B. BAHAN FINISHING :
LABURAN, PENGISI DAN ALATNYA
1 Plamir Tembok sek. ICI Kg 20,000.00
2 Cat Dasar Tembok sek. Catylac Ltr 18,000.00
3 Cat Tembok sek. Catylac Plapond Ltr 22,000.00
4 Rool Cat Tembok Bh 27,500.00
5 Solignem 1 blek Ltr 12,500.00
6 Kwas 3" Bh 17,500.00
7 Terpentin Ltr 17,500.00
8 Tiner A Ltr 36,000.00
9 Ampelas Lbr 8,000.00
10 Dempul Halus / Imfra ( Wood Filler ) Kg 22,000.00
11 Politur Ltr 35,000.00
12 Ultran Kg 37,000.00
13 Wood Stain Kg 36,000.00
14 Melamine Sending Siller Kg 36,000.00
15 ML 131 Clear Dana Gloss Kg 32,000.00
16 Dempul Kayu Cap Kucing Kg 15,000.00
17 Dempul Besi Kg 54,000.00
18 Meni Kayu / Besi Kg 65,000.00
19 Zincromat Kg 65,000.00
20 Cat Dasar Kayu Kg 45,000.00
21 Cat Kayu SEIV Kg 65,000.00
22 Cat Besi SEIV Kg 65,000.00
23 Cat Dinding sek. ICI Dulux (Interior) Pearl Glo - A913 L Ltr 87,500.00
24 Cat Dinding sek. ICI Dulux (Exterior) Weather Shield MAX - A 194 Ltr 93,000.00
25 Alkali Resisting Primer A931 - 1050 N Kg 550,000.00
26 Soda Api Kg 45,000.00
J. BAHAN KACA
1 Kaca Polos 5 mm M2 135,000.00
2 Kaca Polos 6 mm M2 175,000.00
L. BAHAN PERPIPAAN
PIPA PVC CLASS AW
1 Pipa PVC type AW Ø 1/2" (15 mm2) Btng 26,000.00
2 Pipa PVC type AW Ø 3/4" (20 mm2) Btng 32,000.00
3 Pipa PVC type AW Ø 1" (25 mm2) Btng 41,000.00
4 Pipa PVC type AW Ø 1 1/4" (32 mm2) Btng 50,000.00
5 Pipa PVC type AW Ø 1 1/2" (40 mm2) Btng 59,000.00
6 Pipa PVC type AW Ø 2" (50 mm2) Btng 65,000.00
7 Pipa PVC type AW Ø 2 1/2" (65 mm2) Btng 85,000.00
8 Pipa PVC type AW Ø 3" (80 mm2) Btng 115,000.00
9 Pipa PVC type AW Ø 4" (100 mm2) Btng 145,000.00
10 Pipa PVC type AW Ø 5" (125 mm2) Btng 175,000.00
11 Pipa PVC type AW Ø 6" (150 mm2) Btng 223,000.00
12 Lem Paralon Tb 12,500.00
13 Solatip Leideng Glng 4,500.00
15 Membuat 1 m3 beton mutu f'c = 14.5 Mpa (K175), slump (12 ± 2)cm, w/c = 0,85
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 95,000.00 156,750.00
Tukang Batu L.02 OH 0.2750 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.0280 150,000.00 4,200.00
Mandor L.04 OH 0.0830 150,000.00 12,450.00
JUMLAH TENAGA KERJA 203,650.00
B BAHAN
Semen Portland Kg 326.0000 1,500.00 489,000.00
Pasir Beton M3 0.5429 260,000.00 141,142.86
Kerikil M3 0.7622 265,000.00 201,988.89
(Maks
Air 30mm) Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 842,881.75
C PERALATAN
ls 1 1000 1,000.00
JUMLAH HARGA ALAT 1,000.00
17 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 95,000.00 156,750.00
Tukang Batu L.02 OH 0.2750 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.0280 150,000.00 4,200.00
Mandor L.04 OH 0.0830 150,000.00 12,450.00
JUMLAH TENAGA KERJA 203,650.00
B BAHAN
Semen Portland Kg 371.0000 1,500.00 556,500.00
Pasir Beton M3 0.4986 260,000.00 129,628.57
Kerikil (Maks 30mm) M3 0.7756 265,000.00 205,522.22
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 902,400.79
C PERALATAN
ls 1 1000 1,000.00
JUMLAH HARGA ALAT 1,000.00
75 1 M3 Plat Dak t = 10 cm
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Beton K 250 M3 1.0000 1,123,866.14 1,123,866.14
Besi Beton Kg 80.0000 11,105.00 888,400.00
Bekisting M2 10.0000 260,600.00 2,606,000.00
Harga Satuan Pekerjaan 4,618,266.14
90 Pemasangan 1 m2 dinding bata merah (5x11x12) cm tebal 1 batu campuran 1SP : 5PP
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 95,000.00 57,000.00
Tukang Batu L.02 OH 0.2000 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0300 150,000.00 4,500.00
JUMLAH TENAGA KERJA 86,500.00
B BAHAN
Bata merah M3 140.0000 950.00 133,000.00
Semen Portlan Kg 22.2000 1,500.00 33,300.00
Pasir Pasang M3 0.1020 220,000.00 22,440.00
JUMLAH HARGA BAHAN 188,740.00
C PERALATAN
LS 1 2000 2,000.00
JUMLAH HARGA ALAT 2,000.00
92 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 5PP
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 95,000.00 28,500.00
Tukang Batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0150 150,000.00 2,250.00
JUMLAH TENAGA KERJA 43,250.00
B BAHAN
Bata merah M3 70.0000 950.00 66,500.00
Semen Portlan Kg 9.6800 1,500.00 14,520.00
Pasir Pasang M3 0.0450 220,000.00 9,900.00
JUMLAH HARGA BAHAN 90,920.00
C PERALATAN
LS 1 2000 2,000.00
JUMLAH HARGA ALAT 2,000.00
100 Pemasangan 1 m2 lantai ubin keramik ukuran 40cm x 40cm (rock tile)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 95,000.00 23,750.00
Tukang Batu L.02 OH 0.1250 110,000.00 13,750.00
Kepala tukang L.03 OH 0.0130 150,000.00 1,950.00
Mandor L.04 OH 0.0130 150,000.00 1,950.00
JUMLAH TENAGA KERJA 41,400.00
B BAHAN
Ubin keramik Bh 6.6300 16,111.11 106,816.67
Semen Portlan Kg 9.8000 1,500.00 14,700.00
Semen warna Kg 1.3000 1,700.00 2,210.00
Pasir pasang M3 0.0450 220,000.00 9,900.00
JUMLAH HARGA BAHAN 133,626.67
C PERALATAN
LS 1 1000 1,000.00
JUMLAH HARGA ALAT 1,000.00
101 Pemasangan 1 m2 lantai ubin keramik ukuran 60cm x 60cm Sek. Indogress
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 95,000.00 23,750.00
Tukang Batu L.02 OH 0.1250 110,000.00 13,750.00
Kepala tukang L.03 OH 0.0130 150,000.00 1,950.00
Mandor L.04 OH 0.0130 150,000.00 1,950.00
JUMLAH TENAGA KERJA 41,400.00
B BAHAN
Ubin keramik Bh 3.1000 49,479.17 153,385.42
Semen Portlan Kg 9.8000 1,500.00 14,700.00
Semen warna Kg 1.3000 1,700.00 2,210.00
Pasir pasang M3 0.0450 220,000.00 9,900.00
JUMLAH HARGA BAHAN 180,195.42
C PERALATAN
LS 1 2000 2,000.00
JUMLAH HARGA ALAT 2,000.00
107 Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 95,000.00 9,500.00
Tukang kayu L.02 OH 0.0500 110,000.00 5,500.00
Kepala tukang L.03 OH 0.0050 150,000.00 750.00
Mandor L.04 OH 0.0050 150,000.00 750.00
JUMLAH TENAGA KERJA 16,500.00
B BAHAN
Gypsum board Lembar 0.3640 65,000.00 23,660.00
Paku skrup Kg 0.1100 85,000.00 9,350.00
JUMLAH HARGA BAHAN 33,010.00
C PERALATAN
LS 1 1000 1,000.00
JUMLAH HARGA ALAT 1,000.00
113 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 95,000.00 23,750.00
Tukang Besi L.02 OH 0.2500 110,000.00 27,500.00
Kepala Tukang L.03 OH 0.0250 150,000.00 3,750.00
Mandor L.04 OH 0.0130 150,000.00 1,950.00
JUMLAH TENAGA KERJA 56,950.00
B BAHAN
Rangka metal M1 3.5000 35,000.00 122,500.00
hollow 40.40.2 mm
Assesoris Ls 0.1000 122,500.00 12,250.00
(perkuatan, las dll) JUMLAH HARGA BAHAN 134,750.00
C PERALATAN
LS 1 1000 1,000.00
JUMLAH HARGA ALAT 1,000.00
115 Pemasangan 1 m' listplank ukuran (3 x 20)cm, kayu kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 95,000.00 9,500.00
Tukang kayu L.03 OH 0.2000 110,000.00 22,000.00
Kepala tukang L.03 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0050 150,000.00 750.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Papan kayu M3 0.0108 4,000,000.00 43,200.00
Paku 5 dan 7 cm Kg 0.1000 18,000.00 1,800.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN
LS 1 1000 1,000.00
JUMLAH HARGA ALAT 1,000.00
130 Pengecetan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup )
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 95,000.00 1,900.00
Tukang cat L.02 OH 0.0630 110,000.00 6,930.00
Kepala tukang L.03 OH 0.0063 150,000.00 945.00
Mandor L.04 OH 0.0030 150,000.00 450.00
JUMLAH TENAGA KERJA 10,225.00
B BAHAN
Plamuur Kg 0.1000 20,000.00 2,000.00
Cat dasar Kg 0.1000 18,000.00 1,800.00
Cat penutup Kg 0.5000 22,000.00 11,000.00
JUMLAH HARGA BAHAN 14,800.00
C PERALATAN
LS 1 1000 1,000.00
JUMLAH HARGA ALAT 1,000.00
Halaman 58
ESTIMATE ENGINEER
I . PEKERJAAN PERSIAPAN
PEMBANGUNAN BPJS KANTOR CABANG SOREANG - JAWA BARAT
TAHUN ANGGARAN 2015
I. PEKERJAAN PERSIAPAN
1 Pekerjaan Papan Bouwplank & Pengukuran Lahan 103.200 M1 72,040.00 7,434,528.00
2 Pekerjaan Direksi Keet dan Barak Pekerja 1.000 Ls 8,000,000.00 8,000,000.00
3 Administrasi , As Built drawing Str,Ars,ME/P), Dokumentasi 1.000 Ls 10,000,000.00 10,000,000.00
4 Mobilisasi dan demobilisasi 1.000 ls 25,000,000.00 25,000,000.00
5 Penyediaan Listrik dan Air Kerja 1.000 ls 9,000,000.00 9,000,000.00
6 Pembersihan Lokasi 1.000 ls 5,000,000.00 5,000,000.00
7 K3 dan Safety Net 1.000 ls 18,000,000 18,000,000.00
8 Pekerjaan Pembongkaran
JUMLAH 82,434,528.00
ESTIMATE ENGINEER
II . PEKERJAAN STRUKTUR
PEMBANGUNAN BPJS KANTOR CABANG SUKABUMI - JAWA BARAT
TAHUN ANGGARAN 2016
JUMLAH 509,649,318.17
NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH
F PEKERJAAN INFRASTRUKTUR
I PEKERJAAN PEMAGARAN 176,902,194.05
II PEKERJAAN HALAMAN PARKIR 1,034,975,067.80
III PEKERJAAN POS JAGA 32,781,060.64
IV PEKERJAAN LAIN-LAIN 56,326,729.22
V PEKERJAAN GROUND RESERVOAR 10 M3 (LxPxT=2x2.5x2) DAN RIMAH POMPA 59,997,889.39
TOTAL Rp. 3,397,608,828.07
ESTIMATE ENGINEER
IV. PEKERJAAAN MEKANIKAL ELEKTRIKAL PLUMBING
PEMBANGUNAN BPJS KANTOR CABANG SUKABUMI - JAWA BARAT
TAHUN ANGGARAN 2015
I PEKERJAAN ELEKTRIKAL
a Site Plan
Pengadaan dan pemasangan lampu berikut kelengkapannya
1 Lampu Taman SL 25w lengkap dengan tiang bh 17 775,000 13,175,000
2 Lampu downlight PL 1x13w bh 1 211,500 211,500
Inst.titik lampu dan stop kontak lengkap dengan bobokan dan perapihan kembali
peralatan bantu dan asesories
6 Kabel NYY 3 x 2,5 mm2 didlm pipa PVC 20 mm instalasi titik lampu ta titik 17 467,000 7,939,000
termasuk galian dan urukan kembali
7 Kabel NYM 3 x 2,5 mm2 didlm pipa PVC 20 mm instalasi titik lampu titik 1 314,000 314,000
8 Kabel NYM 3 x 2,5 mm2 didlm pipa PVC 20 mm instalasi titik stop kon titik 1 314,000 314,000
TOTAL A 192,885,770
b Lantai Dasar
Pengadaan dan pemasangan lampu berikut kelengkapannya
1 Lampu downlight PL 2x18w bh 30 347,400 10,422,000
2 Lampu downlight PL 1x13w bh 5 211,500 1,057,500
3 Lampu TL 2x36W RM300 bh 2 912,800 1,825,600
4 Lampu TL 1x36W GSM bh 2 501,900 1,003,800
5 Lampu TL 1x36W balk bh 13 232,000 3,016,000
6 Lampu EXIT + battery bh 2 1,140,000 2,280,000
Inst.titik lampu dan stop kontak lengkap dengan bobokan dan perapihan kembali
peralatan bantu dan asesories
13 Kabel NYM 3 x 2,5 mm2 didlm pipa PVC 20 mm instalasi titik lampu titik 54 160,750 8,680,500
14 Kabel NYM 3 x 2,5 mm2 didlm pipa PVC 20 mm instalasi titik stop kon titik 21 219,750 4,614,750
15 Kabel NYM 3 x 4 mm2 didlm pipa PVC 20 mm instalasi titik AC titik 5 467,500 2,337,500
16 Kabel NYM 4 x 4 mm2 didlm pipa PVC 20 mm instalasi titik AC CASETT titik 2 575,000 1,150,000
17 Kabel NYY 4 x6mm2 dari MDB ke panel DB-1 m" 8 52,000 416,000
18 Kabel NYY 4 x10mm2 dari MDB ke panel AC-1 m" 8 77,000 616,000
TOTAL B 48,009,150
C Lantai 1
Pengadaan dan pemasangan lampu berikut kelengkapannya
1 Lampu downlight PL 2x18w bh 6 347,400 2,084,400
2 Lampu downlight PL 1x13w bh 19 211,500 4,018,500
3 Lampu TL 2x36W RM300 bh 34 912,800 31,035,200
4 Lampu TL 1x36W GSM bh 2 501,900 1,003,800
5 Lampu TL 1x36W balk bh 1 232,000 232,000
6 Lampu EXIT + battery bh 2 1,140,000 2,280,000
Inst.titik lampu dan stop kontak lengkap dengan bobokan dan perapihan kembali
peralatan bantu dan asesories
13 Kabel NYM 3 x 2,5 mm2 didlm pipa PVC 20 mm instalasi titik lampu titik 64 160,750 10,288,000
14 Kabel NYM 3 x 2,5 mm2 didlm pipa PVC 20 mm instalasi titik stop kon titik 42 219,750 9,229,500
15 Kabel NYM 3 x 4 mm2 didlm pipa PVC 20 mm instalasi titik AC titik 5 467,500 2,337,500
16 Kabel NYM 4 x 4 mm2 didlm pipa PVC 20 mm instalasi titik AC CASETT titik 5 575,000 2,875,000
17 Kabel NYY 4 x10mm2 dari MDB ke panel DB-2 m" 18 77,000 1,386,000
18 Kabel NYY 4 x16mm2 dari MDB ke panel DB-AC-2 m" 18 86,000 1,548,000
TOTAL C 80,554,300
D Lantai 2
Pengadaan dan pemasangan lampu berikut kelengkapannya
1 Lampu downlight PL 2x18w bh 28 347,400 9,727,200
2 Lampu downlight PL 1x13w bh 10 211,500 2,115,000
No Uraian Pekerjaan Sat Vol Harga Satuan Jumlah
(Rp.) (Rp.)
Inst.titik lampu dan stop kontak lengkap dengan bobokan dan perapihan kembali
peralatan bantu dan asesories
13 Kabel NYM 3 x 2,5 mm2 didlm pipa PVC 20 mm instalasi titik lampu titik 74 160,750 11,895,500
14 Kabel NYM 3 x 2,5 mm2 didlm pipa PVC 20 mm instalasi titik stop kon titik 30 219,750 6,592,500
15 Kabel NYM 3 x 4 mm2 didlm pipa PVC 20 mm instalasi titik AC titik 2 467,500 935,000
16 Kabel NYM 4 x 4 mm2 didlm pipa PVC 20 mm instalasi titik AC CASETT titik 8 575,000 4,600,000
17 Kabel NYY 4 x10mm2 dari MDB ke panel DB-3 m" 21 77,000 1,617,000
18 Kabel NYY 4 x16mm2 dari MDB ke panel DB-AC-3 m" 21 86,000 1,806,000
TOTAL D 82,530,800
III PEKERJAAN TATA UDARA ( TIDAK PERLU DITAWARKAN KRN SUPPLY BY OWNER, )
a Lantai Dasar
1 Pengadaan & pemasang AC cassette 3PK berikut instalasi & accessorie unit - 15,993,000 -
2 Pengadaan & pemasang AC split wall 1PK berikut instalasi & accessori unit - 4,887,500 -
3 Pengadaan & pemasang AC split wall 1/2PK berikut instalasi & accesso unit - 3,750,000 -
4 Pengadaan & pemasang ceiling fan 100cfm unit - 344,100 -
TOTAL a -
b Lantai 1
1 Pengadaan & pemasang AC cassette 4PK berikut instalasi & accessorie unit - 19,950,000 -
2 Pengadaan & pemasang AC split wall 1PK berikut instalasi & accessori unit - 4,887,500 -
3 Pengadaan & pemasang AC split wall 1/2PK berikut instalasi & accesso unit - 3,750,000 -
4 Pengadaan & pemasang ceiling fan 100cfm unit - 344,100 -
No Uraian Pekerjaan Sat Vol Harga Satuan Jumlah
(Rp.) (Rp.)
TOTAL b -
c Lantai 2
1 Pengadaan & pemasang AC cassette 4PK berikut instalasi & accessorie unit - 19,950,000 -
2 Pengadaan & pemasang AC cassette 3PK berikut instalasi & accessorie unit - 15,993,000 -
3 Pengadaan & pemasang AC split wall 1PK berikut instalasi & accessori unit - 4,887,500 -
4 Pengadaan & pemasang AC split wall 2PK berikut instalasi & accessori unit - 11,050,000 -
5 Pengadaan & pemasang ceiling fan 100cfm unit - 344,100 -
TOTAL c -
IV PEKERJAAN PLUMBING
5 Instalasi atap
Gate valve 50mm bh 5 1,162,500 5,812,500
Gate valve 40mm bh 2 825,000 1,650,000
Gate valve 25mm bh 3 103,500 310,500
Water Level Control ( WLC )
Pada Roof Tank Termasuk Penarikan Kabel Dari Ruang Pompa ke roof unit 2 2,813,000 5,626,000
Pemipaan
Pipa PPR PN-10 dia 50mm ke shaft m 78 89,510 6,981,780
Pipa PPR PN-10 dia 40mm ke shaft m 56 60,190 3,370,640
Pipa PPR PN-10 dia 25mm ke toilet lt,3 m 12 31,490 377,880
Pipa PPR PN-10 dia 50mm instalasi tangki m 18 120,020 2,160,360
Pipa PPR PN-10 dia 25mm instalasi tangki (drain) m 6 31,490 188,940
Fitting & peralatan bantu ls 1 2,500,000 2,500,000
TOTAL a 417,198,200
TOTAL c 50,833,260
TOTAL d 39,925,840
TOTAL e 16,412,740
TOTAL A 37,150,000
b Lantai dasar
1 Outlet telepon bh 3 69,850 209,550
2 Outlet Data bh 2 125,000 250,000
3 Instalasi telepon ITC 2x2x0,6 mm2 didlm pipa PVC 20 mm bh 3 350,000 1,050,000
4 Instalasi data UTP Cat 6 didlm pipa PVC 20 mm bh 2 425,000 850,000
No Uraian Pekerjaan Sat Vol Harga Satuan Jumlah
(Rp.) (Rp.)
TOTAL b 3,434,550
c Lantai 1
1 Outlet telepon bh 31 69,850 2,165,350
2 Outlet Data bh 31 125,000 3,875,000
3 Instalasi telepon ITC 2x2x0,6 mm2 didlm pipa PVC 20 mm bh 31 350,000 10,850,000
4 Instalasi data UTP Cat 6 didlm pipa PVC 20 mm bh 31 425,000 13,175,000
TOTAL c 32,240,350
d Lantai 2
1 Outlet telepon bh 16 69,850 1,117,600
2 Outlet Data bh 29 125,000 3,625,000
3 Instalasi telepon ITC 2x2x0,6 mm2 didlm pipa PVC 20 mm bh 16 350,000 5,600,000
4 Instalasi data UTP Cat 6 didlm pipa PVC 20 mm bh 29 425,000 12,325,000
TOTAL d 24,842,600
TOTAL 1,145,634,100
BPJS KESEHATAN DIVISI REGIONAL V - JAWA BARAT
REKAPITULASI ESTIMATE ENGINEER
PEMBANGUNAN BPJS KANTOR CABANG SUKABUMI - JAWA BARAT
TAHUN ANGGARAN 2016
9,219,378,480.00