DIVISI I : UMUM
1.2.4 Mobilisasi dan Demobilisasi 1.00 ls 7,912,000.00
REKAPITULASI :
DIVISI I : UMUM ..................................................... Rp.
DIVISI V : PERKERASAN NON ASPAL ..................................................... Rp.
DIVISI VI : PERKERASAN ASPAL ..................................................... Rp.
DIVISI VII : STRUKTUR ..................................................... Rp.
KETRANGAN
7,912,000.00
7,912,000.00
15,111,569,160.00
15,111,569,160.00
-
-
-
-
-
-
7,912,000.00
15,111,569,160.00
-
-
15,119,481,160.00
1,511,948,116.00
16,631,429,276.00
16,631,429,000.00
VOLUME PEKERJAAN
KEGIATAN : PERENCANAAN JALAN PALUH MERBAU
PEKERJAAN : Peningkatan Jalan Paluh Merbau
NO. MATA
PEMBA- URAIAN PERHITUNGAN VOLUME
YARAN
DIVISI I : UMUM
1.2.4 Mobilisasi dan Demobilisasi 1.00 ls
Lapis Pondasi Agregat Kelas A ( Dengan Lapis Resap Pengikat Lapis Perekat ( Tack Laston Lapis Aus ( AC - WC )
STA P L AWAL L AKHIR L RATA Luasan Tamper ) ( Prime Coat ) Coat ) Manual/Tanpa Asphalt Finisher
kebutuhan Tebal Volume Koef Volume Koef Volume Tebal Koef Volume
SEGMEN 1 m m m m m2 % m m3 Ltr Ltr m Ton
0,00 s/d 100.00 100.00 6.00 12.00 12.00 1,200.00 50.00 0.10 60.00 1.00 600.00 0.35 210.00 0.04 2.1 100.80
100.00 s/d 200.00 100.00 6.00 12.00 12.00 1,200.00 50.00 0.10 60.00 1.00 600.00 0.35 210.00 0.04 2.1 100.80
200.00 s/d 300.00 100.00 6.00 12.00 12.00 1,200.00 25.00 0.10 30.00 1.00 300.00 0.35 315.00 0.04 2.1 100.80
300.00 s/d 400.00 100.00 6.00 12.00 12.00 1,200.00 25.00 0.10 30.00 1.00 300.00 0.35 315.00 0.04 2.1 100.80
400.00 s/d 500.00 100.00 6.00 12.00 12.00 1,200.00 50.00 0.10 60.00 1.00 600.00 0.35 210.00 0.04 2.1 100.80
Jumlah 500.00 12.00 6,000.00 240.00 2,400.00 1,260.00 504.00
NO. MATA
HARGA SATUAN 2019
PEMBA- URAIAN PENGELUARAN SATUAN Ket
( Rp. )
YARAN
DIVISI I : UMUM
1.2.4 Mobilisasi dan Demobilisasi ls
DIVISI II : DRAINASE
2.1 Galian Untuk Drainase Selokan dan Saluran Air m3 57,662.32 Naik
2.1a Galian Untuk Drainase Selokan dan Saluran Air ( Mini Excavator ) m3 48,629.93 Naik
2.1b Galian Untuk Drainase Selokan dan Saluran Air ( Manual ) m3 137,621.86 Naik
2.1d Galian Tanah Lumpur (Manual) m3 203,457.43 Naik
2.1e Galian Tanah Lumpur (Mekanik) m3 64,298.33 Naik
2.1f Galian Tanah Lumpur (Mekanik) dengan Ponton m3 111,929.87 Naik
2.2a Pasangan Batu Dengan Mortar m3 897,477.58 Naik
2.2b Pasangan Batu Dengan Mortar ( Manual ) m3 998,515.00 Naik
2.2c Pas. Bata Merah m2 160,643.48 Naik
2.2d Pas. Batu Muka m2 207,902.75 Naik
2.3 (1)a Gorong - Gorong Pipa Beton Bertulang dia. 50 cm m1 469,619.59 Naik
2.3 (1)b Gorong - Gorong Pipa Beton Bertulang dia. 60 cm m1 539,600.11 Naik
2.3 (1)c Gorong - Gorong Pipa Beton Bertulang dia. 70 cm m1 635,369.39 Naik
2.3 (1)d Gorong - Gorong Pipa Beton Bertulang dia. 80 cm m1 881,224.02 Naik
2.3 (1)e Gorong - Gorong Pipa Beton Bertulang dia. 100 cm m1 1,208,773.86 Naik
2.3 (1)f Gorong - Gorong Pipa Beton Bertulang dia. 120 cm m1 1,488,803.08 Naik
2.3 (1)g Gorong - Gorong Pipa Beton Bertulang dia. 150 cm m1 2,050,592.19 Naik
2.3 (3)f Gorong - Gorong Persegi Beton Pracetak Dim. 40 cm m1 1,255,632.73 Naik
2.3 (3)g Gorong - Gorong Persegi Beton Pracetak Dim. 50 cm m1 1,690,442.50 Naik
2.3 (3)a Gorong - Gorong Persegi Beton Pracetak Dim. 60 cm m1 2,122,299.45 Naik
2.3 (3)b Gorong - Gorong Persegi Beton Pracetak Dim. 80 cm m1 3,375,465.63 Naik
2.3 (3)c Gorong - Gorong Persegi Beton Pracetak Dim. 100 cm m1 4,423,590.00 Naik
2.3 (3)d Gorong - Gorong Persegi Beton Pracetak Dim. 120 cm m1 5,902,030.00 Naik
2.3 (3)i Gorong - Gorong Persegi Beton Pracetak Dim. 150 cm m1 9,510,749.17 Naik
2.3 (3)j Gorong - Gorong Persegi Beton Pracetak Dim. 200 cm m1 13,782,750.00 Naik
2.3 (3)k Gorong - Gorong Persegi Beton Pracetak Dim. 300 x 150 cm m1 18,003,227.00 TETAP
2.3 (4)g Saluran Terbuka U-Ditch 30 x 30 cm m1 405,516.14 Naik
2.3 (4)h Saluran Terbuka U-Ditch 30 x 40 cm m1 457,151.14 Naik
2.3 (4)i Saluran Terbuka U-Ditch 30 x 50 cm m1 534,548.75 Naik
2.3 (4)a Saluran Terbuka U-Ditch 40 x 40 cm m1 567,553.75 Naik
2.3 (4)j Saluran Terbuka U-Ditch 40 x 50 cm m1 638,623.75 Naik
2.3 (4)k Saluran Terbuka U-Ditch 40 x 60 cm m1 707,014.83 Naik
2.3 (4)b Saluran Terbuka U-Ditch 50 x 50 cm m1 765,434.83 Naik
2.3 (4)c Saluran Terbuka U-Ditch 60 x 60 cm m1 951,373.44 Naik
2.3 (4)l Saluran Terbuka U-Ditch 60 x 80 cm m1 1,057,633.44 Turun
2.3 (4)c Saluran Terbuka U-Ditch 80 x 80 cm m1 1,357,287.50 Naik
2.3 (4)d Saluran Terbuka U-Ditch 80 x 100 cm m1 1,501,727.50 Naik
2.3 (4)e Saluran Terbuka U-Ditch 100 x 100 cm m1 2,035,089.74 Naik
2.3 (4)f Saluran Terbuka U-Ditch 100 x 120 cm m1 2,232,659.74 Turun
2.3 (4)g Saluran Terbuka U-Ditch 120 x 120 cm m1 2,773,964.74 Baru
2.3 (4)h Saluran Terbuka U-Ditch 150 x 150 cm m1 4,238,604.74 Baru
2.3 (4)i Saluran Terbuka U-Ditch 200 x 200 cm m1 7,649,849.74 Baru
2.3 (5)a Buis Beton 1/2, dia 20 cm m1 115,946.82 Naik
2.3 (5)b Buis Beton 1/2, dia 30 cm m1 159,487.73 Naik
2.3 (5)c Buis Beton 1/2, dia 40 cm m1 217,173.63 Naik
2.3 (5)d Buis Beton 1/2, dia 50 cm m1 289,004.53 Naik
2.3 (5)e Buis Beton 1/2, dia 60 cm m1 391,114.59 Naik
2.3 (6)a Tutup U-Ditch 100 (HD) m1 1,177,732.54 Turun
2.3 (6)c Tutup U-Ditch 80 (HD) m1 937,691.89 Naik
2.3 (6)e Tutup U-Ditch 60 (HD) m1 678,023.19 Naik
2.3 (6)g Tutup U-Ditch 50 (HD) m1 553,003.09 Naik
2.3 (6)i Tutup U-Ditch 40 (HD) m1 350,839.85 Turun
2.3 (6)k Tutup U-Ditch 30 (HD) m1 273,995.12 Naik
2.3 (14) Pasangan Batu tanpa Adukan (Aanstamping) m3 539,370.13 Naik
2.4 (1) Bahan Porous untuk Bahan Penyaring (Filter) m3 435,836.43 Naik
2.4 (3) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan
m1 57,193.33 Tetap
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM KOTA MEDAN
TAHUN 2019
NO. MATA
HARGA SATUAN 2019
PEMBA- URAIAN PENGELUARAN SATUAN Ket
( Rp. )
YARAN
2.5 (1) Pasang/Bongkar Kisdam Tinggi 1 s/d 2 m, Dolken 8 - 10 cm, Karung 50 Kg Diisi Tanah
m1 Setempat 284,934.06 Turun
2.5 (2) Pasang/Bongkar Kisdam Tinggi 1 s/d 2 m, Dolken Ø 8 - 10 cm, Pakai Terpal Plastik
m1 267,638.06 Turun
2.6 Dewatering/Pengeringan Air dengan Mesin Pompa Jam #REF! Naik
2.7 Pasang Suling-Suling, PVC 2", Klas AW, Filter Ijuk m' 34,189.50 Tetap
2.8 Side Entry Pit / Tangkapan Air Dengan Cover Grill Beton Uk. 39X28X40 Cm bh 696,913.06 Tetap
NO. MATA
HARGA SATUAN 2019
PEMBA- URAIAN PENGELUARAN SATUAN Ket
( Rp. )
YARAN
NO. MATA
HARGA SATUAN 2019
PEMBA- URAIAN PENGELUARAN SATUAN Ket
( Rp. )
YARAN
NO. MATA
HARGA SATUAN 2019
PEMBA- URAIAN PENGELUARAN SATUAN Ket
( Rp. )
YARAN
NO. MATA
HARGA SATUAN 2019
PEMBA- URAIAN PENGELUARAN SATUAN Ket
( Rp. )
YARAN
HARGA DASAR
KODE
NO. URAIAN SATUAN DISEPAKATI ( Rp ) KET
SHBJ
2019
UPAH
1 Pekerja Jam 18,750.00 -
2 Tukang Jam 22,500.00 -
3 Kepala Tukang Jam 23,750.00 -
4 Mandor Jam 25,000.00 -
BAHAN
1 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 228,000.00 1.00
2 Agregat Pecah Mesin 20 - 30 mm M3 216,700.00 1.06
3 Batu Belah M3 280,300.00 1.04
4 Semen Abu - Abu Kg 1,267.50 1.00
5 Pasir Pasang M3 276,900.00 1.03
6 Pasir Urug M3 214,500.00 1.08
7 Pasir Beton M3 277,000.00 1.08
8 Koral Beton M3 228,000.00 1.00
9 Kansteen Abu - Abu Uk. 10.20.40 K-300 Bh 19,000.00 1.12
10 Kansteen Abu - Abu Uk. 16/20.30.40 K-300 Bh 51,700.00 0.99
11 Paving Block ; t = 6 cm K-300 M2 93,700.00 1.04
12 Paving Block ; t = 8 cm K-300 M2 109,400.00 1.03
13 Uskup Paving Block ; t = 6 cm K-300 M2 136,100.00 0.99
14 Uskup Paving Block ; t = 8 cm K-300 M2 156,000.00 0.96
15 Abu Batu / Screening M3 211,500.00 0.81
16 Plastik Alas Gelaran Beton M2 11,200.00 1.00
17 BetonReady Mix (B-0) M3 708,300.00 1.00
18 Beton Ready Mix (K-125) M3 729,000.00 0.98
19 Beton K-175 ( Ready Mix ) tanpa Pompa M3 798,700.00 1.03
20 Beton K-225 ( Ready Mix ) tanpa Pompa M3 822,000.00 1.02
21 Beton K-250 ( Ready Mix ) tanpa Pompa M3 840,700.00 1.04
22 Beton K-300 ( Ready Mix ) tanpa Pompa M3 831,700.00 0.98
23 Beton K-350 ( Ready Mix ) tanpa Pompa M3 893,600.00 1.01
24 Beton K-350 ( Ready Mix ) dengan Mini Truck Mixer M3 1,334,200.00 0.98
25 Beton K-500 ( Ready Mix ) tanpa Pompa M3 1,057,500.00 1.03
26 Acuan Beton dan Perancah M3 3,300,000.00 1.00
27 Concrete Curing Ls 73,669.50 1.00
28 Kawat Beton Kg 26,200.00 1.00
29 Paku segala ukuran ( rata - rata ) Kg 15,900.00 0.96
30 Buis Beton Bertulang dia. 50 cm M1 271,425.00 HD SHBJ 2019
31 Buis Beton Bertulang dia. 60 cm M1 329,250.00 HD SHBJ 2019
32 Buis Beton Bertulang dia. 70 cm M1 409,500.00 HD SHBJ 2019
33 Buis Beton Bertulang dia. 80 cm M1 595,237.50 HD SHBJ 2019
34 Buis Beton Bertulang dia. 100 cm M1 832,507.50 HD SHBJ 2019
HARGA DASAR
KODE
NO. URAIAN SATUAN DISEPAKATI ( Rp ) KET
SHBJ
2019
114 Tiang Pancang Pracetak Beton Bertulang uk 40x40 cm m1 1,004,250.00 HD SHBJ 2019
115 Sheet Pile Pracetak Beton Bertulang uk 30x12 cm m1 263,312.50 HD SHBJ 2019
116 Sheet Pile Pracetak Beton Bertulang uk 40x15 cm m1 438,875.00 HD SHBJ 2019
119 Solar Liter #REF! #REF!
120 Batu Muka m2 84,100.00 1.00
121 Batu bata merah uk. 22x11x5 cm bata press bh 600.00 1.00
122 Buis Beton 1/2, dia 20 cm m1 55,500.00 HD SHBJ 2019
123 Buis Beton 1/2, dia 30 cm m1 71,250.00 HD SHBJ 2019
124 Buis Beton 1/2, dia 40 cm m1 99,000.00 HD SHBJ 2019
125 Buis Beton 1/2, dia 50 cm m1 138,750.00 HD SHBJ 2019
126 Buis Beton 1/2, dia 60 cm m1 204,187.50 HD SHBJ 2019
127 Pipa PVC, WAVIN, Standard, Ø 2" m1 18,800.00 1.00
128 Ijuk ikat 20,800.00 1.00
143 Besi Profil kg 15,400.00 1.00
129 Pipa Galvanis 3" m' 220,483.33 1.00
130 Cat Dasar Kayu/Besi Nippon Paint - Bodelac Metal Prime kg 86,800.00 1.00
131 Dempul DUCO (SANPOLAC) kg 49,900.00 1.00
132 Cat Kayu/Besi ICI/Catylac Gloss - Warna Khusus (cat da Liter 68,800.00 1.00
133 Cat Kayu/Besi ICI/Catylac Gloss - Warna Khusus (cat p Liter 68,800.00 1.00
142 Baud 22" Bh
HARGA DASAR
KODE
NO. URAIAN SATUAN DISEPAKATI ( Rp ) KET
SHBJ
2019
A. Sewa Tanah M2 - - -
B. PERALATAN
1 Periksa Lembaran 1.2.4 Ls 1.00 500,000.00 500,000.00
C. FASILITAS KONTRAKTOR
1 Base Camp M2 - - -
2 Kantor / Direksikeet ( Sewa ) Ls 1.00 1,000,000.00 1,000,000.00
3 Barak M2 - - -
4 Bengkel M2 - - -
5 Gudang dan Lain - lain M2 - - -
6 Papan Proyek Bh 1.00 300,000.00 300,000.00
D. FASILITAS LABORATURIUM
1 Ruang Laboraturium M2 - - -
2 Peralatan Laboraturium Set - - -
3 Perabotan dan Layanan Set - - -
4 Quality Control Ls 1.00 1,500,000.00 1,500,000.00
5 Quantity Control Ls -
6 …………………….. …… - - -
7 …………………….. …… - - -
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT
1 Jembatan Darurat Ls - - -
2 Perkuatan Jembatan Lama Ls - - -
3 Pemeliharaan Jalan Kerja / Samping Ls - - -
4 …………………….. …… - - -
5 …………………….. …… - - -
6 …………………….. …… - - -
B. PERALATAN
1 ASPHALT FINISHER E02 Unit 0 1,000,000.00 -
2 ASPHALT SPRAYER E03 Unit 0 1,000,000.00 -
3 GENERATOR SET E12 Unit 0 1,000,000.00 -
4 COMPRESSOR 4000 - 6500 L\M E05 Unit 0 1,000,000.00 -
5 TANDEM ROLLER 6 - 8 T. E17 Unit 0 2,000,000.00 -
6 TIRE ROLLER 8 - 10 T. E18 Unit 0 2,000,000.00 -
7 BABY WALES Unit 1 500,000.00 500,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2142 18,750.00 4,016.25
2 Mandor Jam 0.0535 25,000.00 1,337.50
B BAHAN
C PERALATAN
1 Excavator (E10) Jam 0.0535 407,000.00 21,774.50
2 Dump Truck (E08) Jam 0.1557 147,000.00 22,887.90
3 Alat Bantu Ls 1.0000 125.00 125.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 3.9401 18,750.00 73,876.88
2 Mandor (L03) Jam 0.3940 25,000.00 9,850.00
B BAHAN
C PERALATAN
1 Pickup Jam 0.7576 46,125.00 34,944.30
2 Alat Bantu Ls 1.0000 1,000.00 1,000.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 8.0920 18,750.00 151,725.00
2 Mandor (L03) Jam 0.2380 25,000.00 5,950.00
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
2 Truck/Pick up Jam 0.4042 46,125.00 18,644.50
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 0.2142 18,750.00 4,016.06
2 Mandor (L03) Jam 0.0535 25,000.00 1,338.69
B BAHAN
C PERALATAN
1 Excavator (E10) Jam 0.0535 407,000.00 21,793.84
2 Dump Truck (E08) Jam 0.1889 147,000.00 27,762.99
3 Alat Bantu Ls 1.0000 1,000.00 1,000.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
SATUAN PENGUKURAN : M3
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 0.4444 18,750.00 8,333.33
2 Mandor (L03) Jam 0.1111 25,000.00 2,777.78
B BAHAN
C PERALATAN
1 Excavator (E10) Jam 0.1111 407,000.00 45,222.22
2 Ponton Jam 0.1111 - -
3 Dump Truck Jam 0.2721 147,000.00 39,996.99
4 Alat Bantu Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN :
NO. MATA PEMBAYARAN : 2.2a
JENIS PEKERJAAN : PASANGAN BATU DENGAN MORTAR UNTUK SALURAN
SATUAN PENGUKURAN : M3
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 4.0161 18,750.00 75,301.88
2 Tukang (L02) Jam 1.2048 22,500.00 27,108.00
3 Mandor (L03) Jam 0.4016 25,000.00 10,040.00
B BAHAN
1 Batu Belah (M02) M3 1.0800 280,300.00 302,724.00
2 Semen (M12) Kg 161.2800 1,267.50 204,422.40
3 Pasir Pasang (M01) M3 0.4829 276,900.00 133,715.01
C PERALATAN
1 Concrete Mixer ( E06 ) Jam 0.4016 65,000.00 26,104.00
2 Alat Bantu Ls 1.0000 1,000.00 1,000.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 18,750.00 164,062.50
2 Tukang (L02) Jam 22,500.00 39,375.00
3 Mandor (L03) Jam 25,000.00 21,875.00
B BAHAN
1 Batu Belah (M02) M3 1.0800 280,300.00 302,724.00
2 Semen (M12) Kg 161.2800 1,267.50 204,422.40
3 Pasir Pasang (M01) M3 0.4829 276,900.00 133,715.01
C PERALATAN
1 Alat Bantu Ls 1.0000 2,100.00 2,100.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.4000 18,750.00 45,000.00
2 Tukang Jam 0.8000 22,500.00 18,000.00
3 Kepala Tukang Jam 0.0800 23,750.00 1,900.00
4 Mandor Jam 0.1200 25,000.00 3,000.00
B BAHAN
1 Batu bata merah uk. 22x11x5 cm bata pres Buah 70.0000 600.00 42,000.00
2 @Semen Tiga Roda 50 kg Kg 14.3700 1,267.50 18,213.98
3 Pasir Pasang m3 0.0400 276,900.00 11,076.00
C PERALATAN
1 Alat bantu Ls 1.0000 500.00 500.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.9200 18,750.00 36,000.00
2 Tukang Jam 0.9600 22,500.00 21,600.00
3 Kepala Tukang Jam 0.0800 23,750.00 1,900.00
4 Mandor Jam 0.0960 25,000.00 2,400.00
B BAHAN
1 Batu Muka Buah 1.2500 84,100.00 105,125.00
2 @Semen Tiga Roda 50 kg Kg 5.0000 1,267.50 6,337.50
3 Pasir Pasang m3 0.0250 276,900.00 6,922.50
C PERALATAN
1 Alat bantu Ls 1.0000 500.00 500.00
#REF!
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 3.5000 18,750.00 65,625.00
2 Tukang (L02) Jam 0.7000 22,500.00 15,750.00
3 Mandor (L03) Jam 0.7000 25,000.00 17,500.00
B BAHAN
1 Buis Beton Bertulang dia. 50 cm M1 1.0000 271,425.00 271,425.00
2 Pasir M3 0.1292 276,900.00 35,761.64
C PERALATAN
1 Tamper (E25) Jam 0.0389 38,000.00 1,478.22
2 Alat Bantu Ls 1.0000 825.00 825.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 3.5000 18,750.00 65,625.00
2 Tukang (L02) Jam 0.7000 22,500.00 15,750.00
3 Mandor (L03) Jam 0.7000 25,000.00 17,500.00
B BAHAN
1 Buis Beton Bertulang dia. 60 cm M1 1.0000 329,250.00 329,250.00
2 Pasir M3 0.1397 276,900.00 38,669.09
C PERALATAN
1 Tamper (E25) Jam 0.0421 38,000.00 1,598.40
2 Alat Bantu Ls 1.0000 825.00 825.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 3.5000 18,750.00 65,625.00
2 Tukang (L02) Jam 0.7000 22,500.00 15,750.00
3 Mandor (L03) Jam 0.7000 25,000.00 17,500.00
B BAHAN
1 Buis Beton Bertulang dia. 70 cm M1 1.0000 409,500.00 409,500.00
2 Pasir M3 0.1502 276,900.00 41,576.54
C PERALATAN
1 Tamper (E25) Jam 0.0452 38,000.00 1,718.58
2 Alat Bantu Ls 1.0000 825.00 825.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 4.3750 18,750.00 82,031.25
2 Tukang (L02) Jam 0.8750 22,500.00 19,687.50
3 Mandor (L03) Jam 0.8750 25,000.00 21,875.00
B BAHAN
1 Buis Beton Bertulang dia. 80 cm M1 1.0000 595,237.50 595,237.50
2 Pasir M3 0.1617 276,900.00 44,774.73
C PERALATAN
1 Tamper (E25) Jam 0.0487 38,000.00 1,850.78
2 Alat Bantu Ls 1.0000 825.00 825.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 5.8333 18,750.00 109,375.00
2 Tukang (L02) Jam 1.1667 22,500.00 26,250.00
3 Mandor (L03) Jam 1.1667 25,000.00 29,166.67
B BAHAN
1 Buis Beton Bertulang dia. 100 cm M1 1.0000 832,507.50 832,507.50
2 Pasir M3 0.1838 276,900.00 50,880.38
C PERALATAN
1 Tamper (E25) Jam 0.0553 38,000.00 2,103.16
3 Alat Bantu Ls 1.0000 825.00 825.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 5.8333 18,750.00 109,375.00
2 Tukang (L02) Jam 1.1667 22,500.00 26,250.00
3 Mandor (L03) Jam 1.1667 25,000.00 29,166.67
B BAHAN
1 Buis Beton Bertulang dia. 120 cm M1 1.0000 1,020,000.00 1,020,000.00
2 Pasir M3 0.3780 276,900.00 104,668.20
C PERALATAN
1 Tamper (E25) Jam 0.1139 38,000.00 4,326.51
2 Alat Bantu Ls 1.0000 825.00 825.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 7.0000 18,750.00 131,250.00
2 Tukang (L02) Jam 1.4000 22,500.00 31,500.00
3 Mandor (L03) Jam 1.4000 25,000.00 35,000.00
B BAHAN
1 Buis Beton Bertulang dia. 150 cm M1 1.0000 1,442,250.00 1,442,250.00
2 Pasir (M01) M3 0.4935 276,900.00 136,650.15
C PERALATAN
1 Tamper (E25) Jam 0.1486 38,000.00 5,648.49
2 Alat Bantu Ls 1.0000 825.00 825.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 1.7500 18,750.00 32,812.50
2 Mandor (L03) Jam 0.3500 25,000.00 8,750.00
B BAHAN
1 Buis Beton tanpa Tulangan dia. 20 cm M1 1.0000 - -
2 Pasir M3 0.0200 276,900.00 5,538.00
C PERALATAN
1 Tamper (E25) Jam 0.0060 38,000.00 228.92
2 Alat Bantu Ls 1.0000 1,000.00 1,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 1.7500 18,750.00 32,812.50
2 Mandor (L03) Jam 0.3500 25,000.00 8,750.00
B BAHAN
1 Buis Beton tanpa Tulangan dia. 30 cm M1 1.0000 - -
2 Pasir (M01) M3 0.0300 276,900.00 8,307.00
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.1111 18,750.00 58,333.33
2 Tukang Jam 0.7778 22,500.00 17,500.00
3 Mandor Jam 0.7778 25,000.00 19,444.44
B BAHAN
1 Gorong - Gorong Kotak Dim. 60 x 60 x 10 M1 1.0000 1,749,200.00 1,749,200.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.5000 18,750.00 65,625.00
2 Tukang Jam 0.8750 22,500.00 19,687.50
3 Mandor Jam 0.8750 25,000.00 21,875.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 80 x 80 x 10 M1 1.0000 2,827,000.00 2,827,000.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.0000 18,750.00 75,000.00
2 Tukang Jam 1.0000 22,500.00 22,500.00
3 Mandor Jam 1.0000 25,000.00 25,000.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 100 x 100 x M1 1.0000 3,723,100.00 3,723,100.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.0000 18,750.00 75,000.00
2 Tukang Jam 1.0000 22,500.00 22,500.00
3 Mandor Jam 1.0000 25,000.00 25,000.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 120 x 120 x M1 1.0000 5,008,700.00 5,008,700.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 5.6000 18,750.00 105,000.00
2 Tukang Jam 1.4000 22,500.00 31,500.00
3 Mandor Jam 1.4000 25,000.00 35,000.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 300 x 200 c M1 1.0000 - -
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.9091 18,750.00 35,795.45
2 Tukang Jam 0.6364 22,500.00 14,318.18
3 Mandor Jam 0.6364 25,000.00 15,909.09
B BAHAN
1 U-Ditch 30 x 30 Cm M1 1.0000 285,600.00 285,600.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.1000 18,750.00 39,375.00
2 Tukang Jam 0.7000 22,500.00 15,750.00
3 Mandor Jam 0.7000 25,000.00 17,500.00
B BAHAN
1 U-Ditch 40 x 40 Cm M1 1.0000 419,900.00 419,900.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.3333 18,750.00 43,750.00
2 Tukang Jam 0.7778 22,500.00 17,500.50
3 Mandor Jam 0.7778 25,000.00 19,445.00
B BAHAN
1 U-Ditch 50 x 50 Cm M1 1.0000 583,900.00 583,900.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.6250 18,750.00 49,218.75
2 Tukang Jam 0.8750 22,500.00 19,687.50
3 Mandor Jam 0.8750 25,000.00 21,875.00
B BAHAN
1 U-Ditch 60 x 60 Cm M1 1.0000 735,500.00 735,500.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.0000 18,750.00 56,250.00
2 Tukang Jam 1.0000 22,500.00 22,500.00
3 Mandor Jam 1.0000 25,000.00 25,000.00
B BAHAN
1 U-Ditch 80 x 80 Cm M1 1.0000 1,075,500.00 1,075,500.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.0000 18,750.00 56,250.00
2 Tukang Jam 1.0000 22,500.00 22,500.00
3 Mandor Jam 1.0000 25,000.00 25,000.00
B BAHAN
1 U-Ditch 80 x 100 Cm M1 1.0000 1,201,100.00 1,201,100.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.5000 18,750.00 65,625.00
2 Tukang Jam 1.1667 22,500.00 26,250.75
3 Mandor Jam 1.1667 25,000.00 29,167.50
B BAHAN
1 U-Ditch 100 x 100 Cm M1 1.0000 1,647,600.00 1,647,600.00
88.01
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.5000 18,750.00 65,625.00
2 Tukang Jam 1.1667 22,500.00 26,250.75
3 Mandor Jam 1.1667 25,000.00 29,167.50
B BAHAN
1 U-Ditch 100 x 120 Cm M1 1.0000 1,819,400.00 1,819,400.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.4000 18,750.00 7,500.00
2 Tukang Jam 0.2667 22,500.00 6,000.00
3 Mandor Jam 0.0667 25,000.00 1,666.67
B BAHAN
1 Buis beton 1/2 dia. 20 cm m' 1.0250 55,500.00 56,887.50
2 Pasir urug m3 0.0800 214,500.00 17,160.00
3 Pasir pasang m3 0.0360 276,900.00 9,968.40
4 Semen PC Kg 0.9000 1,267.50 1,140.75
C PERALATAN
1 Alat bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.6000 18,750.00 11,250.00
2 Tukang Jam 0.4000 22,500.00 9,000.00
3 Mandor Jam 0.1000 25,000.00 2,500.00
B BAHAN
1 Buis beton 1/2 dia. 30 cm m' 1.0250 71,250.00 73,031.25
2 Pasir urug m3 0.1200 214,500.00 25,740.00
3 Pasir pasang m3 0.0540 276,900.00 14,952.60
4 Semen PC Kg 1.3500 1,267.50 1,711.13
C PERALATAN
1 Alat bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.8000 18,750.00 15,000.00
2 Tukang Jam 0.5333 22,500.00 12,000.00
3 Mandor Jam 0.1333 25,000.00 3,333.33
B BAHAN
1 Buis beton 1/2 dia. 40 cm m' 1.0250 99,000.00 101,475.00
2 Pasir urug m3 0.1600 214,500.00 34,320.00
3 Pasir pasang m3 0.0720 276,900.00 19,936.80
4 Semen PC Kg 1.8000 1,267.50 2,281.50
C PERALATAN
1 Alat bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0000 18,750.00 18,750.00
2 Tukang Jam 0.6667 22,500.00 15,000.00
3 Mandor Jam 0.1667 25,000.00 4,166.67
B BAHAN
1 Buis beton 1/2 dia. 50 cm m' 1.0250 138,750.00 142,218.75
2 Pasir urug m3 0.2000 214,500.00 42,900.00
3 Pasir pasang m3 0.0900 276,900.00 24,921.00
4 Semen PC Kg 2.2500 1,267.50 2,851.88
C PERALATAN
1 Alat bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.2000 18,750.00 22,500.00
2 Tukang Jam 0.8000 22,500.00 18,000.00
3 Mandor Jam 0.2000 25,000.00 5,000.00
B BAHAN
1 Buis beton 1/2 dia. 60 cm m' 1.0250 204,187.50 209,292.19
2 Pasir urug m3 0.2400 214,500.00 51,480.00
3 Pasir pasang m3 0.1080 276,900.00 29,905.20
4 Semen PC Kg 2.7000 1,267.50 3,422.25
C PERALATAN
1 Alat bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3500 18,750.00 6,562.50
2 Tukang Jam 0.1169 22,500.00 2,630.25
3 Mandor Jam 0.1169 25,000.00 2,922.50
B BAHAN
1 Tutup U-Ditch 100 (HD) M1 1.0000 1,011,000.00 1,011,000.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3500 18,750.00 6,562.50
2 Tukang Jam 0.1169 22,500.00 2,630.25
3 Mandor Jam 0.1169 25,000.00 2,922.50
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3234 18,750.00 6,063.75
2 Tukang Jam 0.1078 22,500.00 2,425.50
3 Mandor Jam 0.1078 25,000.00 2,695.00
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3234 18,750.00 6,063.75
2 Tukang Jam 0.1078 22,500.00 2,425.50
3 Mandor Jam 0.1078 25,000.00 2,695.00
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3003 18,750.00 5,630.63
2 Tukang Jam 0.1001 22,500.00 2,252.25
3 Mandor Jam 0.1001 25,000.00 2,502.50
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3003 18,750.00 5,630.63
2 Tukang Jam 0.1001 22,500.00 2,252.25
3 Mandor Jam 0.1001 25,000.00 2,502.50
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2800 18,750.00 5,250.00
2 Tukang Jam 0.0931 22,500.00 2,094.75
3 Mandor Jam 0.0931 25,000.00 2,327.50
B BAHAN
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2800 18,750.00 5,250.00
2 Tukang Jam 0.0931 22,500.00 2,094.75
3 Mandor Jam 0.0931 25,000.00 2,327.50
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2625 18,750.00 4,921.88
2 Tukang Jam 0.0875 22,500.00 1,968.75
3 Mandor Jam 0.0875 25,000.00 2,187.50
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2625 18,750.00 4,921.88
2 Tukang Jam 0.0875 22,500.00 1,968.75
3 Mandor Jam 0.0875 25,000.00 2,187.50
B BAHAN
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
A. TENAGA
B. BAHAN
C. PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.8000 18,750.00 52,500.00
2 Mandor Jam 0.7000 25,000.00 17,500.00
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.5500 216,700.00 119,185.00
2 Pasir M3 0.5500 276,900.00 152,295.00
C PERALATAN
1 Tamper Jam 0.9639 38,000.00 36,628.20
2 Alat Bantu Ls 1.0000 880.00 880.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1667 18,750.00 21,875.00
2 Tukang Jam 0.5833 22,500.00 13,125.00
3 Mandor Jam 0.5833 25,000.00 14,583.33
B BAHAN
1 Pipa Porous m' 1.0500 - -
C PERALATAN
1 Alat Bantu Ls 1.0000 150.00 150.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.6690 18,750.00 87,543.75
2 Mandor Jam 1.1690 25,000.00 29,225.00
B BAHAN
1 Karung Plastik 50 Kg Bh 12.0000 2,500.00 30,000.00
2 Kawat Beton Kg 1.0000 26,200.00 26,200.00
3 Dolken Ø 5-7 x 350-400 cm Btg 2.0000 37,400.00 74,800.00
C PERALATAN
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.6690 18,750.00 87,543.75
2 Mandor Jam 1.1690 25,000.00 29,225.00
B BAHAN
1 Terpal Plastik L = 120 cm m 1.1000 13,600.00 14,960.00
2 Kawat Beton Kg 1.0000 26,200.00 26,200.00
3 Dolken Ø 5-7 x 350-400 cm Btg 2.0000 37,400.00 74,800.00
C PERALATAN
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.9996 18,750.00 18,742.50
2 Tukang Jam 0.9996 22,500.00 22,491.00
3 Mandor Jam 0.2499 25,000.00 6,247.50
B BAHAN
1 Solar Liter 3.0000 #REF! #REF!
C PERALATAN
1 Water Pump Jam 0.9000 61,000.00 54,900.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.4320 18,750.00 8,100.00
2 Tukang Jam 0.7200 22,500.00 16,200.00
3 Kepala Tukang Jam 0.0720 23,750.00 1,710.00
4 Mandor Jam 0.0216 25,000.00 540.00
B BAHAN
1 Pipa PVC, WAVIN, Standard, Ø 2" Batang 0.1000 18,800.00 1,880.00
2 Ijuk Ikat 0.0625 20,800.00 1,300.00
C
1
BACK
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.9091 18,750.00 35,795.45
2 Tukang Jam 0.6364 22,500.00 14,318.18
3 Mandor Jam 0.6364 25,000.00 15,909.09
B BAHAN
1 U-Ditch 30 x 40 Cm M1 1.0000 330,500.00 330,500.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.1000 18,750.00 39,375.00
2 Tukang Jam 0.7000 22,500.00 15,750.00
3 Mandor Jam 0.7000 25,000.00 17,500.00
B BAHAN
1 U-Ditch 30 x 50 Cm M1 1.0000 391,200.00 391,200.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.1000 18,750.00 39,375.00
2 Tukang Jam 0.7000 22,500.00 15,750.00
3 Mandor Jam 0.7000 25,000.00 17,500.00
B BAHAN
1 U-Ditch 40 x 50 Cm M1 1.0000 481,700.00 481,700.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.3333 18,750.00 43,750.00
2 Tukang Jam 0.7778 22,500.00 17,500.50
3 Mandor Jam 0.7778 25,000.00 19,445.00
B BAHAN
1 U-Ditch 40 x 60 Cm M1 1.0000 533,100.00 533,100.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.6250 18,750.00 49,218.75
2 Tukang Jam 0.8750 22,500.00 19,687.50
3 Mandor Jam 0.8750 25,000.00 21,875.00
B BAHAN
1 U-Ditch 60 x 80 Cm M1 1.0000 827,900.00 827,900.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2471 18,750.00 4,633.13
2 Tukang Jam 0.0826 22,500.00 1,858.50
3 Mandor Jam 0.0826 25,000.00 2,065.00
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2471 18,750.00 4,633.13
2 Tukang Jam 0.0826 22,500.00 1,858.50
3 Mandor Jam 0.0826 25,000.00 2,065.00
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.8000 18,750.00 52,500.00
2 Tukang Jam 0.7000 22,500.00 15,750.00
3 Mandor Jam 0.7000 25,000.00 17,500.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 50 x 50 cm M1 1.0000 1,383,200.00 1,383,200.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.5455 18,750.00 47,727.27
2 Tukang Jam 0.6364 22,500.00 14,318.18
3 Mandor Jam 0.6364 25,000.00 15,909.09
B BAHAN
1 Gorong - Gorong Kotak Dim. 40 x 40 cm M1 1.0000 1,012,900.00 1,012,900.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.5000 18,750.00 65,625.00
2 Tukang Jam 0.8750 22,500.00 19,687.50
3 Mandor Jam 0.8750 25,000.00 21,875.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 80 x 100 cm M1 1.0000 - -
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.6667 18,750.00 87,500.00
2 Tukang Jam 1.1667 22,500.00 26,250.00
3 Mandor Jam 1.1667 25,000.00 29,166.67
B BAHAN
1 Gorong - Gorong Kotak Dim. 150 x 150 cm M1 1.0000 8,126,300.00 8,126,300.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
2 Excavator 80 - 120 HP Jam 1.1667 - -
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 5.6000 18,750.00 105,000.00
2 Tukang Jam 1.4000 22,500.00 31,500.00
3 Mandor Jam 1.4000 25,000.00 35,000.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 200 x 200 cm M1 1.0000 11,812,500.00 11,812,500.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
2 Excavator 80 - 120 HP Jam 1.4000 - -
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 5.6000 18,750.00 105,000.00
2 Tukang Jam 1.4000 22,500.00 31,500.00
3 Mandor Jam 1.4000 25,000.00 35,000.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 300 x 150 cm M1 1.0000 14,694,700.00 14,694,700.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
2 Crane 20 Ton Jam 1.4000 564,000.00 789,600.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.9545 18,750.00 17,897.73
2 Tukang Jam 0.3182 22,500.00 7,159.09
3 Mandor Jam 0.3182 25,000.00 7,954.55
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2945 18,750.00 5,521.88
2 Mandor Jam 0.0736 25,000.00 1,840.00
B BAHAN
C PERALATAN
1 Excavator (E10) Jam 0.0736 103,728.57 7,634.42
2 Dump Truck (E08) Jam 0.1848 147,000.00 27,165.60
3 Alat Bantu Ls 1.0000 125.00 125.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 0.1071 18,750.00 2,008.03
2 Mandor (L03) Jam 0.0535 25,000.00 1,337.50
B BAHAN
C PERALATAN
1 Excavator (E10) Jam 0.0535 407,000.00 21,774.50
2 Dump Truck (E08) Jam 0.1537 147,000.00 22,593.90
3 Alat Bantu Ls 1.0000 1,500.00 1,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 4.1667 18,750.00 78,125.00
2 Mandor (L03) Jam 0.4167 25,000.00 10,416.67
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
2 Pick Up Jam 0.7904 46,125.00 36,455.42
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 6.3492 18,750.00 119,047.62
2 Mandor (L03) Jam 0.1984 25,000.00 4,960.32
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
2 Pick Up Jam 0.4748 46,125.00 21,900.77
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 7.3733 18,750.00 138,248.85
2 Mandor (L03) Jam 0.2304 25,000.00 5,760.37
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
2 Pick Up Jam 0.5211 46,125.00 24,034.89
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 8.1633 18,750.00 153,061.22
2 Mandor (L03) Jam 0.2551 25,000.00 6,377.55
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
2 Pick Up Jam 0.5471 46,125.00 25,236.62
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 8.7912 18,750.00 164,835.16
2 Mandor (L03) Jam 0.2747 25,000.00 6,868.13
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
2 Pick Up Jam 0.5755 46,125.00 26,545.23
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0000 18,750.00 18,750.00
2 Mandor Jam 0.1250 25,000.00 3,125.00
B BAHAN
C PERALATAN
1 Compressor Jam 0.1250 118,000.00 14,750.00
2 Jack Hammer Jam 0.1250 38,000.00 4,750.00
3 Wheel Loader Jam 0.1250 350,000.00 43,750.00
4 Dump Truck Jam 0.2631 147,000.00 38,675.70
5 Alat Bantu Ls 1.0000 250.00 250.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 0.2362 18,750.00 4,428.75
2 Mandor (L03) Jam 0.0591 25,000.00 1,477.50
B BAHAN
1 Urugan Pilihan (EI-322) M3 0.5000 180,000.00 90,000.00
C PERALATAN
1 Excavator Jam 0.0591 407,000.00 24,053.70
2 Bulldozer Jam 0.0226 452,000.00 10,215.20
3 Alat Bantu Ls 1.0000 660.00 660.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 0.7753 18,750.00 14,536.88
2 Mandor (L03) Jam 0.0775 25,000.00 1,937.50
B BAHAN
1 Urugan Pilihan (EI-322) M3 0.5000 180,000.00 90,000.00
C PERALATAN
1 Excavator Jam 0.0775 407,000.00 31,542.50
2 Bulldozer Jam 0.0226 452,000.00 10,215.20
3 Alat Bantu Ls 1.0000 600.00 600.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 1.0467 18,750.00 19,625.63
2 Mandor (L03) Jam 0.0872 25,000.00 2,180.00
B BAHAN
C PERALATAN
1 Excavator Jam 0.0872 407,000.00 35,490.40
2 Bulldozer Jam 0.0226 452,000.00 10,215.20
3 Alat Bantu Ls 1.0000 600.00 600.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 10.0000 18,750.00 187,500.00
2 Mandor (L03) Jam 0.5000 25,000.00 12,500.00
B BAHAN
C PERALATAN
1 Pick Up Jam 0.4771 46,125.00 22,006.24
2 Alat Bantu Ls 1.0000 600.00 600.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1
2
B BAHAN
C PERALATAN
1 Dump Truck ( E08 ) Jam 0.0117 147,000.00 1,719.90
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0714 18,750.00 1,338.75
2 Mandor Jam 0.0178 25,000.00 445.00
B BAHAN
1 Bahan Timbunan (Tanah mera(M08) M3 1.2000 307,500.00 369,000.00
C PERALATAN
1 Whell Loader (E15) Jam 0.0178 350,000.00 6,230.00
2 Dump Truck (E08) Jam 0.0994 147,000.00 14,611.80
3 Motor Grader (E13) Jam 0.0061 353,000.00 2,153.30
4 Vibro Roller (E19) Jam 0.0100 289,000.00 2,890.00
5 Water Tanker (E23) Jam 0.0070 235,000.00 1,645.00
6 Alat Bantu Ls 1.0000 1,000.00 1,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0714 18,750.00 1,338.75
2 Mandor Jam 0.0178 25,000.00 445.00
B BAHAN
1 Material Pilihan (M09) M3 1.2000 180,000.00 216,000.00
C PERALATAN
1 Motor Grader (E13) Jam 0.0117 353,000.00 4,130.10
2 Vibro Roller (E19) Jam 0.0214 289,000.00 6,184.60
3 Water Tanker (E23) Jam 0.0070 235,000.00 1,645.00
4 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.4518 18,750.00 8,471.25
2 Mandor Jam 0.1506 25,000.00 3,765.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.1000 18,750.00 39,375.00
2 Mandor Jam 0.0700 25,000.00 1,750.00
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 500.00 500.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.5000 18,750.00 65,625.00
2 Mandor Jam 0.1400 25,000.00 3,500.00
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0161 18,750.00 301.88
2 Mandor Jam 0.0040 25,000.00 100.00
B BAHAN
C PERALATAN
1 Motor Grader (E13) Jam 0.0025 353,000.00 882.50
2 Vibro Roller (E19) Jam 0.0040 289,000.00 1,156.00
3 Alat Bantu Ls 1.0000 350.00 350.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0700 18,750.00 1,312.50
2 Mandor Jam 0.0140 25,000.00 350.00
B BAHAN
C PERALATAN
1 Dump Truck Jam 0.0228 147,000.00 3,345.38
2 Alat Bantu Ls 1.0000 350.00 350.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0140 18,750.00 262.50
2 Mandor Jam 0.0140 25,000.00 350.00
B BAHAN
C PERALATAN
1 Excavator (E10) Jam 0.0054 407,000.00 2,179.38
2 Dump Truck Jam 0.0114 387,000.00 4,403.61
3 Alat Bantu Ls 1.0000 350.00 350.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.6667 18,750.00 87,500.63
2 Tukang Jam 4.6667 22,500.00 105,000.75
3 Mandor Jam 2.3333 25,000.00 58,332.50
B BAHAN
C PERALATAN
1 Dump Truck Jam 0.5000 147,000.00 73,500.00
2 Alat Bantu Ls 1.0000 45,454.55 45,454.55
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 9.3333 18,750.00 174,999.38
2 Tukang Jam 9.3333 22,500.00 209,999.25
3 Mandor Jam 4.6667 25,000.00 116,667.50
B BAHAN
C PERALATAN
1 Dump Truck Jam 1.0000 147,000.00 147,000.00
2 Alat Bantu Ls 1.0000 90,909.09 90,909.09
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 14.0000 18,750.00 262,500.00
2 Tukang Jam 14.0000 22,500.00 315,000.00
3 Mandor Jam 7.0000 25,000.00 175,000.00
B BAHAN
C PERALATAN
1 Dump Truck Jam 1.5000 147,000.00 220,500.00
2 Alat Bantu Ls 1.0000 90,909.09 90,909.09
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.2048 18,750.00 22,590.36
2 Mandor Jam 0.2410 25,000.00 6,024.10
C PERALATAN
1 Stamper Jam 0.2410 38,000.00 9,156.63
2 Alat Bantu Ls 1.0000 600.00 600.00
A. TENAGA
1 Pekerja jam 0.1414 18,750.00 2,651.04
2 mandor jam 0.0177 25,000.00 441.84
B. BAHAN
1 Geotekstile M2 1.0500 - -
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : ………………………………………….
NO. MATA PEMBAYARAN : 3.7 (2)
JENIS PEKERJAAN : GEOGRID
SATUAN PENGUKURAN : M2
A. TENAGA
1 Pekerja jam 0.1414 18,750.00 2,651.04
2 mandor jam 0.0177 25,000.00 441.84
B. BAHAN
1 Geogrid M2 1.0500 - -
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2499 18,750.00 4,685.63
2 Mandor Jam 0.0357 25,000.00 892.50
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.2643 216,700.00 57,273.81
2 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 0.6293 228,000.00 143,480.40
3 Pasir Pasang M3 0.3650 276,900.00 101,068.50
C PERALATAN
1 Motor Grader Kap. 100 HP Jam 0.0117 353,000.00 4,134.87
2 Tandem Roller Jam 0.0357 238,000.00 8,496.21
3 Water Tanker Jam 0.0141 235,000.00 3,303.21
4 Alat Bantu Ls 1.0000 240.00 240.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.9996 18,750.00 18,742.50
2 Mandor Jam 0.0714 25,000.00 1,785.00
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.2643 216,700.00 57,273.81
2 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 0.6293 228,000.00 143,480.40
3 Pasir Pasang M3 0.3650 276,900.00 101,068.50
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.0080 18,750.00 37,650.00
2 Mandor Jam 0.4016 25,000.00 10,040.00
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.2643 216,700.00 57,273.81
2 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 0.6293 228,000.00 143,480.40
3 Pasir Pasang M3 0.3650 276,900.00 101,068.50
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2499 18,750.00 4,685.63
2 Mandor Jam 0.0357 25,000.00 892.50
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.3776 216,700.00 81,825.92
2 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 0.5664 228,000.00 129,139.20
3 Sirtu M3 0.3147 180,000.00 56,646.00
C PERALATAN
1 Motor Grader Kap. 100 HP Jam 0.0117 353,000.00 4,134.87
2 Tandem Roller Jam 0.0357 238,000.00 8,496.21
3 Water Tanker Jam 0.0141 235,000.00 3,303.21
4 Alat Bantu Ls 1.0000 240.00 240.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.9996 18,750.00 18,742.50
2 Mandor Jam 0.0714 25,000.00 1,785.00
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.2643 216,700.00 57,273.81
2 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 0.6293 228,000.00 143,480.40
3 Sirtu M3 0.3650 180,000.00 65,700.00
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.0080 18,750.00 37,650.00
2 Mandor Jam 0.4016 25,000.00 10,040.00
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.2643 216,700.00 57,273.81
2 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 0.6293 228,000.00 143,480.40
3 Sirtu M3 0.3650 180,000.00 65,700.00
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2499 18,750.00 4,685.63
2 Mandor Jam 0.0357 25,000.00 892.50
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.1384 216,700.00 29,991.28
2 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 0.6167 228,000.00 140,607.60
3 Sirtu M3 0.5034 180,000.00 90,612.00
C PERALATAN
1 Motor Grader Kap. 100 HP Jam 0.0039 353,000.00 1,378.29
2 Tandem Roller Jam 0.0357 238,000.00 8,496.21
3 Water Tanker Jam 0.0141 235,000.00 3,303.21
4 Alat Bantu Ls 1.0000 240.00 240.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2499 18,750.00 4,685.63
2 Mandor Jam 0.0357 25,000.00 892.50
B BAHAN
C PERALATAN
1 Motor Grader Kap. 100 HP Jam 0.0117 353,000.00 4,134.87
2 Tandem Roller Jam 0.0357 238,000.00 8,496.21
3 Water Tanker Jam 0.0141 235,000.00 3,303.21
4 Alat Bantu Ls 1.0000 240.00 240.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.6064 18,750.00 30,120.00
2 Tukang Jam 0.5020 22,500.00 11,295.00
3 Mandor Jam 0.2008 25,000.00 5,020.00
B BAHAN
1 Beton K-225 Ready Mix M3 1.0500 822,000.00 863,100.00
2 Multiplek 9mm Lembar 0.0770 106,600.00 8,208.20
3 Acuan / Kayu Bekesting M3 0.0068 3,300,000.00 22,440.00
4 Paku / Angker Kg 0.0807 15,900.00 1,282.79
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 10.0000 11,200.00 112,000.00
C PERALATAN
1 Concrete Vibrator Jam 0.1004 37,000.00 3,714.80
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0710 18,750.00 20,081.25
2 Tukang Jam 0.4685 22,500.00 10,541.25
3 Mandor Jam 0.1339 25,000.00 3,347.50
B BAHAN
1 Beton K-500 Ready Mix M3 1.0500 1,057,500.00 1,110,375.00
2 Multiplek 9mm Lembar 0.0770 106,600.00 8,208.20
3 Acuan / Kayu Bekesting M3 0.0028 3,300,000.00 9,240.00
4 Paku / Angker Kg 0.0321 15,900.00 511.02
5 Joint Sealent M1 0.8000 35,300.00 28,240.00
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 4.0000 11,200.00 44,800.00
C PERALATAN
1 Concrete Vibrator Jam 0.0669 37,000.00 2,475.30
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.6064 18,750.00 30,120.00
2 Tukang Jam 0.5020 22,500.00 11,295.00
3 Mandor Jam 0.2008 25,000.00 5,020.00
B BAHAN
1 Beton K-350 Ready Mix M3 1.0500 893,600.00 938,280.00
2 Multiplek 9mm Lembar 0.0770 106,600.00 8,208.20
3 Acuan / Kayu Bekesting M3 0.0045 3,300,000.00 14,850.00
4 Paku / Angker Kg 0.0457 15,900.00 727.26
5 Joint Sealent M1 1.3333 35,300.00 47,065.49
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 6.6667 11,200.00 74,667.04
C PERALATAN
1 Concrete Vibrator Jam 0.1004 37,000.00 3,714.80
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.4458 18,750.00 27,108.75
2 Tukang Jam 0.4518 22,500.00 10,165.50
3 Mandor Jam 0.1807 25,000.00 4,517.50
1.0710 -
0.4685 -
0.1339 -
B BAHAN
1 Beton K-350 Ready Mix M3 1.0500 893,600.00 938,280.00
2 Multiplek 9mm Lembar 0.0770 106,600.00 8,208.20
3 Acuan / Kayu Bekesting M3 0.0035 3,300,000.00 11,550.00
4 Paku / Angker Kg 0.0377 15,900.00 600.06
5 Joint Sealent M1 1.0000 35,300.00 35,300.00
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 5.0000 11,200.00 56,000.00
C PERALATAN
1 Concrete Vibrator Jam 0.0904 37,000.00 3,344.80
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.3387 18,750.00 25,100.63
2 Tukang Jam 0.5020 22,500.00 11,295.00
3 Mandor Jam 0.1673 25,000.00 4,182.50
B BAHAN
1 Beton K-350 Ready Mix M3 1.0500 893,600.00 938,280.00
2 Multiplek 9mm Lembar 0.0770 106,600.00 8,208.20
3 Acuan / Kayu Bekesting M3 0.0028 3,300,000.00 9,240.00
4 Paku / Angker Kg 0.0321 15,900.00 511.02
5 Joint Sealent M1 0.8000 35,300.00 28,240.00
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 4.0000 11,200.00 44,800.00
C PERALATAN
1 Concrete Vibrator Jam 0.0837 37,000.00 3,096.90
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.2129 18,750.00 60,241.88
2 Tukang Jam 0.6024 22,500.00 13,554.00
3 Mandor Jam 0.4016 25,000.00 10,040.00
B BAHAN
1 Beton K-350 Ready Mix Mini Mixer M3 1.0500 1,334,200.00 1,400,910.00
2 Multiplek 9mm Lembar 0.0770 106,600.00 8,208.20
3 Acuan / Kayu Bekesting M3 0.0046 3,300,000.00 15,180.00
4 Paku / Angker Kg 0.0465 15,900.00 739.98
5 Joint Sealent M1 1.3333 35,300.00 47,065.49
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 6.6667 11,200.00 74,667.04
C PERALATAN
1 Concrete Vibrator Jam 0.2008 37,000.00 7,429.60
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.8273 18,750.00 53,011.88
2 Tukang Jam 0.5301 22,500.00 11,927.25
3 Mandor Jam 0.3534 25,000.00 8,835.00
B BAHAN
1 Beton K-350 Ready Mix Mini Mixer M3 1.0500 1,334,200.00 1,400,910.00
2 Multiplek 9mm Lembar 0.0770 106,600.00 8,208.20
3 Acuan / Kayu Bekesting M3 0.0035 3,300,000.00 11,550.00
4 Paku / Angker Kg 0.0377 15,900.00 600.06
5 Joint Sealent M1 1.0000 35,300.00 35,300.00
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 5.0000 11,200.00 56,000.00
C PERALATAN
1 Concrete Vibrator Jam 0.1767 37,000.00 6,537.90
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.5703 18,750.00 48,193.13
2 Tukang Jam 0.6426 22,500.00 14,458.50
3 Mandor Jam 0.3213 25,000.00 8,032.50
B BAHAN
1 Beton K-350 Ready Mix Mini Mixer M3 1.0500 1,334,200.00 1,400,910.00
2 Multiplek 9mm Lembar 0.0770 106,600.00 8,208.20
3 Acuan / Kayu Bekesting M3 0.0028 3,300,000.00 9,240.00
4 Paku / Angker Kg 0.0321 15,900.00 511.02
5 Joint Sealent M1 0.8000 35,300.00 28,240.00
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 4.0000 11,200.00 44,800.00
C PERALATAN
1 Concrete Vibrator Jam 0.1606 37,000.00 5,942.20
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.7671 18,750.00 33,133.13
2 Tukang Jam 0.5522 22,500.00 12,424.50
3 Mandor Jam 0.2209 25,000.00 5,522.50
B BAHAN
1 Beton K-125 Ready Mix M3 1.0500 729,000.00 765,450.00
2 Multiplek 9mm Lembar 0.0770 106,600.00 8,208.20
3 Acuan / Kayu Bekesting M3 0.0068 3,300,000.00 22,440.00
4 Paku / Angker Kg 0.0641 15,900.00 1,019.82
5 Concrete Curing Ls 1.0000 73,669.50 73,669.50
6 Plastik M2 10.0000 11,200.00 112,000.00
C PERALATAN
1 Concrete Vibrator Jam 0.1104 37,000.00 4,084.80
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.6064 18,750.00 30,120.00
2 Tukang Jam 0.5020 22,500.00 11,295.00
3 Mandor Jam 0.2008 25,000.00 5,020.00
B BAHAN
1 Beton K-125 Ready Mix M3 1.0500 729,000.00 765,450.00
2 Multiplek 9mm Lembar 0.0766 106,600.00 8,165.56
3 Acuan / Kayu Bekesting M3 0.0046 3,300,000.00 15,180.00
4 Paku / Angker Kg 0.0465 15,900.00 739.18
5 Concrete Curing Ls 1.0000 73,669.50 73,669.50
6 Plastik M2 6.6667 11,200.00 74,667.04
C PERALATAN
1 Concrete Vibrator Jam 0.1004 37,000.00 3,714.80
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.8742 18,750.00 35,141.25
2 Tukang Jam 0.4685 22,500.00 10,541.25
3 Mandor Jam 0.2343 25,000.00 5,857.50
B BAHAN
1 Beton B-0 Ready Mix M3 1.0500 708,300.00 743,715.00
2 Acuan / Kayu Bekesting M3 0.0107 3,300,000.00 35,310.00
3 Paku / Angker Kg 0.0856 15,900.00 1,361.04
4 Concrete Curing Ls 1.0000 73,669.50 73,669.50
C PERALATAN
1 Concrete Vibrator Jam 0.1171 37,000.00 4,332.70
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.7671 18,750.00 33,133.13
2 Tukang Jam 0.5522 22,500.00 12,424.50
3 Mandor Jam 0.2209 25,000.00 5,522.50
B BAHAN
1 Beton B-0 Ready Mix M3 1.0500 708,300.00 743,715.00
2 Acuan / Kayu Bekesting M3 0.0054 3,300,000.00 17,820.00
3 Paku / Angker Kg 0.0432 15,900.00 686.88
4 Concrete Curing Ls 1.0000 73,669.50 73,669.50
C PERALATAN
1 Concrete Vibrator Jam 0.1104 37,000.00 4,084.80
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.6064 18,750.00 30,120.00
2 Tukang Jam 0.5020 22,500.00 11,295.00
3 Mandor Jam 0.2008 25,000.00 5,020.00
B BAHAN
1 Beton B0 Ready Mix M3 1.0500 708,300.00 743,715.00
2 Acuan / Kayu Bekesting M3 0.0036 3,300,000.00 11,880.00
3 Paku / Angker Kg 0.0288 15,900.00 457.92
4 Concrete Curing Ls 1.0000 73,669.50 73,669.50
C PERALATAN
1 Concrete Vibrator Jam 0.1004 37,000.00 3,714.80
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2857 18,750.00 5,356.88
2 Tukang Jam 0.0571 22,500.00 1,284.75
3 Kep. Tukang Jam 0.0571 23,750.00 1,356.13
4 Mandor Jam 0.0286 25,000.00 715.00
B BAHAN
1 Kerb Uk. 10.20.40 K-300 Bh 2.6250 19,000.00 49,875.00
2 Semen Kg 1.5843 1,267.50 2,008.10
3 Pasir Pasang M3 0.0044 276,900.00 1,218.36
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2857 18,750.00 5,356.88
2 Tukang Jam 0.0571 22,500.00 1,284.75
3 Kep. Tukang Jam 0.0571 23,750.00 1,356.13
4 Mandor Jam 0.0286 25,000.00 715.00
B BAHAN
1 Kerb Uk. 16/20.30.40 K-300 Bh 2.6250 51,700.00 135,712.50
2 Semen Kg 3.1685 1,267.50 4,016.08
3 Pasir Pasang M3 0.0088 276,900.00 2,436.72
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3500 18,750.00 6,562.50
2 Tukang Jam 0.0700 22,500.00 1,575.00
3 Kep. Tukang Jam 0.0700 23,750.00 1,662.50
4 Mandor Jam 0.0350 25,000.00 875.00
B BAHAN
1 Paving Block ; t = 6 cm K-300 M2 1.0500 93,700.00 98,385.00
2 Abu Batu M3 0.0525 211,500.00 11,103.75
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3684 18,750.00 6,907.50
2 Tukang Jam 0.0737 22,500.00 1,658.25
3 Kep. Tukang Jam 0.0737 23,750.00 1,750.38
4 Mandor Jam 0.0672 25,000.00 1,680.00
B BAHAN
1 Paving Block ; t = 8 cm K-300 M2 1.0500 109,400.00 114,870.00
2 Abu Batu M3 0.0525 211,500.00 11,103.75
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3889 18,750.00 7,291.88
2 Tukang Jam 0.0778 22,500.00 1,750.50
3 Kep. Tukang Jam 0.0778 23,750.00 1,847.75
4 Mandor Jam 0.0389 25,000.00 972.50
B BAHAN
1 Topi Uskup ; t = 6 cm K-300 M2 1.0500 136,100.00 142,905.00
2 Abu Batu M3 0.0525 211,500.00 11,103.75
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.4516 18,750.00 8,467.50
2 Tukang Jam 0.0903 22,500.00 2,031.75
3 Kep. Tukang Jam 0.0903 23,750.00 2,144.63
4 Mandor Jam 0.0452 25,000.00 1,130.00
B BAHAN
1 Topi Uskup ; t = 8 cm K-300 M2 1.0500 156,000.00 163,800.00
2 Abu Batu M3 0.0525 211,500.00 11,103.75
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0301 18,750.00 564.38
2 Mandor Jam 0.0060 25,000.00 150.00
B BAHAN
1 Prime Coat Kg 1.0300 15,900.00 16,377.00
C PERALATAN
1 Asphalt Sprayer Jam 0.0030 123,000.00 369.00
2 Air Compressor Jam 0.0031 118,000.00 365.80
3 Dump Truck Jam 0.0030 147,000.00 441.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0301 18,750.00 564.38
2 Mandor Jam 0.0060 25,000.00 150.00
B BAHAN
1 Tack Coat Kg 1.0300 13,800.00 14,214.00
C PERALATAN
1 Asphalt Sprayer Jam 0.0030 123,000.00 369.00
2 Air Compressor Jam 0.0063 118,000.00 743.40
3 Dump Truck Jam 0.0030 147,000.00 441.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
1.
2.
3.
4.
5. Asphalt Finisher Jam 0.0290 839,000.00 24,310.81
6. Tandem Roller Jam 0.0285 238,000.00 6,788.52
7 P. Tyre Roller Jam 0.0082 366,000.00 2,986.04
8 Alat Bantu Ls 1.0000 0.00 0.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1334 18,750.00 2,501.25
3 Mandor Jam 0.0191 25,000.00 477.50
B BAHAN
1 Material Hotmix ( HRS - WC ) Ton 1.0300 1,320,000.00 1,359,600.00
C PERALATAN
1 Asphalt Finisher Jam 0.0191 839,000.00 16,024.90
2 Tandem Roller Jam 0.0343 238,000.00 8,163.40
3 Pneumatic Tyre Roller Jam 0.0192 366,000.00 7,027.20
4 Alat Bantu Ls 1.0000 120.00 120.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1906 18,750.00 3,573.75
2 Mandor Jam 0.0191 25,000.00 477.50
B BAHAN
1 Material Hotmix AC - WC Ton 1.0300 1,190,200.00 1,225,906.00
C PERALATAN
1 Asphalt Finisher 6 (M) Jam 0.0191 839,000.00 16,024.90
2 Tandem Roller Jam 0.0348 238,000.00 8,282.40
3 Pneumatic Tyre Roller Jam 0.0249 366,000.00 9,113.40
4 Alat Bantu Ls 1.0000 5,000.00 5,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2000 18,750.00 3,750.00
2 Mandor Jam 0.0200 25,000.00 500.00
B BAHAN
1 Material Hotmix AC - WC Ton 1.0300 1,190,200.00 1,225,906.00
C PERALATAN
1 Baby Wales Jam 0.0246 90,600.00 2,228.76
2 Alat Bantu Ls 1.0000 150.00 150.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1906 18,750.00 3,573.75
2 Mandor Jam 0.0191 25,000.00 477.50
B BAHAN
1 Material Hotmic ( AC - BC ) Ton 1.0300 1,133,200.00 1,167,196.00
C PERALATAN
1 Asphalt Finisher Jam 0.0191 839,000.00 16,024.90
2 Tandem Roller Jam 0.0148 238,000.00 3,522.40
3 Pneumatic Tyre Roller Jam 0.0257 366,000.00 9,406.20
4 Alat Bantu Set 1.0000 2,400.00 2,400.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1906 18,750.00 3,573.75
2 Mandor Jam 0.0191 25,000.00 477.50
B BAHAN
1 Laston Lapis Antara Leveling ( AC - BC L ) Ton 1.0489 1,133,200.00 1,188,613.48
C PERALATAN
1 Asphalt Finisher Jam 0.0191 839,000.00 16,024.90
2 Tandem Roller Jam 0.0148 238,000.00 3,522.40
3 Pneumatic Tyre Roller Jam 0.0111 366,000.00 4,062.60
4 Alat Bantu Ls 1.0000 2,100.00 2,100.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1044 18,750.00 20,707.50
2 Tukang Jam 1.2149 22,500.00 27,335.25
3 Mandor Jam 0.1104 25,000.00 2,760.00
B BAHAN
1 Beton K-350 Ready Mix M3 1.0500 893,600.00 938,280.00
2 Acuan / Kayu Bekesting M3 0.2000 3,300,000.00 660,000.00
3 Paku / Angker Kg 1.6000 15,900.00 25,440.00
C PERALATAN
1 Concrete Vibrator Jam 0.1104 37,000.00 4,084.80
2 Alat Bantu Ls 1.0000 900.00 900.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1044 18,750.00 20,707.50
2 Tukang Jam 1.2149 22,500.00 27,335.25
3 Mandor Jam 0.1104 25,000.00 2,760.00
B BAHAN
1 Beton K-300 Ready Mix M3 1.0500 831,700.00 873,285.00
2 Acuan / Kayu Bekesting M3 0.2000 3,300,000.00 660,000.00
3 Paku / Angker Kg 1.6000 15,900.00 25,440.00
C PERALATAN
1 Concrete Vibrator Jam 0.1104 37,000.00 4,084.80
2 Alat Bantu Ls 1.0000 900.00 900.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.8835 18,750.00 16,565.63
2 Tukang Jam 1.2149 22,500.00 27,335.25
3 Mandor Jam 0.1104 25,000.00 2,760.00
B BAHAN
1 Beton K-250 Ready Mix M3 1.0500 840,700.00 882,735.00
2 Acuan / Kayu Bekesting M3 0.2000 3,300,000.00 660,000.00
3 Paku / Angker Kg 1.6000 15,900.00 25,440.00
C PERALATAN
1 Concrete Vibrator Jam 0.1104 37,000.00 4,084.80
2 Alat Bantu Ls 1.0000 900.00 900.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.3655 18,750.00 25,602.41
2 Tukang Jam 1.3655 22,500.00 30,722.89
3 Mandor Jam 0.6827 25,000.00 17,068.27
B BAHAN
1 Pasir Beton M3 0.5205 277,000.00 144,191.78
2 Batu Pecah / Split Uk. 1-2 cm M3 0.7302 228,000.00 166,496.80
3 Semen Abu - Abu Kg 326.0000 1,267.50 413,205.00
4 Acuan / Kayu Bekesting M3 0.1000 3,300,000.00 330,000.00
5 Paku / Angker Kg 0.8000 15,900.00 12,720.00
C PERALATAN
1 Concrete Mixer Jam 0.6827 65,000.00 44,377.51
2 Alat Bantu Ls 1.0000 2,500.00 2,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.3655 18,750.00 25,602.41
2 Tukang Jam 1.3655 22,500.00 30,722.89
3 Mandor Jam 0.6827 25,000.00 17,068.27
B BAHAN
1 Pasir Beton M3 0.5671 277,000.00 157,093.15
2 Koral Beton M3 0.7203 228,000.00 164,224.91
3 Semen Abu - Abu Kg 276.0000 1,267.50 349,830.00
4 Acuan / Kayu Bekesting M3 0.1000 3,300,000.00 330,000.00
5 Paku / Angker Kg 0.8000 15,900.00 12,720.00
C PERALATAN
1 Concrete Mixer Jam 0.6827 65,000.00 44,377.51
2 Alat Bantu Ls 1.0000 2,500.00 2,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.7309 18,750.00 51,204.82
2 Tukang Jam 1.3655 22,500.00 30,722.89
3 Mandor Jam 1.3655 25,000.00 34,136.55
B BAHAN
1 Semen abu - abu Kg 211.1500 1,267.50 267,632.63
2 Pasir Pasang M3 0.4095 276,900.00 113,390.55
3 Koral Beton M3 0.5775 228,000.00 131,670.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(1) a
JENIS PEKERJAAN : UNIT PRACETAK GELAGAR I BENTANG 20.6 METER, TINGGI 125 CM
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
1. Unit Pracetak Gelagar I, Bentang 20.6 m, Tinggi 125 cm unit 1.0000 94,248,000.00 94,248,000.00
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(1) b
JENIS PEKERJAAN : UNIT PRACETAK GELAGAR I BENTANG 25.6 METER, TINGGI 160 CM
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(1) c
JENIS PEKERJAAN : UNIT PRACETAK GELAGAR I BENTANG 30.6 METER, TINGGI 170 CM
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(1) d
JENIS PEKERJAAN : UNIT PRACETAK GELAGAR I BENTANG 35.6 METER, TINGGI 170 CM
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) f
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 8.8 M H = 0.46 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) j
JENIS PEKERJAAN : UNIT VOID SLAB L = 15.6 M H = 0.66 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.3 (1)
JENIS PEKERJAAN : BAJA TULANGAN ( POLOS )
SATUAN PENGUKURAN : KG
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1050 18,750.00 1,968.75
2 Tukang Jam 0.0350 22,500.00 787.50
3 Mandor Jam 0.0350 25,000.00 875.00
B BAHAN
1 Besi Beton ( Polos ) Kg 1.0500 9,715.08 10,200.83
2 Kawat Beton Kg 0.0200 26,200.00 524.00
C PERALATAN
1 Alat Bantu Ls 1.0000 150.00 150.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1050 18,750.00 1,968.75
2 Tukang Jam 0.0350 22,500.00 787.50
3 Mandor Jam 0.0350 25,000.00 875.00
B BAHAN
1 Besi Beton ( Ulir ) Kg 1.0500 10,450.11 10,972.62
2 Kawat Beton Kg 0.0200 26,200.00 524.00
C PERALATAN
1 Alat Bantu Ls 1.0000 150.00 150.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1050 18,750.00 1,968.75
2 Tukang Jam 0.0350 22,500.00 787.50
3 Mandor Jam 0.0175 25,000.00 437.50
B BAHAN
1 Welded Wiremesh Kg 1.0200 16,018.00 16,338.36
2 Kawat Beton Kg 0.0200 26,200.00 524.00
C PERALATAN
1 Alat Bantu Ls 1.0000 150.00 150.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1111 18,750.00 2,083.33
2 Tukang Jam 0.0556 22,500.00 1,250.00
3 Mandor Jam 0.0556 25,000.00 1,388.89
B BAHAN
1 Cerucuk Bambu 8 - 10 cm, 5 - 6 m Btg 0.2000 23,200.00 4,640.00
C PERALATAN
1 Alat Bantu Ls 1.0000 210.00 210.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1111 18,750.00 2,083.33
2 Tukang Jam 0.0556 22,500.00 1,250.00
3 Mandor Jam 0.0556 25,000.00 1,388.89
B BAHAN
1 Cerucuk Dolken 8 - 10 cm,3 - 4 m Btg 0.3333 52,300.00 17,433.33
C PERALATAN
1 Alat Bantu Ls 1.0000 210.00 210.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
JUMLAH
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN HARGA
KUANTITAS (Rp)
( Rp. )
A. TENAGA
1 Pekerja Jam 0.2603 18,750.00 4,880.63
2 Tukang Jam 0.0521 22,500.00 1,171.35
3 Mandor Jam 0.0260 25,000.00 650.75
B. BAHAN
C. PERALATAN
1 Dump Truck 3-4 m³, 100 HP, Kap. 6 ton Jam 0.0433 147,000.00 6,366.64
2 Crane 10-15 TON, 150 HP, Kap. 15 ton Jam 0.0260 564,000.00 14,680.95
3 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
JUMLAH
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN HARGA
KUANTITAS (Rp)
( Rp. )
A. TENAGA
1 Pekerja Jam 0.2975 18,750.00 5,577.87
2 Tukang Jam 0.0595 22,500.00 1,338.69
3 Mandor Jam 0.0297 25,000.00 743.72
B. BAHAN
C. PERALATAN
1 Dump Truck 3-4 m³, 100 HP, Kap. 6 ton Jam 0.0433 147,000.00 6,366.64
2 Crane 10-15 TON, 150 HP, Kap. 15 ton Jam 0.0297 564,000.00 16,778.22
3 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
JUMLAH
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN HARGA
KUANTITAS (Rp)
( Rp. )
A. TENAGA
1 Pekerja Jam 0.3347 18,750.00 6,275.10
2 Tukang Jam 0.0669 22,500.00 1,506.02
3 Mandor Jam 0.0335 25,000.00 836.68
B. BAHAN
C. PERALATAN
1 Dump Truck 3-4 m³, 100 HP, Kap. 6 ton Jam 0.0433 147,000.00 6,366.64
2 Crane 10-15 TON, 150 HP, Kap. 15 ton Jam 0.0335 564,000.00 18,875.50
3 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
JUMLAH
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN HARGA
KUANTITAS (Rp)
( Rp. )
A. TENAGA
1 Pekerja Jam 0.3719 18,750.00 6,972.33
2 Tukang Jam 0.0744 22,500.00 1,673.36
3 Mandor Jam 0.0372 25,000.00 929.64
B. BAHAN
C. PERALATAN
1 Dump Truck 3-4 m³, 100 HP, Kap. 6 ton Jam 0.0511 147,000.00 7,516.18
2 Crane 10-15 TON, 150 HP, Kap. 15 ton Jam 0.0372 564,000.00 20,972.78
Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
SATUAN PENGUKURAN : M1
JUMLAH
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN HARGA
KUANTITAS (Rp)
( Rp. )
A. TENAGA
1 Pekerja Jam 0.2603 18,750.00 4,880.63
2 Tukang Jam 0.0521 22,500.00 1,171.35
3 Mandor Jam 0.0260 25,000.00 650.75
B. BAHAN
1 Sheet Pile Beton Bertulang Pracetak uk. 30 x 12 cm meter 1.0500 263,312.50 276,478.13
C. PERALATAN
1 Dump Truck 3-4 m³, 100 HP, Kap. 6 ton Jam 0.0316 147,000.00 4,646.36
2 Crane 10-15 TON, 150 HP, Kap. 15 ton Jam 0.0260 564,000.00 14,680.95
Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
SATUAN PENGUKURAN : M1
JUMLAH
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN HARGA
KUANTITAS (Rp)
( Rp. )
A. TENAGA
1 Pekerja Jam 0.2975 18,750.00 5,577.87
2 Tukang Jam 0.0595 22,500.00 1,338.69
3 Mandor Jam 0.0297 25,000.00 743.72
B. BAHAN
1 Sheet Pile Beton Bertulang Pracetak uk. 40 x 15 cm meter 1.0500 438,875.00 460,818.75
C. PERALATAN
1 Dump Truck 3-4 m³, 100 HP, Kap. 6 ton Jam 0.0362 147,000.00 5,319.14
2 Crane 10-15 TON, 150 HP, Kap. 15 ton Jam 0.0297 564,000.00 16,778.22
Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
SATUAN PENGUKURAN : M1
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.8925 18,750.00 16,733.60
2 Tukang Jam 0.2231 22,500.00 5,020.08
3 Mandor Jam 0.1116 25,000.00 2,788.93
B BAHAN
C PERALATAN
1 Pile Driver jam 0.1116 91,000.00 10,151.72
2 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
SATUAN PENGUKURAN : M1
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.9817 18,750.00 18,406.96
2 Tukang Jam 0.2454 22,500.00 5,522.09
3 Mandor Jam 0.1227 25,000.00 3,067.83
B BAHAN
C PERALATAN
1 Pile Driver jam 0.1227 91,000.00 11,166.89
2 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
SATUAN PENGUKURAN : M1
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1602 18,750.00 21,753.68
2 Tukang Jam 0.2900 22,500.00 6,526.10
3 Mandor Jam 0.1450 25,000.00 3,625.61
B BAHAN
C PERALATAN
1 Pile Driver jam 0.1450 91,000.00 13,197.23
2 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
SATUAN PENGUKURAN : M1
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.6734 18,750.00 31,375.50
2 Tukang Jam 0.3347 22,500.00 7,530.12
3 Mandor Jam 0.1673 25,000.00 4,183.40
B BAHAN
C PERALATAN
1 Pile Driver jam 0.1673 91,000.00 15,227.58
2 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.6426 18,750.00 12,048.19
2 Tukang Jam 0.1606 22,500.00 3,614.46
3 Mandor Jam 0.0803 25,000.00 2,008.03
B BAHAN
C PERALATAN
1 Pile Driver jam 0.0803 91,000.00 7,309.24
2 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.8936 18,750.00 16,754.52
2 Tukang Jam 0.1787 22,500.00 4,021.08
3 Mandor Jam 0.0894 25,000.00 2,233.94
B BAHAN
C PERALATAN
1 Pile Driver jam 0.0894 91,000.00 8,131.53
2 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.5783 18,750.00 85,843.37
2 Tukang Jam 2.2892 22,500.00 51,506.02
3 Mandor Jam 0.7631 25,000.00 19,076.31
B BAHAN
1 Beton K-250 Ready Mix m3 0.1257 840,700.00 105,645.48
2 Baja Tulangan kg 31.4159 10,450.11 328,300.04
C PERALATAN
1 Bor pile Machine dia.60 jam 0.7631 364,000.00 277,751.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 9.6770 18,750.00 181,443.75
2 Mandor Jam 1.9354 25,000.00 48,385.00
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 2,000.00 2,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 7.7416 18,750.00 145,155.00
2 Mandor Jam 1.5483 25,000.00 38,707.50
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 2,000.00 2,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 11.2000 18,750.00 210,000.00
2 Tukang (L02) Jam 2.8000 22,500.00 63,000.00
3 Mandor (L03) Jam 1.4000 25,000.00 35,000.00
B BAHAN
1 Batu Belah (M02) M3 1.1700 280,300.00 327,951.00
2 Semen (M12) Kg 176.4000 1,267.50 223,587.00
3 Pasir Pasang (M01) M3 0.3961 276,900.00 109,680.09
C PERALATAN
1 Alat Bantu Ls 1.0000 2,100.00 2,100.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 5.4618 18,750.00 102,408.75
2 Tukang (L02) Jam 1.3655 22,500.00 30,723.75
3 Mandor (L03) Jam 0.6827 25,000.00 17,067.50
B BAHAN
1 Batu Belah (M02) M3 1.1700 280,300.00 327,951.00
2 Semen (M12) Kg 176.4000 1,267.50 223,587.00
3 Pasir Pasang (M01) M3 0.3961 276,900.00 109,680.09
C PERALATAN
1 Concrete Mixer ( E06 ) Jam 0.6827 65,000.00 44,375.50
2 Water Tanker (E23) Jam 0.0248 187,000.00 4,637.60
3 Alat Bantu Ls 1.0000 1,200.00 1,200.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 5.2500 18,750.00 98,437.50
2 Tukang Jam 2.6250 22,500.00 59,062.50
3 Mandor Jam 0.8750 25,000.00 21,875.00
B BAHAN
1 Batu Belah M3 1.1000 280,300.00 308,330.00
2 Kawat Bronjong Kg 15.0000 30,700.00 460,500.00
C PERALATAN
1 Alat Bantu Ls 1.0000 400.00 400.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.8193 18,750.00 90,361.45
2 Mandor Jam 1.2048 25,000.00 30,120.48
B BAHAN
C PERALATAN
1 Pick Up Ls 0.2843 46,125.00 13,115.06
2 Alat Bantu Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.1667 18,750.00 78,125.63
2 Mandor Jam 1.0417 25,000.00 26,042.50
B BAHAN
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.4016 18,750.00 7,530.00
2 Tukang Jam 0.2677 22,500.00 6,023.25
3 Mandor Jam 0.1339 25,000.00 3,347.50
B BAHAN
1 Joint Sealent kg 0.8278 35,300.00 29,219.58
C PERALATAN
1 Concrete Cutter Machine Jam 0.1339 - -
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0417 18,750.00 19,531.88
2 Tukang Jam 0.6944 22,500.00 15,624.00
3 Mandor Jam 0.3472 25,000.00 8,680.00
B BAHAN
1 Joint Sealent M3 0.0004 35,300.00 14.12
C PERALATAN
1 Concrete Cutter Machine Jam 0.1389 - -
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.6400 18,750.00 68,250.00
2 Tukang Jam 1.8200 22,500.00 40,950.00
3 Kepala Tukang Jam 0.1820 23,750.00 4,322.50
4 Mandor Jam 0.1820 25,000.00 4,550.00
B BAHAN
1 Papan 2/20 klas kuat III M3 0.0450 2,236,800.00 100,656.00
2 Paku segala ukuran (rata-rata) Kg 0.3000 15,900.00 4,770.00
C PERALATAN
1 Alat Bantu Ls 1.0000 2,500.00 2,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.2000 18,750.00 78,750.00
2 Tukang Jam 2.9400 22,500.00 66,150.00
3 Mandor Jam 0.2100 25,000.00 5,250.00
B BAHAN
1 Rangka Kayu 5/7 Kelas II
Borneo Segala Ukuran M3 0.0608 1,303,000.00 79,222.40
2 Paku segala ukuran ( rata - rata ) Kg 0.3000 15,900.00 4,770.00
C PERALATAN
1 Alat Bantu Ls 1.0000 2,500.00 2,500.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 5.8800 18,750.00 110,250.00
2 Tukang Jam 4.1160 22,500.00 92,610.00
3 Mandor Jam 0.2940 25,000.00 7,350.00
B BAHAN
1 Rangka Kayu 5/7 Kelas II
Borneo Segala Ukuran M3 0.0851 1,303,000.00 110,885.30
2 Paku segala ukuran ( rata - rata ) Kg 0.4200 15,900.00 6,678.00
C PERALATAN
1 Alat Bantu Ls 1.0000 3,500.00 3,500.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 7.5600 18,750.00 141,750.00
2 Tukang Jam 5.2920 22,500.00 119,070.00
3 Mandor Jam 0.3780 25,000.00 9,450.00
B BAHAN
1 Rangka Kayu 5/7 Kelas II
Borneo Segala Ukuran M3 0.1094 1,303,000.00 142,548.20
2 Paku segala ukuran ( rata - rata ) Kg 0.5400 15,900.00 8,586.00
C PERALATAN
1 Alat Bantu Ls 1.0000 4,500.00 4,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 9.6600 18,750.00 181,125.00
2 Tukang Jam 6.7620 22,500.00 152,145.00
3 Mandor Jam 0.4830 25,000.00 12,075.00
B BAHAN
1 Rangka Kayu 5/7 Kelas II
Borneo Segala Ukuran M3 0.1398 1,303,000.00 182,159.40
2 Paku segala ukuran ( rata - rata ) Kg 0.6900 15,900.00 10,971.00
C PERALATAN
1 Alat Bantu Ls 1.0000 5,750.00 5,750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0200 18,750.00 375.00
2 Mandor Jam 0.0033 25,000.00 82.50
B BAHAN
1 Bahan Grouting Kg 1.0300 - -
C PERALATAN
1 Bor (Rock Drill Φ 35mm) jam 0.0625 104,000.00 6,500.00
2 Air Compresor jam 0.0625 118,000.00 7,375.00
3 Pompa dan alat injeksi jam 0.0033 - -
5 Alat Bantu LS 1.0000 250.00 250.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.4000 18,750.00 26,250.00
2 Tukang Jam 1.0500 22,500.00 23,625.00
3 Kepala Tukang Jam 0.1050 23,750.00 2,493.75
4 Mandor Jam 0.0700 25,000.00 1,750.00
B BAHAN
1 Semen Kg 5.5610 1,267.50 7,048.57
2 Pasir Pasang Kg 0.0260 276,900.00 7,199.40
C PERALATAN
1 Alat Bantu Ls 1.0000 250.00 250.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.2000 18,750.00 22,500.00
2 Tukang Jam 0.1800 22,500.00 4,050.00
3 Kepala Tukang Jam 0.0270 23,750.00 641.25
4 Mandor Jam 0.0041 25,000.00 101.25
B BAHAN
1 Semen Kg 4.3200 1,267.50 5,475.60
2 Pasir Pasang Kg 0.0160 276,900.00 4,430.40
C PERALATAN
1 Alat Bantu Ls 1.0000 250.00 250.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.2000 18,750.00 22,500.00
2 Tukang Jam 0.1800 22,500.00 4,050.00
3 Kepala Tukang Jam 0.0270 23,750.00 641.25
4 Mandor Jam 0.0041 25,000.00 101.25
B BAHAN
1 Semen Kg 8.5200 1,267.50 10,799.10
2 Pasir Pasang m3 0.0170 276,900.00 4,707.30
C PERALATAN
1 Alat Bantu Ls 1.0000 250.00 250.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.98 18,750.00 18,375.00
2 Tukang Jam 0.74 22,500.00 16,537.50
3 Kepala Tukang Jam 0.07 23,750.00 1,745.63
4 Mandor Jam 0.05 25,000.00 1,225.00
B BAHAN
1 Semen Kg 3.9360 1,267.50 4,988.88
2 Pasir Pasang m3 0.0260 276,900.00 7,199.40
C PERALATAN
1 Alat Bantu Ls 1.0000 250.00 250.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1750 18,750.00 3,281.25
2 Tukang Jam 0.1750 22,500.00 3,937.50
3 Kep. Tukang Jam 0.0875 23,750.00 2,078.13
4 Mandor Jam 0.0875 25,000.00 2,187.50
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.4800 18,750.00 9,000.00
2 Tukang Jam 0.0480 22,500.00 1,080.00
3 Kepala Tukang Jam 0.0240 23,750.00 570.00
4 Mandor Jam 0.4800 25,000.00 12,000.00
B BAHAN
1 Besi Profil kg 1.0500 15,400.00 16,170.00
C PERALATAN
1 Alat bantu Ls 1.0000 1,000.00 1,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.8640 18,750.00 16,200.00
2 Tukang Jam 1.4400 22,500.00 32,400.00
3 Kepala Tukang Jam 0.1440 23,750.00 3,420.00
4 Mandor Jam 0.0432 25,000.00 1,080.00
B BAHAN
1 Pipa Galvanis 3" m' 1.2000 220,483.33 264,580.00
C PERALATAN
1 Perlengkapan Ls 1.0000 50,000.00 50,000.00
#REF!
Penawar,
BACK #REF!
#REF!
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.4000 18,750.00 7,500.00
2 Tukang Jam 0.1600 22,500.00 3,600.00
3 Kepala Tukang Jam 0.0240 23,750.00 570.00
4 Mandor Jam 0.0080 25,000.00 200.00
B BAHAN
C PERALATAN
1 Perlengkapan Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.0000 18,750.00 37,500.00
2 Tukang Jam 0.8000 22,500.00 18,000.00
3 Kepala Tukang Jam 0.1200 23,750.00 2,850.00
4 Mandor Jam 0.0400 25,000.00 1,000.00
B BAHAN
1 Mur / Baut (untuk jembatan) Bh 1.0000 - -
C PERALATAN
1 Perlengkapan Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.0000 18,750.00 37,500.00
2 Tukang Jam 0.8000 22,500.00 18,000.00
3 Kepala Tukang Jam 0.1200 23,750.00 2,850.00
4 Mandor Jam 0.0400 25,000.00 1,000.00
B BAHAN
1 Angkur Bh 1.0000 20,400.00 20,400.00
2 Kawat Beton Kg 0.0200 26,200.00 524.00
C PERALATAN
1 Perlengkapan Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
A. TENAGA
1 Pekerja Jam 14.0000 18,750.00 262,500.00
2 Tukang Jam 7.0000 22,500.00 157,500.00
3 Mandor Jam 3.5000 25,000.00 87,500.00
B. BAHAN
1 Expansion Joint tipe Asphaltic Plug kg 20.0000 42,000.00 840,000.00
2 Besi Siku 40X40X5 kg 6.0000 15,400.00 92,400.00
C. PERALATAN
1 Concrete Cutter Jam 0.8500 0.00 0.00
2 Mesin Las Listrik Jam 0.2500 85,000.00 21,250.00
3 Alat Bantu Ls 1.0000 800.00 800.00
HARGA JUMLAH
PERKIRAAN
NO. SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.5600 18,750.00 10,500.00
2 Tukang Jam 0.8400 22,500.00 18,900.00
3 Kepala Tukang Jam 0.0320 23,750.00 760.00
4 Mandor Jam 0.0200 25,000.00 500.00
B BAHAN
1 Cat Dasar Kayu/Besi Nippon Paint - Bodelac Metal Prime kg 0.2000 86,800.00 17,360.00
2 Dempul DUCO (SANPOLAC) kg 0.1500 49,900.00 7,485.00
3 Cat Kayu/Besi ICI/Catylac Gloss - Warna Khusus liter 0.1700 68,800.00 11,696.00
Cat dasar
4 Cat Kayu/Besi ICI/Catylac Gloss - Warna Khusus liter 0.3500 68,800.00 24,080.00
Cat penutup 3 kali
C PERALATAN
1 Perlengkapan Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1600 18,750.00 3,000.00
2 Tukang Jam 0.5040 22,500.00 11,340.00
3 Kepala Tukang Jam 0.0480 23,750.00 1,140.00
4 Mandor Jam 0.0240 25,000.00 600.00
B BAHAN
1 Plamur Tembok kg 0.1000 39,300.00 3,930.00
2 Cat dasar liter 0.1000 26,100.00 2,610.00
C PERALATAN
1 Alat Bantu Ls 1.0000 - -
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 5.4217 18,750.00 101,656.63
2 Tukang Jam 2.7108 22,500.00 60,993.98
3 Mandor Jam 0.9036 25,000.00 22,590.36
B BAHAN
1 Beton K-250 Ready Mix m3 0.1963 840,700.00 165,071.06
2 Baja Tulangan kg 39.2699 10,450.11 410,375.05
C PERALATAN
1 Bor pile Machine dia.50 jam 0.9036 #REF! #REF!
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.3655 18,750.00 25,603.13
2 Tukang Jam 1.3655 22,500.00 30,723.75
3 Mandor Jam 0.7560 25,000.00 18,900.00
B BAHAN
1 bh 1.0000 1,250,000.00 1,250,000.00
PC concrete pilar railling motif precast fabric uk. 910x500x300
C PERALATAN
1 Alat Bantu Ls 1.0000 10,000.00 10,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.3655 18,750.00 25,603.13
2 Tukang Jam 1.3655 22,500.00 30,723.75
3 Mandor Jam 0.7560 25,000.00 18,900.00
B BAHAN
1 bh 1.0000 1,500,000.00 1,500,000.00
PC concrete railling motif uk. 1500x740x220
C PERALATAN
1 Alat Bantu Ls 1.0000 10,000.00 10,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) b
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 7.6 M H = 0.57 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) c
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 5,8 M H = 0.46 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) d
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 9.6 M H = 0.57 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) e
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 10.6 M H = 0.52 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) g
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 12.6 M H = 0.66 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) h
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 13.6 M H = 0.66 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) i
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 14.6 M H = 0.66 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2677 18,750.00 5,019.38
2 Mandor Jam 0.1339 25,000.00 3,347.50
B BAHAN
C PERALATAN
1 Excavator (E10) Jam 0.1339 407,000.00 54,497.30
2 Dump Truck (E08) Jam 0.2719 147,000.00 39,969.30
3 Alat Bantu Ls 1.0000 125.00 125.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1044 18,750.00 20,707.50
2 Tukang Jam 1.2149 22,500.00 27,335.25
3 Mandor Jam 0.1104 25,000.00 2,760.00
B BAHAN
1 Beton K-500 Ready Mix M3 1.0500 1,057,500.00 1,110,375.00
2 Acuan / Kayu Bekesting M3 0.2000 3,300,000.00 660,000.00
3 Paku / Angker Kg 1.6000 15,900.00 25,440.00
C PERALATAN
1 Concrete Vibrator Jam 0.1104 37,000.00 4,084.80
2 Alat Bantu Ls 1.0000 900.00 900.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2677 18,750.00 5,019.38
2 Mandor Jam 0.1339 25,000.00 3,347.50
B BAHAN
C PERALATAN
1 Excavator (E10) Jam 0.1339 103,728.57 13,889.26
2 Dump Truck (E08) Jam 0.2719 147,000.00 39,969.30
3 Alat Bantu Ls 1.0000 125.00 125.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
B BAHAN
C PERALATAN
1 Mobil Crane 60 ton Jam 0.9700 8,000,000.00 7,760,000.00
2 Alat Bantu Ls 1.0000 3,500.00 3,500.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
B BAHAN
C PERALATAN
1 Mobil Crane 60 ton Jam 1.0211 8,000,000.00 8,168,912.80
2 Alat Bantu Ls 1.0000 3,500.00 3,500.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
B BAHAN
C PERALATAN
1 Mobil Crane 60 ton Jam 0.9870 8,000,000.00 7,896,304.27
2 Alat Bantu Ls 1.0000 3,500.00 3,500.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
B BAHAN
C PERALATAN
1 Mobil Crane 60 ton Jam 1.0041 8,000,000.00 8,032,608.53
2 Alat Bantu Ls 1.0000 3,500.00 3,500.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0400 18,750.00 750.00
2 Tukang Jam 0.0200 22,500.00 450.00
3 Mandor Jam 0.0100 25,000.00 250.00
B BAHAN
1 Gebalan Rumput manila - tandur M2 1.1000 41,400.00 45,540.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,150.00 1,150.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2800 18,750.00 5,250.00
2 Tukang Jam 0.1400 22,500.00 3,150.00
3 Mandor Jam 0.0700 25,000.00 1,750.00
B BAHAN
1 Pohon Trembesi, diameter 4 cm Pot 1.0000 341,600.00 341,600.00
C PERALATAN
1 Alat Bantu Ls 1.0000 250.00 250.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2800 18,750.00 5,250.00
2 Tukang Jam 0.1400 22,500.00 3,150.00
3 Mandor Jam 0.0700 25,000.00 1,750.00
B BAHAN
1 Pohon Bintaro diameter 5 cm Pot 1.0000 513,000.00 513,000.00
C PERALATAN
1 Alat Bantu Ls 1.0000 250.00 250.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN :
NO. MATA PEMBAYARAN : 8.3 (3)c
JENIS PEKERJAAN : POHON BOUGENVILLE HAWAII ; T = 60,00 CM
SATUAN PENGUKURAN : BH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2800 18,750.00 5,250.00
2 Tukang Jam 0.1400 22,500.00 3,150.00
3 Mandor Jam 0.0700 25,000.00 1,750.00
B BAHAN
1 Bougenville Hawaii ; t = 60 cm Pot 1.0000 174,700.00 174,700.00
2 Tanah untuk media Tanam M3 0.0233 111,400.00 2,595.62
C PERALATAN
1 Alat Bantu Ls 1.0000 250.00 250.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1584 18,750.00 21,720.00
2 Tukang Jam 0.2896 22,500.00 6,516.00
3 Mandor Jam 0.1448 25,000.00 3,620.00
B BAHAN
1 Tiang Lampu type tunggal bh 1.0000 - -
2 Lampu Merkuri 250 watt bh 1.0000 - -
C PERALATAN
1 Flat Bed Truck Jam 0.1448 250,000.00 36,200.00
2 Alat Bantu Ls 1.0000 3,500.00 3,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1584 18,750.00 21,720.00
2 Tukang Jam 0.2896 22,500.00 6,516.00
3 Mandor Jam 0.1448 25,000.00 3,620.00
B BAHAN
1 Tiang Lampu type ganda bh 1.0000 - -
2 Lampu Merkuri 250 watt bh 1.0000 - -
C PERALATAN
1 Flat Bed Truck Jam 0.1448 250,000.00 36,200.00
2 Alat Bantu Ls 1.0000 3,500.00 3,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1584 18,750.00 21,720.00
2 Tukang Jam 0.2896 22,500.00 6,516.00
3 Mandor Jam 0.1448 25,000.00 3,620.00
B BAHAN
1 Tiang Lampu type tunggal bh 1.0000 - -
2 Lampu Merkuri 400 watt bh 1.0000 - -
C PERALATAN
1 Flat Bed Truck Jam 0.1448 250,000.00 36,200.00
2 Alat Bantu Ls 1.0000 3,500.00 3,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1584 18,750.00 21,720.00
2 Tukang Jam 0.2896 22,500.00 6,516.00
3 Mandor Jam 0.1448 25,000.00 3,620.00
B BAHAN
1 Tiang Lampu type Tunggal bh 1.0000 3,540,000.00 3,540,000.00
2 Lampu Merkuri 400 watt bh 1.0000 248,900.00 248,900.00
C PERALATAN
1 Flat Bed Truck Jam 0.1448 250,000.00 36,200.00
2 Alat Bantu Ls 1.0000 3,500.00 3,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3500 18,750.00 6,562.50
2 Tukang Jam 0.1167 22,500.00 2,625.75
3 Mandor Jam 0.1167 25,000.00 2,917.50
B BAHAN
1 Beton Pracetak uk. 50 x 136 cm
; t = 15 cm, K-300 Bh 1.0000 Err:509 Err:509
C PERALATAN
I ASUMSI
II URUTAN KERJA
1 BAHAN
2 ALAT
2.a TAMPER
Lanjutan
V x Fa x 60
Kapasitas produksi / M3 : Q2 7.5455 M3 / Jam
Ts1
diperlukan :
- Sekop = 3 buah
- Alat bantu lainnya
3 TENAGA
Volume Pekerjaan = - M1
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3500 18,750.00 6,562.50
2 Tukang Jam 0.1167 22,500.00 2,625.75
3 Mandor Jam 0.1167 25,000.00 2,917.50
B BAHAN
1 Beton Pracetak uk. 50 x 136 cm
; t = 10 cm, K-300 Bh 1.0000 Err:509 Err:509
C PERALATAN
I ASUMSI
II URUTAN KERJA
1 BAHAN
2 ALAT
2.a TAMPER
Lanjutan
V x Fa x 60
Kapasitas produksi / M3 : Q2 7.5455 M3 / Jam
Ts1
diperlukan :
- Sekop = 3 buah
- Alat bantu lainnya
3 TENAGA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 8.7500 18,750.00 164,062.50
2 Tukang (L02) Jam 1.7500 22,500.00 39,375.00
3 Mandor (L03) Jam 0.8750 25,000.00 21,875.00
B BAHAN
1 Semen (M12) Kg 403.2000 Err:509 Err:509
2 Pasir Pasang (M01) M3 1.2072 Err:509 Err:509
C PERALATAN
1 Alat Bantu Ls 1.0000 2,100.00 2,100.00
Penawar,
……………………………………………
BACK
#REF!
#REF!
URAIAN TEKNIK ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
I ASUMSI
II URUTAN KERJA
1 Semen, pasir dan air dicampur dan diaduk menjadi mortar dengan
menggunakan alat bantu
2 Batu dibersihkan dan dibasahi seluruh permukaannya sebelum
dipasang
3 Penyelesaian dan perapihan setelah pemasangan
1 BAHAN
2 ALAT
diperlukan :
- Sekop = 2 buah
- Pacul = 2 buah
- Sendok Semen = 2 buah
- Ember Cor = 4 buah
- Gerobak Dorong = 1 buah
3 TENAGA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 jam 1.0040 - -
2. Alat Bantu LS 1.0000 500.00 500.00
BACK
URAIAN TEKNIS ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2 (1) b
JENIS PEKERJAAN : UNIT VOIDED SLAAB BENTANG 15 METER, TINGGI 52 CM
SATUAN PENGUKURAN : BUAH
I. ASUMSI
1 Voided Slaab dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00 jam
3 Tinggi PC Voided Slaab H 0.52 M
4 Bentang PC Voided Slaab L 15.00 M
5 Menggunakan beton K500
6 Komponen baja tulangan 250 kg/m3
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00 Buah sepasang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu memuat dan membongkar T1 35.00 menit
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00 menit
Ts2 50.00 menit
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 5.00 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 5.00 orang
- Pekerja P 18.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.40 jam
- Tukang = (Tk x Tb) : Qt (L02) 7.00 jam
- Pekerja = (Tk x P) : Qt (L01) 25.20 jam
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2 (1) b
JENIS PEKERJAAN : UNIT VOIDED SLAAB BENTANG 20 METER, TINGGI 52 CM
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 jam 1.1044 - -
2. Alat Bantu LS 1.0000 500.00 500.00
BACK
URAIAN TEKNIS ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2 (1) b
JENIS PEKERJAAN : UNIT VOIDED SLAAB BENTANG 20 METER, TINGGI 52 CM
SATUAN PENGUKURAN : BUAH
I. ASUMSI
1 Voided Slaab dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00 jam
3 Tinggi PC Voided Slaab H 0.52 M
4 Bentang PC Voided Slaab L 15.00 M
5 Menggunakan beton K500
6 Komponen baja tulangan 250 kg/m3
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00 Buah
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu memuat dan membongkar T1 40.00 menit
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00 menit
Ts2 55.00 menit
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 4.00 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 5.00 orang
- Pekerja P 18.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.75 jam
- Tukang = (Tk x Tb) : Qt (L02) 8.75 jam
- Pekerja = (Tk x P) : Qt (L01) 31.50 jam
ALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
KETERANGAN
tinggi 52
tabel
tabel
analisa tabel
sepasang
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2 (1) b
JENIS PEKERJAAN : UNIT VOIDED SLAAB BENTANG 25 METER, TINGGI 52 CM
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 jam 1.2048 - -
2. Alat Bantu LS 1.0000 500.00 500.00
BACK
URAIAN TEKNIS ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2 (1) b
JENIS PEKERJAAN : UNIT VOIDED SLAAB BENTANG 25 METER, TINGGI 52 CM
SATUAN PENGUKURAN : BUAH
I. ASUMSI
1 Voided Slaab dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00 jam
3 Tinggi PC Voided Slaab H 0.52 M
4 Bentang PC Voided Slaab L 15.00 M
5 Menggunakan beton K500
6 Komponen baja tulangan 250 kg/m3
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00 Buah sepasang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu memuat dan membongkar T1 45.00 menit
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00 menit
Ts2 60.00 menit
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 3.00 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 5.00 orang
- Pekerja P 18.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 2.33 jam
- Tukang = (Tk x Tb) : Qt (L02) 11.67 jam
- Pekerja = (Tk x P) : Qt (L01) 42.00 jam
DAFTAR ANALISA PEKERJAAN MARK JALAN
HARGA JUMLAH
NO. URAIAN PEKERJAAN
SATUAN (Rp) HARGA (Rp)
1 2 3 4
A Tenaga
0.5000 oh Pekerja 18,750 9,375.00
0.2250 oh Tukang Cat 22,500 5,062.50
0.0025 oh Kepala Tukang Cat 23,750 59.38
0.0075 oh Mandor 25,000 187.50
Jumlah Harga Tenaga 14,684.38
B Bahan
0.9000 kg Thermoplastik 208,000 187,200.00
0.1000 kg Glassbeads 29,400 2,940.00
Jumlah Harga Bahan 190,140.00
C Alat
1.0000 ls Alat bantu 500 500.00
Jumlah Harga Alat 500.00
HARGA JUMLAH
NO. URAIAN PEKERJAAN
SATUAN (Rp) HARGA (Rp)
1 2 3 4
PERKIRA
HARGA JUMLAH
AN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTI
( Rp. ) ( Rp. )
TAS
A TENAGA
1 Pekerja jam 3.5000 18,750.00 65,625.00
2 Tukang jam 1.1667 22,500.00 26,250.75
3 Mandor jam 1.1667 25,000.00 29,167.50
B BAHAN
1 U-Ditch 120 x 120 Cm M1 1.0000 2,290,100.00 2,290,100.00
C PERALATAN
PERKIRA
HARGA JUMLAH
AN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTI
( Rp. ) ( Rp. )
TAS
A TENAGA
1 Pekerja jam 3.5000 18,750.00 65,625.00
2 Tukang jam 1.1667 22,500.00 26,250.75
3 Mandor jam 1.1667 25,000.00 29,167.50
B BAHAN
1 U-Ditch 150 x 150 Cm M1 1.0000 3,563,700.00 3,563,700.00
C PERALATAN
PERKIRA
HARGA JUMLAH
AN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTI
( Rp. ) ( Rp. )
TAS
A TENAGA
1 Pekerja jam 3.5000 18,750.00 65,625.00
2 Tukang jam 1.1667 22,500.00 26,250.75
3 Mandor jam 1.1667 25,000.00 29,167.50
B BAHAN
1 U-Ditch 200 x 200 Cm M1 1.0000 6,530,000.00 6,530,000.00
C PERALATAN
HARGA
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN
KUANTITAS
( Rp. )
A TENAGA
1 Pekerja Jam 1.6064 18,750.00
2 Tukang Jam 0.4016 22,500.00
3 Mandor Jam 0.2008 25,000.00
B BAHAN
1 Beton K-350 Ready Mix 3 hari M3 1.0500 1,382,300.00
2 Multiplek 9mm Lembar 0.0770 106,600.00
3 Acuan / Kayu Bekesting M3 0.0045 3,300,000.00
4 Paku / Angker Kg 0.0457 15,900.00
5 Joint Sealent M1 1.3333 35,300.00
6 Concrete Curing Ls 1.0000 73,669.50
7 Plastik M2 6.6667 11,200.00
C PERALATAN
1 Concrete Vibrator Jam 0.1004 37,000.00
2 Alat Bantu Ls 1.0000 750.00
JUMLAH
HARGA NO. URAIAN KODE
( Rp. )
I ASUMSI
30,120.00 1 Pekerjaan dilakukan dengan menggunakan alat ( cara mekanik )
9,036.00 2 Lokasi pekerjaan : Sepanjang jalan
5,020.00 3 Bahan jadi ( Beton Ready Mix ) diterima di lokasi pekerjaan
4 Jarak rata - rata Base Camp ke lokasi pe L
5 Jam kerja efektif per - hari Tk
6 Tebal Beton Tb
7 Kadar semen ( Sp- Maksimum Ks1
- Minimum Ks2
44,176.00 8 Perbandingan air / semen maksimum ( Spe Wcr
9 Perb: 1,00 Semen Sm
: 2,50 Pasir Ps
1,451,415.00 : 4,00 Aggregat Kasar Kr
8,208.20
14,850.00 10 Berat Jenis Material
727.26 - Beton D1
47,065.49 - Semen D2
73,669.50 - Pasir D3
74,667.04 - Aggregat Kasar D4
1 BAHAN
1 Beto= Volume x 1.05
1.a. Seme= { Sm x D1 x 1.000 } x 1.05
1.b. Pasi = (( Ps x D1 ) / D3 } x 1.05
1.c. Agre= ( Kr x D1 ) / D4 } x 1.10
1.d. Multiplek 9mm
4,464.80 1.e. Bekisting / Acuan
1.f. Paku / Angker
1,719,243.29 1.g Joint Sealent
257,886.49
1,977,129.78 1.g Concrete Curing
1.h Plastik
2 ALAT
2.a WHEEL LOADER
Kapasitas alat V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu siklus Ts
- Memuat T1
- Lain - lain T2
Ts
V x Fb x Fa x 60
Kapa : Q1
Ts
Koef= 1 : Q1
Kapasitas produksi V
Faktor efisiensi alat Fa
Waktu siklus Ts
- Memuat T1
- Mengaduk T2
- Menuang T3
- Tunggu dan Lain - lain T4
Ts
V x Fa x 60
Kapa : Q1
Ts
Koef= 1 : Q1
V x Fa x n
Kapa : Q2
Wc
Koef= 1 : Q2
2.d CONCRETE VIBRATOR
Koef= 1 : Q3
Kapasitas V
Faktor Efisiensi alat Fa
Waktu siklus Ts
- Berputar T1
- Membuang T1
- Lain - lain T2
Ts
V x Fa x 60
Kapa : Q2
Ts
Koef= 1 : Q2
diperlukan :
- S = 2 buah
- Pa= 2 buah
- S = 3 buah
- E = 8 buah
3 TENAGA
Prod: Tk x Q Qt
Kebutuhan Tenaga :
- Pekerja P
- Tukang batu Tb
- Tukang kayu Tk
- Mandor M
- Pekerja = ( Tk x P ) /Qt
Koefisien Tenaga / M3 : - Tukang = ( Tk x T ) / Qt
- Mandor = ( Tk x M ) / Qt
Volu= ……………M3
UAN MATA PEMBAYARAN UTAMA
a di lokasi pekerjaan
- Km
7.00 Jam
15.00 Cm
335.00 Kg / M3
385.00 Kg / M3
0.4750 -
13.29 %
33.23 %
53.47 %
2.40 Ton / M3
1.44 Ton / M3
2.00 Ton / M3
2.15 Ton / M3
1.0500 m3
335.0000 Kg
0.4187 M3
0.6566 M3
- Lembar ###
- M3
- Kg
- M1
1.0000 Ls
- M2
1.5000 M3
0.9000 -
0.8300
2.5000 Menit
5.0000 Menit
7.5000 Menit
Lanjutan
KOEF. SATUAN KET
8.9640 M3
0.1116 Jam
2.0000 M3
0.8300
2.0000 Menit
2.0000 Menit
2.0000 Menit
0.2500 Menit
11.0000 Menit
9.0545 M3
0.1104 Jam
4.0000 M3
0.1675 M3
0.8300 -
1.0000 Kali
19.8209 M3
0.0505 Jam
ikan dengan kapasitas
9.9600 M3
0.1004 Jam
6.00 M3
0.83
7.0000 Menit
15.0000 Menit
8.0000 Menit
30.0000 Menit
Lanjutan
KOEF. SATUAN KET
9.9600 M3
0.1004 Jam
69.7200 M3
16.0000 Orang
4.0000 Orang 20m3/org
- Orang 2m3/org
2.0000 Orang
1.6064 Jam
0.4016 Jam
0.2008 Jam
PERLUKAN
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
PERKIRA
HARGA JUMLAH
AN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTI
( Rp. ) ( Rp. )
TAS
A TENAGA
1 Pekerja Jam 1.4458 18,750.00 27,108.75
2 Tukang Jam 0.3614 22,500.00 8,131.50
3 Mandor Jam 0.1807 25,000.00 4,517.50
B BAHAN
1 Beton K-350 Ready Mix 3 hari M3 1.0500 1,382,300.00 1,451,415.00
2 Multiplek 9mm Lembar 0.0770 106,600.00 8,208.20
3 Acuan / Kayu Bekesting M3 0.0035 3,300,000.00 11,550.00
4 Paku / Angker Kg 0.0377 15,900.00 600.06
5 Joint Sealent M1 1.0000 35,300.00 35,300.00
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 5.0000 11,200.00 56,000.00
C PERALATAN
1 Concrete Vibrator Jam 0.0904 37,000.00 3,344.80
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
PERKIRA
HARGA JUMLAH
AN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTI
( Rp. ) ( Rp. )
TAS
A TENAGA
1 Pekerja Jam 1.3387 18,750.00 25,100.63
2 Tukang Jam 0.4183 22,500.00 9,411.75
3 Mandor Jam 0.1673 25,000.00 4,182.50
B BAHAN
1 Beton K-350 Ready Mix M3 1.0500 1,382,300.00 1,451,415.00
2 Multiplek 9mm Lembar 0.0770 106,600.00 8,208.20
3 Acuan / Kayu Bekesting M3 0.0028 3,300,000.00 9,240.00
4 Paku / Angker Kg 0.0321 15,900.00 511.02
5 Joint Sealent M1 0.8000 35,300.00 28,240.00
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 4.0000 11,200.00 44,800.00
C PERALATAN
1 Concrete Vibrator Jam 0.0837 37,000.00 3,096.90
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
PERKIRA
HARGA JUMLAH
AN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTI
( Rp. ) ( Rp. )
TAS
A TENAGA
1 Pekerja Jam 1.0710 18,750.00 20,081.25
2 Tukang Jam 0.4016 22,500.00 9,036.00
3 Mandor Jam 0.1339 25,000.00 3,347.50
B BAHAN
1 Beton K-225 Ready Mix M3 1.0500 822,000.00 863,100.00
2 Multiplek 9mm Lembar - 106,600.00 -
3 Acuan / Kayu Bekesting M3 0.0068 3,300,000.00 22,440.00
4 Paku / Angker Kg 0.0807 15,900.00 1,282.79
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 10.0000 11,200.00 112,000.00
C PERALATAN
1 Concrete Vibrator Jam 0.0669 37,000.00 2,475.30
2 Alat Bantu Ls 1.0000 750.00 750.00
I ASUMSI
1 Pekerjaan dilakukan dengan menggunakan alat ( cara mekanik )
2 Lokasi pekerjaan : Sepanjang jalan
3 Bahan jadi ( Beton Ready Mix ) diterima di lokasi pekerjaan
4 Jarak rata - rata Base Camp ke lokasi pe L -
5 Jam kerja efektif per - hari Tk 7.00
6 Tebal Beton Tb 15.00
7 Kadar semen ( Sp- Maksimum Ks1 335.00
- Minimum Ks2 385.00
8 Perbandingan air / semen maksimum ( Spe Wcr 0.4750
9 Perb: 1,00 Semen Sm 13.29
: 2,50 Pasir Ps 33.23
: 4,00 Aggregat Kasar Kr 53.47
II URUTAN KERJA
1 Beton Ready Mix ditimbang dan di Batching Plant, kemudian dicampur
dan diantar ke lokasi pekerjaan dengan menggunakan Truck Mixer
2 Beton di cor ke dalam perancah yang telah disiapkan
3 Penyelesaian dan perapihan setelah pemasangan
1 BAHAN
1 Beto= Volume x 1.05 1.0500
1.a. Seme= { Sm x D1 x 1.000 } x 1.05 335.0000
1.b. Pasi = (( Ps x D1 ) / D3 } x 1.05 0.4187
1.c. Agre= ( Kr x D1 ) / D4 } x 1.10 0.6566
1.d. Multiplek 9mm -
1.e. Bekisting / Acuan -
1.f. Paku / Angker -
1.g Joint Sealent -
V x Fb x Fa x 60
Kapa : Q1 8.9640
Ts
Koef= 1 : Q1 0.1116
V x Fa x 60
Kapa : Q1 9.0545
Ts
Koef= 1 : Q1 0.1104
V x Fa x n
Kapa : Q2 19.8209
Wc
Koef= 1 : Q2 0.0505
Koef= 1 : Q3 0.0669
Kapasitas V 6.00
Faktor Efisiensi alat Fa 0.83
Waktu siklus Ts
- Berputar T1 5.0000
- Membuang T1 12.0000
- Lain - lain T2 3.0000
Ts 20.0000
V x Fa x 60
Kapa : Q2 14.9400
Ts
Koef= 1 : Q2 0.0669
diperlukan :
- S = 2 buah
- Pa= 2 buah
- S = 3 buah
- E= 8 buah
3 TENAGA
Prod: Tk x Q Qt 104.5800
Kebutuhan Tenaga :
- Pekerja P 16.0000
- Tukang batu Tb 6.0000
- Tukang kayu Tk -
- Mandor M 2.0000
Volu= ……………M3
A PEMBAYARAN UTAMA
SATUAN KET
Km
Jam
Cm
Kg / M3
Kg / M3
-
%
%
%
Ton / M3
Ton / M3
Ton / M3
Ton / M3
m3
Kg
M3
M3
Lembar ###
M3
Kg
M1
Ls
M2
M3
-
Menit
Menit
Menit
A PEMBAYARAN UTAMA
Lanjutan
SATUAN KET
M3
Jam
M3
Menit
Menit
Menit
Menit
Menit
M3
Jam
M3
M3
-
Kali
M3
Jam
M3
Jam
M3
Menit
Menit
Menit
Menit
A PEMBAYARAN UTAMA
Lanjutan
SATUAN KET
M3
Jam
M3
Orang
Orang 20m3/org
Orang 2m3/org
Orang
Jam
Jam
Jam
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET
PROP / KAB / KODYA : Banten/Tanggerang
ITEM PEMBAYARAN NO. PERKIRAAN VOL.: 0.00
JENIS PEKERJAAN : Tiang Bor Beton ukuran dia 600 mm TOTAL HARGA (Rp: 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA P : 0.00
A. TENAGA
1. Pekerja (L01) jam 0.0099 18,750.00 185.63
2. Tukang (L02) jam 0.0050 22,500.00 112.50
3. Mandor (L03) jam 0.0017 25,000.00 42.50
B. BAHAN
C. PERALATAN
NAMA PAKET
PROP / KAB / KODYA : Banten/Tanggerang
ITEM PEMBAYARAN NO. PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Tiang Bor Beton ukuran dia TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.00
A. TENAGA
1. Pekerja (L01) jam 0.0099 16,000.00 158.40
2. Tukang (L02) jam 0.0050 19,000.00 95.00
3. Mandor (L03) jam 0.0017 22,000.00 37.40
B. BAHAN
C. PERALATAN
PERKIRA
HARGA
AN
NO. KOMPONEN SATUAN SATUAN
KUANTI
( Rp. )
TAS
A TENAGA
1 Pekerja Jam 0.3500 18,750.00
2 Tukang Jam 0.0700 22,500.00
3 Kep. Tukang Jam 0.0700 23,750.00
4 Mandor Jam 0.0350 25,000.00
B BAHAN
1 Paving Block ; t = 6 cm K-2 M2 1.0500 71,500.00
2 Abu Batu M3 0.0525 211,500.00
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00
BACK
AYARAN UTAMA
JUMLAH
HARGA
( Rp. )
6,562.50
1,575.00
1,662.50
875.00
10,675.00
75,075.00
11,103.75
86,178.75
600.00
600.00
97,453.75
14,618.06
112,071.81
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN :
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 8.6 M H = 0.57 M k-600
SATUAN PENGUKURAN : BUAH
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
PERKIRA
HARGA
AN
NO. KOMPONEN SATUAN SATUAN
KUANTI
( Rp. )
TAS
A TENAGA
1 Pekerja hari 0.4071 150,000.00
2 Tukang hari 0.2443 180,000.00
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 500.00
BACK
AYARAN UTAMA
JUMLAH
HARGA
( Rp. )
61,065.00
43,974.00
4,420.00
109,459.00
500.00
500.00
109,959.00
16,493.85
126,452.85
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
PERKIRAAN
NO. KOMPONEN SATUAN
KUANTITAS
A TENAGA
1 Pekerja Jam 1.4155
2 Tukang Jam 0.3539
3 Mandor Jam 0.1769
B BAHAN
1 Beam Baja Uk. 4320x312x2.7 mm Btg 0.2500
2 Tiang penyangga (Chanel Post) Uk. 1800x178x6 mm Bh 1.0000
3 Besi pengikat (Blocking Piece) Uk. 350x178x78x6 mm Bh 3.0000
4 Baut M. 16x32 mm (Blocking) Bh 21.0000
5 Besi Angkur 30x30x3 mm M 3.0000
6 Adukan Readymix K-175 M3 0.3000
7 Pasir Pasang (Sedang) M3 0.3000
C PERALATAN
1 Dump Truk Jam 0.5016
2 Alat Bantu Ls 1.0000
HARGA JUMLAH
SATUAN HARGA
( Rp. ) ( Rp. )
18,750.00 26,540.63
22,500.00 7,962.75
25,000.00 4,422.50
750,000.00 187,500.00
336,000.00 336,000.00
85,500.00 256,500.00
15,000.00 315,000.00
28,500.00 85,500.00
798,700.00 239,610.00
276,900.00 83,070.00
147,000.00 73,735.20
1,500.00 1,500.00
1,617,341.08
242,601.16
1,859,942.24
NAMA PAKET KEGI : ……………………………………………………..
NO. MATA PEMBAY : 8.2 (3)
JENIS PEKERJAAN : PENEBANGAN POHON ; Uk. 30 - 50 CM
SATUAN PENGUKU : BH
PERKIRA
HARGA
AN
NO. KOMPONEN SATUAN SATUAN
KUANTI
( Rp. )
TAS
A TENAGA
1 Pekerja Jam 4.6667 18,750.00
2 Tukang Jam 4.6667 22,500.00
3 Mandor Jam 2.3333 25,000.00
JUMLAH HA
B BAHAN
JUMLAH HA
C PERALATAN
1 Dump Truck Jam 0.5000 147,000.00
2 Alat Bantu Ls 1.0000 5,000.00
JUMLAH HA
JUMLAH
HARGA
( Rp. )
87500.625
105000.75
58332.5
250833.875
73500
5000
78500
329333.875
49,400.08
378,733.96