Anda di halaman 1dari 1

LAMPIRAN KEPUTUSAN KEPALA DINAS

PEKERJAAN UMUM DAN PENATAAN RUANG


NOMOR :
TANGGAL :
5 - 10 M CEMARA 50
KIPAS PEKARANGAN
SR
PETA SITUASI
6 - 10 M PALM RAJA 6 SR
CEMARA
RO JL. H.
ABDU
W L SO
SR 6.5 M AD
( lebar
GSS = 3 m SELO 3.4 m)
10 - 30 CM
KA N KE
CIL
RAPAT PERDU 25
MENYEBAR SEMAK
AN
JEM BAT

BERBUNGA
K
ea

R e ol am
+196 .23 RO n te
5 W nsi
6.5
..\..\untitled-1.jpg
Ciamp

SR
+198.85
Ke Jl.

6.5
W
SR
RO
SUMUR RESAPAN RO
W
6.5
3m
+210.39 SR
GSS =
TITIK APAR RO
W
6.5
gneng

SR
ARAH ALIRAN DRAINASE +213.39 SR GS
SR X : 106.7080140 Y : -6.5777368
SR S=
SR 3m SR
GSS =
KETERANGAN :
Cinan

3m
SR
SOLIH

RO
W
TITIK PJU 6.5
SR
GSS =
TATA GUNA LAHAN
3m
Jalan

ROW
7 LUAS TANAH = 33.780,00 M2
SR SR KDB MAKSIMAL = 60 % KDH MINIMAL = 40%
KETERANGAN LUAS M2 % KDB (%) KDH (%)
SR
RO
W LUAS KAVLING EFEKTIF - - - -
6.5

7
GSS = LUAS SARANA DAN TAMAN - - - -
W

3m
SR SR SR
RO

SR PANJANG B Sal H Sal KAPASITAS


LUAS PSU - - - -
PEKARANGAN
JUMLAH
+210.17 NO KETERANGAN (m) (m) (m) (m³)
GSS =
+213.39 JALAN DAN DRAINASE - - - -
3m
1 SALURAN - - - - JUMLAH TOTAL 33.780,00 100 - -
+210.39
SR SR 2 ROW 7 - - - -
+212.26 3 ROW 6.5 - - - -
DIAJUKAN OLEH
SR
+198.85
RO
W SR 4 SUMUR RESAPAN 70 - 1 1 70
6.5
5 KOLAM RETENSI 2 55 - - 110
SR
PT. PURI ANGKASA PERMATA
+213.26
GSJ =
11 m RO
W
JUMLAH TOTAL
6.5

SR 6.5
W
7

+198.20
RO
W

SR
RO

RO
SR W
6.5 SR
ROW 6.5 RO
W
+210.39
6.5 SR
Drs. SUNARYO, MT
+213.39
SR
Direktur
SR SR
SR RO
W
6.5
DISAHKAN OLEH
PENGEMBANGAN
RO
W
6.5 SR KEPALA DINAS
SR
SR
2.00 PEKERJAAN UMUM DAN PENATAAN RUANG
SR
BERDASARKAN/MEMPERHATIKAN :
SR
RO
SR SR W
6.5 - KEPUTUSAN BUPATI BOGOR NOMOR 114 TAHUN 2021 TENTANG PEDOMAN PENGESAHAN RENCANA TAPAK
DAN GAMBAR SITUASI
SR RO
W PENGEMBANGAN 0.80 - PERIZINAN BERUSAHA BERBASIS RISIKO NOMOR INDUK BERUSAHA : 8120010130643
6.5
SR
0 YANG DITANDATANGANI SECARA ELEKTRONIK OLEH MENTERI INVESTASI/KEPALA BADAN KOORDINASI
5
PENANAMAN MODAL
SR
PENGEMBANGAN - BUKTI SURAT TANAH BERUPA SURAT PELEPASAN HAK ATAS TANAH YANG TELAH DILEGALISASI OLEH
SR NOTARIS NY. KHADIJAH BUDHI ASTUTI, SH.MKn :
7

SR
SUMUR RESAPAN
W

+213.26 1. SPH NO. 503/033/SPH/KEC.CPA/VII/2023 LUAS 6945 M2


RO

SR 2. SPH NO. 503/038/SPH/KEC.CPA/VII/2023 LUAS 2450 M2


RO SKALA 1 : 100 3. SPH NO. 503/034/SPH/KEC.CPA/VII/2023 LUAS 153 M2
W SR
7 4. SPH NO. 503/029/SPH/KEC.CPA/VII/2023 LUAS 1419 M2
RO
W 5. SPH NO. 503/025/SPH/KEC.CPA/VII/2023 LUAS 219 M2
6.5
SR 6. SPH NO. 503/032/SPH/KEC.CPA/VII/2023 LUAS 99 M2
7. SPH NO. 503/031/SPH/KEC.CPA/VII/2023 LUAS 3825 M2
PENGEMBANGAN
SR
0.20 4.00 0.20 8.
9.
SPH NO. 503/014/SPH/KEC.CPA/VII/2023 LUAS 2020 M2
SPH NO. 503/042/SPH/KEC.CPA/VII/2023 LUAS 360 M2
)
SR 10. SPH NO. 503/023/SPH/KEC.CPA/VII/2023 LUAS 124 M2
m 11. SPH NO. 503/022/SPH/KEC.CPA/VII/2023 LUAS 69 M2
RUMAH WARGA
I(
le
ba
r1
SR
RO
W 0.30 1.00 0.30 12. SPH NO. 503/015/SPH/KEC.CPA/VII/2023 LUAS 1181 M2
AS 6.5
U
RA
N
IR
IG
SR
2.00 13. SPH NO. 503/024/SPH/KEC.CPA/VII/2023 LUAS 951 M2
14. SPH NO. 503/017/SPH/KEC.CPA/VII/2023 LUAS 791 M2
+213.39 S
AL
RO
W 1.20 15. SPH NO. 503/019/SPH/KEC.CPA/VII/2023 LUAS 360 M2
6.5 SR 16. SPH NO. 503/020/SPH/KEC.CPA/VII/2023 LUAS 260 M2
17. SPH NO. 503/037/SPH/KEC.CPA/VII/2023 LUAS 260 M2
SR PENGEMBANGAN 18. SPH NO. 503/016/SPH/KEC.CPA/VII/2023 LUAS 188 M2
RO
W

19. SPH NO. 503/030/SPH/KEC.CPA/VII/2023 LUAS 1778 M2


6.

0.50 1.00 0.50 0.70 3.00 0.70


5

20. SPH NO. 503/027/SPH/KEC.CPA/VII/2023 LUAS 1003 M2


SR RO
+210.39 W 21. SPH NO. 503/012/SPH/KEC.CPA/VII/2023 LUAS 368 M2
SR 6.5 22. SPH NO. 503/026/SPH/KEC.CPA/VII/2023 LUAS 951 M2
23. SPH NO. 503/018/SPH/KEC.CPA/VII/2023 LUAS 1060 M2
RO

SR
W

24. SPH NO. 503/035/SPH/KEC.CPA/VII/2023 LUAS 4276 M2


6.
5

PENGEMBANGAN 25. SPH NO. 503/039/SPH/KEC.CPA/VII/2023 LUAS 2721 M2


+198.20
SR SR SR
TOTAL LUAS KESELURUHAN = 33.831 M2
SR
GSS =
3m KEPALA DINAS
RO

SR PEKERJAAN UMUM DAN PENATAAN RUANG


W

5
6.
6.

KABUPATEN BOGOR
5

SR W
RO
SR +210.17
SR
PEKARANGAN +212.26
RO
W
6.

SR
5

TR TR
SR
K
R e ol am
n te
nsi

TM
SAL
JALAN
SAL
TM
R. SOEBIANTORO W.
SR GSB GSB
3.00 5.80 3.00
0.60
TATA DRAINASE
GSS = 0.60
3m
)
1m

POTONGAN ROW 6.50 m


r
leba
I(

MENDIRIKAN
IGAS

SKALA 1 : 200
N IR

PEMBANGUNAN PERUMAHAN
URA
S AL

ATAS NAMA
LU
RA
N PT. PURI ANGKASA PERMATA
SA
LOKASI : DESA BOJONG JENGKOL DAN DESA CINANGKA
PERUMAHAN PURI PERMATA DRAMAGA TR TM JALAN TM TR

KECAMATAN CIAMPEA
KABUPATEN BOGOR
SAL SAL
GSB
3.00 5.30
GSB
3.00 SKALA JUMLAH LEMBAR NO. LEMBAR
0.60 0.60
POTONGAN ROW 6.50 m
SKALA 1 : 200 1/1 1

Anda mungkin juga menyukai