MINGGU
NO URAIAN PEKERJAAN BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
TOTAL 100.00 1.79 3.15 6.83 9.20 9.20 9.20 9.33 9.43 7.50 7.45 6.11 6.22 5.34 5.23 2.83 1.20
1.79 4.94 11.77 20.97 30.16 39.36 48.69 58.12 65.62 73.07 79.18 85.40 90.74 95.97 98.80 100.00
KET
HARGA SATUAN UPAH DAN BAHAN
A. UPAH ###
1 Mandor Lapangan Org/hari 130,000.00 1. Harga belum termasuk PPN
2 Kepala Tukang Org/hari 160,000.00 ↔
3 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari 125,000.00 ↔
4 Pekerja / Buruh Lapangan Tak terlatih Org/hari 115,000.00 2. Harga belum termasuk
Profit dan Overhead
B. BAHAN PENGISI ###
1 Batu pecah 1/2 cm M³ 436,500.00 ↑
2 Pasir Urug M³ 70,000.00 ↑
3 Pasir Beton M³ 110,000.00 ↑
4 Semen PC (50 Kg) Zak 93,500.00 ↑
5 Semen PC Kg 1,870.00 ↑
6 Semen Warna Kg 3,500.00 ###
7 Bataco Bh 2,800.00 ###
8 Keramik 40 x 40 cm Buah 11,200.00 ↑
9 Keramik 20 x 20 cm Buah 2,600.00 ###
10 Sewa Molen Hari 547,840.00 ###
11 Tanah Biasa M³ 100,000.00
###
C. BAHAN KAYU ###
1 Balok Kayu Klas II Mabang (Tdk Ketam) M³ 2,936,000.00 N
2 Papan kayu klas II (mabang) tdk ketam M³ 2,905,000.00 ↑
3 Ky. Klas III M³ 3,200,000.00 ###
4 Papan Mal M³ 950,000.00 ↑
5 Kayu cerucuk /dolken ø8 - Pj. 4 M Btg 35,000.00 ↑
6 List kayu profil M' 38,000.00 ###
###
D. BAHAN CAT ###
1 Cat kilat Kg 70,000.00 ↑
2 Plamur Kg 23,250.00 ↑
3 Cat dasar emulsion setara Mowilex Kg 54,000.00 TT
4 Cat Akhir setara Mowilex Weather Shield (Exterior) Kg 103,000.00 TT
5 Cat Akhir setara Mowilex (Interior) Kg 69,000.00 TT
6 Dempul Kg 13,000.00 TT
7 Meni Kg 60,000.00 TT
8 Oker Kg 27,000.00 ↑
9 Lem Kayu Kg 25,000.00 ###
10 Kuas Buah 40,000.00 ###
11 Tiner HD Kg 35,000.00 ###
12 Amplas Lbr 5,500.00 ###
###
E. BAHAN SANITASI ###
1 Kloset Duduk Porselin + Tangki Unit 2,400,000.00 ↑
2 Floor Drain Bh 40,000.00 ↑
3 Kran Air Bh 30,000.00 ###
4 Pipa PVC 4" M' 104,600.00 ###
5 Pipa PVC 3" M' 64,000.00 ###
6 Pipa PVC 1" M' 13,800.00 ###
7 Menhole Septictank Unit 250,000.00
8 Ventilasi Septictank Pipa 2" Unit 100,000.00
###
F. BAHAN BESI DAN ALUMINIUM ###
1 Besi Tulangan Beton Kg 16,000.00 ###
2 Wiremesh Kg 16,000.00 ###
3 Kawat Beton Kg 25,000.00 ###
4 Pipa Galvanis 3/4" M' 51,000.00 ###
5 Kusen Alumunium M' 120,000.00
6 Rangka Plafond Metal Fooring M2 190,000.00
7 Besi Hollow 4/4 M 50,000.00
###
NO URAIAN SATUAN HARGA (Rp) KETERANGAN
JUMLAH
N O. URAIAN PEKERJAAN HARGA
( Rp )
1 2 3
(A) JUMLAH HARGA PEKERJAAN (Termasuk Biaya Umum dan Keuntungan) 1,454,545,453.48
(B) PAJAK PERTAMBAHAN NILAI (PPN) = 10% X (A) 145,454,545.35
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 1,599,999,998.83
(D) PEMBULATAN 1,600,000,000.00
1 2 3
A. PEKERJAAN PERSIAPAN
1 P. Ps. 02 #REF!
B. PEKERJAAN TANAH
1 P. T. 01 #REF!
2 P. T. 09 #REF!
3 P. T. 13 #REF!
C. PEKERJAAN PONDASI TIANG TONGKAT
1 P. TT. 02 #REF!
D. PEKERJAAN BETON BERTULANG
1 P. BB. 03 #REF!
E. PEKERJAAN DINDING
1 P. Dnd. 01 #REF!
F. PEKERJAAN PLESTERAN
1 P. Pls. 08 #REF!
G. PEKERJAAN KAYU
1 P. K. 06 #REF!
2 P. K. 08 #REF!
3 P. K. 25 #REF!
4 P. K. 27 #REF!
5 P. K. 33 #REF!
6 P. K. 35 #REF!
7 P. K. 42 #REF!
H. PEKERJAAN PENUTUP ATAP
1 P. PA. 12 #REF!
2 P. PA. 07 #REF!
I. PEKERJAAN PLAFOND
1 P. Pf. 01 #REF!
2 P. Pf. 04 #REF!
J. PEKERJAAN PENUTUP LANTAI DAN DINDING
1 P. LD. 04 #REF!
K. PEKERJAAN PENGECATAN
1 P. Ct. 04 #REF!
#REF!
2 P. Ct. 11
#REF!
Rekapitulasi 6
TULASI ANALISA BIAYA KONSTRUKSI ( ABK )
HARGA SATUAN
(Rp)
4
A. PEKERJAAN PERSIAPAN
#REF!
B. PEKERJAAN TANAH
#REF!
#REF!
#REF!
C. PEKERJAAN PONDASI TIANG TONGKAT
#REF!
D. PEKERJAAN BETON BERTULANG
#REF!
E. PEKERJAAN DINDING
#REF!
F. PEKERJAAN PLESTERAN
#REF!
G. PEKERJAAN KAYU
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
H. PEKERJAAN PENUTUP ATAP
#REF!
#REF!
I. PEKERJAAN PLAFOND
#REF!
#REF!
PEKERJAAN PENUTUP LANTAI DAN DINDING
#REF!
K. PEKERJAAN PENGECATAN
#REF!
#REF!
Rekapitulasi 7
RENCANA ANGGARAN BIAYA
OWNEER'S ESTIMATE (OE)
I PEKERJAAN PENDAHULUAN
1 Pembersihan dan Pemerataan Lokasi 432.00 M2 AHSP A.2.2.1.9 20,700.00 8,942,400.00
2 Pengukuran dan Pemasangan Bowplank 100.00 M' AHSP A.2.2.1.4.a 78,660.00 7,866,000.00
3 Pembuatan Papan Nama Proyek 1.00 Lsm HSUB - 350,000.00 350,000.00
4 Pembuatan Direksi Keet 1.00 Lsm HSUB - 5,000,000.00 5,000,000.00
5 Penyiapan RK3K 1.00 Set HSUB - 1,200,000.00 1,200,000.00
6 Spanduk (baner) Sosialisasi dan Promosi K3 1.00 Lbr HSUB - 250,000.00 250,000.00
7 Rompi + Helm Pelindung (Safety Helmed) 5.00 Set HSUB - 50,000.00 250,000.00
8 Sarung Tangan (safety Glooves) 5.00 Psg HSUB - 7,500.00 37,500.00
9 Sepatu Keselamatan (Safety Shoes) 5.00 Psg HSUB - 250,000.00 1,250,000.00
10 Peralatan P3K 1.00 Lsm HSUB - 300,000.00 300,000.00
11 Rambu Petunjuk 1.00 Lsm HSUB - 200,000.00 200,000.00
12 Rambu Peringatan 2.00 Bh HSUB - 200,000.00 400,000.00
SUB JUMLAH 26,045,900.00
II PEKERJAAN PONDASI
1 Galian Tanah Pondasi 103.03 M3 AHSP A.2.3.1.1 102,925.00 10,604,568.60
2 Urugan Kembali Galian Tanah Pondasi 34.34 M3 AHSP A.2.3.1.9 73,600.00 2,527,718.40
3 Pasir Urug T = 15 cm 11.45 M3 AHSP A.2.3.1.11 137,770.00 1,577,190.96
4 Pengecoran Lantai Kerja Beton K-100, T = 5 cm 3.82 M3 AHSP A.4.1.1.4.a 1,269,896.26 4,845,924.14
5 Bekisting Pondasi 83.26 M2 AHSP A.4.1.1.20 270,641.00 22,534,381.58
6 Tulangan Dia. 10 mm 1,163.21 Kg AHSP A.4.1.1.17 21,871.85 25,441,602.76
7 Tulangan Dia. 8 mm 50.19 Kg AHSP A.4.1.1.17 21,871.85 1,097,705.11
8 Tulangan Dia. 6 mm 35.99 Kg AHSP A.4.1.1.17 21,871.85 787,260.38
9 Pengecoran Pondasi Beton K-225 13.67 M3 AHSP A.4.1.1.7.a 1,623,216.79 22,187,263.28
SUB JUMLAH 91,603,615.20
IV PEKERJAAN LANTAI
1 Mengurug Pasir T = 38 Cm 164.16 M3 AHSP A.2.3.1.11 137,770.00 22,616,323.20
2 Pengecoran Lt. Beton K-225, T = 12 Cm 51.84 M3 AHSP A.4.1.1.7.a 1,623,216.79 84,147,558.17
3 Pemasangan Keramik Lantai Uk. 40/40 411.75 M2 AHSP A.4.4.3.34.a 281,405.69 115,868,792.86
4 Pemasangan Keramik Lantai Uk. 20/20 20.25 M2 AHSP A.4.4.3.36 268,373.20 5,434,557.30
5 Pemasangan Keramik Dinding WC Uk. 20/20 33.40 M2 AHSP A.4.4.3.36 268,373.20 8,963,664.88
6 Pemasangan Keramik Dinding Bak WC Uk. 20/20 13.95 M2 AHSP A.4.4.3.36 268,373.20 3,744,342.89
SUB JUMLAH 240,775,239.30
XI PEKERJAAN PENGECATAN
1 Cat Tembok Baru Eksterior 217.13 M2 AHSP A.4.7.1.10.b 52,989.70 11,505,653.56
2 Cat Tembok Baru Interior 747.56 M2 AHSP A.4.7.1.10.a 42,823.70 32,013,285.17
3 Cat Plafond 532.00 M2 AHSP A.4.7.1.10.a 42,823.70 22,782,208.40
4 Cat Kilat List Bawah Dinding Depan 6.30 M2 AHSP A.4.7.1.4 64,333.88 405,303.41
SUB JUMLAH 66,706,450.55
JUMLAH 1,454,545,453.48
NO PEKERJAAN PERHITUNGA
1 PEKERJAAN PENDAHULUAN
- Pembersihan dan Pemerataan Lokasi 36 x 12
- Pengukuran dan Pemasangan Bowplank 37 + 13
- Pembuatan Papan Nama Proyek
- Pembuatan Direksi Keet
- Penyiapan RK3K
- Spanduk (baner) Sosialisasi dan Promosi K3
- Rompi + Helm Pelindung (Safety Helmed)
- Sarung Tangan (safety Glooves)
- Sepatu Keselamatan (Safety Shoes)
- Peralatan P3K
- Rambu Petunjuk
- Rambu Peringatan
2 PEKERJAAN PONDASI
- Galian Tanah Pondasi 1.2 x 1.2
- Urugan Kembali Galian Tanah Pondasi
- Pasir Urug T = 15 cm 1.2 x 1.2
- Pengecoran Lantai Kerja Beton K-100, T = 5 cm 1.2 x 1.2
- Bekisting Pondasi 1x 0.23
0.93 x 0.2
0.93 x 0.15
4 PEKERJAAN LANTAI
- Mengurug Pasir T = 38 Cm 432 x 0.38
- Pengecoran Lt. Beton K-225, T = 12 Cm 432 x 0.12
- Pemasangan Keramik Lantai Uk. 40/40 432 - 20.25
- Pemasangan Keramik Lantai Uk. 20/20 2.25 + 18
- Pemasangan Keramik Dinding WC Uk. 20/20 1.72 + 1.72
- Pemasangan Keramik Dinding Bak WC Uk. 20/20 1.04 + 1.568
5 PEKERJAAN DINDING DAN PLESTERAN
- Pemasangan Batako
Dinding Bangunan 144 x 3.7
Dinding Bak WC 2.28 X 0.8
Dinding Selasar 1x 2.85
- Plesteran Halus
Dinding Bangunan
Dinding Bak WC 3.26 x 0.8
Dinding Selasar
6 PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
- Pemasangan Rangka Atap Baja Ringan
- Pemasangan Penutup Atap Zincalume + Lisplank 113.62 + 502.2
7 PEKERJAAN PLAFOND
- Rangka Plafond Besi Hollow Metal Fooring ( Ruangan + Selasar + Kaki Atap ) 14 x 38
- Plafond GRC, Lev. + 3,60 Meter ( Ruangan + Selasar + Kaki Atap )
8 PEKERJAAN PINTU, JENDELA DAN VENTILASI
- Kusen Pintu, Jendela & Ventilasi Alumunium 306.4
- Pintu 2 Daun Double Multiplek 4 mm + Finishing HPL & Ventilasi ( PV1 )
Daun Pintu Uk. 0,80 x 2,30
Daun Pintu + Kaca Uk. 0,50 x 2,30
Ventilasi Kaca t = 5 mm Uk. 0,80 x 0,70
Kaca t = 5 mm Uk. 0,45 x 0,70
Pemasangan (15% Dari Harga Bahan)
- Pintu 1 Daun Double Multiplek 4 mm + Finishing HPL & Ventilasi ( PV2 )
Daun Pintu Uk. 0,80 x 2,30
Ventilasi Kaca t = 5 mm Uk. 0,80 x 0,70
Pemasangan (15% Dari Harga Bahan)
- Pintu 1 Daun Double Multiplek 4 mm + Finishing HPL ( PV3 )
Daun Pintu Uk. 0,70 x 2,30
Pemasangan (15% Dari Harga Bahan)
- Daun Jendela Alumunium & Ventilasi ( JV1 )
Daun Jendela Uk. 0,80 x 1,40
Ventilasi Kaca t = 5 mm Uk. 0,80 x 0,70
Kaca t = 5 mm Uk. 0,80 x 1,40
Kaca t = 5 mm Uk. 0,80 x 0,70
Pemasangan (15% Dari Harga Bahan)
- Ventilasi Alumunium ( V1 )
Ventilasi Kaca t = 5 mm Uk. 0,80 x 0,70
Kaca t = 5 mm Uk. 0,80 x 0,70
Pemasangan (15% Dari Harga Bahan)
- Ventilasi Alumunium ( V2 )
9 PEKERJAAN KUNCI DAN PENGGANTUNG
- Kunci Pintu Panel 2 Daun
Kunci Pintu Panel 1 Daun
- Engsel Pintu Panel
Engsel Jendela
- Slot Pintu
- Slot Jendela
- Handle Jendela
- Kait Angin Jendela
10 PEKERJAAN MEKANIKAL & ELEKTRIKAL
MCB Box
- Lampu SL 15 Watt
- Stop Kontak
- Saklar Tuggal
- Saklar Ganda
- Kabel
- Instalasi dan Pemasangan (15% Dari Harga Bahan)
11 PEKERJAAN PENGECATAN
- Cat Tembok Baru Eksterior 48 x 3.6
3.986 x 15
432.00 m2
+ 37 + 13 100.00 m'
1.00 lsm
1.00 lsm
1.00 Set
1.00 Lbr
5.00 Set
5.00 Psg
5.00 Psg
1.00 Lsm
1.00 Lsm
2.00 Bh
x 1.35 53 103.03 m3
34.34 m3
x 0.15 53 11.45 m3
x 0.05 53 3.82 m3
x 4 53 48.76 Pondasi Tapak
x 2 53 19.72 Kolom Pondasi
x 2 53 14.79 Kolom Pondasi
83.26 m2
x 0.006165 x 100 53 1006.37 Pondasi Tapak
x 0.006165 x 100 53 156.84 Kolom Pondasi
1163.21 Kg
x 0.006165 x 64 53 50.19 Kg
x 0.006165 x 36 53 35.99 Kg
X 0.23 53 12.19 Pondasi Tapak
X 0.93 53 1.48 Kolom Pondasi
13.67 m3
202.50 m2
x 0.006165 x 100 499.37 Kg
x 0.006165 x 64 159.80 Kg
x 0.006165 x 36 332.58 Kg
x 202.5 15.19 m3
148.50 m2
x 0.006165 x 100 488.27 Kg
x 0.006165 x 64 156.25 Kg
x 0.006165 x 36 208.00 Kg
x 198 8.91 m3
6.75 m2
x 0.006165 x 64 21.31 Kg
x 0.006165 x 36 8.19 Kg
x 13.5 0.27 m3
x 51 142.80 m2
x 0.006165 x 100 x 51 503.06 Kg
x 0.006165 x 64 x 51 160.98 Kg
x 0.006165 x 36 x 51 153.94 Kg
x 4x 51 6.12 m3
x 12 9.12 m2
x 0.006165 x 64 x 12 71.97 Kg
x 0.006165 x 36 x 12 14.17 Kg
x 3.8 x 12 0.46 m3
x 16 13.68 m2
x 0.006165 x 64 x 16 71.97 Kg
x 0.006165 x 36 x 16 14.17 Kg
x 2.85 x 16 0.46 m3
164.16 m3
51.84 m3
411.75 m2
20.25 m2
+ 1+ 2.24 x 5 33.40 m2
+ 0.1824 x 5 13.95 m2
- 111.55 421.25 m2
X 5 9.12 m2
x 16 45.60 m2
842.50 m2
+ 0.1824 x 5 13.95 M2
91.20 m2
615.82 m2
615.82 m2
532.00 m2
532.00 m2
306.40 m'
4.00 unit
4.00 unit
4.00 unit
4.00 unit
15.00 %
3.00 unit
3.00 unit
15.00 %
5.00 unit
15.00 %
20.00 unit
20.00 unit
10.00 unit
10.00 unit
15.00 %
14.00 unit
7.00 unit
15.00 %
14.00 unit
4.00 Set
8.00 Set
48.00 bh
40.00 bh
32.00 bh
40.00 bh
20.00 bh
40.00 bh
1.00 Set
35.00 bh
7.00 bh
8.00 bh
7.00 bh
210.70 m
15.00 %
- 61.06 111.74
59.79 kolom
217.13 m2
- 111.55 x 2- 111.74 747.56 m2
532.00 m2
6.30 m2
5.00 Unit
5.00 Unit
5.00 Unit
15.00 %
x 1.65 26.40 m3
0.15 2.40 m3
3.18 m2
x 0.006165 x 64 20.91 Kg
x 0.006165 x 36 8.04 Kg
x 13.25 0.30 m3
5.96 m2 1.4432
x 0.006165 x 64 20.91 Kg
x 0.006165 x 36 8.04 Kg
x 13.25 0.30 m3
X 6 6.12 m2
x 0.006165 x 64 x 6 16.10 Kg
x 0.006165 x 36 x 6 6.19 Kg
x 1.7 x 6 0.23 m3
16.00 M
15.00 %
14.00 M
12.00 M
15.00 %
50.16 m2
1.00 Lsm
x 0.43 x 2 1.24 m3
0.41 m3
x 0.15 2 0.43 m3
x 0.05 2 0.14 m3
x 4 2 1.76 Pondasi Tapak
x 0.006165 x 169 2 64.18 Pondasi Tapak
X 0.22 2 0.44 Pondasi Tapak
2.40 m2
x 0.006165 x 169 24.96 Kg
x 0.006165 x 64 8.91 Kg
x 6 0.24 m3
14.24 m2
x 0.006165 x 169 148.36 Kg
x 0.006165 x 64 42.14 Kg
x 35.6 0.85 m3
6.60 m2
x 0.006165 x 169 49.93 Kg
x 0.006165 x 64 17.81 Kg
x 11 0.44 m3
x 2 8.80
x 4x 2 0.56
x 0.4 x 4x 2 1.12
10.48 m2
x 0.006165 x 169 x 2 76.27 Kg
x 0.006165 x 100 x 2 35.71 Kg
x 2.2 x 2 1.10
x 0.26 x 2 0.08
x 0.1 x 2 0.10
1.28 m3
6.05 m2
12.10 m2
16.07 m2
10.80 m
0.55 m3
0.62 m3
+ 1.6 x 0.1 1.14 m3
+ 0.8 + 0.22 + 1.42 26.27 m2
+ 2.34
1.00
1.00
KOEFISIEN TENAGA KERJA DAN KOEFISIEN BAHAN
A.2.2.1.4.a Pengukuran dan pemasangan 1 m' Bowplank (dengan kayu dolken dan papan kayu kelas III)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien (Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.100 115,000.00 11,500.00
2. Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
3. Kepala Tukang L.03 OH 0.010 160,000.00 1,600.00
4. Mandor L.04 OH 0.005 130,000.00 650.00
Jumlah Harga Tenaga Kerja 26,250.00
B BAHAN
1. Kayu Pancang (Dolken) d = 6-8 cm, p = 4m m³ 1.000 35,000.00 35,000.00
2. Paku 2" - 3" Kg 0.020 25,000.00 500.00
3. Kayu papan klas III m³ 0.007 950,000.00 6,650.00
Jumlah Harga Bahan 42,150.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 68,400.00
E Overhead & Profit 15% x D 10,260.00
F Harga Satuan Pekerjaan ( D + E ) 78,660.00
A TENAGA
1. Pekerja L.01 OH 0.100 115,000.00 11,500.00
2. Mandor L.04 OH 0.050 130,000.00 6,500.00
Jumlah Harga Tenaga Kerja 18,000.00
B BAHAN
D Jumlah ( A + B + C ) 18,000.00
E Overhead & Profit 15% x D 2,700.00
F Harga Satuan Pekerjaan ( D + E ) 20,700.00
A.2.3.1 Pekerjaan Tanah
D Jumlah ( A + B + C ) 89,500.00
E Overhead & Profit 15% x D 13,425.00
F Harga Satuan Pekerjaan ( D + E ) 102,925.00
D Jumlah ( A + B + C ) 64,000.00
E Overhead & Profit 15% x D 9,600.00
F Harga Satuan Pekerjaan ( D + E ) 73,600.00
D Jumlah ( A + B + C ) 119,800.00
E Overhead & Profit 15% x D 17,970.00
F Harga Satuan Pekerjaan ( D + E ) 137,770.00
B. PEKERJAAN TANAH (P.T.)
D Jumlah ( A + B + C ) 193,995.00
E Overhead & Profit 15% x D 29,099.25
F Harga Satuan Pekerjaan ( D + E ) 223,094.25
Acuan : ABK Bangunan Gedung dan Perumahan
Pekerjaan Tanah 26
A.4.1.1 Pekerjaan Beton
A.4.1.1.4.a Pembuatan 1 m³ lantai kerja beton mutu fc 7,4 Mpa (K100) menggunakan molen
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.960 115,000.00 110,400.00
2. Tukang Batu L.02 OH 0.130 125,000.00 16,250.00
3. Kepala Tukang L.03 OH 0.013 160,000.00 2,080.00
4. Mandor L.04 OH 0.048 130,000.00 6,240.00
Jumlah Harga Tenaga Kerja 134,970.00
B BAHAN
1. Semen portland Kg 230.000 1,870.00 430,100.00
2. Pasir beton Kg 893.000 78.57 70,164.29
3. kerikil (maks 30 mm) Kg 1,027.000 323.33 332,063.33
4. Air Ltr 200.000 -
Jumlah Harga Bahan 832,327.62
C PERALATAN
1. Molen sewa-hari 0.250 547,840.00 136,960.00
Jumlah Harga Alat 136,960.00
D Jumlah ( A + B + C ) 1,104,257.62
E Overhead & Profit 15% x D 165,638.64
F Harga Satuan Pekerjaan ( D + E ) 1,269,896.26
B BAHAN
1. Semen portland Kg 371.000 1,870.00 693,770.00
2. Pasir beton Kg 698.000 78.57 54,842.86
3. kerikil (maks 30 mm) Kg 1,047.000 323.33 338,530.00
4. Air Ltr 215.000 -
Jumlah Harga Bahan 1,087,142.86
C PERALATAN
1. Molen sewa-hari 0.250 547,840.00 136,960.00
Jumlah Harga Alat 136,960.00
D Jumlah ( A + B + C ) 1,411,492.86
E Overhead & Profit 15% x D 211,723.93
F Harga Satuan Pekerjaan ( D + E ) 1,623,216.79
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.070 115,000.00 8,050.00
2. Tukang Besi L.02 OH 0.070 125,000.00 8,750.00
3. Kepala Tukang L.03 OH 0.007 160,000.00 1,120.00
4. Mandor L.04 OH 0.004 130,000.00 520.00
Jumlah Harga Tenaga Kerja 18,440.00
B BAHAN
1. Besi beton (polos/ulir) Kg 10.500 16,000.00 168,000.00
2. Kawat beton Kg 0.150 25,000.00 3,750.00
Jumlah Harga Bahan 171,750.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 190,190.00
E Overhead & Profit 15% x D 28,528.50
F Harga Satuan Pekerjaan ( D + E ) 218,718.50
D Jumlah ( A + B + C ) 174,580.00
E Overhead & Profit 15% x D 26,187.00
F Harga Satuan Pekerjaan ( D + E ) 200,767.00
A.4.1.1.20 Pemasangan 1 m² bekisting untuk pondasi
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.520 115,000.00 59,800.00
2. Tukang Kayu L.02 OH 0.260 125,000.00 32,500.00
3. Kepala Tukang L.03 OH 0.026 160,000.00 4,160.00
4. Mandor L.04 OH 0.026 130,000.00 3,380.00
Jumlah Harga Tenaga Kerja 99,840.00
B BAHAN
1. Kayu kelas III m³ 0.040 3,200,000.00 128,000.00
2. Paku 5 - 10 cm Kg 0.300 25,000.00 7,500.00
3. Minyak bekisting Ltr 0.100 -
Jumlah Harga Bahan 135,500.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 235,340.00
E Overhead & Profit 15% x D 35,301.00
F Harga Satuan Pekerjaan ( D + E ) 270,641.00
D Jumlah ( A + B + C ) 251,340.00
E Overhead & Profit 15% x D 37,701.00
F Harga Satuan Pekerjaan ( D + E ) 289,041.00
A.4.1.1.23.a Pemasangan 1 m² bekisting untuk balok (dengan papan mal)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.660 115,000.00 75,900.00
2. Tukang Kayu L.02 OH 0.330 125,000.00 41,250.00
3. Kepala Tukang L.03 OH 0.033 160,000.00 5,280.00
4. Mandor L.04 OH 0.033 130,000.00 4,290.00
Jumlah Harga Tenaga Kerja 126,720.00
B BAHAN
1. Kayu kelas III m³ 0.058 3,200,000.00 185,600.00
2. Paku 5 - 12 cm Kg 0.400 25,000.00 10,000.00
3. Minyak bekisting Ltr 0.200 -
4. Papan mal m³ 0.017 950,000.00 16,150.00
5. Dolken kayu Ø 8-10 / 400 cm Btg 2.000 35,000.00 70,000.00
Jumlah Harga Bahan 281,750.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 408,470.00
E Overhead & Profit 15% x D 61,270.50
F Harga Satuan Pekerjaan ( D + E ) 469,740.50
D Jumlah ( A + B + C ) 398,870.00
E Overhead & Profit 15% x D 59,830.50
F Harga Satuan Pekerjaan ( D + E ) 458,700.50
A.4.4.1 Pekerjaan Dinding Pasangan
D Jumlah ( A + B + C ) 104,845.00
E Overhead & Profit 15% x D 15,726.75
F Harga Satuan Pekerjaan ( D + E ) 120,571.75
A.4.4.2 Pekerjaan Plesteran
D Jumlah ( A + B + C ) 71,908.80
E Overhead & Profit 15% x D 10,786.32
F Harga Satuan Pekerjaan ( D + E ) 82,695.12
A.4.4.3 Pekerjaan Penutup Lantai & Penutup Dinding
D Jumlah ( A + B + C ) 244,700.60
E Overhead & Profit 15% x D 36,705.09
F Harga Satuan Pekerjaan ( D + E ) 281,405.69
D Jumlah ( A + B + C ) 233,368.00
E Overhead & Profit 15% x D 35,005.20
F Harga Satuan Pekerjaan ( D + E ) 268,373.20
Harga Satuan Pekerjaan Plafond
D Jumlah ( A + B + C ) 53,660.00
E Overhead & Profit 15% x D 8,049.00
F Harga Satuan Pekerjaan ( D + E ) 61,709.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.24
A.4.7.1 Pekerjaan Pengecatan
A.4.7.1.4 Pengecatan 1 m² bidang kayu baru (1 lapis plamur, 1 lapis cat dasar 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.070 115,000.00 8,050.00
2. Tukang Cat L.02 OH 0.009 125,000.00 1,125.00
3. Kepala Tukang L.03 OH 0.006 160,000.00 960.00
4. Mandor L.04 OH 0.003 130,000.00 390.00
Jumlah Harga Tenaga Kerja 10,525.00
B BAHAN
1. Cat menie Kg 0.200 60,000.00 12,000.00
2. Plamur Kg 0.150 23,250.00 3,487.50
3. Cat dasar Kg 0.170 54,000.00 9,180.00
4. Cat penutup Kg 0.260 70,000.00 18,200.00
5. Kuas Bh 0.010 40,000.00 400.00
6. Pengencer Kg 0.030 35,000.00 1,050.00
7. Ampelas Lbr 0.200 5,500.00 1,100.00
Jumlah Harga Bahan 45,417.50
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 55,942.50
E Overhead & Profit 15% x D 8,391.38
F Harga Satuan Pekerjaan ( D + E ) 64,333.88
D Jumlah ( A + B + C ) 37,238.00
E Overhead & Profit 15% x D 5,585.70
F Harga Satuan Pekerjaan ( D + E ) 42,823.70
A.4.7.1.10.b Pengecatan 1m2 tembok baru Eksterior (setara Mowilex)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.020 115,000.00 2,300.00
2. Tukang Cat L.02 OH 0.063 125,000.00 7,875.00
3. Kepala Tukang L.03 OH 0.0063 160,000.00 1,008.00
4. Mandor L.04 OH 0.003 130,000.00 390.00
Jumlah Harga Tenaga Kerja 11,573.00
B BAHAN
1. Plamur Kg 0.100 23,250.00 2,325.00
2. Cat dasar Kg 0.100 54,000.00 5,400.00
3. Cat penutup Kg 0.260 103,000.00 26,780.00
Jumlah Harga Bahan 34,505.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 46,078.00
E Overhead & Profit 15% x D 6,911.70
F Harga Satuan Pekerjaan ( D + E ) 52,989.70