Anda di halaman 1dari 2

Permohonan Biaya Akad

3 Unit

Block Nama Konsumen No. Sertipikat/NIB NOP


U.20 Imas Nuraisah 0016 + NIB 2746 32.18.120.006.009.0084.0
P. 17 Ali Mahfut NIB 2741 32.18.120.006.009.0082.0
S.11 Iwan Sumpena 0120 32.18.120.006.009.0084.0

Biaya Pajak Harga Jual Perhitungan Pajak Validasi Jumlah Jumlah Unit TOTAL Catatan
SSP 168,000,000.00 x 1 % 1,680,000.00 250,000.00 1,930,000.00 3 5,790,000.00 Bayar Sendiri
BPHTB 168,000,000.00 (Harga Jual - 60.000.000,-) x 5% 5,400,000.00 250,000.00 5,650,000.00 3 16,950,000.00
22,740,000.00

Biaya Pesiapan Akad


PDAM 3 1,500,000.00 4,500,000.00
LPA 3 650,000.00 1,950,000.00
SLF 3 150,000.00 450,000.00
Untuk Orang LPA dan SLF 750,000.00
Ember tempat sampah 3 50,000.00 150,000.00
Plat No Rumah 3 10,000.00 30,000.00
Perapihan Blok S.11 1,050,000.00 1,050,000.00
8,880,000.00

Total keseluruhan 31,620,000.00

Catatan
5,790,000 Bayar Sendiri SSP
16,950,000 Ke Rekening Mustopa
BPHTB
: BRI 110501012054509 an Mustopa Kamal
8,880,000 Ke Rekening pa Awang : BRI 53701000130565 an Awang Prasetya

Anda mungkin juga menyukai