PERHITUNGAN TRUST BLOCK BETON DAN GALIAN PERLINTASAN PIPA

No. Uraian Panj. Leb. Tinggi Alas Atas Dia. Jumlah Volume Dibulatkan
1 2 3 4 5 6 7 8 9 10
THRUST BLOCK
Pekerjaan Pondasi
Thrust block beton adk. 1:2:3 (K.175)
Dia. 50 & 75
1 Tee 0.200 0.200 0.200 1.000 0.008 0.008
2 Cap/dop 0.200 0.200 0.200 2.000 0.016 0.016
3 Bend 0.200 0.200 0.200 - - -

Dia. 100 & 150


1 Tee 0.300 0.300 0.300 3.000 0.081 0.081
2 Cap/dop 0.300 0.300 0.300 2.000 0.054 0.054
3 Bend 0.300 0.300 0.300 - - -

Dia. 200 & 250


1 Tee 0.450 0.450 0.450 - - -
2 Cap/dop 0.450 0.450 0.450 - - -
3 Bend 0.450 0.450 0.450 - - -
4 Street box 3.000 0.0138 0.0140
0.173
dibulatkan 0.180

Jembatan Type T2, T3, T4, T5


Pekerjaan Pondasi
1 Galian Tanah Pondasi 0.400 0.400 1.200 2.000 0.384 0.384
0.384

2 Trust block (Beton K-125) 0.400 0.400 0.300 0.200 4.000 0.160 0.160
0.160

Jembatan type T1
Pekerjaan Pondasi
1 Galian Tanah Pondasi 0.500 0.500 1.200 2.000 0.600 0.600
1.000 - -
0.600
2 Trust block (Beton K-125) 0.400 0.400 0.300 0.200 4.000 0.160 0.160
1.000 - -
0.160
3 Beton bertulang
Dudukan besi support pipa 0.800 1.000 1.100 - - -
Ket.
11
Galian Tanah Pasir Urug
Dia. Pipa
Penampang Ukuran (M') Volume (M3)
Pipa (A2) Volume
Ø MM INCH Tinggi Lebar Galian Urugan Tinggi Lebar
(M3)
dia. 400 16 0.1256 1.800 0.850 1.5300 0.8944 0.6000 0.850 0.5100
dia. 350 14 0.0989 1.600 0.750 1.2000 0.6848 0.5550 0.750 0.4163
dia. 300 12 0.0779 1.500 0.700 1.0500 0.6116 0.5150 0.700 0.3605
dia. 250 10 0.0491 1.400 0.600 0.8400 0.5209 0.4500 0.600 0.2700
dia. 200 8 0.0314 1.200 0.500 0.6000 0.3686 0.4000 0.500 0.2000
dia. 150 6 0.0201 1.100 0.400 0.4400 0.3999 0.0500 0.400 0.0200
dia. 100 4 0.0095 0.800 0.300 0.2400 0.2155 0.0500 0.300 0.0150
dia. 75 3 0.0064 0.700 0.250 0.1750 0.1561 0.0500 0.250 0.0125
dia. 50 2 0.0031 0.600 0.200 0.1200 0.1069 0.0500 0.200 0.0100
dia. 16 - 40 ½-1½ 0.0020 0.500 0.200 0.1000 0.0880 0.0500 0.200 0.0100
JUMLAH

75
100

Rp
Panjang
Volume Galian (M3)
Pipa
Urugan V. Pasir
M' Galian
Kembali Urug (m3)
- - -
- - -
- - -
- - - -
- - - -
- - - -
- - - -
1,250.00 218.75 195.18 15.63 7.95 210.80
- - - - - -
- - - 210.80
1,250.00 218.75 195.17 15.62

208.33
-

200,000,000.00
200,000,000.00
-
DATA PERHITUNGAN

No Uraian Pekerjaan Perhitungan Jumlah Volume Total Volume

II PEKERJAAN TANAH
1 Galian tanah
Pipa 160 mm 0.40 x 1.10 x 0.00 - m3 218.75 m3
Pipa 110 mm 0.30 x 0.80 x 0.00 - m3
Pipa 90 mm 0.25 x 0.70 x 1,250.00 218.75 m3
Pipa 63 mm 0.20 x 0.60 x 0.00 - m3

2 Urugan tanah kembali


Pipa 160 mm - - (0.05 x 0.30 x 5,500.00) - (1/4 x 3.14 x 110²) 0.000 m3 195.17 m3
Pipa 110 mm - - (0.05 x 0.30 x 5,500.00) - (1/4 x 3.14 x 110²) 0.000 m3
Pipa 90 mm 218.75 - (0.05 x 0.30 x 1200.00) - (1/4 x 3.14 x 90²) 195.177 m3
Pipa 63 mm - - (0.05 x 0.30 x 1200.00) - (1/4 x 3.14 x 90²) 0.000 m3

3 Urugan Pasir
Pipa 160 mm 0.400 x 0.050 x 0.00 0.000 m2 15.62 m3
Pipa 110 mm 0.300 x 0.050 x 0.00 0.000 m3
Pipa 90 mm 0.250 x 0.050 x 1,250.00 15.625 m3
Pipa 63 mm 0.200 x 0.050 x 0.00 0.000 m4

III PEKERJAAN PERPIPAAN SEPJ. 7.770 M


1 Pengadaan dan Pemas. Pipa PVC RRJ dia. 160 mm 0.00 m' 1,250.00 m'
2 Pengadaan dan Pemas. Pipa PVC RRJ dia. 110 mm 0.00 m'
3 Pengadaan dan Pemas. Pipa PVC RRJ dia. 90 mm 1250.00 m'
4 Pengadaan dan Pemas. Pipa PVC RRJ dia. 63 mm 0.00 m'

5 Pengadaan Pipa dan Assesories 1.00 paket 1.00 paket

IV PEKERJAAN BETON
1 Thrustblock
Diameter 50 & 75 mm
Tee 0.20 x 0.20 x 0.20 x 1.00 0.008 m3 0.32 m3
Cap/dop 0.20 x 0.200 x 0.200 x 5.00 0.040 m3
Bend 0.20 x 0.200 x 0.200 x 1.00 0.008 m3

Diameter 100 & 150 mm


Tee 0.30 x 0.30 x 0.30 x 6.00 0.162 m3
Cap/dop 0.30 x 0.30 x 0.30 x 3.00 0.081 m3
Street Box 3.00 0.0138 m3

V PEKERJAAN PERLINTASAN
1 Pengadaan dan Pemas. Perlintasan Pipa Ø 150 mm-83 m 83.00 m' 93.00 m'
2 Pengadaan dan Pemas. Perlintasan Pipa Ø 150 mm-3m 3.00 m'
3 Pengadaan dan Pemas. Perlintasan Pipa Ø 75 mm- 4 m 4.00 m'
4 Pengadaan dan Pemas. Perlintasan Pipa Ø 75 mm- 1,5 m 1.50 m'
5 Pengadaan dan Pemas. Perlintasan Pipa Ø 50 mm-1,5 m 1.50 m'

VI PEKERJAAN LAIN-LAIN
1 Pengetesan Pipa Ø 100 mm 0.00 m' 1,250.00 m'
2 Pengetesan Pipa Ø 100 mm 0.00 m'
3 Pengetesan Pipa Ø 75 mm 1250.00 m'
4 Pengetesan Pipa Ø 75 mm 0.00 m'

5 Interkoneksi Pipa 1.00 titik 1.00 titik


6 Pengadaan pipa dan Acc. Sambungan Rumah 100.00 unit 100.00 unit
PEMERINTAH KABUPATEN ACEH UTARA
DINAS CIPTA KARYA
Jalan Exxon Mobil Oil Ex Bachelor Camp Landing
Lhoksukon

RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA AIR BERSIH (DAK)


PEKERJAAN : PENINGKATAN JARINGAN DISTRIBUSI AIR BERSIH GP. MATANG BAYU
LOKASI : KECAMATAN BAKTIYA BARAT
VOLUME : 1.250 M
BIAYA : Rp. 200,000,000
T. ANGGARAN : 2017

KONSULTAN PERENCANA
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA AIR BERSIH (DAK)


PEKERJAAN : PENINGKATAN JARINGAN PIPA DISTRIBUSI AIR BERSIH GP. MATANG BAYU KEC. BAKTIYA BARAT
LOKASI : KECAMATAN BAKTIYA BARAT
VOLUME : 1.250 M
BIAYA : Rp. 200,000,000
TAHUN ANGGARAN : 2017

HARGA SATUAN JUMLAH HARGA


NO URAIAN VOLUME ANALISA
(Rp.) (Rp.)

I PEKERJAAN PERSIAPAN
1 Biaya Pengukuran 1.00 Ls Taksir 2,500,000.00 2,500,000.00
2 Sewa Direksi Keet 1.00 Ls Taksir 1,500,000.00 1,500,000.00
3 Papan nama proyek 1.00 unit Taksir 530,000.00 530,000.00
4 P3K & Keamanan 1.00 Ls Taksir 1,500,000.00 1,500,000.00
5 ADM & Dokumentasi 1.00 Ls Taksir 2,500,000.00 2,500,000.00
Jumlah 8,530,000.00

II PEKERJAAN TANAH
1 Galian tanah biasa kedalaman < 1 m 218.75 M3 AHSP PU A. 2.3.1.1 70,500.00 15,421,875.00
2 Urugan kembali tanah galian 195.17 M 3
AHSP PU A. 2.3.1.9 51,000.00 9,953,670.00
3 Urugan Pasir 15.62 M3 AHSP PU A. 2.3.1.11 286,200.00 4,470,444.00
Jumlah 29,845,989.00

III PEKERJAAN PERPIPAAN SEPJ. 1.250 M


1 Pengadaan dan Pemasangan Pipa PVC RRJ Ø 90 mm 1,250.00 M
1
AHSP PU 8.4.1.2 82,015.00 102,518,750.00
2 Pengadaan Pipa dan Assesories 1.00 Paket Lampiran BOQ.2 7,216,100.00 7,216,100.00
3 Borring 1.00 Titik Taksir 5,000,000.00 5,000,000.00
Jumlah 114,734,850.00

IV PEKERJAAN BETON
1 Thrustblock (Beton K-175) 0.18 M3 AHSP PU A.4.1.1.5 1,130,230.00 203,441.40
Jumlah 203,441.40

V PEKERJAAN PERLINTASAN
1 Pengadaan dan Pemas. Perlintasan Pipa Ø 75 mm-5 m 1.00 Paket Lamp. BOQ.1 - B 5,468,000.00 5,468,000.00
Jumlah 5,468,000.00

VI PEKERJAAN LAIN-LAIN
1 Pengetesan Pipa Ø 90 mm 1,250.00 M
1
AHSP PU 8.4.5.2 1,824.00 2,280,000.00
2 Interkoneksi Pipa 1.00 Titik Taksir 1,500,000.00 1,500,000.00
3 Pengadaan Pipa dan Assesories Sambungan Rumah 45.00 Unit Lamp. BOQ.3 832,000.00 37,440,000.00
Jumlah 41,220,000.00
REKAPITULASI RENCANA ANGGARAN BIAYA :

I PEKERJAAN PERSIAPAN 8,530,000.00


II PEKERJAAN TANAH 29,845,989.00
III PEKERJAAN PERPIPAAN SEPJ. 1.250 M 114,734,850.00
IV PEKERJAAN BETON 203,441.40
V PEKERJAAN PERLINTASAN 5,468,000.00
VI PEKERJAAN LAIN-LAIN 41,220,000.00
JUMLAH 200,002,280.40
DIBULAT 200,000,000.00

Terbilang : Dua ratus juta rupiah,-

Lhokseumawe, September 2016


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Perencana
Pembangunan Sarana dan Prasarana Air Bersih PT. KARYA PET KONSULTAN
Dinas Cipta Karya Kabupaten Aceh Utara

BADRUZZAMAN, A.Md NAZARUDDIN AH, ST


Nip. 19700817 200701 1 005 Direktur
Mengetahui/ Menyetujui,

Kuasa Pengguna Anggaran


Pembangunan Sarana dan Prasarana Air Bersih
Dinas Cipta Karya Kabupaten Aceh Utara

RAZALY, ST
Nip. 19650924 199603 1 001
LAMPIRAN BOQ.3
PENGADAAN PIPA DAN ASSESORIES PEMASANGAN SAMBUNGAN RUMAH

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
(Rp.) (Rp.)

Pengadaan Pipa dan Acc. Untuk 1 (satu) unit Sambungan Rumah


1 Clam Sadle 3" x 1/2" 1.00 bh Taksir 75,000.00 75,000.00
2 Pipa PVC Ø 1/2" 1.00 btg Taksir 34,000.00 34,000.00
3 V. Socket PVC 1/2" 1.00 bh Taksir 2,500.00 2,500.00
4 Elbow PVC 1/2" 3.00 bh Taksir 3,200.00 9,600.00
5 F. Elbow PVC 1/2" 2.00 bh Taksir 3,200.00 6,400.00
6 Water Meter (SNI type-B, Bronze) 1.00 unit Taksir 425,000.00 425,000.00
7 Stop kran 1/2" - Onda 1.00 bh Taksir 75,000.00 75,000.00
8 Double Neeple 1/2" 1.00 bh Taksir 5,000.00 5,000.00
9 F. Tee PVC 1/2" 1.00 bh Taksir 5,000.00 5,000.00
10 Hand kran 1/2" - Onda 1.00 bh Taksir 28,000.00 28,000.00
11 Plug/Dop PVC 1/2" 1.00 bh Taksir 2,500.00 2,500.00
12 Pipa Galv. 1" (chasing) 2.00 m' Taksir 22,500.00 45,000.00
13 Box meter plastik 1.00 bh Taksir 90,000.00 90,000.00
14 Sealtape 2.00 bh Taksir 4,500.00 9,000.00
15 Lem pipa 2.00 bh Taksir 10,000.00 20,000.00
Jumlah 832,000.00

Lhokseumawe, September 2016


Konsultan Perencana
PT. KARYA PET KONSULTAN

NAZARUDDIN AH, ST
Direktur
LAMPIRAN BOQ.2
PENGADAAN PIPA DAN ASSESORIES

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
(Rp.) (Rp.)
1 Tee PVC RRJ Ø 160 x 90 mm 1.00 bh Taksir 1,906,200.00 1,906,200.00
2 Tee PVC RRJ Ø 110 X 110 mm 1.00 bh Taksir 472,400.00 472,400.00
3 Tee PVC RRJ Ø 110 x 90 mm 0.00 bh Taksir 786,900.00 -
4 Tee PVC RRJ Ø 90 x 90 mm 1.00 bh Taksir 264,900.00 264,900.00
5 Flange socket PVC RRJ Ø 90 mm 2.00 bh Taksir 395,100.00 790,200.00
6 Dop PVC RRJ Ø 110 mm 0.00 bh Taksir 281,300.00 -
7 Dop PVC RRJ Ø 90 mm 2.00 bh Taksir 219,500.00 439,000.00
8 Gate Valve CI Ø 75 mm, JIS 10 K 1.00 bh Taksir 2,100,000.00 2,100,000.00
9 Giboult for PVC ND 150 1.00 bh Taksir 670,000.00 670,000.00
10 Street Box CI 1.00 bh Taksir 290,400.00 290,400.00
11 Baut 5/8" x 2,5 " 16.00 set Taksir 4,500.00 72,000.00
12 Gasket / packing karet 5.00 Kg Taksir 42,200.00 211,000.00
Jumlah 7,216,100.00

Lhokseumawe, September 2016


Konsultan Perencana
PT. KARYA PET KONSULTAN

NAZARUDDIN AH, ST
Direktur
LAMPIRAN BOQ.1
PENGADAAN DAN PEMASANGAN PERLINTASAN PIPA

A. JEMBATAN PIPA Ø 150 MM TYPE T.1 - L = 83 M


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME ANALISA
(Rp.) (Rp.)
1 2 3 4 5 6
Pekerjaan Pipa Dan Accessories
1 Pipa Gip Ø 150 mm 87.000 m' Taksir 330,000.00 28,710,000.00
2 Bend SGP Ø 150 mm x 45° 12.000 bh Taksir 138,500.00 1,662,000.00
3 Tee SGP Ø 150 x 50 mm 1.000 bh Taksir 260,000.00 260,000.00
4 Tee SGP Ø 150 x 75 mm 1.000 bh Taksir 260,000.00 260,000.00
5 Flange Socket PVC Ø 160 mm RRJ 2.000 bh Taksir 960,900.00 1,921,800.00
6 Loss Flange CS Ø 150 mm 80.000 bh Taksir 457,000.00 36,560,000.00
7 Loss Flange CS Ø 75 mm 2.000 bh Taksir 250,000.00 500,000.00
8 Loss Flange CS Ø 50 mm 1.000 bh Taksir 131,000.00 131,000.00
9 Air Valve - Double Ø 2 inc 1.000 bh Taksir 1,820,000.00 1,820,000.00
10 Gate Valve Ø 2 inc, JIS 10 K 1.000 bh Taksir 1,400,000.00 1,400,000.00
11 Gate Valve Ø 3 inc, JIS 10 K 1.000 bh Taksir 2,100,000.00 2,100,000.00
12 Street box 2.000 bh Taksir 290,400.00 580,800.00
13 Baut 3/4 x 2,5" 328.000 set Taksir 7,500.00 2,460,000.00
14 Baut 5/8 x 2" 32.000 set Taksir 4,000.00 128,000.00
15 Gasket 30.000 kg Taksir 42,200.00 1,266,000.00
16 Gantungan pipa / Support pipa 25.000 unit Taksir 700,000.00 17,500,000.00
17 Pengelasan 37.680 m' AHSP PU A.4.2.1.5 558,700.00 21,051,816.00
18 Pengecatan 40.977 m2 AHSP PU A. 4.7.1.19 41,220.00 1,689,071.94
19 Galian Tanah 0.600 m3 AHSP PU A. 2.3.1.1 70,500.00 42,300.00
20 Trusht Block (K 175) 0.160 m3 AHSP PU A.4.1.1.5 1,130,230.00 180,836.80
21 Ongkos Pemasangan 1.000 ls Taksir 8,000,000.00 8,000,000.00
TOTAL 128,223,624.74
DIBULATKAN 128,223,620.00

B. JEMBATAN PIPA Ø 100 MM TYPE T.2 - L = 5 M


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME ANALISA
(Rp.) (Rp.)
1 2 3 4 5 6
Pekerjaan Pipa Dan Accessories
1 Pipa Gip Ø 100 mm 7.000 m' Taksir 210,000.00 1,470,000.00
2 Bend Gip Ø 100 mm x 45° 4.000 bh Taksir 57,500.00 230,000.00
3 Flange Socket Ø 100 mm 2.000 bh Taksir 521,100.00 1,042,200.00
4 Loss Flange CS Ø 100 mm 6.000 bh Taksir 351,000.00 2,106,000.00
5 Air Valve - Ø 1 inc 1.000 bh Taksir 980,000.00 980,000.00
6 Baut 5/8 x 2" 32.000 set Taksir 4,000.00 128,000.00
7 Gasket 6.000 kg Taksir 42,200.00 253,200.00
8 Pengelasan 3.140 m' AHSP PU A.4.2.1.5 558,700.00 1,754,318.00
9 Pengecatan 2.198 m2 AHSP PU A. 4.7.1.19 41,220.00 90,601.56
10 Galian Tanah 0.384 m3 AHSP PU A. 2.3.1.1 70,500.00 27,072.00
11 Trusht Block (K 175) 0.160 m3 AHSP PU A.4.1.1.5 1,130,230.00 180,836.80
12 Ongkos Pemasangan 1.000 ls Taksir 1,000,000.00 1,000,000.00
TOTAL 9,262,228.36
DIBULATKAN 9,262,000.00

C. JEMBATAN PIPA Ø 75 MM TYPE T.4 - L = 5 M


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME ANALISA
NO. URAIAN PEKERJAAN VOLUME ANALISA
(Rp.) (Rp.)
1 2 3 4 5 6
Pekerjaan Pipa Dan Accessories
1 Pipa Gip Ø 75 mm 7.000 mtr Taksir 145,000.00 1,015,000.00
2 Bend Gip Ø 75 mm x 45° 4.000 bh Taksir 32,000.00 128,000.00
3 Flange Socket Ø 90 mm 2.000 bh Taksir 395,100.00 790,200.00
4 Loss Flange CS Ø 75 mm 6.000 bh Taksir 250,000.00 1,500,000.00
5 Baut 1/2 x 2" 16.000 set Taksir 3,700.00 59,200.00
6 Gasket 2.000 kg Taksir 42,200.00 84,400.00
7 Pengelasan 2.355 mtr AHSP PU A.4.2.1.5 558,700.00 1,315,738.50
8 pengecatan 1.649 m2 AHSP PU A. 4.7.1.19 41,220.00 67,951.17
9 Galian Tanah 0.384 m3 AHSP PU A. 2.3.1.1 70,500.00 27,072.00
10 Trusht Block (K 175) 0.160 m3 AHSP PU A.4.1.1.5 1,130,230.00 180,836.80
11 Ongkos Pemasangan 1.000 ls Taksir 300,000.00 300,000.00
TOTAL 5,468,398.47
DIBULATKAN 5,468,000.00

D. JEMBATAN PIPA Ø 75 MM TYPE T.4 - L = 1,5 M


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME ANALISA
(Rp.) (Rp.)
1 2 3 4 5 6
Pekerjaan Pipa Dan Accessories
1 Pipa Gip Ø 75 mm 3.500 mtr Taksir 145,000.00 507,500.00
2 Bend Gip Ø 75 mm x 45° 4.000 bh Taksir 32,000.00 128,000.00
3 Flange Socket Ø 90 mm 2.000 bh Taksir 395,100.00 790,200.00
4 Loss Flange CS Ø 75 mm 6.000 bh Taksir 250,000.00 1,500,000.00
5 Baut 1/2 x 2" 16.000 set Taksir 3,700.00 59,200.00
6 Gasket 2.000 kg Taksir 42,200.00 84,400.00
7 Pengelasan 2.355 mtr Taksir 558,700.00 1,315,738.50
8 pengecatan 0.824 m2 Taksir 41,220.00 33,975.59
9 Galian Tanah 0.384 m3 Taksir 70,500.00 27,072.00
10 Trusht Block (K 175) 0.160 m3 Taksir 1,130,230.00 180,836.80
11 Ongkos Pemasangan 1.000 ls Taksir 300,000.00 300,000.00
TOTAL 4,926,922.89
DIBULATKAN 4,926,000.00

E. JEMBATAN PIPA Ø 50 MM TYPE T.4 - L = 1,5 M


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME ANALISA
(Rp.) (Rp.)
1 2 3 4 5 6
Pekerjaan Pipa Dan Accessories
1 Pipa Gip Ø 50 mm 3.500 mtr Taksir 75,000.00 262,500.00
2 Bend Gip Ø 50 mm x 45° 4.000 bh Taksir 14,000.00 56,000.00
3 Flange Socket Ø 63 mm 2.000 bh Taksir 287,000.00 574,000.00
4 Loss Flange CS Ø 50 mm 6.000 bh Taksir 131,000.00 786,000.00
5 Baut 1/2 x 2" 16.000 set Taksir 3,700.00 59,200.00
6 Gasket 2.000 kg Taksir 42,200.00 84,400.00
7 Pengelasan 1.570 mtr AHSP PU A.4.2.1.5 558,700.00 877,159.00
8 pengecatan 0.550 m2 AHSP PU A. 4.7.1.19 41,220.00 22,650.39
9 Galian Tanah 0.384 m3 AHSP PU A. 2.3.1.1 70,500.00 27,072.00
10 Trusht Block (K 175) 0.160 m3 AHSP PU A.4.1.1.5 1,130,230.00 180,836.80
11 Ongkos Pemasangan 1.000 ls Taksir 300,000.00 300,000.00
TOTAL 3,229,818.19

Lhokseumawe, September 2016


Konsultan Perencana
PT. KARYA PET KONSULTAN

NAZARUDDIN AH, ST
Direktur
DAFTAR ANALISA HARGA SATUAN

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


AHSP PU A. 2.3.1.1 : Penggalian 1 m³ Tanah Biasa Sedalam 1 m
: Tenaga Kerja
0.750 OH Pekerja @ Rp. 90,000.00 Rp. 67,500.00
0.025 OH Mandor @ Rp. 120,000.00 Rp. 3,000.00
Jumlah Rp. 70,500.00
Dibulatkan Rp. 70,500.00

AHSP PU A. 2.3.1.2 : Penggalaian 1 m³ Tanah Biasa Sedalam 2 m


: Tenaga Kerja
0.900 OH Pekerja @ Rp. 90,000.00 Rp. 81,000.00
0.045 OH Mandor @ Rp. 120,000.00 Rp. 5,400.00
Jumlah Rp. 86,400.00
Dibulatkan Rp. 86,400.00

AHSP PU A. 2.3.1.3 : Menggali 1 m³ Tanah Biasa Sedalam 3 m


: Tenaga Kerja
1.050 OH Pekerja @ Rp. 90,000.00 Rp. 94,500.00
0.067 OH Mandor @ Rp. 120,000.00 Rp. 8,040.00
Jumlah Rp. 102,540.00
Dibulatkan Rp. 102,540.00

AHSP PU A. 2.3.1.9 : Pengurugan kembali 1 m³ galian tanah


0.500 OH Pekerja @ Rp. 90,000.00 Rp. 45,000.00
0.050 OH Mandor @ Rp. 120,000.00 Rp. 6,000.00
Jumlah Rp. 51,000.00
Dibulatkan Rp. 51,000.00

AHSP PU A. 2.3.1.11 : 1 m³ Mengurug Pasir Urug


: Bahan
1.200 m3 Pasir Urug @ Rp. 215,000.00 Rp. 258,000.00
0.300 OH Pekerja @ Rp. 90,000.00 Rp. 27,000.00
0.010 OH Mandor @ Rp. 120,000.00 Rp. 1,200.00
Jumlah Rp. 286,200.00
Dibulatkan Rp. 286,200.00

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


AHSP PU A.4.1.1.2 : Membuat 1 m³ Beton Mutu F'C = 9,8 MPa (K 125), Slump (12 ± 2) cm, w/c = 0,78
: Bahan
276.000 kg Semen @ Rp. 1,750.00 Rp. 483,000.00
828.000 kg Pasir Beton @ Rp. 160.36 Rp. 132,775.71
1012.000 kg Kerikil (Maksimum 30 mm) @ Rp. 214.81 Rp. 217,392.59
215.000 Liter Air @ Rp. 92.00 Rp. 19,780.00
: Tenaga Kerja
1.650 OH Pekerja @ Rp. 90,000.00 Rp. 148,500.00
0.275 OH Tukang @ Rp. 125,000.00 Rp. 34,375.00
0.028 OH Kepala Tukang @ Rp. 150,000.00 Rp. 4,200.00
0.083 OH Mandor @ Rp. 120,000.00 Rp. 9,960.00
Jumlah Rp. 1,049,983.31
Dibulatkan Rp. 1,049,983.00

AHSP PU A.4.1.1.5 : Membuat 1 m³ Beton Mutu F'C = 14,5 MPa (K 175), Slump (12 ± 2) cm, w/c = 0,66
: Bahan
326.000 kg Semen @ Rp. 1,750.00 Rp. 570,500.00
760.000 kg Pasir Beton @ Rp. 160.36 Rp. 121,871.43
1029.000 kg Kerikil (Maksimum 30 mm) @ Rp. 214.81 Rp. 221,044.44
215.000 Liter Air @ Rp. 92.00 Rp. 19,780.00
: Tenaga Kerja
1.650 OH Pekerja @ Rp. 90,000.00 Rp. 148,500.00
0.275 OH Tukang @ Rp. 125,000.00 Rp. 34,375.00
0.028 OH Kepala Tukang @ Rp. 150,000.00 Rp. 4,200.00
0.083 OH Mandor @ Rp. 120,000.00 Rp. 9,960.00
Jumlah Rp. 1,130,230.87
Dibulatkan Rp. 1,130,230.00

Analisa 16
AHSP PU A.4.1.1.7 : Membuat 1 m³ Beton Mutu F'C = 19,3 MPa (K 225), Slump (12 ± 2) cm, w/c = 0,58
: Bahan
371.000 kg Semen @ Rp. 1,750.00 Rp. 649,250.00
698.000 kg Pasir Beton @ Rp. 160.36 Rp. 111,929.29
1047.000 kg Kerikil (Maksimum 30 mm) @ Rp. 214.81 Rp. 224,911.11
215.000 Liter Air @ Rp. 92.00 Rp. 19,780.00
: Tenaga Kerja
1.650 OH Pekerja @ Rp. 90,000.00 Rp. 148,500.00
0.275 OH Tukang @ Rp. 125,000.00 Rp. 34,375.00
0.028 OH Kepala Tukang @ Rp. 150,000.00 Rp. 4,200.00
0.083 OH Mandor @ Rp. 120,000.00 Rp. 9,960.00
Jumlah Rp. 1,202,905.40
Dibulatkan Rp. 1,202,905.00

AHSP PU A.4.1.1.17 : Pembesian 1 kg dengan besi polos atau besi ulir


: Bahan
10.500 kg Besi beton polos @ Rp. 18,000.00 Rp. 189,000.00
0.150 kg Kawat beton @ Rp. 25,000.00 Rp. 3,750.00
: Tenaga Kerja
0.070 OH Pekerja @ Rp. 90,000.00 Rp. 6,300.00
0.070 OH Tukang @ Rp. 125,000.00 Rp. 8,750.00
0.007 OH Kepala Tukang @ Rp. 150,000.00 Rp. 1,050.00
0.040 OH Mandor @ Rp. 120,000.00 Rp. 4,800.00
Jumlah Rp. 213,650.00
Per kg pembesian Rp. 21,365.00
Dibulatkan Rp. 21,365.00

AHSP PU A.4.1.1.20 : 1 m2 Memasang bekisting untuk pondasi


: Bahan
0.040 m3 Kayu kelas III @ Rp. 6,000,000.00 Rp. 240,000.00
0.300 kg Paku 5 cm - 10 cm @ Rp. 19,635.00 Rp. 5,890.50
0.100 liter Minyak bekisting @ Rp. 22,600.00 Rp. 2,260.00
: Tenaga Kerja
0.520 OH Pekerja @ Rp. 90,000.00 Rp. 46,800.00
0.260 OH Tukang @ Rp. 125,000.00 Rp. 32,500.00
0.026 OH Kepala Tukang @ Rp. 150,000.00 Rp. 3,900.00
0.026 OH Mandor @ Rp. 120,000.00 Rp. 3,120.00
Jumlah Rp. 334,470.50
Bekisting dipakai 2 kali Rp. 167,235.25
Dibulatkan Rp. 167,235.00

AHSP PU A.4.1.1.22 : 1 m2 Memasang bekisting untuk kolom


: Bahan
0.040 m3 Kayu kelas III @ Rp. 6,000,000.00 Rp. 240,000.00
0.400 kg Paku 5 cm - 10 cm @ Rp. 19,635.00 Rp. 7,854.00
0.200 liter Minyak bekisting @ Rp. 22,600.00 Rp. 4,520.00
0.015 m3 Balok kayu kelas II @ Rp. 8,000,000.00 Rp. 120,000.00
0.350 lbr Plywood tebal 9 mm @ Rp. 147,200.00 Rp. 51,520.00
2.000 btg Kayu dolken dia. 8-10 cm, L=4 m @ Rp. 92,400.00 Rp. 184,800.00
: Tenaga Kerja
0.660 OH Pekerja @ Rp. 90,000.00 Rp. 59,400.00
0.330 OH Tukang @ Rp. 125,000.00 Rp. 41,250.00
0.033 OH Kepala Tukang @ Rp. 150,000.00 Rp. 4,950.00
0.033 OH Mandor @ Rp. 120,000.00 Rp. 3,960.00
Jumlah Rp. 718,254.00
Bekisting dipakai 2 kali Rp. 359,127.00
Dibulatkan Rp. 359,127.00

Analisa 17
AHSP PU B.39 : 1 m3 Bongkar beton secara konvensional
: Tenaga Kerja
2.650 OH Pekerja @ Rp. 90,000.00 Rp. 238,500.00
0.265 OH Mandor @ Rp. 120,000.00 Rp. 31,800.00
Jumlah Rp. 270,300.00
Dibulatkan Rp. 270,300.00

A. 4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM


AHSP PU A.4.2.1.5 : Pengerjaan 1 m pengelasan dengan las listrik
: Bahan
4.000 kg Kawat las listrik @ Rp. 41,250.00 Rp. 165,000.00
3.000 liter Solar @ Rp. 9,800.00 Rp. 29,400.00
0.400 liter Minyak pelumas @ Rp. 56,250.00 Rp. 22,500.00
: Tenaga kerja
0.400 OH Pekerja @ Rp. 90,000.00 Rp. 36,000.00
0.200 OH Tukang Besi Konstruksi @ Rp. 125,000.00 Rp. 25,000.00
0.020 OH Kepala tukang @ Rp. 150,000.00 Rp. 3,000.00
0.020 OH Mandor @ Rp. 120,000.00 Rp. 2,400.00
: Peralatan
1.7 Jam Sewa Alat @ Rp. 162,000.00 Rp. 275,400.00
Jumlah Rp. 558,700.00
Dibulatkan Rp. 558,700.00

A. 4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


AHSP PU A. 4.7.1.19 : Pengecatan 1 m2 permukaan baja galvanis sistem 1 lapis
: Bahan
0.300 kg Cat @ Rp. 84,300.00 Rp. 25,290.00
0.010 bh Kuas @ Rp. 37,500.00 Rp. 375.00
0.010 liter Pengencer @ Rp. 49,500.00 Rp. 495.00
: Tenaga Kerja
0.060 OH Pekerja @ Rp. 90,000.00 Rp. 5,400.00
0.060 OH Tukang cat @ Rp. 125,000.00 Rp. 7,500.00
0.012 OH Kepala tukang @ Rp. 150,000.00 Rp. 1,800.00
0.003 OH Mandor @ Rp. 120,000.00 Rp. 360.00
Jumlah Rp. 41,220.00
Dibulatkan Rp. 41,220.00

A.8.4.1 HARGA SATUAN PEKERJAAN PIPA


AHSP PU 8.4.1.1 Pemasangan 1 m pipa PVC RRJ dia. 63 mm
1.000 M' Pipa PVC ND 50 mm, OD 63 mm @ Rp. 33,600.00 Rp. 33,600.00
0.081 OH Pekerja @ Rp. 90,000.00 Rp. 7,290.00
0.041 OH Tukang Pipa @ Rp. 125,000.00 Rp. 5,125.00
0.008 OH Mandor @ Rp. 120,000.00 Rp. 960.00
Jumlah Rp. 46,975.00
Dibulatkan Rp. 46,975.00

AHSP PU 8.4.1.2 Pemasangan 1 m pipa PVC RRJ dia. 90 mm


1.000 M' Pipa PVC ND 75 mm @ Rp. 66,600.00 Rp. 66,600.00
0.094 OH Pekerja @ Rp. 90,000.00 Rp. 8,460.00
0.047 OH Tukang Pipa @ Rp. 125,000.00 Rp. 5,875.00
0.009 OH Mandor @ Rp. 120,000.00 Rp. 1,080.00
Jumlah Rp. 82,015.00
Dibulatkan Rp. 82,015.00

AHSP PU 8.4.1.3 Pemasangan 1 m pipa PVC RRJ dia. 110 mm


1.000 M' Pipa PVC ND 100 mm @ Rp. 98,800.00 Rp. 98,800.00
0.105 OH Pekerja @ Rp. 90,000.00 Rp. 9,450.00
0.053 OH Tukang Pipa @ Rp. 125,000.00 Rp. 6,625.00
0.011 OH Mandor @ Rp. 120,000.00 Rp. 1,320.00
Jumlah Rp. 116,195.00
Dibulatkan Rp. 116,195.00

AHSP PU 8.4.1.4 Pemasangan 1 m pipa PVC RRJ dia. 150 mm


1.000 M' Pipa PVC ND 150 mm @ Rp. 196,800.00 Rp. 196,800.00
0.118 OH Pekerja @ Rp. 90,000.00 Rp. 10,620.00
0.059 OH Tukang @ Rp. 125,000.00 Rp. 7,375.00
Analisa 18
0.012 OH Mandor @ Rp. 120,000.00 Rp. 1,440.00
Jumlah Rp. 216,235.00
Dibulatkan Rp. 216,235.00

Analisa 19
AHSP PU 8.4.1.5 Pemasangan 1 m pipa PVC RRJ dia. 200 mm
1.000 M' Pipa PVC ND 200 mm @ Rp. 307,850.00 Rp. 307,850.00
0.189 OH Pekerja @ Rp. 90,000.00 Rp. 17,010.00
0.095 OH Tukang Pipa @ Rp. 125,000.00 Rp. 11,875.00
0.019 OH Mandor @ Rp. 120,000.00 Rp. 2,280.00
Jumlah Rp. 339,015.00
Dibulatkan Rp. 339,015.00

AHSP PU 8.4.1.6 Pemasangan 1 m pipa PVC RRJ dia. 250 mm


1.000 M' Pipa PVC ND 250 mm @ Rp. 489,500.00 Rp. 489,500.00
0.256 OH Pekerja @ Rp. 90,000.00 Rp. 23,040.00
0.128 OH Tukang Pipa @ Rp. 125,000.00 Rp. 16,000.00
0.026 OH Mandor @ Rp. 120,000.00 Rp. 3,120.00
Jumlah Rp. 531,660.00
Dibulatkan Rp. 531,660.00

A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA

AHSP PU 8.4.5.1 Pengetesan 1 M' pipa dia. 50 mm


0.0020 M3 Air test (Air bersih) @ Rp. 92,000.00 Rp. 184.00
0.0600 liter Bahan bakar @ Rp. 8,800.00 Rp. 528.00
0.0020 liter Oli @ Rp. 56,250.00 Rp. 112.50
0.0080 OH Pekerja @ Rp. 90,000.00 Rp. 720.00
0.0008 OH Mandor @ Rp. 120,000.00 Rp. 96.00
Jumlah Rp. 1,640.50
Dibulatkan Rp. 1,640.00

AHSP PU 8.4.5.2 Pengetesan 1 M' pipa dia. 75 mm


0.0040 M3 Air test (Air bersih) @ Rp. 92,000.00 Rp. 368.00
0.0600 liter Bahan bakar @ Rp. 8,800.00 Rp. 528.00
0.0020 liter Oli @ Rp. 56,250.00 Rp. 112.50
0.0080 OH Pekerja @ Rp. 90,000.00 Rp. 720.00
0.0008 OH Mandor @ Rp. 120,000.00 Rp. 96.00
Jumlah Rp. 1,824.50
Dibulatkan Rp. 1,824.00

AHSP PU 8.4.5.3 Pengetesan 1 M' pipa dia. 100 mm


0.0080 M3 Air test (Air bersih) @ Rp. 92,000.00 Rp. 736.00
0.0600 liter Bahan bakar @ Rp. 8,800.00 Rp. 528.00
0.0020 liter Oli @ Rp. 56,250.00 Rp. 112.50
0.0080 OH Pekerja @ Rp. 90,000.00 Rp. 720.00
0.0008 OH Mandor @ Rp. 120,000.00 Rp. 96.00
Jumlah Rp. 2,192.50
Dibulatkan Rp. 2,192.00

AHSP PU 8.4.5.4 Pengetesan 1 M' pipa dia. 150 mm


0.0180 M3 Air test (Air bersih) @ Rp. 92,000.00 Rp. 1,656.00
0.0600 liter Bahan bakar @ Rp. 8,800.00 Rp. 528.00
0.0020 liter Oli @ Rp. 56,250.00 Rp. 112.50
0.0080 OH Pekerja @ Rp. 90,000.00 Rp. 720.00
0.0008 OH Mandor @ Rp. 120,000.00 Rp. 96.00
Jumlah Rp. 3,112.50
Dibulatkan Rp. 3,112.00

AHSP PU 8.4.5.5 Pengetesan 1 M' pipa dia. 200 mm


0.0310 M3 Air test (Air bersih) @ Rp. 92,000.00 Rp. 2,852.00
0.0600 liter Bahan bakar @ Rp. 8,800.00 Rp. 528.00
0.0020 liter Oli @ Rp. 56,250.00 Rp. 112.50
0.0080 OH Pekerja @ Rp. 90,000.00 Rp. 720.00
0.0008 OH Mandor @ Rp. 120,000.00 Rp. 96.00
Jumlah Rp. 4,308.50
Dibulatkan Rp. 4,308.00

Analisa 20
AHSP PU 8.4.5.6 Pengetesan 1 M' pipa dia. 250 mm
0.0490 M3 Air test (Air bersih) @ Rp. 92,000.00 Rp. 4,508.00
0.0600 liter Bahan bakar @ Rp. 8,800.00 Rp. 528.00
0.0020 liter Oli @ Rp. 56,250.00 Rp. 112.50
0.0080 OH Pekerja @ Rp. 90,000.00 Rp. 720.00
0.0008 OH Mandor @ Rp. 120,000.00 Rp. 96.00
Jumlah Rp. 5,964.50
Dibulatkan Rp. 5,964.00

Lhokseumawe, September 2016


Konsultan Perencana
PT. KARYA PET KONSULTAN

NAZARUDDIN AH, ST
Direktur

Analisa 21
HARGA SATUAN UPAH, BAHAN DAN PERALATAN

HARGA
NO U R A I A N SATUAN SATUAN
(Rp)
UPAH
1 Pekerja hk 90,000
2 Tukang hk 125,000
3 Kepala Tukang hk 150,000
4 Mandor hk 120,000

PIPA DAN AKSESORIS


1 Pipa PVC RRJ S 12.5 Ø 50 mm, OD 63 mm m 33,600
2 Pipa PVC RRJ S 12.5 Ø 75 mm, OD 90 mm m 66,600
3 Pipa PVC RRJ S 12.5 Ø 100 mm, OD 110 mm m 98,800
4 Pipa PVC RRJ S 12.5 Ø 150 mm, OD 160 mm m 196,800
5 Pipa PVC RRJ S 12.5 Ø 200 mm, OD 200 mm m 307,850
6 Pipa PVC RRJ S 12.5 Ø 250 mm, OD 250 mm m 489,500
7 Pipa GIP Ø 50 mm m 75,000
8 Pipa GIP Ø 75 mm m 145,000
9 Pipa GIP Ø 100 mm m 210,000
10 Pipa GIP Ø 150 mm m 330,000
11 Pipa GIP Ø 200 mm m 500,000
12 Bend SGP 45° Ø 50 mm bh 14,000
13 Bend SGP 45° Ø 75 mm bh 32,000
14 Bend SGP 45° Ø 100 mm bh 57,500
15 Bend SGP 45° Ø 150 mm m 138,500
16 Bend SGP 45° Ø 200 mm m 283,500
17 Tee SGP Ø 200 x 50 mm bh 490,000
18 Tee SGP Ø 200 x 100 mm bh 490,000
19 Tee SGP Ø 200 x 200 mm bh 580,000
20 Tee SGP Ø 150 x 50 mm bh 260,000
21 Tee SGP Ø 150 x 75 mm bh 260,000
22 Tee SGP Ø 100 x 50 mm bh 170,000
23 Flange socket PVC Ø 63 mm bh 287,000
24 Flange socket PVC Ø 90 mm bh 395,100
25 Flange socket PVC Ø 110 mm bh 521,100
26 Flange socket PVC Ø 160 mm bh 960,900
27 Flange socket PVC Ø 200 mm bh 1,548,700
28 Bend PVC RRJ Ø 63 mm x 90o bh 78,700
29 Bend PVC RRJ Ø 63 mm x 45o bh 70,000
30 Bend PVC RRJ Ø 90 mm x 90o bh 161,800
31 Bend PVC RRJ Ø 110 mm x 90o bh 246,400
32 Bend PVC RRJ Ø 110 mm x 45o bh 226,500
33 Bend PVC RRJ Ø 150 mm x 90o bh 595,400
34 Bend PVC RRJ Ø 150 mm x 45o bh 505,200
35 Bend PVC RRJ Ø 200 mm x 45o bh 939,600
36 Bend PVC RRJ Ø 200 mm x 90o bh 1,107,100
37 Loss Flange Cs Ø 50 mm bh 131,000
38 Loss Flange Cs Ø 75 mm bh 250,000
39 Loss Flange Cs Ø 100 mm bh 351,000
40 Loss Flange Cs Ø 150 mm bh 457,000
41 Loss Flange Cs Ø 200 mm bh 787,000
42 Tee PVC All-Sc Ø 63 x 63 mm bh 213,700
43 Tee PVC All-Sc Ø 90 x 63 mm bh 401,600
44 Tee PVC All-Sc Ø 90 x 90 mm bh 264,900

Harga Satuan 22/3


HARGA
NO U R A I A N SATUAN SATUAN
(Rp)
45 Tee PVC All-Sc Ø 110 x 63 mm bh 786,900

46 Tee PVC All-Sc Ø 110 x 90 mm bh 786,900


47 Tee PVC All-Sc Ø 110 x 110 mm bh 472,400
48 Tee PVC All-Sc Ø 160 x 63 mm bh 1,903,300
49 Tee PVC All-Sc Ø 160 x 90 mm bh 1,906,200
50 Tee PVC All-Sc Ø 160 x 110 mm bh 1,666,600
51 Tee PVC All-Sc Ø 160 x 160 mm bh 1,860,100
52 Tee PVC All-Sc Ø 200 x 110 mm bh 3,660,300
53 Tee PVC All-Sc Ø 200 x 160 mm bh 3,904,300
54 Tee PVC All-Sc Ø 200 x 200 mm bh 4,392,400
55 Reducer PVC RRJ Ø 90 x 63 mm bh 123,500
56 Reducer PVC RRJ Ø 110-63 mm bh 175,700
57 Reducer PVC RRJ Ø 110-90 mm bh 202,400
58 Reducer PVC RRJ Ø 160-90 mm bh 322,500
59 Reducer PVC RRJ Ø 160-110 mm bh 337,600
60 Dop PVC Ø 63mm bh 142,400
61 Dop PVC Ø 90 mm bh 219,500
62 Dop PVC Ø 110 mm bh 281,300
63 Dop PVC Ø 160 mm bh 513,400
64 Dop PVC Ø 200 mm bh 878,200
65 Gate valve CI Ø 50 mm, 10 K bh 1,400,000
66 Gate valve CI Ø 75 mm, 10 K bh 2,100,000
67 Gate valve CI Ø 100 mm , 10 K bh 2,950,000
68 Gate valve CI Ø 150 mm, 10 K bh 5,100,000
69 Gate valve CI Ø 200 mm, 10 K bh 8,100,000
70 Giboult for PVC ND 200 bh 1,060,000
71 Giboult for PVC ND 150 bh 670,000
72 Giboult for PVC ND 100 bh 470,000
73 Giboult for PVC ND 75 bh 355,000
74 Giboult for PVC ND 50 bh 335,000
75 Street box bh 290,400
76 Baut 3/4 x 5" set 11,000
77 Baut 3/4 x 3" set 8,000
78 Baut 3/4 x 2,5" set 7,500
79 Baut 5/8 x 3" set 5,000
80 Baut 5/8 x 2,5" set 4,500
81 Baut 5/8 x 2" set 4,000
82 Baut 1/2 x 2" set 3,700
83 Gasket/Packing karet kg 42,200
84 Air Valve - 1 inch bh 980,000
85 Air Valve - Double 2 inch bh 1,820,000
86 Clam Sadle 3" x 1/2" bh 75,000
87 Pipa PVC Ø 1/2" btg 34,000
88 V. Socket PVC 1/2" bh 2,500
89 Elbow PVC 1/2" bh 3,200
90 F. Elbow PVC 1/2" bh 3,200
91 Water Meter (SNI type-B, Bronze) setara ONDA, ITRON unit 425,000
92 Stop kran 1/2" - Onda bh 75,000
93 Double Neeple 1/2" bh 5,000
94 F. Tee PVC 1/2" bh 5,000
95 Hand kran 1/2" - Onda bh 28,000

Harga Satuan 23/3


HARGA
NO U R A I A N SATUAN SATUAN
(Rp)
96 Plug/Dop PVC 1/2" bh 2,500
97 Pipa Galv. 1" (chasing) m' 22,500

98 Box meter plastik bh 90,000


99 Sealtape bh 4,500
100 Lem pipa bh 10,000
101 Stop kran 1" - Onda bh 175,000

PERALATAN
1 sewa alat pengetesan pipa hk 200,000
2 sewa mesin las jam 162,000
3 sewa alat perpipaan (tracker & katrol) hk 187,200

BAHAN PENUNJANG
1 Air Bersih m3 92,000
2 Air Bersih Ltr 92
3 Besi Beton Polos kg 18,000
4 Besi Beton Ulir kg 22,000
5 Cat kilat kg 84,300
6 Cat Manie kg 71,500
7 Kawat Las Listrik kg 41,250
8 Kawat Beton kg 25,000
9 Kayu Bekesting Kelas III m3 6,000,000
10 Kayu Klas I m3 14,000,000
11 Kayu Klas II m3 8,000,000
12 Kayu dolken dia. 8-10 cm, L=4 m batang 92,400
13 Kuas 3" bh 37,500
14 Kerikil Bersih (tersaring) m3 290,000
15 Minyak bekisting liter 22,600
16 Paku Kayu kg 19,635
17 Pasir Beton Bersih m3 224,500
18 Pasir Pasangan m3 224,500
19 Pasir Urug m3 215,000
20 Pelumas/Olie lt 56,250
21 Pengencer/Tinner lt 49,500
22 Plywood tebal 9 mm lembar 147,200
23 Premium/Bahan bakar lt 8,800
24 Semen Andalas @ 40 Kg zak 70,000
25 Sirtu m3 250,000
26 Solar (non subsidi) lt 9,800
27 Tanah Timbun Pilihan Tanah Berbatu m3 220,000
28 Tanah Timbun Wil m3 170,000

Lhokseumawe, September 2016


Konsultan Perencana
PT. KARYA PET KONSULTAN

NAZARUDDIN AH, ST
Direktur

Harga Satuan 24/3


JARAK PIPA B-E
elevasi jarak
1 ### 16 m 0 0:00:01 0.6 km/h 336° true N5 00.300 E97 19.809
2 ### 16 m 0 0:00:01 0.3 km/h 11° true N5 00.300 E97 19.809
3 ### 15 m 4 0:00:21 0.7 km/h 321° true N5 00.300 E97 19.809
4 ### 15 m 9 0:00:28 1.1 km/h 99° true N5 00.302 E97 19.807
5 ### 15 m 2 0:00:34 0.2 km/h 243° true N5 00.301 E97 19.812
6 ### 15 m 28 0:00:08 13 km/h 169° true N5 00.301 E97 19.811
7 ### 16 m 47 0:00:10 17 km/h 170° true N5 00.286 E97 19.814
8 ### 15 m 25 0:00:06 15 km/h 167° true N5 00.261 E97 19.818
9 ### 16 m 1 0:00:10 0.3 km/h 208° true N5 00.248 E97 19.821
10 ### 15 m 9 0:00:08 4 km/h 164° true N5 00.247 E97 19.821
11 ### 16 m 66 0:00:10 24 km/h 172° true N5 00.242 E97 19.823
12 ### 16 m 51 0:00:07 26 km/h 171° true N5 00.207 E97 19.828
13 ### 16 m 13 0:00:02 23 km/h 169° true N5 00.180 E97 19.832
14 ### 16 m 71 0:00:07 36 km/h 172° true N5 00.173 E97 19.833
15 ### 16 m 74 0:00:07 38 km/h 174° true N5 00.136 E97 19.838
16 ### 16 m 61 0:00:08 28 km/h 171° true N5 00.096 E97 19.843
17 ### 17 m 85 0:00:08 38 km/h 172° true N5 00.063 E97 19.848
18 ### 16 m 61 0:00:06 37 km/h 163° true N5 00.018 E97 19.854
19 ### 16 m 55 0:00:07 28 km/h 157° true N4 59.986 E97 19.864
20 ### 17 m 39 0:00:06 23 km/h 154° true N4 59.959 E97 19.876
21 ### 16 m 5 0:00:17 1.0 km/h 130° true N4 59.940 E97 19.885
22 ### 16 m 11 0:00:03 13 km/h 152° true N4 59.939 E97 19.887
23 ### 16 m 68 0:00:10 24 km/h 141° true N4 59.934 E97 19.889
24 ### 17 m 104 0:00:10 38 km/h 136° true N4 59.905 E97 19.912
25 ### 17 m 85 0:00:08 38 km/h 146° true N4 59.865 E97 19.951
26 ### 17 m 101 0:00:09 40 km/h 172° true N4 59.827 E97 19.977
27 ### 17 m 101 0:00:09 40 km/h 174° true N4 59.773 E97 19.985
28 ### 17 m 79 0:00:07 41 km/h 178° true N4 59.719 E97 19.991
29 ### 17 m 37 0:00:05 27 km/h 181° true N4 59.677 E97 19.992
30 ### 16 m 2 0:00:07 0.9 km/h 261° true N4 59.656 E97 19.992
31 ### 16 m 2 0:00:16 0.4 km/h 170° true N4 59.656 E97 19.991
32 ### 16 m 29 0:00:11 10 km/h 176° true N4 59.655 E97 19.991
33 ### 16 m 48 0:00:11 16 km/h 178° true N4 59.640 E97 19.992
34 ### 16 m 41 0:00:07 21 km/h 180° true N4 59.614 E97 19.993
35 ### 16 m 88 0:00:10 32 km/h 179° true N4 59.592 E97 19.993
36 ### 17 m 109 0:00:11 36 km/h 178° true N4 59.544 E97 19.994
37 ### 17 m 83 0:00:10 30 km/h 174° true N4 59.486 E97 19.996
38 ### 17 m 61 0:00:08 28 km/h 163° true N4 59.441 E97 20.001
39 ### 17 m 8 0:00:06 5 km/h 157° true N4 59.410 E97 20.011
40 ### 17 m 3 0:00:36 0.3 km/h 158° true N4 59.406 E97 20.013
41 ### 16 m 30 0:00:09 12 km/h 163° true N4 59.404 E97 20.013
42 ### 17 m 67 0:00:10 24 km/h 161° true N4 59.389 E97 20.018
43 ### 17 m 92 0:00:11 30 km/h 161° true N4 59.355 E97 20.030
44 ### 17 m 117 0:00:13 32 km/h 156° true N4 59.308 E97 20.047
45 ### 17 m 52 0:00:07 27 km/h 156° true N4 59.250 E97 20.072
46 ### 17 m 19 0:00:05 14 km/h 151° true N4 59.225 E97 20.084
47 ### 17 m 59 0:00:08 26 km/h 155° true N4 59.216 E97 20.089
48 ### 17 m 14 0:00:05 10 km/h 152° true N4 59.187 E97 20.102
49 ### 17 m 6 0:00:17 1.3 km/h 146° true N4 59.180 E97 20.106
50 ### 17 m 33 0:00:06 20 km/h 157° true N4 59.178 E97 20.108
51 ### 17 m 68 0:00:07 35 km/h 145° true N4 59.161 E97 20.115
52 ### 18 m 124 0:00:11 41 km/h 144° true N4 59.131 E97 20.136
53 ### 19 m 42 0:00:06 25 km/h 154° true N4 59.077 E97 20.175
54 ### 18 m 24 0:00:08 11 km/h 153° true N4 59.057 E97 20.185
55 ### 17 m 6 0:00:10 2 km/h 164° true N4 59.045 E97 20.191
56 ### 17 m 38 0:00:08 17 km/h 160° true N4 59.042 E97 20.192
57 ### 18 m 73 0:00:11 24 km/h 158° true N4 59.023 E97 20.199
58 ### 18 m 42 0:00:08 19 km/h 160° true N4 58.986 E97 20.213
59 ### 18 m 9 0:00:11 3 km/h 156° true N4 58.965 E97 20.221
60 ### 18 m 24 0:00:07 13 km/h 162° true N4 58.960 E97 20.223
61 ### 18 m 51 0:00:07 26 km/h 158° true N4 58.948 E97 20.227
62 ### 18 m 1 0:00:06 0.7 km/h 84° true N4 58.922 E97 20.238
63 ### 18 m 21 0:00:13 6 km/h 334° true N4 58.923 E97 20.238
64 ### 17 m 5 0:00:12 2 km/h 354° true N4 58.933 E97 20.234
65 ### 17 m 1 0:00:47 0.1 km/h 37° true N4 58.936 E97 20.233
66 ### 18 m 1 0:00:34 0.1 km/h 50° true N4 58.936 E97 20.234
67 ### 18 m 18 0:00:05 13 km/h 160° true N4 58.936 E97 20.234
68 ### 20 m 10 0:00:02 18 km/h 159° true N4 58.927 E97 20.237
69 ### 18 m 49 0:00:07 25 km/h 159° true N4 58.922 E97 20.239
70 ### 19 m 95 0:00:11 31 km/h 160° true N4 58.898 E97 20.249
71 ### 19 m 28 0:00:03 33 km/h 165° true N4 58.849 E97 20.266
72 ### 19 m 89 0:00:10 32 km/h 168° true N4 58.835 E97 20.270
73 ### 19 m 16 0:00:06 10 km/h 168° true N4 58.788 E97 20.280
74 ### 18 m 1 0:00:18 0.2 km/h 202° true N4 58.779 E97 20.282
75 ### 18 m 3 0:00:21 0.4 km/h 130° true N4 58.779 E97 20.282
76 ### 19 m 24 0:00:06 14 km/h 171° true N4 58.778 E97 20.283
77 ### 19 m 65 0:00:11 21 km/h 165° true N4 58.765 E97 20.285
78 ### 19 m 76 0:00:11 25 km/h 155° true N4 58.732 E97 20.294
79 ### 19 m 96 0:00:13 27 km/h 148° true N4 58.695 E97 20.311
80 ### 19 m 11 0:00:07 6 km/h 141° true N4 58.651 E97 20.339
81 ### 19 m 1 0:00:09 0.5 km/h 339° true N4 58.646 E97 20.343
82 ### 16 m 0 0:00:01 0.5 km/h 74° true N4 58.647 E97 20.343
83 ### 19 m 8 0:00:57 0.5 km/h 142° true N4 58.647 E97 20.343
84 ### 20 m 40 0:00:08 18 km/h 145° true N4 58.644 E97 20.345
85 ### 20 m 70 0:00:12 21 km/h 139° true N4 58.626 E97 20.358
86 ### 19 m 3 0:00:08 2 km/h 126° true N4 58.597 E97 20.383
87 ### 19 m 2 0:00:16 0.4 km/h 194° true N4 58.596 E97 20.384
88 ### 19 m 30 0:00:08 14 km/h 137° true N4 58.595 E97 20.384
89 ### 20 m 32 0:00:08 14 km/h 140° true N4 58.583 E97 20.395
90 ### 20 m 46 0:00:10 16 km/h 139° true N4 58.570 E97 20.406
91 ### 20 m 68 0:00:11 22 km/h 146° true N4 58.551 E97 20.423
92 ### 21 m 66 0:00:10 24 km/h 164° true N4 58.521 E97 20.443
93 ### 21 m 82 0:00:10 29 km/h 167° true N4 58.487 E97 20.453
94 ### 21 m 130 0:00:11 43 km/h 166° true N4 58.444 E97 20.463
95 ### 21 m 41 0:00:05 29 km/h 165° true N4 58.375 E97 20.479
96 ### 21 m 45 0:00:11 15 km/h 159° true N4 58.354 E97 20.485
97 ### 20 m 55 0:00:11 18 km/h 161° true N4 58.332 E97 20.493
98 ### 21 m 79 0:00:13 22 km/h 157° true N4 58.303 E97 20.503
99 ### 21 m 33 0:00:09 13 km/h 155° true N4 58.264 E97 20.520
100 ### 21 m 12 0:00:18 2 km/h 160° true N4 58.248 E97 20.527
101 ### 21 m 12 0:00:18 2 km/h 266° true N4 58.242 E97 20.529
102 ### 22 m 7 0:01:58 0.2 km/h 256° true N4 58.242 E97 20.523
103 ### 17 m 9 0:00:14 2 km/h 256° true N4 58.241 E97 20.519
104 ### 20 m 25 0:00:12 8 km/h 257° true N4 58.240 E97 20.515
105 ### 20 m 7 0:00:13 2 km/h 250° true N4 58.236 E97 20.501
106 ### 20 m 38 0:00:09 15 km/h 259° true N4 58.235 E97 20.498
107 ### 20 m 59 0:00:13 16 km/h 259° true N4 58.231 E97 20.478
108 ### 22 m 29 0:00:48 2 km/h 232° true N4 58.225 E97 20.446
109 ### 23 m 12 0:00:25 2 km/h 239° true N4 58.216 E97 20.434
110 ### 24 m 30 0:00:14 8 km/h 237° true N4 58.212 E97 20.428
111 ### 23 m 31 0:00:11 10 km/h 230° true N4 58.203 E97 20.414
112 ### 23 m 15 0:00:06 9 km/h 234° true N4 58.192 E97 20.401
113 ### 22 m 6 0:11:39 0.0 km/h 294° true N4 58.188 E97 20.395
114 ### 24 m 4 0:00:17 0.9 km/h 133° true N4 58.189 E97 20.392
115 ### 24 m 3 0:00:23 0.4 km/h 33° true N4 58.187 E97 20.394
116 ### 24 m 9 0:00:07 4 km/h 102° true N4 58.189 E97 20.394
117 ### 24 m 13 0:00:11 4 km/h 159° true N4 58.188 E97 20.399
118 ### 24 m 10 0:00:18 2 km/h 131° true N4 58.181 E97 20.401
119 ### 24 m 27 0:00:13 8 km/h 132° true N4 58.178 E97 20.406
120 ### 25 m 29 0:00:11 9 km/h 130° true N4 58.168 E97 20.417
121 ### 25 m 35 0:00:13 10 km/h 137° true N4 58.158 E97 20.429
122 ### 25 m 41 0:00:13 11 km/h 143° true N4 58.144 E97 20.442
123 ### 25 m 39 0:00:12 12 km/h 145° true N4 58.126 E97 20.455
124 ### 25 m 37 0:00:14 9 km/h 144° true N4 58.109 E97 20.467
125 ### 25 m 8 0:00:09 3 km/h 145° true N4 58.093 E97 20.479
126 ### 25 m 29 0:00:09 12 km/h 148° true N4 58.089 E97 20.481
127 ### 25 m 43 0:00:12 13 km/h 147° true N4 58.076 E97 20.490
128 ### 25 m 46 0:00:13 13 km/h 157° true N4 58.057 E97 20.502
129 ### 25 m 38 0:00:12 11 km/h 165° true N4 58.034 E97 20.512
130 ### 25 m 3 0:00:13 0.8 km/h 176° true N4 58.014 E97 20.517
131 ### 25 m 28 0:00:13 8 km/h 164° true N4 58.012 E97 20.517
132 ### 25 m 39 0:00:11 13 km/h 160° true N4 57.998 E97 20.522
133 ### 26 m 26 0:00:11 9 km/h 152° true N4 57.978 E97 20.529
134 ### 25 m 32 0:00:09 13 km/h 146° true N4 57.965 E97 20.535
135 ### 25 m 47 0:00:14 12 km/h 143° true N4 57.951 E97 20.545
136 ### 25 m 52 0:00:14 13 km/h 140° true N4 57.931 E97 20.560
137 ### 25 m 43 0:00:13 12 km/h 133° true N4 57.910 E97 20.578
138 ### 26 m 21 0:00:10 8 km/h 131° true N4 57.894 E97 20.596
139 ### 26 m 4 0:00:17 0.8 km/h 145° true N4 57.886 E97 20.604
140 ### 26 m 4 0:00:28 0.5 km/h 35° true N4 57.885 E97 20.605
141 ### 26 m 3 0:00:26 0.4 km/h 81° true N4 57.886 E97 20.606
142 ### 26 m 15 0:00:27 2 km/h 160° true N4 57.887 E97 20.608
143 ### 26 m 33 0:00:12 10 km/h 134° true N4 57.879 E97 20.611
144 ### 26 m 42 0:00:14 11 km/h 138° true N4 57.867 E97 20.624
145 ### 26 m 42 0:00:12 13 km/h 150° true N4 57.849 E97 20.639
146 ### 26 m 47 0:00:09 19 km/h 155° true N4 57.830 E97 20.650
147 ### 26 m 6 0:00:01 20 km/h 154° true N4 57.807 E97 20.661
148 ### 27 m 76 0:00:13 21 km/h 152° true N4 57.804 E97 20.662
149 ### 27 m 56 0:00:11 18 km/h 151° true N4 57.768 E97 20.682
150 ### 27 m 24 0:00:09 10 km/h 144° true N4 57.742 E97 20.697
151 ### 26 m 3 0:00:11 0.8 km/h 96° true N4 57.731 E97 20.704
152 ### 26 m 3 0:00:14 0.7 km/h 121° true N4 57.731 E97 20.706
153 ### 27 m 3 0:00:03 4 km/h 225° true N4 57.730 E97 20.707
154 ### 26 m 5 0:00:07 3 km/h 250° true N4 57.729 E97 20.706
155 ### 25 m 5 0:00:04 5 km/h 221° true N4 57.728 E97 20.703
156 ### 25 m 4 0:00:03 4 km/h 244° true N4 57.726 E97 20.701
157 ### 25 m 8 0:00:11 3 km/h 212° true N4 57.725 E97 20.699
158 ### 25 m 6 0:00:04 5 km/h 236° true N4 57.721 E97 20.697
159 ### 25 m 8 0:00:10 3 km/h 238° true N4 57.720 E97 20.695
160 ### 26 m 9 0:00:10 3 km/h 247° true N4 57.717 E97 20.691
161 ### 25 m 14 0:00:10 5 km/h 239° true N4 57.715 E97 20.687
162 ### 25 m 1 0:00:01 5 km/h 239° true N4 57.712 E97 20.680
163 ### 25 m 13 0:00:09 5 km/h 248° true N4 57.711 E97 20.680
164 ### 25 m 12 0:00:09 5 km/h 240° true N4 57.709 E97 20.673
165 ### 25 m 10 0:00:09 4 km/h 245° true N4 57.706 E97 20.668
166 ### 25 m 10 0:00:07 5 km/h 241° true N4 57.703 E97 20.663
167 ### 25 m 9 0:00:07 5 km/h 241° true N4 57.701 E97 20.658
168 ### 25 m 10 0:00:09 4 km/h 233° true N4 57.698 E97 20.654
169 ### 25 m 11 0:00:08 5 km/h 237° true N4 57.695 E97 20.650
170 ### 25 m 16 0:00:13 4 km/h 244° true N4 57.692 E97 20.645
171 ### 25 m 12 0:00:09 5 km/h 237° true N4 57.688 E97 20.637
172 ### 26 m 11 0:00:09 4 km/h 234° true N4 57.685 E97 20.632
173 ### 25 m 5 0:00:10 2 km/h 241° true N4 57.681 E97 20.627
174 ### 25 m 7 0:00:13 2 km/h 228° true N4 57.680 E97 20.625
175 ### 25 m 12 0:00:11 4 km/h 234° true N4 57.677 E97 20.622
176 ### 25 m 12 0:00:09 5 km/h 241° true N4 57.674 E97 20.616
177 ### 25 m 6 0:00:04 5 km/h 250° true N4 57.670 E97 20.611
178 ### 25 m 5 0:00:05 4 km/h 228° true N4 57.669 E97 20.608
179 ### 25 m 18 0:00:14 5 km/h 235° true N4 57.667 E97 20.605
180 ### 26 m 7 0:00:12 2 km/h 232° true N4 57.662 E97 20.598
181 ### 26 m 10 0:00:09 4 km/h 228° true N4 57.659 E97 20.594
182 ### 25 m 11 0:00:09 4 km/h 237° true N4 57.656 E97 20.590
183 ### 25 m 10 0:00:11 3 km/h 241° true N4 57.653 E97 20.586
184 ### 26 m 7 0:00:07 4 km/h 245° true N4 57.650 E97 20.581
185 ### 25 m 14 0:00:10 5 km/h 236° true N4 57.648 E97 20.577
186 ### 25 m 10 0:00:08 4 km/h 236° true N4 57.644 E97 20.571
187 ### 26 m 14 0:00:11 5 km/h 236° true N4 57.641 E97 20.566
188 ### 25 m 11 0:00:09 4 km/h 234° true N4 57.637 E97 20.560
189 ### 25 m 14 0:00:11 4 km/h 240° true N4 57.634 E97 20.556
190 ### 25 m 11 0:00:09 4 km/h 240° true N4 57.630 E97 20.549
191 ### 25 m 10 0:00:10 4 km/h 238° true N4 57.627 E97 20.544
192 ### 25 m 6 0:00:12 2 km/h 232° true N4 57.624 E97 20.539
193 ### 25 m 1 0:00:06 0.4 km/h 219° true N4 57.622 E97 20.537
194 ### 25 m N4 57.622 E97 20.537

JARAK PIPA D - F

1 ### 27 m 8 0:00:02 14 km/h 34° true N4 57.133 E97 20.878


2 ### 28 m 6 0:00:07 3 km/h 37° true N4 57.137 E97 20.881
3 ### 27 m 8 0:00:33 0.9 km/h 19° true N4 57.139 E97 20.883
4 ### 27 m 40 0:00:12 12 km/h 45° true N4 57.143 E97 20.884
5 ### 27 m 57 0:00:12 17 km/h 38° true N4 57.159 E97 20.899
6 ### 28 m 55 0:00:11 18 km/h 32° true N4 57.183 E97 20.918
7 ### 29 m 6 0:00:01 20 km/h 25° true N4 57.208 E97 20.934
8 ### 29 m 58 0:00:11 19 km/h 16° true N4 57.211 E97 20.935
9 ### 28 m 47 0:00:10 17 km/h 22° true N4 57.241 E97 20.944
10 ### 27 m 48 0:00:11 16 km/h 32° true N4 57.264 E97 20.953
11 ### 27 m 23 0:00:05 16 km/h 33° true N4 57.286 E97 20.967
12 ### 27 m 51 0:00:10 18 km/h 26° true N4 57.297 E97 20.974
13 ### 28 m 25 0:00:05 18 km/h 355° true N4 57.321 E97 20.986
14 ### 27 m 41 0:00:10 15 km/h 344° true N4 57.335 E97 20.985
15 ### 27 m 2 0:00:08 1.0 km/h 343° true N4 57.356 E97 20.979
16 ### 27 m 6 0:00:33 0.7 km/h 236° true N4 57.357 E97 20.979
17 ### 27 m 3 0:00:45 0.2 km/h 43° true N4 57.355 E97 20.976
18 ### 26 m 7 0:00:41 0.7 km/h 349° true N4 57.356 E97 20.977
19 ### 27 m 33 0:00:14 9 km/h 341° true N4 57.360 E97 20.976
20 ### 26 m 50 0:00:14 13 km/h 348° true N4 57.377 E97 20.970
21 ### 26 m 32 0:00:11 11 km/h 353° true N4 57.404 E97 20.965
22 ### 25 m 44 0:00:11 14 km/h 346° true N4 57.421 E97 20.962
23 ### 26 m 14 0:00:03 16 km/h 352° true N4 57.444 E97 20.956
24 ### 26 m 47 0:00:09 19 km/h 338° true N4 57.451 E97 20.955
25 ### 26 m 16 0:00:03 19 km/h 327° true N4 57.475 E97 20.946
26 ### 26 m 76 0:00:14 20 km/h 311° true N4 57.482 E97 20.941
27 ### 26 m 77 0:00:15 18 km/h 307° true N4 57.509 E97 20.910
28 ### 26 m 5 0:00:01 18 km/h 314° true N4 57.534 E97 20.877
29 ### 26 m 74 0:00:14 19 km/h 325° true N4 57.536 E97 20.875
30 ### 26 m 70 0:00:13 19 km/h 341° true N4 57.568 E97 20.852
31 ### 26 m 65 0:00:12 19 km/h 329° true N4 57.604 E97 20.840
32 ### 25 m 14 0:00:03 17 km/h 319° true N4 57.634 E97 20.822
33 ### 25 m 71 0:00:14 18 km/h 305° true N4 57.639 E97 20.817
34 ### 25 m 70 0:00:14 18 km/h 305° true N4 57.661 E97 20.785
35 ### 25 m 69 0:00:13 19 km/h 314° true N4 57.683 E97 20.754
36 ### 25 m 49 0:00:11 16 km/h 314° true N4 57.709 E97 20.727
37 ### 25 m 14 0:00:10 5 km/h 324° true N4 57.727 E97 20.708
38 ### 25 m 0 0:00:01 0.5 km/h 34° true N4 57.733 E97 20.704
39 ### 25 m N4 57.733 E97 20.704
0 E97 19.809
0 E97 19.809
0 E97 19.809 C
2 E97 19.807 150
1 E97 19.812
1 E97 19.811 150 1000
6 E97 19.814 BEURANDANG
1 E97 19.818 430
8 E97 19.821 A
B
7 E97 19.821 340 GP LHOK REUHAT 299 JALAN COT GIREK
2 E97 19.823
7 E97 19.828 1056
0 E97 19.832 450
3 E97 19.833 621
E D
6 E97 19.838
6 E97 19.843 1980
3 E97 19.848 908
8 E97 19.854 GP. TRIENG
6 E97 19.864 F
9 E97 19.876
0 E97 19.885
9 E97 19.887
4 E97 19.889 GP. BUKET SLAMAT
5 E97 19.912
5 E97 19.951
7 E97 19.977
3 E97 19.985
9 E97 19.991
7 E97 19.992
6 E97 19.992
6 E97 19.991
5 E97 19.991
0 E97 19.992
4 E97 19.993
2 E97 19.993
4 E97 19.994
6 E97 19.996
1 E97 20.001
0 E97 20.011
6 E97 20.013
4 E97 20.013
9 E97 20.018
5 E97 20.030
8 E97 20.047
0 E97 20.072
5 E97 20.084
6 E97 20.089
7 E97 20.102
0 E97 20.106
8 E97 20.108
1 E97 20.115
1 E97 20.136
7 E97 20.175
7 E97 20.185
5 E97 20.191
2 E97 20.192
3 E97 20.199
6 E97 20.213
5 E97 20.221
0 E97 20.223
8 E97 20.227
2 E97 20.238
3 E97 20.238
3 E97 20.234
6 E97 20.233
6 E97 20.234
6 E97 20.234
7 E97 20.237
2 E97 20.239
8 E97 20.249
9 E97 20.266
5 E97 20.270
8 E97 20.280
9 E97 20.282
9 E97 20.282
8 E97 20.283
5 E97 20.285
2 E97 20.294
5 E97 20.311
1 E97 20.339
6 E97 20.343
7 E97 20.343
7 E97 20.343
4 E97 20.345
6 E97 20.358
7 E97 20.383
6 E97 20.384
5 E97 20.384
3 E97 20.395
0 E97 20.406
1 E97 20.423
1 E97 20.443
7 E97 20.453
4 E97 20.463
5 E97 20.479
4 E97 20.485
2 E97 20.493
3 E97 20.503
4 E97 20.520
8 E97 20.527
2 E97 20.529
2 E97 20.523
1 E97 20.519
0 E97 20.515
6 E97 20.501
5 E97 20.498
1 E97 20.478
5 E97 20.446
6 E97 20.434
2 E97 20.428
3 E97 20.414
2 E97 20.401
8 E97 20.395
9 E97 20.392
7 E97 20.394
9 E97 20.394
8 E97 20.399
1 E97 20.401
8 E97 20.406
8 E97 20.417
8 E97 20.429
4 E97 20.442
6 E97 20.455
9 E97 20.467
3 E97 20.479
9 E97 20.481
6 E97 20.490
7 E97 20.502
4 E97 20.512
4 E97 20.517
2 E97 20.517
8 E97 20.522
8 E97 20.529
5 E97 20.535
1 E97 20.545
1 E97 20.560
0 E97 20.578
4 E97 20.596
6 E97 20.604
5 E97 20.605
6 E97 20.606
7 E97 20.608
9 E97 20.611
7 E97 20.624
9 E97 20.639
0 E97 20.650
7 E97 20.661
4 E97 20.662
8 E97 20.682
2 E97 20.697
1 E97 20.704
1 E97 20.706
0 E97 20.707
9 E97 20.706
8 E97 20.703
6 E97 20.701
5 E97 20.699
1 E97 20.697
0 E97 20.695
7 E97 20.691
5 E97 20.687
2 E97 20.680
1 E97 20.680
9 E97 20.673
6 E97 20.668
3 E97 20.663
1 E97 20.658
8 E97 20.654
5 E97 20.650
2 E97 20.645
8 E97 20.637
5 E97 20.632
1 E97 20.627
0 E97 20.625
7 E97 20.622
4 E97 20.616
0 E97 20.611
9 E97 20.608
7 E97 20.605
2 E97 20.598
9 E97 20.594
6 E97 20.590
3 E97 20.586
0 E97 20.581
8 E97 20.577
4 E97 20.571
1 E97 20.566
7 E97 20.560
4 E97 20.556
0 E97 20.549
7 E97 20.544
4 E97 20.539
2 E97 20.537
2 E97 20.537

3 E97 20.878
7 E97 20.881
9 E97 20.883
3 E97 20.884
9 E97 20.899
3 E97 20.918
8 E97 20.934
1 E97 20.935
1 E97 20.944
4 E97 20.953
6 E97 20.967
7 E97 20.974
1 E97 20.986
5 E97 20.985
6 E97 20.979
7 E97 20.979
5 E97 20.976
6 E97 20.977
0 E97 20.976
7 E97 20.970
4 E97 20.965
1 E97 20.962
4 E97 20.956
1 E97 20.955
5 E97 20.946
2 E97 20.941
9 E97 20.910
4 E97 20.877
6 E97 20.875
8 E97 20.852
4 E97 20.840
4 E97 20.822
9 E97 20.817
1 E97 20.785
3 E97 20.754
9 E97 20.727
7 E97 20.708
3 E97 20.704
3 E97 20.704
DAFTAR ANALISA HARGA SATUAN

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


AHSP PU A. 2.3.1.1 : Penggalian 1 m³ Tanah Biasa Sedalam 1 m
: Tenaga Kerja
0.750 OH Pekerja @ Rp. 90,000.00 Rp. 67,500.00
0.025 OH Mandor @ Rp. 120,000.00 Rp. 3,000.00
Jumlah Rp. 70,500.00
Dibulatkan Rp. 70,500.00

AHSP PU A. 2.3.1.2 : Penggalaian 1 m³ Tanah Biasa Sedalam 2 m


: Tenaga Kerja
0.900 OH Pekerja @ Rp. 90,000.00 Rp. 81,000.00
0.045 OH Mandor @ Rp. 120,000.00 Rp. 5,400.00
Jumlah Rp. 86,400.00
Dibulatkan Rp. 86,400.00

AHSP PU A. 2.3.1.3 : Menggali 1 m³ Tanah Biasa Sedalam 3 m


: Tenaga Kerja
1.050 OH Pekerja @ Rp. 90,000.00 Rp. 94,500.00
0.067 OH Mandor @ Rp. 120,000.00 Rp. 8,040.00
Jumlah Rp. 102,540.00
Dibulatkan Rp. 102,540.00

AHSP PU A. 2.3.1.9 : Pengurugan kembali 1 m³ galian tanah


0.500 OH Pekerja @ Rp. 90,000.00 Rp. 45,000.00
0.050 OH Mandor @ Rp. 120,000.00 Rp. 6,000.00
Jumlah Rp. 51,000.00
Dibulatkan Rp. 51,000.00

AHSP PU A. 2.3.1.11 : 1 m³ Mengurug Pasir Urug


: Bahan
1.200 m3 Pasir Urug @ Rp. 215,000.00 Rp. 258,000.00
0.300 OH Pekerja @ Rp. 90,000.00 Rp. 27,000.00
0.010 OH Mandor @ Rp. 120,000.00 Rp. 1,200.00
Jumlah Rp. 286,200.00
Dibulatkan Rp. 286,200.00

A.4.1.1 HARGA SATUAN PEKERJAAN BETON

AHSP PU A.4.1.1.5 : Membuat 1 m³ Beton Mutu F'C = 14,5 MPa (K 175), Slump (12 ± 2) cm, w/c = 0,66
: Bahan
200.000 kg Semen @ Rp. 1,750.00 Rp. 350,000.00
640.000 kg Pasir Beton @ Rp. 160.36 Rp. 102,628.57
1029.000 kg Kerikil (Maksimum 30 mm) @ Rp. 214.81 Rp. 221,044.44
215.000 Liter Air @ Rp. 92.00 Rp. 19,780.00
: Tenaga Kerja
1.650 OH Pekerja @ Rp. 90,000.00 Rp. 148,500.00
0.275 OH Tukang @ Rp. 125,000.00 Rp. 34,375.00
0.028 OH Kepala Tukang @ Rp. 150,000.00 Rp. 4,200.00
0.083 OH Mandor @ Rp. 120,000.00 Rp. 9,960.00
Jumlah Rp. 890,488.02
Dibulatkan Rp. 890,488.00

Analisa 35
Lhokseumawe, September 2016
Konsultan Perencana
PT. KARYA PET KONSULTAN

NAZARUDDIN AH, ST
Direktur

Analisa 36
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA AIR BERSIH (DAK)


PEKERJAAN : PENINGKATAN JARINGAN PIPA DISTRIBUSI AIR BERSIH GP. MATANG BAYU KEC. BAKTIYA BARAT
LOKASI : KECAMATAN BAKTIYA BARAT
VOLUME : 1.250 M
BIAYA : Rp. 200,000,000
TAHUN ANGGARAN : 2017

HARGA SATUAN JUMLAH HARGA


NO URAIAN VOLUME ANALISA
(Rp.) (Rp.)

I PEKERJAAN PERSIAPAN
1 Biaya Pengukuran 1.00 Ls Taksir 2,500,000.00 2,500,000.00
2 Sewa Direksi Keet 1.00 Ls Taksir 1,500,000.00 1,500,000.00
3 Papan nama proyek 1.00 unit Taksir 530,000.00 530,000.00
4 P3K & Keamanan 1.00 Ls Taksir 1,500,000.00 1,500,000.00
5 ADM & Dokumentasi 1.00 Ls Taksir 2,500,000.00 2,500,000.00
Jumlah 8,530,000.00

II PEKERJAAN TANAH
1 Galian tanah biasa kedalaman < 1 m 218.75 M3 AHSP PU A. 2.3.1.1 70,500.00 15,421,875.00
2 Urugan kembali tanah galian 195.17 M 3
AHSP PU A. 2.3.1.9 51,000.00 9,953,670.00
3 Urugan Pasir 15.62 M3 AHSP PU A. 2.3.1.11 286,200.00 4,470,444.00
Jumlah 29,845,989.00

III PEKERJAAN PERPIPAAN SEPJ. 1.250 M


1 Pengadaan dan Pemasangan Pipa PVC RRJ Ø 90 mm 1,250.00 M
1
AHSP PU 8.4.1.2 82,015.00 102,518,750.00
2 Pengadaan Pipa dan Assesories 1.00 Paket Lampiran BOQ.2 7,216,100.00 7,216,100.00
3 Borring 1.00 Titik Taksir 5,000,000.00 5,000,000.00
Jumlah 114,734,850.00

IV PEKERJAAN BETON
1 Thrustblock (Beton K-175) 0.18 M3 AHSP PU A.4.1.1.5 1,130,230.00 203,441.40
Jumlah 203,441.40

V PEKERJAAN PERLINTASAN
1 Pengadaan dan Pemas. Perlintasan Pipa Ø 75 mm-5 m 1.00 Paket Lamp. BOQ.1 - B 5,468,000.00 5,468,000.00
Jumlah 5,468,000.00

VI PEKERJAAN LAIN-LAIN
1 Pengetesan Pipa Ø 90 mm 1,250.00 M
1
AHSP PU 8.4.5.2 1,824.00 2,280,000.00
2 Interkoneksi Pipa 1.00 Titik Taksir 1,500,000.00 1,500,000.00
3 Pengadaan Pipa dan Assesories Sambungan Rumah 45.00 Unit Lamp. BOQ.3 832,000.00 37,440,000.00
Jumlah 41,220,000.00
REKAPITULASI RENCANA ANGGARAN BIAYA :

I PEKERJAAN PERSIAPAN 8,530,000.00


II PEKERJAAN TANAH 29,845,989.00
III PEKERJAAN PERPIPAAN SEPJ. 1.250 M 114,734,850.00
IV PEKERJAAN BETON 203,441.40
V PEKERJAAN PERLINTASAN 5,468,000.00
VI PEKERJAAN LAIN-LAIN 41,220,000.00
JUMLAH 200,002,280.40
DIBULAT 200,000,000.00

Terbilang : Dua ratus juta rupiah,-

Lhokseumawe, September 2016


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Perencana
Pembangunan Sarana dan Prasarana Air Bersih PT. KARYA PET KONSULTAN
Dinas Cipta Karya Kabupaten Aceh Utara

BADRUZZAMAN, A.Md NAZARUDDIN AH, ST


Nip. 19700817 200701 1 005 Direktur
Mengetahui/ Menyetujui,

Kuasa Pengguna Anggaran


Pembangunan Sarana dan Prasarana Air Bersih
Dinas Cipta Karya Kabupaten Aceh Utara

RAZALY, ST
Nip. 19650924 199603 1 001