TO
GA
H
P RAY
A G
A
KU
SAYAGA
TA N CA
UD A Y A WA
T EG
A R BERI MAN
KEGIATAN
PENATAAN BANGUNAN DAN LINGKUNGAN
PENATAAN KAWASAN KALIBARU SEGMEN 2
AS BUILT DRAWING
KETERANGAN :
PEDESTRIAN
+00.30
JALAN
+/-00.00
PIPA
4" = 22
00 mm 12°
PIPA 4"
0°
MUKA AIR BANJIR
Mengetahui
Pejabat Pembuat Komitmen (PPK)
SHEETPILE W 325 B
MUKA AIR NURMAL
Riza Juangsah Rahmat, ST, M.Si.
NIP : 197904172010011002
MENYETUJUI
KONSULTAN PERENCANA
PT. Jakarta Konsultindo
Riyanto Rivky, ST
Team Leader
MEMERIKSA
KONSULTAN PENGAWAS
PT. INKONEKSI IZI KONSULTAN
DIBUAT OLEH
KONTRAKTOR PELAKSANA
CV. ABADI
Zaenudin
DIREKTUR
JUDUL GAMBAR
550
STA:8+
EXISTING
SALURAN
pi
Lip
25
:8+5
ru
EXISTING
+0.30
EL =
SALURAN
+0.30
EL =
Ba
STA
AIR
SALURAN
EXISTING
AIR
lan
SALURAN
00
SALURAN
= +0.30 AIR
EL SALURAN
:8+5
EXISTING
Ja
AIR
SALURAN
SALURAN
+47
EXISTING
AIR
STA
SALURAN
SALURAN
A:8
ST
Ukuran
EXISTING
Milimeter
= +/-0.00
EL
SALURAN
AIR
SALURAN
AIR
= +0.30
+45
SALURAN
EL
A:8
AIR
SALURAN
ST
AIR
SALURAN
25
AIR
+4
SALURAN
= +0.30
A:8
EL
AIR
SALURAN
ST
AIR
rta
SALURAN
Jaka
r-
i
sur
AIR
Bogo
SALURAN
Raya
Jalan
yam
AIR
SALURAN
= +0.30
EL
00
AIR
H.S
SALURAN
+4
A:8
AIR
SALURAN
Jl.K
ST
Skala
AIR
SALURAN
+0.30
=
1 : 70
EL
AIR
75
SALURAN
+3
AIR
A:8
SALURAN
ST
AIR
SALURAN
rta
Jaka
r-
AIR
+0.35
=
EL SALURAN
Bogo
BT
+0.30
=
EL
AIR Raya
BT
SALURAN
Jalan
50
+3ATAN
AIR
BT
SALURAN
JEMB
AIR
+0.35 SALURAN
= BT
A:8
EL
AIR
SALURAN
AIR
ST
SALURAN
+0.30
=
EL
25
+0.30
=
AIR EL
+3
SALURAN
A:8
Digambar
AIR
ST
AIR
SALURAN
AIR = +0.30
EL
00
SALURAN
+3
AIR
A:8
SALURAN
ST
AIR
SALURAN
= +0.30
EL
= +0.35
EL
75
BT
+2
AIR
= +0.30
EL
BT
SALURAN
A:8
rta
SPBU
BT
AIR
Jaka
r-
0
ST
SALURAN
250
= +0.35
STA:7+70
BT
EL
Bogo
AKSES
AIR
Raya
STA:7+725
:8+
SALURAN
Jalan
= +0.30
EL
STA
0
AIR
STA:7+75
SALURAN
5
25
STA AKSES SPBU
STA:7+77
= +/-0.00
:8+2
EL
0
SALURAN
AIR
STA:7+80
EL = +0.30
Muhammad Saiful
SALURAN
AIR
SALURAN
AIR
SALURAN
AIR
5
SALURAN
AIR
EL = +0.30
STA:7+82
SALURAN
JEMBATAN
AIR
AIR
SALURAN SALURAN = +0.30
AIR EL
SALURAN
AIR
0
SALURAN
EL = +0.30 AIR AIR
STA:7+85
SALURAN SALURAN
AIR
00
SALURAN
AIR = +0.30
Jalan Raya SALURAN
AIR
EL
Bogor -
5
EL = +0.30
:8+2
SALURAN
Jakarta AIR
STA:7+87
SALURAN
AIR
00
SALURAN
AIR
SALURAN
AIR
EL = +0.30
STA:7+9
SALURAN
JEMBATAN
AIR
STA
25
= +/-0.00
+175
EL
AIR
SALURAN
STA:7+9
- Jakarta
SALURAN
AIR
0
AIR
SALURAN SALURAN
Jalan Raya AIR
Bogor
STA:7+95
SALURAN
Bogor - AIR
Raya
STA:8
Jakarta EL = +0.30
SALURAN
AIR SALURAN
AIR
150
SALURAN
AIR
AIR
Jalan
+0.30
SALURAN EL =
AIR SALURAN
SALURAN
AIR
5
EL = +0.30
SALURAN
STA:8+
AIR
AIR SALURAN
STA:7+97
EL = +0.35
5
AIR
Jalan Raya EL =
+0.35
SALURAN
0
SALURAN
Bogor -
BT
STA:8+12
AIR
Jakarta
BT
BT
AIR SALURAN +0.30
EL =
BT
BT BT
SALURAN
Jalan Tegar Beriman
AIR
STA:8+100
AIR
JEMBATAN
EL = +0.30 SALURAN BT
AIR
STA:8+050
AIR
SALURAN SALURAN
STA:8+02
AIR
STA:8+075
SALURAN AIR
AIR SALURAN
SALURAN
AIR
EL = +0.30 AIR EL = +0.30
SALURAN SALURAN
AIR
STA:8+070
SALURAN AIR
AIR SALURAN
SALURAN
AIR
AIR
Bogor -
Jakarta
SALURAN
AIR
NG SALURAN
AIR
EL = +0.30
- Jakarta
Tanggal
SALURAN
AIR
Bogor
Raya
DPT EXISTING AIR
SALURAN
AIR
EL = +0.30
SALURAN
AIR
Jalan
SALURAN
02 Januari 2024
AIR
SALURAN
SALURAN AIR
EL = +0.30
Jalan Raya
Bogor -
Jakarta Jalan Raya
Bogor - Jakarta
Bogor - Jakarta
Jalan Raya
No. Gambar
ARS-2008 A