Anda di halaman 1dari 30

REKAPILUTASI ANGGARAN BIAYA

PEMBANGUNAN DAN REHABILITASI GUDANG IMST


JL. RING ROAD KOTA MADIUN

KODE URAIAN PEKERJAAN JUMLAH HARGA

0 - Rp.
B PEKERJAAN TANAH Rp.
C PEKERJAAN PASANGAN ,SALURAN DAN AKSESORIES Rp.
D PEKERJAAN BETON BERTULANG Rp.
E PEKERJAAN PLESTERAN DINDING Rp.
F PEKERJAAN FINISHING PENGECATAN Rp.

ANGGARAN BIAYA PEMBANGUNAN Rp.

PPN & PPH 10% Rp.

TOTAL ANGGARAN BIAYA PEMBANGUNAN Rp.

TOTAL ANGGARAN BIAYA DIBULATKAN Rp.

MENYETUJUI,
TIM INVESTASI IMS TRADING
TERBILANG = SATU MILYAR TUJUH RATUS LIMA PULUH LIMA JUTA RUPIAH

VIRGIANTO ATLANTIKA
AYA

DANG IMST

JUMLAH HARGA

86,461,210.90
40,015,315.18
234,303,059.84
873,862,892.56
64,465,498.46
25,199,274.38

1,324,307,251.31
132,430,725.13
1,456,737,976.44
1,456,800,000.00

YETUJUI,
SI IMS TRADING

O ATLANTIKA
LAMPIRAN PERHITUNGAN PEKERJAA

PEMBANGUNAN DAN REHABILITASI GUD


JL. RING ROAD KOTA MADIUN

KONTRAK MC 100

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA


SATUAN VOLUME SATUAN VOLUME
Rp. Rp.
A PEKERJAAN PERSIAPAN

1 PEMBONGKARAN PAVING EXISTING M2 1805.00 21,862.50 39,461,812.50 M2 1,797.00


2 PEMINDAHAN BONGKARAN PAVING LS 1.00 8,000,000.00 8,000,000.00 LS 1.00
3 PEMBERSIHAN LOKASI DAN PERSIAPAN LAHAN M2 1805.00 12,000.00 21,660,000.00 M2 1,797.00
4 PEMBUANGAN SISA BONGKARAN LS 1.00 500,000.00 500,000.00 LS 1.00
5 PEMBONGKARAN SALURAN LAMA M3 30.72 548,157.50 16,839,398.40 M3 30.72
Rp. 86,461,210.90

B PEKERJAAN TANAH

1 PEK.GALIAN TANAH STROUS dia.25 - 2 meter M1 120.00 37,656.19 4,518,742.80 M1 120.00


2 PEK. GALIAN SLOOF 20/30 M3 50.79 60,362.50 3,065,811.38 M3 50.79
3 URUGAN PASIR BAWAH RIGID Tb.10 cm M3 126.80 182,545.00 23,146,706.00 M3 127.22
KONTRAK MC 100

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA


SATUAN VOLUME SATUAN VOLUME
4 URUGAN TANAH PENINGGIAN LAVELING M3 46.80 114,262.50 5,347,485.00 M3 89.97
5 URUGAN TANAH KEMBALI M3 15.36 43,725.00 671,616.00 M3 15.36
5 PEMADATAN TANAH DENGAN MEKANIS M3 62.16 52,525.00 3,264,954.00 M3 105.33
Rp. 40,015,315.18

C PEKERJAAN PASANGAN ,SALURAN DAN AKSESORIES

1 PEK. PASANGAN BATA SALURAN M2 537.60 105,235.90 56,574,819.84 M2 302.40


2 PEK. GORONG-GORONG Dia. 50 cm M1 192.00 95,000.00 18,240,000.00 M1 108.00
3 PEK. PEMBUATAN BAK KONTROL UNIT 40.00 598,906.00 23,956,240.00 UNIT 22.00
-INCLUDE TUTUP BAK KONTROL
4 PEK. PENGGANTIAN ATAP TRANSPARAN M2 105.60 95,000.00 10,032,000.00 M2 105.60
-SPESIFIKASI SPANDEK TRANSPARAN
5 EXHAUST FAN UNIT 5.00 23,000,000.00 115,000,000.00 UNIT
-INSTALASI DAN PEMASANGAN INCLUDE
-KAPASITAS 1700 CFM
6 LAMPU PENERANGAN GUDANG TITIK 15.00 700,000.00 10,500,000.00 TITIK 15.00
-INSTALASI,PANEL DAN PEMASANGAN
-LAMPU SPESIFIKASI MENGGUNAKAN LED
7 Panel ea 7,500,000.00 ea
Kabel Lampu (NYM 2x1,5 Eterna/Setara) m1 7,300.00 m1
Kabel Grounding (NYM 1x2,5 Eterna/Setara) m1 3,000.00 m1
KONTRAK MC 100

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA


SATUAN VOLUME SATUAN VOLUME
Konduit Kabel m1 8,000.00 m1
Konduit Fitting ls 1,000,000.00 ls
Kabel exhaus fan (NYM 4x2,5 Eterna/Setara) m1 12,840.00 m1
Saklar 5A,Broco /Setara ea 15,000.00 ea

8 Lampu
Lampu 220v,50 hz,200w,Led Metal/Almunium ea 2,706,000.00 ea
Besi Gantungan Dia 10 .2 meter ea 12,000.00 ea
Clamp& Asesories ea 250,000.00 ea

9 Exhaus Fan (CKE /Setara)


Size 1000 m 750 w 380 v 30500 CMH ea 4,440,000.00 ea
Panel fan Start Stop 3 Phase ea 2,000,000.00 ea

10 Cable Tray & assesories


pxlxt =2400x100x50;1,2 mm hotdip galvanis m1 55,000.00 m1
55,000.00
siku 90+Cover siku ea 70,000.00 ea
Cover tray ea 32,500.00 ea
Jointing ea 15,000.00 ea
Cover Clip ea 15,000.00 ea
KONTRAK MC 100

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA


SATUAN VOLUME SATUAN VOLUME
Bracket ea 24,000.00 ea
Bracket Mounting ea 25,200.00 ea

Tray Tipe U (2400x100x50;1,5 mm;HotdipGalvanis) m1 55,000.00 m1


siku 90+Cover siku ea 70,000.00 ea
Cover tray ea 32,500.00 ea
Inside Riser ea 78,000.00 ea
Outsider Riser ea 78,000.00 ea
Jointing ea 15,000.00 ea
Cover Clip ea 15,000.00 ea
Bracket ea 24,000.00 ea
Bracket Mounting ea 25,200.00 ea
Dynabolt ea 2,000.00 ea

Rp. 234,303,059.84

D PEKERJAAN BETON BERTULANG

1 STROUS Ø25 KEDALAMAN 2 METER


-PENGECORAN BETON K-225 M3 5.94 999,163.00 5,935,028.22 M3 5.94
-PEMBESIAN (5 Ø10 - begel Ø6) KG 528.57 12,524.60 6,620,127.82 KG 528.57
KONTRAK MC 100

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA


SATUAN VOLUME SATUAN VOLUME
2 SLOOF 20/30 (S1)
-PENGECORAN BETON K-275 M3 25.39 999,163.00 25,368,748.57 M3 25.39
-PEMBESIAN (3Ø12 & 2 Ø 8- begel Ø6-150) KG 3140.46 12,524.60 39,333,005.32 KG 3,140.46
-BEGESTING SLOOF 2x Pakai M2 253.93 148,951.00 37,823,127.43 M2 169.29
3 PLAT STRUKTUR TROWEL Tb.10 CM
BANGUNAN GUDANG DEPAN
-PENGECORAN BETON K-275 M3 103.40 999,163.00 103,313,454.20 M3 82.23
-PEMBESIAN WIREMESH M7 M2 4313.80 50,000.00 215,690,000.00 M2 822.34
-BEGESTING PLAT RIGID M2 103.40 148,951.00 15,401,533.40 M2 82.23
-INCLUDE LAPISAN PLASTIK BAWAH PLAT
4 PLAT STRUKTUR TROWEL Tb.10 CM
BANGUNAN GUDANG BELAKANG
-PENGECORAN BETON K-275 M3 23.40 999,163.00 23,380,414.20 M3 44.99
-PEMBESIAN WIREMESH M7 M2 976.24 50,000.00 48,812,000.00 M2 449.86
-BEGESTING PLAT RIGID M2 23.40 148,951.00 3,485,453.40 M2 44.99
-INCLUDE LAPISAN PLASTIK BAWAH PLAT
5 FIN. FLOOR HARDENER RIGID (PRIME COAT & EPOXY)
BANGUNAN GUDANG DEPAN M2 1034.00 275,000.00 284,350,000.00 M2 822.34
-SPESIFIKASI PRIME COAT 500 Micron
-SPESIFIKASI EPOXY 250 Micron
6 FIN. FLOOR HARDENER RIGID (PRIME COAT & EPOXY)
KONTRAK MC 100

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA


SATUAN VOLUME SATUAN VOLUME
BANGUNAN GUDANG BELAKANG M2 234.00 275,000.00 64,350,000.00 M2 974.66
-SPESIFIKASI PRIME COAT 500 Micron
-SPESIFIKASI EPOXY 250 Micron
Rp. 873,862,892.56

E PEKERJAAN PLESTERAN DINDING

1 PEKERJAAN FIN PLESTERAN GUDANG DALAM M2 193.10 56,070.30 10,827,174.93 M2 581.00


2 PEKERJAAN FIN PLESTERAN GUDANG LUAR M2 84.10 56,070.30 4,715,512.23 M2 103.00
3 PEKERJAAN FIN PLESTERAN PAGAR DALAM M2 74.50 56,070.30 4,177,237.35 M2 180.90
4 PEKERJAAN FIN PLESTERAN PAGAR LUAR M2 121.50 56,070.30 6,812,541.45 M2 283.00
5 PEKERJAAN FIN ACIAN GUDANG DALAM M2 193.10 31,075.00 6,000,582.50 M2 581.00
6 PEKERJAAN FIN ACIAN GUDANG LUAR M2 84.10 31,075.00 2,613,407.50 M2 103.00
7 PEKERJAAN FIN ACIAN PAGAR DALAM M2 74.50 31,075.00 2,315,087.50 M2 180.90
8 PEKERJAAN FIN ACIAN PAGAR LUAR M2 121.50 31,075.00 3,775,612.50 M2 283.00
9 PEK. BENANGAN & TALI AIR M1 2270.00 10,232.75 23,228,342.50 M1
Rp. 64,465,498.46

F PEKERJAAN FINISHING PENGECATAN

1 PEKERJAAN FIN PENGECATAN GUDANG DALAM M2 193.10 19,477.70 3,761,143.87 M2 581.00


2 PEKERJAAN FIN PENGECATAN GUDANG LUAR M2 84.10 19,477.70 1,638,074.57 M2 103.00
3 PEKERJAAN FIN PENGECATAN PAGAR DALAM M2 74.50 19,477.70 1,451,088.65 M2 180.90
KONTRAK MC 100

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA


SATUAN VOLUME SATUAN VOLUME
4 PEKERJAAN FIN PENGECATAN PAGAR LUAR M2 121.50 19,477.70 2,366,540.55 M2 283.00
5 PENGECATAN KOLOM EXISTING M2 280.25 19,477.70 5,458,625.43 M2 280.25
6 PENGECATAN BALOK EXISTING M2 540.30 19,477.70 10,523,801.31 M2 540.30
Rp. 25,199,274.38

I. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan / Peralatan Ls 500,000.00 Ls 1.00
2 Pek. Bongkar Dinding Bata M2 122,479.50 M2 21.00
3 Pek. Pembongkaran Dinding Galavlum ( Dipasang Kembali ) M2 25,000.00 M2 57.00
4 Pek. Pembongkaran Rangka Dinding Galvalum (Dipasang Kembali) M2 35,000.00 M2 57.00

II. PEKERJAAN STRUKTUR PONDASI

1 Pekerjaan Tanah dan Galian


a. Galian Tanah M3 78,952.50 M3 2.40
b. Urugan Tanah Kembali M3 46,475.00 M3 0.84
c. Pengeboran Strouss Dia. 30 Cm M' 34,061.50 M' 6.00
2 Urugan Pasir Dasar Galian FP Tebal 10 Cm M3 269,032.50 M3 0.20
3 Lantai Kerja Bawah FP Tebal 7 Cm M3 951,640.63 M3 0.14
4 Pekerjaan Pondasi Beton
- Footplate 80 x 80 x 30 Cm
KONTRAK MC 100

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA


SATUAN VOLUME SATUAN VOLUME
a. Membuat Mutu beton K - 250 M3 1,144,276.69 M3 0.38
b. Pembesian Besi Ulir Kg 15,809.48 Kg 52.95
c. Sewa Begisting Untuk Pondasi M2 117,258.35 M2 1.92
- Strouss Dia. 30 cm
a. Membuat Mutu beton K - 250 M3 1,144,276.69 M3 0.42
b. Pembesian Besi Polos Kg 14,596.73 Kg 53.05

V. PEKERJAAN BETON
1 Beton Kolom
- Kolom 30x40 Cm
a. Membuat Mutu beton K - 250 M3 1,144,276.69 M3 0.54
b. Pembesian Besi Polos Kg 14,596.73 Kg 20.03
c. Pembesian Besi Ulir Kg 15,809.48 Kg 85.68
d. Sewa Begisting Untuk Kolom M2 197,601.80 M2 6.30

VI. PEKERJAAN RANGKA WF


1 Pek. Potong & Bongkar Kolom WF Ls 750,000.00 Ls 1.00
2 Pek. Susukan Perkuatan Rafter
WF 250.125.6.9 Kg 30,156.50 Kg 189.44

3 Pek. Susulan WF Baru


KONTRAK MC 100

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA


SATUAN VOLUME SATUAN VOLUME
WF 300.150.6,5.9 Kg 30,156.50 Kg 789.05

4 Vute WF 300.150.6,5.9 Kg 30,156.50 Kg 58.72

5 Asesoris :
a. Rib 8 mm (Stiffener) Kg 26,677.75 Kg 62.64
b. Plat joint PI 12 mm Kg 26,677.75 Kg 74.89
c. Plat Plandes 16 mm Kg 26,677.75 Kg 45.22
d. Baut HTB M22 Pcs 8,500.00 Pcs 24.00
e. Angkur Ø 22 mm Pcs 95,000.00 Pcs 8.00
6 Pengecatan Baja M2 34,464.10 M2 72.97

V. PEKERJAAN ARSITEK

1 Pas. Acian Kolom Beton M2 33,025.09 M2 3.50


2 Pengecatan Kolom M2 22,897.77 M2 3.50
3 Pasang Kembali Penutup Galvalum + Rangka M2 38,116.50 M2 46.00
4 Pasang Penutup Galvalum Baru M2 193,975.10 M2 16.10
Rp. -
1,324,307,251.31
132,430,725.13
KONTRAK MC 100

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA


SATUAN VOLUME SATUAN VOLUME
1,456,737,976.44
1,456,800,000.00
N PEKERJAAN TAMBAH KURANG

AN REHABILITASI GUDANG IMST


NG ROAD KOTA MADIUN

MC 100 PERUBAHAN
BOBOT
TAMBAH KURANG
NILAI FISIEK
PROYEK Rp PROYEK NILAI FISIEK NILAI FISIEK
SATUAN VOLUME SATUAN VOLUME
Rp Rp
KETERANGAN
%

39,286,994.48 3.24 M2 - - M2 8.00 174,818.02 KURANG


8,000,000.00 0.66 LS - - M2 - - TETAP
21,564,045.00 1.78 M2 - - M2 8.00 95,955.00 KURANG
500,000.00 0.04 LS - - M2 - - TETAP
16,839,398.40 1.39 M3 - - M2 - - TETAP
86,190,437.88 7.11 - 270,773.02

4,518,742.80 0.37 M1 - - M2 - - TETAP


3,065,594.07 0.25 M3 - - M2 0.00 217.31 KURANG
23,223,443.35 1.91 M3 0.42 76,737.35 M2 - - TAMBAH
MC 100 PERUBAHAN
BOBOT
TAMBAH KURANG
NILAI FISIEK
PROYEK Rp PROYEK SATUAN VOLUME NILAI FISIEK SATUAN VOLUME
NILAI FISIEK
10,280,425.65 0.85 M3 43.17 Rp
4,932,940.65 M2 - Rp - TAMBAH
KETERANGAN
%
671,616.00 0.06 M3 - - M2 - - TETAP
5,532,563.30 0.46 M3 43.17 2,267,609.30 M2 - - TAMBAH
47,292,385.17 3.90 7,277,287.30 217.31

31,823,336.16 2.62 M2 - - M2 235.20 24,751,483.68 KURANG


10,260,000.00 0.85 M1 - - M2 84.00 7,980,000.00 KURANG
13,175,932.00 1.09 UNIT - - M2 18.00 10,780,308.00 KURANG
TETAP
10,032,000.00 0.83 M2 - - M2 - - TETAP
TETAP
- - UNIT - - M2 5.00 115,000,000.00 KURANG
TETAP
TETAP
10,500,000.00 0.87 TITIK - - M2 - - TETAP

ea 1.00 7,500,000.00 ea TAMBAH


m1 294.00 2,146,200.00 m1 TAMBAH
m1 294.00 882,000.00 m1 TAMBAH
MC 100 PERUBAHAN
BOBOT
TAMBAH KURANG
NILAI FISIEK
PROYEK Rp PROYEK NILAI FISIEK NILAI FISIEK
SATUAN VOLUME SATUAN VOLUME
m1 294.00 Rp
2,352,000.00 m1 Rp TAMBAH
KETERANGAN
%
ls 1.00 1,000,000.00 ls TAMBAH
m1 30.00 385,200.00 m1 TAMBAH
ea 12.00 180,000.00 ea TAMBAH
-
-
ea 12.00 32,472,000.00 ea TAMBAH
ea 12.00 144,000.00 ea TAMBAH
ea 12.00 3,000,000.00 ea TAMBAH
-
-
ea 3.00 13,320,000.00 ea TAMBAH
ea 3.00 6,000,000.00 ea TAMBAH
-
-
m1 26.00 1,430,000.00 m1 TAMBAH
66.00 3,630,000.00 TAMBAH
ea 1.00 70,000.00 ea TAMBAH
ea 92.00 2,990,000.00 ea TAMBAH
ea 40.00 600,000.00 ea TAMBAH
ea 40.00 600,000.00 ea TAMBAH
MC 100 PERUBAHAN
BOBOT
TAMBAH KURANG
NILAI FISIEK
PROYEK Rp PROYEK NILAI FISIEK NILAI FISIEK
SATUAN VOLUME SATUAN VOLUME
ea 40.00 Rp
960,000.00 ea Rp TAMBAH
KETERANGAN
%
ea 40.00 1,008,000.00 ea TAMBAH
-
m1 69.00 3,795,000.00 m1 TAMBAH
ea 2.00 140,000.00 ea TAMBAH
ea 69.00 2,242,500.00 ea TAMBAH
ea 2.00 156,000.00 ea TAMBAH
ea 2.00 156,000.00 ea TAMBAH
ea 30.00 450,000.00 ea TAMBAH
ea 40.00 600,000.00 ea TAMBAH
ea 40.00 960,000.00 ea TAMBAH
ea 40.00 1,008,000.00 ea TAMBAH
ea 160.00 320,000.00 ea TAMBAH

75,791,268.16 6.25 90,496,900.00 158,511,791.68

5,935,028.22 0.49 M3 - - M2 - - TETAP


6,620,127.82 0.55 KG - - M2 - - TETAP
MC 100 PERUBAHAN
BOBOT
TAMBAH KURANG
NILAI FISIEK
PROYEK Rp PROYEK NILAI FISIEK NILAI FISIEK
SATUAN VOLUME SATUAN VOLUME
Rp Rp TETAP
KETERANGAN
%
25,371,945.89 2.09 M3 0.00 3,197.32 M2 - - TAMBAH
39,333,026.46 3.24 KG 0.00 21.14 M2 - - TAMBAH
25,215,616.89 2.08 M2 - - M2 84.64 12,607,510.54 KURANG

82,165,544.83 6.77 M3 - - M2 21.17 21,147,909.37 KURANG


41,117,187.50 3.39 M2 - - M2 3,491.46 174,572,812.50 KURANG
12,248,892.39 1.01 M2 - - M2 21.17 3,152,641.01 KURANG

44,948,346.72 3.71 M3 21.59 21,567,932.52 M2 - - TAMBAH


22,493,000.00 1.85 M2 - - M2 526.38 26,319,000.00 KURANG
6,700,709.69 0.55 M2 21.59 3,215,256.29 M2 - - TAMBAH

226,144,531.25 18.65 M2 - - M2 211.66 58,205,468.75 KURANG


MC 100 PERUBAHAN
BOBOT
TAMBAH KURANG
NILAI FISIEK
PROYEK Rp PROYEK SATUAN VOLUME NILAI FISIEK SATUAN VOLUME
NILAI FISIEK
268,031,500.00 22.10 M2 740.66 Rp
203,681,500.00 M2 - Rp - TAMBAH
KETERANGAN
%

806,325,457.65 66.48 228,467,907.27 296,005,342.17

32,576,844.30 2.69 M2 387.90 21,749,669.37 M2 - - TAMBAH


5,775,240.90 0.48 M2 18.90 1,059,728.67 M2 - - TAMBAH
10,143,117.27 0.84 M2 106.40 5,965,879.92 M2 - - TAMBAH
15,867,894.90 1.31 M2 161.50 9,055,353.45 M2 - - TAMBAH
18,054,575.00 1.49 M2 387.90 12,053,992.50 M2 - - TAMBAH
3,200,725.00 0.26 M2 18.90 587,317.50 M2 - - TAMBAH
5,621,467.50 0.46 M2 106.40 3,306,380.00 M2 - - TAMBAH
8,794,225.00 0.73 M2 161.50 5,018,612.50 M2 - - TAMBAH
- - M1 - - M2 2,270.00 23,228,342.50 KURANG
100,034,089.87 8.25 58,796,933.91 23,228,342.50

11,316,543.70 0.93 M2 387.90 7,555,399.83 M2 - - TAMBAH


2,006,203.10 0.17 M2 18.90 368,128.53 M2 - - TAMBAH
3,523,515.93 0.29 M2 106.40 2,072,427.28 M2 - - TAMBAH
MC 100 PERUBAHAN
BOBOT
TAMBAH KURANG
NILAI FISIEK
PROYEK Rp PROYEK SATUAN VOLUME NILAI FISIEK SATUAN VOLUME
NILAI FISIEK
5,512,189.10 0.45 M2 161.50 Rp
3,145,648.55 M2 - Rp - TAMBAH
KETERANGAN
%
5,458,625.43 0.45 M2 - - M2 - - TETAP
10,523,801.31 0.87 M2 - - M2 - - TETAP
38,340,878.57 3.16 13,141,604.19 -

500,000.00 0.04 Ls 1.00 500,000.00 Ls - - TAMBAH


2,572,069.50 0.21 M2 21.00 2,572,069.50 M2 - - TAMBAH
1,425,000.00 0.12 M2 57.00 1,425,000.00 M2 - - TAMBAH
1,995,000.00 0.16 M2 57.00 1,995,000.00 M2 - - TAMBAH

189,486.00 0.02 M3 2.40 189,486.00 M3 - - TAMBAH


39,039.00 0.00 M3 0.84 39,039.00 M3 - - TAMBAH
204,369.00 0.02 M' 6.00 204,369.00 M' - - TAMBAH
53,806.50 0.00 M3 0.20 53,806.50 M3 - - TAMBAH
133,229.69 0.01 M3 0.14 133,229.69 M3 - - TAMBAH
MC 100 PERUBAHAN
BOBOT
TAMBAH KURANG
NILAI FISIEK
PROYEK Rp PROYEK SATUAN VOLUME NILAI FISIEK SATUAN VOLUME
NILAI FISIEK
439,402.25 0.04 M3 0.38 Rp
439,402.25 M3 - Rp - TAMBAH
KETERANGAN
%
837,160.84 0.07 Kg 52.95 837,160.84 Kg - - TAMBAH
225,136.03 0.02 M2 1.92 225,136.03 M2 - - TAMBAH

485,058.89 0.04 M3 0.42 485,058.89 M3 - - TAMBAH


774,429.11 0.06 Kg 53.05 774,429.11 Kg - - TAMBAH

617,909.41 0.05 M3 0.54 617,909.41 M3 - - TAMBAH


292,341.25 0.02 Kg 20.03 292,341.25 Kg - - TAMBAH
1,354,617.42 0.11 Kg 85.68 1,354,617.42 Kg - - TAMBAH
1,244,891.34 0.10 M2 6.30 1,244,891.34 M2 - - TAMBAH

750,000.00 0.06 Ls 1.00 750,000.00 Ls - - TAMBAH

5,712,847.36 0.47 Kg 189.44 5,712,847.36 Kg - - TAMBAH


MC 100 PERUBAHAN
BOBOT
TAMBAH KURANG
NILAI FISIEK
PROYEK Rp PROYEK SATUAN VOLUME NILAI FISIEK SATUAN VOLUME
NILAI FISIEK
23,794,986.33 1.96 Kg 789.05 Rp
23,794,986.33 Kg - Rp - TAMBAH
KETERANGAN
%

1,770,789.68 0.15 Kg 58.72 1,770,789.68 Kg - - TAMBAH

1,671,174.29 0.14 Kg 62.64 1,671,174.29 Kg - - TAMBAH


1,997,870.02 0.16 Kg 74.89 1,997,870.02 Kg - - TAMBAH
1,206,261.14 0.10 Kg 45.22 1,206,261.14 Kg - - TAMBAH
204,000.00 0.02 Pcs 24.00 204,000.00 Pcs - - TAMBAH
760,000.00 0.06 Pcs 8.00 760,000.00 Pcs - - TAMBAH
2,514,759.22 0.21 M2 72.97 2,514,759.22 M2 - - TAMBAH

115,587.83 0.01 M2 3.50 115,587.83 M2 - - TAMBAH


80,142.18 0.01 M2 3.50 80,142.18 M2 - - TAMBAH
1,753,359.00 0.14 M2 46.00 1,753,359.00 M2 - - TAMBAH
3,122,999.11 0.26 M2 16.10 3,122,999.11 M2 - - TAMBAH
58,837,722.39 4.85 58,837,722.39 -
1,212,812,239.69 398,180,632.67 478,016,466.67
121,281,223.97 39,818,063.27 47,801,646.67
MC 100 PERUBAHAN
BOBOT
TAMBAH KURANG
NILAI FISIEK
PROYEK Rp PROYEK NILAI FISIEK NILAI FISIEK
SATUAN VOLUME SATUAN VOLUME
1,334,093,463.66 Rp
437,998,695.94 Rp
525,818,113.34 KETERANGAN
%
1,334,100,000.00 438,000,000.00 525,900,000.00

122,700,000.00
PEKERJAAN SIPIL STRUKTURAL

SKET
DIMENSI
No ITEM PEKERJAAN GAMBA GRID VOLUME
R cad area Keliling Panjang Lebar Tinggi Tebal n (jumlah)
1 2 3 4 5 6 7 8 9 10 11 =….x…

A PEKERJAAN PERSIAPAN
PEMBONGKARAN PAVING EXISTING 1797.00 1,797.00
PEMINDAHAN BONGKARAN PAVING 1.00
PEMBERSIHAN LOKASI DAN PERSIAPAN LAHAN 1797.00 1,797.00
PEMBUANGAN SISA BONGKARAN 1.00
PEMBONGKARAN SALURAN LAMA 192.00 0.40 0.40 30.72

B PEKERJAAN TANAH
PEK.GALIAN TANAH STROUS dia.25 - 2 meter 2.00 60.00 120.00
PEK. GALIAN SLOOF 20/30 423.22 0.30 0.40 50.79
URUGAN PASIR BAWAH RIGID Tb.10 cm 1272.20 0.10 127.22
URUGAN TANAH PENINGGIAN LAVELING 449.86 0.20 89.97
URUGAN TANAH KEMBALI 15.36
PEMADATAN TANAH DENGAN MEKANIS 105.33

C PEKERJAAN PASANGAN ,SALURAN DAN AKSESORIES


PEK. PASANGAN BATA SALURAN 108.00 1.40 2.00 302.40
PEK. GORONG-GORONG Dia. 50 cm 108.00 108.00
PEK. PEMBUATAN BAK KONTROL JARAK 5.00 108.00 21.60 DIBULATKAN 22.00 22.00
PEK. PENGGANTIAN ATAP TRANSPARAN 12.00 0.80 11.00 105.60
EXHAUST FAN 5.00 5.00
LAMPU PENERANGAN GUDANG 15.00 15.00

D PEKERJAAN BETON BERTULANG


STROUS Ø25 KEDALAMAN 2 METER
-PENGECORAN BETON K-225 0.05 2.00 60.00 5.94
-PEMBESIAN (5 Ø10 - begel Ø6) TUL.UTAMA 2.10 0.617 5.00 60.00 528.57
SKET
DIMENSI
No ITEM PEKERJAAN GAMBA GRID VOLUME
R cad area Keliling Panjang Lebar Tinggi Tebal n (jumlah)
1 2 3 4 5 6 7 8 9 10 11 =….x…
0.222 0.75 14.00
SKET
DIMENSI
No ITEM PEKERJAAN GAMBA GRID VOLUME
R cad area Keliling Panjang Lebar Tinggi Tebal n (jumlah)
1 2 3 4 5 6 7 8 9 10 11 =….x…
SLOOF 20/30 (S1)
-PENGECORAN BETON K-275 423.22 0.20 0.30 25.39
-PEMBESIAN (3Ø12 & 2 Ø 8- begel Ø6-150) TUL.UTAMA 6.00 0.888 423.22 BEGEL 0.88 0.222 2821.47 3,140.46
2.00 0.395 423.22
-BEGESTING SLOOF 2x Pakai 423.22 0.20 2.00 169.29

PLAT STRUKTUR TROWEL Tb.10 CM


BANGUNAN GUDANG DEPAN
-PENGECORAN BETON K-275 822.34 0.10 82.23
-PEMBESIAN WIREMESH M7 TUL.UTAMA 822.34 M7 822.34
-BEGESTING PLAT RIGID 411.17 0.20 82.23
BANGUNAN GUDANG BELAKANG
-PENGECORAN BETON K-275 449.86 0.10 44.99
-PEMBESIAN WIREMESH M7 TUL.UTAMA 449.86 M7 449.86
-BEGESTING PLAT RIGID 224.93 0.20 44.99

FIN. FLOOR HARDENER RIGID (PRIME COAT & EPOXY)


BANGUNAN GUDANG DEPAN 822.34 822.34
BANGUNAN GUDANG BELAKANG 974.66 974.66
KET
12

M2
LS
M2
LS
M3

M1
M3
M3
M3
M3
M3

M2
M1
UNIT
M2
UNIT
TITIK

M3
KG
KET
12
KET
12

M3
KG

M2

M3
M2
M2

M3
M2
M2

M2
M2
PEKERJAAN ARSITEKTURAL BANGUNAN

SKET DIMENSI
No ITEM PEKERJAAN GRID
GAMBAR cad area Keliling Panjang
1 2 3 4 5 6

E PEKERJAAN PLESTERAN DINDING


PEKERJAAN FIN PLESTERAN GUDANG DALAM 581.00 200.00
PEKERJAAN FIN PLESTERAN GUDANG LUAR 103.00 91.00
PEKERJAAN FIN PLESTERAN PAGAR DALAM 180.90 77.00
PEKERJAAN FIN PLESTERAN PAGAR LUAR 283.00 124.00

PEKERJAAN FIN ACIAN GUDANG DALAM


PEKERJAAN FIN ACIAN GUDANG LUAR
PEKERJAAN FIN ACIAN PAGAR DALAM
PEKERJAAN FIN ACIAN PAGAR LUAR

PEK. BENANGAN & TALI AIR 200.00


77.00
124.00

F PEKERJAAN FINISHING PENGECATAN


PEKERJAAN FIN PENGECATAN GUDANG DALAM
PEKERJAAN FIN PENGECATAN GUDANG LUAR
PEKERJAAN FIN PENGECATAN PAGAR DALAM
PEKERJAAN FIN PENGECATAN PAGAR LUAR

PENGECATAN KOLOM EXISTING

PENGECATAN BALOK EXISTING


DIMENSI
VOLUME KET
Lebar Tinggi Tebal n (jumlah)
7 8 9 10 11 =….x… 12

6.90 581.00 M2
6.90 103.00 M2
2.50 180.90 M2
2.50 283.00 M2

581.00 M2
103.00 M2
180.90 M2
283.00 M2

33.33 48.00 1600.00 2270.00 M1


25.67 10.00 256.67
41.33 10.00 413.33

581.00 M2
103.00 M2
180.90 M2
283.00 M2

33.33 6.90 230.00 280.25 M2


25.67 0.75 19.25
41.33 0.75 31.00
33.33 14.40 480.00 540.30 M2
25.67 0.90 23.10
41.33 0.90 37.20

Anda mungkin juga menyukai