DIAMETER LUAR DIAMETER DALAM PENGETESAN

Koefisien Koefisien
UKURAN PIPA Penampang DLM CM UKURAN PIPA Penampang DLM CM Air dlm pipa Harga air Harga air Harga air
Pipa Pipa m3 dlm 75 m dlm 1 m m3
Dia. MM Dia. 400 MM 0.126 0.200 9.42 282,600.00 3,768.00 30,000
Dia. MM Dia. 350 MM 0.096 0.175 7.21 216,365.63 2,884.88 30,000
Dia. 315 MM 0.078 0.158 Dia. 300 MM 0.071 0.150 5.30 158,962.50 2,119.50 30,000
Dia. 260 MM 0.053 0.130 Dia. 250 MM 0.049 0.125 3.68 110,390.63 1,471.88 30,000
Dia. 210 MM 0.035 0.105 Dia. 200 MM 0.031 0.100 2.36 70,650.00 942.00 30,000
Dia. 160 MM 0.020 0.080 Dia. 150 MM 0.018 0.075 1.32 39,740.63 529.88 30,000
Dia. 110 MM 0.009 0.055 Dia. 100 MM 0.008 0.050 0.59 17,662.50 235.50 30,000
Dia. 90 MM 0.006 0.045 Dia. 75 MM 0.004 0.038 0.33 9,935.16 132.47 30,000
Dia. 65 MM 0.003 0.033 Dia. 50 MM 0.002 0.025 0.15 4,415.63 58.88 30,000
Dia. 50 MM 0.002 0.025 Dia. 40 MM 0.001 0.020 0.09 2,826.00 37.68 30,000

Koefisien mm dijadikan cm
Penampang Pipa
dia.400 mm 0.126 0.200
dia.350 mm 0.096 0.175
dia.300 mm 0.071 0.150
dia.250 mm 0.049 0.125
dia.200 mm 0.031 0.100
dia.150 mm 0.018 0.075
dia.100 mm 0.008 0.050
dia.75 mm 0.004 0.038
dia.50 mm 0.002 0.025
dia.40 mm 0.001 0.020
BIAYA PENGANGKUTAN PIPA

Harga/Btg
1. dia. 200 mm 3000
2. dia. 150 mm 2500
3. dia. 100 mm 2000
4. dia. 75 mm 1500
5. dia. 50 mm 1000
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
UNTUK PEKERJAAN SIPIL

NO. PAKET : (PKPAM-44)


PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR
LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013

JUMLAH
NO. URAIAN PEKERJAAN
HARGA

REKAPITULASI

I. PEKERJAAN PERSIAPAN 32,495,000.00


II. PEKERJAAN BANGUNAN AIR BAKU DAN PERPIPAAN 293,357,452.58
III. PEKERJAAN BANGUNAN PRODUKSI DAN M/E 99,262,100.94
IV. PEKERJAAN SIPIL UNIT PRODUKSI 918,204,740.94
V. PEKERJAAN LAIN-LAIN 9,000,000.00

JUMLAH 1,352,319,294.46
DIBULATKAN 1,352,300,000.00
TERBILANG :

Jakarta, 22 Agustus 2013

Mengetahui & Menyetujui :


Penerima Pekerjaan Pemberi Pekerjaan
………………………………. PT. Maswandi

Zulfikar Danny Mustari Setiabudhi


Direktur Pemasaran
DAFTAR KUANTITAS DAN HARGA
UNTUK PEKERJAAN SIPIL
NO. PAKET : (PKPAM-44)
PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR
LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
I. PEKERJAAN PERSIAPAN
1 Direksi Keet / Gudang (Sewa) 1.00 Ls Ditaksir 4,850,000.00 4,850,000.00
2 Papan Nama Proyek 1.00 Ls Ditaksir 970,000.00 970,000.00
3 Pematokan/pengukuran (setting out) 1.00 Ls Ditaksir 7,275,000.00 7,275,000.00
4 Administrasi dan Dokumentasi 1.00 Ls Ditaksir - -
5 Pembersihan Lahan Lokasi Instalasi (WTP) 1.00 Ls Ditaksir 14,550,000.00 14,550,000.00
JUMLAH - A 27,645,000.00
II. PEKERJAAN BANGUNAN AIR BAKU DAN PERPIPAAN
1 Pembuatan Bangunan Intake, lengkap dgn Pengadaan dan pemasangan pompa, Lemari 1.00 Pkt LAMPIRAN - 1 293,357,452.58 293,357,452.58
Panel, Kabel, Pipa, dan Accessories
JUMLAH - B.I 293,357,452.58
III. PEKERJAAN BANGUNAN PRODUKSI DAN M/E
1 1.00 Pkt
Pengadaan dan Pemasangan Paket IPA 20 l/dt, Lengkap Pipa dan Accessories, termasuk :

- Pondasi Beton Unit IPA (Sesuai gambar) 1.00 Pkt Ditaksir 76,000,000.00 76,000,000.00

2 Pengadaan dan Pemasangan Pompa Dosing (soda ash, kaporit dan alum sulfat), lengkap 6.00 Unit Ditaksir - -
dgn sistem Perpipaan dan Accessories.
3 Pengadaan dan Pemasangan Mixer pengaduk bahan kimia, lengkap dgn sistem perpipaan, 3.00 Unit Ditaksir - -
Accessories dan Kabel (Kabel Tray dan Rak Kabel)
4 Pengadaan dan pemasangan Lemari Panel untuk masing-masing motor pompa dosing dan 1.00 Pkt Ditaksir - -
mixer
5 Pengadaan dan Pemasangan Tangki Pembubuh Bahan Kimia, lengkap dgn sistem 6.00 Unit Ditaksir - -
Perpipaan dan Accessories
6 Pengadaan dan Pemasangan Pompa Distribusi Centrifugal Kap. 20 L/Dt, Lengkap dengan 1.00 Pkt LAMPIRAN - 2 - -
Lemari Panel, Kabel, Pipa dan Accessories
7 Pengadaan dan Pemasangan Lemari Panel Induk (MDP) Lengkap dengan Change Over 1.00 Unit Ditaksir - -
Switch, termasuk :
- Kabel pompa ke masing-masing panel (Kabel Tray, Rak Kabel)
-
Peralatan M/E (Meger, Avo Meter, Tang Ampere, Obeng, Tang potong, palu dll)
8 Penyambungan Daya PLN 80 KVA BP material dan pemasangan 1.00 Unit Ditaksir - -
9 Pengadaan dan Pemasangan Genset 80 KVA, Lengkap dengan tangki harian, pondasi 1.00 Unit Ditaksir - -
dudukan dan peralatan Bengkel (Toolkit)
10 Pengadaan dan Pemasangan Tangki BBM Kap. 5.000 Liter Lengkap dengan pondasi, sistem 1.00 Unit Ditaksir - -
perpipaan dan accessories
11 Pengadaan/pemasangan Water Meter PIT dia. 200 mm, Lengkap Box Pengaman 1.00 Unit LAMPIRAN - 3 9,762,100.94 9,762,100.94

12 Pengadaan dan Pemasangan Lampu Penerangan termasuk Tiang, Lampu Taman, Saklar, 3.00 Unit Ditaksir 4,500,000.00 13,500,000.00
Stop Kontak
JUMLAH - B.II 99,262,100.94
IV. PEKERJAAN SIPIL UNIT PRODUKSI
1 1.00 Unit LAMPIRAN - 4 163,162,450.63 163,162,450.63
Pembuatan Bangunan Operasional, Rumah Jaga Type 54 M2 dan Gudang
2 Pembuatan Bangunan Genset, Ruang Pompa, Ruang Panel dan Gardu PLN Type 60 M2 1.00 Unit LAMPIRAN - 5 211,196,355.37 211,196,355.37
(Atap Plat Beton)
3 Pembuatan Bangunan Laboratorium dan Chamical Dozing Type 36 M2 1.00 Unit LAMPIRAN - 6 169,245,620.99 169,245,620.99
4 Pembuatan Saluran Induk 1.00 Pkt LAMPIRAN - 8 40,616,731.62 40,616,731.62
5 Pembuatan Pagar Keliling Lokasi IPA Termasuk Pintu 1.00 Pkt LAMPIRAN - 9 246,473,916.22 246,473,916.22
6 Pekerjaan pembuatan jalan setapak beton 1:3:5 30.00 M3 SNI-03.G6.1 616,988.87 18,509,666.10
7 Pengadaan dan Pemasangan Reservoar Baja Kap. 200 M3, Lengkap dengan Pondasi dan 1.00 Pkt Ditaksir 69,000,000.00 69,000,000.00
Sistem Perpipaan (bentuk Cylender)
JUMLAH - B.III 918,204,740.94

V. PEKERJAAN LAIN-LAIN
1 Landscaping 1.00 Ls Ditaksir 9,000,000.00 9,000,000.00
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
JUMLAH - B.IV 9,000,000.00
LAMPIRAN - 10 : Pembuatan Bangunan Intake, lengkap dgn Pengadaan dan pemasangan pompa, Lemari Panel, Kabel, Pipa,
dan Accessories

PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR


LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.

I. PEMBUATAN INTAKE

PEKERJAAN TANAH
1 Dewatering/pemindahan aliran air sementara 1.00 Ls Ditaksir 10,000,000.00 10,000,000.00###
2 Galian tanah berlumpur 146.11 M3 SNI-006-2007.6.6 66,381.47 9,698,995.85###
3 Timbunan kembali 55.88 M3 SNI-03.T.6.9 11,514.97 643,456.36###
4 Urugan pasir 2.30 M3 SNI-03-T.6.11b 168,664.57 387,928.51###

PKERJAAN KONSTRUKSI
1 Pasangan Bronjong 30.00 M3 Anl. G 5a 735,019.93 22,050,597.75###
2 Beton tumbuk 1 : 3 : 5, untuk Lantai kerja 1.15 M3 SNI-03.G6.1 616,988.87 709,537.20###
3 Beton cor 1 : 1½ : 2½ 25.75 M3 SNI-03.G6.9 833,902.21 21,472,981.91###
4 Pembesian 3,327.68 Kg SNI-03.I6.25 15,231.30 50,684,888.72###
5 Bekisting lantai 3.92 M2 SNI-03.F6.28 83,537.37 327,466.49###
6 Bekisting dinding 207.20 M2 SNI-03.F6.33 238,770.45 49,473,236.62
7 Bekisting tutup 9.97 M2 SNI-03.F6.32 329,101.21 3,281,139.08
8 Plesteran 1 : 2, tebal 15 mm 25.57 M2 SNI-03.G6.2q 40,113.57 1,025,704.09###
9 Tangga monyet 2.00 Unit Ditaksir 500,000.00 1,000,000.00
10 Penutup Main Hole 80 x 80 cm Lengkap Engsel, Gembok, cat dll 2.00 Unit Ditaksir 1,500,000.00 3,000,000.00

PENGADAAN/PEMASANGAN PIPA SADAP, LENGKAP ACCESSORIES


1 Pipa Screen Gip dia. 250 mm 24.00 M Ditaksir 2,425,000.00 58,200,000.00
2 Loss Flange dia. 250 mm 4.00 Bh Ditaksir 690,640.00 2,762,560.00
3 Wallface dia. 250 mm 1.00 Unit Ditaksir 1,967,518.90 1,967,518.90
4 Pemasangan pipa dan accessories 1.00 Ls Ditaksir 3,395,000.00 3,395,000.00
Jumlah - I 240,081,011.48###
II. PENGADAAN / PEMASANGAN POMPA INTAKE, PIPA DAN
ACCESSSORIES
1 Mekanikal / Elektrikal
- Pompa Intake Submersible Non Cloging, Q = 10 L/det, H = 30 M, 2.00 Unit Ditaksir 112,585,000.00 225,170,000.00###
1450 Rpm dan Lemari Panel pompa Air Baku untuk 2 Motor (in
door, out door & kontrol jarak jauh) Lengkap dengan WLC
- Kabel uk. 4x16 mm NYY untuk pompa 100.00 M' Ditaksir 113,100.00 11,310,000.00
- Pipa Gip dia. 100 mm 12.00 M Ditaksir - ###
-
- Tee Y Gip dia. 100 x 200 mm 2.00 Bh Ditaksir - -
- Bend All Flange Gip dia. 100 mm x 90⁰ 4.00 Bh Ditaksir - ###
-
- Wallface dia. 100 mm 2.00 Unit Ditaksir - ###
-
- Gate valve CI dia. 100 mm 2.00 Unit Ditaksir - ###
-
- Chack Valve dia. 100 mm 2.00 Bh Ditaksir - -
- Blind flange dia. 200 mm 2.00 Bh Ditaksir - -
- Loss flange dia. 100 mm 4.00 Bh Ditaksir - ###
-
2 Pabrikasi/pemasangan Pompa, Lemari Panel, Kabel, Pipa dan 2.00 Unit Ditaksir - ###
-
Accessories lengkap dgn baut paking dll.
Jumlah - II 236,480,000.00###

III. PENGADAAN / PEMASANGAN PIPA TRANSMISI AIR BAKU


DAN DISTRIBUSI (JDU) LENGKAP ACCESSSORIES
1 Pipa Transmisi air baku lengkap dgn accessories
- Pipa Gip dia. 200 mm 24.00 M Ditaksir - ###
-
- Pipa PVC dia. 200 mm, S-12,5 RRJ 258.00 M Ditaksir - ###
-
2 Accessories
- Bend Gip dia. 200 mm x 90⁰ 2.00 Bh Ditaksir - ###
-
- Bend Gip dia. 200 mm x 45⁰ 2.00 Bh Ditaksir 753,960.00 1,507,920.00
- Gate valve CI dia. 200 mm 1.00 Unit Ditaksir - ###
-
- Loss Flange dia. 200 mm 8.00 Bh Ditaksir - ###
-
- Tee All Flange dia. 200 x 200 mm 1.00 Bh Ditaksir - ###
-
- Flange Socket dia. 200 mm 2.00 Bh Ditaksir - ###
-
- Bend All Socket dia. 200 mm x 90⁰ 5.00 Bh Ditaksir - ###
-
- Bend All Socket dia. 200 mm x 45⁰ 3.00 Bh Ditaksir - ###
-
- Bend All Socket dia. 200 mm x 22,5⁰ 3.00 Bh Ditaksir 781,320.00 2,343,960.00
3 PEMASANGAN PIPA, ACCESSORIES DAN TEST ALIRAN PIPA
- Galian tanah 112.80 M3 SNI-03.T.6.4 37,495.06 4,229,442.66###
- Urugan kembali 102.93 M3 SNI-03.T.6.9 11,514.97 1,185,235.55###
- Pipa Gip dia. 200 mm 24.00 M' SNI-03.GSP.6 86,383.53 2,073,204.73###
- Pipa PVC dia. 200 mm, S-12,5 RRJ 258.00 M' SNI-03.PVC.5 26,089.82 6,731,172.75###
4 PENGADAAN/PEMASANGAN PERLINTASAN PIPA GIP DIA. 200 ###
MM DAN ACCESSORIES, L = 12 M' ; 2 UNIT
- Pengadaan pipa Gip dia. 200 mm 30.00 M Ditaksir - -
- Bend Gip dia. 200 mm x 45⁰ 8.00 Bh Ditaksir - -
- Loss Flange dia. 200 mm 12.00 Bh Ditaksir - -
- Flange Socket PVC dia. 200 mm 4.00 Bh Ditaksir - -
- Air Realese CI dia. 100 mm + Flange Spigot 2.00 Bh Ditaksir - -
- Beton 1:3;5 Untuk Umpak 1.00 Ls Ditaksir 630,000.00 630,000.00
- Pabrikasi/pemasangan pengecatan pipa dan accessories 2.00 Unit Ditaksir 7,178,000.00 14,356,000.00
Jumlah - III 33,056,935.68

REKAPITULASI
I. PEMBUATAN INTAKE 240,081,011.48###
II. PENGADAAN / PEMASANGAN POMPA INTAKE, PIPA DAN ACCESSSORIES 236,480,000.00###
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
III. PENGADAAN / PEMASANGAN PIPA TRANSMISI AIR BAKU DAN DISTRIBUSI (JDU) LENGKAP ACCESSSORIES 33,056,935.68###

JUMLAH 509,617,947.16###
LAMPIRAN - 1 : Pembuatan Bangunan Intake, lengkap dgn Pengadaan dan pemasangan pompa, Lemari Panel, Kabel, Pipa, dan Accessories

PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR


LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.

I. PEMBUATAN INTAKE

PEKERJAAN TANAH
1 Dewatering/pemindahan aliran air sementara 1.00 Ls Ditaksir 9,700,000.00 9,700,000.00
2 Galian tanah berlumpur 146.11 M3 SNI-006-2007.6.6 66,381.47 9,698,995.85
3 Timbunan kembali 55.88 M3 SNI-03.T.6.9 11,514.97 643,456.36
4 Urugan pasir 2.30 M3 SNI-03-T.6.11b 168,664.57 387,928.51

PKERJAAN KONSTRUKSI
1 Pasangan Bronjong 30.00 M3 Anl. G 5a 735,019.93 22,050,597.75
2 Beton tumbuk 1 : 3 : 5, untuk Lantai kerja 1.15 M3 SNI-03.G6.1 616,988.87 709,537.20
3 Beton cor 1 : 1½ : 2½ 25.75 M3 SNI-03.G6.9 833,902.21 21,472,981.91
4 Pembesian 3,327.68 Kg SNI-03.I6.25 15,231.30 50,684,888.72
5 Bekisting lantai 3.92 M2 SNI-03.F6.28 83,537.37 327,466.49
6 Bekisting dinding 207.20 M2 SNI-03.F6.33 238,770.45 49,473,236.62
7 Bekisting tutup 9.97 M2 SNI-03.F6.32 329,101.21 3,281,139.08
8 Plesteran 1 : 2, tebal 15 mm 25.57 M2 SNI-03.G6.2q 40,113.57 1,025,704.09
9 Tangga monyet 2.00 Unit Ditaksir 485,000.00 970,000.00
10 Penutup Main Hole 80 x 80 cm Lengkap Engsel, Gembok, cat dll 2.00 Unit Ditaksir 1,455,000.00 2,910,000.00

PENGADAAN/PEMASANGAN PIPA SADAP, LENGKAP ACCESSORIES


1 Pipa Screen Gip dia. 250 mm 24.00 M Ditaksir 2,425,000.00 58,200,000.00
2 Loss Flange dia. 250 mm 4.00 Bh Ditaksir 690,640.00 2,762,560.00
3 Wallface dia. 250 mm 1.00 Unit Ditaksir 1,967,518.90 1,967,518.90
4 Pemasangan pipa dan accessories 1.00 Ls Ditaksir 3,395,000.00 3,395,000.00
JUMLAH - I 239,661,011.48

II. PENGADAAN / PEMASANGAN POMPA INTAKE, PIPA DAN


ACCESSSORIES
1 Mekanikal / Elektrikal
- Pompa Intake Submersible Non Cloging, Q = 20 L/det, H = 30 M, 1450 2.00 Unit Ditaksir - -
Rpm dan Lemari Panel pompa Air Baku untuk 2 Motor (in door, out door
& kontrol jarak jauh) Lengkap dengan WLC
- Kabel uk. 4x35 mm NYY untuk pompa 100.00 M' Ditaksir - -
- Pipa Gip dia. 100 mm 12.00 M Ditaksir - -
- Tee Y Gip dia. 100 x 200 mm 2.00 Bh Ditaksir - -
- Bend All Flange Gip dia. 100 mm x 90⁰ 4.00 Bh Ditaksir - -
- Wallface dia. 100 mm 2.00 Unit Ditaksir - -
- Gate valve CI dia. 100 mm 2.00 Unit Ditaksir - -
- Chack Valve dia. 100 mm 2.00 Bh Ditaksir - -
- Blind flange dia. 200 mm 2.00 Bh Ditaksir - -
- Loss flange dia. 100 mm 4.00 Bh Ditaksir - -
2 Pabrikasi/pemasangan Pompa, Lemari Panel, Kabel, Pipa dan Accessories 2.00 Unit Ditaksir - -
lengkap dgn baut paking dll.
JUMLAH - II -
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
III. PENGADAAN / PEMASANGAN PIPA TRANSMISI AIR BAKU LENGKAP
ACCESSSORIES TERMASUK FITTING & VALVE
1 Pipa Transmisi air baku lengkap dgn accessories
- Pipa Gip dia. 200 mm 24.00 M Ditaksir - -
- Pipa PVC dia. 200 mm, S-12,5 RRJ 628.00 M Ditaksir - -
2 Accessories
- Bend Gip dia. 200 mm x 90⁰ 4.00 Bh Ditaksir - -
- Loss Flange dia. 200 mm 8.00 Bh Ditaksir - -
- Tee All Flange dia. 200 x 200 mm 1.00 Bh Ditaksir - -
- Gate valve CI dia. 200 mm 3.00 Unit Ditaksir - -
- Flange Socket dia. 200 mm 6.00 Bh Ditaksir - -
- Bend All Socket dia. 200 mm x 90⁰ 4.00 Bh Ditaksir - -
- Bend All Socket dia. 200 mm x 45⁰ 4.00 Bh Ditaksir - -
3 PEMASANGAN PIPA, ACCESSORIES DAN TEST ALIRAN PIPA
- Galian tanah keras 256.00 M3 SNI-03.T.6.4 37,495.06 9,598,735.10
- Urugan kembali 233.60 M3 SNI-03.T.6.9 11,514.97 2,689,896.29
- Pipa Gip dia. 200 mm 24.00 M' SNI-03.GSP.6 86,383.53 2,073,204.73
- Pipa PVC dia. 200 mm, S-12,5 RRJ 628.00 M' SNI-03.PVC.5 26,089.82 16,384,404.98

4 PENGADAAN/PEMASANGAN PERLINTASAN PIPA GIP DIA. 200 MM DAN


ACCESSORIES, L = 12 M' ; 1 UNIT
- Pengadaan pipa Gip dia. 200 mm 15.00 M Ditaksir - -
- Bend Gip dia. 200 mm x 45⁰ 4.00 Bh Ditaksir - -
- Loss Flange dia. 200 mm 6.00 Bh Ditaksir - -
- Flange Socket PVC dia. 200 mm 2.00 Bh Ditaksir - -
- Air Realese CI dia. 100 mm + Flange Spigot 1.00 Bh Ditaksir - -
- Beton 1:3;5 Untuk Umpak 1.00 Ls Ditaksir 305,550.00 305,550.00
- Pemasangan, pengecatan pipa dan accessories 1.00 Unit Ditaksir 7,178,000.00 7,178,000.00

5 PENGADAAN/PEMASANGAN PERLINTASAN PIPA GIP DIA. 200 MM DAN


ACCESSORIES, L = 6 M' ; 3 UNIT
- Pengadaan pipa Gip dia. 200 mm 27.00 M Ditaksir - -
- Bend Gip dia. 200 mm x 45⁰ 12.00 Bh Ditaksir - -
- Loss Flange dia. 200 mm 18.00 Bh Ditaksir - -
- Flange Socket PVC dia. 200 mm 6.00 Bh Ditaksir - -
- Air Realese CI dia. 100 mm + Flange Spigot 3.00 Bh Ditaksir - -
- Beton 1:3;5 Untuk Umpak 1.00 Ls Ditaksir 916,650.00 916,650.00
- Pemasangan, pengecatan pipa dan accessories 3.00 Unit Ditaksir 4,850,000.00 14,550,000.00
Jumlah - III 53,696,441.10

REKAPITULASI
I. PEMBUATAN INTAKE 239,661,011.48
II. PENGADAAN / PEMASANGAN POMPA INTAKE, PIPA DAN ACCESSSORIES -
III. PENGADAAN / PEMASANGAN PIPA TRANSMISI AIR BAKU LENGKAP ACCESSSORIES TERMASUK FITTING & VALVE 53,696,441.10

JUMLAH 293,357,452.58
LAMPIRAN - 12 : Pengadaan/pemasangan Water Meter PIT dia. 200 mm, Lengkap Box Pengaman

PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR

LOKASI : KABUPATEN ACEH UTARA

TAHUN ANGGARAN : 2013


HARGA JUMLAH
NO. URAIAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.

I. PENGADAAN WATER METER PIT, PIPA & ACCESSORIES


1 Pipa Gip dia. 200 mm 4.00 M Ditaksir - -
2 Water Meter Induk dia. 200 mm 1.00 M' Ditaksir 24,600,000.00 24,600,000.00
3 Gate Valve CI dia. 200 mm 3.00 Bh Ditaksir - -
4 Tee All Flange Gip dia. 200 x 200 mm 2.00 Bh Ditaksir - -
5 Bend All Flange Gip dia. 200 mm x 90º 2.00 Unit Ditaksir 1,998,450.00 3,996,900.00
6 Flange Socket PVC dia. 200 mm 2.00 Bh Ditaksir 1,473,120.00 2,946,240.00
7 Flexible Joint dia. 200 mm 1.00 Bh Ditaksir 3,919,410.00 3,919,410.00
8 Loose Flange dia. 200 mm 10.00 Bh Ditaksir - -
9 Pabrikasi/pemasangan Water meter, pipa, accessories dan 1.00 Ls Ditaksir 7,500,000.00 7,500,000.00
koneksi dgn pipa existing

10 Tutup Box dari plat 1.00 Unit Ditaksir 1,500,000.00 1,500,000.00


11 Pengecatan pipa dan accessories 1.00 Ls Ditaksir 250,000.00 250,000.00
Jumlah - I 44,712,550.00

II. PEMBUATAN DAN PEMASANGAN BOX METER PIT DAN


ACCESSORIES

PEKERJAAN TANAH
1 Galian tanah 10.67 M3 SNI-03.T.6.1 24,021.08 256,304.92
2 Timbunan kembali 2.33 M3 SNI-03.T.6.9 11,514.97 26,829.87
3 Urugan kerikil 0.29 M3 SNI-03-T.6.11c 180,304.57 52,288.33

PEKERJAAN BETON DAN PLESTERAN


1 Pasangan Batu kosong 0.88 M3 SNI-03.G6.14m 360,333.37 317,093.36
2 Beton cor 1:2:3 2.89 M3 SNI-03.G6.5 624,450.11 1,804,660.82
3 Pembesian 303.45 Kg SNI-03.I6.25 15,231.30 4,621,937.65
4 Bekisting 21.56 M2 SNI-03.F6.28 83,537.37 1,801,065.70
5 Plesteran 1:3, tebal 15 mm 23.52 M2 SNI-03.G6.3q 37,496.61 881,920.29
Jumlah - II 9,762,100.94

JUMLAH I + II 54,474,650.94
LAMPIRAN - 2 : Pengadaan dan Pemasangan Pompa Distribusi Centrifugal Kap. 20 L/Dt, Lengkap dengan Lemari Panel, Kabel, Pipa dan Accessories

PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR


LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.

PENGADAAN/PEMASANGAN POMPA, PIPA DAN ACCESSORIES

1 Pompa Distribusi Centrifugal Kap. 20 l/dt, H - 40 M', 1450 Rpm, (Mekanikal 2.00 Unit Ditaksir 74,961,600.00 149,923,200.00
Seal) dan Lemari Panel untuk 2 Motor Lengkap dengan Kabel (Rak Kabel,
Kabel Tray dan Lain-lain)

2 HISAP
- Gate Valve CI dia. 150 mm 2.00 Bh Ditaksir 3,937,424.00 7,874,848.00
- Reducer All Flange Gip dia. 150 x 75 mm 2.00 Bh Ditaksir 1,075,726.36 2,151,452.73
- Bend All Flange Gip dia. 150 mm x 90⁰ 2.00 Bh Ditaksir 1,238,573.60 2,477,147.20
- Foot Klep dia. 150 mm 2.00 Bh Ditaksir 1,834,852.00 3,669,704.00
- Pipa Gip dia. 150 mm 12.00 M' Ditaksir 620,024.00 7,440,288.00
- Loss Flange dia. 150 mm 4.00 Bh Ditaksir 383,926.00 1,535,704.00

3 OUT
- Manometer skala 10 dia. 100 mm 1.00 Unit Ditaksir 300,700.00 300,700.00
- Tee Y Gip dia. 200 x 200 mm 2.00 Bh Ditaksir 1,129,429.20 2,258,858.40
- Gate Valve CI dia. 200 mm 2.00 Bh Ditaksir 6,908,776.50 13,817,553.00
- Chack Valve dia. 200 mm 2.00 Bh Ditaksir 10,060,888.50 20,121,777.00
- Flexible Joint dia. 200 mm 2.00 Bh Ditaksir 3,801,827.70 7,603,655.40
- Reducer All Flange Gip dia. 200 mm x 75 mm 2.00 Bh Ditaksir 1,165,999.41 2,331,998.83
- Blind Flange dia. 200 mm 1.00 Bh Ditaksir 735,167.85 735,167.85
- Pipa Gip dia. 200 mm 12.00 M' Ditaksir 960,494.00 11,525,928.00
- Loss Flange dia. 200 mm 4.00 Bh Ditaksir 468,728.25 1,874,913.00

4 Pabrikasi/pemasangan Pompa, Lemari Panel, Kabel, Pipa dan Accessories 2.00 Unit Ditaksir 9,700,000.00 19,400,000.00
lengkap dgn baut paking dll.

Jumlah 255,042,895.40
LAMPIRAN - 3 : Pengadaan/pemasangan Water Meter PIT dia. 200 mm, Lengkap Box Pengaman

PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR


LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013

HARGA JUMLAH
NO. URAIAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.

I. PENGADAAN WATER METER PIT, PIPA & ACCESSORIES


1 Pipa Gip dia. 200 mm 4.00 M Ditaksir - -
2 Water Meter Induk dia. 200 mm 1.00 M' Ditaksir - -
3 Gate Valve CI dia. 200 mm 3.00 Bh Ditaksir - -
4 Tee All Flange Gip dia. 200 x 200 mm 2.00 Bh Ditaksir - -
5 Bend All Flange Gip dia. 200 mm x 90º 2.00 Unit Ditaksir - -
6 Flange Socket PVC dia. 200 mm 2.00 Bh Ditaksir - -
7 Flexible Joint dia. 200 mm 1.00 Bh Ditaksir - -
8 Loose Flange dia. 200 mm 10.00 Bh Ditaksir - -
9 Pabrikasi/pemasangan Water meter, pipa, accessories dan koneksi dgn 1.00 Ls Ditaksir - -
pipa existing

10 Tutup Box dari plat 1.00 Unit Ditaksir - -


11 Pengecatan pipa dan accessories 1.00 Ls Ditaksir - -
Jumlah - I -

II. PEMBUATAN DAN PEMASANGAN BOX METER PIT DAN


ACCESSORIES

PEKERJAAN TANAH
1 Galian tanah 10.67 M3 SNI-03.T.6.1 24,021.08 256,304.92
2 Timbunan kembali 2.33 M3 SNI-03.T.6.9 11,514.97 26,829.87
3 Urugan kerikil 0.29 M3 SNI-03-T.6.11c 180,304.57 52,288.33

PEKERJAAN BETON DAN PLESTERAN


1 Pasangan Batu kosong 0.88 M3 SNI-03.G6.14m 360,333.37 317,093.36
2 Beton cor 1:2:3 2.89 M3 SNI-03.G6.5 624,450.11 1,804,660.82
3 Pembesian 303.45 Kg SNI-03.I6.25 15,231.30 4,621,937.65
4 Bekisting 21.56 M2 SNI-03.F6.28 83,537.37 1,801,065.70
5 Plesteran 1:3, tebal 15 mm 23.52 M2 SNI-03.G6.3q 37,496.61 881,920.29
Jumlah - II 9,762,100.94

JUMLAH I + II 9,762,100.94
LAMPIRAN - 4 : Pembuatan Bangunan Operasional, Rumah Jaga Type 54 M2 dan Gudang

PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR


LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013

HARGA JUMLAH ###


NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA SATUAN
Rp. Rp. Rp.

PEKERJAAN TANAH
1 Galian tanah 12.62 M3 SNI-03.T.6.1 24,021.08 303,146.03###
2 Urugan kembali 3.15 M3 SNI-03.T.6.9 11,514.97 36,272.15###
3 Timbunan tanah yang didatangkan 39.14 M3 SNI-03-T.6.11a 81,801.07 3,201,438.25###
4 Urugan pasir 6.61 M3 SNI-03-T.6.11b 168,664.57 1,114,029.48###

PEKERJAAN BETON
1 Beton 1 : 3 : 5, untuk lantai 6.36 M3 SNI-03.G6.1 616,988.87 3,924,049.21###
2 Beton 1 : 2 : 3 (Sloof) 1.55 M3 SNI-03.G6.5 624,450.11 967,897.67###
3 Beton 1 : 2 : 3 (Kolom) 0.73 M3 SNI-03.G6.5 624,450.11 455,848.58###
4 Beton 1 : 2 : 3 (Ring balok) 1.29 M3 SNI-03.G6.5 624,450.11 805,540.64###
5 Pembesian 374.85 Kg SNI-03.I6.25 15,231.30 5,709,452.39###
6 Bekisting untuk sloof 20.60 M2 SNI-03.F6.29 114,342.97 2,355,465.17###
7 Bekisting untuk kolom 24.48 M2 SNI-03.F6.30 221,448.67 5,421,063.49
8 Bekisting untuk balok 20.85 M2 SNI-03.F6.31 228,022.07 4,754,260.18

PEKERJAAN PASANGAN
1 Pasangan pondasi 1 : 3 25.75 M3 SNI-03.G6.4m 709,236.84 18,262,848.63###
2 Pas. Bata 1/2 bata 1 : 3 138.06 M2 SNI-03.G6.10bb 107,978.53 14,907,516.23###
3 Plesteran 1 : 4 ; tebal 15 mm 276.11 M2 SNI-03.G6.4q 35,823.07 9,891,107.86###
4 Pasang lantai keramik 63.90 M2 SNI-03.G6.45 139,182.92 8,893,788.81###
5 Pembuatan KM/WC dinding 1/2 keramik+bak+Klosed jongkok 1.00 Unit Ditaksir 4,850,000.00 4,850,000.00###

PEKERJAAN KOZEN DAN PINTU


1 Daun Pintu 7.00 Unit Ditaksir 645,050.00 4,515,350.00###
2 Daun Jendela 10.00 Unit Ditaksir 344,350.00 3,443,500.00###
3 Kusen pintu dan Jendela 0.59 M3 SNI-03.F6.2 7,254,659.10 4,280,248.87###
4 Jalusi 1.00 Ls Ditaksir 1,697,500.00 1,697,500.00###
5 Kosen KM/WC 1.00 Bh Ditaksir 501,975.00 501,975.00###
6 Plafond triplek dan rangka 117.45 M2 SNI-03.F6.21a 184,361.93 21,653,309.21###

PEKERJAAN PENGECATAN
1 Pengecatan tembok dinding luar/dalam 393.56 M2 SNI-03.K6.14 18,681.34 7,352,226.87###
2 Pengecatan permukuaan kayu 69.15 M2 SNI-03.K6.9 30,226.90 2,090,189.96###

PEKERJAAN ATAP
1 Rangka atap kayu 1.85 M3 SNI-03.F6.28 6,390,369.70 11,822,183.95###
2 Atap seng BJLS 130.48 M2 SNI-03.H6.38 47,461.91 6,192,829.49###
3 Bubungan Seng 6.03 M2 SNI-03.H6.39 38,928.62 234,739.59###
4 Listplank 46.80 M' SNI-03.F6.53 57,926.65 2,710,967.41###

PEMASANGAN PINTU, JENDELA & ACCESORIES


1 Kunci dan engsel untuk pintu 7.00 Unit Ditaksir 339,500.00 2,376,500.00###
2 Engsel dan pacok untuk jendela 10.00 Unit Ditaksir 97,000.00 970,000.00###

PEKERJAAN INSTALASI LISTRIK


1 Titik api + instalasi 16.00 Titik Ditaksir 156,170.00 2,498,720.00###
2 Lampu hemat energi 20 Watt 7.00 Bh Ditaksir 83,032.00 581,224.00###
3 Stop Kontak 3.00 Bh Ditaksir 25,511.00 76,533.00###
4 Saklar Tunggal 1.00 Bh Ditaksir 20,903.50 20,903.50###
5 Saklar Ganda 3.00 Bh Ditaksir 31,040.00 93,120.00###
6 Box Sakering 1.00 Unit Ditaksir 122,705.00 122,705.00###

PEKERJAAN LAIN - LAIN


1 Septictank dan resapan lengkap dgn pipa air kotor 1.00 Ls Ditaksir 4,074,000.00 4,074,000.00###

JUMLAH ###
163,162,450.63
LAMPIRAN - 13 : Pembuatan Bangunan Genset, Ruang Pompa, Ruang Panel dan Gardu PLN Type 60 M2 (Atap Plat Beton)

PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR


LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN: 2013

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.

I. PEKERJAAN TANAH
1 Galian tanah 21.84 M3 SNI-03.T.6.1 24,021.08 524,620.39
2 Urugan tanah 9.48 M3 SNI-03.T.6.9 11,514.97 109,161.89
3 Urugan pasir 6.34 M3 SNI-03-T.6.11b 168,664.57 1,069,333.37
4 Timbunan tanah yang didatangkan 52.43 M3 SNI-03-T.6.11a 81,801.07 4,288,830.10

II. PEKERJAAN PASANGAN & BETON


1 Pasangan batu 1 : 3 22.00 M3 SNI-03.G6.4m 709,236.84 15,603,210.48
2 Beton 1 : 2 : 3 29.33 M3 SNI-03.G6.5 624,450.11 18,315,121.73
3 Beton 1 : 3 : 5 (untuk lantai) 5.88 M3 SNI-03.G6.1 616,988.87 3,627,894.56
4 Pembesian 3,079.65 Kg SNI-03.I6.25 15,231.30 46,907,069.66
5 Bekisting untuk sloof 15.40 M2 SNI-03.F6.29 114,342.97 1,760,881.73
6 Bekisting untuk kolom 64.20 M2 SNI-03.F6.30 221,448.67 14,217,004.74
7 Bekisting untuk balok 26.30 M2 SNI-03.F6.31 228,022.07 5,996,980.47
8 Bekisting untuk atap 91.28 M2 SNI-03.F6.32 329,101.21 30,040,358.63

III. PEKERJAAN PASANGAN & PLESTERAN


1 Pasangan bata 1/2 batu 1 : 3 128.32 M2 SNI-03.G6.10bb 107,978.53 13,855,805.32
2 Plesteran 1 : 3 ; tebal 15 mm 256.64 M2 SNI-03.G6.3q 37,496.61 9,623,130.25
3 Pas. Keramik lantai 67.00 M2 SNI-03.G6.45 139,182.92 9,325,255.87

IV. PEKERJAAN KOZEN DAN PINTU


1 Pintu (besi plat) 3.00 Unit Ditaksir 5,500,000.00 16,500,000.00
2 Kayu kozen 0.27 M3 SNI-03.F6.2 7,254,659.10 1,958,757.96
3 Jalusi 1.00 Ls Ditaksir 2,100,000.00 2,100,000.00
4 Fentilasi radiator Genset 2.00 Bh Ditaksir 2,000,000.00 4,000,000.00

V. PEKERJAAN INSTALASI LISTRIK


1 Titik api + instalasi 16.00 Titik Ditaksir 156,170.00 2,498,720.00
2 Lampu hemat energi 14 Watt 7.00 Bh Ditaksir 83,032.00 581,224.00
3 Stop Kontak 3.00 Bh Ditaksir 25,511.00 76,533.00
4 Saklar Tunggal 2.00 Bh Ditaksir 20,903.50 41,807.00
5 Saklar Ganda 1.00 Bh Ditaksir 31,040.00 31,040.00
6 Box Sakering 1.00 Unit Ditaksir 122,705.00 122,705.00

VI. PEKERJAAN PENGECATAN


1 Pengecatan dinding tembok dan atap 375.29 M2 SNI-03.K6.14 18,681.34 7,010,918.85
2 Pengecatan permukaan kayu/besi 43.81 M2 SNI-03.K6.9 30,226.90 1,324,240.38

JUMLAH 211,510,605.37
LAMPIRAN - 5 : Pembuatan Bangunan Genset, Ruang Pompa, Ruang Panel dan Gardu PLN Type 60 M2 (Atap Plat Beton)

PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR


LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.

I. PEKERJAAN TANAH
1 Galian tanah 21.84 M3 SNI-03.T.6.1 24,021.08 524,620.39
2 Urugan tanah 9.48 M3 SNI-03.T.6.9 11,514.97 109,161.89
3 Urugan pasir 6.34 M3 SNI-03-T.6.11b 168,664.57 1,069,333.37
4 Timbunan tanah yang didatangkan 52.43 M3 SNI-03-T.6.11a 81,801.07 4,288,830.10

II. PEKERJAAN PASANGAN & BETON


1 Pasangan batu 1 : 3 22.00 M3 SNI-03.G6.4m 709,236.84 15,603,210.48
2 Beton 1 : 2 : 3 29.33 M3 SNI-03.G6.5 624,450.11 18,315,121.73
3 Beton 1 : 3 : 5 (untuk lantai) 5.88 M3 SNI-03.G6.1 616,988.87 3,627,894.56
4 Pembesian 3,079.65 Kg SNI-03.I6.25 15,231.30 46,907,069.66
5 Bekisting untuk sloof 15.40 M2 SNI-03.F6.29 114,342.97 1,760,881.73
6 Bekisting untuk kolom 64.20 M2 SNI-03.F6.30 221,448.67 14,217,004.74
7 Bekisting untuk balok 26.30 M2 SNI-03.F6.31 228,022.07 5,996,980.47
8 Bekisting untuk atap 91.28 M2 SNI-03.F6.32 329,101.21 30,040,358.63

III. PEKERJAAN PASANGAN & PLESTERAN


1 Pasangan bata 1/2 batu 1 : 3 128.32 M2 SNI-03.G6.10bb 107,978.53 13,855,805.32
2 Plesteran 1 : 3 ; tebal 15 mm 256.64 M2 SNI-03.G6.3q 37,496.61 9,623,130.25
3 Pas. Keramik lantai 67.00 M2 SNI-03.G6.45 139,182.92 9,325,255.87

IV. PEKERJAAN KOZEN DAN PINTU


1 Pintu (besi plat) + engsel dan kunci 3.00 Unit Ditaksir 5,451,400.00 16,354,200.00
2 Kayu kozen 0.27 M3 SNI-03.F6.2 7,254,659.10 1,958,757.96
3 Jalusi 1.00 Ls Ditaksir 2,051,550.00 2,051,550.00
4 Fentilasi radiator Genset 2.00 Bh Ditaksir 1,940,000.00 3,880,000.00

V. PEKERJAAN INSTALASI LISTRIK


1 Titik api + instalasi 16.00 Titik Ditaksir 156,170.00 2,498,720.00
2 Lampu hemat energi 20 Watt 7.00 Bh Ditaksir 83,032.00 581,224.00
3 Stop Kontak 3.00 Bh Ditaksir 25,511.00 76,533.00
4 Saklar Tunggal 2.00 Bh Ditaksir 20,903.50 41,807.00
5 Saklar Ganda 1.00 Bh Ditaksir 31,040.00 31,040.00
6 Box Sakering 1.00 Unit Ditaksir 122,705.00 122,705.00

VI. PEKERJAAN PENGECATAN


1 Pengecatan dinding tembok dan atap 375.29 M2 SNI-03.K6.14 18,681.34 7,010,918.85
2 Pengecatan permukaan kayu/besi 43.81 M2 SNI-03.K6.9 30,226.90 1,324,240.38

JUMLAH 211,196,355.37
LAMPIRAN - 6 : Pembuatan Bangunan Laboratorium dan Chamical Dozing Type 36 M2

PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR


LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.

I. PEKERJAAN TANAH
1 Galian tanah 17.92 M3 SNI-03.T.6.1 24,021.08 430,457.75
2 Urugan tanah 6.93 M3 SNI-03.T.6.9 11,514.97 79,798.72
3 Urugan pasir 4.01 M3 SNI-03-T.6.11b 168,664.57 676,344.93
4 Timbunan tanah yang didatangkan 29.51 M3 SNI-03-T.6.11a 81,801.07 2,413,949.58

II. PEKERJAAN PASANGAN & BETON


1 Pasangan batu 1 : 3 17.00 M3 SNI-03.G6.4m 709,236.84 12,057,026.28
2 Beton 1 : 2 : 3 26.36 M3 SNI-03.G6.5 624,450.11 16,460,504.90
3 Beton tumbuk 1 : 3 : 5 3.55 M3 SNI-03.G6.1 616,988.87 2,190,310.49
4 Pembesian 2,899.60 Kg SNI-03.I6.25 15,231.30 44,164,674.29
5 Bekisting untuk sloof 11.90 M2 SNI-03.F6.29 114,342.97 1,360,681.34
6 Bekisting untuk kolom 42.80 M2 SNI-03.F6.30 221,448.67 9,478,003.16
7 Bekisting untuk dudukan tangki mixer 9.48 M2 SNI-03.F6.32 329,101.21 3,119,879.49
8 Bekisting untuk balok 21.84 M2 SNI-03.F6.31 228,022.07 4,980,002.03
9 Bekisting untuk atap 62.14 M2 SNI-03.F6.32 329,101.21 20,451,665.72
10 Bekisting untuk meja bersih 6.45 M2 SNI-03.F6.28 83,537.37 538,816.04
11 Bak stainlessteel + sistem perpipaan & accessories 1.00 Unit Ditaksir 970,000.00 970,000.00

III. PEKERJAAN PASANGAN & PLESTERAN


1 Pasangan bata 1/2 batu 1 : 3 95.06 M2 SNI-03.G6.10bb 107,978.53 10,264,439.32
2 Plesteran 1 : 3 ; tebal 15 mm 190.11 M2 SNI-03.G6.3q 37,496.61 7,128,480.72
3 Pas. Keramik 53.90 M2 SNI-03.G6.45 139,182.92 7,501,959.58
4 Meja bersih + Bak cuci stainles 620 cm x 80 cm 1.00 Unit Ditaksir 4,365,000.00 4,365,000.00

IV. PEKERJAAN KOZEN DAN PINTU


1 Kosen pintu dan jendela 0.50 M3 SNI-03.F6.2 7,254,659.10 3,627,329.55
2 Daun Pintu 3.00 Unit Ditaksir 645,050.00 1,935,150.00
3 Daun Jendela 5.00 Unit Ditaksir 344,350.00 1,721,750.00
4 Jalusi 1.00 Ls Ditaksir 2,037,000.00 2,037,000.00

V. PEKERJAAN PENGECATAN
1 Pengecatan dindin tembok dan atap 283.72 M2 SNI-03.K6.14 18,681.34 5,300,268.85
2 Pengecatan permukuaan kayu 36.24 M2 SNI-03.K6.9 30,226.90 1,095,422.77

VI. PEMASANGAN PINTU, JENDELA & ACCESORIES


1 Kunci dan engsel untuk pintu 3.00 Unit Ditaksir 339,500.00 1,018,500.00
2 Engsel dan pacok untuk jendela 5.00 Unit Ditaksir 97,000.00 485,000.00

VII. PEKERJAAN INSTALASI LISTRIK


1 Titik api + instalasi 16.00 Titik Ditaksir 156,170.00 2,498,720.00
2 Lampu hemat energi 20 Watt 7.00 Bh Ditaksir 83,032.00 581,224.00
3 Stop Kontak 3.00 Bh Ditaksir 25,511.00 76,533.00
4 Saklar Tunggal 1.00 Bh Ditaksir 20,903.50 20,903.50
5 Saklar Ganda 3.00 Bh Ditaksir 31,040.00 93,120.00
6 Box Sakering 1.00 Unit Ditaksir 122,705.00 122,705.00

JUMLAH 169,245,620.99
LAMPIRAN - 7 : Pembangunan Sludge Drying Bed (SDB)

PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR


LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.

I. PEKERJAAN TANAH
1 Galian Tanah 31.00 M3 SNI-03.T.6.1 24,021.08 744,653.48
2 Urugan Tanah Kembali 7.00 M3 SNI-03.T.6.9 11,514.97 80,604.77
3 Media Filter (SDB)
- Pasir dia. 0,5 - 1 mm 4.20 M3 SNI-03-T.6.11d 166,103.77 697,635.83
- Pasir & Gravel dia. 1 - 25 mm 5.00 M3 SNI-03-T.6.11c 180,304.57 901,522.85

II. PEKERJAAN BETON

1 Beton 1 : 1,5 : 2,5 12.00 M3 SNI-03.G6.9 833,902.21 10,006,826.52


2 Pembesian 1,260.00 Kg SNI-03.I6.25 15,231.30 19,191,436.61
3 Bekisting untuk lantai 4.48 M2 SNI-03.F6.28 83,537.37 374,247.42
4 Bekisting untuk dinding 69.52 M2 SNI-03.F6.33 238,770.45 16,599,321.48
5 Plesteran 1 : 2, tebal 15 mm 80.44 M2 SNI-03.G6.2q 40,113.57 3,226,735.89
6 Plat Strep 1.00 Ls Ditaksir 291,000.00 291,000.00

III. PENGADAAN DAN PEMASANGAN PIPA & ACC.

PIPA POROS
1 Pipa PVC dia. 150 mm RRJ, S-12,5 24.00 M' Ditaksir 183,330.00 4,399,920.00
2 Pipa Inlet Gip dia 150 mm 12.00 M' Ditaksir 620,024.00 7,440,288.00
3 Tee All Socket PVC dia. 150 x 150 mm 1.00 Bh Ditaksir 1,280,400.00 1,280,400.00
4 Gate Valve CI dia. 150 mm 1.00 Bh Ditaksir 3,937,424.00 3,937,424.00
5 Bend All Socket dia. 150 mm x 90⁰ 2.00 Bh Ditaksir 1,001,040.00 2,002,080.00
6 Bend Gip dia. 150 mm x 90⁰ 2.00 Bh Ditaksir 419,040.00 838,080.00
7 Loose Flange dia. 150 mm 4.00 Bh Ditaksir 383,926.00 1,535,704.00
8 Blind Flange dia. 150 mm 1.00 Bh Ditaksir 519,764.80 519,764.80
9 Pipa Penguras PVC dia. 150 mm 24.00 M' Ditaksir 183,330.00 4,399,920.00
10 Pemasangan Pipa dan Accessories 1.00 Ls Ditaksir 4,850,000.00 4,850,000.00

JUMLAH 83,317,565.65
Lampiran - 9 : Pondasi tangki BBM

PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR


LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.

I. PEKERJAAN TANAH
1 Galian tanah 3.00 M3 SNI-03.T.6.1 24,021.08 72,063.24

II. PEKERJAAN PASANGAN & BETON


1 Urugan pasir 1.00 M3 SNI-03.T.6.9 168,664.57 168,664.57
2 Lantai kerja 1 : 3 : 5 0.44 M3 SNI-03.G6.1 616,988.87 271,475.10
3 Beton 1 : 2 : 3 untuk pondasi & dudukan tangki 2.61 M3 SNI-03.G6.5 624,450.11 1,629,814.79
4 Pembesian 274.05 Kg SNI-03.I6.25 15,231.30 4,174,137.46
5 Bekisting 6.09 M2 SNI-03.F6.28 167,074.74 1,017,485.17
6 Plesteran 1 : 2 ; tebal 15 mm 16.84 M2 SNI-03.G6.2q 40,113.57 675,512.59

III. PEKERJAAN LAIN-LAIN


1 Angkur Bolt M.20 x 150 mm 6.00 Bh Ditaksir 20,000.00 120,000.00
2 Pengadaan/Pemas.Tangga + Plat bordes 1.00 Bh Ditaksir 5,000,000.00 5,000,000.00

JUMLAH 13,129,152.92
LAMPIRAN - 8 : Pembuatan Saluran Induk

PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR


LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.

1 Galian tanah 60.00 M3 SNI-03.T.6.1 24,021.08 1,441,264.80


2 Urugan tanah kembali 12.00 M3 SNI-03.T.6.9 11,514.97 138,179.60
3 Urugan pasir 3.00 M3 SNI-03-T.6.11b 168,664.57 505,993.71
4 Pas. Batu gunung/kali 1:3 39.00 M3 SNI-03.G6.4m 709,236.84 27,660,236.76
5 Beton cor 1:2:3, untuk lantai 6.00 M3 SNI-03.G6.5 624,450.11 3,746,700.66
6 Plesteran 1 :3 190.00 M2 SNI-03.G6.3q 37,496.61 7,124,356.09

JUMLAH 40,616,731.62
LAMPIRAN - 9 : Pembuatan Pagar Keliling Lokasi IPA Termasuk Pintu

PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR


LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.

1 Galian tanah 110.74 M3 SNI-03.T.6.1 24,021.08 2,660,094.40


2 Urugan kembali 39.55 SNI-03.T.6.9 11,514.97 455,416.94
3 Urugan pasir 7.91 M3 SNI-03-T.6.11b 168,664.57 1,334,136.75
4 Pasangan batu gunung 1 : 3 63.28 M3 SNI-03.G6.4m 709,236.84 44,880,507.24
5 Beton cor 1 : 2 : 3 20.16 M3 SNI-03.G6.5 624,450.11 12,588,914.22
6 Pembesian 2,116.80 Kg SNI-03.I6.25 15,231.30 32,241,613.51
7 Bekisting untuk sloof 90.10 M2 SNI-03.F6.29 114,342.97 10,302,301.55
8 Bekisting untuk kolom 126.72 M2 SNI-03.F6.30 221,448.67 28,061,975.72
9 Bekisting untuk balok 54.58 M2 SNI-03.F6.31 228,022.07 12,445,444.64
10 Pasangan bata 1 : 3 280.46 M2 SNI-03.G6.10bb 107,978.53 30,283,659.30
11 Plesteran 1 : 3, t = 15 mm 707.32 M2 SNI-03.G6.4q 37,496.61 26,522,102.89
12 Pengecatan tembok 707.32 M2 SNI-03.K6.14 18,681.34 13,213,683.07
13 Pagar BRC 240 x 120 cm 37.00 Kp Ditaksir 426,218.00 15,770,066.00
14 2.00 Unit Ditaksir 7,857,000.00 15,714,000.00
Pengadaan/pemasangan pintu gerbang+slot+ engsel+kunci

JUMLAH 246,473,916.22

85.00 439,400.00
170.00 8,100,000.00

PAGAR BETON TAMBAHAN

1 Galian tanah 40.67 M3 SNI-03.T.6.1 24,021.08 976,937.32


2 Urugan kembali 13.56 M3 SNI-03.T.6.9 11,514.97 156,104.57
3 Urugan pasir 2.91 M3 SNI-03-T.6.11b 168,664.57 489,970.58
4 Pasangan batu gunung 1 : 3 24.28 M3 SNI-03.G6.4m 709,236.84 17,218,497.38
5 Beton cor 1 : 2 : 3 11.06 M3 SNI-03.G6.5 624,450.11 6,903,295.97
6 Pembesian 1,160.78 Kg SNI-03.I6.25 15,231.30 17,680,110.98
7 Bekisting untuk sloof 33.20 M2 SNI-03.F6.29 114,342.97 3,796,186.59
8 Bekisting untuk kolom 94.50 M2 SNI-03.F6.30 221,448.67 20,926,899.50
9 Bekisting untuk balok 33.20 M2 SNI-03.F6.31 228,022.07 7,570,332.76
10 Pasangan bata 1 : 3 157.29 M2 SNI-03.G6.10bb 107,978.53 16,983,943.42
11 Plesteran 1 : 3, t = 15 mm 451.75 M2 SNI-03.G6.4q 37,496.61 16,939,094.02
12 Pengecatan tembok 451.75 M2 SNI-03.K6.14 18,681.34 8,439,293.85
13 Pagar Kawat duri 75.00 kg Ditaksir 9,603.00 720,225.00
14 Besi siku 11.82 kg Ditaksir 16,975.00 200,613.64
15 Pengelasanan 44.00 ttk Ditaksir 46,700.00 2,054,800.00
16 Pemasangan kawat duri 1.00 Ls Ditaksir 800,000.00 800,000.00

JUMLAH 121,856,305.57
LAMPIRAN - 11 : Pengadaan dan Pemasangan Pompa Distribusi Centrifugal Kap. 10 L/Dt, Lengkap dengan Lemari Panel,
Kabel, Pipa dan Accessories
PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR
LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
PENGADAAN/PEMASANGAN POMPA, PIPA DAN
ACCESSORIES
1 Pompa Distribusi Centrifugal Kap. 10 l/dt, H - 60 M', 2950 Rpm, 2.00 Unit Ditaksir 82,176,000.00 164,352,000.00
(Mekanikal Seal) dan Lemari Panel untuk 2 Motor Lengkap
dengan Kabel (Rak Kabel, Kabel Tray dan Lain-lain)

2 HISAP
- Gate Valve CI dia. 150 mm 2.00 Bh Ditaksir 4,059,200.00 8,118,400.00
- Reducer All Flange Gip dia. 150 x 75 mm 2.00 Bh Ditaksir 1,108,996.25 2,217,992.50
- Bend All Flange Gip dia. 150 mm x 90⁰ 2.00 Bh Ditaksir 1,276,880.00 2,553,760.00
- Foot Klep dia. 150 mm 2.00 Bh Ditaksir 1,891,600.00 3,783,200.00
- Pipa Gip dia. 150 mm 12.00 M' Ditaksir 639,200.00 7,670,400.00
- Loss Flange dia. 150 mm 4.00 Bh Ditaksir 395,800.00 1,583,200.00

3 OUT
- Manometer skala 10 dia. 100 mm 1.00 Unit Ditaksir 310,000.00 310,000.00
- Tee Y Gip dia. 200 x 200 mm 2.00 Bh Ditaksir 1,164,360.00 2,328,720.00
- Gate Valve CI dia. 200 mm 2.00 Bh Ditaksir - -
- Chack Valve dia. 200 mm 2.00 Bh Ditaksir 10,372,050.00 20,744,100.00
- Flexible Joint dia. 200 mm 2.00 Bh Ditaksir 3,919,410.00 7,838,820.00
- Reducer All Flange Gip dia. 200 mm x 75 mm 2.00 Bh Ditaksir 1,202,061.25 2,404,122.50
- Blind Flange dia. 200 mm 1.00 Bh Ditaksir - -
- Pipa Gip dia. 200 mm 12.00 M' Ditaksir - -
- Loss Flange dia. 200 mm 4.00 Bh Ditaksir - -

4 Pabrikasi/pemasangan Pompa, Lemari Panel, Kabel, Pipa dan 2.00 Unit Ditaksir 10,000,000.00 20,000,000.00
Accessories lengkap dgn baut paking dll.

Jumlah 243,904,715.00
Pembuatan Bangunan Genset, Ruang Pompa, Ruang Panel dan Gardu PLN Type 60 M2 (Atap Plat Beton)

PEK. TANAH DAN PONDASI


Galian tanah bangunan 0.7 0.7 44 21.56 M3
Galian tanah selasar 0.7 0.7 14 6.86 M3
Jumlah 28.42 M3
Urugan tanah pd pondasi 11.455 M3
Urugan tanah dibawah lantai 16.965 M3

Urugan pasir dibawah pondasi 0.7 0.05 58 2.03 M3


Urugan pasir dibawah lantai 0.7 12 6 50.4
Jumlah 52.43 M3

Pasangan batu gunung/kali 1 : 3 0.45 0.65 58 16.965 M3

BETON 1:2:3 UTK SLOF, KOLOM & RING BALK


Sloof 0.15 0.2 58 1.74 M3
Kolom 0.15 0.15 3.2 12 0.864 M3
Ring Balk 0.18 0.2 58.4 2.1024 M3

ATAP DEK
BETON 1:2:3 Luas/pjg Tebal
Atap dak 14.4 0.12 7.4 12.7872 M3
Listplank 0.5 0.08 58.4 2.336 M3
M3
15.1232 M3

BETON TUMBUK 1:3:5


Untuk lantai 12 6 0.7 50.40 M3

Luas
BEKISTING
Lantai atap dek 14.4 7.4 106.56 M2
Listplank 0.58 58.4 33.872 M2
Slof 0.5 58 29 M2
Kolom 0.6 38.4 23.04 M2
192.472 M2

KOSEN
Lubang angin 3 lobang 7.2 2 14.4 0.0072 0.10368 m3
Lubang angin 2 lobang 5 7 35 0.0072 0.252 m3
0.35568 m3

JALUSI
Lubang angin 3 lobang 4.25 2 3 25.5 m'
Lubang angin 2 lobang 4.25 7 2 59.5 m'
85 m'
Jumlah 21.25 Lbr

PAS. KERAMIK
Lantai dalam 12 5 60 M2
Luar 12 1 12 M2
Jumlah psg keramik 72.00 M2

PAS. BATA
Dinding 44 3.2 140.8 M2

Potong
Pintu 3.36 3 10.08 M2
Lubang angin 3 lobang 1.3 2 2.6 M2
Lubang angin 2 lobang 0.85 7 5.95 M2
18.63 M2
Jumlah pasg dinding bata 122.17 M2

PLESTERAN
Dinding 44 3.2 140.8 M2
Jumlah plesteran bersih 244.34 M2

PENGECATAN
Permukaan dinding Tembok 244.34 M2
Permukaan atap dak sblh bawah 14.4 7.4 106.56 M2
Listplank 0.58 58.4 33.872 M2
Jumlah 384.772 M2

Permukaan kayu/besi
Lubang angin 3 lobang 1.728 2 3.456
Lubang angin 2 lobang 0.7872 7 5.5104
Jalusi besi 45
Pintu besi 3.36 3 10.08
64.0464
ANALISA HARGA SATUAN PEKERJAAN

HARGA JUMLAH
KODE ANALISA URAIAN SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

I. PEKERJAAN TANAH

SNI-03.T.6.1 1 M3 Galian tanah biasa sedalam 1 meter M3


- Pekerja galian tanah OH 0.4000 52,477.00 20,990.80
- Mandor OH 0.0400 75,757.00 3,030.28
Jumlah 24,021.08

SNI-03.T.6.2 1 M3 Galian tanah biasa sedalam 2 meter M3


- Pekerja galian tanah OH 0.5260 52,477.00 27,602.90
- Mandor OH 0.0520 75,757.00 3,939.36
Jumlah 31,542.27

SNI-006-2007.6.6 1 M3 Galian tanah lumpur M3


- Pekerja galian tanah OH 1.2000 52,477.00 62,972.40
- Mandor OH 0.0450 75,757.00 3,409.07
Jumlah 66,381.47

SNI-03.T.6.4 1 M3 Galian tanah keras sedalam 1 meter M3


- Pekerja galian tanah OH 0.6250 52,477.00 32,798.13
- Mandor OH 0.0620 75,757.00 4,696.93
Jumlah 37,495.06

SNI-03.T.6.9 1 M3 Urugan kembali M3


- Pekerja OH 0.1920 52,477.00 10,075.58
- Mandor OH 0.0190 75,757.00 1,439.38
Jumlah 11,514.97

SNI-03.T.6.10 1 M3 Pemadatan tanah M3


- Pekerja OH 0.5000 52,477.00 26,238.50
- Mandor OH 0.0500 75,757.00 3,787.85
Jumlah 30,026.35

SNI-03-T.6.11a 1 M3 Tanah timbun yang didatangkan


- Mandor OH 0.0100 75,757.00 757.57
- Pekerja OH 0.3000 52,477.00 15,743.10
- Tanah timbun M3 1.2000 54,417.00 65,300.40
Jumlah 81,801.07

SNI-03-T.6.11b 1 M3 Urugan Pasir


- Mandor OH 0.0100 75,757.00 757.57
- Pekerja OH 0.3000 56,454.00 16,936.20
- Pasir urug M3 1.2000 125,809.00 150,970.80
Jumlah 168,664.57

SNI-03-T.6.11c 1 M3 Urugan Kerikil


- Mandor OH 0.0100 75,757.00 757.57
- Pekerja OH 0.3000 56,454.00 16,936.20
- Kerikil M3 1.2000 135,509.00 162,610.80
Jumlah 180,304.57

SNI-03-T.6.11d 1 M3 Urugan Pasir Pasang


- Mandor OH 0.0100 75,757.00 757.57
- Pekerja OH 0.3000 56,454.00 16,936.20
- Pasir Pasang M3 1.2000 123,675.00 148,410.00
Jumlah 166,103.77

II. PEKERJAAN PENGELASAN

Gg.3 Pekerjaan 1 M' pengelasan Pipa M'


- Kawat las Kg 2.3000 48,500.00 111,550.00
- Tukang OH 0.5000 83,323.00 41,661.50
- Kepala tukang OH 0.0210 100,104.00 2,102.18
- Sewa mesin las HK 0.2000 145,500.00 29,100.00
- Solar Liter 0.7500 8,536.00 6,402.00
Jumlah 190,815.68

ANALISA HARGA SATUAN PEKERJAAN 24/38


HARGA JUMLAH
KODE ANALISA URAIAN SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

Gg.4 Pekerjaan 1 M' Pengelasan Pipa HDPE


- Solar Liter 2.5000 8,536.00 21,340.00
- Minyak Pelumas Liter 0.2500 24,250.00 6,062.50
- Operator OH 0.9000 97,000.00 87,300.00
- Mekanik OH 0.4000 97,000.00 38,800.00
- Sewa mesin Penyambung HDPE Hari 0.4500 203,700.00 91,665.00
Jumlah 245,167.50
III. PEMASANGAN PIPA
A. PIPA PVC

SNI-03.PVC.2 Memasang 1 M' pipa PVC dia. 50 mm M'


- Pekerja OH 0.0540 56,454.00 3,048.52
- Tukang OH 0.0900 83,323.00 7,499.07
- Kepala tukang OH 0.0090 100,104.00 900.94
- Mandor OH 0.0027 75,757.00 204.54
- Air Bersih Untuk Tes aliran pipa M3 0.0020 29,100.00 57.11
Jumlah 11,710.17

SNI-03.PVC.3 Memasang 1 M' pipa PVC dia. 75 mm M'


- Pekerja OH 0.0810 56,454.00 4,572.77
- Tukang OH 0.1350 83,323.00 11,248.61
- Kepala tukang OH 0.0135 100,104.00 1,351.40
- Mandor OH 0.0041 75,757.00 310.60
- Air Bersih Untuk Tes aliran pipa M3 0.0044 29,100.00 128.49
Jumlah 17,611.88

SNI-03.PVC.3A Memasang 1 M' pipa PVC dia. 100 mm M'


- Pekerja OH 0.0810 56,454.00 4,572.77
- Tukang OH 0.1350 83,323.00 11,248.61
- Kepala tukang OH 0.0135 100,104.00 1,351.40
- Mandor OH 0.0041 75,757.00 310.60
- Air Bersih Untuk Tes aliran pipa M3 0.0079 29,100.00 228.44
Jumlah 17,711.82

SNI-03.PVC.4 Memasang 1 M' pipa PVC dia. 150 mm M'


- Pekerja OH 0.0972 56,454.00 5,487.33
- Tukang OH 0.1620 83,323.00 13,498.33
- Kepala tukang OH 0.0162 100,104.00 1,621.68
- Mandor OH 0.0049 75,757.00 372.72
- Air Bersih Untuk Tes aliran pipa M3 0.0177 29,100.00 513.98
Jumlah 21,494.04

SNI-03.PVC.5 Memasang 1 M' pipa PVC dia. 200 mm M'


- Pekerja OH 0.1166 56,454.00 6,584.79
- Tukang OH 0.1944 83,323.00 16,197.99
- Kepala tukang OH 0.0194 100,104.00 1,946.02
- Mandor OH 0.0059 75,757.00 447.27
- Air Bersih Untuk Tes aliran pipa M3 0.0314 29,100.00 913.74
Jumlah 26,089.82
SNI-03.PVC.6 Memasang 1 M' pipa PVC dia. 250 mm M'
- Pekerja OH 0.1341 56,454.00 7,572.51
- Tukang OH 0.2236 83,323.00 18,627.69
- Kepala tukang OH 0.0224 100,104.00 2,237.93
- Mandor OH 0.0068 75,757.00 514.36
- Air Bersih Untuk Tes aliran pipa M3 0.0491 29,100.00 1,427.72
Jumlah 30,380.21

SNI-03.PVC.7 Memasang 1 M' pipa PVC dia. 300 mm M'


- Pekerja OH 0.1543 56,454.00 8,708.39
- Tukang OH 0.2571 83,323.00 21,421.84
- Kepala tukang OH 0.0257 100,104.00 2,573.61
- Mandor OH 0.0078 75,757.00 591.51
- Air Bersih Untuk Tes aliran pipa M3 0.0707 29,100.00 2,055.92
Jumlah 35,351.28

SNI-03.PVC.8 Memasang 1 M' pipa PVC dia. 350 mm M'


- Pekerja OH 0.1774 56,454.00 10,014.65
- Tukang OH 0.2957 83,323.00 24,635.12
- Kepala tukang OH 0.0296 100,104.00 2,959.66
- Mandor OH 0.0090 75,757.00 680.24
- Air Bersih Untuk Tes aliran pipa M3 0.0962 29,100.00 2,798.33
Jumlah 41,087.99

ANALISA HARGA SATUAN PEKERJAAN 25/38


HARGA JUMLAH
KODE ANALISA URAIAN SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

SNI-03.PVC.9 Memasang 1 M' pipa PVC dia. 400 mm M'


- Pekerja OH 0.2040 56,454.00 11,516.85
- Tukang OH 0.3400 83,323.00 28,330.39
- Kepala tukang OH 0.0340 100,104.00 3,403.60
- Mandor OH 0.0103 75,757.00 782.28
- Air Bersih Untuk Tes aliran pipa M3 0.1256 29,100.00 3,654.96
Jumlah 47,688.08

PIPA GSP/STEEL

SNI-03.GSP.2 Memasang 1 M' pipa GSP/Steel dia. 50 mm


- Pengelasan keliling M' 0.0523 190,815.68 9,986.02
- Pekerja OH 0.0675 56,454.00 3,810.65
- Tukang OH 0.1125 83,323.00 9,373.84
- Kepala tukang OH 0.0113 100,104.00 1,126.17
- Mandor OH 0.0338 75,757.00 2,556.80
- Air Bersih Untuk Tes aliran pipa M3 0.0020 29,100.00 57.11
Jumlah 26,910.58

SNI-03.GSP.3 Memasang 1 M' pipa GSP/Steel dia. 75 mm


- Pengelasan keliling M' 0.0785 190,815.68 14,979.03
- Pekerja OH 0.1380 56,454.00 7,790.65
- Tukang OH 0.1800 83,323.00 14,998.14
- Kepala tukang OH 0.0180 100,104.00 1,801.87
- Mandor OH 0.0054 75,757.00 409.09
- Air Bersih Untuk Tes aliran pipa M3 0.0044 29,100.00 128.49
Jumlah 40,107.28

SNI-03.GSP.4 Memasang 1 M' pipa GSP/Steel dia. 100 mm


- Pengelasan keliling M' 0.1047 190,815.68 19,972.04
- Pekerja OH 0.1350 56,454.00 7,621.29
- Tukang OH 0.2250 83,323.00 18,747.68
- Kepala tukang OH 0.0225 100,104.00 2,252.34
- Mandor OH 0.0068 75,757.00 515.15
- Air Bersih Untuk Tes aliran pipa M3 0.0079 29,100.00 228.44
Jumlah 49,336.93
,
SNI-03.GSP.5 Memasang 1 M' pipa GSP/Steel dia. 150 mm
- Pengelasan keliling M' 0.1570 190,815.68 29,958.06
- Pekerja OH 0.1688 56,454.00 9,526.61
- Tukang OH 0.2813 83,323.00 23,434.59
- Kepala tukang OH 0.0281 100,104.00 2,815.43
- Mandor OH 0.0085 75,757.00 643.93
- Air Bersih Untuk Tes aliran pipa M3 0.0177 29,100.00 513.98
Jumlah 66,892.61

SNI-03.GSP.6 Memasang 1 M' pipa GSP/Steel dia. 200 mm


- Pengelasan keliling M' 0.2093 190,815.68 39,944.08
- Pekerja OH 0.2109 56,454.00 11,908.27
- Tukang OH 0.3516 83,323.00 29,293.24
- Kepala tukang OH 0.0352 100,104.00 3,519.28
- Mandor OH 0.0106 75,757.00 804.92
- Air Bersih Untuk Tes aliran pipa M3 0.0314 29,100.00 913.74
Jumlah 86,383.53

SNI-03.GSP.7 Memasang 1 M' pipa GSP/Steel dia. 250 mm


- Pengelasan keliling M' 0.2617 190,815.68 49,930.10
- Pekerja OH 0.2531 56,454.00 14,289.92
- Tukang OH 0.4219 83,323.00 35,151.89
- Kepala tukang OH 0.0422 100,104.00 4,223.14
- Mandor OH 0.0128 75,757.00 965.90
- Air Bersih Untuk Tes aliran pipa M3 0.0491 29,100.00 1,427.72
Jumlah 105,988.67

SNI-03.GSP.8 Memasang 1 M' pipa GSP/Steel dia. 300 mm


- Pengelasan keliling M' 0.3140 190,815.68 59,916.12
- Pekerja OH 0.2911 56,454.00 16,433.41
- Kepala tukang OH 0.4852 83,323.00 40,424.67
- Tukang OH 0.0485 100,104.00 4,856.61
- Mandor OH 0.0147 75,757.00 1,110.79
- Air Bersih Untuk Tes aliran pipa M3 0.0707 29,100.00 2,055.92
Jumlah 124,797.52

ANALISA HARGA SATUAN PEKERJAAN 26/38


HARGA JUMLAH
KODE ANALISA URAIAN SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

SNI-03.GSP.9 Memasang 1 M' pipa GSP/Steel dia. 350 mm


- Pengelasan keliling M' 0.3663 190,815.68 69,902.15
- Pekerja OH 0.3348 56,454.00 18,898.42
- Tukang OH 0.5579 83,323.00 46,488.38
- Kepala tukang OH 0.0558 100,104.00 5,585.10
- Mandor OH 0.0169 75,757.00 1,277.41
- Air Bersih Untuk Tes aliran pipa M3 0.0962 29,100.00 2,798.33
Jumlah 144,949.77

SNI-03.GSP.10 Memasang 1 M' pipa GSP/Steel dia. 400 mm


- Pengelasan keliling M' 0.4187 190,815.68 79,888.17
- Pekerja OH 0.3682 56,454.00 20,788.26
- Tukang OH 0.6137 83,323.00 51,137.21
- Kepala tukang OH 0.0614 100,104.00 6,143.61
- Mandor OH 0.0185 75,757.00 1,405.15
- Air Bersih Untuk Tes aliran pipa M3 0.1256 29,100.00 3,654.96
Jumlah 163,017.35

V. PEKERJAAN BETON

SNI-03.G6.1 1 M3 Membuat beton tumbuk 1Pc : 3Ps : 5Kr


- Semen PC Zak 5.4500 56,163.00 306,088.35
- Pasir beton M3 0.5200 135,509.00 70,464.68
- Kerikil/Koral Beton M3 0.8700 135,509.00 117,892.83
- Pekerja OH 1.6500 56,454.00 93,149.10
- Tukang OH 0.2500 83,323.00 20,830.75
- Kepala tukang OH 0.0250 100,104.00 2,502.60
- Mandor OH 0.0800 75,757.00 6,060.56
Jumlah 616,988.87

SNI-03.G6.5 1 M3 Membuat beton bertulang 1Pc : 2Ps : 3Kr


- Semen PC Zak 5.8000 56,163.00 325,745.40
- Pasir beton M3 0.5200 135,509.00 70,464.68
- Kerikil/Koral Beton M3 0.7800 135,509.00 105,697.02
- Pekerja OH 1.6500 56,454.00 93,149.10
- Tukang OH 0.2500 83,323.00 20,830.75
- Kepala tukang OH 0.0250 100,104.00 2,502.60
- Mandor OH 0.0800 75,757.00 6,060.56
Jumlah 624,450.11

SNI-03.G6.9 1 M3 Membuat beton bertulang 1Pc : 1,5Ps : 2,5Kr


- Semen PC Zak 9.6500 56,163.00 541,972.95
- Pasir beton M3 0.4700 135,509.00 63,689.23
- Kerikil/Koral Beton M3 0.7800 135,509.00 105,697.02
- Pekerja OH 1.6500 56,454.00 93,149.10
- Tukang OH 0.2500 83,323.00 20,830.75
- Kepala tukang OH 0.0250 100,104.00 2,502.60
- Mandor OH 0.0800 75,757.00 6,060.56
Jumlah 833,902.21

PEKERJAAN PEMBESIAN
SNI-03.I6.25 1 Kg Pembesian dengan besi polos
- Besi Beton Polos Kg 1.0500 13,192.00 13,851.60
- Kawat Beton Kg 0.0150 20,564.00 308.46
- Pekerja OH 0.0070 56,454.00 395.18
- Tukang Besi OH 0.0070 83,323.00 583.26
- Kepala Tukang OH 0.0007 100,104.00 70.07
- Mandor OH 0.0003 75,757.00 22.73
Jumlah 15,231.30

SNI-03.F6.28 1 M2 Pasang Bekisting untuk Pondasi


- Kayu terentang Klas III M3 0.0400 4,005,906.00 160,236.24
- Paku biasa Kg 0.3000 17,945.00 5,383.50
- Minyak bekisting Liter 0.1000 14,550.00 1,455.00
- Mandor OH 0.0050 75,757.00 378.79
- Pekerja OH 0.3000 56,454.00 16,936.20
- Tukang OH 0.2600 83,323.00 21,663.98
- Kepala tukang OH 0.0260 100,104.00 2,602.70
Jumlah 167,074.74
Untuk 1 M2 Bekisting dipakai 2 x x 0.5000 167,074.74 83,537.37

ANALISA HARGA SATUAN PEKERJAAN 27/38


HARGA JUMLAH
KODE ANALISA URAIAN SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

SNI-03.F6.29 1 M2 Pasang Bekisting untuk sloof


- Kayu terentang Klas III M3 0.0450 4,005,906.00 180,265.77
- Paku biasa Kg 0.3000 17,945.00 5,383.50
- Minyak bekisting Liter 0.1000 14,550.00 1,455.00
- Mandor OH 0.0050 75,757.00 378.79
- Pekerja OH 0.3000 56,454.00 16,936.20
- Tukang OH 0.2600 83,323.00 21,663.98
- Kepala tukang OH 0.0260 100,104.00 2,602.70
Jumlah 228,685.94
- Untuk 1 M2 Bekisting dipakai 2 x x 0.5000 228,685.94 114,342.97

SNI-03.F6.30 1 M2 Pasang Bekisting untuk kolom


- Kayu terentang Klas III M3 0.0400 4,005,906.00 160,236.24
- Paku biasa Kg 0.4000 17,945.00 7,178.00
- Minyak bekisting Liter 0.2000 14,550.00 2,910.00
- Balok kayu borneo Klas III M3 0.0150 4,005,906.00 60,088.59
- Plywood tebal 9 mm Lbr 0.3500 163,445.00 57,205.75
- Dolken kayu dia. 8-10/4 m Btg 2.0000 53,544.00 107,088.00
- Mandor OH 0.0060 75,757.00 454.54
- Pekerja OH 0.3000 56,454.00 16,936.20
- Tukang OH 0.3300 83,323.00 27,496.59
- Kepala tukang OH 0.0330 100,104.00 3,303.43
Jumlah 442,897.34
- Untuk 1 M2 Bekisting dipakai 2 x x 0.5000 442,897.34 221,448.67

SNI-03.F6.31 1 M2 Pasang Bekisting untuk Balok


- Kayu terentang Klas III M3 0.0400 4,005,906.00 160,236.24
- Paku biasa Kg 0.4000 17,945.00 7,178.00
- Minyak bekisting Liter 0.2000 14,550.00 2,910.00
- Balok kayu Klas III M3 0.0180 4,005,906.00 72,106.31
- Multiplek 9 mm Lbr 0.3500 163,445.00 57,205.75
- Dolken dia. 8-10cm/4 m Btg 2.0000 53,544.00 107,088.00
- Mandor OH 0.0060 75,757.00 454.54
- Pekerja OH 0.3200 56,454.00 18,065.28
- Tukang OH 0.3300 83,323.00 27,496.59
- Kepala tukang OH 0.0330 100,104.00 3,303.43
Jumlah 456,044.14
Untuk 1 M2 Bekisting dipakai 2 x x 0.5000 456,044.14 228,022.07

SNI-03.F6.32 1 M2 Pasang Bekisting untuk Lantai Atas


- Kayu terentang Klas III M3 0.0400 4,005,906.00 160,236.24
- Paku biasa Kg 0.4000 17,945.00 7,178.00
- Minyak bekisting Liter 0.2000 14,550.00 2,910.00
- Balok kayu Klas III M3 0.0150 4,005,906.00 60,088.59
- Plywood 9 mm Lbr 0.3500 163,445.00 57,205.75
- Dolken dia. 8 cm/4 m Btg 6.0000 53,544.00 321,264.00
- Mandor OH 0.0060 75,757.00 454.54
- Pekerja OH 0.3200 56,454.00 18,065.28
- Tukang OH 0.3300 83,323.00 27,496.59
- Kepala tukang OH 0.0330 100,104.00 3,303.43
Jumlah 658,202.42
Untuk 1 M2 Bekisting dipakai 2 x x 0.5000 658,202.42 329,101.21

SNI-03.F6.33 1 M2 Pasang Bekisting untuk Dinding


- Kayu terentang Klas III M3 0.0300 4,005,906.00 120,177.18
- Paku biasa Kg 0.4000 17,945.00 7,178.00
- Minyak bekisting Liter 0.2000 14,550.00 2,910.00
- Balok kayu Klas III M3 0.0200 4,005,906.00 80,118.12
- Plywood 9 mm Lbr 0.3500 163,445.00 57,205.75
- Dolken dia. 8 cm/4 m Btg 3.0000 53,544.00 160,632.00
- Mandor OH 0.0060 75,757.00 454.54
- Pekerja OH 0.3200 56,454.00 18,065.28
- Tukang OH 0.3300 83,323.00 27,496.59
- Kepala tukang OH 0.0330 100,104.00 3,303.43
Jumlah 477,540.89
Untuk 1 M2 Bekisting dipakai 2 x x 0.5000 477,540.89 238,770.45

ANALISA HARGA SATUAN PEKERJAAN 28/38


HARGA JUMLAH
KODE ANALISA URAIAN SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

SNI-03.G6.45 1 M2 Pasang Lantai Keramik


- Keramik Uk. 40x40 M2 1.0000 44,426.00 44,426.00
- Semen Zak 0.2845 56,163.00 15,978.37
- Pasir Pasang M3 0.0420 123,675.00 5,194.35
- Semen warna Kg 1.5000 2,428.88 3,643.32
- Pekerja OH 0.6200 56,454.00 35,001.48
- Tukang OH 0.3500 83,323.00 29,163.05
- Kepala tukang OH 0.0350 100,104.00 3,503.64
- Mandor OH 0.0300 75,757.00 2,272.71
Jumlah 139,182.92

Anl. G 5a 1 M3 Memasang Bronjong Kawat Pabrikasi


Pekerja OH 1.5000 56,454.00 84,681.00
Mandor OH 0.0250 75,757.00 1,893.93
Kawat Bronjong Pabrikan Uk. (2 x 1 x 0,5) dia. 3 mm Unit 1.0000 449,110.00 449,110.00
Batu Kali M3 1.0000 199,335.00 199,335.00
Jumlah 735,019.93

SNI-03.G6.4m 1 M3 Pasang Pondasi Batu Kali/Gunung 1Pc : 3 Ps


- Batu Kali/Gunung M3 1.1000 199,335.00 219,268.50
- Semen PC Zak 5.0500 56,163.00 283,623.15
- Pasir Pasang M3 0.4850 123,675.00 59,982.38
- Pekerja OH 1.5000 56,454.00 84,681.00
- Tukang OH 0.6000 83,323.00 49,993.80
- Kepala tukang OH 0.0600 100,104.00 6,006.24
- Mandor OH 0.0750 75,757.00 5,681.78
Jumlah 709,236.84

SNI-03.G6.5m 1 M3 Pasang Pondasi Batu Kali/Gunung 1Pc : 4 Ps


- Batu Kali/Gunung M3 1.1000 199,335.00 219,268.50
- Semen PC Zak 4.0750 56,163.00 228,864.23
- Pasir Pasang M3 0.5200 123,675.00 64,311.00
- Pekerja OH 1.5000 56,454.00 84,681.00
- Tukang OH 0.6000 83,323.00 49,993.80
- Kepala tukang OH 0.0600 100,104.00 6,006.24
- Mandor OH 0.0750 75,757.00 5,681.78
Jumlah 658,806.54

SNI-03.G6.14m 1 M3 Pasang Pondasi Batu Kosong


- Batu Kali/Gunung M3 1.2000 199,335.00 239,202.00
- Pasir Urug M3 0.3000 125,809.00 37,742.70
- Pekerja OH 0.7800 56,454.00 44,034.12
- Tukang OH 0.3900 83,323.00 32,495.97
- Kepala tukang OH 0.0390 100,104.00 3,904.06
- Mandor OH 0.0390 75,757.00 2,954.52
Jumlah 360,333.37

SNI-03.G6.10bb 1 M2 Pasangan batu bata 1/2 bata, 1 Pc : 3 Ps


- Batu bata Bh 80.0000 679.00 54,320.00
- Semen PC Zak 0.3593 56,163.00 20,176.56
- Pasir Pasang M3 0.0400 123,675.00 4,947.00
- Pekerja OH 0.3200 56,454.00 18,065.28
- Tukang OH 0.1000 83,323.00 8,332.30
- Kepala tukang OH 0.0100 100,104.00 1,001.04
- Mandor OH 0.0150 75,757.00 1,136.36
Jumlah 107,978.53

SNI-03-G6.3bb 1 M2 Pasangan batu bata, 1 Pc : 2 Ps


- Batu bata Bh 140.0000 679.00 95,060.00
- Semen Zak 1.0875 56,163.00 61,077.26
- Pasir Pasang M3 0.0800 123,675.00 9,894.00
- Pekerja OH 0.6500 56,454.00 36,695.10
- Tukang OH 0.2000 83,323.00 16,664.60
- kepala tukang OH 0.0200 100,104.00 2,002.08
- mandor OH 0.0300 75,757.00 2,272.71
Jumlah 223,665.75

ANALISA HARGA SATUAN PEKERJAAN 29/38


HARGA JUMLAH
KODE ANALISA URAIAN SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

SNI-03.G6.2q 1 M2 Plesteran 1 Pc : 2 Ps, tebal 15 mm


- Semen PC Zak 0.2130 56,163.00 11,962.72
- Pasir Pasang M3 0.0170 123,675.00 2,102.48
- Pekerja OH 0.2000 56,454.00 11,290.80
- Tukang OH 0.1500 83,323.00 12,498.45
- Kepala tukang OH 0.0150 100,104.00 1,501.56
- Mandor OH 0.0100 75,757.00 757.57
Jumlah 40,113.57

SNI-03.G6.3q 1 M2 Plesteran 1 Pc : 3 Ps, tebal 15 mm


- Semen PC Zak 0.1620 56,163.00 9,098.41
- Pasir Pasang M3 0.0190 123,675.00 2,349.83
- Pekerja OH 0.2000 56,454.00 11,290.80
- Tukang OH 0.1500 83,323.00 12,498.45
- Kepala tukang OH 0.0150 100,104.00 1,501.56
- Mandor OH 0.0100 75,757.00 757.57
Jumlah 37,496.61

SNI-03.G6.4q 1 M2 Plesteran 1 Pc : 4 Ps, tebal 15 mm


- Semen PC Zak 0.1300 56,163.00 7,301.19
- Pasir Pasang M3 0.0200 123,675.00 2,473.50
- Pekerja OH 0.2000 56,454.00 11,290.80
- Tukang OH 0.1500 83,323.00 12,498.45
- Kepala tukang OH 0.0150 100,104.00 1,501.56
- Mandor OH 0.0100 75,757.00 757.57
Jumlah 35,823.07

SNI-03.F6.2 1 M3 Pasang Kozen Pintu dan Jendela


- Kayu Klas II M3 1.2000 4,327,655.00 5,193,186.00
- Pekerja OH 6.0000 56,454.00 338,724.00
- Tukang OH 18.0000 83,323.00 1,499,814.00
- Kepala tukang OH 2.0000 100,104.00 200,208.00
- Mandor OH 0.3000 75,757.00 22,727.10
Jumlah 7,254,659.10

SNI-03.F6.28 1 M3 Pasang Konstruksi Kuda-kuda


- Kayu Klas II M3 1.1000 4,327,655.00 4,760,420.50
- Besi strip Kg 15.0000 16,975.00 254,625.00
- Paku Kg 0.8000 17,945.00 14,356.00
- Pekerja OH 4.0000 56,454.00 225,816.00
- Tukang OH 12.0000 83,323.00 999,876.00
- Kepala tukang OH 1.2000 100,104.00 120,124.80
- Mandor OH 0.2000 75,757.00 15,151.40
Jumlah 6,390,369.70

SNI-03.F6.53 1 M' Pasang Listplank


- Kayu Klas II M3 0.0088 4,327,655.00 38,083.36
- Paku Kg 0.0600 17,945.00 1,076.70
- Pekerja OH 0.1000 56,454.00 5,645.40
- Tukang OH 0.1000 83,323.00 8,332.30
- Kepala tukang OH 0.0100 100,104.00 1,001.04
- Mandor OH 0.0500 75,757.00 3,787.85
Jumlah 57,926.65

SNI-03.F6.21a 1 M2 Langit-Langit Plywood 4 mm + Rangka kayu


- Kayu Klas II M3 0.0230 4,327,655.00 99,536.07
- Paku Kg 0.0600 17,945.00 1,076.70
Plywood 4 mm Lbr 0.3900 77,309.00 30,150.51
- Pekerja OH 0.2700 56,454.00 15,242.58
- Tukang OH 0.4000 83,323.00 33,329.20
- Kepala tukang OH 0.0400 100,104.00 4,004.16
- Mandor OH 0.0135 75,757.00 1,022.72
Jumlah 184,361.93

SNI-03.H6.38 1 M2 Pasang Atap seng Gelombang


- Seng Gelombang BJLS 0,30 Lbr 0.7000 48,985.00 34,289.50
- Paku seng Kg 0.0200 17,169.00 343.38
- Pekerja OH 0.1200 56,454.00 6,774.48
- Tukang OH 0.0600 83,323.00 4,999.38
- Kepala tukang OH 0.0060 100,104.00 600.62
- Mandor OH 0.0060 75,757.00 454.54
Jumlah 47,461.91

ANALISA HARGA SATUAN PEKERJAAN 30/38


HARGA JUMLAH
KODE ANALISA URAIAN SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

SNI-03.H6.39 1 M2 Pasang Atap Nok Seng


- Seng Plat BJLS 0,30 Lbr 0.3000 61,983.00 18,594.90
- Paku seng Kg 0.0400 17,169.00 686.76
- Pekerja OH 0.1500 56,454.00 8,468.10
- Tukang OH 0.0700 83,323.00 5,832.61
- Kepala tukang OH 0.0080 100,104.00 800.83
- Mandor OH 0.0600 75,757.00 4,545.42
Jumlah 38,928.62

SNI-03.K6.14 1 M2 Pengecatan Tembok Baru (1x plamir, 1x cat dasar, 2x cat


penutup)
- Plamir Kg 0.1000 14,259.00 1,425.90
- Cat dasar tembok Kg 0.1000 27,936.00 2,793.60
- Cat tembok/penutup 2x Kg 0.2600 27,936.00 7,263.36
- Pekerja OH 0.0200 56,454.00 1,129.08
- Tukang OH 0.0630 83,323.00 5,249.35
- Kepala Tukang OH 0.0063 100,104.00 630.66
- Mandor OH 0.0025 75,757.00 189.39
Jumlah 18,681.34

SNI-03.K6.15 1 M2 Pengecatan Tembok lama (1 x cat dasar, 2 x cat penutup)

- Cat dasar tembok Kg 0.1200 27,936.00 3,352.32


- Cat tembok/penutup 2x Kg 0.1800 27,936.00 5,028.48
- Pekerja OH 0.0280 56,454.00 1,580.71
- Tukang OH 0.0420 83,323.00 3,499.57
- Kepala Tukang OH 0.0042 100,104.00 420.44
- Mandor OH 0.0025 75,757.00 189.39
Jumlah 14,070.91

SNI-03.K6.7 1 M2 Pengecatan Bidang Kayu lama


- Plamir Kg 0.1500 14,259.00 2,138.85
- Cat dasar kayu Kg 0.1700 26,772.00 4,551.24
- Cat kayu penutup Kg 0.1700 41,419.00 7,041.23
- Pekerja OH 0.0700 56,454.00 3,951.78
- Tukang OH 0.0750 83,323.00 6,249.23
- Kepala Tukang OH 0.0075 100,104.00 750.78
- Mandor OH 0.0025 75,757.00 189.39
Jumlah 24,872.50

SNI-03.K6.9 1 M2 Pengecatan Bidang Kayu Baru (1x plamir, 1x cat dasar, 3x


cat penutup)
- Cat dasar kayu Kg 0.2000 26,772.00 5,354.40
- Plamir Kg 0.1500 14,259.00 2,138.85
- Cat dasar kayu Kg 0.1700 26,772.00 4,551.24
- Cat kayu penutup 3x Kg 0.1700 41,419.00 7,041.23
- Pekerja OH 0.0700 56,454.00 3,951.78
- Tukang OH 0.0750 83,323.00 6,249.23
- Kepala Tukang OH 0.0075 100,104.00 750.78
- Mandor OH 0.0025 75,757.00 189.39
Jumlah 30,226.90

SNI-03.S6.2 Memasang 1 Bh Klosed Jongkok


- Klosed jongkok Bh 1.0000 123,093.00 123,093.00
- Semen Zak 0.1500 56,163.00 8,424.45
- Pasir pasang M3 0.0100 123,675.00 1,236.75
- Pekerja OH 1.0000 56,454.00 56,454.00
- Tukang OH 1.5000 83,323.00 124,984.50
- Kepala Tukang OH 1.5000 100,104.00 150,156.00
- Mandor OH 0.1600 75,757.00 12,121.12
Jumlah 476,469.82

SNI-03.S6.36 Memasang 1 Bh Floor Drain


- Floor drain Bh 1.0000 22,601.00 22,601.00
- Pekerja OH 0.0100 56,454.00 564.54
- Tukang OH 0.1000 83,323.00 8,332.30
- Kepala Tukang OH 0.0100 100,104.00 1,001.04
- Mandor OH 0.0050 75,757.00 378.79
Jumlah 32,877.67

ANALISA HARGA SATUAN PEKERJAAN 31/38


HARGA JUMLAH
KODE ANALISA URAIAN SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

SNI-03.K6.23 1 M2 Pengecatan permukaan baja secara manual sistem 4 lapis


- Cat meni (read lead) A Kg 0.1000 24,832.00 2,483.20
- Cat meni (read lead) B Kg 0.1000 33,950.00 3,395.00
- Pengencer/Thinner Ltr 0.0100 19,788.00 197.88
- Perancah kayu/Kayu Klas III M3 0.0020 4,005,906.00 8,011.81
- Pekerja OH 0.0060 56,454.00 338.72
- Tukang OH 0.0060 83,323.00 499.94
- Kepala Tukang OH 0.0225 100,104.00 2,252.34
- Mandor OH 0.0075 75,757.00 568.18
Jumlah 17,747.07

SNI-03.K6.24 1 M2 Pengecatan permukaan baja secara manual sistem 1 lapis


- Cat dasar/meni Kg 0.0800 24,832.00 1,986.56
- Cat antara Kg 0.0800 33,950.00 2,716.00
- Cat penutup/Epoxy Kg 0.0800 33,950.00 2,716.00
- Pekerja OH 0.5000 56,454.00 28,227.00
- Tukang OH 0.8000 83,323.00 66,658.40
- Kepala Tukang OH 0.3000 100,104.00 30,031.20
- Mandor OH 0.2000 75,757.00 15,151.40
Jumlah 147,486.56
Untuk 3 lapis pengecatan

SNI-03.K6.25 1 M2 Pengecatan permukaan baja secara semprot sistem 1 lapis


- Cat dasar/meni Kg 0.3000 24,832.00 7,449.60
- Pekerja OH 0.4000 56,454.00 22,581.60
- Tukang OH 0.7000 83,323.00 58,326.10
- Kepala Tukang OH 0.2000 100,104.00 20,020.80
- Mandor OH 0.2000 75,757.00 15,151.40
Jumlah 123,529.50

SNI-03.K6.25b 1 M2 Pengecatan permukaan baja secara semprot sistem 1 lapis

- Epoxy Kg 0.3000 33,950.00 10,185.00


- Pekerja OH 0.4000 56,454.00 22,581.60
- Tukang OH 0.7000 83,323.00 58,326.10
- Kepala Tukang OH 0.2000 100,104.00 20,020.80
- Mandor OH 0.2000 75,757.00 15,151.40
Jumlah 126,264.90

SNI-03.K6.14.a 1 M2 Water Profing


- Water Profing Kg 0.2600 43,650.00 11,349.00
- Pekerja OH 0.0200 56,454.00 1,129.08
- Tukang OH 0.0630 83,323.00 5,249.35
- Kepala Tukang OH 0.0063 100,104.00 630.66
- Mandor OH 0.0025 75,757.00 189.39
Jumlah 18,547.48

ANALISA HARGA SATUAN PEKERJAAN 32/38


DAFTAR HARGA UPAH, BAHAN DAN PERALATAN

No Uraian Satuan Harga (Rp)


I Upah

1 Pekerja galian tanah OH 52,477.00


2 Pekerja batu, besi, kayu dan cat OH 56,454.00
3 Mandor OH 75,757.00
4 Tukang batu, besi, kayu dan cat OH 83,323.00
5 Kepala Tukang batu, besi, kayu dan cat OH 100,104.00
6 Operator OH 97,000.00
7 Mekanik OH 97,000.00

II Harga Bahan

1 Air Bersih/ Mobil Tanki PDAM M3 29,100.00


2 Batu Bata Bh 679.00
3 Batu Kali/Gunung M3 199,335.00
4 Besi Beton Polos Kg 13,192.00
5 Besi Beton Ulir Kg 18,042.00
6 Besi Strip Kg 16,975.00
7 Bubungan Seng M1 21,534.00
8 Cat Kayu Dasar Kg 26,772.00
9 Cat Kayu Mengkilat Kg 41,419.00
10 Cat Menie Besi Kg 24,832.00
11 Cat Tembok Kg 27,936.00
12 Dempul Kayu Kg 19,788.00
13 Engsel Jendela Pasang 20,564.00
14 Engsel Pintu Pasang 26,093.00
15 Epoxy Kg 33,950.00
16 Floor Drain Bh 22,601.00
17 Grendel Jendela/ Pintu Bh 13,483.00
18 Hak Angin Bh 16,005.00
19 Ijuk Kg 14,356.00
20 Kawat Beton Kg 20,564.00
21 Kawat Bronjong Pabrikan Uk. (2 x 1 x 0,5) dia. 3 mm Unit 449,110.00
22 Kawat Duri Kg 9,603.00
23 Kawat Las Kg 48,500.00
24 Kayu Kelas I M3 5,750,645.00
25 Kayu Kelas II M3 4,327,655.00
26 Kayu Kelas III M3 4,005,906.00
27 Kayu Dolken dia. 10 mm - 4 m Btg 53,544.00
28 Keramik Uk. 30 x 30 cm M2 42,486.00

DAFTAR HARGA UPAH, BAHAN DAN PERALATAN 33/38


No Uraian Satuan Harga (Rp)
29 Keramik Uk. 40 x 40 cm M2 44,426.00
30 Kloset Jongkok Keramik Bh 123,093.00
31 Kunci Pintu Bh 134,054.00
32 Lampu Pijar 40 watt Bh 6,014.00
33 Lampu TL 20 watt Bh 83,032.00
34 Lampu TL 40 watt Bh 105,924.00
35 Lempengan Rumput M2 31,040.00
36 Minyak Cat Ltr 19,788.00
37 Minyak bekisting/ Residu Ltr 14,550.00
38 Multipleks 4 mm Lbr 77,309.00
39 Multipleks 9 mm Lbr 163,445.00
40 Paku Kayu Kg 17,945.00
41 Paku Seng Kg 17,169.00
42 Pasir Beton/ Kerikil M3 135,509.00
43 Pasir Pasang M3 123,675.00
44 Pasir Urug M3 125,809.00
45 Paving Block M2 90,598.00
46 Plamur Tembok Kg 14,259.00
47 Semen @ 40 Kg Zak 56,163.00
48 Semen Putih @ 50 Kg Zak 126,003.00
49 Semen Warna @ 50 Kg Kg 2,428.88
50 Seng Gelombang BJLS 0,30 M2 48,985.00
51 Seng Plat/ Rabung Seng 0,30 Lbr 61,983.00
52 Sirtu M3 281,591.00
53 Solar Industri Ltr 8,536.00
54 Stop Kontak + Instalasi Titik 156,170.00
55 Tanah Timbun M3 54,417.00
56 Teralis Besi M2 390,619.00
57 Titik Lampu + Instalasi Titik 137,740.00
58 Water Profing M2 43,650.00
59 Minyak Pelumas Ltr 24,250.00
60 Sewa mesin Penyambung HDPE HK 203,700.00
61 Mesin las / sewa HK 145,500.00

III Harga Sewa Peralatan

1 Mesin tes Pipa (Sewa) HK 145,500.00


2 Mesin las / sewa HK 145,500.00
3 Alat bantu pemasangan pipa HDPE Ls 9,700.00
4 Alat bantu pemasangan pipa GIP/GSP/Steel Ls 6,790.00

DAFTAR HARGA UPAH, BAHAN DAN PERALATAN 34/38


HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

HARGA SATUAN
NO. U R A I A N SATUAN
Rp.

I. Upah
1 Mandor OH 64,100.00
2 Tukang OH 71,200.00
3 Kepala tukang OH 85,500.00
4 Pekerja galian tanah OH 44,900.00
5 Pekerja kayu,besi,batu,cat,penganyam OH 48,100.00

II. Harga Bahan


1 Semen PC @ 40 kg Zak 44,400.00
2 Semen warna Kg 2,100.00
3 Batu Kali/Gunung M3 138,100.00
4 Tanah timbun M3 51,100.00
5 Pasir urug M3 107,600.00
6 Pasir Pasang M3 112,000.00
7 Kerikil M3 125,400.00
8 Pasir beton M3 125,400.00
9 Kerikil/Koral beton M3 125,400.00
10 Plamur tembok Kg 12,500.00
11 Dempul kayu Kg 17,300.00
12 Cat dasar tembok Kg 25,800.00
13 Cat tembok Kg 25,800.00
14 Cat dasar kayu Kg 25,700.00
15 Cat kayu Mengkilat Kg 38,600.00
16 Cat meni besi Kg 21,900.00
17 Epoxy Kg 50,000.00
18 Pengencer/Thinner Kg 19,900.00
19 Besi beton polos Kg 12,700.00
20 Besi Strip Kg 12,700.00
21 Kawat beton Kg 19,000.00
22 Batu bata Bh 500.00
23 Seng Gelombang BJLS 0,30 (8kk) Lbr 97,000.00
24 Seng Plat/Rabung seng BJLS 0,30 Lbr 120,600.00
25 Floor drain Bh 17,600.00
26 Klosed Jongkok keramik Bh 115,100.00
27 Kayu Klas I M3 4,737,900.00
28 Kayu Klas II M3 3,585,400.00
29 Kayu terentang Klas III M3 2,945,200.00
30 Keramik Bh 39,800.00
31 Dolken dia. 10 cm/4 M Btg 47,200.00
32 Kawat Bronjong dia. 3 mm Kg 17,100.00
33 Multipleks 4 mm Lbr 70,300.00
34 Multipleks 9 mm Lbr 95,900.00
35 Penjaga jarak bekisting/spacer Bh -
36 Paku kayu Kg 14,800.00
37 Paku seng Kg 15,200.00
38 Minyak bekisting Liter 15,000.00
39 Kawat las Kg 45,000.00
40 Solar (industri) Liter 8,300.00
41 Air Bersih / Mobil tangki 4.000 liter M3 40,000.00
42 Water profing M2 42,000.00

III. Harga Sewa Peralatan -


1 Mesin tes Pipa (Sewa) HK 150,000.00
2 Mesin las / sewa HK 150,000.00
3 Alat bantu pemasangan pipa PE Ls 10,000.00
4 Alat bantu pemasangan pipa GIP/GSP/Steel Ls 7,000.00
Lampiran - 12 : Pembuatan Reservoar Baja Kap. 200 M3, Lengkap dengan Pondasi dan Sistem Perpipaan

PAKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR


LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013
HARGA JUMLAH
NO. URAIAN KEGIATAN VOLUME ANALISA SATUAN HARGA
Rp ( Rp )

I. PEKERJAAN PENGADAAN & PEMASANGAN BAJA


A PENGADAAN BAJA
1 MS Plate 5''x20''x8mm 2,633.00 Kg Ditaksir 12,700.00 33,439,100.00
2 MS Plate 5''x20''x10mm 6,912.50 Kg Ditaksir 12,700.00 87,788,750.00
3 MS Plate 5''x20''x6mm 2,835.00 Kg Ditaksir 12,700.00 36,004,500.00
4 UNP 100x50x5 mm - 6m 228.00 Kg Ditaksir 12,700.00 2,895,600.00
5 UNP 120x50x5 mm - 6m 646.00 Kg Ditaksir 12,700.00 8,204,200.00
6 UNP 80x45x5 mm - 6m 322.40 Kg Ditaksir 12,700.00 4,094,480.00
7 L 60x60x6 mm - 6m 297.60 Kg Ditaksir 12,700.00 3,779,520.00
8 Pipa GSP dia. 40 mm 6.00 M' Ditaksir 12,700.00 76,200.00
9 Pipa GSP dia. 25 mm 6.00 M' Ditaksir 12,700.00 76,200.00
10 Plate Strip 8 mm x 75 mm 179.41 Kg Ditaksir 12,700.00 2,278,507.00
11 Manhole dia. 600 mm 2.00 Unit Ditaksir 2,000,000.00 4,000,000.00

B PEMASANGAN BAJA
1 MS Plate 5''x20''x8mm 2,633.00 Kg Ditaksir 6,500.00 17,114,500.00
2 MS Plate 5''x20''x10mm 6,912.50 Kg Ditaksir 6,500.00 44,931,250.00
3 MS Plate 5''x20''x6mm 2,835.00 Kg Ditaksir 6,500.00 18,427,500.00
4 UNP 100x50x5 mm - 6m 228.00 Kg Ditaksir 6,500.00 1,482,000.00
5 UNP 120x50x5 mm - 6m 646.00 Kg Ditaksir 6,500.00 4,199,000.00
6 UNP 80x45x5 mm - 6m 322.40 Kg Ditaksir 6,500.00 2,095,600.00
7 L 60x60x6 mm - 6m 297.60 Kg Ditaksir 6,500.00 1,934,400.00
8 Pipa GSP dia. 40 mm 6.00 M' Ditaksir 6,500.00 39,000.00
9 Pipa GSP dia. 25 mm 6.00 M' Ditaksir 6,500.00 39,000.00
10 Plate Strip 8 mm x 75 mm 179.41 Kg Ditaksir 6,500.00 1,166,165.00
SUB JUMLAH - I 274,065,472.00

II. PEKERJAAN PIPA DAN ACCESSORIES


A PEKERJAAN PENGADAAN DAN PEMASANGAN
1. Pipa Inlet
1 Pipa Gip dia. 200 mm 6.00 M' Ditaksir - -
2 Bend All Flange Gip dia. 200 mm x 90º 6.00 Bh Ditaksir 1,311,000.00 7,866,000.00
3 Loss Flange dia. 200 mm 4.00 Bh Ditaksir 226,000.00 904,000.00
4 Gate Valve Butterfly CI dia. 200 mm 1.00 Unit Ditaksir 1,794,000.00 1,794,000.00
5 Pembuatan lubang dinding 1.00 Ls Ditaksir 200,000.00 200,000.00
6 Pemasangan/Fabrikasi/Pengelasan 1.00 Ls Ditaksir 500,000.00 500,000.00
7 Paking karet 1.00 Ls Ditaksir 850,000.00 850,000.00
8 Baut dan mur 1.00 Ls Ditaksir 1,680,000.00 1,680,000.00
HARGA JUMLAH
NO. URAIAN KEGIATAN VOLUME ANALISA SATUAN HARGA
Rp ( Rp )

2. Pipa Outlet
1 Pipa Gip dia. 150 mm, untuk 3 pompa 18.00 M' Ditaksir 636,000.00 11,448,000.00
2 Bend All Flange Gip dia. 150 mm x 90º 6.00 Bh Ditaksir 1,238,573.60 7,431,441.60
3 Loss Flange dia. 150 mm 12.00 Bh Ditaksir 199,000.00 2,388,000.00
4 Gate Valve Butterfly CI dia. 150 mm 3.00 Unit Ditaksir 974,000.00 2,922,000.00
5 Pembuatan lubang dinding ; 3 Unit 1.00 Ls Ditaksir 600,000.00 600,000.00
6 Pemasangan/Fabrikasi/Pengelasan ; 3 Unit 1.00 Ls Ditaksir 375,000.00 375,000.00
7 Paking karet 1.00 Ls Ditaksir 880,000.00 880,000.00
8 Baut dan mur 1.00 Ls Ditaksir 2,160,000.00 2,160,000.00

3. Pipa By Pass
1 Pipa Gip dia. 150 mm 24.00 M' Ditaksir 636,000.00 15,264,000.00
2 Bend All Flange Gip dia. 150 mm x 90º 2.00 Bh Ditaksir 1,238,573.60 2,477,147.20
3 Loss Flange dia. 150 mm 6.00 Bh Ditaksir 199,000.00 1,194,000.00
4 Gate Valve Butterfly CI dia. 150 mm 2.00 Unit Ditaksir 974,000.00 1,948,000.00
5 Pemasangan/Fabrikasi/Pengelasan 1.00 Ls Ditaksir 125,000.00 125,000.00
6 Paking karet 1.00 Ls Ditaksir 390,000.00 390,000.00
7 Baut dan mur 1.00 Ls Ditaksir 960,000.00 960,000.00

4. Pipa Peluap
1 Pipa Gip dia. 150 mm 10.00 M' Ditaksir 636,000.00 6,360,000.00
2 Bend All Flange Gip dia. 150 mm x 90º 3.00 Bh Ditaksir 1,238,573.60 3,715,720.80
3 Loss Flange dia. 150 mm 4.00 Bh Ditaksir 199,000.00 796,000.00
4 Pembuatan lubang dinding 2.00 Ls Ditaksir 200,000.00 400,000.00
5 Pemasangan/Fabrikasi/Pengelasan 1.00 Ls Ditaksir 125,000.00 125,000.00
6 Paking karet 1.00 Ls Ditaksir 145,000.00 145,000.00
7 Baut dan mur 1.00 Ls Ditaksir 360,000.00 360,000.00

5. Pipa Kuras
1 Pipa Gip dia. 150 mm 6.00 M' Ditaksir 636,000.00 3,816,000.00
2 Bend All Flange Gip dia. 150 mm x 90º 1.00 Bh Ditaksir 1,238,573.60 1,238,573.60
3 Loss Flange dia. 150 mm 4.00 Bh Ditaksir 199,000.00 796,000.00
4 Gate Valve Butterfly dia. 150 mm 1.00 Unit Ditaksir 974,000.00 974,000.00
5 Pembuatan lubang dinding 1.00 Ls Ditaksir 200,000.00 200,000.00
6 Pemasangan/Fabrikasi/Pengelasan 1.00 Ls Ditaksir 125,000.00 125,000.00
7 Paking karet 1.00 Ls Ditaksir 196,000.00 196,000.00
8 Baut dan mur 1.00 Ls Ditaksir 480,000.00 480,000.00

B PEKERJAAN PENGECATAN
1 Primer Coating 160.00 M2 SNI-03.K6.25 123,529.50 19,764,720.00
2 Final Coating 80.00 M2 SNI-03.K6.24 147,486.56 11,798,924.80
3 Epoxy Painting 80.00 M2 SNI-03.K6.25b 126,264.90 10,101,192.00
4 Thinner 127.50 ltr Ditaksir 19,900.00 2,537,250.00
SUB JUMLAH - II 128,285,970.00

III. PEKERJAAN PEMBUATAN PONDASI RESERVOIR


A Pekerjaan Tanah
1 Galian Tanah Pondasi 80.00 M
3
SNI-03.T.6.1 24,021.08 1,921,686.40
2 Pasir Urug W = 50 mm 50.00 M
3
SNI-03-T.6.11b 168,664.57 8,433,228.50
3 Tanah dipadatkan 45.50 M
3
SNI-03.T.6.10 30,026.35 1,366,198.93
HARGA JUMLAH
NO. URAIAN KEGIATAN VOLUME ANALISA SATUAN HARGA
Rp ( Rp )

B Pekerjaan Beton
1 Beton Campuran 1 : 3 : 5 16.00 M
3
SNI-03.G6.1 616,988.87 9,871,821.92
2 Beton Campuran 1 : 2 : 3 56.00 M
3
SNI-03.G6.5 624,450.11 34,969,206.16
3 Pembesian (perakitan rangka tulangan) 405.10 Kg SNI-03.I6.25 15,231.30 6,170,199.18
4 Bekisting 30.14 M
2
SNI-03.F6.28 83,537.37 2,517,816.33

C Pembuatan Saluran Drainase


1 Pasangan Batu Bata Camp 1 : 3 6.84 M
3
SNI-03.G6.10bb 107,978.53 738,573.16
2 Plesteran 1 : 4 46.00 M
2
SNI-03.G6.4q 35,823.07 1,647,861.22
3 Beton Campuran 1 : 3 : 5 16.00 M
3
SNI-03.G6.1 616,988.87 9,871,821.92

D PEKERJAAN LAIN - LAIN


1 Pengujian Tangki 1.00 Ls Ditaksir 2,000,000.00 2,000,000.00
SUB JUMLAH - III 79,508,413.73

REKAPITULASI
I. PEKERJAAN PENGADAAN & PEMASANGAN BAJA 274,065,472.00
II. PEKERJAAN PIPA DAN ACCESSORIES 128,285,970.00
III. PEKERJAAN PEMBUATAN PONDASI RESERVOIR 79,508,413.73
JUMLAH 481,859,855.73