Anda di halaman 1dari 1

GRESIK

PEMERINTAH KABUPATEN GRESIK


DINAS PEKERJAAN UMUM DAN
TATA RUANG
BIDANG SUMBER DAYA AIR
Jl. Dr. Wahidin Sudirohusodo 247 Gresik

KEGIATAN

PENYUSUNAN RENCANA TEKNIS DAN


DOKUMEN LINGKUNGAN HIDUP UNTUK
KONTRUKSI IRIGASI DAN RAWA

PEKERJAAN

PERENCANAAN PEMELIHARAAN SALURAN


PEMBUANG KALI MEDANGAN

LOKASI PEKERJAAN

KECAMATAN CERME
KABUPATEN GRESIK

N KONSULTAN PERENCANA
TA m
M BA 25.5
E 3 +
J .31
P

MENGETAHUI/MENYETUJUI :
PEJABAT PEMBUAT KOMITMEN
(PPK)
bidang persamaan / reference level
+2.00 meter
P.305

P.306

P.307

P.308

P.309

P.310

P.311

P.312

P.313

P.314

P.315
NOMOR PROFIL
PROFILE NUMBER

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE


ACCUMULATED DISTANCE 44.560 50.385 47.960 50.416 55.708 45.390 57.476 38.308 60.606 46.809
UBAIDILLAH.ST.MT
NIP. 19790827 200604 1 019
3.81 6.37 6.67

3.82 6.50 5.91

3.80 5.88 5.88

3.79 5.88 5.76

3.75 5.98 5.94

3.74 6.25 7.16

3.71 5.78 6.01

3.44 5.73 5.74

3.42 6.18 5.98

3.53 6.14 6.21

3.53 6.05 5.93


ELEVASI TANGGUL KIRI
LEFT BANK LEVEL DIBUAT :
YANG ADA
EXISTING

ELEVASI TANGGUL KANAN


RIGHT BANK LEVEL
Konsultan Perencana
CV . MAHAKARYA UTAMA
ELEVASI DASAR SUNGAI PADA AS
BED LEVEL IN CENTER LINE

ELEVASI TANAH ASLI PADA AS SUNGAI


GROUND LEVEL IN CENTER LINE

8.411
8.278

7.904

7.187

7.148

7.503

7.743

7.553

8.157
RENCANA / DESIGN

ELEVASI TANGGUL
BANK LEVEL
ELEVASI MUKA AIR RENCANA
DESIGN WATER LEVEL Ir. WAHYUDI
Direktur
3.480

3.400
3.470

3.460

3.440

3.420

3.360

3.320

3.280

3.240

3.200
ELEVASI DASAR RENCANA
BED LEVEL

R.X .Y. l JUDUL GAMBAR SKALA


TRACE SUNGAI / ALIGNMENT

LONG SECTION & SITUASI III 1: 2000


P. 305 - P. 315

KODE GAMBAR NO. GAMBAR JML. GAMBAR

KL MDG
5 24