Anda di halaman 1dari 45

REKAPITULASI PENAWARAN HARGA

PEKERJAAN SIPIL & PEMASANGAN GANTRY


PEMBANGUNAN GARDU INDUK 150KV SUKAMARA 2 LINE BAY, 1 BAY COUPLER DAN 1 TRAFO BAY

NILAI PENAWARAN

NO URAIAN PEKERJAAN Harga Satuan Jumlah Harga


SATUAN
Volume
(Rp) (Rp)
1 2 3 7 8 9= 7 X 8
PEKERJAAN GEDUNG KONTROL 150 KV :

A. PEKERJAAN TANAH Ls 1.00 30,043,108.13 30,043,108.13


B. PEKERJAAN BETON DAN PASANGAN Ls 1.00 467,313,310.12 467,313,310.12
C. PEKERJAAN RANGKA ATAP, PENUTUP ATAP DAN PLAFON Ls 1.00 494,851,782.36 494,851,782.36
D. PEKERJAAN PINTU DAN JENDELA & VENTILASI Ls 1.00 63,024,767.43 63,024,767.43
E. PEKERJAAN SANITAIR Ls 1.00 142,046,565.99 142,046,565.99
F. PEKERJAAN PANTRY Ls 1.00 4,852,573.81 4,852,573.81
G. PEKERJAAN ALAT PENGGANTUNG DAN PENGUNCI Ls 1.00 4,064,657.35 4,064,657.35
H. PEKERJAAN PENGECATAN Ls 1.00 58,228,653.12 58,228,653.12
I. PEKERJAAN INSTALASI LISTRIK DAN AC (HANYA PEMASANGAN) Ls 1.00 90,891,418.91 90,891,418.91
J. PEKERJAAN PENANGKAL PETIR Ls 1.00 23,672,065.13 23,672,065.13
K. PEKERJAAN CABLE DUCT GEDUNG KONTROL
a. PEKERJAAN CABLE DUCK TYPE I M' 49.00 2,824,276.02 138,389,525.18
b. PEKERJAAN CABLE DUCK TYPE II M' 20.50 1,534,995.50 31,467,407.75
c. PEKERJAAN CABLE DUCK TYPE III M' 18.50 1,296,497.20 23,985,198.28
d. PEKERJAAN CABLE DUCK TYPE IV M' 3.50 1,979,974.29 6,929,910.03
L. PEKERJAAN BETON DAN PASANGAN TRAFO PS Ls 1.00 6,145,409.29 6,145,409.29
M. PEKERJAAN PEMASANGAN RAMBU-RAMBU K3 Ls 1.00 1,299,202.59 1,299,202.59
N. PERALATAN PEMADAM API RINGAN Ls 1.00 7,512,417.94 7,512,417.94
O. PENGADAAN APD DAN P3K UNTUK OPERATOR Ls 1.00 5,298,460.00 5,298,460.00

JUMLAH 1,600,016,433.40

PPN 10% 160,001,643.34

JUMLAH + PPN 1,760,018,076.74

DIBULATKAN 1,760,000,000.00

TERBILANG : ## SATU MILYAR TUJUH RATUS ENAM PULUH JUTA RUPIAH ##

Sukamara, 12 Januari 2021

Hormat kami penawar,


CV. SUKMA MANDIRI
REKAPITULASI PENAWARAN HARGA

PEKERJAAN SIPIL & PEMASANGAN GANTRY


PEMBANGUNAN GARDU INDUK 150KV SUKAMARA 2 LINE BAY, 1 BAY COUPLER DAN 1 TRAFO BAY

NILAI PENAWARAN

NO URAIAN PEKERJAAN Harga Satuan Jumlah Harga


SATUAN
Volume
(Rp) (Rp)
1 2 3 7 8 9= 7 X 8

QORI ASTIKA RADA


Direktur
NB :
Rekening Bank Kalteng Cab. Sampit
Nomor : 3000103001463 CV.SUKMA MANDIRI
DAFTAR KUANTITAS DAN HARGA PENAWARAN

PEKERJAAN SIPIL & PEMASANGAN GANTRY


PEMBANGUNAN GARDU INDUK 150KV SUKAMARA 2 LINE BAY, 1 BAY COUPLER DAN 1 TRAFO BAY

NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN TOTAL HARGA

1 2 3 7 8 9=7X8
PEKERJAAN GEDUNG KONTROL 150 KV :

A. PEKERJAAN TANAH
1 Galian tanah m3 74,620.50 -
2 Urugan tanah dipadatkan m3 280.80 35,352.56 9,926,997.44
3 Urugan pasir padat m3 121.31 165,824.01 20,116,110.68
30,043,108.13

B. PEKERJAAN BETON DAN PASANGAN


1 Beton Lantai kerja B-0 m3 13.85 704,753.56 9,760,836.86
2 Beton K-225 m3 22.05 1,448,958.04 31,955,320.56
3 Besi Beton U-24 kg 17,265.19 -
4 Bekisting m2 23.85 165,824.01 3,954,902.64
5 Beton expose (tanpa plester) B-0 untuk rabat keliling m3 84.96 707,051.10 60,071,061.46
6 Kawat Wiremesh M6 untuk beton rabat lbr 15.00 371,201.83 5,568,027.41
7 Pasangan batu belah u/ pondasi camp. 1pc : 4ps m3 6.60 883,813.88 5,833,171.58
8 Pasangan trasram batu bata camp. 1pc : 2ps m2 168.00 150,248.36 25,241,724.27
9 Pasangan batu bata tebal 1/2 bata camp.1pc : 4ps m2 450.00 141,410.22 63,634,599.00
10 Pasangan roster m2 3.60 176,762.78 636,345.99
11 Plesteran batu bata camp.1pc : 2ps m2 336.00 75,000.00 25,200,000.00
12 Plesteran batu bata camp.1pc : 4ps m2 900.00 85,609.38 77,048,444.69
13 Lantai tegel keramik ukuran 60 x 60 cm u/ lantai (granite) m2 465.50 225,403.05 104,925,121.92
14 Lantai tegel keramik ukuran 20 x 20 cm u/ kamar mandi m2 8.00 167,924.64 1,343,397.09
15 Tegel plint keramik uk.10 x 60 cm u/ lantai m' 84.00 141,410.22 11,878,458.48
16 Saluran keliling Gedung Kontrol Buis Beton setengah lingkaran Dia.50cm m' 118.80 309,334.86 36,748,980.92
17 Pipa PVC dia 4 " AW m' 6.00 78,766.25 472,597.52
18 Bak kontrol pas. bt. bata 60 x 60 cm tinggi 50 cm unit 4.00 707,051.10 2,828,204.40
19 Borepile beton K-225 dia. 40 cm m' - 441,906.94 -
20 Pancang Cerucuk Dia.10 cm L = 5 m untuk lantai gedung btg 4.00 53,028.83 212,115.33
20a Pancang Cerucuk Dia. 15 ~ 20 cm L = 2,5 m untuk lantai gedung btg
21 Mini pile K-500 uk. 25x25 cm m' - -
467,313,310.12
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN TOTAL HARGA

1 2 3 7 8 9=7X8
C. PEKERJAAN RANGKA ATAP, PENUTUP ATAP DAN PLAFON -
1 Rangka Atap Baja Ringan m2 730.80 185,600.91 135,637,147.77
2 Atap Onduline Classic m2 730.80 159,086.50 116,260,412.37
3 Bubungan Onduline Classic m' 42.00 159,086.50 6,681,632.90
4 Kawat Anyam m2 730.80 18,559.71 13,563,436.97
5 Aluminium Foil m2 730.80 30,933.11 22,605,913.49
6 Rangka plapond aluminium (bagian dalam) m2 468.00 141,410.22 66,179,982.96
7 Plafon dalam aqustik tebal 9 mm m2 468.00 123,733.94 57,907,485.09
8 Rangka plapond besi holo (bagian luar) m2 159.00 132,572.08 21,078,960.92
9 Plafon luar & teras aluminium lambersiring m2 159.00 150,248.36 23,889,489.04
10 Talang tegak PVC dia.4" kualitas AW m' 95.76 114,895.80 11,002,422.17
11 Lapis plinkute u/ lapisan atap beton m2 117.60 44,190.69 5,196,825.59
12 List plafond luar aluminium m' 120.00 123,733.94 14,848,073.10
494,851,782.36
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN TOTAL HARGA

1 2 3 7 8 9=7X8

D. PEKERJAAN PINTU DAN JENDELA & VENTILASI -


1 Pintu type PJ ( kosen, daun pintu allm. dan kaca ) lengkap bh 1.00 3,977,162.44 3,977,162.44
2 Pintu type P1 ( kosen, daun pintu allm. dan kaca ) lengkap bh 3.00 2,651,441.63 7,954,324.88
3 Pintu type P2 ( kosen, daun pintu allm. dan kaca ) lengkap bh 2.00 2,474,678.85 4,949,357.70
4 Pintu type P3 ( kosen, daun pintu allm. dan kaca ) lengkap bh 2.00 2,297,916.08 4,595,832.15
5 Pintu type P4 ( Folding Gate ) dengan kunci lengkap m2 15.00 972,195.26 14,582,928.94
6 Pintu type P5 ( kosen, daun pintu allm. dan kaca ) lengkap bh 1.00 2,209,534.69 2,209,534.69
7 Ventilasi type V1 ( kosen allm. + kaca ) lengkap bh 7.00 707,051.10 4,949,357.70
8 Ventilasi type V2 ( kosen allm. + kaca ) lengkap bh 5.00 662,860.41 3,314,302.03
9 Ventilasi type V3 ( kosen allm. + kaca ) lengkap bh 4.00 618,669.71 2,474,678.85
10 Ventilasi type V4 ( kosen allm. + kaca ) lengkap bh 2.00 600,993.44 1,201,986.87
11 Ventilasi type V5 ( kosen allm. + kaca ) lengkap bh 2.00 530,288.33 1,060,576.65
12 Jendela type J1 ( kosen, daun pintu allm. dan kaca ) lengkap bh 1.00 2,121,153.30 2,121,153.30
13 Jendela type J2 ( kosen, daun pintu allm. dan kaca ) lengkap bh 2.00 1,944,390.53 3,888,781.05
14 Jendela type J3 ( kosen, daun pintu allm. dan kaca ) lengkap bh 3.00 1,767,627.75 5,302,883.25
15 Ventilasi type V6 ( JALUSI KAYU ) lengkap bh 1.00 441,906.94 441,906.94
63,024,767.43

E. PEKERJAAN SANITAIR -
1 Closet jongkok lengkap bh 2.00 441,906.94 883,813.88
2 Bak mandi fiberglass uk. 55 x 55 x 60 cm bh 2.00 530,288.33 1,060,576.65
3 Instalasi air bersih pipa PVC 3/4" Kualitas AW m 400.00 79,543.25 31,817,299.50
4 Stop kran dia. 1" bh 4.00 159,086.50 636,345.99
5 Instalasi saluran air kotor PVC 4" kualitas AW m 400.00 123,733.94 49,493,577.00
6 Pipa PVC kualitas AW dia. 4" u/ closet ke septictank m 60.00 97,219.53 5,833,171.58
7 Filter drain lengkap bh 2.00 132,572.08 265,144.16
8 Septictank dan rembesan lengkap unit 2.00 6,186,697.13 12,373,394.25
9 Sumur bor lengkap dengan instalasi pipa sampai ke gedung kontrol unit 1.00 14,141,022.00 14,141,022.00
Pompa untuk sumur dalam kapasitas 30 liter/menit lengkap dengan rumah
10 unit 1.00 1,679,246.36 1,679,246.36
pompa & panel (untuk sumur bor)
11 Bak penampungan air dari beton bertulang kapasitas 12 m3 unit 1.00 6,186,697.13 6,186,697.13
12 Menara air rangka baja tinggi 5 meter lengkap dgn pondasi unit 1.00 8,838,138.75 8,838,138.75
Pompa kapasitas 40 liter/menit lengkap dengan rumah pompa & intalasi
13 unit 1.00 2,651,441.63 2,651,441.63
(untuk menaikkan air dari bak ke Tangki diatas menara)
Tangki air dari fiber glass kapasitas 2 x 1200 L lengkap dengan instalasi
14 1.00 4,419,069.38 4,419,069.38
dan kran unit
15 Penyambungan air PDAM ls 1.00 1,767,627.75 1,767,627.75
142,046,565.99
F. PEKERJAAN PANTRY -
1 Kitchen sink / Bak cuci piring set 2.00 707,051.10 1,414,102.20
2 Pasangan bata merah tebal 1 bata, 1Pc : 6 Ps m2 6.00 123,733.94 742,403.66
3 Beton bertulang 1 Pc : 2 Ps : 3 Kr. m3 0.20 3,535,255.50 707,051.10
4 Bekisting m2 4.00 165,824.01 663,296.04
5 Pasangan keramik 20x20 m2 8.00 132,572.08 1,060,576.65
6 stop kran dapur bh 2.00 132,572.08 265,144.16

4,852,573.81
G. PEKERJAAN ALAT PENGGANTUNG DAN PENGUNCI -
1 Engsel pintu allumunium (1 set = 3 buah) set 8.00 79,543.25 636,345.99
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN TOTAL HARGA

1 2 3 7 8 9=7X8
2 Engsel jendela allumunium (1 set = 2 buah) set 1.00 46,841.76 46,841.76
3 Grendel tanam u/ pintu double swing bh 2.00 123,733.94 247,467.89
4 Kunci pintu allumunium bh 6.00 243,048.44 1,458,290.61
5 Grendel jendela allumunium bh 2.00 97,219.53 194,439.05
6 Kait angin jendela allumunium (1 set = 2 buah) set 2.00 24,746.79 49,493.58
7 Door closer bh 6.00 238,629.75 1,431,778.48
4,064,657.35
H. PEKERJAAN PENGECATAN -
1 Pekerjaan cat kayu m2 28.13 68,053.29 1,914,339.00
2 Pekerjaan cat besi m2 33.74 68,053.29 2,296,117.95
3 Pekerjaan cat tembok u/ dinding m2 1,236.00 39,771.24 49,157,257.88
4 Pekerjaan cat politur u/ plafond kayu lambersiring m2 100.00 48,609.38 4,860,938.30
58,228,653.12
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN TOTAL HARGA

1 2 3 7 8 9=7X8

I. PEKERJAAN INSTALASI LISTRIK DAN AC


1 Bok panel (MCB, dll) lengkap sesuai spesifikasi unit 1.00 6,186,697.13 6,186,697.13
2 Down Light lengkap dgn lampu TL 18 watt bh 64.00 176,762.78 11,312,817.60
3 Exhausefan 40 Watt lengkap bh 2.00 441,906.94 883,813.88
4 AC split 1 PK lengkap + Stop Kontak bh 5.00 4,153,925.21 20,769,626.06
5 AC split 3/4 PK lengkap + Stop Kontak bh 5.00 3,800,399.66 19,001,998.31
6 Saklar ganda kualitas I bh 9.00 53,028.83 477,259.49
7 Saklar Multi 3 kualitas I bh 2.00 70,705.11 141,410.22
8 Saklar Multi 4 kualitas I bh 2.00 97,219.53 194,439.05
9 Stop kontak kualitas I bh 12.00 53,028.83 636,345.99
10 Lampu DC 40 Watt lengkap (emergency) bh 17.00 618,669.71 10,517,385.11
11 Panel box u/ lampu DC + kontaktor & MCB lengkap unit 1.00 4,419,069.38 4,419,069.38
12 Wiring & accessiries + pemasangan lengkap ls 1.00 3,093,348.56 3,093,348.56
13 Arder/ground rod + pipa lengkap ls 1.00 4,419,069.38 4,419,069.38
14 Biaya penyambungan daya listrik 20.000 VA ls 1.00 8,838,138.75 8,838,138.75
90,891,418.91

J. PEKERJAAN PENANGKAL PETIR -


1 Penangkal petir lengkap bh 4.00 163,505.19 654,020.75
2 Kawat BC 50 mm2 m 67.10 79,543.25 5,337,351.99
3 Arde/ground rod + pipa + bak kontrol beton lengkap titik 2.00 8,396,231.81 16,792,463.63
4 Pipa PVC dia. 3/4" kualitas AW + klem m 11.00 48,609.38 534,703.21
5 Klem penyangga kawat ls 1.00 353,525.55 353,525.55
23,672,065.13
K. PEKERJAAN CABLE DUCT GEDUNG KONTROL -
a. PEKERJAAN CABLE DUCK TYPE I -
1 Galian tanah m3 1.74 74,620.50 129,839.67
2 Urugan pasir padat m3 0.12 165,824.01 19,898.88
3 Urugan tanah kembali m3 0.27 33,164.50 8,954.41
4 Beton Lantai kerja B-0 m3 0.06 704,753.56 42,285.21
5 Beton K -175 m3 0.36 1,016,385.96 365,898.94
6 Besi Beton U -24 kg 37.95 14,141.02 536,651.78
7 Rak cable (dari plat strip galvanize) set 2.00 318,173.00 636,345.99
8 Plat bordes tebal 6 mm u/ tutup cable duct kg 56.52 15,469.97 874,362.93
9 Besi siku L.50.50.4 serta plat strip kg 7.85 16,353.41 128,374.25
10 Cat besi u/ plat bordes bagian atas m2 1.20 68,053.29 81,663.95
2,824,276.02
b. PEKERJAAN CABLE DUCK TYPE II -
1 Galian tanah m3 0.42 74,620.50 31,340.61
2 Urugan pasir padat m3 0.06 165,824.01 9,949.44
3 Urugan tanah kembali m3 0.05 33,164.50 1,658.22
4 Beton Lantai kerja B-0 m3 0.03 704,753.56 21,142.61
5 Beton K -175 m3 0.20 1,016,385.96 203,277.19
6 Besi Beton U -24 kg 10.50 14,141.02 148,480.73
7 Rak cable (dari plat strip galvanize) bh 2.00 318,173.00 636,345.99
8 Plat bordes tebal 6 mm u/ tutup cable duct kg 25.91 15,469.97 400,827.03
9 Besi siku L.50.50.4 serta plat strip kg 3.14 16,353.41 51,349.70
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN TOTAL HARGA

1 2 3 7 8 9=7X8
10 Cat besi u/ plat bordes bagian atas m2 0.45 68,053.29 30,623.98
1,534,995.50
c. PEKERJAAN CABLE DUCK TYPE III -
1 Galian tanah m3 0.28 74,620.50 20,893.74
2 Urugan pasir padat m3 0.05 165,824.01 8,291.20
3 Urugan tanah kembali m3 - 33,164.50 -
4 Beton Lantai kerja B-0 m3 0.03 704,753.56 21,142.61
5 Beton K -175 m3 0.12 1,016,385.96 121,966.31
6 Besi Beton U -24 kg 3.18 14,141.02 44,968.45
7 Rak cable (dari plat strip galvanize) bh 2.00 318,173.00 636,345.99
8 Plat bordes tebal 6 mm u/ tutup cable duct kg 23.55 15,469.97 364,317.89
9 Besi siku L.50.50.4 serta plat strip kg 3.14 16,353.41 51,349.70
10 Cat besi u/ plat bordes bagian atas m2 0.40 68,053.29 27,221.32
1,296,497.20

d. PEKERJAAN CABLE DUCK TYPE IV -


1 Galian tanah m3 0.60 74,620.50 44,772.30
2 Urugan pasir padat m3 0.08 165,824.01 13,265.92
3 Urugan tanah kembali m3 - 33,164.50 -
4 Beton Lantai kerja B-0 m3 0.04 704,753.56 28,190.14
5 Beton K -175 m3 0.20 1,016,385.96 203,277.19
6 Besi Beton U -24 kg 22.21 14,141.02 314,072.10
7 Rak cable (dari plat strip galvanize) bh 2.00 318,173.00 636,345.99
8 Plat bordes tebal 6 mm u/ tutup cable duct kg 37.68 15,469.97 582,908.62
9 Besi siku L.50.50.4 serta plat strip kg 6.28 16,353.41 102,699.40
10 Cat besi u/ plat bordes bagian atas m2 0.80 68,053.29 54,442.63
1,979,974.29

L. PEKERJAAN BETON DAN PASANGAN TRAFO PS -


1 Beton Lantai kerja B-0 m3 0.11 704,753.56 77,522.89
2 Beton K-175 m3 0.22 1,016,385.96 223,604.91
3 Bekisting m2 1.76 165,824.01 291,850.26
4 Kawat Wiremesh M6 untuk beton rabat lbr 2.00 371,201.83 742,403.66
5 Pasangan batu bata tebal 1/2 bata camp.1pc : 4ps m2 0.80 141,410.22 113,128.18
6 Panel BRC tinggi 190cm dia.7mm galvanize lengkap clamp dan baut panel 3.00 829,121.57 2,487,364.72
7 Pintu pagar geser galvanized type BRC 120 A2, lebar = 1 m lengkap unit 1.00 2,209,534.69 2,209,534.69
6,145,409.29

M. PEKERJAAN PEMASANGAN RAMBU-RAMBU K3 -


1 Tanda APAR bh 6.00 75,123.80 450,742.80
2 Jalur Evakuasi bh 3.00 75,123.80 225,371.40
3 Tanda dilarang merokok bh 4.00 61,866.97 247,467.89
4 Benner K3 bh 2.00 61,866.97 123,733.94
5 Tanda High Voltage bh 1.00 44,190.69 44,190.69
6 Papan K3 bh 1.00 132,572.08 132,572.08
7 Muster point bh 1.00 75,123.80 75,123.80
1,299,202.59
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN TOTAL HARGA

1 2 3 7 8 9=7X8
N. PERALATAN PEMADAM API RINGAN -
1 Tabung APAR 6.8 Kg Portable Unit Media C02 bh 6.00 618,669.71 3,712,018.28
2 Tabung Alat Pemadam Api 25 Kg Dry chemical powder Trolley bh 1.00 3,800,399.66 3,800,399.66
7,512,417.94

O. PENGADAAN APD DAN P3K UNTUK OPERATOR -


1 Helm Safety set 5.00 198,857.74 994,288.71
2 Sarung tangan jenis latex set 5.00 19,443.91 97,219.53
3 Masker set 5.00 28,282.04 141,410.22
4 Kacamata set 5.00 110,476.35 552,381.77
5 Sepatu safety set 5.00 344,687.41 1,723,437.06
6 Lemari penyimpanan set 1.00 1,546,674.28 1,546,674.28
7 Kotak P3K set 1.00 243,048.44 243,048.44
5,298,460.00

Sukamara, 12 Januari 2021

Hormat kami penawar,


CV. SUKMA MANDIRI

QORI ASTIKA RADA


Direktur
BACK UP DATA

PEKERJAAN SIPIL & PEMASANGAN GANTRY


PEMBANGUNAN GARDU INDUK 150KV SUKAMARA 2 LINE BAY, 1 BAY COUPLER DAN 1 TRAFO BAY

Dimensi Dalam Satuan (M)


No. Uraian Pekerjaan Jumlah
Panjang Lebar Tinggi

1 Pekerjan Talang Beton


Beton K-225
- Plat Talang 100.10 1.05 0.15
- Lisplank Talang 102.20 0.60 0.15
Bekisting
- Plat Talang 100.10 1.05
- Lisplank Talang Luar 102.20 0.60
- Lisplank Talang Dalam 102.20 0.45
Besi Ulir Dia. 13 mm
- Memanjang 103.00 6.00
- Melintang 1.52 516.00
- Over Stek 0.60 9.00

2 Pekerjaan Ring Balok Talang Beton


Beton K-225 98.00 0.15 0.15
Bekisting 98.00 0.15 2.00
Pembesian
- Tul. Pokok 4 Ø 12 98.10 4.00
- Tul. Bagi Ø8 - 150 0.60 654.00
Titik Koef. Volume Satuan

36 1.05 37.05 0.15 78.08


13 1.05 14.05
24.96 M3 51.1
15.77 102.2
9.20
212.42 M2
105.11
61.32
45.99

2.00 1.04 1,287.91


2.00 1.04 1,634.52
2.00 1.04 11.25
2,933.69 Kg 235.07

2.21 M3
29.40 M2
503.45 Kg
0.888 348.45
0.395 155.00

14.215
3,291
1645.429 0
1.52
RENCANA JADWAL PENUGASAN PERSONIL (MAN POWER)

PEKERJAAN : PEMBANGUNAN GARDU INDUK 150KV SUKAMARA 2 LINE BAY, 1 BAY COUPLER DAN 1 TRAFO BAY
LOKASI : KABUPATEN SUKAMARA
TAHUN : 2021
PENAWAR : CV. SUKMA MANDIRI

JADWAL RENCANA PELAKSANAAN 36 HARI KALENDER


NO. URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
Minggu 1 Minggu 2 Minggu 3 Minggu 4 Minggu 5 Minggu 6

I. PERSONIL INTI
Supervisor Orang 1 1 1 1 1 1 1
Koord. Engineering Orang 1 1 1 1 1 1 1
Staff Logistik & Peralatan Orang 1 1 1 1 1 1 1
Safety man Orang 1 1 1 1 1 1 1
Security Orang 1 1 1 1 1 1 1
II. SUB PERSONIL INTI
Mandor Orang 1 1 1 1 1 1 1
Tukang (Batu, Besi, Kayu, Csp) Orang 8 8 8 8 8 8 8
Pembatu Tukang Orang 6 6 6 6 6 6 6
Operator Orang 1 1
Signalman Orang 1 1 1 1 1 1 1

CATATAN : 1 KOLOM MINGGU = 6 HARI KALENDER Penawar,


CV. SUKMA MANDIRI

QORI ASTIKA RADA


Direktur
RENCANA JADWAL MOBILISASI PERALATAN

PEKERJAAN : PEMBANGUNAN GARDU INDUK 150KV SUKAMARA 2 LINE BAY, 1 BAY COUPLER DAN
LOKASI : KABUPATEN SUKAMARA
TAHUN : 2021
PENAWAR : CV. SUKMA MANDIRI

JADWAL RENCANA PELAKSANAAN 36 HARI KALENDER


NO. URAIAN PEKERJAAN SATUAN VOLUME
Minggu 1 Minggu 2 Minggu 3 Minggu 4

I. PERALATAN UTAMA
1 ALAT TUKANG UNIT 1 1
2 BABY ROLLEY/PEDESTRIAN ROLL UNIT 1 1
3 WELDING SET SET 1 1

CATATAN : 1 KOLOM MINGGU = 6 HARI KALENDER


CV. SUKMA MANDIR

QORI ASTIKA RADA


N

AY, 1 BAY COUPLER DAN 1 TRAFO BAY

N 36 HARI KALENDER
KETERANGAN
Minggu 5 Minggu 6

Penawar,
CV. SUKMA MANDIRI

QORI ASTIKA RADA


Direktur
NO URAIAN PEKERJAAN SATUAN

1 2 3
PEKERJAAN GEDUNG KONTROL 150 KV :

A. PEKERJAAN TANAH
1 Galian tanah m3
2 Urugan tanah dipadatkan m3
3 Urugan pasir padat m3
JUMLAH

B. PEKERJAAN BETON DAN PASANGAN


1 Beton Lantai kerja B-0 m3
2 Beton K-225 m3
3 Besi Beton U-24 kg
4 Bekisting m2
5 Beton expose (tanpa plester) B-0 untuk rabat keliling m3
6 Kawat Wiremesh M6 untuk beton rabat lbr
7 Pasangan batu belah u/ pondasi camp. 1pc : 4ps m3
8 Pasangan trasram batu bata camp. 1pc : 2ps m2
9 Pasangan batu bata tebal 1/2 bata camp.1pc : 4ps m2
10 Pasangan roster m2
11 Plesteran batu bata camp.1pc : 2ps m2
12 Plesteran batu bata camp.1pc : 4ps m2
13 Lantai tegel keramik ukuran 60 x 60 cm u/ lantai (granite) m2
14 Lantai tegel keramik ukuran 20 x 20 cm u/ kamar mandi m2
15 Tegel plint keramik uk.10 x 60 cm u/ lantai m'
16 Saluran keliling Gedung Kontrol Buis Beton setengah lingkaran Dia.50cm m'
17 Pipa PVC dia 4 " AW m'
18 Bak kontrol pas. bt. bata 60 x 60 cm tinggi 50 cm unit
19 Borepile beton K-225 dia. 40 cm m'
20 Pancang Cerucuk Dia.10 cm L = 5 m untuk lantai gedung btg
20a Pancang Cerucuk Dia. 15 ~ 20 cm L = 2,5 m untuk lantai gedung btg
21 Mini pile K-500 uk. 25x25 cm m'
JUMLAH

C. PEKERJAAN RANGKA ATAP, PENUTUP ATAP DAN PLAFON


1 Rangka Atap Baja Ringan m2
2 Atap Onduline Classic m2
3 Bubungan Onduline Classic m'
4 Kawat Anyam m2
5 Aluminium Foil m2
6 Rangka plapond aluminium (bagian dalam) m2
7 Plafon dalam aqustik tebal 9 mm m2
8 Rangka plapond besi holo (bagian luar) m2
9 Plafon luar & teras aluminium lambersiring m2
10 Talang tegak PVC dia.4" kualitas AW m'
11 Lapis plinkute u/ lapisan atap beton m2
12 List plafond luar aluminium m'
JUMLAH
D. PEKERJAAN PINTU DAN JENDELA & VENTILASI
1 Pintu type PJ ( kosen, daun pintu allm. dan kaca ) lengkap bh
2 Pintu type P1 ( kosen, daun pintu allm. dan kaca ) lengkap bh
3 Pintu type P2 ( kosen, daun pintu allm. dan kaca ) lengkap bh
4 Pintu type P3 ( kosen, daun pintu allm. dan kaca ) lengkap bh
5 Pintu type P4 ( Folding Gate ) dengan kunci lengkap m2
6 Pintu type P5 ( kosen, daun pintu allm. dan kaca ) lengkap bh
7 Ventilasi type V1 ( kosen allm. + kaca ) lengkap bh
8 Ventilasi type V2 ( kosen allm. + kaca ) lengkap bh
9 Ventilasi type V3 ( kosen allm. + kaca ) lengkap bh
10 Ventilasi type V4 ( kosen allm. + kaca ) lengkap bh
11 Ventilasi type V5 ( kosen allm. + kaca ) lengkap bh
12 Jendela type J1 ( kosen, daun pintu allm. dan kaca ) lengkap bh
13 Jendela type J2 ( kosen, daun pintu allm. dan kaca ) lengkap bh
14 Jendela type J3 ( kosen, daun pintu allm. dan kaca ) lengkap bh
15 Ventilasi type V6 ( JALUSI KAYU ) lengkap bh
JUMLAH

E. PEKERJAAN SANITAIR
1 Closet jongkok lengkap bh
2 Bak mandi fiberglass uk. 55 x 55 x 60 cm bh
3 Instalasi air bersih pipa PVC 3/4" Kualitas AW m
4 Stop kran dia. 1" bh
5 Instalasi saluran air kotor PVC 4" kualitas AW m
6 Pipa PVC kualitas AW dia. 4" u/ closet ke septictank m
7 Filter drain lengkap bh
8 Septictank dan rembesan lengkap unit
9 Sumur bor lengkap dengan instalasi pipa sampai ke gedung kontrol unit
10 Pompa untuk sumur dalam kapasitas 30 liter/menit lengkap dengan rumah po unit
11 Bak penampungan air dari beton bertulang kapasitas 12 m3 unit
12 Menara air rangka baja tinggi 5 meter lengkap dgn pondasi unit
Pompa kapasitas 40 liter/menit lengkap dengan rumah pompa & intalasi
13 unit
(untuk
Tangkimenaikkan airglass
air dari fiber dari bak ke Tangki
kapasitas diatasLmenara)
2 x 1200 lengkap dengan instalasi dan unit
14
kran ls
15 Penyambungan air PDAM
JUMLAH
F. PEKERJAAN PANTRY
1 Kitchen sink / Bak cuci piring set
2 Pasangan bata merah tebal 1 bata, 1Pc : 6 Ps m2
3 Beton bertulang 1 Pc : 2 Ps : 3 Kr. m3
4 Bekisting m2
5 Pasangan keramik 20x20 m2
6 stop kran dapur bh

JUMLAH
G. PEKERJAAN ALAT PENGGANTUNG DAN PENGUNCI
1 Engsel pintu allumunium (1 set = 3 buah) set
2 Engsel jendela allumunium (1 set = 2 buah) set
3 Grendel tanam u/ pintu double swing bh
4 Kunci pintu allumunium bh
5 Grendel jendela allumunium bh
6 Kait angin jendela allumunium (1 set = 2 buah) set
7 Door closer bh
JUMLAH
H. PEKERJAAN PENGECATAN
1 Pekerjaan cat kayu m2
2 Pekerjaan cat besi m2
3 Pekerjaan cat tembok u/ dinding m2
4 Pekerjaan cat politur u/ plafond kayu lambersiring m2
JUMLAH

I. PEKERJAAN INSTALASI LISTRIK DAN AC


1 Bok panel (MCB, dll) lengkap sesuai spesifikasi unit
2 Down Light lengkap dgn lampu TL 18 watt bh
3 Exhausefan 40 Watt lengkap bh
4 AC split 1 PK lengkap + Stop Kontak bh
5 AC split 3/4 PK lengkap + Stop Kontak bh
6 Saklar ganda kualitas I bh
7 Saklar Multi 3 kualitas I bh
8 Saklar Multi 4 kualitas I bh
9 Stop kontak kualitas I bh
10 Lampu DC 40 Watt lengkap (emergency) bh
11 Panel box u/ lampu DC + kontaktor & MCB lengkap unit
12 Wiring & accessiries + pemasangan lengkap ls
13 Arder/ground rod + pipa lengkap ls
14 Biaya penyambungan daya listrik 20.000 VA ls
JUMLAH

J. PEKERJAAN PENANGKAL PETIR


1 Penangkal petir lengkap bh
2 Kawat BC 50 mm2 m
3 Arde/ground rod + pipa + bak kontrol beton lengkap titik
4 Pipa PVC dia. 3/4" kualitas AW + klem m
5 Klem penyangga kawat ls
JUMLAH
K. PEKERJAAN CABLE DUCT GEDUNG KONTROL
a. PEKERJAAN CABLE DUCK TYPE I
1 Galian tanah m3
2 Urugan pasir padat m3
3 Urugan tanah kembali m3
4 Beton Lantai kerja B-0 m3
5 Beton K -175 m3
6 Besi Beton U -24 kg
7 Rak cable (dari plat strip galvanize) set
8 Plat bordes tebal 6 mm u/ tutup cable duct kg
9 Besi siku L.50.50.4 serta plat strip kg
10 Cat besi u/ plat bordes bagian atas m2

JUMLAH K
b. PEKERJAAN CABLE DUCK TYPE II
1 Galian tanah m3
2 Urugan pasir padat m3
3 Urugan tanah kembali m3
4 Beton Lantai kerja B-0 m3
5 Beton K -175 m3
6 Besi Beton U -24 kg
7 Rak cable (dari plat strip galvanize) bh
8 Plat bordes tebal 6 mm u/ tutup cable duct kg
9 Besi siku L.50.50.4 serta plat strip kg
10 Cat besi u/ plat bordes bagian atas m2

JUMLAH K
c. PEKERJAAN CABLE DUCK TYPE III
1 Galian tanah m3
2 Urugan pasir padat m3
3 Urugan tanah kembali m3
4 Beton Lantai kerja B-0 m3
5 Beton K -175 m3
6 Besi Beton U -24 kg
7 Rak cable (dari plat strip galvanize) bh
8 Plat bordes tebal 6 mm u/ tutup cable duct kg
9 Besi siku L.50.50.4 serta plat strip kg
10 Cat besi u/ plat bordes bagian atas m2

JUMLAH K
d. PEKERJAAN CABLE DUCK TYPE IV
1 Galian tanah m3
2 Urugan pasir padat m3
3 Urugan tanah kembali m3
4 Beton Lantai kerja B-0 m3
5 Beton K -175 m3
6 Besi Beton U -24 kg
7 Rak cable (dari plat strip galvanize) bh
8 Plat bordes tebal 6 mm u/ tutup cable duct kg
9 Besi siku L.50.50.4 serta plat strip kg
10 Cat besi u/ plat bordes bagian atas m2

JUMLAH K
L. PEKERJAAN BETON DAN PASANGAN TRAFO PS
1 Beton Lantai kerja B-0 m3
2 Beton K-175 m3
3 Bekisting m2
4 Kawat Wiremesh M6 untuk beton rabat lbr
5 Pasangan batu bata tebal 1/2 bata camp.1pc : 4ps m2
6 Panel BRC tinggi 190cm dia.7mm galvanize lengkap clamp dan baut panel
7 Pintu pagar geser galvanized type BRC 120 A2, lebar = 1 m lengkap unit
JUMLAH

M. PEKERJAAN PEMASANGAN RAMBU-RAMBU K3


1 Tanda APAR bh
2 Jalur Evakuasi bh
3 Tanda dilarang merokok bh
4 Benner K3 bh
5 Tanda High Voltage bh
6 Papan K3 bh
7 Muster point bh
JUMLAH

N. PERALATAN PEMADAM API RINGAN


1 Tabung APAR 6.8 Kg Portable Unit Media C02 bh
2 Tabung Alat Pemadam Api 25 Kg Dry chemical powder Trolley bh
JUMLAH
O. PENGADAAN APD DAN P3K UNTUK OPERATOR
1 Helm Safety set
2 Sarung tangan jenis latex set
3 Masker set
4 Kacamata set
5 Sepatu safety set
6 Lemari penyimpanan set
7 Kotak P3K set
JUMLAH
JUMLAH
PPN 10%
JUMLAH + PPN
Pembulatan
TOTAL BOBOT PEKERJAAN
JADWAL RENCANA
KOMULATIF JADWAL RENCANA

CATATAN : 1 KOLOM MINGGU = 6 HARI KALENDER


BOBOT
VOLUME HARGA SATUAN TOTAL HARGA
PEK. (%) M1
7 8 9=7X8

74,620.50 - - -
280.80 35,352.56 9,926,997.44 0.62
121.31 165,824.01 20,116,110.68 1.26
JUMLAH A 30,043,108.13
-
-
13.85 704,753.56 9,760,836.86 0.61
22.05 1,448,958.04 31,955,320.56 2.00
17,265.19 - -
23.85 165,824.01 3,954,902.64 0.25
84.96 707,051.10 60,071,061.46 3.75
15.00 371,201.83 5,568,027.41 0.35
6.60 883,813.88 5,833,171.58 0.36
168.00 150,248.36 25,241,724.27 1.58
450.00 141,410.22 63,634,599.00 3.98
3.60 176,762.78 636,345.99 0.04
336.00 75,000.00 25,200,000.00 1.57
900.00 85,609.38 77,048,444.69 4.82
465.50 225,403.05 104,925,121.92 6.56
8.00 167,924.64 1,343,397.09 0.08
84.00 141,410.22 11,878,458.48 0.74
118.80 309,334.86 36,748,980.92 2.30
6.00 78,766.25 472,597.52 0.03
4.00 707,051.10 2,828,204.40 0.18
- 441,906.94 - -
4.00 53,028.83 212,115.33 0.01 0.01
-
- - -
JUMLAH B 467,313,310.12
-
- -
730.80 185,600.91 135,637,147.77 8.48
730.80 159,086.50 116,260,412.37 7.27
42.00 159,086.50 6,681,632.90 0.42
730.80 18,559.71 13,563,436.97 0.85
730.80 30,933.11 22,605,913.49 1.41
468.00 141,410.22 66,179,982.96 4.14
468.00 123,733.94 57,907,485.09 3.62
159.00 132,572.08 21,078,960.92 1.32
159.00 150,248.36 23,889,489.04 1.49
95.76 114,895.80 11,002,422.17 0.69
117.60 44,190.69 5,196,825.59 0.32
120.00 123,733.94 14,848,073.10 0.93
JUMLAH C 494,851,782.36
-
- -
1.00 3,977,162.44 3,977,162.44 0.25
3.00 2,651,441.63 7,954,324.88 0.50
2.00 2,474,678.85 4,949,357.70 0.31
2.00 2,297,916.08 4,595,832.15 0.29
15.00 972,195.26 14,582,928.94 0.91
1.00 2,209,534.69 2,209,534.69 0.14
7.00 707,051.10 4,949,357.70 0.31
5.00 662,860.41 3,314,302.03 0.21
4.00 618,669.71 2,474,678.85 0.15
2.00 600,993.44 1,201,986.87 0.08
2.00 530,288.33 1,060,576.65 0.07
1.00 2,121,153.30 2,121,153.30 0.13
2.00 1,944,390.53 3,888,781.05 0.24
3.00 1,767,627.75 5,302,883.25 0.33
1.00 441,906.94 441,906.94 0.03
JUMLAH D 63,024,767.43
-
- -
2.00 441,906.94 883,813.88 0.06
2.00 530,288.33 1,060,576.65 0.07
400.00 79,543.25 31,817,299.50 1.99
4.00 159,086.50 636,345.99 0.04
400.00 123,733.94 49,493,577.00 3.09
60.00 97,219.53 5,833,171.58 0.36
2.00 132,572.08 265,144.16 0.02
2.00 6,186,697.13 12,373,394.25 0.77
1.00 14,141,022.00 14,141,022.00 0.88
1.00 1,679,246.36 1,679,246.36 0.10
1.00 6,186,697.13 6,186,697.13 0.39
1.00 8,838,138.75 8,838,138.75 0.55
1.00 2,651,441.63 2,651,441.63 0.17
1.00 4,419,069.38 4,419,069.38 0.28
1.00 1,767,627.75 1,767,627.75 0.11
JUMLAH E 142,046,565.99
- -
2.00 707,051.10 1,414,102.20 0.09
6.00 123,733.94 742,403.66 0.05
0.20 3,535,255.50 707,051.10 0.04
4.00 165,824.01 663,296.04 0.04
8.00 132,572.08 1,060,576.65 0.07
2.00 132,572.08 265,144.16 0.02
-
JUMLAH F 4,852,573.81
- -
8.00 79,543.25 636,345.99 0.04
1.00 46,841.76 46,841.76 0.00
2.00 123,733.94 247,467.89 0.02
6.00 243,048.44 1,458,290.61 0.09
2.00 97,219.53 194,439.05 0.01
2.00 24,746.79 49,493.58 0.00
6.00 238,629.75 1,431,778.48 0.09
JUMLAH G 4,064,657.35
- -
28.13 68,053.29 1,914,339.00 0.12
33.74 68,053.29 2,296,117.95 0.14
1,236.00 39,771.24 49,157,257.88 3.07
100.00 48,609.38 4,860,938.30 0.30
JUMLAH H 58,228,653.12
-
-
1.00 6,186,697.13 6,186,697.13 0.39
64.00 176,762.78 11,312,817.60 0.71
2.00 441,906.94 883,813.88 0.06
5.00 4,153,925.21 20,769,626.06 1.30
5.00 3,800,399.66 19,001,998.31 1.19
9.00 53,028.83 477,259.49 0.03
2.00 70,705.11 141,410.22 0.01
2.00 97,219.53 194,439.05 0.01
12.00 53,028.83 636,345.99 0.04
17.00 618,669.71 10,517,385.11 0.66
1.00 4,419,069.38 4,419,069.38 0.28
1.00 3,093,348.56 3,093,348.56 0.19
1.00 4,419,069.38 4,419,069.38 0.28
1.00 8,838,138.75 8,838,138.75 0.55
JUMLAH I 90,891,418.91
-
- -
4.00 163,505.19 654,020.75 0.04
67.10 79,543.25 5,337,351.99 0.33
2.00 8,396,231.81 16,792,463.63 1.05
11.00 48,609.38 534,703.21 0.03
1.00 353,525.55 353,525.55 0.02
JUMLAH J 23,672,065.13
- -
- -
1.74 74,620.50 129,839.67 0.40
0.12 165,824.01 19,898.88 0.06
0.27 33,164.50 8,954.41 0.03
0.06 704,753.56 42,285.21 0.13
0.36 1,016,385.96 365,898.94 1.12
37.95 14,141.02 536,651.78 1.64
2.00 318,173.00 636,345.99 1.95
56.52 15,469.97 874,362.93 2.68
7.85 16,353.41 128,374.25 0.39
1.20 68,053.29 81,663.95 0.25
49.00 2,824,276.02
JUMLAH K (a) 138,389,525.18
- -
0.42 74,620.50 31,340.61 0.04
0.06 165,824.01 9,949.44 0.01
0.05 33,164.50 1,658.22 0.00
0.03 704,753.56 21,142.61 0.03
0.20 1,016,385.96 203,277.19 0.26
10.50 14,141.02 148,480.73 0.19
2.00 318,173.00 636,345.99 0.82
25.91 15,469.97 400,827.03 0.51
3.14 16,353.41 51,349.70 0.07
0.45 68,053.29 30,623.98 0.04
20.50 1,534,995.50
JUMLAH K (b) 31,467,407.75
- -
0.28 74,620.50 20,893.74 0.02
0.05 165,824.01 8,291.20 0.01
- 33,164.50 - -
0.03 704,753.56 21,142.61 0.02
0.12 1,016,385.96 121,966.31 0.14
3.18 14,141.02 44,968.45 0.05 28.24
2.00 318,173.00 636,345.99 0.74
23.55 15,469.97 364,317.89 0.42
3.14 16,353.41 51,349.70 0.06
0.40 68,053.29 27,221.32 0.03
18.50 1,296,497.20
JUMLAH K (c) 23,985,198.28
- -
0.60 74,620.50 44,772.30 0.01
0.08 165,824.01 13,265.92 0.00
- 33,164.50 - -
0.04 704,753.56 28,190.14 0.01
0.20 1,016,385.96 203,277.19 0.04
22.21 14,141.02 314,072.10 0.07
2.00 318,173.00 636,345.99 0.14
37.68 15,469.97 582,908.62 0.13
6.28 16,353.41 102,699.40 0.02
0.80 68,053.29 54,442.63 0.01
3.50 1,979,974.29
JUMLAH K (d) 6,929,910.03
- -
0.11 704,753.56 77,522.89 0.00
0.22 1,016,385.96 223,604.91 0.01
1.76 165,824.01 291,850.26 0.02
2.00 371,201.83 742,403.66 0.05
0.80 141,410.22 113,128.18 0.01
3.00 829,121.57 2,487,364.72 0.16
1.00 2,209,534.69 2,209,534.69 0.14
JUMLAH L 6,145,409.29
-
- -
6.00 75,123.80 450,742.80 0.03 0.03
3.00 75,123.80 225,371.40 0.01 0.01
4.00 61,866.97 247,467.89 0.02 0.02
2.00 61,866.97 123,733.94 0.01 0.01
1.00 44,190.69 44,190.69 0.00 0.00
1.00 132,572.08 132,572.08 0.01 0.01
1.00 75,123.80 75,123.80 0.00 0.00
JUMLAH M 1,299,202.59
-
- -
6.00 618,669.71 3,712,018.28 0.23 0.23
1.00 3,800,399.66 3,800,399.66 0.24 0.24
JUMLAH N 7,512,417.94
-
- -
5.00 198,857.74 994,288.71 0.06 0.06
5.00 19,443.91 97,219.53 0.01 0.01
5.00 28,282.04 141,410.22 0.01 0.01
5.00 110,476.35 552,381.77 0.03 0.03
5.00 344,687.41 1,723,437.06 0.11 0.11
1.00 1,546,674.28 1,546,674.28 0.10 0.10
1.00 243,048.44 243,048.44 0.02 0.02
JUMLAH O 5,298,460.00
1,600,016,433.40
160,001,643.34
1,760,018,076.74
1,760,000,000.00
100.00
0.90
0.90
0.90
JADWAL RENCANA PEKERJAAN 36 HARI KALENDER
BULAN 1
M2 M3 M4

CHEDULE RENCANA

0.62
1.26

0.61
2.00
-
0.25
3.75
0.35
0.36
1.58
3.98 CHEDULE RENCANA
0.04
1.57
4.82

8.48
7.27
0.42
0.85
1.41

81.69
81.69

58.73
58.73

0.39
0.71
0.06
1.30
1.19
0.03
0.01
0.01
0.04
0.66
0.28
48.79
0.19
0.28
0.55

0.40
0.06
0.03
0.13
1.12
1.64
1.95
2.68
0.39
0.25

0.04
0.01
0.00
0.03
0.26
0.19
0.82
0.51
0.07
0.04

0.02
0.01
-
0.02
0.14
0.05
28.24
0.74
0.42
0.06
0.03

0.01
0.00
-
0.01
0.04
0.07
0.14
0.13
0.02
0.01
27.34 20.55 9.94
28.24 48.79 58.73
NDER
BULAN 2 KETERANGAN
M5 M6

0.62
100.00 1.26
-
-
-
0.61
2.00
-
0.25
3.75
0.35
0.36
1.58
3.98
0.04
1.57
4.82
6.56 6.56
0.08 0.08
0.74 0.74
2.30 2.30
0.03 0.03
0.18 0.18
-
0.01
-
-
-
-
-
8.48
7.27
0.42
0.85
1.41
4.14 4.14
3.62 3.62
1.32 1.32
1.49 1.49
0.69 0.69
0.32 0.32
0.93 0.93
81.69 -
-
81.69

-
0.25 0.25
0.50 0.50
0.31 0.31
0.29 0.29
0.91 0.91
0.14 0.14
0.31 0.31
0.21 0.21
0.15 0.15
0.08 0.08
0.07 0.07
0.13 0.13
0.24 0.24
0.33 0.33
0.03 0.03
-
-
-
0.06 0.06
0.07 0.07
1.99 1.99
0.04 0.04
3.09 3.09
0.36 0.36
0.02 0.02
0.77 0.77
0.88 0.88
0.10 0.10
0.39 0.39
0.55 0.55
0.17 0.17
0.28 0.28
0.11 0.11
-
-
0.09 0.09
0.05 0.05
0.04 0.04
0.04 0.04
0.07 0.07
0.02 0.02
-
-
-
0.04 0.04
0.00 0.00
0.02 0.02
0.09 0.09
0.01 0.01
73
0.00 0.00
0.09 0.09
-
-
73

0.12 0.12
0.14 0.14
3.07 3.07
0.30 0.30
-
-
-
0.39
0.71
0.06
1.30
1.19
0.03
0.01
0.01
0.04
0.66
0.28
0.19
0.28
0.55
-
-
-
0.04 0.04
0.33 0.33
1.05 1.05
0.03 0.03
0.02 0.02
-
-
-
0.40
0.06
0.03
0.13
1.12
1.64
1.95
2.68
0.39
0.25
-
-
-
0.04
0.01
0.00
0.03
0.26
0.19
0.82
0.51
0.07
0.04
-
-
-
0.02
0.01
-
0.02
0.14
0.05
0.74
0.42
0.06
0.03
-
-
-
0.01
0.00
-
0.01
0.04
0.07
0.14
0.13
0.02
0.01
-
-
-
0.00 0.00
0.01 0.01
0.02 0.02
0.05 0.05
0.01 0.01
0.16 0.16
0.14 0.14
-
-
-
0.03
0.01
0.02
0.01
0.00
0.01
0.00
-
-
-
0.23
0.24
-
-
-
0.06
0.01
0.01
0.03
0.11
0.10
0.02

22.96 18.31
81.69 100.00

Penawar,
CV. SUKMA MANDIRI

QORI ASTIKA RADA


Direktur
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JADWAL RENCANA PEKERJAAN 90 HARI KALENDER
BOBOT
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN TOTAL HARGA BULAN 1 BULAN 2 BULAN 3 100.00 KETERANGAN
PEK. (%)
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15
1 2 3 7 8 9=7X8
PEKERJAAN GEDUNG KONTROL 150 KV :

A. PEKERJAAN TANAH
1 Galian tanah m3 74,620.50 - - -
2 Urugan tanah dipadatkan m3 280.80 35,352.56 9,926,997.44 0.62 0.62
3 Urugan pasir padat m3 121.31 165,824.01 20,116,110.68 1.26 1.26
JUMLAH A 30,043,108.13
-
95.40
B. PEKERJAAN BETON DAN PASANGAN -
1 Beton Lantai kerja B-0 m3 13.85 704,753.56 9,760,836.86 0.61 CHEDULE RENCANA 0.61
2 Beton K-225 m3 22.05 1,448,958.04 31,955,320.56 2.00 2.00
3 Besi Beton U-24 kg 17,265.19 - - -
4 Bekisting m2 23.85 165,824.01 3,954,902.64 0.25 0.25
5 Beton expose (tanpa plester) B-0 untuk rabat keliling m3 84.96 707,051.10 60,071,061.46 3.75 3.75
6 Kawat Wiremesh M6 untuk beton rabat lbr 15.00 371,201.83 5,568,027.41 0.35 0.35
7 Pasangan batu belah u/ pondasi camp. 1pc : 4ps m3 6.60 883,813.88 5,833,171.58 0.36 0.36
m2 91.75
8 Pasangan trasram batu bata camp. 1pc : 2ps 168.00 150,248.36 25,241,724.27 1.58 1.58
9 Pasangan batu bata tebal 1/2 bata camp.1pc : 4ps m2 450.00 141,410.22 63,634,599.00 3.98 3.98
10 Pasangan roster m2 3.60 176,762.78 636,345.99 0.04 0.04
11 Plesteran batu bata camp.1pc : 2ps m2 336.00 75,000.00 25,200,000.00 1.57 1.57
12 Plesteran batu bata camp.1pc : 4ps m2 900.00 85,609.38 77,048,444.69 4.82 4.82
13 Lantai tegel keramik ukuran 60 x 60 cm u/ lantai (granite) m2 465.50 225,403.05 104,925,121.92 6.56 6.56
14 Lantai tegel keramik ukuran 20 x 20 cm u/ kamar mandi m2 8.00 167,924.64 1,343,397.09 0.08 0.08
15 Tegel plint keramik uk.10 x 60 cm u/ lantai m' 84.00 141,410.22 11,878,458.48 0.74 0.74
16 Saluran keliling Gedung Kontrol Buis Beton setengah lingkaran Dia.50cm m' 118.80 309,334.86 36,748,980.92 2.30 2.30
17 Pipa PVC dia 4 " AW m' 6.00 78,766.25 472,597.52 0.03 0.03
18 Bak kontrol pas. bt. bata 60 x 60 cm tinggi 50 cm unit 4.00 707,051.10 2,828,204.40 0.18 0.18
19 Borepile beton K-225 dia. 40 cm m' - 441,906.94 - - -
20 Pancang Cerucuk Dia.10 cm L = 5 m untuk lantai gedung btg 4.00 53,028.83 212,115.33 0.01 0.01
86.07
20a Pancang Cerucuk Dia. 15 ~ 20 cm L = 2,5 m untuk lantai gedung btg -
21 Mini pile K-500 uk. 25x25 cm m' - - -
JUMLAH B 467,313,310.12
-
C. PEKERJAAN RANGKA ATAP, PENUTUP ATAP DAN PLAFON - -
1 Rangka Atap Baja Ringan m2 730.80 185,600.91 135,637,147.77 8.48 4.24 4.24
2 Atap Onduline Classic m2 730.80 159,086.50 116,260,412.37 7.27 3.63 3.63
3 Bubungan Onduline Classic m' 42.00 159,086.50 6,681,632.90 0.42 0.42
4 Kawat Anyam m2 730.80 18,559.71 13,563,436.97 0.85 0.85
5 Aluminium Foil m2 730.80 30,933.11 22,605,913.49 1.41 1.41
6 Rangka plapond aluminium (bagian dalam) m2 468.00 141,410.22 66,179,982.96 4.14 4.14
7 Plafon dalam aqustik tebal 9 mm m2 468.00 123,733.94 57,907,485.09 3.62 3.62
8 Rangka plapond besi holo (bagian luar) m2 159.00 132,572.08 21,078,960.92 1.32 1.32
9 Plafon luar & teras aluminium lambersiring m2 159.00 150,248.36 23,889,489.04 1.49 1.49
10 Talang tegak PVC dia.4" kualitas AW m' 95.76 114,895.80 11,002,422.17 0.69 0.69
11 Lapis plinkute u/ lapisan atap beton m2 117.60 44,190.69 5,196,825.59 0.32 0.32
12 List plafond luar aluminium m' 120.00 123,733.94 14,848,073.10 0.93 0.93
JUMLAH C 494,851,782.36
-
D. PEKERJAAN PINTU DAN JENDELA & VENTILASI - - 77.55
1 Pintu type PJ ( kosen, daun pintu allm. dan kaca ) lengkap bh 1.00 3,977,162.44 3,977,162.44 0.25 0.25
2 Pintu type P1 ( kosen, daun pintu allm. dan kaca ) lengkap bh 3.00 2,651,441.63 7,954,324.88 0.50 0.50
3 Pintu type P2 ( kosen, daun pintu allm. dan kaca ) lengkap bh 2.00 2,474,678.85 4,949,357.70 0.31 0.31
4 Pintu type P3 ( kosen, daun pintu allm. dan kaca ) lengkap bh 2.00 2,297,916.08 4,595,832.15 0.29 0.29
5 Pintu type P4 ( Folding Gate ) dengan kunci lengkap m2 15.00 972,195.26 14,582,928.94 0.91 0.91
6 Pintu type P5 ( kosen, daun pintu allm. dan kaca ) lengkap bh 1.00 2,209,534.69 2,209,534.69 0.14 0.14
7 Ventilasi type V1 ( kosen allm. + kaca ) lengkap bh 7.00 707,051.10 4,949,357.70 0.31 0.31
8 Ventilasi type V2 ( kosen allm. + kaca ) lengkap bh 5.00 662,860.41 3,314,302.03 0.21 0.21
9 Ventilasi type V3 ( kosen allm. + kaca ) lengkap bh 4.00 618,669.71 2,474,678.85 0.15 0.15
10 Ventilasi type V4 ( kosen allm. + kaca ) lengkap bh 2.00 600,993.44 1,201,986.87 0.08 0.08
11 Ventilasi type V5 ( kosen allm. + kaca ) lengkap bh 2.00 530,288.33 1,060,576.65 0.07 0.07
12 Jendela type J1 ( kosen, daun pintu allm. dan kaca ) lengkap bh 1.00 2,121,153.30 2,121,153.30 0.13 0.13
13 Jendela type J2 ( kosen, daun pintu allm. dan kaca ) lengkap bh 2.00 1,944,390.53 3,888,781.05 0.24 0.24
14 Jendela type J3 ( kosen, daun pintu allm. dan kaca ) lengkap bh 3.00 1,767,627.75 5,302,883.25 0.33 0.33
15 Ventilasi type V6 ( JALUSI KAYU ) lengkap bh 1.00 441,906.94 441,906.94 0.03 0.03
JUMLAH D 63,024,767.43
-
E. PEKERJAAN SANITAIR - -
1 Closet jongkok lengkap bh 2.00 441,906.94 883,813.88 0.06 0.06
2 Bak mandi fiberglass uk. 55 x 55 x 60 cm bh 2.00 530,288.33 1,060,576.65 0.07 0.07
3 Instalasi air bersih pipa PVC 3/4" Kualitas AW m 400.00 79,543.25 31,817,299.50 1.99 1.99
4 Stop kran dia. 1" bh 4.00 159,086.50 636,345.99 0.04 67.63
0.04
5 Instalasi saluran air kotor PVC 4" kualitas AW m 400.00 123,733.94 49,493,577.00 3.09 3.09
6 Pipa PVC kualitas AW dia. 4" u/ closet ke septictank m 60.00 97,219.53 5,833,171.58 0.36 0.36
7 Filter drain lengkap bh 2.00 132,572.08 265,144.16 0.02 0.02
8 Septictank dan rembesan lengkap unit 2.00 6,186,697.13 12,373,394.25 0.77 0.77
9 Sumur bor lengkap dengan instalasi pipa sampai ke gedung kontrol unit 1.00 14,141,022.00 14,141,022.00 0.88 0.88
10 Pompa untuk sumur dalam kapasitas 30 liter/menit lengkap dengan rumah pom unit 1.00 1,679,246.36 1,679,246.36 0.10 0.10
11 Bak penampungan air dari beton bertulang kapasitas 12 m3 unit 1.00 6,186,697.13 6,186,697.13 0.39 0.39
12 Menara air rangka baja tinggi 5 meter lengkap dgn pondasi unit 1.00 8,838,138.75 8,838,138.75 0.55 0.55
Pompa kapasitas 40 liter/menit lengkap dengan rumah pompa & intalasi
13 unit 1.00 2,651,441.63 2,651,441.63 0.17
(untuk menaikkan air dari bak ke Tangki diatas menara) 0.17
Tangki air dari fiber glass kapasitas 2 x 1200 L lengkap dengan instalasi dan
14 1.00 4,419,069.38 4,419,069.38 0.28
kran unit 0.28
15 Penyambungan air PDAM ls 1.00 1,767,627.75 1,767,627.75 0.11 0.11
JUMLAH E 142,046,565.99
F. PEKERJAAN PANTRY - - 61.37

1 Kitchen sink / Bak cuci piring set 2.00 707,051.10 1,414,102.20 0.09 0.09
2 Pasangan bata merah tebal 1 bata, 1Pc : 6 Ps m2 6.00 123,733.94 742,403.66 0.05 0.05
3 Beton bertulang 1 Pc : 2 Ps : 3 Kr. m3 0.20 3,535,255.50 707,051.10 0.04 0.04
4 Bekisting m2 4.00 165,824.01 663,296.04 0.04 0.04
5 Pasangan keramik 20x20 m2 8.00 132,572.08 1,060,576.65 0.07 0.07
6 stop kran dapur bh 2.00 132,572.08 265,144.16 0.02 0.02
-
JUMLAH F 4,852,573.81
G. PEKERJAAN ALAT PENGGANTUNG DAN PENGUNCI - -
1 Engsel pintu allumunium (1 set = 3 buah) set 8.00 79,543.25 636,345.99 0.04 0.04
56.62
2 Engsel jendela allumunium (1 set = 2 buah) set 1.00 46,841.76 46,841.76 0.00 0.00
3 Grendel tanam u/ pintu double swing bh 2.00 123,733.94 247,467.89 0.02 0.02
4 Kunci pintu allumunium bh 6.00 243,048.44 1,458,290.61 0.09 0.09
5 Grendel jendela allumunium bh 2.00 97,219.53 194,439.05 0.01 0.01
6 Kait angin jendela allumunium (1 set = 2 buah) set 2.00 24,746.79 49,493.58 0.00 0.00
7 Door closer bh 6.00 238,629.75 1,431,778.48 0.09 0.09
JUMLAH G 4,064,657.35
H. PEKERJAAN PENGECATAN - -
m2 53.00
1 Pekerjaan cat kayu 28.13 68,053.29 1,914,339.00 0.12 0.12
2 Pekerjaan cat besi m2 33.74 68,053.29 2,296,117.95 0.14 0.14
3 Pekerjaan cat tembok u/ dinding m2 1,236.00 39,771.24 49,157,257.88 3.07 1.54 1.54
4 Pekerjaan cat politur u/ plafond kayu lambersiring m2 100.00 48,609.38 4,860,938.30 0.30 0.30
JUMLAH H 58,228,653.12
-
I. PEKERJAAN INSTALASI LISTRIK DAN AC -
1 Bok panel (MCB, dll) lengkap sesuai spesifikasi unit 1.00 6,186,697.13 6,186,697.13 0.39 0.39
2 Down Light lengkap dgn lampu TL 18 watt bh 64.00 176,762.78 11,312,817.60 0.71 0.71
3 Exhausefan 40 Watt lengkap bh 2.00 441,906.94 883,813.88 0.06 48.86 0.06
4 AC split 1 PK lengkap + Stop Kontak bh 5.00 4,153,925.21 20,769,626.06 1.30 1.30
5 AC split 3/4 PK lengkap + Stop Kontak bh 5.00 3,800,399.66 19,001,998.31 1.19 1.19
6 Saklar ganda kualitas I bh 9.00 53,028.83 477,259.49 0.03 0.03
7 Saklar Multi 3 kualitas I bh 2.00 70,705.11 141,410.22 0.01 0.01
8 Saklar Multi 4 kualitas I bh 2.00 97,219.53 194,439.05 0.01 0.01
9 Stop kontak kualitas I bh 12.00 53,028.83 636,345.99 0.04 0.04
10 Lampu DC 40 Watt lengkap (emergency) bh 17.00 618,669.71 10,517,385.11 0.66 0.66
11 Panel box u/ lampu DC + kontaktor & MCB lengkap unit 1.00 4,419,069.38 4,419,069.38 0.28 0.28
12 Wiring & accessiries + pemasangan lengkap ls 1.00 3,093,348.56 3,093,348.56 0.19 0.19
13 Arder/ground rod + pipa lengkap ls 1.00 4,419,069.38 4,419,069.38 0.28 0.28
14 Biaya penyambungan daya listrik 20.000 VA ls 1.00 8,838,138.75 8,838,138.75 0.55 0.55
JUMLAH I 90,891,418.91
-
J. PEKERJAAN PENANGKAL PETIR - - 42.55
1 Penangkal petir lengkap bh 4.00 163,505.19 654,020.75 0.04 0.04
2 Kawat BC 50 mm2 m 67.10 79,543.25 5,337,351.99 0.33 0.33
3 Arde/ground rod + pipa + bak kontrol beton lengkap titik 2.00 8,396,231.81 16,792,463.63 1.05 1.05
4 Pipa PVC dia. 3/4" kualitas AW + klem m 11.00 48,609.38 534,703.21 0.03 0.03
5 Klem penyangga kawat ls 1.00 353,525.55 353,525.55 0.02 0.02
JUMLAH J 23,672,065.13
K. PEKERJAAN CABLE DUCT GEDUNG KONTROL - -
a. PEKERJAAN CABLE DUCK TYPE I - -
1 Galian tanah m3 1.74 74,620.50 129,839.67 0.40 0.40
2 Urugan pasir padat m3 0.12 165,824.01 19,898.88 0.06 0.06
3 Urugan tanah kembali m3 0.27 33,164.50 8,954.41 0.03 0.03
4 Beton Lantai kerja B-0 m3 0.06 704,753.56 42,285.21 0.13 0.13
5 Beton K -175 m3 0.36 1,016,385.96 365,898.94 1.12 1.12
6 Besi Beton U -24 kg 37.95 14,141.02 536,651.78 1.64 1.64
7 Rak cable (dari plat strip galvanize) set 2.00 318,173.00 636,345.99 1.95 1.95
8 Plat bordes tebal 6 mm u/ tutup cable duct kg 56.52 15,469.97 874,362.93 2.68 2.68
9 Besi siku L.50.50.4 serta plat strip kg 7.85 16,353.41 128,374.25 0.39 0.39
10 Cat besi u/ plat bordes bagian atas m2 1.20 68,053.29 81,663.95 0.25 0.25 34.68
49.00 2,824,276.02
JUMLAH K (a) 138,389,525.18
b. PEKERJAAN CABLE DUCK TYPE II - -
1 Galian tanah m3 0.42 74,620.50 31,340.61 0.04 0.04
2 Urugan pasir padat m3 0.06 165,824.01 9,949.44 0.01 0.01
3 Urugan tanah kembali m3 0.05 33,164.50 1,658.22 0.00 0.00
4 Beton Lantai kerja B-0 m3 0.03 704,753.56 21,142.61 0.03 0.03
5 Beton K -175 m3 0.20 1,016,385.96 203,277.19 0.26 0.26
6 Besi Beton U -24 kg 10.50 14,141.02 148,480.73 0.19 0.19
7 Rak cable (dari plat strip galvanize) bh 2.00 318,173.00 636,345.99 0.82 0.82
8 Plat bordes tebal 6 mm u/ tutup cable duct kg 25.91 15,469.97 400,827.03 0.51 0.51

26.63
34.68

9 Besi siku L.50.50.4 serta plat strip kg 3.14 16,353.41 51,349.70 0.07 0.07
10 Cat besi u/ plat bordes bagian atas m2 0.45 68,053.29 30,623.98 0.04 0.04
20.50 1,534,995.50
JUMLAH K (b) 31,467,407.75
c. PEKERJAAN CABLE DUCK TYPE III - -
1 Galian tanah m3 0.28 74,620.50 20,893.74 0.02 0.02
2 Urugan pasir padat m3 0.05 165,824.01 8,291.20 0.01 0.01
26.63
3 Urugan tanah kembali m3 - 33,164.50 - - -
4 Beton Lantai kerja B-0 m3 0.03 704,753.56 21,142.61 0.02 0.02
5 Beton K -175 m3 0.12 1,016,385.96 121,966.31 0.14 0.14
6 Besi Beton U -24 kg 3.18 14,141.02 44,968.45 0.05 0.05
7 Rak cable (dari plat strip galvanize) bh 2.00 318,173.00 636,345.99 0.74 0.74
8 Plat bordes tebal 6 mm u/ tutup cable duct kg 23.55 15,469.97 364,317.89 0.42 0.42
9 Besi siku L.50.50.4 serta plat strip kg 3.14 16,353.41 51,349.70 0.06 0.06
10 Cat besi u/ plat bordes bagian atas m2 0.40 68,053.29 27,221.32 0.03 0.03
18.50 1,296,497.20
JUMLAH K (c) 23,985,198.28
d. PEKERJAAN CABLE DUCK TYPE IV - -
1 Galian tanah m3 0.60 74,620.50 44,772.30 0.01 0.01
2 Urugan pasir padat m3 0.08 165,824.01 13,265.92 0.00 0.00
3 Urugan tanah kembali m3 - 33,164.50 - - -
4 Beton Lantai kerja B-0 m3 0.04 704,753.56 28,190.14 0.01 0.01
5 Beton K -175 m3 0.20 1,016,385.96 203,277.19 0.04 0.04
6 Besi Beton U -24 kg 22.21 14,141.02 314,072.10 0.07 0.07
7 Rak cable (dari plat strip galvanize) bh 2.00 318,173.00 636,345.99 0.14 0.14
8 Plat bordes tebal 6 mm u/ tutup cable duct kg 37.68 15,469.97 582,908.62 0.13 0.13
9 Besi siku L.50.50.4 serta plat strip kg 6.28 16,353.41 102,699.40 0.02 0.02
10 Cat besi u/ plat bordes bagian atas m2 0.80 68,053.29 54,442.63 0.01 0.01
3.50 1,979,974.29
JUMLAH K (d) 6,929,910.03
L. PEKERJAAN BETON DAN PASANGAN TRAFO PS - -
1 Beton Lantai kerja B-0 m3 0.11 704,753.56 77,522.89 0.00 0.00
2 Beton K-175 m3 0.22 1,016,385.96 223,604.91 0.01 0.01
3 Bekisting m2 1.76 165,824.01 291,850.26 0.02 0.02
4 Kawat Wiremesh M6 untuk beton rabat lbr 2.00 371,201.83 742,403.66 0.05 0.05
5 Pasangan batu bata tebal 1/2 bata camp.1pc : 4ps m2 0.80 141,410.22 113,128.18 0.01 0.01
6 Panel BRC tinggi 190cm dia.7mm galvanize lengkap clamp dan baut panel 3.00 829,121.57 2,487,364.72 0.16 0.16
7 Pintu pagar geser galvanized type BRC 120 A2, lebar = 1 m lengkap unit 1.00 2,209,534.69 2,209,534.69 0.14 0.14
JUMLAH L 6,145,409.29 -
-
M. PEKERJAAN PEMASANGAN RAMBU-RAMBU K3 - -
1 Tanda APAR bh 6.00 75,123.80 450,742.80 0.03 0.03
2 Jalur Evakuasi bh 3.00 75,123.80 225,371.40 0.01 0.01
3 Tanda dilarang merokok bh 4.00 61,866.97 247,467.89 0.02 0.02
4 Benner K3 bh 2.00 61,866.97 123,733.94 0.01 0.01 9.94
5 Tanda High Voltage bh 1.00 44,190.69 44,190.69 0.00 0.00
6 Papan K3 bh 1.00 132,572.08 132,572.08 0.01 0.01
7 Muster point bh 1.00 75,123.80 75,123.80 0.00 0.00
JUMLAH M 1,299,202.59
-
N. PERALATAN PEMADAM API RINGAN - -
1 Tabung APAR 6.8 Kg Portable Unit Media C02 bh 6.00 618,669.71 3,712,018.28 0.23 0.23
2 Tabung Alat Pemadam Api 25 Kg Dry chemical powder Trolley bh 1.00 3,800,399.66 3,800,399.66 0.24 0.24
JUMLAH N 7,512,417.94
-
O. PENGADAAN APD DAN P3K UNTUK OPERATOR - -
1 Helm Safety set 5.00 198,857.74 994,288.71 0.06 0.06
2 Sarung tangan jenis latex set 5.00 19,443.91 97,219.53 0.01 0.01
3 Masker set 5.00 28,282.04 141,410.22 0.01 0.01
4 Kacamata set 5.00 110,476.35 552,381.77 0.03 0.03
5 Sepatu safety set 5.00 344,687.41 1,723,437.06 0.11 0.11
6 Lemari penyimpanan set 1.00 1,546,674.28 1,546,674.28 0.10 0.10
7 Kotak P3K set 1.00 243,048.44 243,048.44 0.02 0.02
JUMLAH O 5,298,460.00
JUMLAH 1,600,016,433.40
PPN 10% 160,001,643.34 0.88

JUMLAH + PPN 1,760,018,076.74 CHEDULE RENCANA


Pembulatan 1,760,000,000.00
TOTAL BOBOT PEKERJAAN 100.00
JADWAL RENCANA 0.88 9.06 16.69 8.05 7.87 6.31 4.14 3.62 4.75 6.26 9.92 8.51 5.68 3.65 4.60
KOMULATIF JADWAL RENCANA 0.88 9.94 26.63 34.68 42.55 48.86 53.00 56.62 61.37 67.63 77.55 86.07 91.75 95.40 100.00
RENCANA KEMAJUAN KEUANGAN 15,520,929.17 159,396,513.42 293,790,116.52 141,653,014.45 138,542,235.13 111,078,167.63 72,797,233.56 63,697,579.37 83,616,489.08 110,169,976.06 174,661,419.48 149,833,194.94 99,979,533.92 64,306,176.30 80,957,420.96
KOMULATIF RENCANA KEMAJUAN KEUANGAN 15,520,929.17 174,917,442.59 468,707,559.11 610,360,573.57 748,902,808.69 859,980,976.33 932,778,209.89 996,475,789.26 1,080,092,278.34 1,190,262,254.40 1,364,923,673.88 1,514,756,868.82 1,614,736,402.74 1,679,042,579.04 1,760,000,000.00

CATATAN : 1 KOLOM MINGGU = 6 HARI KALENDER

Penawar,
CV. SUKMA MANDIRI

QORI ASTIKA RADA


Direktur
DISBURSEMENT CASH IN PLAN

Project Name : PEMBANGUNAN GARDU INDUK 150KV SUKAMARA 2 LINE BAY, 1 BAY COUPLER DAN 1 TRAFO BAY
Contract No. : 0218.03/S/RE/II/2021, TANGGAL 01 FEBRUARI 2021
Client : CV. SUKMA MANDIRI
Location : Kabupaten Sukamara

BULAN
Description
FEBRUARI MARET APRIL
Cash In Plan (Inc. PPN 10%) 748,902,809 441,359,446 569,737,746
Cumm. Cash In Plan (Inc. PPN 10%) 748,902,809 1,190,262,254 1,760,000,000

BULAN
Description
FEBRUARI MARET APRIL
Cash In Plan (Inc. PPN 10%)
Cumm. Cash In Plan (Inc. PPN 10%)

CHEDULE RENCANA KEUANGAN


2,000,000,000
1,800,000,000
1,600,000,000
1,400,000,000
1,200,000,000
1,000,000,000 CHEDULE RENCANA KEUANGAN
800,000,000
600,000,000
400,000,000
200,000,000
-
1 2 3

Disiapkan Oleh,
PT …..

…………….
………………………………

Anda mungkin juga menyukai