 x 0.60 - 0.3 x 0.5 ) = 0.63 m2
K.F = ( 1.50 x 0.60 - 0.2 x 0.5 ) = 0.80 m2
K.G = 1.60 x 0.15 = 0.24 m2
K.H = 0.50 x 0.15 x 6 = 0.45 m2
K.I = 0.60 x 0.15 x 2 = 0.18 m2
K.J = 0.60 x 0.60 x 2 = 0.72 m2
TOTAL = 7.37 m2
Pembesian
1. Panjang Besi = 2.05 m'
Panjang = 2.50 m'
Volume = 2.05 x 2.50 x 34.76 / 11.34 = 15.71 Kg
2. Timbunan
a. Saluran
Volume /m2 = 1.97 m2
Panjang Boks = 2.5 m
Volume = 1.97 x 2.5 = 4.93 m3
2
Volume /m2 = 1.14 m
Panjang Boks = 2.5 m
Volume = 1.14 x 2.5 = 2.85 m3
REKAP PERHITUNGAN
1. Volume Beton = 2.63 m3
2. Volume Bekisting = 54.90 m2
3. Volume Pembesian = 93.28 Kg
4. Volume Galian = 0.07 m3
5. Volume Timbunan = 13.40 m3
6. Nomenklatur = 1.00 bh
7. Pintu
a. Pintu Angkat B = 20 Cm, H = 50 Cm = 1 bh
b. Pintu Angkat B = 30 Cm, H = 50 Cm = 1 bh
Nama Bangunan : Box Tersier B.Aw 2Ki (T7)
No.
PROFIL SKET PENAMPANG MELINTANG URAIAN PERHITUNGAN
Beton K225
B
1 +3.18 2.50 0.15 1.50 0.15 2.50 +3.08 2
1. L.A = ( 0.85 + 0.88 ) x 0.07 = 0.12 m2
0.40 +3.78 +3.58 0.40
A
L.B =( 0.30 + 0.36 ) x 0.07 / 2 = 0.02 m2
A
+3.18
0.14 m2
0.22
0.30 +3.18 +3.08 +3.08 0.20
0.20
0.40
1
+3.78
1 r,0.50 r,0.50
2 +3.58
+3.08
0.40
Panjang = 2.50
+3.13
+3.18
2
Volume = 0.14 x 2.50 = 0.36 m3
3
+3.63
+3.13 +3.13
+3.63
2. L.A =( 0.71 + 0.68 ) x 0.07 = 0.10 m2
+3.13
L.B =( 0.15 + 0.27 ) x 0.07 = 0.03 m2
3 0.20 3
B
C
L.C =( 0.34 + 0.20 ) x 0.15 / 2 = 0.04 m2
L Saluran
Pintu Angkat
b = 0.22m
h = 0.20m
0.17 m2
+3.78
+3.78
0.30 +3.48 +3.58 +3.58
+3.48
0.30 +3.28 +3.28 0.30
0.07
+3.18 +3.18
+2.93
+3.08 0.20
0.07 Panjang = 2.50
2.50 0.15
1.50 0.15 2.50
Volume = 0.17 x 2.50 = 0.42 m3
BETON K 225 DENGAN
TULANGAN WIRE MESH M06
Volume 1 = 0.36 x
0.15 x 0.2 = 0.01 m3
POTONGAN A -A
Skala 1 : 50
TOTAL = VOLUME + VOLUME 1 = 0.43 m3
+3.78
0.30
+3.63
+3.33
+3.48 Panjang = 2.50
0.20 +3.13 +3.18
0.14
0.10 Volume = 0.12 x 2.50 = 0.294 m3
2.50
0.15 1.50
BETON K 225 DENGAN
TULANGAN WIRE MESH M06
0.15
Volume 1 = 0.14 x
0.10 x 0.2 = 0.003 m3
TOTAL = VOLUME + VOLUME 1 = 0.297 m3
POTONGAN B-B
Skala 1 : 50
4. BOKS
L.A = 1.8 x 1.60 x 0.15 = 0.43 m3
L.B = 0.6 x 1.80 x 0.15 = 0.16 m3
L.C =( 0.6 x 1.30 x 0.15 ) = 0.10 m3
- ( 0.5 x 0.2 x 0.15 )
L.D = 0.6 x 1.80 x 0.15 = 0.15 m3
- ( 0.5 x 0.2 x 0.15 )
L.E =( 0.6 x 0.60 ) / 2 x 0.15 x 2 = 0.05 m3
0.90 m3
TOTAL BETON = 1.98 m3
Bekisting
1. K.A = ( 0.85 x 2.00 ) + ( 0.88 x 2 ) = 4.12 m
+ 0.30 + 0.36
4.12 m
TYPE 1 TYPE 2 Panjang = 2.50
Volume = 4.12 x 2.50 = 10.30 m2
4. BOKS
K.A = 1.80 x 0.75 = 1.35 m2
K.B = ( 1.60 x 0.75 - 0.2 x 0.5 ) = 1.09 m2
K.C = ( 1.80 x 0.75 - 0.2 x 0.5 ) = 1.25 m2
K.D = 1.50 x 0.60 = 0.90 m2
K.E = ( 1.50 x 0.60 - 0.2 x 0.5 ) = 0.80 m2
K.F = ( 1.30 x 0.60 - 0.2 x 0.5 ) = 0.67 m2
K.G = 0.15 x 1.60 = 0.24 m2
7
K.H = 0.50 x 0.15 x 4 = 0.30 m2
K.I = 0.60 x 0.15 x 2 = 0.18 m2
K.J = 0.60 x 0.60 x 2 = 0.72 m2
7
TOTAL = 7.50 m2
Pembesian
1. Panjang Besi = 2.05 m'
Panjang = 2.50 m'
Volume = 2.05 x 2.50 x 34.76 / 11.34 = 15.71 Kg
4. Boks
a. Panjang Besi = 1.80 m'
Panjang = 1.60 m'
Volume = 1.80 x 1.60 x 34.76 / 11.34 = 8.83 Kg
2. Timbunan
a. Saluran
Volume /m2 = 0.59 m2
Panjang Boks = 2.5 m
Volume = 0.59 x 2.5 = 1.48 m3
REKAP PERHITUNGAN
1. Volume Beton = 1.98 m3
2. Volume Bekisting = 36.60 m2
3. Volume Pembesian = 65.61 Kg
4. Volume Galian = 0.05 m3
3
5. Volume Timbunan = 13.63 m
6. Nomenklatur = 1.00 bh
7. Pintu
a. Pintu Angkat B = 22 Cm, H = 50 Cm = 1 bh
b. Pintu Angkat B = 20 Cm, H = 50 Cm = 1 bh
Nama Bangunan : Box Tersier B.Aw 2Ki (K1)
No. SKET PENAMPANG MELINTANG URAIAN PERHITUNGAN
PROFIL
2
1 Beton K225
2.50
+4.15
0.15
0.15 1.50 0.15 2.50
2 +4.10
1 L.A = ( 0.71 + 0.74 ) x 0.07 = 0.10 m2
L.B =( 0.20 + 0.26 ) x 0.07 / 2 = 0.02 m2
1:1
1:1
+3.65
1.50
0.20 +3.65 0.20 +3.60 0.20
1:1
1:1
0.20
+4.15 0.15 +4.10 0.12 m2
1
0.15
0.17 1.72 B
+3.60 0.20
Panjang = 2.50
3
0.66
0.14
1
0.15
+4.10
Volume = 0.12 x 2.50 = 0.29 m3
+3.60
1.00
4
+4.10
+4.10
2
3
0.20
3 2 L.A =( 0.71 + 0.74 ) x 0.07 = 0.10 m2
C
CL Saluran
L.B =( 0.26 + 0.20 ) x 0.07 / 2 = 0.02 m2
0.12 m2
Pintu Angkat
b = 0.20m
h = 0.15m
+4.15 +4.15
+4.10
0.30 +3.85 +3.85 +3.80 0.30
0.20
0.07
+3.65
0.15
+3.65
0.14
+3.60 0.20 Panjang = 2.50
0.10
Pintu Angkat
b = 0.20m
h = 0.15m
3 L.A =( 0.71 + 0.74 ) x 0.07 = 0.10 m2
+4.15 +4.15 +4.10 L.C =( 0.26 + 0.20 ) x 0.07 / 2 = 0.02 m2
0.30 +3.85 +3.85 +3.80 0.30
0.20
0.07
+3.65
0.15
+3.65 +3.60
0.14
0.20 0.12 m2
0.10
0.15 2.50
2.50 0.15 1.50
BETON K 225 DENGAN
TULANGAN WIRE MESH M06
Pintu Angkat
b = 0.20m
h = 0.15m 4 A.
+4.15 +4.15 +4.10 L.A =( 0.26 + 0.20 ) x 0.07 / 2 = 0.02 m2
0.30 +3.85 +3.85 +3.80 0.30
0.20 +3.65 +3.65 +3.60
0.07 0.15
0.10
0.14
0.20
L.B =( 0.71 + 0.74 ) x 0.07 = 0.10 m2
0.15 2.50
2.50 0.15 1.50 0.12 m2
BETON K 225 DENGAN
TULANGAN WIRE MESH M06
POTONGAN A-C
Skala 1 : 50 Panjang = 1.00
Volume = 0.12 x 1.00 = 0.118 m3
Volume 1 = 0.14 x
0.10 x 0.2 = 0.003 m3
TOTAL = VOLUME + VOLUME 1 = 0.120 m3
B.
L.A =( 0.15 x 0.50 ) = 0.08 m2
L.B =( 0.15 x 0.50 ) = 0.08 m2
L.C =( 0.15 x 0.50 ) = 0.08 m2
TYPE 1
0.23 m2
TYPE 2
Panjang = 3.11
Volume = 0.23 x 3.11 = 0.70 m3
C.
L.A =( 0.15 x 0.65 ) x 4 = 0.39 m2
0.39 m2
TYPE 3 TYPE 4 A Panjang = 0.55
Volume = 0.39 x 0.55 = 0.21 m3
5 BOKS
L.A = 1.8 x 1.80 x 0.15 = 0.49 m3
L.B = 0.5 x 1.80 x 0.15 = 0.14 m3
L.C =( 0.5 x 1.50 x 0.15 ) = 0.10 m3
- ( 0.5 x 0.2 x 0.15 )
TYPE 4 B L.D = 0.5 x 1.80 x 0.15 = 0.12 m3
- ( 0.5 x 0.2 x 0.15 )
L.E =( 0.5 x 0.50 ) / 2 x 0.15 x 2 = 0.04 m3
0.88 m3
TOTAL BETON = 2.71 m3
Bekisting
1. K.A = ( 0.74 x 2.00 ) + ( 0.71 x 2 ) = 3.36 m
+ 0.20 + 0.26
3.36 m
Panjang = 2.50
Volume = 3.36 x 2.50 = 8.40 m2
Pembesian
1. Panjang Besi = 1.67 m'
Panjang = 2.50 m'
Volume = 1.67 x 2.50 x 34.76 / 11.34 = 12.80 Kg
5. Boks
a. Panjang Besi = 1.80 m'
Panjang = 1.80 m'
Volume = 1.80 x 1.80 x 34.76 / 11.34 = 9.93 Kg
2
Volume /m2 = 0.029 m
Panjang Saluran = 2.5 m
Volume = 0.029 x 2.5 = 0.07 m3
2. Timbunan
a. Boks
Volume /m2 = 0.82 m2
Panjang Boks = 1.8 m
Volume = 0.82 x 1.8 = 1.48 m3
b. Saluran
Volume /m2 = 0.19 m2
Panjang Boks 3 2.5 m
Volume = 0.19 x 2.5 = 0.48 m3
2
Volume /m2 = 0.19 m
Panjang Boks 3 2.5 m
Volume = 0.19 x 2.5 = 0.48 m3
REKAP PERHITUNGAN
1. Volume Beton = 2.71 m3
2. Volume Bekisting = 45.11 m2
3. Volume Pembesian = 93.03 Kg
4. Volume Galian = 4.32 m3
5. Volume Timbunan = 2.43 m3
6. Nomenklatur = 1.00 bh
Nama Bangunan : Box Tersier B.Aw 2Ki (K2)
No.
PROFIL SKET PENAMPANG MELINTANG URAIAN PERHITUNGAN
B
Beton K225
1 +3.33 2.50 0.15 1.50 0.15 2.50 +2.92 3 1. L.A = ( 0.71 + 0.74 ) x 0.07 = 0.10 m2
A
0.40 +3.47
+2.97
+3.42 0.30
A L.B =( 0.20 + 0.26 ) x 0.07 / 2 = 0.02 m2
0.20
+2.97 +2.92 +2.92
0.20
0.25
0.20
0.12 m2
0.40
1
+3.47
1r,0.50 r,0.50
2 +3.42
+2.92
0.30
Panjang = 2.50
+2.92
+3.33
3
Volume = 0.12 x 2.50 = 0.29 m3
3
+3.42
+2.92 +2.92
+3.42
2. L.A =( 0.71 + 0.74 ) x 0.07 = 0.10 m2
+2.92
L.C =( 0.26 + 0.20 ) x 0.07 / 2 = 0.02 m2
2 0.30 2
B
0.12 m2
C
L Saluran
b = 0.20m
h = 0.15m Panjang = 2.50
Volume = 0.12 x 2.50 = 0.29 m3
+3.47 +3.47 +3.42 +3.42
0.30
0.20
+3.17
+2.97
+3.17
+2.97
+3.12 +3.12
+2.92
0.30
0.20
Volume 1 = 0.14 x
0.10 x 0.2 = 0.00 m3
0.07 0.15 0.14
0.10
TOTAL = VOLUME + VOLUME 1 = 0.30 m3
2.50 0.15 1.50 0.15 2.50
BETON K 225 DENGAN
TULANGAN WIRE MESH M06
0.15 1.50
0.40
Panjang = 2.50
+3.42 +3.42
+3.47
Volume = 0.12 x 2.50 = 0.294 m3
+3.17
+3.12 +3.12
+2.92
0.14
+2.97 Volume 1 = 0.14 x 0.10 x 0.2 = 0.003 m3
0.10
2.50 0.15
1.50 0.15 TOTAL = VOLUME + VOLUME 1 = 0.297 m3
BETON K 225 DENGAN
TULANGAN WIRE MESH M06
POTONGAN B-B
Skala 1 : 50
4. BOKS
L.A = 1.8 x 1.60 x 0.15 = 0.43 m3
L.B = 0.5 x 1.80 x 0.15 = 0.14 m3
L.C =( 0.5 x 1.30 x 0.15 ) = 0.08 m3
- ( 0.5 x 0.2 x 0.15 )
L.D = 0.5 x 1.80 x 0.15 = 0.12 m3
- ( 0.5 x 0.2 x 0.15 )
L.E =( 0.5 x 0.50 ) / 2 x 0.15 x 2 = 0.04 m3
0.81 m3
TOTAL BETON = 1.70 m3
Bekisting
1. K.A = ( 0.71 x 2.00 ) + ( 0.74 x 2 ) = 3.36 m
+ 0.20 + 0.26
3.36 m
Panjang = 2.50
Volume = 3.36 x 2.50 = 8.40 m2
4. BOKS
K.A = 1.80 x 0.65 = 1.17 m2
K.B = ( 1.60 x 0.65 - 0.2 x 0.5 ) = 0.95 m2
K.C = ( 1.80 x 0.65 - 0.2 x 0.5 ) = 1.08 m2
K.D = 1.50 x 0.50 = 0.75 m2
K.E = ( 1.50 x 0.50 - 0.2 x 0.5 ) = 0.66 m2
K.F = ( 1.30 x 0.50 - 0.2 x 0.5 ) = 0.56 m2
K.G = 0.15 x 1.60 = 0.24 m2
K.H = 0.45 x 0.15 x 4 = 0.27 m2
K.I = 0.50 x 0.15 x 2 = 0.15 m2
9
K.J = 0.50 x 0.50 x 2 = 0.50 m2
9 TOTAL = 6.33 m2
Pembesian
1. Panjang Besi = 1.67 m'
Panjang = 2.50 m'
Volume = 1.67 x 2.50 x 34.76 / 11.34 = 12.80 Kg
4. Boks
a. Panjang Besi = 1.80 m'
Panjang = 1.60 m'
Volume = 1.80 x 1.60 x 34.76 / 11.34 = 8.83 Kg
2. Timbunan
a. Boks
Volume /m2 = 0.48 m2
Panjang Boks = 1.8 m
Volume = 0.48 x 1.8 = 0.86 m3
b. Saluran
Volume /m2 = 1.82 m2
Panjang Boks = 2.5 m
Volume = 1.82 x 2.5 = 4.55 m3
2
Volume /m2 = 1.02 m
Panjang Boks = 2.5 m
Volume = 1.02 x 2.5 = 2.55 m3
REKAP PERHITUNGAN
1. Volume Beton = 1.70 m3
2. Volume Bekisting = 31.53 m2
3. Volume Pembesian = 57.80 Kg
4. Volume Galian = 0.04 m3
3
5. Volume Timbunan = 10.51 m
6. Nomenklatur = 1.00 bh
PERHITUNGAN VOLUME PEKERJAAN (BOQ)
Nama Bangunan : Box Tersier B.Jw 3Ka (T1)
No.
SKET PENAMPANG MELINTANG URAIAN PERHITUNGAN
PROFIL
0.40
B
0.30 0.40
C
0.30
Beton K175
3 3
1. L.A = ( 0.80 + 0.60 ) x 0.07 / 2.00 = 0.05 m2
L.B =( 1.20 x 0.10 ) = 0.12 m2
L.C =( 1.20 x 0.10 ) = 0.12 m2
+5.30
+4.95 +4.95
+5.30
+5.30
0.29 m2
+4.80
+4.80
0.15
r,0.60m 0.50
1 r,0.75m
+5.05 r,0.60m +4.95 2
Panjang = 2.50
+5.40 +5.30
0.40
A
+5.30
A Volume = 0.29 x 2.50 = 0.72 m3
0.30
+4.70
0.30
0.50 +4.70 0.40
+4.40
+5.30 +5.30
0.40 +5.40
2. L.A =( 0.80 + 0.60 ) x 0.07 / 2.00 = 0.05 m2
+4.95 2
1 +5.05
B L.B =( 1.20 x 0.10 ) = 0.12 m2
L.C =( 1.20 x 0.10 ) = 0.12 m2
0.29 m2
Panjang = 2.50
Volume = 0.29 x 2.50 = 0.72 m3
0.60
0.50
0.15
0.60
1.00
0.15
0.15 1.50
PERHITUNGAN VOLUME PEKERJAAN (BOQ)
Nama Bangunan : Box Tersier B.Jw 3Ka (T1)
No.
SKET PENAMPANG MELINTANG URAIAN PERHITUNGAN
PROFIL
3
0.40
B
0.30 0.40
C
0.30
3
Beton K175
1. L.A = ( 0.80 + 0.60 ) x 0.07 / 2.00 = 0.05 m2
L.B =( 1.20 x 0.10 ) = 0.12 m2
+4.95 +4.95
+5.30
+5.30
+5.30
L.C =( 1.20 x 0.10 ) = 0.12 m2
+4.80
0.29 m2
+4.80
0.15
r,0.60m 0.50
1 r,0.75m
+5.05 r,0.60m +4.95 2
+5.40 +5.30
Panjang = 2.50
0.40
+5.30
A
0.30
A
Volume = 0.29 x 2.50 = 0.72 m3
0.30
0.50 +4.70 +4.70 0.40
+4.40
+5.30 +5.30
0.40 +5.40
+4.95 2
2. L.A =( 0.80 + 0.60 ) x 0.07 / 2.00 = 0.05 m2
1 +5.05
B
L.B =( 1.20 x 0.10 ) = 0.12 m2
L.C =( 1.20 x 0.10 ) = 0.12 m2
0.29 m2
Panjang = 2.50
Volume = 0.29 x 2.50 = 0.72 m3
0.60
0.50
0.15
0.60
1.00
0.15
0.15 1.50
PERHITUNGAN VOLUME PEKERJAAN (BOQ)
Nama Bangunan : Box Tersier B.Jw 3Ka (T2)
No.
SKET PENAMPANG MELINTANG URAIAN PERHITUNGAN
PROFIL
3
0.40
B
0.30 0.40
C
0.30
3
Beton K175
1. L.A = ( 0.80 + 0.60 ) x 0.07 / 2.00 = 0.05 m2
L.B =( 1.20 x 0.10 ) = 0.12 m2
+4.95 +4.95
+5.30
+5.30
+5.30
L.C =( 1.20 x 0.10 ) = 0.12 m2
+4.80
0.29 m2
+4.80
0.15
r,0.60m 0.50
1 r,0.75m
+5.05 r,0.60m +4.95 2
+5.40 +5.30
Panjang = 2.50
0.40
+5.30
A
0.30
A
Volume = 0.29 x 2.50 = 0.72 m3
0.30
0.50 +4.70 +4.70 0.40
+4.40
+5.30 +5.30
0.40 +5.40
+4.95 2
2. L.A =( 0.80 + 0.60 ) x 0.07 / 2.00 = 0.05 m2
1 +5.05
B
L.B =( 1.20 x 0.10 ) = 0.12 m2
L.C =( 1.20 x 0.10 ) = 0.12 m2
0.29 m2
Panjang = 2.50
Volume = 0.29 x 2.50 = 0.72 m3
0.60
0.50
0.15
0.60
1.00
0.15
0.15 1.50
PERHITUNGAN VOLUME PEKERJAAN (BOQ)
Nama Bangunan : Box Tersier B.Jw 3Ka (T3)
No.
SKET PENAMPANG MELINTANG URAIAN PERHITUNGAN
PROFIL
Beton K175
1. L.A = ( 0.80 + 0.60 ) x 0.07 / 2.00 = 0.05 m2
+1.18
+1.18
+0.75 +0.75
+0.68
r,1.00 +0.85
0.29 m2
+0.75 r,1.00
+0.75
2.00 1.50 +0.85
2. L.A =( 0.80 + 0.60 ) x 0.07 / 2.00 = 0.05 m2
0.15 0.15
0.50
0.15
0.60
1.00
0.15
0.15 1.50
PERHITUNGAN VOLUME PEKERJAAN (BOQ)
Nama Bangunan : Box Kwarter B.Jw 3Ka (k1)
No.
SKET PENAMPANG MELINTANG URAIAN PERHITUNGAN
PROFIL
3
0.40
B
0.30 0.40
C
0.30
3
Beton K175
1. L.A = ( 0.80 + 0.60 ) x 0.07 / 2.00 = 0.05 m2
L.B =( 1.20 x 0.10 ) = 0.12 m2
+4.95 +4.95
+5.30
+5.30
+5.30
L.C =( 1.20 x 0.10 ) = 0.12 m2
+4.80
0.29 m2
+4.80
0.15
r,0.60m 0.50
1 r,0.75m
+5.05 r,0.60m +4.95 2
+5.40 +5.30
Panjang = 2.50
0.40
+5.30
A
0.30
A
Volume = 0.29 x 2.50 = 0.72 m3
0.30
0.50 +4.70 +4.70 0.40
+4.40
+5.30 +5.30
0.40 +5.40
+4.95 2
2. L.A =( 0.80 + 0.60 ) x 0.07 / 2.00 = 0.05 m2
1 +5.05
B
L.B =( 1.20 x 0.10 ) = 0.12 m2
L.C =( 1.20 x 0.10 ) = 0.12 m2
0.29 m2
Panjang = 2.50
Volume = 0.29 x 2.50 = 0.72 m3
0.60
0.50
0.15
0.60
1.00
0.15
0.15 1.50
PERHITUNGAN VOLUME PEKERJAAN (BOQ)
Nama Bangunan : Box Tersier B.Jw 3Ka (T1.1)
No.
SKET PENAMPANG MELINTANG URAIAN PERHITUNGAN
PROFIL
3
0.40
B
0.30 0.40
C
0.30
3
Beton K175
1. L.A = ( 0.80 + 0.60 ) x 0.07 / 2.00 = 0.05 m2
L.B =( 1.20 x 0.10 ) = 0.12 m2
+4.95 +4.95
+5.30
+5.30
+5.30
L.C =( 1.20 x 0.10 ) = 0.12 m2
+4.80
0.29 m2
+4.80
0.15
r,0.60m 0.50
1 r,0.75m
+5.05 r,0.60m +4.95 2
+5.40 +5.30
Panjang = 2.50
0.40
+5.30
A
0.30
A
Volume = 0.29 x 2.50 = 0.72 m3
0.30
0.50 +4.70 +4.70 0.40
+4.40
+5.30 +5.30
0.40 +5.40
+4.95 2
2. L.A =( 0.80 + 0.60 ) x 0.07 / 2.00 = 0.05 m2
1 +5.05
B
L.B =( 1.20 x 0.10 ) = 0.12 m2
L.C =( 1.20 x 0.10 ) = 0.12 m2
0.29 m2
Panjang = 2.50
Volume = 0.29 x 2.50 = 0.72 m3
0.60
0.50
0.15
0.60
1.00
0.15
0.15 1.50
PERHITUNGAN VOLUME PEKERJAAN (BOQ)
Nama Bangunan : Box Tersier B.Jw 3Ka (T2.2)
No.
SKET PENAMPANG MELINTANG URAIAN PERHITUNGAN
PROFIL
+0.85
0.15
1.50
0.15
2.00
+0.75
Beton K175
1. L.A = ( 0.80 + 0.60 ) x 0.07 / 2.00 = 0.05 m2
0.50 +1.28 +1.18 0.30
0.15
A
+0.38
A L.B =( 1.20 x 0.10 ) = 0.12 m2
0.30 +0.68 0.30 +0.68 0.30
0.30
L.C =( 1.20 x 0.10 ) = 0.12 m2
0.50 +1.28 0.15 +1.18 0.30
0.29 m2
r,1.00 +0.75
+0.68
+0.85 r,1.00
Panjang = 6.20
Volume = 0.29 x 6.20 = 1.79 m3
+1.18
+1.18
+0.75 +0.75
0.50
0.15
0.60
1.00
0.15
0.15 1.50
PERHITUNGAN VOLUME PEKERJAAN (BOQ)
Nama Bangunan : Box Tersier B.Jw.6 (k2)
No.
SKET PENAMPANG MELINTANG URAIAN PERHITUNGAN
PROFIL