Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
Penanggung Jawab (TeMan Mont 1.82 29,000,000.00 10.00 5,278,000.00 58,058,000.00
Tenaga Ahli Arsitektur Man Mont 1.64 19,500,000.00 10.00 3,198,000.00 35,178,000.00
Tenaga Ahli Struktur Man Mont 0.77 19,500,000.00 10.00 1,501,500.00 16,516,500.00
Tenaga Ahli Interior Man Mont 1.36 19,500,000.00 10.00 2,652,000.00 29,172,000.00
Tenaga Ahli Mekanikal Man Mont 1.09 18,000,000.00 10.00 1,962,000.00 21,582,000.00
Tenaga Ahli Elektrikal Man Mont 1.09 18,000,000.00 10.00 1,962,000.00 21,582,000.00
Tenaga Ahli K3 KonstrukMan Mont 1.32 18,000,000.00 10.00 2,376,000.00 26,136,000.00
Estimator Man Mont 0.95 6,200,000.00 10.00 589,000.00 6,479,000.00
Drafter / Juru Gambar Man Mont 11.16 0.00 10.00 0.00 0.00
Operator Komputer Man Mont 1.00 3,000,000.00 10.00 300,000.00 3,300,000.00
Surveyor / Juru Ukur Man Mont 1.35 4,000,000.00 10.00 540,000.00 5,940,000.00
Biaya ATK Bulan 2.00 1,500,000.00 10.00 300,000.00 3,300,000.00
Biaya Komunikasi Bulan 2.00 1,800,000.00 10.00 360,000.00 3,960,000.00
Biaya Transportasi (sewahari 8.00 3,500,000.00 10.00 2,800,000.00 30,800,000.00
Biaya Penyelidikan tanatitik 4.00 1,500,000.00 10.00 600,000.00 6,600,000.00
Biaya Penyelidikan tanameter 20.00 500,000.00 10.00 1,000,000.00 11,000,000.00
a. Laporan Pendahulu Set 5.00 200,000.00 10.00 100,000.00 1,100,000.00
b. Laporan Antara (Ko Set 5.00 200,000.00 10.00 100,000.00 1,100,000.00
c. Lap.Akhir /Dok Lela Set 5.00 700,000.00 10.00 350,000.00 3,850,000.00
d. Gambar Perspektif Unit 4.00 500,000.00 10.00 200,000.00 2,200,000.00
e. Animasi menit 2.00 1,000,000.00 10.00 200,000.00 2,200,000.00
Rehabilitasi Gedung Wisma
Keterangan
S2 Tenaga Ahli Madya 6 tahun
S1 Tenaga Ahli Muda 5 Tahun
S1 Tenaga Ahli Muda 5 Tahun
S1 Tenaga Ahli Muda 5 Tahun
S1 Tenaga Ahli Muda 4 Tahun
S1 Tenaga Ahli Muda 4 Tahun
S1 Tenaga Ahli Muda 4 Tahun
D3 / 5th Teknisi
D3 / 5th
D3 / 5th
D3 / 5th Teknisi