KETERANGAN
NAMA PEKERJAAN
ROW5,
LOKASI
ROW 5,
18.0
8M
ROW 5,
18.0
8M
27.32
ROW 5,
18.0 PERUMAHAN 66 RESIDENCE
50.0
8M
27.32 8 M
ROW 6,
ROW 5,
18.0
25
Jl. Jendral Sudirman Km 4,5 Tg B Asahan
8M
27.32
Kec Pahang, Kota Tanjung Balai
ROW 5,
18.0 27.32
8
27.32 8M
ROW 5,
24.0
ROW 5,
ROW 6,
M
18.0 27.32
8M
27.32
ROW 5,
24.0
ROW 5,
18.0 27.32
JUDUL GAMBAR SKALA
8M
8M
27.32
ROW 5,
24.0
ROW 5,
18.0 27.32
8M
8M
27.32
ROW5,
24.0
ROW 8.
18.0 8 M 27.32
ROW 6.
8M
8M
27.32
ROW 5,
20.0 24.0
27.32
8M
27.32
2M
1 : 4000
ROW 5,
24.0 RENCANA PERKERASAN
27.32
8 M
8M
ROW 6. BETON
ROW 5,
24.0
27.32
8
ROW 5,
24.0
M
27.32
8
ROW 5,
ROW 8.
24.0
M
298.0 MENGETAHUI
8
24.0
M
8M
7 M
2M
ROW 6,
ROW 6,7
202.0
HADASA MANURUNG, ST
NIP. 197111107 200502 2 001
DISETUJUI
RENCANA PERKERASAN BETON PEJABAT PELAKSANA TEKNIS
SKALA 1:4000 KEGIATAN
BIDANG PRASARANA, SARANA DAN
UTILITAS UMUM DINAS PERUMAHAN
DAN KAASAN PERMUKIMAN PROVINSI
SUMATERA UTARA
IMRAN SIREGAR, ST
NIP. 19720911 199312 1 001
PERENCANA
NAMA/JABATAN TTD
06 14