Anda di halaman 1dari 1

LABORATORIUM TRANSPORTASI DAN JALAN RAYA

FAKULTAS TEKNIK UNIVERSITAS TADULAKO


Kampus Bumi Tadulako Tondo Palu Telp. 422611 Psw 158

PROYEK : Praktikum Perkerasan Jalan DIKERJAKAN : KELOMPOK 2 UMP


PEKERJAAN : AC - WC DIHITUNG : KELOMPOK 2 UMP
=
SUMBER MAT. : Ex.S.C.Taipa DIPERIKSA : Ir. Dian Rifany K., SST, MT
NO. CONTOH : Gradasi Gabungan TANGGAL : 14 NOVEMBER 2023

GRADASI GABUNGAN
AASHTO T. 11-82, T. 27-28

Bukaan Agg. 3/4 Agg. 3/8 Abu Batu Gradasi


Sieve No. Spesifikasi
(mm) % lolos 27% % lolos 22% % lolos 51% Gabungan
3/4 " 19,100 100,00 27,00 100,00 22,00 100,00 51,00 100,00 100,00
1/2 " 12,700 69,12 18,66 100,00 22,00 100,00 51,00 91,66 90-100
3/8 " 9,520 24,88 6,72 99,86 21,97 100,00 51,00 79,69 77-90
No. 4 4,760 1,50 0,40 69,98 15,40 99,33 50,66 66,46 53-69
No. 8 2,380 0,67 0,18 3,57 0,78 76,46 39,00 39,96 33-53
No. 16 1,160 0,64 0,17 1,18 0,26 47,64 24,30 24,73 21-40
No. 30 0,590 0,61 16,55 1,10 0,24 24,37 12,43 29,22 14-30
No. 50 0,279 0,59 11,03 1,06 0,23 17,30 8,83 20,09 9-22
No. 100 0,150 0,54 3,62 0,63 0,14 7,22 3,68 7,44 6-15
No. 200 0,074 0,44 0,18 0,39 0,09 1,28 0,65 0,92 4-9
PAN 0,00 0,00 0,00 0,00 0,00 0,00 0,00

100

90

80

70

60

50
% Lolos

40

30

20

10

0
0,01 0,10 1,00 10,00 100,00 1000,00

Ukuran Butir (mm)

Bts Atas

Palu, 2023
Disetujui Oleh

Ir. Dian Rifany K., SST, MT

Anda mungkin juga menyukai