GAMBAR PERENCANAAN
PEKERJAAN :
PERENCANAAN SPAM DAK TA. 2023
LOKASI :
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
KABUPATEN PESISIR BARAT
Tahun 2022
KONSULTAN PERENCANA :
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN DAK
SPAM TA. 2023 PEKON KOTAKARANG
95 m
KECAMATAN PESISIR UTARA
75 m
55 m
LOKASI :
65 m
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
50 m
145 m
40 m 140 m
45 m
20 m
135 m
NAMA GAMBAR :
130 m
35 m
70 m
LAY OUT JARINGAN PIPA
15 m
30 m 125 m
120 m
PEKON KOTAKARANG
110 m
115 m
100 m
25 m
INTAKE
60 m
X = 0368269
105 m
Y = 09442344 KONSULTAN PERENCANA :
Z = 72 m
SMPN 2 85 m
PESISIR UTARA JPP 1 = 6 m
X = 0367257.1595
72
71
11
Way Pampsng
10
P71
P70 Y = 09442299.2395 80 m
1
72
P0
70
76
73
8 10 m 8
P69 Z = 17 m
9 P72 2
P75 64
77 75 74 P1
8 5
P76 P74
7
P73 90 m 3
69 64
5 P2
P68
78
7
95 m
P77 68
79 8
Ke Bengkulu 81
7
P78
P67
80
12
P80
8
P79
15 m 67
21
P66 4
64
5 P3
64
66 P4
22
P65
6
64
P5 DIGAMBAR OLEH : DIRENCANA OLEH :
65
22
P64
64
21
P63
20 m
5m 7
62
P6
63
20
P62
15 m
62
21
P61 8
61
61 P7
22
P60
60
22
P59
9
61
59 P8
23
5m P58
58
17
56
19
P55
11
63
P10 Drafter Team Leader
RESERVOAR
45
5m 31
P44 X = 0368080
12
60
P11
46
44
36
P43
Y = 09441931
16
DIPERIKSA OLEH :
P45
13
55
Z = 53 m
47
17 P12
P46 43
38
P42
48
13
P47
14
53
42 P13
40
P41
49 15
12 53
P48 P14
PEKON KOTAKARANG
41
42
P40 36
48
37 P35 16
47 43
40 39 38 P36 P15
42 45 44
P39 P38 P37
50
11 17
P49 34
P16
18
23
P17
51
8
P50
19
19
52 P18
8
P51
20
12
P19 JPP 2 = 12 m
ELZA NOVILYANSA, ST, MT
53
4
P52
X = 0368137
54
21
Y = 09441787
Direktris
4
P53 9
P20
Z=7m
55
3
P54 22
5
P21
23
3
P22
24
3
P23
CATATAN :
25
4
P24
26
2
P25
27
3
P26
28
4
P27
29
5
P28 30
2
P29 31
5
P30
32
4
P31
33
10
P32 34
11 Ke Krui
P33 35
18
P34
U KODE
TANGGAL
SKALA
NO.
LEMBAR
JUMLAH
LEMBAR
1 : 1500
LOKASI
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
Chollector
Chamber
Elev. 72
NAMA GAMBAR :
SKEMATIK PIPA
Intake Elv. 73
Reservoar
Elv. 53
DIPERIKSA OLEH :
Sambungan Sambungan Sambungan Sambungan Sambungan Sambungan Sambungan Sambungan Sambungan Sambungan Sambungan Sambungan CATATAN :
Rumah (SR) Rumah (SR) Rumah (SR) Rumah (SR) Rumah (SR) Rumah (SR) Rumah (SR) Rumah (SR) Rumah (SR) Rumah (SR) Rumah (SR) Rumah (SR)
Pipa PVC Ø 75 mm Pipa PVC Ø 75 mm Pipa PVC Ø 75 mm Pipa PVC Ø 75 mm Pipa PVC Ø 75 mm Pipa PVC Ø 75 mm
KETERANGAN : KODE
SKALA
NO. JUMLAH
TANGGAL LEMBAR LEMBAR
TAHUN ANGGARAN
2022
GAMBAR
INTAKE
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
LOKASI
0.50
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
AS
EN B NAMA GAMBAR :
DU
NG
LAYOUT INTAKE
A 3.50
KONSULTAN PERENCANA :
+7
8,6
0.50
71
DIGAMBAR OLEH : DIRENCANA OLEH :
DIPERIKSA OLEH :
re
en
0.3
0.70
0
0
1.0 ELZA NOVILYANSA, ST, MT
0
0.3 Direktris
B 8.00
Pip
CATATAN :
aI
nle
tP
VC
Ø2
00
0.70
mm
LAYOUT INTAKE
Skala 1 : 50
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
LOKASI
Bronjong 2 x 1 x 0,5 m
PEKON KOTAKARANG
+ 73 KECAMATAN PESISIR UTARA
78,671
78,671
78,671
78,671
ELEVASI TANAH
79,671
79,671
79,071
79,071
ELEVASI RENCANA
CATATAN :
POTONGAN A - A
Skala 1 : 100
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
LOKASI
PEKON KOTAKARANG
0.30 0.30 1.00 0.30 KECAMATAN PESISIR UTARA
+ 73
+ 72,4
0.90 NAMA GAMBAR :
1.00
+ 72 + 72,1
0.30
0.30 POTONGAN INTAKE
0.50 0.50
KONSULTAN PERENCANA :
0.70 1.00 0.70
DIPERIKSA OLEH :
BP. + 78,671
78,671
78,671
78,671
CATATAN :
ELEVASI TANAH
79,671
79,671
79,671
79,671
ELEVASI RENCANA
POTONGAN B - B
Skala 1 : 100 KODE NO. JUMLAH
SKALA
TANGGAL LEMBAR LEMBAR
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Bronjong 2 x 1 x 0,5 m
PEKERJAAN:
+ 73 PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
POTONGAN INTAKE
0.50
0.50 1.50 0.80 0.70 0.50
DIGAMBAR OLEH : DIRENCANA OLEH :
POTONGAN A - A
Skala 1 : 50
DIPERIKSA OLEH :
+ 79,671
ELZA NOVILYANSA, ST, MT
+ 79,071 Direktris
1.00 0.90
CATATAN :
+ 78,671 + 78,771
0.30 0.30
0.50 0.50
POTONGAN B - B
Skala 1 : 50
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
LOKASI
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
NAMA GAMBAR :
POTONGAN RESERVOIR
KONSULTAN PERENCANA :
GAMBAR
PINTU SORONG DAN SARINGAN HIDAYATUL LAILIAH ELZA NOVILYANSA, ST, MT
Drafter Team Leader
DIPERIKSA OLEH :
CATATAN :
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
LOKASI
Lubang Pasak Ø 12
0.10 PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
0.05
0.05
NAMA GAMBAR :
DETAIL
0.20 PINTU SORONG
KONSULTAN PERENCANA :
0.45
II
0.05
0.35 0.30
0.18 0.70
0.40
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
BESI POLOS BESI POLOS KECAMATAN PESISIR UTARA
Ø 12 mm Ø 12 mm
50 50
M 16
12 12 LOKASI
10
48 42 45 PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
94
40 40
52
NAMA GAMBAR :
8 8
54 x 8 DETAIL
PINTU SORONG
40 40
KONSULTAN PERENCANA :
8 70 70 8
12
16
16
12
2
2
8
DETAIL I
SKALA 1 : 10
DIGAMBAR OLEH : DIRENCANA OLEH :
70
CATATAN :
50
10
L. 70 x 70 x 7
Baut M. 16
100
KODE NO. JUMLAH
SKALA
TANGGAL LEMBAR LEMBAR
40 30
L. 70 x 70 x 7
DETAIL II 10 40 20
SKALA 1 : 25
70 TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
BESI L.50.50.5
B LOKASI
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
0.15
ANGKUR BESI Ø 12 mm
NAMA GAMBAR :
DETAIL SARINGAN
BESI POLOS JERUJI BESI (TRASHRACK)
0.30 Ø 12 mm
A A KONSULTAN PERENCANA :
BESI POLOS
0.90 Ø 12 mm 0.90
BESI POLOS Ø 12 mm
BESI L.60.60.6
0.15
HIDAYATUL LAILIAH ELZA NOVILYANSA, ST, MT
Drafter Team Leader
0.02
DI LAS DIPERIKSA OLEH :
B
ANGKUR BESI
0.50 Ø12 mm
ANGKUR BESI Ø 12 mm
0.50
POTONGAN A-A
SKALA 1 : 10
TAHUN ANGGARAN
2022
GAMBAR
R E S E R V O I R K A P. 50 m³
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
B LOKASI
15 420
15 15 15 15 420
15 15 15 PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
30
15 105 30 115 65 30
15 105 30 115 65
NAMA GAMBAR :
KONSULTAN PERENCANA :
15
15
15
15
30
30
A A
20
20
30
30
PIPA PELUAP GIP Ø 100 mm DIGAMBAR OLEH : DIRENCANA OLEH :
60
60
PIPA VINTILASI GIP Ø 50 mm
20
20
15
15
260
260
350
350
30
30
340
340
HIDAYATUL LAILIAH ELZA NOVILYANSA, ST, MT
Drafter Team Leader
PIPA INLET PVC 100 mm PIPA INLET PVC 100 mm DIPERIKSA OLEH :
30
105
105
MANHOLE 60 x 60
30
15
15
15
15
30
30
30
30
ELZA NOVILYANSA, ST, MT
Direktris
20 53 20 20 20 15 30 260 30 15
240 CATATAN :
350
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
20 260 20
10 200 10 LOKASI
20
250
MT KONSULTAN PERENCANA :
MT
BETON RABAT
PLAT LANTAI BAWAH
adk 1 : 3 : 5
adk 1 : 3 : 5
53 53
10 10
PASIR URUG
DIGAMBAR OLEH : DIRENCANA OLEH :
LANTAI KERJA
adk 1 : 3 : 5 PASIR URUG
PAS. BATU KOSONG
MT MT
BETON RABAT
adk 1 : 3 : 5 PIPA OUTLET PVC 75 mm
PASIR URUG
30 30
BETON RABAT
adk 1 : 3 : 5
53 53
10 10
PASIR URUG
LANTAI KERJA
adk 1 : 3 : 5 PASIR URUG NO.
KODE JUMLAH
PAS. BATU KOSONG SKALA
TANGGAL LEMBAR LEMBAR
1030 500 30 75 45
570
POTONGAN A - A
Skala 1 : 20
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
560 10
20
10 53 20 53 20 53 20 PEKERJAAN:
10
10
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
20
20
LOKASI
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
NAMA GAMBAR :
PENULANGAN RESERVOAR
Ø 8 - 20
Ø 8 - 20
200
260
560
500
KONSULTAN PERENCANA :
Ø 8 - 20
Ø 8 - 20
15
15
10
10
20
20
30
30
HIDAYATUL LAILIAH ELZA NOVILYANSA, ST, MT
Drafter Team Leader
20
10 53 20 53 20 53 20 DIPERIKSA OLEH :
560
10
PENULANGAN LANTAI ATAS
Skala 1 : 10
ELZA NOVILYANSA, ST, MT
Direktris
Ø 12 - 15
Ø 12 - 15
490
490
580
580
CATATAN :
Ø 12 - 15
Ø 12 - 15
30
15
15
15 30 49 20 53 20 49 30 15
580
PENULANGAN LANTAI BAWAH TAHUN ANGGARAN
Skala 1 : 10
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
20 560 20 LOKASI
10 500 10 PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
MANHOLE 40 x 40
NAMA GAMBAR :
DETAIL II
10
DETAIL
PENULANGAN RESERVOAR
Ø 8 - 20
Ø 10 - 20
250
KONSULTAN PERENCANA :
320 DETAIL I
20
10
1010
30 30
30 500 30
550
HIDAYATUL LAILIAH ELZA NOVILYANSA, ST, MT
Drafter Team Leader
PENULANGAN
240
Ø 10 - 20
DIPERIKSA OLEH :
Skala 1 : 20
320
ELZA NOVILYANSA, ST, MT
Ø 12 - 15 Direktris
CATATAN :
30
30
Ø 8 - 20 Ø 8 - 20
1010
Ø 8 - 20
10
30
20
DETAIL I
Skala 1 : 10 KODE NO. JUMLAH
SKALA
TANGGAL LEMBAR LEMBAR
DETAIL II
Skala 1 : 10
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
LOKASI
0.30 Ø 8 - 15 DETAIL
0.30
MANHOLE RESERVOAR
0.07
KONSULTAN PERENCANA :
BETON BERTULANG
adk. 1 : 2 : 3 Ø 8 - 10
0.30
BESI Ø 20 mm
POTONGAN 1 - 1
0.30 Skala 1 : 10 DIGAMBAR OLEH : DIRENCANA OLEH :
0.30
BESI Ø 20 mm
0.05
0.10 0.30 0.10
0.20
Direktris
0.40
0.15
CATATAN :
BESI Ø 20 mm
0.05
KAWAT KASA
PIPA GIP. Ø 75 mm
ANKER Ø 16 mm
NO. JUMLAH
0.05 0.40 0.05 KODE
TANGGAL
SKALA
LEMBAR LEMBAR
TAHUN ANGGARAN
2022
GAMBAR
COLLECTOR CHAMBER
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
LOKASI
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
B NAMA GAMBAR :
DENAH
COLLECTOR CHAMBER
KONSULTAN PERENCANA :
0.20 2.00 0.20 1.50 0.20
0.20
A A
DIGAMBAR OLEH : DIRENCANA OLEH :
manhole 60 cm x 60 cm
Pipa Inlet PVC Ø 200 mm
Pipa Outlet PVC Ø 200 mm
Screen
Ke Distribusi 1.50
0.20
DIPERIKSA OLEH :
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
LOKASI
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
NAMA GAMBAR :
TAMPAK ATAS
COLLECTOR CHAMBER
KONSULTAN PERENCANA :
0.20 2.00 0.20 1.50 0.20
manhole 60 cm x 60 cm
Pipa Inlet PVC Ø 200 mm Pipa Outlet PVC Ø 200 mm
Screen
Ke Distribusi 1.50
0.20
DIPERIKSA OLEH :
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
LOKASI
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
NAMA GAMBAR :
POTONGAN A-A
Ø 10 - 250 Ø 10 - 250 COLLECTOR CHAMBER
KONSULTAN PERENCANA :
C C
MA
Ø 10 - 150
Ø 10 - 150 (5) Ø 10- 150 (14)
MA DIGAMBAR OLEH : DIRENCANA OLEH :
1.50
0.30
CATATAN :
0.30 0.20 2.00 0.20 1.50 1.20 0.30
4.70
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
LOKASI
Ø 10 - 150
Ø 10 - 250 (12)
Ø 10 - 250 (13)
Ø 10 - 150
PEKON KOTAKARANG
Ø 10 - 250
Ø 10 - 150 Ø 10 - 150
KECAMATAN PESISIR UTARA
Ø 10 - 150
Ø 10 - 250 (10) 1.90 NAMA GAMBAR :
0.20 0.30
2.00 1.50
SKALA 1 : 25
DIPERIKSA OLEH :
TABEL TULANGAN
TOTAL TOTAL ELZA NOVILYANSA, ST, MT
KODE Ø TUL BERAT/M JUMLAH PANJANG PANJANG BERAT SKETSA KODE Ø TUL BERAT/M JUMLAH PANJANG PANJANG BERAT SKETSA Direktris
TUL ( mm ) ( Kg/m ) ( Bt ) ( Cm ) ( Cm ) ( Kg ) ( Cm ) TUL ( mm ) ( Kg/m ) ( Bt ) ( Cm ) ( Cm ) ( Kg ) ( Cm )
05 225 05
08 10 0.62 24 525 12600 78.12 TOTAL BERAT 733.97
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Ø 10 - 250
0.12 PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
MA
LOKASI
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
V-NOCTH
1.50 NAMA GAMBAR :
POTONGAN B-B
SKALA 1 : 25
Engsel
CATATAN :
Kerangka L. 50.50.5
Dilas Titik
Lubang Gembok
Plat Penutup t = 10 mm
0.12
Kerangka L .40.40.4
Angkur Ø 10 mm
KODE NO. JUMLAH
SKALA LEMBAR
TANGGAL LEMBAR
0.60
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
5 100 1000 100 5 PEKON KOTAKARANG
120 KECAMATAN PESISIR UTARA
1200 10 LOKASI
5
120 PAJAR BULAN
PEKON KOTAKARANG
100
KECAMATAN
KECAMATAN WAY KRUI
PESISIR UTARA
PLAT Ø5MM
100 5
300
250 PLAT t=5 mm V-NOTCH
10
Ø 16 mm 10 KONSULTAN PERENCANA :
100
200
50
CATATAN :
Plat t = 5 mm
0.40
15 20 15
0.40
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
0.15
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
0.15
0.10 0.60 0.10
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
0.10 KECAMATAN PESISIR UTARA
Engsel
Plat t = 3 mm
0.30 L 50.50.5 LOKASI
0.30
PAJAR BULAN
PEKON KOTAKARANG
KECAMATAN
KECAMATAN WAY KRUI
PESISIR UTARA
L 50.50.5
Angkur
NAMA GAMBAR :
0.30
Besi Ø 20 mm
0.30 0.30
POTONGAN I-I KONSULTAN PERENCANA :
SKALA 1 : 10
Besi Ø 20 mm
0.075
DIPERIKSA OLEH :
Pegangan
Engsel
ELZA NOVILYANSA, ST, MT
Kawat Kasa Direktris
0.10 0.30 0.10 0.60
Anker Ø 16 mm Gembok
0.20
0.075 L 50 . 50 . 5
0.15
0.10
Besi Ø 20 mm KODE
SKALA
NO. JUMLAH
TANGGAL LEMBAR LEMBAR
TAHUN ANGGARAN
2022
GAMBAR
JEMBATAN PIPA GIP Ø 75 mm
BENTANG = 12 M'
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
LOKASI
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
NAMA GAMBAR :
DENAH JEMBATAN
B Baja IWF.250.125.5.7
Tee All Flange Ø 200 x Ø 100 mm
Giboult Joint Air Valve Giboult Joint
Pipa PVC Ø 75 mm Pipa PVC Ø 200 mm
Ke Collector
Gate Valve Ø 100 mm
KONSULTAN PERENCANA :
Pipa GIP Ø 200 mm
Bar Pengaman
Klem Besi Strip 3 x 25
Pondasi Jembatan Pipa Gate Valve Ø 200 mm
Beton Bertulang Adk. 1 : 2 :3 B Pipa Penguras PVC Ø 100 mm
12.00
DIPERIKSA OLEH :
CATATAN :
TAHUN ANGGARAN
2022
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
12.00
LOKASI
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
Pipa GIP Ø 200 mm
DIPERIKSA OLEH :
POTONGAN A - A
SKALA 1 : 50
ELZA NOVILYANSA, ST, MT
Direktris
CATATAN :
TAHUN ANGGARAN
2022
Pipa GIP Ø 200 mm
PEMERINTAH KABUPATEN PESISIR BARAT
KLEM PIPA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
NAMA GAMBAR :
Ø 16 - 150 10
05 DIPERIKSA OLEH :
130
DETAIL PEMBESIAN ELZA NOVILYANSA, ST, MT
SKALA = 1 : 10
POTONGAN B - B Direktris
SKALA = 1 : 10
CATATAN :
130
B
PLAT DUDUKAN t = 10 mm 25 80 25
25
PLAT PENGAKU t = 5 mm
110
60
C C
NO. JUMLAH
130
KODE
80
SKALA LEMBAR
TANGGAL LEMBAR
25
B TAHUN ANGGARAN
DENAH PONDASI 2022
SKALA 1 : 10
PEMERINTAH KABUPATEN PESISIR BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN:
60 50 60 PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
LOKASI
BESI Ø 6 mm
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
KLEM PIPA PIPA GIP Ø 200 mm
NAMA GAMBAR :
DETAIL JEMBATAN
BAUT/MUR 12 mm
PROFIL CNP.60.30.10.1,6
KONSULTAN PERENCANA :
DIPERIKSA OLEH :
CATATAN :
PEKERJAAN:
PERENCANAAN SPAM DAK TA. 2023
PEKON KOTAKARANG
KECAMATAN PESISIR UTARA
LOKASI
PEKON KOTAKARANG
I KECAMATAN PESISIR UTARA
B H
E E
7.5
C E D E H
NAMA GAMBAR :
C C Pipa PVC 1/2" C
C STANDARD
7.5
Pipa PVC 1/2"
D SAMBUNGAN RUMAH
Pipa PVC 1/2" Pipa PVC 1/2" 25
15
5 KONSULTAN PERENCANA :
B B
B B B B
J
C B
60 60
C C G
C B B
Pipa PVC 1/2" DIGAMBAR OLEH : DIRENCANA OLEH :
C C G
B F
TAHUN ANGGARAN
2022