Anda di halaman 1dari 29

I H

TENGA
KETERANGAN

MANIS
JL. G
RIYO
KEBR
AON
BARA

RAON
T XVII
JL. G JL. G
RIYO RIY O KE

JL. KEB
KEBR BR
AON AON
BARA TENG
JL. G
RIYO
T XVI
JL. G
XVII
I U
KEBR RIYO JL. K
AON KEBR EMLA
BARA AON TEN
T X TENG XII C
V AH X
VII
AH II

JL. G
RIY O KE
BRAO
TENG

N TENG
XVI JL. K
B TEN T
H III

EMLA
JL. G
ANIS

XII
RIY XII
O KE B
A

BRAO
TENG
ON M

N TENG

AH
XV
JL. KEM

TENG
AON
IS

JL. G LA
BRA

RIYO JL. K TEN


XII
N MAN

KEBR EML ATEN

EBR
JL. KE

AON

AON
TENG XI
XIV

O K
BRAO

BR
S

GRIY

O KE
JL. G
JL. KE

RIYO
KEBR

RIY
AON

JL .
TENG
XIII

JL. G
KONSULTAN PERENCANA TEKNIK
JL. KE
MLAT
EN XI

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
JL.
KEM
LA
TE
NX

E-Mail : karyawirabumi@gmail.com

JL.
KE
MLA
TE
N IX

NAMA SUB KEGIATAN

XII
EN
KE MLAT
JL.
VI
JL. GR

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


IYA
KEBR
AON
SELA
TAN
IX

DANTEKNIS SISTEM DRAINASE PERKOTAAN


JL. GR
IYA
KEBR
AON
SE LATA
N VII 7.5
JL.
KEML
ATEN
VIII

NAMA PEKERJAAN

IP
JL. GR
IYA

TR
KEBR
AO N SE
LATA

AS
NV

. M
JL
N
TE
2858
7.733
pg

MLA
2856
7.526
pv

2851
7.855
pg

KE
2850
7.586
pv

2841
8.024
pg

2861
7.506

JL. GR
pv
2866 2840

JL.
7.454 7.542
cv pv
2883
7.569
cp1

2884
7.578 2826
2828
2827
2873 cp2 7.478
6.857
7.471
6.500 2881 ds pg

IYA
2870ds 2876 7.603 ds
7.529 7.505 2875 pv
cv 2877
cv

7.499
6.721
2879 cv ds 2874 2824
6.545 7.531 2823
7.605
ds cv 2853 tm
7.518
2878 7.582 pv650

KEBR
7.535
pv

cv

2852
7.579
pg
2818
2819
2868 8.579
7.576

AON
7.591 2854 2831 tp13

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


7.580
cv

2871 2869 7.677 pv 2815


7.579 6.539 pv 2817 12.681
2816
cv 2872
ds 7.568 tlk
7.967
2867
7.588 2842 tp12
tlk

7.574 7.582
cv cv pv

SE
2855
7.681 2843 2795
2880 pv 7.659 7.510
8.312 as
pv

tg

LATA
2844
7.684 2849
pv 7.746 2837
cv 7.552
pv650 2797
7.508
as
2848
7.736
cv 2838
2864 7.766

N II
2865
7.600 2799
cv

6.381 2863 2846 7.473


cv 7.603 7.570 2814 2798
ds

ps

11.254 2802 7.473


mh

cv 2839 7.459
2801 ps
7.766 tlk 7.472
ps

2845
bg

ps

7.571
mh
2830 2790
2835
7.631 2829
2847 mh 7.637 7.450
7.571 7.616 2832 mh as
mh 2836 mh 6.962
7.610 ds
2862 mh 2833
7.541 7.629
pv
2857 mh
7.565 2834
pv 7.619
mh
2803
7.534
2859 as
7.511 2788 2813
7.366 8.755
pv

as
tlk

2786
2860 7.375
7.789 2800
as

2820 7.442
pg

7.551 as
pv

2812
8.328
2793 tlk
7.441
as600
2822 2821 2811

NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17


7.673 7.626 8.248
pg ps
tlk

2784
7.543
2825
pg

6.784
ds
2783
7.476
cv

2796
7.444
as600
2782
7.374
as575

2791

JL
7.446 2785
2794 as 7.450
7.520 as 2810
sal 7.852
2792
7.532 tlk
as 2770
2787 7.598

.K
7.447 pg
as
2769
7.509
cv
2789
6.817
ds

2768

EM
7.459
2779 as550
7.425
as575

LA
2807
9.787
tl

2781
6.833

TE
ds
2882 2780
6.633 2772
ma 7.422 7.534
ps as

RUMAH POMPA KEBRAON


2762
7.720
pg

N
2763
7.145
ds

VII
2776 2761
7.492 7.506
as as525

2809 2759
7.794 6.823
tl 2775 pg
7.464
ps
2774
6.785
2773
ds
7.466
ps

2765
7.543 2806
as525 12.361
tl

2756
7.188
2804
ds

8.367
tl
2771
7.495 2754
7.552 2751
as

as500 7.689
cv

2752
7.610
2777
7.605 cv
cv
2778
7.612 2767
7.554
pg

gg
2757
7.584
as500

2760
7.603
gg

2747
7.844
cv
2746
2766
7.758
7.750 as
gg
2749
2753 7.584
7.520 tp11
2755
as500
7.048
ds 2808
2764 2748 11.131
7.713 7.590 2733
pg tp10 tl 14.889
2758 tl
7.607
pg
2745
7.540
as

2805
9.658
tl

2750
8.628
as475

2744
7.595
as

2742
7.641
as

2743
2732
7.612 13.349
as
tl

2740
7.643
cv

2731
13.081
tl

2736
7.672
as450 2739
7.714
cv
2737
7.689
cv

2734
7.691
as450

2735
7.674
as450

2714
2716 7.692
7.652 cv
cv2738 2713
6.946 7.600
ds 2712cv
2741 7.634
7.714 as425
cv

2715
7.723
as

NAMA GAMBAR SKALA


2711
7.705
gg

2705
7.714
as425

2710
7.709
gg

2706
7.613
cv

2707
7.695
cv
2709
7.725
gg

2730
11.079
tl
2729
9.218
tlk2

2708
7.683
gg

2704
7.515
cv
2703
7.536
cv

2702
7.705
as400

2695
7.547
cv
2701 2694
7.768 7.559
as400 cv

2700
6.306
ds
2692
7.720
as
2689
2697 7.644
7.681 cv
2699 as400
6.877 2693
ds2698
7.646 6.262
pg ds
2691
6.367
2690
ds

7.684
cv
2687
7.857
crs
2677
7.505
2686
pg

7.828
crs

2696
6.892
ds
2678
6.305
pg

2676
7.278
cv
2679 2681
7.551
2675 7.550
7.642 mh mh
2684 2680
as

7.816 7.551
mh
gg

2728
9.185
2674
tlk 7.579
as

2685
6.909 2682 2726
ds 7.726 9.180
as ph
2669
7.275
2683 2725 cv
7.906
gg 9.175
ph 2720
9.877
tl
2668 2666
7.275 7.268
cv pg
2727 2670
9.211 7.664
tlk as375 2665
6.315
2671 ds
2688 7.679
6.330 cv
ds

2672
7.682
cv 2664
7.279
cv
2724
9.148
2673 ph
7.794
pg
2661
7.413
as350

2723
9.370
ph

2667
7.495
as

2722
9.413
ph 2659 2658
7.373 2653 2647
6.439 7.396 11.423
cv

ds pg tl
2721
9.431
ph
2660
2624
7.509 7.357 2616
2663 as350 2655 7.429
cv

6.870 7.362 cv
ds 2657 2617
7.467 cv 2623 7.454
as 7.399 cv
2656 cv
2662 7.457
7.599 as325
pg

2621 2614
7.464 7.424
as
cv
2620
7.492
2649 as
7.523
2650 tp9 2618
2648
8.555 7.544
7.546
as325 tp8
as300

2717 2646
13.036 11.127
tl 2619
tl
2645
7.468 2613
as 7.476 11.073
tl
as

2651
2654 7.611
6.909 as325
ds

2652
2622
7.738 7.527
pg as

2611
7.414
as 2610
7.441
cv

2612
7.547
2615as300
7.589
int

2719
12.592
tl 2609
7.471
as275

2718
13.5372638
10.209
2608 tl tl
7.492
as275

2606
7.466
as275
2607
7.584
cv

2601
7.609
cv
2602 2604
6.675
7.610 ds
2644 cv
9.411
ph
2605
6.619
ds 2567
7.728
cv
2568 2566
7.809 7.627
cv cv 2564
2643 2565 7.623
9.394 7.551 as
ph as
2598
7.540
as250

2603
7.581
as250

2639
10.006
tl

2599
7.537
as250 2637
10.498
2600 tl
7.536
cv
2596
6.712

ds
2592
7.705

cv
2563
2642 7.678
9.320 as
ph 2591
7.685
cv

2589 2562
7.565 7.711
as225 bg

2571 2569
6.855 7.690
ds cv
2641
9.301 2570
ph 2636 7.695
2597 9.785 cv
7.610 tl
as225
2573 2560
7.646 2572 6.753
cv 7.644 ds
cv 2558
7.776 2556
cv 7.869
cv
2557
2559 7.856
7.757 cv
cv
2590
7.606
as225
2555
6.881 2552
2593 ds 2561 7.722
7.726 2583 7.446 pg
cv pipa
2640 7.702
9.485 as 2554
tl 7.596
2594

crs
7.649
cv
2550
7.767
2584 2553
cv
2595 7.662
7.656 6.912

as
pg ds
2549
7.776

cv
2630
9.524
tl

2587 2548
7.628 7.585
pg as200
2586
7.614
2588
6.917 cv 2574
ds 7.687
gg

2551
7.677
2575 2576 as200 2634
6.674 9.729
7.666 ds ph
pv 2577
7.970

ps
2545
7.864
pg
2544

JL.
2546 7.845
7.675
as200 cv
2580
2543
7.673 7.857
ps 2547 cv
2578
2579 7.833 2633

KE
7.709 6.734 pg 9.937
pv ph
ds

2582
2581
7.668
6.650

MLA
pg 2585
ds 7.383
pv

2629
2628 10.093
9.638 tl
tlk 2627
2542 10.092 2632
7.717 10.116

TE

tlk
as175 ph

2540
7.836
as175
N VI
2539
2635 7.835 2538
9.990 as175 2631 7.882
pju 9.717 2537
ph 7.898 cv
cv
2541
7.756
pg

2534
7.634
as150

2536
7.816
as150 2532
7.749
tp7

2625
10.945
2531 tl2626
2523
7.764 10.946
10.203
tp6 tlk
2506
7.456
cv
2535
7.893
as150 2530
9.490
ph 2505
7.918

cv
2504
7.728
bh

2503
7.647
as125
2529
9.389
ph

2507
7.824
as125

2528
9.437
ph

2533
8.887 2527
as 9.467
ph

2499
7.988 2501 2502
7.178 7.953

cv
ds
cv
2521
12.582
tlk

2497
7.727
as100

2526
9.529
ph

2500
7.914
as100
2525
9.382
ph

2498
7.981
as100

2494
8.069
pg
2493
8.049
cv
2492
8.054
cv
25242522
2518
2495 10.252
9.897 11.878
7.889 tl 2488
as tlk 8.076
cv

2496 2519
10.522
8.057

ph
as

2520
11.235
tlk
2489
8.072
as75

2490 2485
8.073 8.317
bh 2483
pg
8.126
cv
2482
2491 7.199
8.093 2484 ds
pg 8.134
2486 2477

cv
8.326
8.102 pg
ps 2475
8.276
pg
2516
9.485 2473
ph 2481 2474 8.126
8.015 7.252 cv
as50 2478 2472 ds
8.103
8.132
cv cv
2510
9.931 2479
tl 2511 2480
9.937 8.203
tlk 2514 8.220
ps
9.906 ps
ph

2469
7.297
ds 2467
8.621
2515

int
9.873
ph
2373
9.128
cv
2374
9.127
cv 2372
2476 8.898
2517 8.203 as
as50
9.694
ph
2463 2462
8.697 8.638
int pg 2441

DIRENCANAKAN
8.871
as

2487
7.940
bg 2512 2466
9.909 2513
tlk 8.182
9.921 bh 2440
tl 8.299

ds
2464
2465 8.408
int
8.182
as25

2509
10.421
tl
2369
9.026
bg

2468
8.336
as25
2371
2370
8.987
as

bg
2439
9.367
2438

pg
9.220
krb
2448

LOKASI
2449
8.285
9.274 2460 2437
2470 tp5 2459
9.120 9.169
8.382 8.744 2450 cv

tm
as 2461 8.947 2431

cv
7.787 pg 8.998
2436 2433 as
2458
ds 2434
9.162 8.861
2447 8.744 2394 2435
9.061

cv

as
8.300 cv 10.029 krb
8.904
2471 tp4

gp
7.946 as
bg
2457
8.596
ps 2398
9.911 2375
tm 9.217
2425 2424

cv
11.762 11.716 2422
2452 2451 tlk 11.585
2444

tl
8.940 8.960 9.235
pos pstl
trs
2455 2453 2423
8.759 8.957 2443 11.565 2445
krb 2454
pos 8.912 tlk4 8.896
2402
2456 2508 8.809 tn 2385
krb
8.420
8.417 2426pos 2400
10.813 2396 8.891
tl 11.988 8.836 9.642 as

bh
as0 gp 2392 2442

tm
tl 8.741 9.077 2386 2446
gp 8.842 8.868 2432

tn
as as 9.006
2387 as
2389 8.823 2368
8.704 as 9.014
bg

as
2406
9.031
as
2407
2403 9.126 2367
8.601 9.260

tn
as0 bg
2408
9.311
pg

2397
8.606
as
2399 2404
9.072 8.941

pg
as
2421
2395 2366 10.918
8.629 9.003 tl
2401 as

as
9.168 2420
9.192 2419

pg
2393 9.634
8.870 mh gst
bm1

2390
8.710
gp 23912383
8.770
8.790
2384 2405
gp
9.159 9.031
tmas 2414 2428

as
9.392 10.815
2415

bk
rm
9.372
bk
2388 2427
9.013 2409 10.7982418
tm 8.981 23642416 rk 9.130
2382 as 2417
9.3329.082 tn
8.902 ptar pipa
7.789
as ds
2413
9.367
bk
2430
11.859 2429
tlk5 11.457
2412

pju
7.687
2381 ds
8.905 2365
as 8.977
bg

PEKERJAAN
2358
7.636

bg
2359
7.491

tn
2380 2360
8.867 7.385
cv 2361 tn
7.006
ds

JL
2362
2357 6.830
8.060 ds
2410 tn
9.063
2363

as
8.701
bg

2411

.
9.041
as

BA
2379
8.900
cv 2377
2353
9.043 7.446
as bg

2378 2354
7.340
8.846 2355
as tn
7.215
tn

LA
2351
7.249 2356
tn 6.683

ds
SK 2376
9.116
as
2349
2350
7.712
mh 7.695
mh
2344
7.719
2328
8.047
bg

LU
tn 2342 2341
7.684 7.741
tn 2339
2340

bg
7.643
8.641
tp3
2345
2352 7.738
6.663 tn 2346
7.712

ds
pa
2347
7.705 2338
pa 2348 7.651

MP
7.701 tp2
pa

2327
2343 7.466
7.609 tn

tn
RIK
2324
7.407
tn
2330
6.159
ds

2326
7.284
tn

2332
7.435 2325
tn 7.279
pg
2321
7.319
tn

2331
7.324

tn
2329
7.958
bg 2316
6.521
ds
2315 2322
2319 7.142
7.100 7.090 tn
sal tn

2313
6.549 2310
ds 6.812
U
2312 2314
6.863 7.113 2323
sal

tn
7.089
tn

2320
6.275

ds
2318
7.234

tn
2317
2309 7.021
30.000 tn
tp1

2336
8.514
pg

2311
6.808
ma

2334
8.543

pg
2333
6.499
ma

2335
8.537
pg

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
2337
8.524

pg
KANTOR
DIPERIKSA
RW. KEBRAON

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

PLE
KS
MA
RIN
IR
KA
RA
NG
PILA
NG

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 10 30
KETERANGAN

B T

KONSULTAN PERENCANA TEKNIK


2469
7.297 2467
ds 8.621
int
CV. KARYA WIRA BUMI
ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

2463 2462
8.697 8.63
NAMA SUB KEGIATAN
int 8
pg

2466
PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI
8.182
bh DANTEKNIS SISTEM DRAINASE PERKOTAAN
2464
8.408
2465 int
8.182
as25
NAMA PEKERJAAN
2509
10.421
tl

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


2468
8.336
NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
as25
RUMAH POMPA KEBRAON

2439
9.36
pg 7 2438
9.220
krb NAMA GAMBAR SKALA
244948
8.27
9. 284
5 2460 2437
2470 tp5 249.59 9.169
120 2450
8.382 8.74
tm4 cv
24cv 8.947
as 61 pg
7.787 2436 2433
ds
2458 9.1624
2447 8.744 28.34
861
2394 cv 9.as
06
24135
8.30 cv 10.0 krb
8.904
2471 tp4 0 gp 29 as
7.946
bg

2457
8.596
ps 2398
9.911 2375
tm2425 9.217
2424 cv
11.762 11.716
2451 tlk 2424
4422
2452 tl 9.11
23.585
8.940 8.96
pos 0 pstl 5
trs
2453 2423
2455 8.957 11.565 2445
8.759 2443
po54
24 s tlk4 8.896
2456krb
24
8. 02
2508 8.80
10.8 9 2396
8.912
tn kr85
23 b DIRENCANAKAN
8.41
427
0 26pos2400
2413 8.891
bh
as0 tl 11.9 8.83 9.642 as
88gp 6 2392 tm 2442
tl 8.741 2386 2446
9.077 8.842
gp tn 8.868
as as
2387
2389 8.823
8.704 as
as

2403
8.601
as0
MOHAMMAD SOCHIF BURU'YAH, ST.
PERENCANA
DIPERIKSA
BENCH MARK (BM)
X = 688162.8
2397
8.606 Y = 9188902.523
as Z = 8.870
2399 2404
9.072 8.941
pg as

2395
8.629
2401
9.16
as Ir. M. V. HERY KUSBIANTORO
pg 8
2393 TEAM LEADER
8.870
bm1
DISETUJUI
2390
8.710
gp 2323
23779183 2405
8. 8479
8. 0 0
9.15
gp as9 9.031
tm as

2388
9.013
tm
2382
8.902
MARGA MAULLANA S.Ars.
DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

B T
2477
8.326
pg
2475
8.276
pg
2473
2481 2474 8.126
8.015 7.25 cv
as50 2478 2472 ds 2
8.132 8.103
cv cv

2510
9.93125
tl 9. 11
937
2479
24
8.2
8003
S
tlk 8.2
ps 20
2514 ps
9.90
ph 6

2469
KONSULTAN PERENCANA TEKNIK
7.297 2467
ds 8.621
2515 int
9.873
ph

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
2463 2462 E-Mail : karyawirabumi@gmail.com
8.697 8.63
int pg 8

2512 2466
NAMA SUB KEGIATAN
9.909 2513 8.182
tlk 9.921 bh
tl
2464
8.408
2465 int
8.182
as25
R.
P PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI
2509 +8. ANEL
10.42
tl 1 820 DANTEKNIS SISTEM DRAINASE PERKOTAAN

2468
8.336
as25

NAMA PEKERJAAN
2439
R. 9.36
pg 7 2438
PO 9.220
+8. MPA krb
2449
48 720
2470
9.2
8.274
tp5
tp5
85 2460
249.59
12
744 0
8.tm 2450
2437
9.169
cv
BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),
8.382 8.947
24cv
as 61
7.787
ds
2458
pg
2436 2433
248.34
NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
9.162 861
2447
2471
8.30
tp4 0
8.744
cv
2394
10.02
gp 9
cv 9.as
0635
24
krb
1
8.904
as
RUMAH POMPA KEBRAON
7.946
bg

2457
8.59
ps 6 2398
9.911 2375
tm2425 9.217
2424 cv
11.762 11.716
tlk 24244422
2452
8.940
trs
2451
8.960
pos
tl 9.11
23.58
pstl 5 5 NAMA GAMBAR SKALA
2453 2423
2455 8.957 11.565 2445
8.759 2443
po54
24 s 8.912 tlk4 8.896
24 krb 2508 8.80 kr85
2456
02 9 2396 tn 23 b
8.417
8.42 10.81 3 pos2400
2426 8.891
bh 0 tl 11.98 8.83 9.642 as
as0 8 gp 6 2392 2442
tl tm 2386
8.741 9.077 2446
gp tn 8.842 8.868
as as
2387
2389 8.823
8.704 as
as

2403
8.601
as0

BENCH MARK (BM)


X = 688162.8
2397
8.606
Y = 9188902.523
2399
as
Z = 8.870 2404
DIRENCANAKAN
9.072 8.941
pg as

2395
8.629
2401 as
9.168
pg
2393
8.870
bm1

2390
8.710
gp 2323
23779183 2405
8. 8479
8. 0 0
9.15
gp as9 9.031
tm as
MOHAMMAD SOCHIF BURU'YAH, ST.
2388
9.013 PERENCANA
tm
2382
8.902
as DIPERIKSA
2430
11.85
tlk5 9

2381
8.905
as

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
2380
8.867
DISETUJUI
cv

2410
9.063
as

2411
9.041
as

2379
8.900
MARGA MAULLANA S.Ars.
DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

B
-

-
NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN

C
-
C BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),
-
NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
R. PANEL CHAMBER RUMAH POMPA KEBRAON
+8.820 +6.820

NAMA GAMBAR SKALA


R. POMPA
+8.720

JALAN ASPAL
+8.420
A

DIRENCANAKAN
-

B
-
MOHAMMAD SOCHIF BURU'YAH, ST.
PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

JENIS KOLOM
K1
40X50

DESKRIPSI

KONSULTAN PERENCANA TEKNIK


TULANGAN UTAMA 10 D 22
SENGKANG Ø10 - 100 CV. KARYA WIRA BUMI
ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

JENIS BALOK B1 40X50 (MEMANJANG) B2 40X50 (MELINTANG) B3 30X30 NAMA SUB KEGIATAN

TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

DESKRIPSI
NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON
TULANGAN ATAS 6 D16 4 D16 10 D16 10 D16 5 D16 3 D16
TULANGAN BAWAH 4 D16 6 D16 6 D16 6 D16 3 D16 5 D16
TULANGAN TENGAH 2 D13 2 D13 2 D13 2 D13 - - NAMA GAMBAR SKALA
SENGKANG Ø10 - 100 Ø10 - 200 Ø10 - 100 Ø10 - 200 Ø10 - 100 Ø10 - 200

BORE PILE
Dia.40 CM

DIRENCANAKAN

DESKRIPSI

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA
TULANGAN UTAMA 8 D16
SENGKANG Ø10 - 100

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

Dasar Polder
+6.820
DIRENCANAKAN

Dasar Polder Dasar Polder Dasar Polder


+5.115 +3.920 +4.420

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

KONSULTAN PERENCANA TEKNIK


R. POMPA
+8.720 CV. KARYA WIRA BUMI
ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

A A
- - NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

B
-
A A
- -

200

300
KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3

100
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

B
-
PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI
DANTEKNIS SISTEM DRAINASE PERKOTAAN
150 300 300

750 NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN
Spesi Finishing Waterprofing

Plat Atap Tb. 10 Cm

List Plank Beton


Tb. 8 Cm
Pas. 1/2 Bata
1 Pc : 4 Ps

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Pas. 1/2 Bata Trasram Telp : 081357573391
E-Mail : karyawirabumi@gmail.com
1 Pc : 3 Ps

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

Plat Atap Tb. 10 Cm


List Plank Beton
Tb. 8 Cm

Pas. 1/2 Bata


1 Pc : 4 Ps

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Pas. 1/2 Bata Trasram Telp : 081357573391
E-Mail : karyawirabumi@gmail.com
1 Pc : 3 Ps

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI

384
ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN
44

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI
44

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

200

300
KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN

100
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


150.00 300.00 300.00 DANTEKNIS SISTEM DRAINASE PERKOTAAN
750

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

200

300
KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3

100
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


150.00 300.00 300.00 DANTEKNIS SISTEM DRAINASE PERKOTAAN

750
NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

PL

200
DIRENCANAKAN
120 +8.580
PL PL

300
+8.580 120 +8.580 120

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA

100
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


150.00 300.00 300.00 TEAM LEADER
750 DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

Ø10-200
Ø10-200

Ø10-150
Ø10-150

200
Ø10-200
Ø10-200

300
KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

100
NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

150.00 300.00 300.00


750 NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

200
DIRENCANAKAN

300
100
MOHAMMAD SOCHIF BURU'YAH, ST.
PERENCANA
DIPERIKSA
B
-

150 300 300


Ir. M. V. HERY KUSBIANTORO
750 TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

JENIS KOLOM K1 K2

DESKRIPSI

KONSULTAN PERENCANA TEKNIK

TULANGAN UTAMA 6 D16 4 D13


CV. KARYA WIRA BUMI
SENGKANG Ø10 - 100 Ø10 - 100 ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

JENIS BALOK RB1 RB2 BK1 NAMA SUB KEGIATAN


TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN
PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI
DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN
DESKRIPSI

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

TULANGAN ATAS 4 D16 2 D16 2 Ø12 2 Ø12 2 D16 2 D16 NAMA GAMBAR SKALA
TULANGAN BAWAH 2 D16 4 D16 2 Ø12 2 Ø12 2 D16 2 D16
TULANGAN TENGAH - - - - - -
SENGKANG Ø10 - 100 Ø10 - 200 Ø6 - 100 Ø6 - 200 Ø10 - 100 Ø10 - 200

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN
A
5
Kusen Alumunium 10 Cm

Kusen Alumunium 5 10 Cm Kaca Bening T=5mm


A

Rangka Alumunium 3 8 Cm

Kusen Alumunium 5 10 Cm
Kaca Bening T=5mm Kaca Bening T=5mm

B
Rangka Alumunium 3 8 Cm KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com
B
Kaca Bening T=5mm
Kaca Bening T=5mm NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON
A

NAMA GAMBAR SKALA

A
Kusen Alumunium 5 10 Cm
DIRENCANAKAN
Kaca Bening T=5mm
B

Pintu PVC A Kusen Alumunium 5 10 Cm


MOHAMMAD SOCHIF BURU'YAH, ST.
Kaca Bening T=5mm PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

DETAIL U-DITCH (200.200.120) 1 : 20


(FC'30 MPA) FABRIKASI TYPE 1

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

ISOMETI U-DITCH & COVER (FC'30 1 : 20


MPA) FABRIKASI TYPE 1

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

DETAIL PENULANGAN U-DITCH 1 : 25


UK.200.200.120 (FC'30 MPA)

DETAIL PENULANGAN COR 1 : 25


SETEMPAT ( 1 Pc : 2 Ps : 3 Kr )

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

13 ∅8 13 D13 22 ∅8

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

7 D13 7 D13 7 D13

13 Ø10
NAMA SUB KEGIATAN
6 D13 6 D13
6 D13

13 ∅10 13 ∅10 12 Ø8 PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


10 ∅8 10 ∅8
DANTEKNIS SISTEM DRAINASE PERKOTAAN

13 Ø8

NAMA PEKERJAAN
11 Ø8

13 ∅8 13 ∅8
7 D13 22 ∅8 7 D13
BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),
NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA


DETAIL TAMPAK SAMPING 1 : 20
PENULANGAN U-DITCH
UK.200.200.120 (FC'30 MPA)

DETAIL PENULANGAN COVER & 1 : 20


U-DITCH 100X100X120 FC'30 MPA
(FABRIKASI)

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN

KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI


DANTEKNIS SISTEM DRAINASE PERKOTAAN

NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA


DETAIL COVER & UDITCH 100X100X120 1 : 25
FC' 30 Mpa (FABRIKASI)

DIRENCANAKAN

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA
120

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
DISETUJUI

10 80 10

13 100 13

MARGA MAULLANA S.Ars.


126
DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
A17 - 2022 30
KETERANGAN
10 20 20 20 10

120

3
KONSULTAN PERENCANA TEKNIK

CV. KARYA WIRA BUMI


ARCHITECTURAL & ENGINEERING DESIGN
Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
E-Mail : karyawirabumi@gmail.com

NAMA SUB KEGIATAN

10

10
80
60 10 60 10 60
PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI

10

10

10
8
DANTEKNIS SISTEM DRAINASE PERKOTAAN
60 10 60 60

NAMA PEKERJAAN

10 60 10 BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17
RUMAH POMPA KEBRAON

NAMA GAMBAR SKALA

72
DETAIL U-DITCH 60.80.120 FC'30 MPA 1 : 20
80

80
90

(FABRIKASI)

10 8
10

10
8 44 8
120 120 DIRENCANAKAN
10 60 10

80

MOHAMMAD SOCHIF BURU'YAH, ST.


PERENCANA
DIPERIKSA

Ir. M. V. HERY KUSBIANTORO


TEAM LEADER
120

DISETUJUI

MARGA MAULLANA S.Ars.


DIREKTUR
KODE GAMBAR NO. LEMBAR JML. GAMBAR
10 8 44 8 10
A17 - 2022 30
KETERANGAN

80

8
6 D13 3 ∅8

0
12

0
80 12
20

8
10 60 10
10 10
KONSULTAN PERENCANA TEKNIK

5 ∅8 5 ∅8 CV. KARYA WIRA BUMI


0 ARCHITECTURAL & ENGINEERING DESIGN
5 D13 5 D13 12 Kantor : JL. Dukuh Pondok Jati Blok O-3
Telp : 081357573391
4 D13 4 D13 E-Mail : karyawirabumi@gmail.com

0
12

90
9 ∅8 10 NAMA SUB KEGIATAN
10
9 D13
9 ∅8
PENYUSUNAN RENCANA KEBIJAKAN, STRATEGI
8 ∅8
DANTEKNIS SISTEM DRAINASE PERKOTAAN

72

80
NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK SEDERHANA),


0
12 NILAI PEKERJAAN 700 JT (POMPA) – PAKET A17

10 8
RUMAH POMPA KEBRAON

10
8 44 8 NAMA GAMBAR SKALA
10 60 10 DETAIL PENULANGAN UDITCH & COVER 1 : 20
60.80.120 (FABRIKASI) GANDAR 10 TON
TAMPAK ATAS PENULANGAN COVER 1 : 20
6 D13 3 ∅8 UDITCH 80.120.10
PERSPEKTIF U-DITCH 60.80.120 1 : 20
FC'30 MPA (FABRIKASI) 1 : 20

DIRENCANAKAN

5 Ø8
MOHAMMAD SOCHIF BURU'YAH, ST.
PERENCANA
DIPERIKSA
5 D13

3 ∅8
4 D13
9 Ø8

8 Ø8
Ir. M. V. HERY KUSBIANTORO
TEAM LEADER
DISETUJUI
9 D13

4 ∅12

MARGA MAULLANA S.Ars.


DIREKTUR