Anda di halaman 1dari 11

KEMENTRIAN PEKERJAAN UMUM DAN

PERUMAHAN RAKYAT
NAMA PEKERJAAN
PEMBANGUNAN
REHABILITASI RUMAH SAKIT UMUM DAERAH
UNDATA PALU
AS BUILT DRAWING
MT.-0.60 DIBUAT OLEH :
157.5 200 900 250 500 400 400
C D
100 100 157.5 50 150 50 100 150 175 225 225 175 157.5 KONTRAKTOR PELAKSANA
C D 200 900 250 500 400 400
100 50 150 50 100 150 175 225 225 75 100
157.5

M PT. NINDYA KARYA(PERSERO)


175

M SELASAR
157.5

157.5
175

175

SELASAR -0.35 L
75
SHAFT

150
SPOEL
PROJECT MANAGER

PANTRY
L KM/WC
HOK
75

275
SHAFT

DUTY NURSE
REST ROOM
150

SPOEL
PANTRY

200
KM/WC 2°
HOK

118 120 113


275

450

450
KM/WC 250
DUTY NURSE
REST ROOM
200


118 120 113

250 K
450

450

50
KM/WC RG. DOKTER RG.KELAS 1E
LINEN

700
RG. DOKTER RG.KELAS 3A
K
50

800
LINEN RG.KELAS 2B
700

325

225
KORIDOR WC
+4.00
800

50
KELAS 1A SHAFT
325

225

KORIDOR WC
-0.35 ±0.00 LIFT
50

SHAFT NURSE

50
BED KM/WC

1575
200
ADMN
NURSE
LIFT STATION 2°
KM/WC
2° J A
50

BED KM/WC KM/WC KM/WC


1575
200

200
STATION 2° 2° J 2° I
JOHANES, ST.
200

2° I
KM/WC H
DIKETAHUI OLEH :

300
-0.35 MT-0.47 H KORIDOR KORIDOR
300

2250

2250
300
MT-1.05 KORIDOR
KORIDOR KORIDOR
RSUD UNDATA PALU
2250

2250
G
300

50 115 58
KORIDOR
50 115 58 G +4.00 F
KORIDOR WC 100 TR
B

200
F RG. RAPAT

BORDES

+2.40
+4.00
KM/WC

400
200

KM/WC

SHAFT
RG. KELAS 1C
GUDANG
BORDES

177

+2.40

±0.00 2° E

50
KM/WC
KM/WC
SHAFT

177
2° E D
50

NK

325

225

75
KORIDOR WC

800
D
RG.KELAS 2A

157.5
325

225

75

KORIDOR WC +4.00
800

-0.35
KELAS 3B

50
±0.00 C

500
-0.75
93.8 81.3 81.3
50

KM/WC

200
C 81.3

500

675
93.8 2°
MOH.ARIF BUDIMAN., S.E., M.M

275
81.3 81.3
PLAT TEGAK
200

81.3
NIP.19810216 200902 1 002

675
2° 10/75 CM
275

KM/WC

75
PLAT TEGAK SHAFT
10/75 CM B
DIPERIKSA OLEH :
75

SHAFT

175

175
B
175

175
SELASAR A
A PT. INDRA KARYA(PERSERO)
157.5

157.5
-0.75 "SAFER,STONGER,FASTER"
350 200 350 150 5050 400
200 900 400 350 150 650
1 2 3 4 5 6 7 8 9
MANAGEMENT KONTRUKSI

630
RAMP 1500 1150
2650
MT.-1.10
157.5 200
350 200
900
350 300
400
100 157.5
350 150
150 5050
650
400
157.5
DENAH LANTAI 2
1 2 3 4 5 6 7 8 9 Skala 1 : 150 AHMAD MURTAFI, ST.
1500 1150
2650 DISETUJUI OLEH :
KOORDINATOR PERENCANAAN BANGUNAN GEDUNG
DENAH LANTAI 1 WILAYAH SULAWESI TENGAH
Skala 1 : 150
DJHONY EKO PRASETYO, ST
NIP.19680505 200701 1 006
JUDUL GAMBAR
LOKASI PEMBONGKARAN &
PENGGANTIAN DINDING BATA DENAH LANTAI 1&2 CATELIA
SKALA 1
: : 150 TANGGAL :
NO. GAMBAR DIKELUARKAN UNTUK :
Diperiksa Oleh : Informasi
Persetujuan
ARS-01 Digambar Oleh : Pelaksanaan
As Built Drawing
KEMENTRIAN PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT
NAMA PEKERJAAN
Bubungan
Nok Baja Ringan PEMBANGUNAN
Konst. Rangka Kuda-Kuda Baja Ringan REHABILITASI RUMAH SAKIT UMUM DAERAH
UNDATA PALU
AS BUILT DRAWING
+11.65
DIBUAT OLEH :
512
KONTRAKTOR PELAKSANA
265
PT. NINDYA KARYA(PERSERO)
+9.00
165 PROJECT MANAGER
+7.30
500
LIFT 335
BED
+4.00
JOHANES, ST.
66
+3.30 DIKETAHUI OLEH :
+2.40
334
400 RSUD UNDATA PALU
±0.00
47
LOKASI RETAKAN DINDING
Bubungan MOH.ARIF BUDIMAN., S.E., M.M
Nok Baja Ringan NIP.19810216 200902 1 002
Konst. Rangka Kuda-Kuda Baja Ringan
DIPERIKSA OLEH :
PT. INDRA KARYA(PERSERO)
"SAFER,STONGER,FASTER"
MANAGEMENT KONTRUKSI
476
Ring Balk RB1 15x25
Lisplank Elephant Wood
Board 20 cm
150 165
+7.50 AHMAD MURTAFI, ST.
+7.30 +7.30 +7.30 DISETUJUI OLEH :
+7.10 +7.10
500 KOORDINATOR PERENCANAAN BANGUNAN GEDUNG
350 WILAYAH SULAWESI TENGAH
335
+4.00 +4.00 +4.00
66 66
+3.30 +3.30 +3.30 +3.30 +3.30
+2.40
400 DJHONY EKO PRASETYO, ST
334 334
NIP.19680505 200701 1 006
±0.00 ±0.00 ±0.00
JUDUL GAMBAR
-0.35 47
100 -0.75
85 POTONGAN 1&2 CATELIA
SKALA 1
: : 150 TANGGAL :
NO. GAMBAR DIKELUARKAN UNTUK :
Diperiksa Oleh : Informasi
Persetujuan
ARS-01 Digambar Oleh : Pelaksanaan
As Built Drawing
KEMENTRIAN PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT
NAMA PEKERJAAN
PEMBANGUNAN
REHABILITASI RUMAH SAKIT UMUM DAERAH
UNDATA PALU
AS BUILT DRAWING
DIBUAT OLEH :
KONTRAKTOR PELAKSANA
PT. NINDYA KARYA(PERSERO)
PROJECT MANAGER
JOHANES, ST.
DIKETAHUI OLEH :
RSUD UNDATA PALU
MOH.ARIF BUDIMAN., S.E., M.M
NIP.19810216 200902 1 002
DIPERIKSA OLEH :
PT. INDRA KARYA(PERSERO)
"SAFER,STONGER,FASTER"
MANAGEMENT KONTRUKSI
AHMAD MURTAFI, ST.
DISETUJUI OLEH :
KOORDINATOR PERENCANAAN BANGUNAN GEDUNG
WILAYAH SULAWESI TENGAH
DJHONY EKO PRASETYO, ST
NIP.19680505 200701 1 006
JUDUL GAMBAR
TAMPAK 1&2 CATELIA
SKALA 1
: : 150 TANGGAL :
NO. GAMBAR DIKELUARKAN UNTUK :
Diperiksa Oleh : Informasi
Persetujuan
ARS-01 Digambar Oleh : Pelaksanaan
As Built Drawing
KEMENTRIAN PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT
NAMA PEKERJAAN
PEMBANGUNAN
REHABILITASI RUMAH SAKIT UMUM DAERAH
UNDATA PALU
AS BUILT DRAWING
MT.-0.60
157.5 200 900 250 500 400 400 DIBUAT OLEH :
100 100 157.5 50 150 50 100 150 175 225 225 175 157.5
C D
C D 200 900 250 500 400 400
KONTRAKTOR PELAKSANA
100 50 150 50 100 150 175 225 225 75 100
157.5

M
PT. NINDYA KARYA(PERSERO)
175

M SELASAR
157.5

157.5
175

175

SELASAR -0.35 L
75

SHAFT

150
SPOEL

PANTRY
KM/WC
L HOK PROJECT MANAGER
75

275

DUTY NURSE
SHAFT

REST ROOM
150

SPOEL
PANTRY

200
KM/WC 2°
HOK

118 120 113


275

450

450
KM/WC 250
DUTY NURSE
REST ROOM
200


118 120 113

250 K
450

450

50
KM/WC RG. DOKTER RG.KELAS 1E
LINEN

700
RG. DOKTER RG.KELAS 3A
K
50

800
LINEN RG.KELAS 2B
700

325

225
KORIDOR WC +4.00
800

50
KELAS 1A SHAFT
325

225

KORIDOR WC
-0.35 ±0.00 LIFT
50

SHAFT NURSE

50
BED KM/WC

200

1575
ADMN
NURSE
LIFT STATION 2°
KM/WC
2° J A
50

BED KM/WC KM/WC KM/WC


200

A
1575

200
STATION 2° 2° J 2° I
JOHANES, ST.
200

2° I
KM/WC H

300
-0.35 MT-0.47 H KORIDOR KORIDOR
DIKETAHUI OLEH :
300

2250

2250
300
MT-1.05 KORIDOR
KORIDOR KORIDOR
2250

2250
G
300

50 115 58
KORIDOR
G +4.00 F
RSUD UNDATA PALU
50 115 58
KORIDOR WC 100 TR
B

200
F RG. RAPAT

BORDES

+2.40
KM/WC +4.00

400
200

KM/WC

SHAFT
RG. KELAS 1C
GUDANG
BORDES

177
2° E
+2.40

±0.00 2°

50
KM/WC
KM/WC
SHAFT

177
2° E D
50

NK

325

225

75
KORIDOR WC

800
D RG.KELAS 2A

157.5
325

225

75

KORIDOR WC +4.00
-0.35
800

KELAS 3B

50
±0.00 C

500
-0.75
93.8 81.3 81.3
50

KM/WC

200
C 81.3

500

675
93.8 2°

275
81.3 81.3
PLAT TEGAK MOH.ARIF BUDIMAN., S.E., M.M
200

81.3

675
2° 10/75 CM
NIP.19810216 200902 1 002
275

KM/WC

75
PLAT TEGAK SHAFT
10/75 CM B
DIPERIKSA OLEH :
75

SHAFT

175

175
B
175

175
SELASAR A
A PT. INDRA KARYA(PERSERO)
157.5

157.5
-0.75
350 200 350 150 5050 400 "SAFER,STONGER,FASTER"
200 900 400 350 150 650
1 2 3 4 5 6 7 8 9 MANAGEMENT KONTRUKSI

630
RAMP 1500 1150
2650
MT.-1.10
DENAH LANTAI 2
350 200 350 300 100 157.5 150 5050 400
Skala 1 : 150
157.5 200 900 400 350 150 650 157.5
1 2 3 4 5 6 7 8 9
1500 1150
AHMAD MURTAFI, ST.
2650
DISETUJUI OLEH :
KOORDINATOR PERENCANAAN BANGUNAN GEDUNG
DENAH LANTAI 1 LOKASI PEMBONGKARAN & WILAYAH SULAWESI TENGAH
PENGGANTIAN PLAFOND
Skala 1 : 150
LOKASI PEMBONGKARAN &
LANTAI 1 TIDAK ADA PENGGANTIAN LIST PLAFOND
PEMBONGKARAN PLAFOND
DJHONY EKO PRASETYO, ST
NIP.19680505 200701 1 006
JUDUL GAMBAR
DENAH LANTAI 1 CATELIA
SKALA 1
: : 150 TANGGAL :
NO. GAMBAR DIKELUARKAN UNTUK :
Diperiksa Oleh : Informasi
Persetujuan
ARS-01 Digambar Oleh : Pelaksanaan
As Built Drawing
KEMENTRIAN PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT
NAMA PEKERJAAN
PEMBANGUNAN
REHABILITASI RUMAH SAKIT UMUM DAERAH
UNDATA PALU
AS BUILT DRAWING
MT.-0.60
157.5 200 900 250 500 400 400
C D DIBUAT OLEH :
100 100 157.5 50 150 50 100 150 175 225 225 175 157.5
C D 200 900 250 500 400 400 KONTRAKTOR PELAKSANA
100 50 150 50 100 150 175 225 225 75 100
157.5

M
PT. NINDYA KARYA(PERSERO)
175

M SELASAR
157.5

157.5
175

175

SELASAR -0.35 L
75

SHAFT

150
SPOEL

PANTRY
L KM/WC
HOK
PROJECT MANAGER
75

275

DUTY NURSE
SHAFT

REST ROOM
150

SPOEL
PANTRY

200

KM/WC 2°
HOK

118 120 113


275

450

450
KM/WC 250
DUTY NURSE
REST ROOM
200


118 120 113

K
450

450

250
50
KM/WC RG. DOKTER RG.KELAS 1E
LINEN

700
RG. DOKTER RG.KELAS 3A
K
50

800
LINEN RG.KELAS 2B
700

325

225
KORIDOR WC +4.00
800

50
KELAS 1A SHAFT
325

225

KORIDOR WC ±0.00
-0.35 LIFT
50

SHAFT NURSE

50
BED KM/WC

200

1575
ADMN
NURSE
LIFT STATION 2°
KM/WC
2° J A
50

BED KM/WC KM/WC KM/WC


200

1575

200
STATION 2° 2° J 2° I
JOHANES, ST.
200

2° I
KM/WC H

300
-0.35 MT-0.47 H KORIDOR KORIDOR DIKETAHUI OLEH :
300

2250

2250
300
MT-1.05 KORIDOR
KORIDOR KORIDOR
2250

2250
G
300

50 115 58
KORIDOR
G +4.00 F RSUD UNDATA PALU
50 115 58
KORIDOR WC 100 TR
B

200
F RG. RAPAT

BORDES

+2.40
KM/WC +4.00
200

400
KM/WC

SHAFT
RG. KELAS 1C
GUDANG
BORDES

177

+2.40

±0.00 2° E

50
KM/WC
KM/WC
SHAFT

B
177
2° E D
50

NK

325

225

75
KORIDOR WC

800
D RG.KELAS 2A

157.5
325

225

75

KORIDOR WC +4.00
800

-0.35
KELAS 3B

50
±0.00 C

500
-0.75
93.8 81.3 81.3
50

KM/WC

200
C 81.3

500

675
93.8 2°

275
81.3 81.3
PLAT TEGAK
MOH.ARIF BUDIMAN., S.E., M.M
200

81.3

675
2° 10/75 CM
275

KM/WC
NIP.19810216 200902 1 002

75
PLAT TEGAK SHAFT
10/75 CM B
75

SHAFT
DIPERIKSA OLEH :

175

175
B
175

175
SELASAR A
A
PT. INDRA KARYA(PERSERO)
157.5

157.5
-0.75
350 200 350 150 5050 400 "SAFER,STONGER,FASTER"
200 900 400 350 150 650
1 2 3 4 5 6 7 8 9
MANAGEMENT KONTRUKSI

630
RAMP 1500 1150
2650
MT.-1.10
350 200 350 300 100 157.5 150 5050 400
DENAH LANTAI 2
157.5 200 900 400 350 150 650 157.5 Skala 1 : 150
1 2 3 4 5 6 7 8 9
1500 1150 AHMAD MURTAFI, ST.
2650
DISETUJUI OLEH :
LOKASI PEMBONGKARAN & KOORDINATOR PERENCANAAN BANGUNAN GEDUNG
DENAH LANTAI 1 PENGGANTIAN KERAMIK LANTAI
WILAYAH SULAWESI TENGAH
Skala 1 : 150
LOKASI PEMBONGKARAN &
PENGGANTIAN PLINT LANTAI
DJHONY EKO PRASETYO, ST
NIP.19680505 200701 1 006
JUDUL GAMBAR
DENAH LANTAI 1&2 CATELIA
SKALA 1
: : 150 TANGGAL :
NO. GAMBAR DIKELUARKAN UNTUK :
Diperiksa Oleh : Informasi
Persetujuan
ARS-01 Digambar Oleh : Pelaksanaan
As Built Drawing
KEMENTRIAN PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT
NAMA PEKERJAAN
PEMBANGUNAN
REHABILITASI RUMAH SAKIT UMUM DAERAH
UNDATA PALU
MT.-0.60 AS BUILT DRAWING
157.5 200 900 250 500 400 400
100 100 157.5 50 150 50 100 150 175 225 225 175 157.5
C D
C D 200 900 250 500 400 400
100 50 150 50 100 150 175 225 225 75 100 DIBUAT OLEH :
157.5

M KONTRAKTOR PELAKSANA
175

M SELASAR
157.5

157.5
175

175

SELASAR -0.35 L
75

SHAFT
PT. NINDYA KARYA(PERSERO)

150
SPOEL

PANTRY
L KM/WC
HOK
75

275

DUTY NURSE
SHAFT

REST ROOM
150

SPOEL
PANTRY

200

KM/WC 2°
HOK

118 120 113


275

250

450

450
KM/WC
DUTY NURSE
REST ROOM
200


118 120 113

K
450

450

250
PROJECT MANAGER
50

KM/WC RG. DOKTER RG.KELAS 1E


LINEN

700
RG. DOKTER RG.KELAS 3A
K
50

800

LINEN RG.KELAS 2B
700

325

225
KORIDOR WC
+4.00
800

50
KELAS 1A SHAFT
225
325

KORIDOR WC ±0.00
-0.35 LIFT
50

SHAFT NURSE

50
BED KM/WC

200
A

1575
ADMN LIFT STATION 2° 2° J
NURSE KM/WC
50

BED KM/WC KM/WC KM/WC


1575
200

200
STATION 2° 2° J 2° I
200

2° I
KM/WC
H

300
-0.35 MT-0.47 H KORIDOR KORIDOR
300

2250

2250
300
MT-1.05 KORIDOR JOHANES, ST.
KORIDOR KORIDOR G
2250

2250
300

50 115 58
KORIDOR
G +4.00 F
DIKETAHUI OLEH :
50 115 58

KORIDOR WC 100 TR
B

200
F RG. RAPAT

BORDES

+2.40
400
KM/WC +4.00
RSUD UNDATA PALU
200

KM/WC

SHAFT
RG. KELAS 1C
GUDANG
BORDES

177
2° E
+2.40

±0.00 2°

50
KM/WC
KM/WC
SHAFT

2° 177 E B D
50

NK

325

225

75
KORIDOR WC

800
D RG.KELAS 2A

157.5
325

225

75

KORIDOR WC +4.00
-0.35
800

KELAS 3B

50
±0.00 C

500
-0.75
93.8 81.3 81.3
50

KM/WC

200
C 81.3

500

675
93.8 2°

275
81.3 81.3
PLAT TEGAK
200

81.3

675
2° 10/75 CM
275

KM/WC

75
PLAT TEGAK SHAFT
10/75 CM B
75

SHAFT
MOH.ARIF BUDIMAN., S.E., M.M

175

175
B
NIP.19810216 200902 1 002
175

175
SELASAR A
A DIPERIKSA OLEH :
157.5

157.5
-0.75
350 200 350 150 5050 400
200 900 400 350 150 650
1 2 3 4 5 6 7 8 9
PT. INDRA KARYA(PERSERO)
"SAFER,STONGER,FASTER"

630
RAMP 1500 1150
2650
MT.-1.10 MANAGEMENT KONTRUKSI
DENAH LANTAI 2
350 200 350 300 100 157.5 150 5050 400 Skala 1 : 150
157.5 200 900 400 350 150 650 157.5
1 2 3 4 5 6 7 8 9
1500 1150
2650
AHMAD MURTAFI, ST.
DENAH LANTAI 1 LOKASI PEMBONGKARAN &
DISETUJUI OLEH :
PENGGANTIAN PLESTERAN
Skala 1 : 150 KOORDINATOR PERENCANAAN BANGUNAN GEDUNG
WILAYAH SULAWESI TENGAH
DJHONY EKO PRASETYO, ST
NIP.19680505 200701 1 006
JUDUL GAMBAR
DENAH LANTAI 1 CATELIA
SKALA 1
: : 150 TANGGAL :
NO. GAMBAR DIKELUARKAN UNTUK :
Diperiksa Oleh : Informasi
Persetujuan
ARS-01 Digambar Oleh : Pelaksanaan
As Built Drawing
KEMENTRIAN PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT
NAMA PEKERJAAN
PEMBANGUNAN
REHABILITASI RUMAH SAKIT UMUM DAERAH
UNDATA PALU
AS BUILT DRAWING
DIBUAT OLEH :
MT.-0.60
157.5 200 900 250 500 400 400 KONTRAKTOR PELAKSANA
100 100 157.5 50 150 50 100 150 175 225 225 175 157.5
C D
C D 200 900 250 500 400 400
100 50 150 50 100 150 175 225 225 75 100
PT. NINDYA KARYA(PERSERO)
157.5

M
175

M SELASAR
157.5

157.5

PROJECT MANAGER
175

175

SELASAR -0.35 75 L
SHAFT

150
SPOEL

PANTRY
L KM/WC
HOK
75

275

DUTY NURSE
SHAFT

REST ROOM
150

SPOEL
PANTRY

200
KM/WC 2°
HOK

118 120 113


275

250

450

450
KM/WC
DUTY NURSE
REST ROOM
200


118 120 113

K
450

450

250

50
KM/WC RG. DOKTER RG.KELAS 1E
LINEN

700
RG. DOKTER RG.KELAS 3A
K
50

800
LINEN RG.KELAS 2B
700

325

225
KORIDOR WC
+4.00
800

50
KELAS 1A SHAFT
325

225

KORIDOR WC ±0.00
-0.35 LIFT
50

SHAFT NURSE

50
BED KM/WC

1575
200
ADMN
NURSE
LIFT STATION 2°
KM/WC
2° J A JOHANES, ST.
50

BED KM/WC KM/WC KM/WC


200

1575 A

200
STATION 2° 2° J 2° I
DIKETAHUI OLEH :
200

2° I
KM/WC H

300
-0.35 MT-0.47 300 H KORIDOR KORIDOR

2250

2250
RSUD UNDATA PALU

300
MT-1.05 KORIDOR
KORIDOR KORIDOR
2250

2250
G
300

50 115 58
KORIDOR
G +4.00 F

50 115 58
KORIDOR WC 100 TR
B

200
F RG. RAPAT

BORDES

+2.40
KM/WC +4.00

400
200

KM/WC

SHAFT
RG. KELAS 1C
GUDANG
BORDES

177
2° E
+2.40

±0.00 2°

50
KM/WC
KM/WC
SHAFT

177
2° E D
50

NK

325

225

75
KORIDOR WC

800
D RG.KELAS 2A

157.5
225
325

75

KORIDOR WC +4.00
800

-0.35
KELAS 3B

50
±0.00 C

500
-0.75
93.8 81.3 81.3 MOH.ARIF BUDIMAN., S.E., M.M
50

KM/WC

200
C 81.3

500

675
93.8 2°
NIP.19810216 200902 1 002

275
81.3 81.3
PLAT TEGAK
200

81.3

675
2° 10/75 CM
275

KM/WC DIPERIKSA OLEH :

75
PLAT TEGAK SHAFT
10/75 CM B
75

SHAFT

175

175
B
PT. INDRA KARYA(PERSERO)
175

175
SELASAR A
A "SAFER,STONGER,FASTER"
157.5

157.5
-0.75
350 200 350 150 5050 400
200 900 400 350 150 650 MANAGEMENT KONTRUKSI
1 2 3 4 5 6 7 8 9

630
RAMP 1500 1150
2650
MT.-1.10
DENAH LANTAI 2
350 200 350 300 100 157.5 150 5050 400 Skala 1 : 150
157.5 200 900 400 350 150 650 157.5
AHMAD MURTAFI, ST.
1 2 3 4 5 6 7 8 9
1500 1150 DISETUJUI OLEH :
2650
KOORDINATOR PERENCANAAN BANGUNAN GEDUNG
WILAYAH SULAWESI TENGAH
LOKASI PEMBONGKARAN &
DENAH LANTAI 1 PENGGANTIAN DINDING
Skala 1 : 150
DJHONY EKO PRASETYO, ST
NIP.19680505 200701 1 006
JUDUL GAMBAR
DENAH LANTAI 1&2 CATELIA
SKALA 1
: : 150 TANGGAL :
NO. GAMBAR DIKELUARKAN UNTUK :
Diperiksa Oleh : Informasi
Persetujuan
ARS-01 Digambar Oleh : Pelaksanaan
As Built Drawing
KEMENTRIAN PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT
NAMA PEKERJAAN
PEMBANGUNAN
REHABILITASI RUMAH SAKIT UMUM DAERAH
UNDATA PALU
AS BUILT DRAWING
DIBUAT OLEH :
157.5 200 900 250
MT.-0.60
500 400 400
C D KONTRAKTOR PELAKSANA
100 100 157.5 50 150 50 100 150 175 225 225 175 157.5 200 900 250 500 400 400
C D 100 50 150 50 100 150 175 225 225 75 100
M PT. NINDYA KARYA(PERSERO)
157.5

175

SELASAR
M
L

75
157.5

157.5

SHAFT
PROJECT MANAGER
175

175

150
SPOEL

PANTRY
SELASAR -0.35 KM/WC
HOK

275

DUTY NURSE
REST ROOM
L

200

75

118 120 113


SHAFT 250

450

450
150

SPOEL KM/WC
PANTRY

KM/WC
HOK
275

K
DUTY NURSE
REST ROOM

50
RG. DOKTER RG.KELAS 1E
200

LINEN

700

118 120 113

250
450

450

KM/WC

800
RG. DOKTER RG.KELAS 3A RG.KELAS 2B

325

225
K KORIDOR WC
50

+4.00

50
LINEN SHAFT
700
800

LIFT
KELAS 1A NURSE

50
325

225

BED KM/WC

200
A

1575
KORIDOR WC
-0.35 ±0.00 STATION 2° 2° J
50

SHAFT KM/WC
KM/WC
ADMN

200
NURSE
LIFT 2° I JOHANES, ST.
50

BED KM/WC KM/WC


200

A
1575
STATION 2° 2° J
H
DIKETAHUI OLEH :

300
200

2° I
KM/WC
KORIDOR KORIDOR

2250

2250
300
-0.35 MT-0.47 H KORIDOR

300
G RSUD UNDATA PALU

50 115 58
MT-1.05
KORIDOR KORIDOR
2250

2250
300

+4.00 F
KORIDOR
G B

50 115 58
TR

200
RG. RAPAT

BORDES

+2.40
KORIDOR WC 100 +4.00
F KM/WC KM/WC

SHAFT

177
2° E

50
200

400
RG. KELAS 1C
GUDANG
BORDES


+2.40

KM/WC ±0.00
KM/WC D
SHAFT

325

225
177

75
2° E KORIDOR WC
50

800
NK
RG.KELAS 2A
+4.00
D

157.5

50
325

225

75

KORIDOR WC C

500
800

-0.35
KELAS 3B 93.8 81.3 81.3
-0.75 ±0.00 KM/WC

200
81.3 MOH.ARIF BUDIMAN., S.E., M.M

675

275
50

C PLAT TEGAK

500
93.8 81.3 81.3 10/75 CM NIP.19810216 200902 1 002

75
200

81.3 SHAFT

675

275

KM/WC PLAT TEGAK


B DIPERIKSA OLEH :

175

175
10/75 CM
75

SHAFT
B
A
PT. INDRA KARYA(PERSERO)
175

175
SELASAR
A "SAFER,STONGER,FASTER"
157.5

157.5
350 200 350 150 5050 400
-0.75
200 900 400 350 150 650
MANAGEMENT KONTRUKSI
1 2 3 4 5 6 7 8 9
1500 1150

630
RAMP 2650
MT.-1.10
DENAH LANTAI 2
350 200 350 300 100 157.5 150 5050 400 Skala 1 : 150
157.5 200 900 400 350 150 650 157.5
AHMAD MURTAFI, ST.
1 2 3 4 5 6 7 8 9
1500 1150 DISETUJUI OLEH :
2650
KOORDINATOR PERENCANAAN BANGUNAN GEDUNG
WILAYAH SULAWESI TENGAH
DENAH LANTAI 1
Skala 1 : 150
LOKASI PEMBONGKARAN &
PENGGANTIAN KERAMIK DINDING
LANTAI 1 TIDAK ADA PEMBONGKARAN &
PENGGANTIAN KERAMIK DINDING DJHONY EKO PRASETYO, ST
NIP.19680505 200701 1 006
JUDUL GAMBAR
DENAH LANTAI 1&2 CATELIA
SKALA 1
: : 150 TANGGAL :
NO. GAMBAR DIKELUARKAN UNTUK :
Diperiksa Oleh : Informasi
Persetujuan
ARS-01 Digambar Oleh : Pelaksanaan
As Built Drawing
KEMENTRIAN PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT
C NAMA PEKERJAAN
D
200 900 250 500 400 400
MT.-0.60 PEMBANGUNAN
157.5 200 900 250 500 400 400 100 50 150 50 100 150 175 225 225 75 100
REHABILITASI RUMAH SAKIT UMUM DAERAH
100 100 157.5 50 150 50 100 150 175 225 225 175 157.5
C D M UNDATA PALU
175

SELASAR
L
157.5

75

SHAFT

150
SPOEL

PANTRY
KM/WC
HOK
AS BUILT DRAWING
275

DUTY NURSE
REST ROOM
200


157.5

157.5

118 120 113


175

175

250

450

450
SELASAR -0.35 KM/WC
K
50

L RG. DOKTER RG.KELAS 1E


LINEN
75

700
SHAFT
DIBUAT OLEH :
150

SPOEL
PANTRY

KM/WC
800

HOK RG.KELAS 2B
275

325

225
DUTY NURSE

KORIDOR WC
REST ROOM

+4.00
200

50
2° SHAFT
KONTRAKTOR PELAKSANA
118 120 113
450

450

KM/WC 250
RG. DOKTER RG.KELAS 3A LIFT
NURSE
50

K BED KM/WC

200
A

1575
50

LINEN STATION 2° 2° J
700

KM/WC KM/WC
800

200


KELAS 1A I
PT. NINDYA KARYA(PERSERO)
325

225

KORIDOR WC ±0.00
-0.35
50

SHAFT
ADMN H

300
LIFT
NURSE
50

BED KM/WC KM/WC


200

A
1575

STATION 2° 2° J KORIDOR KORIDOR


2250

2250
300

KORIDOR
PROJECT MANAGER
200

2° I G

50 115 58
KM/WC
H +4.00 F
-0.35 MT-0.47
B
300

MT-1.05 TR

200
RG. RAPAT

BORDES
KORIDOR KORIDOR 2°
2250

2250

+2.40
300

+4.00
KORIDOR KM/WC KM/WC

SHAFT

177
G 2° E
50 115 58

50
KORIDOR WC 100 F D

325

225

75
KORIDOR WC
400
200

800
RG. KELAS 1C
GUDANG
BORDES

2° RG.KELAS 2A
+2.40

KM/WC ±0.00 +4.00


KM/WC
SHAFT

B
177

50
2° E JOHANES, ST.
50

NK C

500
93.8 81.3 81.3
D KM/WC

200
81.3

675

DIKETAHUI OLEH :
157.5
325

225

275
75

KORIDOR WC
800

-0.35 PLAT TEGAK


KELAS 3B
±0.00 10/75 CM
-0.75

75
SHAFT
50

C
B
RSUD UNDATA PALU
500
93.8 81.3 81.3

175

175
200

81.3

675

275

KM/WC PLAT TEGAK A


10/75 CM
75

SHAFT
B
175

175
SELASAR 350 200 350 150 5050 400
200 900 400 350 150 650
A
157.5

157.5
-0.75 1 2 3 4 5 6 7 8 9
1500 1150
2650
MOH.ARIF BUDIMAN., S.E., M.M

630
RAMP NIP.19810216 200902 1 002
MT.-1.10
DIPERIKSA OLEH :
DENAH LANTAI 2 PT. INDRA KARYA(PERSERO)
350 200 350 300 100 157.5 150 5050 400
Skala 1 : 150 "SAFER,STONGER,FASTER"
157.5 200 900 400 350 150 650 157.5
1 2 3 4 5 6 7 8 9
MANAGEMENT KONTRUKSI
1500 1150
2650
LOKASI PEKERJAAN PLESTERAN & ACI
DENAH LANTAI 1
Skala 1 : 150
LOKASI PEMBONGKARAN AHMAD MURTAFI, ST.
&PENGGANTIAN PLESTERAN ACI DISETUJUI OLEH :
KOORDINATOR PERENCANAAN BANGUNAN GEDUNG
LOKASI PEKERJAAN DINDING WILAYAH SULAWESI TENGAH
BATA,PLESTERAN & ACIAN
DJHONY EKO PRASETYO, ST
NIP.19680505 200701 1 006
JUDUL GAMBAR
DENAH LANTAI 1&2 CATELIA
SKALA 1
: : 150 TANGGAL :
NO. GAMBAR DIKELUARKAN UNTUK :
Diperiksa Oleh : Informasi
Persetujuan
ARS-01 Digambar Oleh : Pelaksanaan
As Built Drawing
KEMENTRIAN PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT
NAMA PEKERJAAN
MT.-0.60 PEMBANGUNAN
157.5 200 900 250 500 400 400
REHABILITASI RUMAH SAKIT UMUM DAERAH
100 100 157.5 50 150 50 100 150 175 225 225 175 157.5
C D UNDATA PALU
C D
157.5

200 900 250 500 400 400


M 100 50 150 50 100 150 175 225 225 75 100 AS BUILT DRAWING
157.5

157.5
175

175

SELASAR -0.35
M
L
175
75

SHAFT SELASAR
DIBUAT OLEH :
150

SPOEL
PANTRY

KM/WC
HOK
275

L
DUTY NURSE
REST ROOM
200

75

SHAFT

KONTRAKTOR PELAKSANA

150
SPOEL
118 120 113

PANTRY
250
450

450

KM/WC KM/WC
HOK
275

RG. DOKTER RG.KELAS 3A

DUTY NURSE
REST ROOM
K
200
50

118 120 113


LINEN
700

450

450
KM/WC 250
800

KELAS 1A K
PT. NINDYA KARYA(PERSERO)
325

225

50

KORIDOR WC RG. DOKTER RG.KELAS 1E


-0.35 ±0.00 LINEN

700
50

SHAFT
800

ADMN LIFT RG.KELAS 2B


325

225

NURSE KORIDOR WC
50

BED KM/WC KM/WC +4.00


200

A
1575

50
STATION 2° 2° J SHAFT
LIFT
PROJECT MANAGER
200

2° NURSE
50

I BED KM/WC

200

1575
KM/WC STATION 2°
KM/WC
2° J A
KM/WC
H
200

-0.35 MT-0.47 2° I
300

MT-1.05
KORIDOR KORIDOR
2250

2250

H
300

300
KORIDOR
G
50 115 58

KORIDOR KORIDOR
2250

2250
300
KORIDOR WC 100 F KORIDOR
G

50 115 58
400
200

RG. KELAS 1C
GUDANG
BORDES


+2.40

±0.00 +4.00 F
KM/WC
KM/WC B
SHAFT

B
177

E TR
JOHANES, ST.

200
2° RG. RAPAT
50

BORDES
NK 2°

+2.40
KM/WC +4.00
KM/WC

SHAFT
D

177
2° E DIKETAHUI OLEH :
157.5
325

225

50
75

KORIDOR WC -0.35
800

KELAS 3B
-0.75 ±0.00 D

325

225

75
KORIDOR WC
50

RSUD UNDATA PALU

800
C

500
93.8 RG.KELAS 2A
81.3 81.3 +4.00
200

81.3

675

50

275

500
KM/WC PLAT TEGAK 93.8 81.3 81.3
10/75 CM KM/WC

200
81.3

675

75

SHAFT

275
B PLAT TEGAK
10/75 CM
175

175

75
SELASAR SHAFT
B
A

175

175
157.5

157.5
-0.75
A
MOH.ARIF BUDIMAN., S.E., M.M

630
350 200 350 150 5050 400
RAMP NIP.19810216 200902 1 002
200 900 400 350 150 650
MT.-1.10 1 2 3 4 5 6 7 8 9
DIPERIKSA OLEH :
1500 1150
2650
PT. INDRA KARYA(PERSERO)
350 200 350 300 100 157.5 150 5050 400
"SAFER,STONGER,FASTER"
157.5
1

200
2 3

900
4 5

400
6

350
7

150
8

650
9

157.5
DENAH LANTAI 2
Skala 1 : 150
MANAGEMENT KONTRUKSI
1500 1150
2650
DENAH LANTAI 1
Skala 1 : 150
AHMAD MURTAFI, ST.
DISETUJUI OLEH :
LOKASI PENGECATAN EKSTERIOR SAJA KOORDINATOR PERENCANAAN BANGUNAN GEDUNG
WILAYAH SULAWESI TENGAH
PENGECATAN MENYELURUH
INTERIOR
PENGECATAN MENYELURUH
EKSTERIOR PLAFOND
DJHONY EKO PRASETYO, ST
NIP.19680505 200701 1 006
JUDUL GAMBAR
DENAH LANTAI 1&2 CATELIA
SKALA 1
: : 150 TANGGAL :
NO. GAMBAR DIKELUARKAN UNTUK :
Diperiksa Oleh : Informasi
Persetujuan
ARS-01 Digambar Oleh : Pelaksanaan
As Built Drawing
MT.-0.60
157.5 200 900 250 500 400 400
100 100 157.5 50 150 50 100 150 175 225 225 175 157.5
C D
157.5

M
157.5

157.5
175

175

SELASAR -0.35
L
75

SHAFT
150

SPOEL
PANTRY

KM/WC
HOK
275

DUTY NURSE

KEMENTRIAN PEKERJAAN UMUM DAN


REST ROOM
200


118 120 113
450

450

KM/WC 250
RG. DOKTER RG.KELAS 3A
K
50

LINEN
700

PERUMAHAN RAKYAT
800

KELAS 1A
325

225

KORIDOR WC
-0.35 ±0.00
50

SHAFT
ADMN LIFT
NURSE
50

BED KM/WC KM/WC


A
1575
200

STATION 2° 2° J
200

2° I
NAMA PEKERJAAN
KM/WC
-0.35 MT-0.47 H
300

MT-1.05
KORIDOR KORIDOR
2250

2250
300

KORIDOR
G
50 115 58

KORIDOR WC 100 F
PEMBANGUNAN
400
200

RG. KELAS 1C
GUDANG
BORDES


+2.40

KM/WC ±0.00
SHAFT

KM/WC
B
177

2° E
50

NK
D
REHABILITASI RUMAH SAKIT UMUM DAERAH
157.5
325

225

75

KORIDOR WC
800

-0.35
KELAS 3B
UNDATA PALU
-0.75 ±0.00
50

C
500

93.8 81.3 81.3


200

81.3
675


275

KM/WC PLAT TEGAK


10/75 CM
75

SHAFT
B
175

175

SELASAR
A
157.5

157.5

-0.75
C D AS BUILT DRAWING
630

RAMP
MT.-1.10
200 900 250 500 400 400
100 50 150 50 100 150 175 225 225 75 100
350 200 350 300 100 157.5 150 5050 400
157.5 200 900 400 350 150 650 157.5
1 2 3 4
1500

5 6 7
1150
8 9 M DIBUAT OLEH :
175

2650
SELASAR
KONTRAKTOR PELAKSANA
L
75

SHAFT

150
SPOEL

PANTRY
KM/WC
HOK
275

DUTY NURSE
REST ROOM
200


PT. NINDYA KARYA(PERSERO)

118 120 113


450

450
KM/WC 250
K
50

RG. DOKTER RG.KELAS 1E


LINEN

700
800

RG.KELAS 2B
225
325

KORIDOR WC +4.00 PROJECT MANAGER

50
SHAFT
LIFT
NURSE
50
BED KM/WC

200
A

1575
100 Kaca Bening Kaca Bening STATION 2° 2° J
KM/WC
5 mm 5 mm 200
KM/WC
2° I
Lantai 2
+4.00 20 Kaca Bening H

300
19 5 mm KORIDOR KORIDOR
2250

2250
300
KORIDOR
18 G

50 115 58
17 +4.00 F JOHANES, ST.
TR
B

200
RG. RAPAT
DIKETAHUI OLEH :

BORDES
16 2°

+2.40
+4.00
KM/WC KM/WC

SHAFT

177
15 2° E

50
Kaca Bening
Relling Stenles 14 5 mm
D RSUD UNDATA PALU

325

225

75
KORIDOR WC
Steel Ø1.5"

800
13 RG.KELAS 2A
Bordes +4.00
Relling Stenles

50
12 +2.00 C

500
Steel Ø3" EKSISTING 93.8 81.3 81.3
KM/WC
11

200
81.3

675

275
PLAT TEGAK
10 4 D13 10/75 CM

75
STEK BESI SHAFT
Ø8-150
Kaca Bening 9 D10-250 Perkuatan Balok B
20x20

175

175
5 mm 8
KOLOM 20X20
4 D13
Ø8-150 A
7 MOH.ARIF BUDIMAN., S.E., M.M
6
Perkuatan Kolom BALOK 20X20 NIP.19810216 200902 1 002
D10-250 20X20 350 200 350 150 5050 400
5 DIPERIKSA OLEH :
RENCANA 200 900 400 350 150 650
D10-250
4 1 2 3 4 5 6 7 8 9
RENCANA
100 3 1500 1150 PT. INDRA KARYA(PERSERO)
2650
2
D10-250 4 D16
"SAFER,STONGER,FASTER"
Lantai 1 1 Ø8-150 Gudang MANAGEMENT KONTRUKSI
±0.00 ±0.00 DENAH LANTAI 2
Skala 1 : 150
50 PONDASI&SLOOF
20 EKSISTING
50
354 144
498
AHMAD MURTAFI, ST.
LOKASI PERBAIKAN
DISETUJUI OLEH :
PERKUATAN TANGGA LANTAI 1 SANITARI KOORDINATOR PERENCANAAN BANGUNAN GEDUNG
WILAYAH SULAWESI TENGAH
CATELIA
Skala 1 : 50
DJHONY EKO PRASETYO, ST
NIP.19680505 200701 1 006
JUDUL GAMBAR
DENAH LANTAI 1&2 CATELIA
SKALA 1
: : 150 TANGGAL :
NO. GAMBAR DIKELUARKAN UNTUK :
Diperiksa Oleh : Informasi
Persetujuan
ARS-01 Digambar Oleh : Pelaksanaan
As Built Drawing

Anda mungkin juga menyukai