Anda di halaman 1dari 1

DINAS PERUMAHAN DAN

KAWASAN PEMUKIMAN
PROVINSI SUMATRA UTARA

KETERANGAN

EKSISTING PERKERASAN
URUGAN PILIHAN

B
4.4 84 m2
4.8 14 14 105 m2 105 m2 84 m2
98 m2
14 14 14

14
C5 C7 C9 4m

ROW 7 M
14 2
8 14
C854m2 97 m2 C11 C13 C15

U
ROW 6 M
5.2 C1

6
7 6 7.5 NAMA PEKERJAAN
78 m2 7.5 7 84
m2
C3
6 7 C1

6
6
6 9 C m2 84

6
PENYUSUNAN RENCANA DETAIL
ROW 6 M 21 84

6
78 m2
8 ENGINEERING DESIGN (DED)
C2 6
C2 m2

6
6 6 6
6 6 6
2 84 m PEMBANGUNAN PSU PERUMAHAN MBR

6
13 5.6
3.3
13 13
C2 2

6
13 13 TAHUN 2019
91 m2 C6 C8 C10
C1

T
13

6
7 C12 C14 C16 3 C 84 m

6
7
97.5 m2 78
m2 C18 C2 24 2 84

6
78 m2 78 m2
7 78 m2 LOKASI
6
0 C2 m2

ROW 6 M
6 78 m2

6
6 6
9.5 6
90 m2 105 m2 6 6 6
8.5 5 C 123 m

10
6

6
84 m2 6 RO
26 2

.8
84 m2 84 m2 6 PERUMAHAN CEMARA ASRI SIBULUAN
15 84 m2 W
15B
1 B3 B514 B7 B9 84 m2 84 m2 98 m2 6M

6
B11 B13 B15 7 B23 Jl. Abdul Razab Simatupang - Sibuluan Nauli
B17

98
7
14
14 14 B19 5

m
C2
115 14 14 Kab. Tapanuli Tengah

6.

2
7 m2 14 14

7
6 7.0

7 14
6 6 6 7
B21

6
84
6 6 7
98 m2

7
6

m2
C2
7
ROW 6 M 6 JUDUL GAMBAR SKALA

8 14C

6 2
84
ROW 6 M

m
8 6

6
6 6
84 m2

2914
6 6 6 6

6
84
13 6 6
14 6

m2
C
14 6 1 : 850

6
14 EKSISTING PERKERASAN
B2 B4 B6 14 8.5

30 14
14 14 8.5
B8 B10 B12 14 6
7.5

6
84
7.5

14
7.5

B14 B16 B18 14


7.5

84 m2 14

m
C
7 84 m2 14
B20 B22 B24

6
84 m2

2
8 84 m2

3114
6 6 84 m2 84 B25 B26 B27
A1 A2 6 m 2 84 m2
A3 A4

6
84
6 84 m2
15

6 84 m2

RO
6 84 m2

m2
C3
6
15

6
6
114 m2
16

15.5

15.5

6 MENGETAHUI
114 m2
118 m2

W
6
118 m2

6
16

8.5

2C
6M
8.5

6
84
18.4

14

m2
7.5

6
6
KUASA PENGGUNA ANGGARAN
7.5

33
6 6 4.4
ROW 6 M
105 m2 90 m2

10
7.
14
BIDANG PRASARANA, SARANA DAN
105 m2 90 m2

5
15

5m
C3 1
6
A5 A7 A9 A1

KETERANGAN : B36 B34 B143 14


14 14 UTILITAS UMUM DINAS PERUMAHAN DAN

2
7

A6 A8 A10A

2 B30 B28
7

44
7

14 KAASAN PERMUKIMAN PROVINSI


BLOK A = 14 UNIT

7
14

7.
SUMATERA UTARA

5
15
6

BLOK B = 38 UNIT
6

12.3

10
7. m2
90 m2 90 m2

7
90 m2 90 m2 12

5
5
BLOK C = 62 UNIT
15

C3 14
ROW 6 M
6

6
6

5C

6 m2
84
BLOK D = 8 UNIT 6 6 6

7.
15

36
6 HADASA MANURUNG, ST
6

4.1
6
12 A14
6

6 2
84
6

14 NIP. 197111107 200502 2 001


TOTAL = 122 UNIT

14
1 A13

14

C3 14
m
14

6
B39 B37 B35 14
114 m2

14
15

B33 B31 B29

7C
84
6 2
0 m2
8.5

RO
8.9

DISETUJUI

m
6.5

7.0

6
6

38
6

6M
6

6
84
6 6 16.3
PEJABAT PELAKSANA TEKNIS KEGIATAN

m
6 6

C3 14
2
6

14
6 6 4.3 BIDANG PRASARANA, SARANA DAN

11
9C
14
C62 C1460 C145 14 UTILITAS UMUM DINAS PERUMAHAN DAN

5m
10
8 C56 C1454 C

.4
14 14

4
52 C1450 C48

2
14 KAASAN PERMUKIMAN PROVINSI

0
14
14 SUMATERA UTARA

5.

15
7

112
C41

7.5
11.7

m2
7.5
ROW 6 M

15
IMRAN SIREGAR, ST

90 m
6
C4215
6 6 6 6 NIP. 19720911 199312 1 001

2
6 6 6

6
6 6.6
14

C4315
14 PERENCANA
C61 C59 C57 14
C55 C53 C51 14
EKSISTING PERKERASAN

RO
C49 C47

C44
W
6
6

6M
6
6 6 12.8
6
SKALA 1:850 6

C45
6 6 6 6.8
6.85
D8 D7 D6
14 D5 D4 D3

C46
14
14
14
D2 D1 NAMA/JABATAN TTD

Ir. M. ARIF FADILLAH


DIREKTUR
ROW 7 M

Ir. M. ARIF FADILLAH


TEAM LEADER

TANGGAL NO. LBR. JLH. LBR.

05 10

Anda mungkin juga menyukai