Koefisien Koefisien
UKURAN PIPA Penampang DLM CM UKURAN PIPA Penampang DLM CM Air dlm pipa Harga air Harga air Harga air
Pipa Pipa m3 dlm 75 m dlm 1 m m3
Dia. MM Dia. 400 MM 0.126 0.200 9.42 282,600.00 3,768.00 30,000
Dia. MM Dia. 350 MM 0.096 0.175 7.21 216,365.63 2,884.88 30,000
Dia. 315 MM 0.078 0.158 Dia. 300 MM 0.071 0.150 5.30 158,962.50 2,119.50 30,000
Dia. 260 MM 0.053 0.130 Dia. 250 MM 0.049 0.125 3.68 110,390.63 1,471.88 30,000
Dia. 210 MM 0.035 0.105 Dia. 200 MM 0.031 0.100 2.36 70,650.00 942.00 30,000
Dia. 160 MM 0.020 0.080 Dia. 150 MM 0.018 0.075 1.32 39,740.63 529.88 30,000
Dia. 110 MM 0.009 0.055 Dia. 100 MM 0.008 0.050 0.59 17,662.50 235.50 30,000
Dia. 90 MM 0.006 0.045 Dia. 75 MM 0.004 0.038 0.33 9,935.16 132.47 30,000
Dia. 65 MM 0.003 0.033 Dia. 50 MM 0.002 0.025 0.15 4,415.63 58.88 30,000
Dia. 50 MM 0.002 0.025 Dia. 40 MM 0.001 0.020 0.09 2,826.00 37.68 30,000
Koefisien mm dijadikan cm
Penampang Pipa
dia.400 mm 0.126 0.200
dia.350 mm 0.096 0.175
dia.300 mm 0.071 0.150
dia.250 mm 0.049 0.125
dia.200 mm 0.031 0.100
dia.150 mm 0.018 0.075
dia.100 mm 0.008 0.050
dia.75 mm 0.004 0.038
dia.50 mm 0.002 0.025
dia.40 mm 0.001 0.020
BIAYA PENGANGKUTAN PIPA
Harga/Btg
1. dia. 200 mm 3000
2. dia. 150 mm 2500
3. dia. 100 mm 2000
4. dia. 75 mm 1500
5. dia. 50 mm 1000
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
UNTUK PEKERJAAN SIPIL
JUMLAH
NO. URAIAN PEKERJAAN
HARGA
REKAPITULASI
JUMLAH 1,352,319,294.46
DIBULATKAN 1,352,300,000.00
TERBILANG :
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
I. PEKERJAAN PERSIAPAN
1 Direksi Keet / Gudang (Sewa) 1.00 Ls Ditaksir 4,850,000.00 4,850,000.00
2 Papan Nama Proyek 1.00 Ls Ditaksir 970,000.00 970,000.00
3 Pematokan/pengukuran (setting out) 1.00 Ls Ditaksir 7,275,000.00 7,275,000.00
4 Administrasi dan Dokumentasi 1.00 Ls Ditaksir - -
5 Pembersihan Lahan Lokasi Instalasi (WTP) 1.00 Ls Ditaksir 14,550,000.00 14,550,000.00
JUMLAH - A 27,645,000.00
II. PEKERJAAN BANGUNAN AIR BAKU DAN PERPIPAAN
1 Pembuatan Bangunan Intake, lengkap dgn Pengadaan dan pemasangan pompa, Lemari 1.00 Pkt LAMPIRAN - 1 293,357,452.58 293,357,452.58
Panel, Kabel, Pipa, dan Accessories
JUMLAH - B.I 293,357,452.58
III. PEKERJAAN BANGUNAN PRODUKSI DAN M/E
1 1.00 Pkt
Pengadaan dan Pemasangan Paket IPA 20 l/dt, Lengkap Pipa dan Accessories, termasuk :
- Pondasi Beton Unit IPA (Sesuai gambar) 1.00 Pkt Ditaksir 76,000,000.00 76,000,000.00
2 Pengadaan dan Pemasangan Pompa Dosing (soda ash, kaporit dan alum sulfat), lengkap 6.00 Unit Ditaksir - -
dgn sistem Perpipaan dan Accessories.
3 Pengadaan dan Pemasangan Mixer pengaduk bahan kimia, lengkap dgn sistem perpipaan, 3.00 Unit Ditaksir - -
Accessories dan Kabel (Kabel Tray dan Rak Kabel)
4 Pengadaan dan pemasangan Lemari Panel untuk masing-masing motor pompa dosing dan 1.00 Pkt Ditaksir - -
mixer
5 Pengadaan dan Pemasangan Tangki Pembubuh Bahan Kimia, lengkap dgn sistem 6.00 Unit Ditaksir - -
Perpipaan dan Accessories
6 Pengadaan dan Pemasangan Pompa Distribusi Centrifugal Kap. 20 L/Dt, Lengkap dengan 1.00 Pkt LAMPIRAN - 2 - -
Lemari Panel, Kabel, Pipa dan Accessories
7 Pengadaan dan Pemasangan Lemari Panel Induk (MDP) Lengkap dengan Change Over 1.00 Unit Ditaksir - -
Switch, termasuk :
- Kabel pompa ke masing-masing panel (Kabel Tray, Rak Kabel)
-
Peralatan M/E (Meger, Avo Meter, Tang Ampere, Obeng, Tang potong, palu dll)
8 Penyambungan Daya PLN 80 KVA BP material dan pemasangan 1.00 Unit Ditaksir - -
9 Pengadaan dan Pemasangan Genset 80 KVA, Lengkap dengan tangki harian, pondasi 1.00 Unit Ditaksir - -
dudukan dan peralatan Bengkel (Toolkit)
10 Pengadaan dan Pemasangan Tangki BBM Kap. 5.000 Liter Lengkap dengan pondasi, sistem 1.00 Unit Ditaksir - -
perpipaan dan accessories
11 Pengadaan/pemasangan Water Meter PIT dia. 200 mm, Lengkap Box Pengaman 1.00 Unit LAMPIRAN - 3 9,762,100.94 9,762,100.94
12 Pengadaan dan Pemasangan Lampu Penerangan termasuk Tiang, Lampu Taman, Saklar, 3.00 Unit Ditaksir 4,500,000.00 13,500,000.00
Stop Kontak
JUMLAH - B.II 99,262,100.94
IV. PEKERJAAN SIPIL UNIT PRODUKSI
1 1.00 Unit LAMPIRAN - 4 163,162,450.63 163,162,450.63
Pembuatan Bangunan Operasional, Rumah Jaga Type 54 M2 dan Gudang
2 Pembuatan Bangunan Genset, Ruang Pompa, Ruang Panel dan Gardu PLN Type 60 M2 1.00 Unit LAMPIRAN - 5 211,196,355.37 211,196,355.37
(Atap Plat Beton)
3 Pembuatan Bangunan Laboratorium dan Chamical Dozing Type 36 M2 1.00 Unit LAMPIRAN - 6 169,245,620.99 169,245,620.99
4 Pembuatan Saluran Induk 1.00 Pkt LAMPIRAN - 8 40,616,731.62 40,616,731.62
5 Pembuatan Pagar Keliling Lokasi IPA Termasuk Pintu 1.00 Pkt LAMPIRAN - 9 246,473,916.22 246,473,916.22
6 Pekerjaan pembuatan jalan setapak beton 1:3:5 30.00 M3 SNI-03.G6.1 616,988.87 18,509,666.10
7 Pengadaan dan Pemasangan Reservoar Baja Kap. 200 M3, Lengkap dengan Pondasi dan 1.00 Pkt Ditaksir 69,000,000.00 69,000,000.00
Sistem Perpipaan (bentuk Cylender)
JUMLAH - B.III 918,204,740.94
V. PEKERJAAN LAIN-LAIN
1 Landscaping 1.00 Ls Ditaksir 9,000,000.00 9,000,000.00
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
JUMLAH - B.IV 9,000,000.00
LAMPIRAN - 10 : Pembuatan Bangunan Intake, lengkap dgn Pengadaan dan pemasangan pompa, Lemari Panel, Kabel, Pipa,
dan Accessories
I. PEMBUATAN INTAKE
PEKERJAAN TANAH
1 Dewatering/pemindahan aliran air sementara 1.00 Ls Ditaksir 10,000,000.00 10,000,000.00###
2 Galian tanah berlumpur 146.11 M3 SNI-006-2007.6.6 66,381.47 9,698,995.85###
3 Timbunan kembali 55.88 M3 SNI-03.T.6.9 11,514.97 643,456.36###
4 Urugan pasir 2.30 M3 SNI-03-T.6.11b 168,664.57 387,928.51###
PKERJAAN KONSTRUKSI
1 Pasangan Bronjong 30.00 M3 Anl. G 5a 735,019.93 22,050,597.75###
2 Beton tumbuk 1 : 3 : 5, untuk Lantai kerja 1.15 M3 SNI-03.G6.1 616,988.87 709,537.20###
3 Beton cor 1 : 1½ : 2½ 25.75 M3 SNI-03.G6.9 833,902.21 21,472,981.91###
4 Pembesian 3,327.68 Kg SNI-03.I6.25 15,231.30 50,684,888.72###
5 Bekisting lantai 3.92 M2 SNI-03.F6.28 83,537.37 327,466.49###
6 Bekisting dinding 207.20 M2 SNI-03.F6.33 238,770.45 49,473,236.62
7 Bekisting tutup 9.97 M2 SNI-03.F6.32 329,101.21 3,281,139.08
8 Plesteran 1 : 2, tebal 15 mm 25.57 M2 SNI-03.G6.2q 40,113.57 1,025,704.09###
9 Tangga monyet 2.00 Unit Ditaksir 500,000.00 1,000,000.00
10 Penutup Main Hole 80 x 80 cm Lengkap Engsel, Gembok, cat dll 2.00 Unit Ditaksir 1,500,000.00 3,000,000.00
REKAPITULASI
I. PEMBUATAN INTAKE 240,081,011.48###
II. PENGADAAN / PEMASANGAN POMPA INTAKE, PIPA DAN ACCESSSORIES 236,480,000.00###
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
III. PENGADAAN / PEMASANGAN PIPA TRANSMISI AIR BAKU DAN DISTRIBUSI (JDU) LENGKAP ACCESSSORIES 33,056,935.68###
JUMLAH 509,617,947.16###
LAMPIRAN - 1 : Pembuatan Bangunan Intake, lengkap dgn Pengadaan dan pemasangan pompa, Lemari Panel, Kabel, Pipa, dan Accessories
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
I. PEMBUATAN INTAKE
PEKERJAAN TANAH
1 Dewatering/pemindahan aliran air sementara 1.00 Ls Ditaksir 9,700,000.00 9,700,000.00
2 Galian tanah berlumpur 146.11 M3 SNI-006-2007.6.6 66,381.47 9,698,995.85
3 Timbunan kembali 55.88 M3 SNI-03.T.6.9 11,514.97 643,456.36
4 Urugan pasir 2.30 M3 SNI-03-T.6.11b 168,664.57 387,928.51
PKERJAAN KONSTRUKSI
1 Pasangan Bronjong 30.00 M3 Anl. G 5a 735,019.93 22,050,597.75
2 Beton tumbuk 1 : 3 : 5, untuk Lantai kerja 1.15 M3 SNI-03.G6.1 616,988.87 709,537.20
3 Beton cor 1 : 1½ : 2½ 25.75 M3 SNI-03.G6.9 833,902.21 21,472,981.91
4 Pembesian 3,327.68 Kg SNI-03.I6.25 15,231.30 50,684,888.72
5 Bekisting lantai 3.92 M2 SNI-03.F6.28 83,537.37 327,466.49
6 Bekisting dinding 207.20 M2 SNI-03.F6.33 238,770.45 49,473,236.62
7 Bekisting tutup 9.97 M2 SNI-03.F6.32 329,101.21 3,281,139.08
8 Plesteran 1 : 2, tebal 15 mm 25.57 M2 SNI-03.G6.2q 40,113.57 1,025,704.09
9 Tangga monyet 2.00 Unit Ditaksir 485,000.00 970,000.00
10 Penutup Main Hole 80 x 80 cm Lengkap Engsel, Gembok, cat dll 2.00 Unit Ditaksir 1,455,000.00 2,910,000.00
REKAPITULASI
I. PEMBUATAN INTAKE 239,661,011.48
II. PENGADAAN / PEMASANGAN POMPA INTAKE, PIPA DAN ACCESSSORIES -
III. PENGADAAN / PEMASANGAN PIPA TRANSMISI AIR BAKU LENGKAP ACCESSSORIES TERMASUK FITTING & VALVE 53,696,441.10
JUMLAH 293,357,452.58
LAMPIRAN - 12 : Pengadaan/pemasangan Water Meter PIT dia. 200 mm, Lengkap Box Pengaman
PEKERJAAN TANAH
1 Galian tanah 10.67 M3 SNI-03.T.6.1 24,021.08 256,304.92
2 Timbunan kembali 2.33 M3 SNI-03.T.6.9 11,514.97 26,829.87
3 Urugan kerikil 0.29 M3 SNI-03-T.6.11c 180,304.57 52,288.33
JUMLAH I + II 54,474,650.94
LAMPIRAN - 2 : Pengadaan dan Pemasangan Pompa Distribusi Centrifugal Kap. 20 L/Dt, Lengkap dengan Lemari Panel, Kabel, Pipa dan Accessories
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
1 Pompa Distribusi Centrifugal Kap. 20 l/dt, H - 40 M', 1450 Rpm, (Mekanikal 2.00 Unit Ditaksir 74,961,600.00 149,923,200.00
Seal) dan Lemari Panel untuk 2 Motor Lengkap dengan Kabel (Rak Kabel,
Kabel Tray dan Lain-lain)
2 HISAP
- Gate Valve CI dia. 150 mm 2.00 Bh Ditaksir 3,937,424.00 7,874,848.00
- Reducer All Flange Gip dia. 150 x 75 mm 2.00 Bh Ditaksir 1,075,726.36 2,151,452.73
- Bend All Flange Gip dia. 150 mm x 90⁰ 2.00 Bh Ditaksir 1,238,573.60 2,477,147.20
- Foot Klep dia. 150 mm 2.00 Bh Ditaksir 1,834,852.00 3,669,704.00
- Pipa Gip dia. 150 mm 12.00 M' Ditaksir 620,024.00 7,440,288.00
- Loss Flange dia. 150 mm 4.00 Bh Ditaksir 383,926.00 1,535,704.00
3 OUT
- Manometer skala 10 dia. 100 mm 1.00 Unit Ditaksir 300,700.00 300,700.00
- Tee Y Gip dia. 200 x 200 mm 2.00 Bh Ditaksir 1,129,429.20 2,258,858.40
- Gate Valve CI dia. 200 mm 2.00 Bh Ditaksir 6,908,776.50 13,817,553.00
- Chack Valve dia. 200 mm 2.00 Bh Ditaksir 10,060,888.50 20,121,777.00
- Flexible Joint dia. 200 mm 2.00 Bh Ditaksir 3,801,827.70 7,603,655.40
- Reducer All Flange Gip dia. 200 mm x 75 mm 2.00 Bh Ditaksir 1,165,999.41 2,331,998.83
- Blind Flange dia. 200 mm 1.00 Bh Ditaksir 735,167.85 735,167.85
- Pipa Gip dia. 200 mm 12.00 M' Ditaksir 960,494.00 11,525,928.00
- Loss Flange dia. 200 mm 4.00 Bh Ditaksir 468,728.25 1,874,913.00
4 Pabrikasi/pemasangan Pompa, Lemari Panel, Kabel, Pipa dan Accessories 2.00 Unit Ditaksir 9,700,000.00 19,400,000.00
lengkap dgn baut paking dll.
Jumlah 255,042,895.40
LAMPIRAN - 3 : Pengadaan/pemasangan Water Meter PIT dia. 200 mm, Lengkap Box Pengaman
HARGA JUMLAH
NO. URAIAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
PEKERJAAN TANAH
1 Galian tanah 10.67 M3 SNI-03.T.6.1 24,021.08 256,304.92
2 Timbunan kembali 2.33 M3 SNI-03.T.6.9 11,514.97 26,829.87
3 Urugan kerikil 0.29 M3 SNI-03-T.6.11c 180,304.57 52,288.33
JUMLAH I + II 9,762,100.94
LAMPIRAN - 4 : Pembuatan Bangunan Operasional, Rumah Jaga Type 54 M2 dan Gudang
PEKERJAAN TANAH
1 Galian tanah 12.62 M3 SNI-03.T.6.1 24,021.08 303,146.03###
2 Urugan kembali 3.15 M3 SNI-03.T.6.9 11,514.97 36,272.15###
3 Timbunan tanah yang didatangkan 39.14 M3 SNI-03-T.6.11a 81,801.07 3,201,438.25###
4 Urugan pasir 6.61 M3 SNI-03-T.6.11b 168,664.57 1,114,029.48###
PEKERJAAN BETON
1 Beton 1 : 3 : 5, untuk lantai 6.36 M3 SNI-03.G6.1 616,988.87 3,924,049.21###
2 Beton 1 : 2 : 3 (Sloof) 1.55 M3 SNI-03.G6.5 624,450.11 967,897.67###
3 Beton 1 : 2 : 3 (Kolom) 0.73 M3 SNI-03.G6.5 624,450.11 455,848.58###
4 Beton 1 : 2 : 3 (Ring balok) 1.29 M3 SNI-03.G6.5 624,450.11 805,540.64###
5 Pembesian 374.85 Kg SNI-03.I6.25 15,231.30 5,709,452.39###
6 Bekisting untuk sloof 20.60 M2 SNI-03.F6.29 114,342.97 2,355,465.17###
7 Bekisting untuk kolom 24.48 M2 SNI-03.F6.30 221,448.67 5,421,063.49
8 Bekisting untuk balok 20.85 M2 SNI-03.F6.31 228,022.07 4,754,260.18
PEKERJAAN PASANGAN
1 Pasangan pondasi 1 : 3 25.75 M3 SNI-03.G6.4m 709,236.84 18,262,848.63###
2 Pas. Bata 1/2 bata 1 : 3 138.06 M2 SNI-03.G6.10bb 107,978.53 14,907,516.23###
3 Plesteran 1 : 4 ; tebal 15 mm 276.11 M2 SNI-03.G6.4q 35,823.07 9,891,107.86###
4 Pasang lantai keramik 63.90 M2 SNI-03.G6.45 139,182.92 8,893,788.81###
5 Pembuatan KM/WC dinding 1/2 keramik+bak+Klosed jongkok 1.00 Unit Ditaksir 4,850,000.00 4,850,000.00###
PEKERJAAN PENGECATAN
1 Pengecatan tembok dinding luar/dalam 393.56 M2 SNI-03.K6.14 18,681.34 7,352,226.87###
2 Pengecatan permukuaan kayu 69.15 M2 SNI-03.K6.9 30,226.90 2,090,189.96###
PEKERJAAN ATAP
1 Rangka atap kayu 1.85 M3 SNI-03.F6.28 6,390,369.70 11,822,183.95###
2 Atap seng BJLS 130.48 M2 SNI-03.H6.38 47,461.91 6,192,829.49###
3 Bubungan Seng 6.03 M2 SNI-03.H6.39 38,928.62 234,739.59###
4 Listplank 46.80 M' SNI-03.F6.53 57,926.65 2,710,967.41###
JUMLAH ###
163,162,450.63
LAMPIRAN - 13 : Pembuatan Bangunan Genset, Ruang Pompa, Ruang Panel dan Gardu PLN Type 60 M2 (Atap Plat Beton)
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
I. PEKERJAAN TANAH
1 Galian tanah 21.84 M3 SNI-03.T.6.1 24,021.08 524,620.39
2 Urugan tanah 9.48 M3 SNI-03.T.6.9 11,514.97 109,161.89
3 Urugan pasir 6.34 M3 SNI-03-T.6.11b 168,664.57 1,069,333.37
4 Timbunan tanah yang didatangkan 52.43 M3 SNI-03-T.6.11a 81,801.07 4,288,830.10
JUMLAH 211,510,605.37
LAMPIRAN - 5 : Pembuatan Bangunan Genset, Ruang Pompa, Ruang Panel dan Gardu PLN Type 60 M2 (Atap Plat Beton)
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
I. PEKERJAAN TANAH
1 Galian tanah 21.84 M3 SNI-03.T.6.1 24,021.08 524,620.39
2 Urugan tanah 9.48 M3 SNI-03.T.6.9 11,514.97 109,161.89
3 Urugan pasir 6.34 M3 SNI-03-T.6.11b 168,664.57 1,069,333.37
4 Timbunan tanah yang didatangkan 52.43 M3 SNI-03-T.6.11a 81,801.07 4,288,830.10
JUMLAH 211,196,355.37
LAMPIRAN - 6 : Pembuatan Bangunan Laboratorium dan Chamical Dozing Type 36 M2
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
I. PEKERJAAN TANAH
1 Galian tanah 17.92 M3 SNI-03.T.6.1 24,021.08 430,457.75
2 Urugan tanah 6.93 M3 SNI-03.T.6.9 11,514.97 79,798.72
3 Urugan pasir 4.01 M3 SNI-03-T.6.11b 168,664.57 676,344.93
4 Timbunan tanah yang didatangkan 29.51 M3 SNI-03-T.6.11a 81,801.07 2,413,949.58
V. PEKERJAAN PENGECATAN
1 Pengecatan dindin tembok dan atap 283.72 M2 SNI-03.K6.14 18,681.34 5,300,268.85
2 Pengecatan permukuaan kayu 36.24 M2 SNI-03.K6.9 30,226.90 1,095,422.77
JUMLAH 169,245,620.99
LAMPIRAN - 7 : Pembangunan Sludge Drying Bed (SDB)
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
I. PEKERJAAN TANAH
1 Galian Tanah 31.00 M3 SNI-03.T.6.1 24,021.08 744,653.48
2 Urugan Tanah Kembali 7.00 M3 SNI-03.T.6.9 11,514.97 80,604.77
3 Media Filter (SDB)
- Pasir dia. 0,5 - 1 mm 4.20 M3 SNI-03-T.6.11d 166,103.77 697,635.83
- Pasir & Gravel dia. 1 - 25 mm 5.00 M3 SNI-03-T.6.11c 180,304.57 901,522.85
PIPA POROS
1 Pipa PVC dia. 150 mm RRJ, S-12,5 24.00 M' Ditaksir 183,330.00 4,399,920.00
2 Pipa Inlet Gip dia 150 mm 12.00 M' Ditaksir 620,024.00 7,440,288.00
3 Tee All Socket PVC dia. 150 x 150 mm 1.00 Bh Ditaksir 1,280,400.00 1,280,400.00
4 Gate Valve CI dia. 150 mm 1.00 Bh Ditaksir 3,937,424.00 3,937,424.00
5 Bend All Socket dia. 150 mm x 90⁰ 2.00 Bh Ditaksir 1,001,040.00 2,002,080.00
6 Bend Gip dia. 150 mm x 90⁰ 2.00 Bh Ditaksir 419,040.00 838,080.00
7 Loose Flange dia. 150 mm 4.00 Bh Ditaksir 383,926.00 1,535,704.00
8 Blind Flange dia. 150 mm 1.00 Bh Ditaksir 519,764.80 519,764.80
9 Pipa Penguras PVC dia. 150 mm 24.00 M' Ditaksir 183,330.00 4,399,920.00
10 Pemasangan Pipa dan Accessories 1.00 Ls Ditaksir 4,850,000.00 4,850,000.00
JUMLAH 83,317,565.65
Lampiran - 9 : Pondasi tangki BBM
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
I. PEKERJAAN TANAH
1 Galian tanah 3.00 M3 SNI-03.T.6.1 24,021.08 72,063.24
JUMLAH 13,129,152.92
LAMPIRAN - 8 : Pembuatan Saluran Induk
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
JUMLAH 40,616,731.62
LAMPIRAN - 9 : Pembuatan Pagar Keliling Lokasi IPA Termasuk Pintu
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
JUMLAH 246,473,916.22
85.00 439,400.00
170.00 8,100,000.00
JUMLAH 121,856,305.57
LAMPIRAN - 11 : Pengadaan dan Pemasangan Pompa Distribusi Centrifugal Kap. 10 L/Dt, Lengkap dengan Lemari Panel,
Kabel, Pipa dan Accessories
PEKERJAAN : PEMBANGUNAN SPAM IKK TANAH PASIR
LOKASI : KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2013
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN HARGA
Rp. Rp.
PENGADAAN/PEMASANGAN POMPA, PIPA DAN
ACCESSORIES
1 Pompa Distribusi Centrifugal Kap. 10 l/dt, H - 60 M', 2950 Rpm, 2.00 Unit Ditaksir 82,176,000.00 164,352,000.00
(Mekanikal Seal) dan Lemari Panel untuk 2 Motor Lengkap
dengan Kabel (Rak Kabel, Kabel Tray dan Lain-lain)
2 HISAP
- Gate Valve CI dia. 150 mm 2.00 Bh Ditaksir 4,059,200.00 8,118,400.00
- Reducer All Flange Gip dia. 150 x 75 mm 2.00 Bh Ditaksir 1,108,996.25 2,217,992.50
- Bend All Flange Gip dia. 150 mm x 90⁰ 2.00 Bh Ditaksir 1,276,880.00 2,553,760.00
- Foot Klep dia. 150 mm 2.00 Bh Ditaksir 1,891,600.00 3,783,200.00
- Pipa Gip dia. 150 mm 12.00 M' Ditaksir 639,200.00 7,670,400.00
- Loss Flange dia. 150 mm 4.00 Bh Ditaksir 395,800.00 1,583,200.00
3 OUT
- Manometer skala 10 dia. 100 mm 1.00 Unit Ditaksir 310,000.00 310,000.00
- Tee Y Gip dia. 200 x 200 mm 2.00 Bh Ditaksir 1,164,360.00 2,328,720.00
- Gate Valve CI dia. 200 mm 2.00 Bh Ditaksir - -
- Chack Valve dia. 200 mm 2.00 Bh Ditaksir 10,372,050.00 20,744,100.00
- Flexible Joint dia. 200 mm 2.00 Bh Ditaksir 3,919,410.00 7,838,820.00
- Reducer All Flange Gip dia. 200 mm x 75 mm 2.00 Bh Ditaksir 1,202,061.25 2,404,122.50
- Blind Flange dia. 200 mm 1.00 Bh Ditaksir - -
- Pipa Gip dia. 200 mm 12.00 M' Ditaksir - -
- Loss Flange dia. 200 mm 4.00 Bh Ditaksir - -
4 Pabrikasi/pemasangan Pompa, Lemari Panel, Kabel, Pipa dan 2.00 Unit Ditaksir 10,000,000.00 20,000,000.00
Accessories lengkap dgn baut paking dll.
Jumlah 243,904,715.00
Pembuatan Bangunan Genset, Ruang Pompa, Ruang Panel dan Gardu PLN Type 60 M2 (Atap Plat Beton)
ATAP DEK
BETON 1:2:3 Luas/pjg Tebal
Atap dak 14.4 0.12 7.4 12.7872 M3
Listplank 0.5 0.08 58.4 2.336 M3
M3
15.1232 M3
Luas
BEKISTING
Lantai atap dek 14.4 7.4 106.56 M2
Listplank 0.58 58.4 33.872 M2
Slof 0.5 58 29 M2
Kolom 0.6 38.4 23.04 M2
192.472 M2
KOSEN
Lubang angin 3 lobang 7.2 2 14.4 0.0072 0.10368 m3
Lubang angin 2 lobang 5 7 35 0.0072 0.252 m3
0.35568 m3
JALUSI
Lubang angin 3 lobang 4.25 2 3 25.5 m'
Lubang angin 2 lobang 4.25 7 2 59.5 m'
85 m'
Jumlah 21.25 Lbr
PAS. KERAMIK
Lantai dalam 12 5 60 M2
Luar 12 1 12 M2
Jumlah psg keramik 72.00 M2
PAS. BATA
Dinding 44 3.2 140.8 M2
Potong
Pintu 3.36 3 10.08 M2
Lubang angin 3 lobang 1.3 2 2.6 M2
Lubang angin 2 lobang 0.85 7 5.95 M2
18.63 M2
Jumlah pasg dinding bata 122.17 M2
PLESTERAN
Dinding 44 3.2 140.8 M2
Jumlah plesteran bersih 244.34 M2
PENGECATAN
Permukaan dinding Tembok 244.34 M2
Permukaan atap dak sblh bawah 14.4 7.4 106.56 M2
Listplank 0.58 58.4 33.872 M2
Jumlah 384.772 M2
Permukaan kayu/besi
Lubang angin 3 lobang 1.728 2 3.456
Lubang angin 2 lobang 0.7872 7 5.5104
Jalusi besi 45
Pintu besi 3.36 3 10.08
64.0464
ANALISA HARGA SATUAN PEKERJAAN
HARGA JUMLAH
KODE ANALISA URAIAN SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)
I. PEKERJAAN TANAH
PIPA GSP/STEEL
V. PEKERJAAN BETON
PEKERJAAN PEMBESIAN
SNI-03.I6.25 1 Kg Pembesian dengan besi polos
- Besi Beton Polos Kg 1.0500 13,192.00 13,851.60
- Kawat Beton Kg 0.0150 20,564.00 308.46
- Pekerja OH 0.0070 56,454.00 395.18
- Tukang Besi OH 0.0070 83,323.00 583.26
- Kepala Tukang OH 0.0007 100,104.00 70.07
- Mandor OH 0.0003 75,757.00 22.73
Jumlah 15,231.30
II Harga Bahan
HARGA SATUAN
NO. U R A I A N SATUAN
Rp.
I. Upah
1 Mandor OH 64,100.00
2 Tukang OH 71,200.00
3 Kepala tukang OH 85,500.00
4 Pekerja galian tanah OH 44,900.00
5 Pekerja kayu,besi,batu,cat,penganyam OH 48,100.00
B PEMASANGAN BAJA
1 MS Plate 5''x20''x8mm 2,633.00 Kg Ditaksir 6,500.00 17,114,500.00
2 MS Plate 5''x20''x10mm 6,912.50 Kg Ditaksir 6,500.00 44,931,250.00
3 MS Plate 5''x20''x6mm 2,835.00 Kg Ditaksir 6,500.00 18,427,500.00
4 UNP 100x50x5 mm - 6m 228.00 Kg Ditaksir 6,500.00 1,482,000.00
5 UNP 120x50x5 mm - 6m 646.00 Kg Ditaksir 6,500.00 4,199,000.00
6 UNP 80x45x5 mm - 6m 322.40 Kg Ditaksir 6,500.00 2,095,600.00
7 L 60x60x6 mm - 6m 297.60 Kg Ditaksir 6,500.00 1,934,400.00
8 Pipa GSP dia. 40 mm 6.00 M' Ditaksir 6,500.00 39,000.00
9 Pipa GSP dia. 25 mm 6.00 M' Ditaksir 6,500.00 39,000.00
10 Plate Strip 8 mm x 75 mm 179.41 Kg Ditaksir 6,500.00 1,166,165.00
SUB JUMLAH - I 274,065,472.00
2. Pipa Outlet
1 Pipa Gip dia. 150 mm, untuk 3 pompa 18.00 M' Ditaksir 636,000.00 11,448,000.00
2 Bend All Flange Gip dia. 150 mm x 90º 6.00 Bh Ditaksir 1,238,573.60 7,431,441.60
3 Loss Flange dia. 150 mm 12.00 Bh Ditaksir 199,000.00 2,388,000.00
4 Gate Valve Butterfly CI dia. 150 mm 3.00 Unit Ditaksir 974,000.00 2,922,000.00
5 Pembuatan lubang dinding ; 3 Unit 1.00 Ls Ditaksir 600,000.00 600,000.00
6 Pemasangan/Fabrikasi/Pengelasan ; 3 Unit 1.00 Ls Ditaksir 375,000.00 375,000.00
7 Paking karet 1.00 Ls Ditaksir 880,000.00 880,000.00
8 Baut dan mur 1.00 Ls Ditaksir 2,160,000.00 2,160,000.00
3. Pipa By Pass
1 Pipa Gip dia. 150 mm 24.00 M' Ditaksir 636,000.00 15,264,000.00
2 Bend All Flange Gip dia. 150 mm x 90º 2.00 Bh Ditaksir 1,238,573.60 2,477,147.20
3 Loss Flange dia. 150 mm 6.00 Bh Ditaksir 199,000.00 1,194,000.00
4 Gate Valve Butterfly CI dia. 150 mm 2.00 Unit Ditaksir 974,000.00 1,948,000.00
5 Pemasangan/Fabrikasi/Pengelasan 1.00 Ls Ditaksir 125,000.00 125,000.00
6 Paking karet 1.00 Ls Ditaksir 390,000.00 390,000.00
7 Baut dan mur 1.00 Ls Ditaksir 960,000.00 960,000.00
4. Pipa Peluap
1 Pipa Gip dia. 150 mm 10.00 M' Ditaksir 636,000.00 6,360,000.00
2 Bend All Flange Gip dia. 150 mm x 90º 3.00 Bh Ditaksir 1,238,573.60 3,715,720.80
3 Loss Flange dia. 150 mm 4.00 Bh Ditaksir 199,000.00 796,000.00
4 Pembuatan lubang dinding 2.00 Ls Ditaksir 200,000.00 400,000.00
5 Pemasangan/Fabrikasi/Pengelasan 1.00 Ls Ditaksir 125,000.00 125,000.00
6 Paking karet 1.00 Ls Ditaksir 145,000.00 145,000.00
7 Baut dan mur 1.00 Ls Ditaksir 360,000.00 360,000.00
5. Pipa Kuras
1 Pipa Gip dia. 150 mm 6.00 M' Ditaksir 636,000.00 3,816,000.00
2 Bend All Flange Gip dia. 150 mm x 90º 1.00 Bh Ditaksir 1,238,573.60 1,238,573.60
3 Loss Flange dia. 150 mm 4.00 Bh Ditaksir 199,000.00 796,000.00
4 Gate Valve Butterfly dia. 150 mm 1.00 Unit Ditaksir 974,000.00 974,000.00
5 Pembuatan lubang dinding 1.00 Ls Ditaksir 200,000.00 200,000.00
6 Pemasangan/Fabrikasi/Pengelasan 1.00 Ls Ditaksir 125,000.00 125,000.00
7 Paking karet 1.00 Ls Ditaksir 196,000.00 196,000.00
8 Baut dan mur 1.00 Ls Ditaksir 480,000.00 480,000.00
B PEKERJAAN PENGECATAN
1 Primer Coating 160.00 M2 SNI-03.K6.25 123,529.50 19,764,720.00
2 Final Coating 80.00 M2 SNI-03.K6.24 147,486.56 11,798,924.80
3 Epoxy Painting 80.00 M2 SNI-03.K6.25b 126,264.90 10,101,192.00
4 Thinner 127.50 ltr Ditaksir 19,900.00 2,537,250.00
SUB JUMLAH - II 128,285,970.00
B Pekerjaan Beton
1 Beton Campuran 1 : 3 : 5 16.00 M
3
SNI-03.G6.1 616,988.87 9,871,821.92
2 Beton Campuran 1 : 2 : 3 56.00 M
3
SNI-03.G6.5 624,450.11 34,969,206.16
3 Pembesian (perakitan rangka tulangan) 405.10 Kg SNI-03.I6.25 15,231.30 6,170,199.18
4 Bekisting 30.14 M
2
SNI-03.F6.28 83,537.37 2,517,816.33
REKAPITULASI
I. PEKERJAAN PENGADAAN & PEMASANGAN BAJA 274,065,472.00
II. PEKERJAAN PIPA DAN ACCESSORIES 128,285,970.00
III. PEKERJAAN PEMBUATAN PONDASI RESERVOIR 79,508,413.73
JUMLAH 481,859,855.73