Anda di halaman 1dari 1

PEMBERI TUGAS

TO
GA

H
P RAY

A G
A
KU
SAYAGA
TA N CA
UD A Y A WA

T EG
A R BERI MAN

DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN


PERTANAHAN KABUPATEN BOGOR

KEGIATAN
PENATAAN BANGUNAN DAN LINGKUNGAN
PENATAAN KAWASAN KALIBARU SEGMEN 2

AS BUILT DRAWING
KETERANGAN :

PEDESTRIAN
+00.30

JALAN
+/-00.00

PIPA 2" PIPA 2"

PIPA
4" = 22
00 mm 12°

PIPA 4"

MUKA AIR BANJIR

Mengetahui
Pejabat Pembuat Komitmen (PPK)

SHEETPILE W 325 B
MUKA AIR NURMAL
Riza Juangsah Rahmat, ST, M.Si.
NIP : 197904172010011002

MENYETUJUI

KONSULTAN PERENCANA
PT. Jakarta Konsultindo

Riyanto Rivky, ST
Team Leader

MEMERIKSA

KONSULTAN PENGAWAS
PT. INKONEKSI IZI KONSULTAN

Ir. Wamilonda Eka Putra


Team Leader

DIBUAT OLEH
KONTRAKTOR PELAKSANA
CV. ABADI

Zaenudin
DIREKTUR

JUDUL GAMBAR

DENAH KEYPLAN POTONGAN A-A


PADA TITIK STA 7 + 700

550
STA:8+
EXISTING

SALURAN
pi
Lip

25
:8+5
ru

EXISTING
+0.30
EL =

SALURAN
+0.30
EL =

Ba

STA
AIR
SALURAN

EXISTING
AIR

lan
SALURAN

00
SALURAN
= +0.30 AIR
EL SALURAN

:8+5
EXISTING
Ja
AIR

SALURAN
SALURAN

+47

EXISTING
AIR

STA
SALURAN

SALURAN
A:8
ST
Ukuran

EXISTING
Milimeter
= +/-0.00
EL

SALURAN
AIR
SALURAN

AIR
= +0.30

+45

SALURAN
EL

A:8
AIR
SALURAN

ST
AIR

SALURAN

25
AIR

+4
SALURAN

= +0.30

A:8
EL
AIR

SALURAN

ST
AIR
rta
SALURAN
Jaka
r-

i
sur
AIR
Bogo
SALURAN

Raya
Jalan

yam
AIR

SALURAN
= +0.30
EL

00
AIR

H.S
SALURAN

+4
A:8
AIR

SALURAN

Jl.K
ST
Skala
AIR

SALURAN

+0.30
=

1 : 70
EL
AIR

75
SALURAN

+3
AIR

A:8
SALURAN

ST
AIR

SALURAN

rta
Jaka
r-
AIR
+0.35
=
EL SALURAN

Bogo
BT

+0.30
=
EL
AIR Raya

BT
SALURAN
Jalan

50
+3ATAN
AIR
BT

SALURAN
JEMB
AIR

+0.35 SALURAN
= BT

A:8
EL

AIR

SALURAN
AIR

ST
SALURAN

+0.30
=
EL

25
+0.30
=
AIR EL

+3
SALURAN

A:8
Digambar
AIR

Adzin Fairuz, S.Ars.


SALURAN

ST
AIR

SALURAN

AIR = +0.30
EL

00
SALURAN

+3
AIR

A:8
SALURAN

ST
AIR

SALURAN

= +0.30
EL

= +0.35
EL

75
BT

+2
AIR
= +0.30
EL

BT
SALURAN

A:8
rta

SPBU

BT
AIR
Jaka
r-
0

ST
SALURAN

250
= +0.35
STA:7+70

BT

EL
Bogo

AKSES
AIR
Raya
STA:7+725

:8+
SALURAN

Jalan
= +0.30
EL

STA
0

AIR
STA:7+75

SALURAN
5

25
STA AKSES SPBU
STA:7+77

= +/-0.00

:8+2
EL
0

SALURAN
AIR
STA:7+80

EL = +0.30

Muhammad Saiful
SALURAN
AIR
SALURAN
AIR
SALURAN
AIR
5

SALURAN
AIR
EL = +0.30
STA:7+82

SALURAN
JEMBATAN

AIR
AIR
SALURAN SALURAN = +0.30
AIR EL
SALURAN
AIR
0

SALURAN
EL = +0.30 AIR AIR
STA:7+85

SALURAN SALURAN
AIR

00
SALURAN
AIR = +0.30
Jalan Raya SALURAN
AIR
EL

Bogor -
5

EL = +0.30

:8+2
SALURAN
Jakarta AIR
STA:7+87

SALURAN
AIR
00

SALURAN
AIR
SALURAN
AIR
EL = +0.30
STA:7+9

SALURAN
JEMBATAN

AIR

STA
25

= +/-0.00

+175
EL
AIR
SALURAN
STA:7+9

EL = +0.30 AIR SALURAN

- Jakarta
SALURAN
AIR
0

AIR
SALURAN SALURAN
Jalan Raya AIR
Bogor
STA:7+95

SALURAN
Bogor - AIR

Raya

STA:8
Jakarta EL = +0.30
SALURAN
AIR SALURAN
AIR

150
SALURAN
AIR
AIR
Jalan
+0.30
SALURAN EL =
AIR SALURAN
SALURAN
AIR
5

EL = +0.30
SALURAN

STA:8+
AIR
AIR SALURAN
STA:7+97

EL = +0.35

5
AIR

Jalan Raya EL =
+0.35
SALURAN
0

SALURAN
Bogor -
BT

STA:8+12
AIR

Jakarta
BT

EL = +0.30 SALURAN EL = +0.35 AIR


STA:8+00

BT
AIR SALURAN +0.30
EL =
BT

BT BT

SALURAN
Jalan Tegar Beriman

AIR

STA:8+100
AIR
JEMBATAN

SALURAN +0.35 SALURAN


EL =
BT
AIR
5

EL = +0.30 SALURAN BT
AIR
STA:8+050

AIR
SALURAN SALURAN
STA:8+02

AIR

STA:8+075
SALURAN AIR
AIR SALURAN
SALURAN
AIR
EL = +0.30 AIR EL = +0.30
SALURAN SALURAN
AIR
STA:8+070

SALURAN AIR
AIR SALURAN
SALURAN
AIR
AIR

Jalan Raya EL = +0.30


SALURAN
AIR
SALURAN

Bogor -
Jakarta
SALURAN
AIR
NG SALURAN
AIR

EL = +0.30

DPT EXISTI DPT EXISTING SALURAN


AIR

- Jakarta

Tanggal
SALURAN
AIR
Bogor
Raya
DPT EXISTING AIR
SALURAN
AIR

EL = +0.30
SALURAN
AIR
Jalan
SALURAN

02 Januari 2024
AIR
SALURAN
SALURAN AIR

EL = +0.30

Jalan Raya
Bogor -
Jakarta Jalan Raya
Bogor - Jakarta
Bogor - Jakarta
Jalan Raya

No. Gambar
ARS-2008 A

Anda mungkin juga menyukai