KEGIATAN
PENATAAN BANGUNAN DAN LINGKUNGAN
PENATAAN KAWASAN KALIBARU SEGMEN 2
AS BUILT DRAWING
KETERANGAN :
PEDESTRIAN
+00.30
JALAN
+/-00.00
PIPA
4" = 22
00 mm 12°
PIPA 4"
0°
MUKA AIR BANJIR
Mengetahui
Pejabat Pembuat Komitmen (PPK)
1500
SHEETPILE W 325 B
MUKA AIR NURMAL
Riza Juangsah Rahmat, ST, M.Si.
NIP : 197904172010011002
MENYETUJUI
2500
KONSULTAN PERENCANA
PT. Jakarta Konsultindo
Riyanto Rivky, ST
Team Leader
MEMERIKSA
KONSULTAN PENGAWAS
PT. INKONEKSI IZI KONSULTAN
DIBUAT OLEH
KONTRAKTOR PELAKSANA
CV. ABADI
Zaenudin
DIREKTUR
JUDUL GAMBAR
+550
EXISTING
STA:8
SALURAN
pi
Lip
25
:8+5
ru
EXISTING
+0.30
EL =
SALURAN
+0.30
EL =
Ba
STA
AIR
SALURAN
EXISTING
AIR
lan
SALURAN
00
SALURAN
= +0.30 AIR
EL SALURAN
:8+5
EXISTING
Ja
AIR
5
SALURAN
SALURAN
+47
EXISTING
AIR
STA
SALURAN
SALURAN
A:8
ST
EXISTING
= +/-0.00
EL
SALURAN
AIR
SALURAN
AIR
= +0.30
+45
SALURAN
EL
A:8
AIR
SALURAN
ST
AIR
SALURAN
Ukuran
25
Milimeter
AIR
+4
SALURAN
= +0.30
A:8
EL
AIR
SALURAN
ST
SALURAN
AIR
rta
Jaka
r-
i
sur
AIR
Bogo
SALURAN
Raya
Jalan
yam
AIR
SALURAN
= +0.30
EL
00
AIR
H.S
SALURAN
+4
A:8
AIR
SALURAN
Jl.K
ST
AIR
SALURAN
= +0.30
EL
AIR
75
SALURAN
+3
AIR
A:8
SALURAN
ST
AIR
SALURAN
rta
Jaka
+0.35
r-
Skala
AIR
=
EL
SALURAN
Bogo
BT
+0.30
=
EL
AIR Raya
1 : 70
BT
SALURAN
Jalan
50
+3ATAN
BT
AIR
SALURAN
A:8JEMB
AIR
= +0.35
BT SALURAN
EL
AIR
AIR
SALURAN
ST
SALURAN
= +0.30
EL
+0.30
25
=
EL
AIR
+3
SALURAN
A:8
AIR
SALURAN
ST
AIR
SALURAN
+0.30
=
AIR
EL
00
SALURAN
+3
AIR
A:8
SALURAN
ST
Digambar
AIR
SALURAN
+0.35
=
EL
75
BT
+2
AIR +0.30
=
BT EL
SALURAN
A:8
rta
SPBU
BT
AIR
Jaka
r-
STA:7+700
ST
SALURAN
250
= +0.35
BT
EL
Bogo
AKSES
AIR
Raya
5
:8+
SALURAN
STA:7+72
Jalan
= +0.30
EL
STA
0
AIR
STA:7+75
SALURAN
5
25
STA AKSES SPBU
STA:7+77
+/-0.00
=
:8+2
EL
0
SALURAN
AIR
STA:7+80
EL = +0.30
SALURAN
AIR
SALURAN
AIR
SALURAN
AIR
5
SALURAN
AIR
EL = +0.30
STA:7+82
SALURAN AIR
JEMBATAN
AIR
SALURAN
AIR
SALURAN = +0.30
EL
SALURAN
AIR
50
SALURAN
EL = +0.30 AIR AIR
SALURAN SALURAN
AIR
00
SALURAN
= +0.30
STA:7+8
AIR
EL
Jalan Raya SALURAN
AIR
5
EL = +0.30
Bogor - SALURAN
:8+2
AIR
Jakarta
STA:7+87
SALURAN
0
AIR
SALURAN
AIR
STA:7+90
SALURAN
EL = +0.30 AIR
SALURAN
JEMBATAN
AIR
STA
5
= +/-0.00
175
STA:7+92
EL
AIR
SALURAN
EL = +0.30 AIR SALURAN
Muhammad Saiful
- Jakarta
SALURAN
AIR
0
AIR
SALURAN SALURAN
Jalan Raya
STA:8+
AIR
Bogor
STA:7+95
SALURAN
Bogor - AIR
Raya
Jakarta EL = +0.30
SALURAN
AIR SALURAN
AIR
Jalan
+150
SALURAN
AIR
AIR +0.30
SALURAN EL =
AIR SALURAN
SALURAN
AIR
5
STA:8
EL = +0.35
AIR
STA:8+125
Jalan Raya EL =
+0.35
SALURAN
0
SALURAN
Bogor -
BT
AIR
AIR
Jakarta
BT
BT
AIR SALURAN +0.30
EL =
BT
BT BT
SALURAN
Jalan Tegar Beriman
AIR AIR
0
SALURAN +0.35
JEMBATAN
SALURAN
EL =
BT
AIR
STA:8+025
STA:8+10
SALURAN BT
EL = +0.30 AIR
STA:8+050
AIR
SALURAN SALURAN
AIR
STA:8+075
AIR
SALURAN
AIR SALURAN
SALURAN
AIR
EL = +0.30 AIR
EL = +0.30
SALURAN SALURAN
AIR
STA:8+070
SALURAN AIR
AIR SALURAN
SALURAN
AIR
AIR
Jakarta AIR
EL = +0.30
Raya
Bogor
- Jakarta
DPT EXISTING AIR
SALURAN
AIR
EL = +0.30
SALURAN
AIR
Jalan
SALURAN
AIR
SALURAN
SALURAN AIR
EL = +0.30
Jalan Raya
Bogor -
Jakarta Jalan Raya
Bogor - Jakarta
Bogor - Jakarta
Jalan Raya
No. Gambar
ARS-2009 A