MASTER

THE CIVIL WORKS FOR SCHEDULE & KURVA "S"


THE CONSTRUCTION OF A(I.NEW
GEDUNG FAKULTAS
CAMPUS HUKUM)
OF UNTIRTA SINDANGSAR

ADHI – HK JV OF UNTIRTA SINDANGSARI


WAKTU PELAKSANAAN = 670 HARI KALENDER
2 0 1 8 2 0 1 9
SEPTEMBER OKTOBER NOVEMBER DESEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER
No. URAIAN PEKERJAAN BOBOT (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54
07 - 09 10 - 16 17 - 23 24 - 30 1-7 8 - 14 15 - 21 22 - 28 29 - 4 05 - 11 12 - 18 19 - 25 26 - 02 03 - 09 10 - 16 17 - 23 24 - 30 31 - 6 7 - 13 14 - 20 21 - 27 28 - 3 4 - 10 11 - 17 18 - 24 25 - 3 4 - 10 11 - 17 18 - 24 25 - 31 1-7 8 - 14 15 - 21 22 - 28 29 - 5 6 - 12 13 - 19 20 - 26 27 - 2 3-9 10 - 16 17 - 23 24 - 30 1-7 8 - 14 15 - 21 22 - 28 29 - 4 5 - 11 12 - 18 19 - 25 26 - 1 2-8 9 - 15

X BANGUNAN GEDUNG FAKULTAS HUKUM 7.5946% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0008% 0.0008% 0.0955% 0.0947% 0.0947% 0.0947% 0.0947% 0.0947% 0.0947% 0.0947% 0.0465% 0.0465% 0.1528% 0.1528% 0.2037% 0.2037% 0.1941% 0.1941% 0.1931% 0.1931% 0.1383% 0.1383% 0.0418% 0.1111% 0.1046% 0.1046% 0.2013% 0.1320% 0.1320%
Chart Title

PEKERJAAN STANDARD 4.5959% Chart Title

X. 1 PEKERJAAN PERSIAPAN 0.0025%


PEKERJAAN PERSIAPAN 0.0025% 0.0008% 0.0008% 0.0008%

X. 2 PEKERJAAN STRUKTUR 1.9406%


LANTAI 1 0.1861% 0.0465% 0.0465% 0.0465% 0.0465%
LANTAI 2 0.4249% 0.1062% 0.1062% 0.1062% 0.1062%
LANTAI 3 0.3899% 0.0975% 0.0975% 0.0975% 0.0975%
LANTAI 4 0.3865% 0.0966% 0.0966% 0.0966% 0.0966%
LANTAI ATAP 0.3859% 0.0965% 0.0965% 0.0965% 0.0965%
LANTAI ATAP 1 0.1671% 0.0418% 0.0418% 0.0418% 0.0418%

X. 2 PEKERJAAN ARSITEKTUR 2.1557%


PEKERJAAN PASANGAN DAN PELAPIS DINDING 0.4245% 0.0354% 0.0354% 0.0354% 0.0354% 0.0354%
PEKERJAAN PASANGAN LANTAI 0.2891%
PEKERJAAN PENUTUP LANGIT-LANGIT (PLAFOND) 1.1601% 0.0967% 0.0967% 0.0967%
PEKERJAAN PASANGAN PINTU DAN JENDELA 0.1164%
PEKERJAAN PASANGAN SANITAIR 0.0465%
PEKERJAAN PENGECATAN 0.0545%
PEKERJAAN RAILLING DAN HAND RAILLING 0.0647%

X. 3 PEKERJAAN PLUMBING 0.1700%


PEKERJAAN AIR BERSIH 0.0561% 0.0028% 0.0028% 0.0028% 0.0028%

LIBUR LEBARAN
PEKERJAAN AIR RECYCLING 0.0528% 0.0026% 0.0026% 0.0026% 0.0026%
PEKERJAAN AIR KOTOR 0.0373% 0.0019% 0.0019% 0.0019% 0.0019%
PEKERJAAN AIR HUJAN 0.0238% 0.0012% 0.0012% 0.0012% 0.0012%

X. 4 PEKERJAAN ELEKTRIKAL ARUS KUAT 0.3272%


PEKERJAAN PANEL DAN KABEL FEEDER 0.0793% 0.0040% 0.0040% 0.0040% 0.0040%
PEKERJAAN RAK KABEL 0.0166% 0.0008% 0.0008% 0.0008% 0.0008%
PEKERJAAN LAMPU PENERANGAN, STOP KONTAK DAN INSTALAS 0.2313% 0.0116% 0.0116% 0.0116% 0.0116%

53
PEKERJAAN NON STANDARD 2.9987% .8
3 76
X. 5 PEKERJAAN STRUKTUR 0.7578% 51 %
.2 51
PEKERJAAN PONDASI KONSTRUKSI SARANG LABA - LABA (KSLL) 0.7578% 0.0947% 0.0947% 0.0947% 0.0947% 0.0947% 0.0947% 0.0947% 0.0947% 49 8 .09
18 93
.9 % %
3 48 48
% .83
X. 6 PEKERJAAN ARSITEK 0.8444% 47 49
.09 %
PEKERJAAN PASANGAN DAN PELAPIS DINDING 0.8285% 4
0.0414% 0.0414% 0.0414% 0.0414% 63
45 5. 45 %
PEKERJAAN PASANGAN PINTU DAN JENDELA 0.0159%
78 .35
.1 0.0030%9 0.0030% 0.0030% 0.0030%
76
0 36 8% 43
43 .61 %
.4 %
4 64 41 90
X. 7 PEKERJAAN HYDRANT DAN SPRINKLER 0.0893% % .88 %
PEKERJAAN HYDRANT DAN SPRINKLER 0.0893% 40 03
.6 %
4 55 39
% .22
37 95
X. 8 PEKERJAAN TATA UDARA DAN VENTILASI UDARA 0.6075% .85 %
36 17
PEKERJAAN AIR CONDITIONING 0.5690% 35 .47 %
.7 35 38
PEKERJAAN VENTILASI 0.0385% 6 34 .01 %
09 .46 15
33 % 13 %
32 .4 32 %
.9 4 .64
X. 9 PEKERJAAN ELEVATOR 0.1257% 0 02 06
31 59 % 30 %
PEKERJAAN ELEVATOR 0.1257% .1 % .8
2 19
83 9%
% 28
.27
X. 10 PEKERJAAN PENANGKAL PETIR ( Electro Statis ) 0.0137%
27 27 27 27 71
%
PEKERJAAN PENANGKAL PETIR (Electro Statis) 0.0137% .0 .0 .0 .0 25
7 72 7 72 7 72 7 72 .73
24 % % % % 42
.9 %
7 60 23
X. 11 PEKERJAAN ELEKTRONIC 0.5603% 23 .17
.1 % 84
PEKERJAAN TATA SUARA 0.0678% 2 96 %
% 20 20 20
PEKERJAAN FIRE ALARM 0.0635% 20 .62 .62 .62
19 .7 25 25 25
.9 5 95 % % %
PEKERJAAN ICT 0.3328% 5 % 17
98 .94
PEKERJAAN MASTER CLOCK 0.0150% % 04
17 %
PEKERJAAN BUILDING AUTOMATION SYSTEM 0.0813% 16 .2 15
6 55 .25
.2 %
1 36 83
% 13 %
.24
69
TOTAL BOBOT (%) 7.5946% 12 11 %
.5 10 .23
0 7 10 6 . 5
I.A RENCANA BOBOT PEKERJAAN PERMINGGU (MC - 0) 0.0008% 0.0008% 0.0955% 0.0947% 0.0947% 0.0947% 0.0947% 2%
0.0947% 0.0947% .01
0.0947% 0.0465%228 0.0465% 5% 0.1528% 0.1528% 0.2037% 0.2037% 0.0000% 0.0000% 0.1941% 0.1941% 0.1931% 0.1931% 0.1383% 0.1383% 0.0418% 0.1111% 0.1046% 0.1046% 0.2013% 0.1320% 0.1320%
8.7 01 %
9. 62 %
10 5 7. 9%
I.B KOMULATIF BOBOT RENCANA PEKERJAAN PERMINGGU (MC - 0) 7.5946% 0.0000% 0.0008% 0.0016% 0.0972% 0.1919% 0.2866% 0.3813% 59 6
0.4761% 0.5708% 1570.6655% 0.7602% 0.8068% 0.8533% 1.0061% 1.1588% 1.3625% 1.5662% 1.5662% 1.5662% 1.7603% 1.9544% 2.1475% 2.3407% 2.4789% 2.6172% 2.6590% 2.7701% 2.8747% 2.9793% 3.1807% 3.3127% 3.4447%
% .26 %
5.0 85
21 %
I.C KOMULATIF BOBOT RENCANA PEKERJAAN PERBULAN (MC - 0) 4. 0.0972% 5.0 5. 5. 5. 0.3789%
36 3.7 5.3 3% 0.3772% 0.7129% 0.3882% 0.7046% 0.5217% 0.5282%
96 40 06 12 09 74 68
3. 79 4% 35 12 2.5 % 1% 5%
92 % % % 26
80 1 9%
II.A RENCANA BOBOT PEKERJAAN PERMINGGU (MC - 0) % 0.0108% 0.0108% 1.2580% .271.2472% 1.2472% 1.2472% 1.2472% 1.2472% 1.2472% 1.2472% 0.6127% 0.6127% 2.0114% 2.0114% 2.6821% 2.6821% 0.0000% 0.0000% 2.5558% 2.5558% 2.5429% 2.5429% 1.8207% 1.8207% 0.5502% 1.4623% 1.3779% 1.3779% 2.6508% 1.7387% 1.7387%
0.0 0.0 0.0 97
00 10 21 %
0. 0. 0% 8% 7%
II.B KOMULATIF BOBOT RENCANA PEK. TOTAL FAK. HUKUM PERMINGGU 100.0000% 00 40 0.0000% 0.0108% 0.0217% 1.2797% 2.5269% 3.7741% 5.0213% 6.2685% 7.5157% 8.7629% 10.0101% 10.6228% 11.2355% 13.2469% 15.2583% 17.9404% 20.6225% 20.6225% 20.6225% 23.1784% 25.7342% 28.2771% 30.8199% 32.6406% 34.4613% 35.0115% 36.4738% 37.8517% 39.2295% 41.8803% 43.6190% 45.3576%
00 85
% %
II.C KOMULATIF BOBOT RENCANA PEKERJAAN PERBULAN (MC - 0) 1.2797% 4.9888% 4.9670% 9.3870% 5.1117% 9.2773% 6.8688% 6.9546%

III.A REALISASI BOBOT PEKERJAAN PERMINGGU (MC - 0) 0.0310% 0.2673% 0.0790% 0.0055% 0.0018% 0.0044% 0.0182% 0.0006% 0.2838% 0.2583% 0.2815% 0.0799% 0.2046% 0.0607% 0.1800% 0.1402% 0.1596% 0.0000% 0.0000% 0.0000% 0.3077% 0.1350% 0.0406% 0.1763% 0.3710% 0.2127% 0.1259% 0.0521% 0.3148% 0.1023% 0.1941%

III.B KOMULATIF BOBOT REALISASI PEK. TOTAL FAK. HUKUM PERMINGGU 7.5946% 0.0000% 0.0310% 0.2983% 0.3773% 0.3828% 0.3846% 0.3889% 0.4071% 0.4077% 0.6916% 0.9499% 1.2314% 1.3112% 1.5159% 1.5766% 1.7566% 1.8968% 2.0564% 2.0564% 2.0564% 2.0564% 2.3641% 2.4991% 2.5397% 2.7159% 3.0869% 3.2996% 3.4255% 3.4776% 3.7924% 3.8947% 4.0888%

III.C KOMULATIF BOBOT REALISASI PEKERJAAN PERBULAN (MC - 0) 0.3535% 0.3070% 0.8850% 0.4798% 0.4427% 0.9264% 0.6633% 0.0000%

IV.A REALISASI BOBOT PEKERJAAN PERMINGGU (MC - 0) 0.4085% 3.5195% 1.0399% 0.0725% 0.0231% 0.0577% 0.2397% 0.0076% 3.7374% 3.4013% 3.7064% 1.0518% 2.6944% 0.7997% 2.3701% 1.8463% 2.1013% 0.0000% 0.0000% 0.0000% 4.0511% 1.7776% 0.5343% 2.3208% 4.8846% 2.8009% 1.6572% 0.6862% 4.1450% 1.3470% 2.5558%

IV.B KOMULATIF BOBOT REALISASI PEK. TOTAL FAK. HUKUM PERMINGGU 100.0000% 0.0000% 0.4085% 3.9280% 4.9679% 5.0404% 5.0635% 5.1212% 5.3609% 5.3685% 9.1059% 12.5072% 16.2136% 17.2655% 19.9598% 20.7595% 23.1296% 24.9760% 27.0772% 27.0772% 27.0772% 27.0772% 31.1283% 32.9059% 33.4402% 35.7609% 40.6455% 43.4464% 45.1036% 45.7898% 49.9348% 51.2818% 53.8376%

IV.C KOMULATIF BOBOT REALISASI PEKERJAAN PERBULAN (MC - 0) 4.6551% 4.0424% 11.6535% 6.3177% 5.8287% 12.1977% 8.7339% 0.0000%

0.0039% 0.0088% 0.0107%


KETERANGAN : Mengetahui, Diperiksa oleh, Diperiksa oleh, Diperiksa oleh,
PLANNED PROGRESS ( WEEKLY ) MASTER Pejabat Pembuat Komitmen (PPK) Direktur Eksekutif PIU - IDB Ketua Tim Teknis Pengelola Teknis
S CURVE LINE UNIVERSITAS SULTAN AGENG TIRTAYASA UNIVERSITAS SULTAN AGENG TIRTAYASA UNIVERSITAS SULTAN AGENG TIRTAYASA Dinas Perumahan Rakyat dan Kawasan Permuk
Provinsi Banten

HARI RAYA IDUL FITRI/ LIBUR LEBARAN


WEEK BAR :

RIFKY UJIANTO
KETERANGAN : TOTAL WAKTU PELAKSANAAN = 670 HARI KALENDER KURNIA NUGRAHA AGUNG SUDRAJAD ERI TRIANA NUGRAHA
NIP. 197401042001011001 NIP. 197505152014041001 NIK. 201501011226
NIP. 19810922201101001
AKULTAS
US HUKUM)
OF UNTIRTA SINDANGSARI

2 0 2 0
SEPTEMBER OKTOBER NOVEMBER DESEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI JULI
55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 KET.
16 - 22 23 - 29 30 - 6 7 - 13 14 - 20 21 - 27 28 - 3 4 - 10 11 - 17 18 - 24 25 - 1 2-8 9 - 15 16 - 22 23 - 29 30 - 4 5 - 11 12 - 18 19 - 25 26 - 2 3-9 10 - 16 17 - 23 24 - 1 2-8 9 - 15 16 - 22 23 - 29 30 - 5 6 - 12 13 - 19 20 - 26 27 - 3 4 - 10 11 - 17 18 - 24 25 - 31 1-7 8 - 14 15 - 21 22 - 28 29 - 7

0.1320% 0.1320% 0.1720% 0.1256% 0.1256% 0.1709% 0.1337% 0.1447% 0.1447% 0.2413% 0.2413% 0.2312% 0.2380% 0.2883% 0.2883% 0.1434% 0.3479% 0.2114% 0.2351% 0.2351% 0.0836% 0.0836% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000%

98
.89
97 97
.79 %
94
%
94
.70
32
%
91
.60
71
%
88
.82
36
%

84
.24
23
82 %
.35
0.0354% 0.0354% 0.0354% 0.0354% 0.0354% 0.0354% 0.0354% 47
%
0.0241% 0.0241% 0.0241% 0.0241% 0.0241% 0.0241% 0.0241% 0.0241% 0.0241% 0.0241% 0.0241% 0.0241%
0.0967% 0.0967% 0.0967% 0.0967% 0.0967% 0.0967% 78
0.0967% 0.0967% 0.0967%
.55
83
0.0146% 0.0146% 0.0146% 0.0146% 0.0146% 0.0146% % 0.0073% 0.0073% 0.0073% 0.0073%
0.0066% 0.0066% 0.0066% 0.0066% 0.0066% 0.0066% 0.0035% 0.0035%
74
0.0068% 0.0068% 0.0068% 0.0068% .76 0.0068% 0.0068% 0.0068% 0.0068%
20
% 0.0162% 0.0162% 0.0162% 0.0162%
71
.62
77
%
6
8.5
0.0112% 0.0112% 0.0112% 0.0112%

LIBUR LEBARAN
8 31
0.0106% 0.0106% 0.0106%% 0.0106%
0.0075% 65
0.0075% 0.0075% 0.0075%
.4 05
0.0048% 0.0048%3% 0.0048% 0.0048%
62
.22
76
60 %
.32
27 0.0159% 0.0159% 0.0159% 0.0159%
58 %
.41 0.0033% 0.0033% 0.0033% 0.0033%
56 79
.65 % 0.0463% 0.0463% 0.0463% 0.0463%
77
54 %
.40
52 79
.75 %
51 36
.09 %
93
48 %
.83
47 49
.09 %
63 0.1105% 0.1105% 0.1105% 0.1105% 0.1105% 0.1105%
45 %
.35 0.0020% 0.0020%
76
3.6 %
19
0%

0.0223% 0.0223% 0.0223% 0.0223%

0.0285% 0.0285% 0.0285% 0.0285% 0.0759% 0.0759% 0.0759% 0.0759% 0.0759% 0.0759%
0.0019% 0.0019% 0.0019% 0.0019% 0.0077% 0.0077% 0.0077% 0.0077%

0.0503% 0.0503% 0.0126% 0.0126%

0.0027% 0.0027% 0.0027% 0.0027% 0.0027%

0.0034% 0.0034% 0.0034% 0.0034% 0.0136% 0.0136% 0.0136% 0.0136%


0.0032% 0.0032% 0.0032% 0.0032% 0.0127% 0.0127% 0.0127% 0.0127%
0.0166% 0.0166% 0.0166% 0.0166% 0.0666% 0.0666% 0.0666% 0.0666%
0.0008% 0.0008% 0.0008% 0.0008% 0.0030% 0.0030% 0.0030% 0.0030%
0.0041% 0.0041% 0.0041% 0.0041% 0.0163% 0.0163% 0.0163% 0.0163%

0.1320% 0.1320% 0.1720% 0.1256% 0.1256% 0.1709% 0.1337% 0.1447% 0.1447% 0.2413% 0.2413% 0.2312% 0.2380% 0.2883% 0.2883% 0.1434% 0.3479% 0.2114% 0.2351% 0.2351% 0.0836% 0.0836%

3.5768% 3.7088% 3.8808% 4.0064% 4.1321% 4.3029% 4.4366% 4.5813% 4.7260% 4.9673% 5.2086% 5.4399% 5.6779% 5.9662% 6.2545% 6.3979% 6.7458% 6.9572% 7.1924% 7.4275% 7.5111% 7.5946%

0.5282% 0.7278% 0.7720% 1.1893% 1.0296% 0.1671%

1.7387% 1.7387% 2.2644% 1.6543% 1.6543% 2.2498% 1.7602% 1.9049% 1.9049% 3.1778% 3.1778% 3.0446% 3.1343% 3.7963% 3.7963% 1.8876% 4.5814% 2.7834% 3.0961% 3.0961% 1.1003% 1.1003%

47.0963% 48.8349% 51.0993% 52.7536% 54.4079% 56.6577% 58.4179% 60.3227% 62.2276% 65.4053% 68.5831% 71.6277% 74.7620% 78.5583% 82.3547% 84.2423% 88.8236% 91.6071% 94.7032% 97.7994% 98.8997% 100.0000%

6.9546% 9.5829% 10.1653% 15.6592% 13.5571% 2.2006%

0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000%

0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000%

Diperiksa oleh, Diperiksa oleh, Dibuat oleh,


Pengelola Teknis Project Supervision Consultant (PSC) Kontraktor Pelaksana
inas Perumahan Rakyat dan Kawasan Permukiman PT. CIRIAJASA CIPTA MANDIRI PT. ADHI KARYA - PT. HUTAMA KARYA, JV
Provinsi Banten

ERI TRIANA NUGRAHA DWI SUKSMONO HADHI AGUS WICAKSONO


NIP. 19810922201101001 TEAM LEADER PROJECT MANAGER
REKAPITULASI BOBOT PEKERJAAN PER MINGGU
PROYEK PEMBANGUNAN GEDUNG KAMPUS UNTIRTA
441,337,427,372.34
Tahun No Bulan Minggu ke - Periode Bobot per minggu Nilai per Minggu Bobot per Bulan Nilai Per bulan Komulatif Bobot Komulatif Nilai
1 September 1 7-9 0.0000% - 0.0000% -
2 10 - 16 0.0000% - 0.0000% -
3 17 - 23 0.0000% - 0.0000% -
4 24 - 30 0.0000% - 0.0000% - 0.0000% -
2 Oktober 5 1-7 0.0000% - 0.0000% -
6 8 - 14 0.0000% - 0.0000% -
7 15 - 21 0.0000% - 0.0000% -
2018

8 22 - 28 0.0000% - 0.0000% -
9 29 - 4 0.0000% - 0.0000% - 0.0000% -
3 November 10 5 - 11 0.0000% - 0.0000% -
11 12 - 18 0.0000% - 0.0000% -
12 19 - 25 0.0000% - 0.0000% -
13 26 - 2 0.0000% - 0.0000% - 0.0000% -
4 Desember 14 3-9 0.0000% - 0.0000% -
15 10 - 16 0.0000% - 0.0000% -
16 17 - 23 0.0000% - 0.0000% -
17 24 - 30 0.0000% - 0.0000% -
18 31 - 6 0.0000% - 0.0000% - 0.0000% -
5 Januari 19 7 - 13 0.0000% - 0.0000% -
20 14 - 20 0.0000% - 0.0000% -
21 21 - 27 0.0000% - 0.0000% -
22 28 - 3 0.0000% - 0.0000% - 0.0000% -
6 Februari 23 4 - 10 0.0000% - 0.0000% -
24 11 - 17 0.0108% 47,801,710.05 0.0108% 47,801,710.05
25 18 - 24 0.0108% 47,801,710.05 0.0217% 95,603,420.11
26 25 - 3 1.2580% 5,552,153,565.44 1.2797% 5,647,756,985.55 1.2797% 5,647,756,985.55
7 Maret 27 4 - 10 1.2472% 5,504,351,855.39 2.5269% 11,152,108,840.94
28 11 - 17 1.2472% 5,504,351,855.39 3.7741% 16,656,460,696.33
29 18 - 24 1.2472% 5,504,351,855.39 5.0213% 22,160,812,551.73
30 25 - 31 1.2472% 5,504,351,855.39 4.9888% 22,017,407,421.57 6.2685% 27,665,164,407.12
8 April 31 1-7 1.2472% 5,504,351,855.39 7.5157% 33,169,516,262.51
32 8 - 14 1.2472% 5,504,351,855.39 8.7629% 38,673,868,117.90
33 15 - 21 1.2472% 5,504,351,855.39 10.0101% 44,178,219,973.29
34 22 - 28 0.6127% 2,704,087,696.70 10.6228% 46,882,307,669.99
35 29 - 5 0.6127% 2,704,087,696.70 4.9670% 21,921,230,959.58 11.2355% 49,586,395,366.69
9 Mei 36 6 - 12 2.0114% 8,877,074,995.32 13.2469% 58,463,470,362.01
37 13 - 19 2.0114% 8,877,074,995.32 15.2583% 67,340,545,357.32
38 20 - 26 2.6821% 11,837,181,450.53 17.9404% 79,177,726,807.85
39 27 - 2 2.6821% 11,837,181,450.53 9.3870% 41,428,512,891.68 20.6225% 91,014,908,258.38
10 Juni 40 3-9 0.0000% - 20.6225% 91,014,908,258.38
41 10 - 16 0.0000% - 20.6225% 91,014,908,258.38
42 17 - 23 2.5558% 11,279,842,111.13 23.1784% 102,294,750,369.51
2019

43 24 - 30 2.5558% 11,279,842,111.13 5.1117% 22,559,684,222.26 25.7342% 113,574,592,480.64


11 Juli 44 1-7 2.5429% 11,222,656,373.43 28.2771% 124,797,248,854.07
45 8 - 14 2.5429% 11,222,656,373.43 30.8199% 136,019,905,227.49
46 15 - 21 1.8207% 8,035,313,303.98 32.6406% 144,055,218,531.47
47 22 - 28 1.8207% 8,035,313,303.98 34.4613% 152,090,531,835.46
48 29 - 4 0.5502% 2,428,304,889.77 9.2773% 40,944,244,244.59 35.0115% 154,518,836,725.23
12 Agustus 49 5 - 11 1.4623% 6,453,745,781.54 36.4738% 160,972,582,506.77
50 12 - 18 1.3779% 6,081,029,436.51 37.8517% 167,053,611,943.28
51 19 - 25 1.3779% 6,081,029,436.51 39.2295% 173,134,641,379.79
52 26 - 1 2.6508% 11,698,792,641.38 6.8688% 30,314,597,295.94 41.8803% 184,833,434,021.17
13 September 53 2-8 1.7387% 7,673,351,749.61 43.6190% 192,506,785,770.79
54 9 - 15 1.7387% 7,673,351,749.61 45.3576% 200,180,137,520.40
55 16 - 22 1.7387% 7,673,351,749.61 47.0963% 207,853,489,270.01
56 23 - 29 1.7387% 7,673,351,749.61 6.9546% 30,693,406,998.46 48.8349% 215,526,841,019.63
14 Oktober 57 30 - 6 2.2644% 9,993,677,368.69 51.0993% 225,520,518,388.31
58 7 - 13 1.6543% 7,300,848,150.61 52.7536% 232,821,366,538.92
59 14 - 20 1.6543% 7,300,848,150.61 54.4079% 240,122,214,689.53
60 21 - 27 2.2498% 9,929,216,872.96 56.6577% 250,051,431,562.49
61 28 - 3 1.7602% 7,768,407,059.20 9.5829% 42,292,997,602.06 58.4179% 257,819,838,621.69
15 November 62 4 - 10 1.9049% 8,406,883,133.54 60.3227% 266,226,721,755.23
63 11 - 17 1.9049% 8,406,883,133.54 62.2276% 274,633,604,888.77
64 18 - 24 3.1778% 14,024,646,338.42 65.4053% 288,658,251,227.19
65 25 - 1 3.1778% 14,024,646,338.42 10.1653% 44,863,058,943.92 68.5831% 302,682,897,565.61
16 Desember 66 2-8 3.0446% 13,437,070,491.29 71.6277% 316,119,968,056.90
67 9 - 15 3.1343% 13,832,721,298.46 74.7620% 329,952,689,355.36
68 16 - 22 3.7963% 16,754,637,265.64 78.5583% 346,707,326,621.00
69 23 - 29 3.7963% 16,754,637,265.64 82.3547% 363,461,963,886.64
70 30 - 4 1.8876% 8,330,665,259.75 15.6592% 69,109,731,580.78 84.2423% 371,792,629,146.39
17 Januari 71 5 - 11 4.5814% 20,219,369,843.25 88.8236% 392,011,998,989.63
72 12 - 18 2.7834% 12,284,355,390.66 91.6071% 404,296,354,380.29
73 19 - 25 3.0961% 13,664,427,833.18 94.7032% 417,960,782,213.47
74 26 - 2 3.0961% 13,664,427,833.18 13.5571% 59,832,580,900.27 97.7994% 431,625,210,046.65
18 Februari 75 3-9 1.1003% 4,856,108,662.84 98.8997% 436,481,318,709.50
76 10 - 16 1.1003% 4,856,108,662.84 100.0000% 441,337,427,372.34
77 17 - 23 0.0000% - 100.0000% 441,337,427,372.34
78 24 - 1 0.0000% - 2.2006% 9,712,217,325.68 100.0000% 441,337,427,372.34
19 Maret 79 2-8 0.0000% - 100.0000% 441,337,427,372.34
80 9 - 15 0.0000% - 100.0000% 441,337,427,372.34
81 16 - 22 0.0000% - 100.0000% 441,337,427,372.34
2020

82 23 - 29 0.0000% - 0.0000% - 100.0000% 441,337,427,372.34


20 April 83 30 - 5 0.0000% - 100.0000% 441,337,427,372.34
84 6 - 12 0.0000% - 100.0000% 441,337,427,372.34
85 13 - 19 0.0000% - 100.0000% 441,337,427,372.34
86 20 - 26 0.0000% - 100.0000% 441,337,427,372.34
87 27 - 3 0.0000% - 0.0000% - 100.0000% 441,337,427,372.34
21 Mei 88 4 - 10 0.0000% - 100.0000% 441,337,427,372.34
89 11 - 17 0.0000% - 100.0000% 441,337,427,372.34
90 18 - 24 0.0000% - 100.0000% 441,337,427,372.34
91 25 - 31 0.0000% - 0.0000% - 100.0000% 441,337,427,372.34
22 Juni 92 1-7 0.0000% - 100.0000% 441,337,427,372.34
93 8 - 14 0.0000% - 100.0000% 441,337,427,372.34
94 15 - 21 0.0000% - 100.0000% 441,337,427,372.34
95 22 - 28 0.0000% - 0.0000% - 100.0000% 441,337,427,372.34
23 Juli 96 29 - 7 0.0000% - 0.0000% - 100.0000% 441,337,427,372.34
100.0000% 441,337,427,372.34

Catatan : Mulai Pekerjaan 07 September 2018 - 08 Juli 2020 (670 Hari Kalender)
9/7/2018 670.00 7/8/2020
441,301,839,227.41
No Tahun Bulan Bobot Per Bulan (%) Nilai sesuai S- Curve

1 Agustus 0.4443% 1,960,840,201.95


2 September 1.3750% 6,067,872,460.51
3 2018 Oktober 2.7440% 12,109,249,587.64
4 November 4.4822% 19,780,180,142.57
5 Desember 5.5211% 24,364,691,828.94
6 Januari 8.2050% 36,208,920,822.55
7 Februari 7.5513% 33,324,189,317.69
8 Maret 7.9585% 35,120,966,492.04
9 April 8.4014% 37,075,561,047.98
10 Mei 5.6755% 25,045,944,659.29
11 Juni 2.4261% 10,706,460,254.62
2019
12 Juli 4.9998% 22,064,144,562.20
13 Agustus 5.1096% 22,548,897,130.78
14 September 4.3183% 19,056,522,601.05
15 Oktober 4.2301% 18,667,443,338.31
16 November 3.0127% 13,295,164,754.17
17 Desember 2.7950% 12,334,169,948.44
18 Januari 3.4750% 15,335,242,533.13
19 Februari 5.6993% 25,151,061,047.52
20 Maret 6.0453% 26,677,911,417.24
2020
21 April 4.0323% 17,794,548,400.74
22 Mei 1.0877% 4,800,231,877.68
23 Juni 0.4105% 1,811,624,800.38
Komulatif Nilai Komulatif Bobot

64,282,834,221.61 14.5666% 0.145666 -

349,731,219,150.71 79.2499% 0.792499 -

441,301,839,227.41 100.0000% 1.00 -


33,517,978,4
S CURVE
No URAIAN
Bobot

I PEKERJAAN PERSIAPAN Err:509


PEKERJAAN PERSIAPAN Err:509

II PEKERJAAN FISIK GEDUNG Err:509


BANGUNAN GEDUNG REKTORAT Err:509
BANGUNAN GEDUNG FISIP Err:509
BANGUNAN GEDUNG LAB TERPADU KETAHANAN PANGAN Err:509
BANGUNAN GEDUNG FAKULTAS PERTANIAN Err:509
BANGUNAN GEDUNG PERPUSTAKAAN Err:509
BANGUNAN GEDUNG KULIAH TERPADU Err:509
BANGUNAN GEDUNG FAKULTAS EKONOMI DAN BISNIS Err:509
BANGUNAN GEDUNG AUDITORIUM Err:509
BANGUNAN GEDUNG FAKULTAS HUKUM 100.0000%
BANGUNAN GEDUNG ASRAMA MAHASISWI Err:509
BANGUNAN GEDUNG ASRAMA MAHASISWA Err:509
BANGUNAN GREEN HOUSE Err:509

III PEKERJAAN SITE DEVELOPMENT & PENUNJANG Err:509


JALAN & PARKIR, SALURAN, DPT, GERBANG, OPEN THEATRE, Err:509
PEKERJAAN BANGUNAN POWER HOUSE Err:509
PEKERJAAN BANGUNAN GERBANG & POS JAGA Err:509
PEKERJAAN BANGUNAN RUMAH TRAFO Err:509

IV PEKERJAAN UTILITAS Err:509


PEKERJAAN MEKANIKAL & PLUMBING Err:509
PEKERJAAN ELEKTRIKAL Err:509

TOTAL Err:509
CEK Err:509
Bulan
22.00
660

START KONTRAK Wednesday, August 1, 2018


DURATION 670
FINISH KONTRAK Monday, June 1, 2020
441,301,829,000.00
33,517,978,400.87 441,301,800,000.00
S CURVE BoQ
Nilai Bobot Nilai Deviasi BOBOT

Err:509 0.6296% 2,778,637,000.00 Err:509 Err:509


Err:509 0.6296% 2,778,637,000.00 Err:509 Err:509

Err:509 88.5580% 390,807,904,000.00 Err:509 Err:509


Err:509 11.3422% 50,053,396,000.00 Err:509 Err:509
Err:509 7.3787% 32,562,200,000.00 Err:509 Err:509
Err:509 7.9991% 35,300,281,000.00 Err:509 Err:509
Err:509 10.5627% 46,613,438,000.00 Err:509 Err:509
Err:509 6.6383% 29,294,978,000.00 Err:509 Err:509
Err:509 6.9697% 30,757,568,000.00 Err:509 Err:509
Err:509 11.3608% 50,135,338,000.00 Err:509 Err:509
Err:509 10.4920% 46,301,472,000.00 Err:509 Err:509
33,517,978,400.87 7.7154% 34,047,990,000.00 ### 7.5946%
Err:509 4.0107% 17,699,072,000.00 Err:509 Err:509
Err:509 3.9975% 17,641,101,000.00 Err:509 Err:509
Err:509 0.0909% 401,070,000.00 Err:509 Err:509
-
Err:509 4.7257% 20,854,468,000.00 Err:509 Err:509
Err:509 3.1039% 13,697,357,000.00 Err:509 Err:509
Err:509 0.8097% 3,573,079,000.00 Err:509 Err:509
Err:509 0.7096% 3,131,424,000.00 Err:509 Err:509
Err:509 0.1026% 452,608,000.00 Err:509 Err:509
-
Err:509 6.0867% 26,860,820,000.00 Err:509 Err:509
Err:509 3.5516% 15,673,325,000.00 Err:509 Err:509
Err:509 2.5351% 11,187,495,000.00 Err:509 Err:509

Err:509 100.0000% 441,301,829,000.00 Err:509 Err:509


- Err:509
Hari Minggu
30.00 7
cek 0

Err:509
Err:509
-
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.92
Err:509
Err:509
Err:509
-
Err:509
Err:509
Err:509
Err:509
Err:509
-
Err:509
Err:509
Err:509
-
Err:509
Err:509
REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
PEKERJAAN MEKANIKAL & PLUMBING
TAHUN ANGGARAN 2017-2019
MC - 0
NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN MEKANIKAL & PLUMBING

I. PEKERJAAN MEKANIKAL DAN PLUMBING


A. PEKERJAAN AIR BERSIH
A.PEKERJAAN DEEPWELL 648,906,000.00
A.PEKERJAAN PERALATAN POMPA DAN WATER FI 3,352,236,267.83
A.PEKERJAAN PERALATAN POMPA DAN WATER FIL 2,683,502,972.83
B. PEKERJAAN AIR HUJAN 265,786,957.50
C. PACKAGE PENGOLAHAN AIR LIMBAH ( BIOSEPTIC 1,064,124,618.29
I.PEKERJAAN MEKANIKAL DAN PLUMBING 8,014,556,816.45

II. PEKERJAAN HYDRANT (FIRE FIGHTING)


A. PERALATAN POMPA KEBAKARAN 1,510,188,145.00
B. PEMIPAAN SITE, FITTINGS DAN VALVE, DLL 2,974,676,957.66
II.PEKERJAAN HYDRANT (FIRE FIGHTING) 4,484,865,102.66

III. PEKERJAAN PENGADAAN DAN PEMASANGAN GENER 3,173,903,610.00

III.PEKERJAAN PENGADAAN DAN PEMASAN 3,173,903,610.00

JUMLAH PEKERJAAN UTILITAS 15,673,325,529.11


DIBULATKAN 15,673,325,000.00

REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
PEKERJAAN ELEKTRIKAL
TAHUN ANGGARAN 2017-2019
MC - 0
NO. URAIAN PEKERJAAN JUMLAH HARGA

- UTILITAS

I. PEKERJAAN ELEKTRIKAL
A. PEKERJAAN PANEL UTAMA DAN TRAFO SUBSTAT 656,011,135.00
B. PEKERJAAN PANEL UTAMA DAN TRAFO SUBSTAT 886,620,705.00
C. PEKERJAAN PANEL UTAMA DAN TRAFO SUBSTAT 768,705,330.00
D. PEKERJAAN PANEL UTAMA DAN TRAFO SUBSTAT 766,809,925.00
E. PEKERJAAN PANEL UTAMA DAN TRAFO SUBSTAT 946,676,945.00
F. INSTALASI KABEL DISTRIBUSI UTAMA T1 316,255,350.00
G. INSTALASI KABEL DISTRIBUSI UTAMA T2 383,541,600.00
H. INSTALASI KABEL DISTRIBUSI UTAMA T3 334,260,300.00
I. INSTALASI KABEL DISTRIBUSI UTAMA T4 397,881,090.00
J. INSTALASI KABEL DISTRIBUSI UTAMA T5 399,519,800.00
K. PEKERJAAN PENERANGAN LUAR & KABEL DIST 1,162,490,270.00
L. BIAYA PERIJINAN DAN PENYAMBUNGAN DAYA 636,337,100.00
JUMLAH I.PEKERJAAN ELEKTRIKAL 7,655,109,550.00

II. PEKERJAAN DATA CENTER 256,732,465.00


III. BACKBONE FO - ICT 955,542,905.00
IV. ELECTRONICS GEDUNG 2,320,110,730.00
JUMLAH PEKERJAAN UTILITAS 11,187,495,650.00
DIBULATKAN 11,187,495,000.00
REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
PEKERJAAN SITE DEVELOPMENT & PENUNJANG
TAHUN ANGGARAN 2017-2019
MC - 0 OKE
NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN SITE DEVELOPMENT & PENUNJANG

I. PEKERJAAN JALAN DAN PARKIR 5,275,631,805.00

II. PEKERJAAN PENUNJANG LANDSEKAP 6,657,021,933.26


A. PEKERJAAN PLAZA INFORMAL (W) 2,911,663,020.35
B. PLAZA FORMAL (Q) / UNTUK UPACARA 1,485,711,202.56
C. AREA TEMPAT DUDUK MAHASISWA(S) 952,311,707.79
D. AREA OPEN THEATER (R - A.5A.01) 825,107,930.76
E. AREA OPEN THEATER (R - A.6A.01) 131,346,951.07
F. AREA OPEN THEATER (R - A.5A.01) 98,603,952.83
G. AREA SIGNAGE (R - A.3.01) 78,914,932.88
H. PAGAR DEPAN (GATE WAY) 173,362,235.01

III. PEKERJAAN TANGGA OPEN THEATER 699,155,417.21


A. PEKERJAAN TANGGA TYPE (A-Kiri) 151,670,119.79
B. PEKERJAAN TANGGA TYPE (B-Kanan) 367,548,932.46
C. PEKERJAAN TANGGA TYPE (C-Atas) 179,936,364.96

IV. DUDUKAN STORAGE TANK 16,370,477.89

V. DUDUKAN FRP (Reservoir) 460,344,122.80

VI. TUMPUAN ROOFTANK (11 Gedung) 217,748,501.85

VII. RUMAH POMPA 449,397,115.14

VIII. PEKERJAAN HARVESTING GROUND WATER TANK -

IX. PEKERJAAN CAPING BEAM 190,418,739.80

X. PEKERJAAN DUDUKAN EQUIPMENT MEP 478,256,369.05

XI. PEKERJAAN TANGGA ENTRANCE 1,429,918,531.28

JUMLAH 15,874,263,013.28
DIBULATKAN 15,874,263,000.00
REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
PEKERJAAN BANGUNAN POWER HOUSE
TAHUN ANGGARAN 2017-2019
MC - 0 OKE
NO. URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN 5,940,600.00


JUMLAH I.PEKERJAAN PERSIAPAN 5,940,600.00

II. PEKERJAAN STRUKTUR


2.1.PEKERJAAN TANAH 38,472,977.28
2.2.PEKERJAAN PONDASI TIANG PANCANG 192,333,018.26
2.3.PEKERJAAN STRUKTUR BAWAH 244,518,450.14
2.4.PEKERJAAN STRUKTUR ATAS
A. LANTAI 1 242,418,944.64
B. LANTAI 2 227,812,245.41
C. LANTAI 3 33,864,530.18
JUMLAH II.PEKERJAAN STRUKTUR 979,420,165.92

III. PEKERJAAN ARSITEK


3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 128,112,163.83
3.2.PEKERJAAN PASANGAN LANTAI 134,275,550.95
3.3.PEKERJAAN PASANGAN PLAFOND 8,225,541.28
3.4.PEKERJAAN PASANGAN PINTU DAN JENDELA 76,601,060.00
3.5.PEKERJAAN PENGECATAN 32,248,333.95
JUMLAH III.PEKERJAAN ARSITEK 379,462,650.02

IV. PEKERJAAN MEKANIKAL, ELEKTRIKAL, DAN PLUMBING


4.1.PEKERJAAN AIR HUJAN 24,335,934.00
4.2.PEKERJAAN INSTALASI LISTRIK 1,914,468,215.00
JUMLAH IV.PEKERJAAN MEKANIKAL, ELEKT 1,938,804,149.00

JUMLAH PEKERJAAN POWER HOUSE 3,303,627,564.94


DIBULATKAN 3,303,627,000.00

REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
PEKERJAAN BANGUNAN GERBANG & POS JAGA
TAHUN ANGGARAN 2017-2019
MC - 0 OKE
NO. URAIAN PEKERJAAN JUMLAH HARGA
I. PEKERJAAN PERSIAPAN 10,891,100.00
I.PEKERJAAN PERSIAPAN 10,891,100.00

II. PEKERJAAN STRUKTUR


2.1.PEKERJAAN TANAH 11,189,957.94
2.2.PEKERJAAN PONDASI TIANG PANCANG 199,956,693.25
2.3.PEKERJAAN STRUKTUR BAWAH 100,942,724.50
2.4.PEKERJAAN STRUKTUR ATAS
A. LANTAI 1 138,232,210.84
B. LANTAI 2 142,497,138.44
C. LANTAI 3 134,201,972.67
D. LANTAI 4 366,763,098.48
E. LANTAI 5 45,548,371.87
F. LANTAI 6 45,548,371.87
G. LANTAI 7 30,019,400.67
H. LANTAI 8 18,223,661.54
II.PEKERJAAN STRUKTUR 1,233,123,602.09

III. PEKERJAAN ARSITEK


3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 319,878,827.73
3.2.PEKERJAAN PASANGAN LANTAI 60,107,378.09
3.3.PEKERJAAN PASANGAN PLAFOND 16,751,787.83
3.4.PEKERJAAN PASANGAN PINTU DAN JENDELA 1,017,889,500.00
3.5.PEKERJAAN PASANGAN SANITAIR 2,728,990.00
3.6.PEKERJAAN PENGECATAN 31,767,854.31
3.7.PEKERJAAN TANGGA DAN RAILLING 359,181,480.00
III.PEKERJAAN ARSITEK 1,808,305,817.96

IV. PEKERJAAN MEKANIKAL, ELEKTRIKAL, DAN PLUMBING


4.1.PEKERJAAN AIR BERSIH 4,925,962.81
4.2.PEKERJAAN AIR KOTOR 6,471,839.50
4.3.PEKERJAAN AIR HUJAN 5,961,914.00
4.4.PEKERJAAN INSTALASI LISTRIK 28,810,810.00
IV.PEKERJAAN MEKANIKAL, ELEKTRIKAL, 46,170,526.31

JUMLAH PEKERJAAN BANGUNAN GERBANG 3,098,491,046.36


DIBULATKAN 3,098,491,000.00

REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
PEKERJAAN BANGUNAN RUMAH TRAFO
TAHUN ANGGARAN 2017-2019
MC - 0 OKE
NO. URAIAN PEKERJAAN JUMLAH HARGA
I. PEKERJAAN PERSIAPAN 5,940,600.00
JUMLAH I.PEKERJAAN PERSIAPAN 5,940,600.00

II. PEKERJAAN STRUKTUR


2.1.PEKERJAAN TANAH 4,756,388.88
2.2.PEKERJAAN PONDASI TIANG PANCANG 96,114,173.31
2.3.PEKERJAAN STRUKTUR BAWAH 42,762,051.01
2.4.PEKERJAAN STRUKTUR ATAS
A. LANTAI 1 47,976,930.38
B. LANTAI DAK 47,277,538.20
JUMLAH II.PEKERJAAN STRUKTUR 238,887,081.77

III. PEKERJAAN ARSITEK


3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 40,386,301.15
3.2.PEKERJAAN PASANGAN LANTAI 34,973,124.00
3.3.PEKERJAAN PASANGAN PLAFOND 1,742,063.13
3.4.PEKERJAAN PASANGAN PINTU DAN JENDELA 25,974,460.00
3.5.PEKERJAAN PENGECATAN 6,158,924.88
JUMLAH III.PEKERJAAN ARSITEK 109,234,873.15

IV. PEKERJAAN MEKANIKAL, ELEKTRIKAL, DAN PLUMBING


4.1.PEKERJAAN AIR HUJAN 24,335,934.00
4.2.PEKERJAAN INSTALASI LISTRIK 14,834,020.00
JUMLAH IV.PEKERJAAN MEKANIKAL, ELEKT 39,169,954.00

JUMLAH PEKERJAAN POWER HOUSE 393,232,508.92


DIBULATKAN 393,232,000.00
REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GREEN HOUSE
TAHUN ANGGARAN 2017-2019
MC - 0 OKE
NO. URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN 2,970,300.00


JUMLAH I.PEKERJAAN PERSIAPAN 2,970,300.00

II. PEKERJAAN STRUKTUR


2.1.PEKERJAAN TANAH 9,237,673.92
2.2.PEKERJAAN STRUKTUR BAWAH 21,966,745.83
2.3.PEKERJAAN STRUKTUR ATAS
A. LANTAI 1 59,711,296.00
B.PEKERJAAN BAJA 177,509,928.47
JUMLAH II.PEKERJAAN STRUKTUR 268,425,644.22

III. PEKERJAAN ARSITEK 123,876,898.49

JUMLAH III.PEKERJAAN ARSITEK 123,876,898.49

IV. PEKERJAAN PLUMBING DAN ELEKTRIKAL


4.1.PEKERJAAN AIR BERSIH 4,709,864.00
4.2.PEKERJAAN INSTALASI LISTRIK 13,091,170.00
IV.PEKERJAAN PLUMBING DAN ELEKTRIKAL 17,801,034.00

JUMLAH BANGUNAN GREEN HOUSE 413,073,876.70


DIBULATKAN 413,073,000.00
REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG ASRAMA MAHASISWA
TAHUN ANGGARAN 2017-2019 MC - 0 OKE

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN 6,732,680.00


I.PEKERJAAN PERSIAPAN 6,732,680.00

II. PEKERJAAN STRUKTUR


2.1.PEKERJAAN STRUKTUR ATAS
A. LANTAI 1 485,288,170.61
B. LANTAI 2 1,197,330,773.18
C. LANTAI 3 1,136,633,210.11
D. LANTAI 4 1,027,521,098.58
E. LANTAI ATAP 617,490,864.06
F. LANTAI ATAP 1 316,596,399.78
II.PEKERJAAN STRUKTUR 4,780,860,516.31

III. PEKERJAAN ARSITEK


3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 1,687,190,324.21
3.2.PEKERJAAN PENUTUP LANTAI 878,321,455.34
3.3.PEKERJAAN PASANGAN PINTU DAN JENDELA 2,219,192,710.00
3.4.PEKERJAAN PENUTUP LANGIT-LANGIT (PLAFOND 513,510,735.39
3.5.PEKERJAAN PASANGAN SANITAIR 147,215,670.00
3.6.PEKERJAAN PENGECATAN 165,298,360.93
3.7.PEKERJAAN RAILLING DAN HAND RAILLING 70,538,839.50
III.PEKERJAAN ARSITEK 5,681,268,095.37

IV. PEKERJAAN PLUMBING


4.1.PEKERJAAN AIR BERSIH 280,953,777.31
4.2.PEKERJAAN AIR BERSIH (RECYCLING) 259,882,588.08
4.3.PEKERJAAN AIR KOTOR 152,774,780.18
4.4. PEKERJAAN AIR HUJAN 39,223,598.89
IV.PEKERJAAN PLUMBING 732,834,744.46

V. PEKERJAAN ELEKTRIKAL ARUS KUAT


5.1.PEKERJAAN PANEL DAN KABEL FEEDER 237,667,545.00
5.2.PEKERJAAN RAK KABEL 66,463,809.06
5.3.PEKERJAAN LAMPU PENERANGAN, STOP KONTAK 407,173,030.00
V.PEKERJAAN ELEKTRIKAL ARUS KUAT 711,304,384.06
JUMLAH PEKERJAAN STANDAR STANDAR 11,913,000,420.20

REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG ASRAMA MAHASISWA
TAHUN ANGGARAN 2017-2019

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
1.1.PEKERJAAN PONDASI KONSTRUKSI SARANG LABA 2,001,057,547.50

JUMLAH I.PEKERJAAN STRUKTUR 2,001,057,547.50

II. PEKERJAAN ARSITEK


2.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 1,059,664,941.74
2.2.PEKERJAAN PASANGAN PINTU DAN JENDELA 304,147,020.00
JUMLAH II.PEKERJAAN ARSITEK 1,363,811,961.74

III. PEKERJAAN MEKANIKAL


3.1.PEKERJAAN HYDRANT 328,412,993.88
JUMLAH III.PEKERJAAN MEKANIKAL 328,412,993.88

IV. PEKERJAAN TATA UDARA


4.1.PEKERJAAN VENTILASI 169,977,249.85
JUMLAH IV.PEKERJAAN TATA UDARA 169,977,249.85

V. PEKERJAAN PENANGKAL PETIR ( Electro Statis ) 60,573,237.00

JUMLAH V.PEKERJAAN PENANGKAL PETIR ( El 60,573,237.00

VI. PEKERJAAN ELEKTRONIC


6.1.PEKERJAAN TATA SUARA 221,397,155.00
6.2.PEKERJAAN FIRE ALARM 245,859,661.98
6.3.PEKERJAAN ICT 197,767,590.00
6.4.PEKERJAAN MASTER CLOCK 48,006,400.00
6.5.PEKERJAAN BUILDING AUTOMATION SYSTEM 390,696,280.00
1,103,727,086.98

JUMLAH PEKERJAAN NON STANDAR 5,027,560,076.94


REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG ASRAMA MAHASISWI
TAHUN ANGGARAN 2017-2019 MC - 0 OKE

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN 6,732,680.00


I.PEKERJAAN PERSIAPAN 6,732,680.00

II. PEKERJAAN STRUKTUR


2.1.PEKERJAAN STRUKTUR ATAS
A. LANTAI 1 485,288,170.61
B. LANTAI 2 1,197,330,773.18
C. LANTAI 3 1,136,633,210.11
D. LANTAI 4 1,027,521,098.58
E. LANTAI ATAP 668,138,685.16
F. LANTAI ATAP 1 316,596,399.78
II.PEKERJAAN STRUKTUR 4,831,508,337.41

III. PEKERJAAN ARSITEK


3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 1,687,190,324.21
3.2.PEKERJAAN PENUTUP LANTAI 898,846,766.24
3.3.PEKERJAAN PASANGAN PINTU DAN JENDELA 2,219,192,710.00
3.4.PEKERJAAN PENUTUP LANGIT-LANGIT (PLAFOND 492,985,424.49
3.5.PEKERJAAN PASANGAN SANITAIR 147,215,670.00
3.6.PEKERJAAN PENGECATAN 165,298,360.93
3.7.PEKERJAAN RAILLING DAN HAND RAILLING 70,538,839.50
III.PEKERJAAN ARSITEK 5,681,268,095.37

IV. PEKERJAAN PLUMBING


4.1.PEKERJAAN AIR BERSIH 286,258,699.33
4.2.PEKERJAAN AIR BERSIH (RECYCLING) 259,739,588.08
4.3.PEKERJAAN AIR KOTOR 151,868,980.18
4.4. PEKERJAAN AIR HUJAN 51,840,718.89
IV.PEKERJAAN PLUMBING 749,707,986.47

V. PEKERJAAN ELEKTRIKAL ARUS KUAT


5.1.PEKERJAAN PANEL DAN KABEL FEEDER 285,238,790.00
5.2.PEKERJAAN RAK KABEL 66,463,809.06
5.3.PEKERJAAN LAMPU PENERANGAN, STOP KONTAK 408,761,500.00
V.PEKERJAAN ELEKTRIKAL ARUS KUAT 760,464,099.06
JUMLAH PEKERJAAN STANDAR STANDAR 12,029,681,198.32

REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG ASRAMA MAHASISWI
TAHUN ANGGARAN 2017-2019

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
1.1.PEKERJAAN PONDASI KONSTRUKSI SARANG LABA 2,001,057,547.50

JUMLAH I.PEKERJAAN STRUKTUR 2,001,057,547.50

II. PEKERJAAN ARSITEK


2.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 1,059,664,941.74
2.2.PEKERJAAN PASANGAN PINTU DAN JENDELA 304,147,020.00
JUMLAH II.PEKERJAAN ARSITEK 1,363,811,961.74

III. PEKERJAAN MEKANIKAL


3.1.PEKERJAAN HYDRANT 345,429,201.43
JUMLAH III.PEKERJAAN MEKANIKAL 345,429,201.43

IV. PEKERJAAN TATA UDARA


4.1.PEKERJAAN VENTILASI 169,976,864.85
JUMLAH IV.PEKERJAAN TATA UDARA 169,976,864.85

V. PEKERJAAN PENANGKAL PETIR ( Electro Statis ) 60,573,237.00

JUMLAH V.PEKERJAAN PENANGKAL PETIR ( El 60,573,237.00

VI. PEKERJAAN ELEKTRONIC


6.1.PEKERJAAN TATA SUARA 221,397,155.00
6.2.PEKERJAAN FIRE ALARM 245,859,661.98
6.3.PEKERJAAN ICT 177,098,425.00
6.4.PEKERJAAN MASTER CLOCK 48,006,400.00
6.5.PEKERJAAN BUILDING AUTOMATION SYSTEM 390,696,280.00
1,083,057,921.98

JUMLAH PEKERJAAN NON STANDAR 5,023,906,734.49


REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG FAKULTAS HUKUM
TAHUN ANGGARAN 2017-2019 MC - 0 OKE

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN 10,891,100.00


I.PEKERJAAN PERSIAPAN 10,891,100.00

II. PEKERJAAN STRUKTUR


2.1.PEKERJAAN STRUKTUR ATAS
A. LANTAI 1 821,462,648.67
B. LANTAI 2 1,875,264,068.82
C. LANTAI 3 1,720,700,085.40
D. LANTAI 4 1,705,952,455.69
E. LANTAI ATAP 1,703,327,887.14
F. LANTAI ATAP 1 737,683,829.18
II.PEKERJAAN STRUKTUR 8,564,390,974.91

III. PEKERJAAN ARSITEK


3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 1,873,374,017.35
3.2.PEKERJAAN PENUTUP LANTAI 1,275,871,644.40
3.3.PEKERJAAN PASANGAN PINTU DAN JENDELA 5,119,785,110.00
3.4.PEKERJAAN PENUTUP LANGIT-LANGIT (PLAFOND 513,898,286.57
3.5.PEKERJAAN PASANGAN SANITAIR 205,095,230.00
3.6.PEKERJAAN PENGECATAN 240,385,961.15
3.7.PEKERJAAN RAILLING DAN HAND RAILLING 285,501,450.00
III.PEKERJAAN ARSITEK 9,513,911,699.47

IV. PEKERJAAN PLUMBING


4.1.PEKERJAAN AIR BERSIH 247,735,700.83
4.2.PEKERJAAN AIR BERSIH (RECYCLING) 233,024,422.64
4.3.PEKERJAAN AIR KOTOR 164,654,657.77
4.4. PEKERJAAN AIR HUJAN 104,867,515.44
IV.PEKERJAAN PLUMBING 750,282,296.68

V. PEKERJAAN ELEKTRIKAL ARUS KUAT


5.1.PEKERJAAN PANEL DAN KABEL FEEDER 349,928,495.00
5.2.PEKERJAAN RAK KABEL 73,080,417.30
5.3.PEKERJAAN LAMPU PENERANGAN, STOP KONTAK 1,020,994,945.00
V.PEKERJAAN ELEKTRIKAL ARUS KUAT 1,444,003,857.30
JUMLAH PEKERJAAN STANDAR STANDAR 20,283,479,928.36

REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG FAKULTAS HUKUM
TAHUN ANGGARAN 2017-2019

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
1.1.PEKERJAAN PONDASI KONSTRUKSI SARANG LABA 3,344,284,625.00

JUMLAH I.PEKERJAAN STRUKTUR 3,344,284,625.00

II. PEKERJAAN ARSITEK


2.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 3,656,440,632.92
2.2.PEKERJAAN PASANGAN PINTU DAN JENDELA 70,300,320.00
JUMLAH II.PEKERJAAN ARSITEK 3,726,740,952.92

III. PEKERJAAN MEKANIKAL


3.1.PEKERJAAN HYDRANT 393,946,007.17
JUMLAH III.PEKERJAAN MEKANIKAL 393,946,007.17

IV. PEKERJAAN TATA UDARA


4.1.PEKERJAAN AIR CONDITIONING 2,511,387,975.70
4.2.PEKERJAAN VENTILASI 169,760,632.49
JUMLAH IV.PEKERJAAN TATA UDARA 2,681,148,608.19

V. PEKERJAAN PENGADAAN DAN PEMASANGAN ELEV 554,772,325.00

JUMLAH V.PEKERJAAN PENGADAAN DAN 554,772,325.00

VI. PEKERJAAN PENANGKAL PETIR ( Electro Statis ) 60,573,237.00

JUMLAH VI.PEKERJAAN PENANGKAL PETIR ( El 60,573,237.00

VII. PEKERJAAN ELEKTRONIC


7.1.PEKERJAAN TATA SUARA 299,080,995.00
7.2.PEKERJAAN FIRE ALARM 280,228,582.23
7.3.PEKERJAAN ICT 1,468,604,260.00
7.4.PEKERJAAN MASTER CLOCK 66,296,980.00
7.5.PEKERJAAN BUILDING AUTOMATION SYSTEM 358,821,900.00
JUMLAH VII.PEKERJAAN ELEKTRONIC 2,473,032,717.23
JUMLAH PEKERJAAN NON STANDAR 13,234,498,472.51
REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG AUDITORIUM
TAHUN ANGGARAN 2017-2019 MC - 0 OKE

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN 17,574,275.00


I.PEKERJAAN PERSIAPAN 17,574,275.00

II. PEKERJAAN STRUKTUR


2.1.PEKERJAAN STRUKTUR ATAS
A. LANTAI 1 1,171,490,971.54
B. LANTAI 2 2,865,030,911.37
C. LANTAI 3 1,020,163,779.62
D. LANTAI DAK ATAP 1 2,832,028,027.34
E. LANTAI ATAP 1 389,610,347.35
F.TUMPUAN PIPA BAJA 87,912,924.75
II.PEKERJAAN STRUKTUR 8,366,236,961.97

III. PEKERJAAN ARSITEK


3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 2,374,220,165.27
3.2.PEKERJAAN PENUTUP LANTAI 1,025,303,542.61
3.3.PEKERJAAN PASANGAN PINTU DAN JENDELA 3,766,061,270.00
3.4.PEKERJAAN PENUTUP LANGIT-LANGIT (PLAFOND 695,709,702.24
3.5.PEKERJAAN PASANGAN SANITAIR 243,241,442.02
3.6.PEKERJAAN PENGECATAN 211,663,796.62
3.7.PEKERJAAN RAILLING DAN HAND RAILLING 47,195,100.00
III.PEKERJAAN ARSITEK 8,363,395,018.76

IV. PEKERJAAN PLUMBING


4.1.PEKERJAAN AIR BERSIH 286,873,414.08
4.2.PEKERJAAN AIR RECYCLING 278,713,912.09
4.3.PEKERJAAN AIR KOTOR 176,640,061.65
4.4.PEKERJAAN AIR HUJAN 51,830,125.52
IV.PEKERJAAN PLUMBING 794,057,513.34

V. PEKERJAAN ELEKTRIKAL ARUS KUAT


5.1.PEKERJAAN PANEL DAN KABEL FEEDER 266,958,225.00
5.2.PEKERJAAN RAK KABEL 109,670,063.25
5.3.PEKERJAAN LAMPU PENERANGAN, STOP KONTAK 949,219,235.00
V.PEKERJAAN ELEKTRIKAL ARUS KUAT 1,325,847,523.25
JUMLAH PEKERJAAN STANDAR 18,867,111,292.33

REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG AUDITORIUM
TAHUN ANGGARAN 2017-2019

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
1.1.PEKERJAAN PONDASI KONSTRUKSI SARANG LABA 7,498,077,597.00
1.2.PEKERJAAN KONSTRUKSI ATAP 7,295,416,500.00
JUMLAH PEKERJAAN NON STANDAR 14,793,494,097.00

II. PEKERJAAN ARSITEK


2.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 5,936,209,517.64
2.2.PEKERJAAN PASANGAN PINTU DAN JENDELA 166,223,430.00
2.3.PEKERJAAN KURSI TRIBUN 2,587,200,000.00
JUMLAH II.PEKERJAAN ARSITEK 8,689,632,947.64

III. PEKERJAAN HYDRANT DAN SPRINKLER

A. PEKERJAAN HYDRANT DAN SPRINKLER 144,274,189.00

JUMLAH III.PEKERJAAN HYDRANT DAN SPRI 144,274,189.00

IV. PEKERJAAN TATA UDARA DAN VENTILASI UDARA


4.1.PEKERJAAN AIR CONDITIONING 1,500,416,003.83
4.2.PEKERJAAN VENTILASI 283,075,791.15
JUMLAH IV.PEKERJAAN TATA UDARA DAN 1,783,491,794.98

V. PEKERJAAN PENANGKAL PETIR ( Electro Statis ) 60,573,237.00

JUMLAH V.PEKERJAAN PENANGKAL PETIR ( El 60,573,237.00

VI. PEKERJAAN ELEKTRONIC


6.1.PEKERJAAN TATA SUARA 272,896,455.00
6.2.PEKERJAAN FIRE ALARM 277,376,488.75
6.3.PEKERJAAN ICT 833,161,600.00
6.4.PEKERJAAN MASTER CLOCK 52,351,050.00
6.5.PEKERJAAN BUILDING AUTOMATION SYSTEM 297,153,235.00
JUMLAH VI.PEKERJAAN ELEKTRONIC 1,732,938,828.75

JUMLAH PEKERJAAN NON STANDAR 27,204,405,094.36


REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG REKTORAT
TAHUN ANGGARAN 2017-2019 MC - 0 OKE

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN 11,188,130.00


I.PEKERJAAN PERSIAPAN 11,188,130.00

II. PEKERJAAN STRUKTUR


2.1.PEKERJAAN TANAH 123,839,713.80
2.2.PEKERJAAN STRUKTUR BAWAH 1,577,468,315.70
2.3.PEKERJAAN STRUKTUR ATAS
A. LANTAI 1 1,952,251,907.74
B. LANTAI 2 2,591,428,962.22
C. LANTAI 3 2,306,138,318.39
D. LANTAI 4 2,374,580,083.83
E. LANTAI ATAP 2,079,631,538.68
F. LANTAI MENARA 1 329,816,540.75
G. LANTAI MENARA 2 248,646,841.63
H. LANTAI MENARA 3 230,480,866.96
I. LANTAI MENARA 4 203,384,767.81
J. LANTAI MENARA 5 194,849,717.84
K. LANTAI MENARA 6 186,455,453.66
L. LANTAI MENARA 7 378,279,216.75
M.LANTAI MENARA 8 305,088,175.09
N. LANTAI MENARA 9 62,923,447.59
O.PEKERJAAN ATAP 2,206,666,701.24
II.PEKERJAAN STRUKTUR 17,351,930,569.69

III. PEKERJAAN ARSITEK


3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 2,990,589,996.12
3.2.PEKERJAAN PASANGAN LANTAI 1,668,378,592.14
3.3.PEKERJAAN PENUTUP LANGIT-LANGIT (PLAFOND 1,121,356,384.95
3.4.PEKERJAAN PASANGAN PINTU DAN JENDELA 3,790,958,770.00
3.5.PEKERJAAN PASANGAN SANITAIR 220,737,301.10
3.6.PEKERJAAN PENGECATAN 266,653,942.69
3.7.PEKERJAAN RAILLING DAN HAND RAILLING 377,600,319.90
3.8.PEKERJAAN PENUTUP ATAP 660,959,196.00
III.PEKERJAAN ARSITEK 11,097,234,502.91

IV. PEKERJAAN PLUMBING


4.1.PEKERJAAN AIR BERSIH 292,068,836.72
4.2.PEKERJAAN AIR RECYCLING 280,647,779.70
4.3.PEKERJAAN AIR KOTOR 213,410,339.64
4.4.PEKERJAAN AIR HUJAN 331,257,851.17
IV.PEKERJAAN PLUMBING 1,117,384,807.22

V. PEKERJAAN ELEKTRIKAL ARUS KUAT


5.1.PEKERJAAN PANEL DAN KABEL FEEDER 437,673,755.00
5.2.PEKERJAAN RAK KABEL 217,690,739.64
5.3.PEKERJAAN LAMPU PENERANGAN, STOP KONTAK 1,286,246,790.00
V.PEKERJAAN ELEKTRIKAL ARUS KUAT 1,941,611,284.64

JUMLAH PEKERJAAN STANDAR 31,519,349,294.45

REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG REKTORAT
TAHUN ANGGARAN 2017-2019

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
1.1.PEKERJAAN PONDASI TIANG PANCANG 3,132,270,126.36
1.2.PEKERJAAN WATERPROOFING TOILET 383,489,268.37
JUMLAH I.PEKERJAAN STRUKTUR 3,515,759,394.73

II. PEKERJAAN ARSITEK


2.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 4,241,251,619.54
2.2.PEKERJAAN PASANGAN PINTU DAN JENDELA 2,410,689,978.00
JUMLAH II.PEKERJAAN ARSITEK 6,651,941,597.54

III. PEKERJAAN HYDRANT DAN SPRINKLER

3.1.PEKERJAAN HYDRANT DAN SPRINKLER 542,246,410.69

JUMLAH III.PEKERJAAN HYDRANT DAN SPRI 542,246,410.69

IV. PEKERJAAN TATA UDARA DAN VENTILASI UDARA


4.1.PEKERJAAN AIR CONDITIONING 2,492,035,075.00
4.2.PEKERJAAN VENTILASI 127,572,863.50
JUMLAH IV.PEKERJAAN TATA UDARA DAN 2,619,607,938.50

V. PEKERJAAN ELEVATOR 1,142,503,300.00

JUMLAH V.PEKERJAAN ELEVATOR 1,142,503,300.00


VI. PEKERJAAN PENANGKAL PETIR ( Electro Statis ) 60,573,237.00

JUMLAH VI.PEKERJAAN PENANGKAL PETIR ( El 60,573,237.00

VII. PEKERJAAN ELEKTRONIC


7.1.PEKERJAAN TATA SUARA 374,243,040.00
7.2.PEKERJAAN FIRE ALARM 307,321,255.00
7.3.PEKERJAAN ICT 2,323,991,790.00
7.4.PEKERJAAN MASTER CLOCK 168,531,275.00
7.5.PEKERJAAN BUILDING AUTOMATION SYSTEM 468,013,430.00
3,642,100,790.00

18,174,732,668.46
REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG FISIP
TAHUN ANGGARAN 2017-2019 MC - 0 OKE

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN 9,287,138.00


I.PEKERJAAN PERSIAPAN 9,287,138.00

II. PEKERJAAN STRUKTUR


2.1.PEKERJAAN STRUKTUR ATAS
A. LANTAI 1 771,276,750.59
B. LANTAI 2 1,670,069,517.28
C. LANTAI 3 1,612,987,499.22
D. LANTAI 4 1,545,547,469.30
E. LANTAI ATAP 1,532,488,529.70
F. LANTAI ATAP 1 174,406,318.26
G. LANTAI ATAP 2 836,873,691.18
II.PEKERJAAN STRUKTUR 8,143,649,775.54

III. PEKERJAAN ARSITEK


3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 3,066,267,212.99
3.2.PEKERJAAN PENUTUP LANTAI 1,642,682,543.67
3.3.PEKERJAAN PASANGAN PINTU DAN JENDELA 4,577,835,670.00
3.4.PEKERJAAN PENUTUP LANGIT-LANGIT (PLAFOND 558,208,756.20
3.5.PEKERJAAN PASANGAN SANITAIR 202,529,950.00
3.6.PEKERJAAN PENGECATAN 200,535,603.66
3.7.PEKERJAAN RAILLING DAN HAND RAILLING 80,257,500.00
III.PEKERJAAN ARSITEK 10,328,317,236.53

IV. PEKERJAAN PLUMBING


4.1.PEKERJAAN AIR BERSIH 243,672,431.77
4.2.PEKERJAAN AIR RECYCLING 342,404,114.71
4.3.PEKERJAAN AIR KOTOR 162,298,751.62
4.4. PEKERJAAN AIR HUJAN 116,955,317.42
IV.PEKERJAAN PLUMBING 865,330,615.52

V. PEKERJAAN ELEKTRIKAL ARUS KUAT


5.1.PEKERJAAN PANEL DAN KABEL FEEDER 350,084,365.00
5.2.PEKERJAAN RAK KABEL 88,682,562.54
5.3.PEKERJAAN LAMPU PENERANGAN, STOP KONTAK 946,406,945.00
V.PEKERJAAN ELEKTRIKAL ARUS KUAT 1,385,173,872.54
JUMLAH PEKERJAAN STANDAR STANDAR 20,731,758,638.13

REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG FISIP
TAHUN ANGGARAN 2017-2019

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
1.1.PEKERJAAN PONDASI KONSTRUKSI SARANG LABA 3,189,668,625.00

JUMLAH PEKERJAAN NON STANDAR 3,189,668,625.00

II. PEKERJAAN ARSITEK


2.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 2,719,031,828.82
2.2.PEKERJAAN PASANGAN PINTU DAN JENDELA 255,790,800.00
JUMLAH II.PEKERJAAN ARSITEK 2,974,822,628.82

III. PEKERJAAN MEKANIKAL


3.1.PEKERJAAN HYDRANT 330,473,928.61
JUMLAH III.PEKERJAAN MEKANIKAL 330,473,928.61

IV. PEKERJAAN TATA UDARA


4.1.PEKERJAAN AIR CONDITIONING 2,359,292,887.71
4.2.PEKERJAAN VENTILASI 79,559,826.10
JUMLAH IV.PEKERJAAN TATA UDARA 2,438,852,713.81

V. PEKERJAAN PENGADAAN DAN PEMASANGAN ELEV 554,772,325.00

JUMLAH V.PEKERJAAN PENGADAAN DAN 554,772,325.00

VI. PEKERJAAN PENANGKAL PETIR ( Electro Statis ) 60,573,237.00

JUMLAH VI.PEKERJAAN PENANGKAL PETIR ( El 60,573,237.00

VII. PEKERJAAN ELEKTRONIC


7.1.PEKERJAAN TATA SUARA 271,949,310.00
7.2.PEKERJAAN FIRE ALARM 287,884,507.00
7.3.PEKERJAAN ICT 2,120,460,695.00
7.4.PEKERJAAN MASTER CLOCK 116,019,715.00
7.5.PEKERJAAN BUILDING AUTOMATION SYSTEM 384,018,840.00
JUMLAH VII.PEKERJAAN ELEKTRONIC 3,180,333,067.00

JUMLAH PEKERJAAN NON STANDAR 12,729,496,525.23


REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG LAB TERPADU KETAHANAN PANGAN
TAHUN ANGGARAN 2017-2019 MC - 0 OKE

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN 13,366,350.00


I.PEKERJAAN PERSIAPAN 13,366,350.00

II. PEKERJAAN STRUKTUR


2.1.PEKERJAAN STRUKTUR ATAS
A. LANTAI Elv. +4.40m 346,438,418.75
B. LANTAI DAK 2,816,571,937.59
C. LANTAI RB 1 184,604,651.00
D. LANTAI RB 2 125,257,018.65
E.TUMPUAN PIPA BAJA 85,564,943.10
II.PEKERJAAN STRUKTUR 3,558,436,969.09

III. PEKERJAAN ARSITEK


3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 990,853,994.63
3.2.PEKERJAAN PENUTUP LANTAI 78,576,504.30
3.3.PEKERJAAN PASANGAN PINTU DAN JENDELA 2,739,869,795.00
3.4.PEKERJAAN PENUTUP LANGIT-LANGIT (PLAFOND 615,462,649.74
3.5.PEKERJAAN PASANGAN SANITAIR 49,757,590.00
3.6.PEKERJAAN PENGECATAN 201,077,670.82
III.PEKERJAAN ARSITEK 4,675,598,204.49

IV. PEKERJAAN PLUMBING


4.1.PEKERJAAN AIR BERSIH 234,225,804.73
4.2.PEKERJAAN AIR RECYCLING 224,145,113.46
4.3.PEKERJAAN AIR KOTOR 509,626,248.00
4.4.PEKERJAAN AIR HUJAN 46,885,650.87
IV.PEKERJAAN PLUMBING 1,014,882,817.06

V. PEKERJAAN ELEKTRIKAL ARUS KUAT


5.1.PEKERJAAN PANEL DAN KABEL FEEDER 165,476,200.00
5.2.PEKERJAAN RAK KABEL 90,614,846.08
5.3.PEKERJAAN LAMPU PENERANGAN, STOP KONTAK 609,696,595.00
V.PEKERJAAN ELEKTRIKAL ARUS KUAT 865,787,641.08

JUMLAH PEKERJAAN STANDAR 10,128,071,981.72


REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG LAB TERPADU KETAHANAN PANGAN
TAHUN ANGGARAN 2017-2019

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
1.1.PEKERJAAN PONDASI KONSTRUKSI SARANG LABA 7,030,679,652.00
1.2.PEKERJAAN KONSTRUKSI ATAP 4,601,589,250.00
JUMLAH I.PEKERJAAN STRUKTUR 11,632,268,902.00

II. PEKERJAAN ARSITEK


2.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 3,403,316,149.08
2.2.PEKERJAAN PASANGAN PINTU DAN JENDELA 623,951,940.00
2.3.PEKERJAAN AREA LABORATORIUM (MEJA & SCR 8,708,669,125.00
JUMLAH II.PEKERJAAN ARSITEK 12,735,937,214.08

III. PEKERJAAN HYDRANT DAN SPRINKLER

A. PEKERJAAN HYDRANT DAN SPRINKLER 225,571,255.95

JUMLAH III.PEKERJAAN HYDRANT DAN SPRI 225,571,255.95

IV. PEKERJAAN TATA UDARA DAN VENTILASI UDARA


A. PEKERJAAN AIR CONDITIONING 523,600,532.13
B. PEKERJAAN VENTILASI 44,761,618.35
JUMLAH IV.PEKERJAAN TATA UDARA DAN 568,362,150.48

V. PEKERJAAN PENANGKAL PETIR ( Electro Statis ) 60,573,237.00

JUMLAH V.PEKERJAAN PENANGKAL PETIR ( El 60,573,237.00

VI. PEKERJAAN ELEKTRONIC


6.1.PEKERJAAN TATA SUARA 213,138,085.00
6.2.PEKERJAAN FIRE ALARM 216,289,583.50
6.3.PEKERJAAN ICT 581,310,125.00
6.4.PEKERJAAN MASTER CLOCK 48,023,050.00
6.5.PEKERJAAN BUILDING AUTOMATION SYSTEM 217,948,270.00
JUMLAH VI.PEKERJAAN ELEKTRONIC 1,276,709,113.50

JUMLAH PEKERJAAN NON STANDAR 26,499,421,873.01


REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG FAKULTAS PERTANIAN
TAHUN ANGGARAN 2017-2019 MC - 0 OKE

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN 11,683,180.00


I.PEKERJAAN PERSIAPAN 11,683,180.00

II. PEKERJAAN STRUKTUR


2.1.PEKERJAAN STRUKTUR ATAS
A. LANTAI 1 892,722,884.25
B. LANTAI 2 2,093,948,817.01
C. LANTAI 3 1,981,602,150.27
D. LANTAI 4 1,932,613,270.54
E. LANTAI ATAP 2,065,188,735.66
F. LANTAI ATAP 1 1,036,304,565.11
II.PEKERJAAN STRUKTUR 10,002,380,422.83

III. PEKERJAAN ARSITEK


3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 2,282,409,693.40
3.2.PEKERJAAN PENUTUP LANTAI 1,735,373,718.33
3.3.PEKERJAAN PASANGAN PINTU DAN JENDELA 4,078,111,525.42
3.4.PEKERJAAN PENUTUP LANGIT-LANGIT (PLAFOND 1,070,028,217.09
3.5.PEKERJAAN PASANGAN SANITAIR 202,529,950.00
3.6.PEKERJAAN PENGECATAN 207,734,037.80
3.7.PEKERJAAN RAILLING DAN HAND RAILLING 337,266,000.00
III.PEKERJAAN ARSITEK 9,913,453,142.04

IV. PEKERJAAN PLUMBING


4.1.PEKERJAAN AIR BERSIH 252,187,873.03
4.2.PEKERJAAN AIR RECYCLING 222,969,679.40
4.3.PEKERJAAN AIR KOTOR 325,577,031.67
4.4.PEKERJAAN AIR HUJAN 87,845,945.92
IV.PEKERJAAN PLUMBING 888,580,530.01

V. PEKERJAAN ELEKTRIKAL ARUS KUAT


5.1.PEKERJAAN PANEL DAN KABEL FEEDER 392,961,745.00
5.2.PEKERJAAN RAK KABEL 121,915,406.91
5.3.PEKERJAAN LAMPU PENERANGAN, STOP KONTAK 1,390,411,990.00
V.PEKERJAAN ELEKTRIKAL ARUS KUAT 1,905,289,141.91
JUMLAH PEKERJAAN STANDAR 22,721,386,416.80

REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG FAKULTAS PERTANIAN
TAHUN ANGGARAN 2017-2019

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
1.1.PEKERJAAN PONDASI KONSTRUKSI SARANG LABA 4,027,631,025.00
JUMLAH I.PEKERJAAN STRUKTUR 4,027,631,025.00

II. PEKERJAAN ARSITEK


2.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 3,795,165,697.08
2.2.PEKERJAAN PASANGAN PINTU DAN JENDELA 229,786,140.00
2.3.PEKERJAAN AREA LABORATORIUM (MEJA & SCR 7,305,741,515.00
JUMLAH II.PEKERJAAN ARSITEK 11,330,693,352.08

III. PEKERJAAN HYDRANT DAN SPRINKLER

A. PEKERJAAN HYDRANT DAN SPRINKLER 519,555,558.36

JUMLAH III.PEKERJAAN HYDRANT DAN SPRI 519,555,558.36

IV. PEKERJAAN TATA UDARA DAN VENTILASI UDARA


A. PEKERJAAN AIR CONDITIONING 2,854,956,810.00
B. PEKERJAAN VENTILASI 139,324,056.25
JUMLAH IV.PEKERJAAN TATA UDARA DAN 2,994,280,866.25

V. PEKERJAAN ELEVATOR 554,772,325.00

JUMLAH V.PEKERJAAN ELEVATOR 554,772,325.00

VI. PEKERJAAN PENANGKAL PETIR ( Electro Statis ) 60,573,237.00

JUMLAH VI.PEKERJAAN PENANGKAL PETIR ( El 60,573,237.00

VII. PEKERJAAN ELEKTRONIC


7.1.PEKERJAAN TATA SUARA 301,343,925.00
7.2.PEKERJAAN FIRE ALARM 315,354,142.00
7.3.PEKERJAAN ICT 1,535,051,570.00
7.4.PEKERJAAN MASTER CLOCK 50,269,920.00
7.5.PEKERJAAN BUILDING AUTOMATION SYSTEM 1,553,521,220.00
JUMLAH VII.PEKERJAAN ELEKTRONIC 3,755,540,777.00
JUMLAH PEKERJAAN NON STANDAR 23,243,047,140.69
REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG PERPUSTAKAAN
TAHUN ANGGARAN 2017-2019 MC - 0 OKE

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN 9,306,940.00


I.PEKERJAAN PERSIAPAN 9,306,940.00

II. PEKERJAAN STRUKTUR


2.1.PEKERJAAN TANAH 90,150,459.95
2.2.PEKERJAAN STRUKTUR BAWAH 862,871,771.83
2.3.PEKERJAAN STRUKTUR ATAS
A. LANTAI 1 1,116,702,813.90
B. LANTAI 2 1,414,338,294.57
C. LANTAI 3 1,252,926,852.42
D. LANTAI 4 1,261,448,819.21
E. LANTAI ATAP 888,962,100.84
F. LANTAI ATAP 1 268,002,609.95
II.PEKERJAAN STRUKTUR 7,155,403,722.67

III. PEKERJAAN ARSITEK


3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 2,089,521,276.76
3.2.PEKERJAAN PENUTUP LANTAI 1,117,012,488.96
3.3.PEKERJAAN PASANGAN PINTU DAN JENDELA 3,685,321,375.00
3.4.PEKERJAAN PENUTUP LANGIT-LANGIT (PLAFOND 468,226,272.78
3.5.PEKERJAAN PASANGAN SANITAIR 202,529,950.00
3.6.PEKERJAAN PENGECATAN 195,488,698.53
3.7.PEKERJAAN RAILLING DAN HAND RAILLING 113,221,500.00
3.8.PEKERJAAN PENUTUP ATAP 430,667,280.00
III.PEKERJAAN ARSITEK 8,301,988,842.04

IV. PEKERJAAN PLUMBING


4.1.PEKERJAAN AIR BERSIH 267,040,930.95
4.2.PEKERJAAN AIR BERSIH (RECYCLING) 256,100,551.07
4.3.PEKERJAAN AIR KOTOR 151,620,643.66
4.4. PEKERJAAN AIR HUJAN 92,861,112.20
IV.PEKERJAAN PLUMBING 767,623,237.88

V. PEKERJAAN ELEKTRIKAL ARUS KUAT


5.1.PEKERJAAN PANEL DAN KABEL FEEDER 332,198,540.00
5.2.PEKERJAAN RAK KABEL 136,230,562.96
5.3.PEKERJAAN LAMPU PENERANGAN, STOP KONTAK 717,963,405.00
V.PEKERJAAN ELEKTRIKAL ARUS KUAT 1,186,392,507.96

JUMLAH PEKERJAAN STANDAR STANDAR 17,420,715,250.55

REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG PERPUSTAKAAN
TAHUN ANGGARAN 2017-2019

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
1.1.PEKERJAAN PONDASI TIANG PANCANG 1,610,008,012.44
JUMLAH I.PEKERJAAN STRUKTUR 1,610,008,012.44

II. PEKERJAAN ARSITEK


2.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 1,906,532,643.12
2.2.PEKERJAAN PASANGAN PINTU DAN JENDELA 250,300,080.00
JUMLAH II.PEKERJAAN ARSITEK 2,156,832,723.12

III. PEKERJAAN MEKANIKAL


3.1.PEKERJAAN HYDRANT 324,123,149.69
JUMLAH III.PEKERJAAN MEKANIKAL 324,123,149.69

IV. PEKERJAAN TATA UDARA


4.1.PEKERJAAN AIR CONDITIONING 1,327,831,092.67
4.2.PEKERJAAN VENTILASI 169,291,326.58
JUMLAH IV.PEKERJAAN TATA UDARA 1,497,122,419.24

V. PEKERJAAN PENGADAAN DAN PEMASANGAN ELEV 630,994,175.00

JUMLAH V.PEKERJAAN PENGADAAN DAN 630,994,175.00

VI. PEKERJAAN PENANGKAL PETIR ( Electro Statis ) 60,573,237.00

JUMLAH VI.PEKERJAAN PENANGKAL PETIR ( El 60,573,237.00

VII. PEKERJAAN ELEKTRONIC


7.1.PEKERJAAN TATA SUARA 262,809,625.00
7.2.PEKERJAAN FIRE ALARM 265,239,572.00
7.3.PEKERJAAN ICT 4,467,791,060.00
7.4.PEKERJAAN MASTER CLOCK 156,250,645.00
7.5.PEKERJAAN BUILDING AUTOMATION SYSTEM 606,489,915.00
JUMLAH VII.PEKERJAAN ELEKTRONIC 5,758,580,817.00
JUMLAH PEKERJAAN NON STANDAR 12,038,234,533.49
REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG KULIAH TERPADU
TAHUN ANGGARAN 2017-2019 MC - 0 OKE

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN 10,148,525.00


I.PEKERJAAN PERSIAPAN 10,148,525.00

II. PEKERJAAN STRUKTUR


2.1.PEKERJAAN TANAH 123,664,732.96
2.2.PEKERJAAN STRUKTUR BAWAH 1,118,852,166.56
2.3.PEKERJAAN STRUKTUR ATAS
A. LANTAI 1 1,356,190,596.89
B. LANTAI 2 1,877,837,523.88
C. LANTAI 3 1,687,573,428.22
D. LANTAI 4 1,585,832,427.71
E. LANTAI ATAP 1,157,654,874.38
F. LANTAI ATAP 1 285,841,412.20
II.PEKERJAAN STRUKTUR 9,193,447,162.80

III. PEKERJAAN ARSITEK


3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 3,366,995,285.32
3.2.PEKERJAAN PENUTUP LANTAI 1,452,104,573.15
3.3.PEKERJAAN PASANGAN PINTU DAN JENDELA 3,251,500,625.00
3.4.PEKERJAAN PENUTUP LANGIT-LANGIT (PLAFOND 776,578,767.81
3.5.PEKERJAAN PASANGAN SANITAIR 202,529,950.00
3.6.PEKERJAAN PENGECATAN 234,573,163.66
3.7.PEKERJAAN RAILLING DAN HAND RAILLING 80,872,500.00
3.8.PEKERJAAN PENUTUP ATAP 440,394,500.00
III.PEKERJAAN ARSITEK 9,805,549,364.95

IV. PEKERJAAN PLUMBING


4.1.PEKERJAAN AIR BERSIH 267,442,397.22
4.2.PEKERJAAN AIR BERSIH (RECYCLING) 267,405,103.07
4.3.PEKERJAAN AIR KOTOR 107,217,145.30
4.4. PEKERJAAN AIR HUJAN 77,720,655.22
IV.PEKERJAAN PLUMBING 719,785,300.81

V. PEKERJAAN ELEKTRIKAL ARUS KUAT


5.1.PEKERJAAN PANEL DAN KABEL FEEDER 345,689,310.00
5.2.PEKERJAAN RAK KABEL 110,217,824.89
5.3.PEKERJAAN LAMPU PENERANGAN, STOP KONTAK 1,072,684,060.00
V.PEKERJAAN ELEKTRIKAL ARUS KUAT 1,528,591,194.89

JUMLAH PEKERJAAN STANDAR STANDAR 21,257,521,548.44

REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG KULIAH TERPADU
TAHUN ANGGARAN 2017-2019

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
1.1.PEKERJAAN PONDASI TIANG PANCANG 949,144,524.61
JUMLAH I.PEKERJAAN STRUKTUR 949,144,524.61

II. PEKERJAAN ARSITEK


2.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 2,820,724,421.93
2.2.PEKERJAAN PASANGAN PINTU DAN JENDELA 60,261,330.00
JUMLAH II.PEKERJAAN ARSITEK 2,880,985,751.93

III. PEKERJAAN MEKANIKAL


3.1.PEKERJAAN HYDRANT 323,895,551.83
JUMLAH III.PEKERJAAN MEKANIKAL 323,895,551.83

IV. PEKERJAAN TATA UDARA


4.1.PEKERJAAN AIR CONDITIONING 2,515,893,545.50
4.2.PEKERJAAN VENTILASI 123,021,757.53
JUMLAH IV.PEKERJAAN TATA UDARA 2,638,915,303.03

V. PEKERJAAN PENGADAAN DAN PEMASANGAN ELEV 575,094,955.00

JUMLAH V.PEKERJAAN PENGADAAN DAN 575,094,955.00

VI. PEKERJAAN PENANGKAL PETIR ( Electro Statis ) 60,573,237.00

JUMLAH VI.PEKERJAAN PENANGKAL PETIR ( El 60,573,237.00

VII. PEKERJAAN ELEKTRONIC


7.1.PEKERJAAN TATA SUARA 240,353,235.00
7.2.PEKERJAAN FIRE ALARM 296,867,102.75
7.3.PEKERJAAN ICT 1,125,332,265.00
7.4.PEKERJAAN MASTER CLOCK 48,006,400.00
7.5.PEKERJAAN BUILDING AUTOMATION SYSTEM 352,037,705.00
2,062,596,707.75

JUMLAH PEKERJAAN NON STANDAR 9,491,206,031.14


REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG FAKULTAS EKONOMI DAN BISNIS
TAHUN ANGGARAN 2017-2019 MC - 0 OKE

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN 13,762,390.00


I.PEKERJAAN PERSIAPAN 13,762,390.00

II. PEKERJAAN STRUKTUR


2.1.PEKERJAAN STRUKTUR ATAS
A. LANTAI 1 1,021,123,064.02
B. LANTAI 2 2,501,965,886.09
C. LANTAI 3 2,304,218,229.92
D. LANTAI 4 2,360,968,423.01
E. LANTAI ATAP 2,046,411,634.79
F. LANTAI ATAP 1 1,147,598,840.66
G.PEKERJAAN ATAP 202,433,810.77
II.PEKERJAAN STRUKTUR 11,584,719,889.25

III. PEKERJAAN ARSITEK


3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 2,438,573,189.09
3.2.PEKERJAAN PENUTUP LANTAI 2,221,586,224.51
3.3.PEKERJAAN PASANGAN PINTU DAN JENDELA 6,329,058,090.00
3.4.PEKERJAAN PENUTUP LANGIT-LANGIT (PLAFOND 1,322,864,510.96
3.5.PEKERJAAN PASANGAN SANITAIR 202,529,950.00
3.6.PEKERJAAN PENGECATAN 319,570,526.53
3.7.PEKERJAAN RAILLING DAN HAND RAILLING 428,802,600.00
3.8.PEKERJAAN PENUTUP ATAP 137,107,100.00
III.PEKERJAAN ARSITEK 13,400,092,191.08

IV. PEKERJAAN PLUMBING


4.1.PEKERJAAN AIR BERSIH 299,317,522.78
4.2.PEKERJAAN AIR BERSIH (RECYCLING) 299,882,004.70
4.3.PEKERJAAN AIR KOTOR 146,531,380.03
4.4. PEKERJAAN AIR HUJAN 151,683,164.96
IV.PEKERJAAN PLUMBING 897,414,072.47

V. PEKERJAAN ELEKTRIKAL ARUS KUAT


5.1.PEKERJAAN PANEL DAN KABEL FEEDER 623,249,850.00
5.2.PEKERJAAN RAK KABEL 501,246,301.05
5.3.PEKERJAAN LAMPU PENERANGAN, STOP KONTAK 1,801,724,935.00
V.PEKERJAAN ELEKTRIKAL ARUS KUAT 2,926,221,086.05

JUMLAH PEKERJAAN STANDAR STANDAR 28,822,209,628.85

REKAPITULASI
BILL OF QUANTITY
PEKERJAAN PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SULTAN AGENG TIRTAYASA
BANGUNAN GEDUNG FAKULTAS EKONOMI DAN BISNIS
TAHUN ANGGARAN 2017-2019

NO. URAIAN PEKERJAAN JUMLAH HARGA

- PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
1.1.PEKERJAAN PONDASI KONSTRUKSI SARANG LABA 4,941,732,125.00

JUMLAH PEKERJAAN NON STANDAR 4,941,732,125.00

II. PEKERJAAN ARSITEK


2.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 4,771,571,539.46
2.2.PEKERJAAN PASANGAN PINTU DAN JENDELA 231,099,780.00
JUMLAH II.PEKERJAAN ARSITEK 5,002,671,319.46

III. PEKERJAAN MEKANIKAL


3.1.PEKERJAAN HYDRANT 681,264,162.74
3.2.PEKERJAAN PENGADAAN DAN PEMASANGAN EL 554,772,325.00
JUMLAH III.PEKERJAAN MEKANIKAL 1,236,036,487.74

IV. PEKERJAAN TATA UDARA


4.1.PEKERJAAN AIR CONDITIONING 3,925,955,030.49
4.2.PEKERJAAN VENTILASI 152,658,229.29
JUMLAH IV.PEKERJAAN TATA UDARA 4,078,613,259.78
GEDUNG G1

V. PEKERJAAN PENANGKAL PETIR ( Electro Statis ) 60,573,237.00


VI. PEKERJAAN ELEKTRONIC
6.1.PEKERJAAN TATA SUARA 284,257,610.00
6.2.PEKERJAAN FIRE ALARM 255,236,283.25
6.3.PEKERJAAN ICT 1,038,003,055.00
6.4.PEKERJAAN MASTER CLOCK 92,986,860.00
6.5.PEKERJAAN BUILDING AUTOMATION SYSTEM 540,274,655.00

2,271,331,700.25
GEDUNG G2

V. PEKERJAAN PENANGKAL PETIR ( Electro Statis ) 60,573,237.00


VI. PEKERJAAN ELEKTRONIC
6.1.PEKERJAAN TATA SUARA 324,224,190.00
6.2.PEKERJAAN FIRE ALARM 295,946,663.28
6.3.PEKERJAAN ICT 1,410,095,805.00
6.4.PEKERJAAN MASTER CLOCK 92,986,860.00
6.5.PEKERJAAN BUILDING AUTOMATION SYSTEM 540,274,655.00

2,724,101,410.28

JUMLAH PEKERJAAN NON STANDAR 20,254,486,302.51