NO URAIAN PEKERJAAN VOLUME SAT HARGA SAT JML. HARGA JML. SUB TOTAL
A PEKERJAAN PERSIAPAN
1 Pengukuran & Pemasangan Bowplank 808.80 m' 62,118.10 50,241,119.28
50,241,119.28
B PEKERJAAN TANAH
1 Galian Tanah Pondasi 456.00 m3 56,237.50 25,644,300.00
2 Urugan Tanah Kembali 152.00 m3 40,975.00 6,228,200.00
3 Urug Pasir Bawah Pondasi 68.40 m3 211,255.00 14,449,842.00
46,322,342.00
C PEK. RANGKA BAWAH
1 Pas. Pondasi batu kosong 91.20 m3 427,269.30 38,966,960.16
2 Pas. Lantai kerja 22.80 m3 829,773.88 18,918,844.37
3 Pas Pondasi Footplat ( 80 x 80 )
Beton 192.38 m3 987,098.41 189,893,057.14
Pembesian 6,417.82 kg 12,088.42 77,581,320.20
Begesting ( 2 Kali Pakai ) 460.20 m2 125,269.70 57,649,115.94
4 Pekerjaan Sloof ( 15 x 20 )
Beton 71.18 m3 987,098.41 70,259,690.82
Pembesian 8,889.66 kg 12,088.42 107,461,945.32
Begesting ( 2 Kali Pakai ) 1,423.56 m2 125,269.70 178,328,934.13
5 Pekerjaan Umpak Kolom
Beton 9.12 m3 987,098.41 9,002,337.52
Pembesian 874.59 kg 12,088.42 10,572,428.67
Begesting ( 2 Kali Pakai ) 139.80 m2 125,269.70 17,512,704.06
6 Pekerjaan Kolom Praktis
Beton 3.83 m3 987,098.41 3,775,651.43
Pembesian 413.30 kg 12,088.42 4,996,193.72
Begesting ( 2 Kali Pakai ) 51.00 m2 125,269.70 6,388,754.70
7 Pekerjaan Balok Ring
Beton 7.26 m3 987,098.41 7,166,334.48
Pembesian 623.49 kg 12,088.42 7,536,996.56
Begesting ( 2 Kali Pakai ) 48.40 m2 125,269.70 6,063,053.48
812,074,322.70
D PEK. TIANG , LANTAI PAPAN
1 Pekerjaan lantai ruangan keramik 60 x 60 2,914.40 m2 228,467.25 665,844,953.40
2 Urugan pasir bawah lantai 145.72 m3 297,775.00 43,391,773.00
3 Pas. Tiang Kayu Kelas II (ukur) 22.98 m3 13,307,360.00 305,835,070.46
4 Pas. Suai Tiang Kayu Kelas II 5.04 m3 13,307,360.00 67,069,094.40
1,082,140,891.26
E PEK. RANGKA KAP ATAP
1 Kuda-kuda Atap /mander/tumpangsari 9.74 m3 4,176,249.00 40,668,312.76
2 Rangka Atap Lanan 4,054.10 m2 56,787.50 230,222,203.75
3 Atap Genteng Metal 4,054.10 m2 141,897.25 575,265,641.23
4 List Plank 860.30 m1 250,013.50 215,086,614.05
5 Pemuung/Nok 254.00 m' 82,318.50 20,908,899.00
6 Blandar Kayu Kelas II 6.81 m3 13,307,360.00 90,632,702.90
7 Aksesoris Atap 48.00 bh 208,012.86 9,984,617.28
1,182,768,990.97
F PEKERJAAN DINDING DAN PARTISI
1 Pasangan Batu Bata 1:4 991.60 m2 243,976.26 241,926,859.42
2 Plesteran Dinding Batu Bata 1,983.20 m2 71,531.06 141,860,406.12
3 Acian Dinding Batu Bata 1,983.20 m2 30,749.40 60,982,210.08
4 Partisi Dinding Rangka Hollow 660.00 m2 352,952.60 232,948,716.00
677,718,191.62
G PEKERJAAN PENGECATAN
Cat dasar + Cat kilap pada : tiang, suai tiang, lipslank, Pasangan
1 Batu Bata Meja Reservasi dan Pasangan kamar Mandi serta Partisi 5,467.78 m2 37,826.25 206,825,643.49
Dinding
206,825,643.49
H PEKERJAAN KAMAR MANDI
1 Pasangan Dinding Kamar Mandi menggunakan Batu Bata 1:4 209.88 m2 243,976.26 51,205,737.45
2 Plesteran Dinding Kamar Mandi 419.76 m2 71,531.06 30,025,879.42
3 Acian Dinding Kamar Mandi 419.76 m2 30,749.40 12,907,368.14
4 Kloset Jongkok 18.00 unit 511,417.50 9,205,515.00
5 Floordrain 18.00 unit 65,367.50 1,176,615.00
6 Pintu Kamar Mandi/ WC Alumunium 18.00 unit 4,433,137.50 79,796,475.00
7 Boven Light 12.00 unit 393,717.50 4,724,610.00
189,042,200.02
Catatan : - No Electrical Engineering dan Sebagian Mechanical JUMLAH : 4,247,133,701.33
PEMBULATAN : 8,532,726,000.00
UNIT : 2.00
Catatan : - No Electrical Engineering dan Sebagian Mechanical
A PEKERJAAN PERSIAPAN
1.00 Pengukuran & Pemasangan Bowplank 190.00 m' 2.00
B PEKERJAAN TANAH
1.00 Galian Tanah Pondasi 80.00 m3
2.00 Urugan Tanah Kembali 26.67 m3
3.00 Urug Pasir Bawah Pondasi 12.00 m3
F PEKERJAAN KUSEN
G PEKERJAAN PENGECATAN
Cat dasar + Cat kilap pada tiang, suai tiang,
1.00 dan lipslank 145.46 m2 15.00
Catatan :
x5
62,118.10 11,802,439.00
11,802,439.00
56,237.50 4,499,000.00
40,975.00 1,092,666.67
211,255.00 2,535,060.00
8,126,726.67
427,269.30 6,836,308.80
829,773.88 3,319,095.50
987,098.41 33,314,571.43
12,088.42 12,187,886.88
125,269.70 6,388,754.70
987,098.41 7,107,108.57
12,088.42 10,870,297.09
125,269.70 18,038,836.80
987,098.41 1,579,357.46
12,088.42 2,016,421.54
125,269.70 3,382,281.90
105,040,920.68
228,467.25 102,810,262.50
297,775.00 6,699,937.50
13,307,360.00 53,655,275.52
13,307,360.00 7,824,727.68
170,990,203.20
4,176,249.00 10,148,285.07
56,787.50 40,208,389.38
141,897.25 100,470,347.86
250,013.50 59,503,213.00
82,318.50 411,592.50
13,307,360.00 22,356,364.80
208,012.86 6,240,385.80
239,338,578.41
8,508,273.00 42,541,365.02
6,763,879.42 304,374,573.73
9,573,655.34 95,736,553.41
442,652,492.16
37,826.25 5,502,055.02
5,502,055.02
JUMLAH : 983,453,415.13
PLUS 10% : 1,081,798,756.65
PEMBULATAN : 1,081,798,000.00
UNIT : 5.00
TOTAL : 5,408,993,783.24
RENCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LOKASI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SAT JML. HARGA JML. SUB TOTAL
A PEKERJAAN PERSIAPAN
1 Pengukuran & Pemasangan Bowplank 39.60 m' 62,118.10 2,459,876.76
2,459,876.76
B PEKERJAAN TANAH
1 Galian Tanah Pondasi 16.00 m3 56,237.50 899,800.00
2 Urugan Tanah Kembali 5.33 m3 40,975.00 218,533.33
3 Urug Pasir Bawah Pondasi 2.40 m3 211,255.00 507,012.00
1,625,345.33
C PEK. RANGKA BAWAH
1 Pas. Pondasi batu kosong 3.20 m3 427,269.30 1,367,261.76
2 Pas. Lantai kerja 0.80 m3 829,773.88 663,819.10
3 Pas Pondasi Footplat ( 80 x 80 ) 16 buah
Beton 6.75 m3 987,098.41 6,662,914.29
Pembesian 201.65 kg 12,088.42 2,437,577.38
Begesting ( 2 Kali Pakai ) 10.20 m2 125,269.70 1,277,750.94
4 Pekerjaan Sloof ( 15 x 20 )
Beton 1.80 m3 987,098.41 1,776,777.14
Pembesian 224.81 kg 12,088.42 2,717,574.27
Begesting ( 2 Kali Pakai ) 36.00 m2 125,269.70 4,509,709.20
5 Pekerjaan Umpak Kolom
Beton 0.32 m3 987,098.41 315,871.49
Pembesian 33.36 kg 12,088.42 403,284.31
Begesting ( 2 Kali Pakai ) 4.80 m2 125,269.70 601,294.56
22,733,834.44
D PEK. TIANG , LANTAI PAPAN
1 Pekerjaan lantai ruangan keramik 60 x 60 56.00 m2 228,467.25 12,794,166.00
2 Urugan pasir bawah lantai 2.80 m3 297,775.00 833,770.00
3 Pas. Tiang Kayu Kelas II (ukur) 0.81 m3 13,307,360.00 10,731,055.10
4 Pas. Suai Tiang Kayu Kelas II 0.12 m3 13,307,360.00 1,564,945.54
25,923,936.64
E PEK. RANGKA KAP ATAP
1 Kuda-kuda Atap /mander/tumpangsari 0.49 m3 4,176,249.00 2,029,657.01
2 Rangka Atap Lanan 116.39 m2 56,787.50 6,609,497.13
3 Atap Genteng Metal 116.39 m2 141,897.25 16,515,420.93
4 List Plank 31.90 m1 250,013.50 7,975,430.65
5 Pemuung/Nok 1.00 m' 82,318.50 82,318.50
6 Blandar Kayu Kelas II 0.30 m3 13,307,360.00 3,979,432.93
7 Aksesoris Atap 6.00 bh 208,012.86 1,248,077.16
38,439,834.31
F PEKERJAAN KUSEN
TAHUN 2019
NILAI PEKERJAAN
NO. URAIAN KEGIATAN BOBOT AGUSTUS SEPTEMBER OKTOBER
(Rp.)
26-31 2-7 9-14 16-21 23-28 30-5 7-12
I PEK. PERSIAPAN
PENGUKURAN DAN PASANG BOUWPLANK 165,855,327.00 1.30 0.14 0.14 0.14 0.14 0.14 0.14 0.14
MOB DAN DEMOB 50,000,000.00 0.39 0.06 0.06 0.06
ADM DAN DOKUMENTASI 80,000,000.00 0.63 0.015 0.015 0.015 0.015 0.015 0.015 0.015
0.06
0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015
0.60 0.60
0.77 0.77 0.77
0.10 0.10 0.10 0.10
0.01 0.01 0.01 0.01 0.01
0.02 0.02 0.02 0.02 0.02 0.02
0.16 0.40
0.45 0.80 0.80 0.80
1.59 1.59 1.59 1.59 1.60
0.56 1.16 1.16
0.16
0.36 0.82
0.04 0.20
0.20 0.15
0.05 0.06
0.01 0.01 0.01 0.01 0.01
0.50 0.50 0.50 0.50 0.50
1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.07 0.07 0.07 0.07 0.07
0.04 0.04 0.04 0.04 0.04 0.04
0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
5.47 5.45 4.79 6.06 6.98 5.83 4.05 6.20 7.80 9.04 7.16 4.63 1.88 1.52 1.52 0.13 0.13 0.22 0.22
23.03 28.48 33.27 39.33 46.30 52.14 56.19 62.39 70.19 79.23 86.39 91.02 92.90 94.42 95.94 96.07 96.20 96.42 96.65
Mengetahui Disetujui,
PT. PERUMDA ANEKA USAHA
(…………………………….) (…………………………….)
AHUN 2020
FEBRUARI MARET KET.
24-29 2-7 9-14 16-21 23-28
0.08
0.015 0.015 0.015 0.015 0.015
0.04
Dibuat,
PT. AVICENA PERKASA
(…………………………….)
DAFTAR ANALISA
A. 4.4.1.7 Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu campuran 1SP : 2PP
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.300 65,000.00 19,500.00
Tukang batu L.02 OH 0.100 90,000.00 9,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
Jumlah Tenaga Kerja 30,925.00
B BAHAN
Bata Merah bh 70.000 600.00 42,000.00
Semen Portland kg 18.950 1,523.30 28,866.54
Pasir Pasang m3 0.038 92,820.00 3,527.16
Jumlah Harga Bahan 74,393.70
C PERALATAN
B. HARGA BAHAN
Air Ltr 50.00
Kayu Kelas 1 m3 5,130,000.00
Kayu Kelas 2 m3 4,464,000.00
Kayu Kelas 3 m3 3,598,000.00
Kayu kelas 4 m3 3,002,800.00
List Eternit Kayu m1 14,928.00
Batu Kali / Belah m3 265,640.00
Papan Kayu Lembar 155,500.00
Paku Beton 4 Inchi kotak 31,100.00
Paku Seng kg 18,880.00
Paku Kayu kg 16,660.00
Pasir Urug m3 103,300.00
Pasir Beton m3 112,820.00
Kerikil Beton m3 112,820.00
Semen Portland kg 1,523.30
Semen 40 kg Zak 60,932.00
Semen Warna Zak 186,600.00
Besi Polos kg 9,800.00
Keramik 40x40 Bh 9,774.24
Kawat Beton kg 24,880.00
Paku Kayu kg 18,660.00
Paku Beton kg 31,100.00
Pasir Pasang m3 92,820.00
Paving Block m2 96,520.00
Batu Bata buah 600.00
Tanah Timbunan m3 82,640.00
Multiplex 3 mm Lembar 78,000.00
Minyak Bekisting Ltr 26,500.00
Pipa PVC 3" m1 67,855.00
Tanah Timbun m3 82,640.00
Pipa PVC 1" m1 49,760.00
Multiplex 9mm M2 156,300.00
Dolken kayu ᴓ 8 - 10 cm - panjang 4 m Btg 20,000.00
Beton K-250 (Ready Mix) M3 1,125,000.00
Pembesian Wiremesh Ø 8 Kg 9,800.00
Plastik Alas Cor Rigid Kg 2,000.00
Paving Block m2 96,520.00
REKAPITULASI
(………………….)
RENCANA ANGGARAN BIAYA
PEKERJAAN : PERENCANAAN REST & RESORT AREA PANDAWA MAETALA
LOKASI : KULON PROGO, YOGYAKARTA
PROVINSI : YOGYAKARTA
TAHUN : 2019
17 Pasangan Dinding Bata 1Pc : 2 Ps (Bangku dan dinding tama 30.10 m2 A. 4.4.1.7 105,704.24 3,181,909.12
18 Plasteran Dinding Bata 1PC : 2Ps (Bangku dan dinding taman 60.20 m2 A. 4.4.2.2 50,217.04 3,023,266.92
Sub-Total 56,034,557.63
No. Uraian Pekerjaan Volume/Sat Analisa Harga Satuan Jumlah Harga
1 2 3 4 5 6
E Pekerjaan Pedestrian
1 Galian Tanah Bawah Beton Kansteen 2.27 m3 A. 2.3.1.1 51,090.00 115,769.94
2 Urugan Pasir Bawah Beton Kansteen 2.27 m3 A. 2.3.1.11 149,354.40 338,437.07
3 Kansteen Pedestrian (bagian Luar Pedestrian Samping Jalan) 262.00 unit Taksir 45,000.00 11,790,000.00
4 Timbunan Tanah Bawah Pedestrian 21.17 m3 Analisa EI-321 131,489.54 2,783,173.30
5 Pemasangan Paving Block (pedestrian) 141.11 m2 A. 4.4.3.66 160,236.65 22,610,993.40
Sub-Total 37,638,373.71
F Pekerjaan Drainase
1 Galian Tanah Drainase 51.52 m3 A. 2.3.1.1 51,090.00 2,632,156.80
2 Urugan Pasir Bawah Saluran Drainase 6.44 m3 A. 2.3.1.11 149,354.40 961,842.34
3 Beton Cor K-150 (Lantai Drainase Landscape)
a. Beton Cor K-150 11.90 m3 A. 4.1.1.3 833,210.37 9,915,203.44
b. Pembesian 506.29 kg A. 4.1.1.17 12,105.18 6,128,748.74
I PEKERJAAN PERSIAPAN
1 Bowplank 48.00 m' 65,398.77 3,139,140.96
2 Air kerja & Listrik 1.00 Ls 1,500,000.00 1,500,000.00
Sub Jumlah 4,639,140.96
II PEKERJAAN TANAH
1 Peninggian Elevasi Tanah 35.15 m3 192,352.50 6,760,344.02
2 Pemadatan Tanah 35.15 m3 20,865.00 733,312.94
Sub Jumlah 7,493,656.97
IV PEKERJAAN STRUKTUR
Beton Bertulang Sloof
1 Sloof Type SP 15 x 20
a. Beton K - 175 1.71 m3 838,939.62 1,434,586.75
b. Tulangan 229.47 kg 13,427.67 3,081,255.49
c. Bekisting 22.80 m2 87,456.33 1,994,004.21
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
01 02 03 05 06
Beton Bertulang Kolom
1 Kolom Type K1 25 x 25
a. Beton K - 225 3.51 m3 902,177.96 3,166,644.62
b. Tulangan 430.75 kg 13,427.67 5,783,931.26
c. Bekisting 46.80 m2 146,605.28 6,861,126.87
2 Kolom Type KP 15 x 15
a. Beton K - 175 1.80 m3 838,939.62 1,510,091.32
b. Tulangan 290.62 kg 13,427.67 3,902,403.17
c. Bekisting 48.00 m2 146,605.28 7,037,053.20
5 Plat Type S1
a. Beton K - 225 3.75 m3 902,177.96 3,384,069.51
b. Tulangan 400.97 kg 13,427.67 5,384,051.16
c. Bekisting 52.51 m2 169,605.28 8,906,651.41
ELV +5.50
1 Balok Type BP 15 x 20
a. Beton K - 175 0.99 m3 838,939.62 830,550.23
b. Tulangan 150.14 kg 13,427.67 2,016,076.03
c. Bekisting 18.15 m2 151,005.27 2,740,745.65
2 Plat Type S1
a. Beton K - 225 1.64 m3 902,177.96 1,479,571.85
b. Tulangan 175.31 kg 13,427.67 2,353,997.31
c. Bekisting 22.96 m2 169,605.28 3,894,137.11
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
01 02 03 05 06
Pekerjaan Waterproofing
1 Pekerjaan Waterproofing Plat 53.91 m2 100,000.00 5,391,000.00
Sub Jumlah 94,404,750.00
V PEKERJAAN ATAP
1 Pekerjaaan Rangka Atap Baja Konvensional (termasuk kuda-kuda, g 319.92 kg 21,692.90 6,939,983.89
track stang ,ikatan angin, plendes dan mur baut)
2 Pasang Penutup Asbes Gelombang 35.84 m2 37,649.50 1,349,358.08
3 Pekerjaan Talang Galvalume 11.20 m' 196,923.50 2,205,543.20
Pekerjaan Listplank :
a. Rangka Listplank, baja konvensional 75.92 kg 21,692.90 1,646,968.35
b. Kalsiboard penutup 23.34 m2 140,086.45 3,269,617.63
c. Pengecatan 23.34 m2 33,247.90 776,005.99
Sub Jumlah 16,187,477.14
Pekerjaan Kusen
Pekerjaan Kusen Almunium , Daun Pintu, Daun Jendela ,
lengkap dengan asesories, sesuai gambar dan spesifikasi
1 Kusen Type P1 1.00 unit 5,576,940.51 5,576,940.51
2 Kusen Type P2 2.00 unit 4,757,709.26 9,515,418.52
3 Kusen Type LV 2.00 unit 1,328,250.00 2,656,500.00
4 Kusen Type LV1 2.00 unit 3,093,300.00 6,186,600.00
Sub Jumlah 73,139,627.90
B PEKERJAAN PLUMBING
Pekerjaan Air Hujan
1 Roof Drain 3.00 buah 150,000.00 450,000.00
2 Pipa PVC Type AW 3" 16.50 m' 42,257.18 697,243.47
3 Fitting dan Accessories 1.00 Ls 167,890.29 167,890.29
Sub jumlah 1,315,133.76
Sub Jumlah Pekerjaan Mekanikal Elektrikal & Plumbing 15,339,533.76
JUMLAH TOTAL 250,000,000.00
PRA - RENCANA KESELAMATAN DAN KESEHATAN
KERJA KONTRAK
PRA - RK3K
1. KEBIJAKAN K3
Saya yang bertanda tangan dibawah ini :
Nama :
Jabatan :
Alamat :
Dengan ini menyatakan bahwa dalam melaksanakan kegiatan konstruksi bila dipercayai menjadi pelaksana pekerjaan ini akan mnerapkan sistem keselamatan
dan kesehatan kerja (K3) bagi semua karyawan maupun pekerja dalam melaksanakan pekerjaan baik dilapangan maupun dikantor.
Demikian Pernyataan ini saya perbuat dengan sesunguh - sungguhnya dan akan dilaksanakan di lapangan.
2. PERENCANAAN
1) Identifikasi Bahaya dan Pengendalian Resiko Bahaya
Identifikasi
No. Jenis/Type Pekerjaan Pengendalain Resiko K3
Jenis Bahaya dan Resiko K3
1. 2. 3. 4.
A Pekerjaan Persiapan
Pembersihan Lapangan Jenis Bahaya dan Resiko Pengendalian Resiko K3
Pengukuran dan Pemasangan Bowplank a) Tertimpa Kayu -> Luka Berat a) Memakai Alat Pelindung Diri (APD)
Papan Nama Proyek b) Tergelincir -> Luka Ringan b) Melakukan pekerjaan dengan hati - hati
Direksi Keet / Gudang Material c) Terkena Peralatan Kerja -> Luka Berat c) Menggunakan Peralatan dengan baik
### d) Terkena Benda Tajam -> Luka Berat
D Pekerjaan Taman Dan Landscape Jenis Bahaya dan Resiko Pengendalian Resiko K3
Galian Tanah Bawah Beton Kerb a) Tertimbun longsoran -> Luka Berat a) Membuat pagar pengaman
Urugan Pasir Bawah Beton Kerb b) Tergelincir -> Luka Ringan b) Melakukan pekerjaan dengan hati - hati
Beton Kerb (K-150) c) Terkena Peralatan Kerja -> Luka Berat c) Menggunakan Peralatan dengan baik
Tanah Humus Timbunan Taman + Pupuk NPK d) Terkena Benda Tajam -> Luka Berat d) Melakukan pekerjaan dengan hati - hati
Penanaman Pohon Tanjung (T=1m) + Tertanam
Penanaman Pohon Cemara Laut (T=1m) + Tertanam
Penanaman Pohon Ketapang (T=1m) + Tertanam
Penanaman Pohon Palem Putri (T=1m) + Tertanam
Penanaman Bunga Asoka + Tertanam
Rumput Taman + Tertanam
Galian Tanah Sloof (Bangku Taman)
Timbunan Tanah (Bangku Taman)
Sloof 13/13 (Bangku duduk taman)
Balok 13/13 (Bangku duduk taman)
Pasangan Dinding Bata 1Pc : 2 Ps (Bangku dan dinding taman)
Plasteran Dinding Bata 1PC : 2Ps (Bangku dan dinding taman)
E Pekerjaan Pedestrian
Galian Tanah Bawah Beton Kansteen Jenis Bahaya dan Resiko Pengendalian Resiko K3
Urugan Pasir Bawah Beton Kansteen a) Tertimpa Material -> Luka Berat a) Memakai Alat Pelindung Diri (APD)
Kansteen Pedestrian (bagian Luar Pedestrian Samping Jalan) b) Tergelincir -> Luka Ringan b) Melakukan pekerjaan dengan hati - hati
Timbunan Tanah Bawah Pedestrian c) Terkena Peralatan Kerja -> Luka Berat c) Menggunakan Peralatan dengan baik
Pemasangan Paving Block (pedestrian) d) Terkena Benda Tajam -> Luka Berat d) Melakukan pekerjaan dengan hati - hati
Program K3
a. Melaksanakan Rencana K3 dengan menyediakan sumber daya K3 (APD,rambu-rambu,spanduk,poster,pagar pengaman) secara konsiten.
b. Melakukan inspeksi secara rutin terhadap kondisi dan cara kerja berbahaya
c. Memastikan semua pekerja untuk mematuhi peraturan yang telah ditetapkan dalam pelaksanaan proyek.
d. dst
Organisasi K3
Menyediakan petugas K3 sesuai dengan struktur organisasi yang diusulkan.
Note :
Kelengkapan Alat Pelindung Diri (APD) Sebagai Berikut :
1 Sabuk Pengaman (Safety Belt) dan Tali Pengaman untuk mencegah cedera yang lebih parah pada pekerja yang bekerja di ketinggian (tinggi > 2m).
2 Sarung Tangan (Bahan Kulit) digunakan untuk pekerjaan pengelasan, pemindahan pipa dll.
3 Sarung Tangan (Bahan Karet) untuk pekerjaan listrik yang dijaga agar tidak ada yang dirobek supaya tidak terjadi bahaya kena arus listrik.
4 Sarung Tangan (Bahan Katun) digunakan pada pekerja besi beton, pekerjaan bobokan dan batu, pelindung pada waktu harus menaiki tangga untuk
5 pekerjaan ketinggian. (Safety Booth) untuk menghindari kecelakaan yang diakibatkan tersandung bahan keras seperti logam atau kayu, terinjak atau
Sepatu Keselamatan
6 terhimpit
Helm/Topibeban berat atau
Keselamatan mencegah
(Safety lukauntuk
Helmet) bakarbekerja
pada waktu mengelas.
di tempat Sepatu
beresiko boot
karena karetjatuh
benda bila bekerja pada pekerjaan
atau melayang, tanah dan
dan dilengkapi pengecoran
dengan beton. untuk
ikatan kedagu
7 menghalangi terlepasnya
Pelindung Pernapasan helmet dari kepala
(Masker)adalah akibat menunduk
alat perlindungan untukatau karena benda
melindungi jatuh. dari gas beracun dan berdebu.
pernafasan
8 Masker pelindung pengelasan yang dilengkapi kaca pengaman (shade of lens) yang disesuaikan dengan diameter las (welding rod). Untuk welding rod
1/16” sampai
9 Kaca 5/32 gunakan
Mata Pelindung shade No.
(Protective 10. untuk welding
Goggles)untuk rod 3/16”
melindungi sampai
meta dari 1/4 “ gunakan
percikan logamshade
cair,No. 13
percikan bahan kimia, seta kacamata pelindung untuk
10 pekerjaan
Pelindung menggerinda
pendengaran dan pekejaan
untuk mencegahberdebu.
rusaknya pendengaran akibat suara bising di atas ambang aman seperti pekerjaan plat logam.