Anda di halaman 1dari 1

PEMBERI TUGAS

TO
GA

H
P RAY

A G
A
KU
SAYAGA
TA N CA
UD A Y A WA

T EG
A R BERI MAN

DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN


PERTANAHAN KABUPATEN BOGOR

KEGIATAN
PENATAAN BANGUNAN DAN LINGKUNGAN
PENATAAN KAWASAN KALIBARU SEGMEN 2

AS BUILT DRAWING
KETERANGAN :

PEDESTRIAN
+00.30

JALAN
+/-00.00

PIPA 2" PIPA 2"

PIPA
4" = 22
00 mm 12°

PIPA 4"

MUKA AIR BANJIR

Mengetahui
Pejabat Pembuat Komitmen (PPK)

1500
SHEETPILE W 325 B
MUKA AIR NURMAL
Riza Juangsah Rahmat, ST, M.Si.
NIP : 197904172010011002

MENYETUJUI

2500
KONSULTAN PERENCANA
PT. Jakarta Konsultindo

Riyanto Rivky, ST
Team Leader

MEMERIKSA

KONSULTAN PENGAWAS
PT. INKONEKSI IZI KONSULTAN

Ir. Wamilonda Eka Putra


Team Leader

DIBUAT OLEH
KONTRAKTOR PELAKSANA
CV. ABADI

Zaenudin
DIREKTUR

JUDUL GAMBAR

DENAH KEYPLAN POTONGAN A-A


PADA TITIK STA 7 + 725

+550
EXISTING

STA:8
SALURAN
pi
Lip

25
:8+5
ru

EXISTING
+0.30
EL =

SALURAN
+0.30
EL =

Ba

STA
AIR
SALURAN

EXISTING
AIR

lan
SALURAN

00
SALURAN
= +0.30 AIR
EL SALURAN

:8+5
EXISTING
Ja
AIR

5
SALURAN

SALURAN
+47

EXISTING
AIR

STA
SALURAN

SALURAN
A:8
ST

EXISTING
= +/-0.00
EL

SALURAN
AIR
SALURAN

AIR
= +0.30

+45

SALURAN
EL

A:8
AIR
SALURAN

ST
AIR

SALURAN

Ukuran

25
Milimeter
AIR

+4
SALURAN

= +0.30

A:8
EL
AIR

SALURAN

ST
SALURAN
AIR
rta
Jaka
r-

i
sur
AIR
Bogo
SALURAN

Raya
Jalan

yam
AIR

SALURAN
= +0.30
EL

00
AIR

H.S
SALURAN

+4
A:8
AIR

SALURAN

Jl.K
ST
AIR

SALURAN

= +0.30
EL
AIR

75
SALURAN

+3
AIR

A:8
SALURAN

ST
AIR

SALURAN

rta
Jaka

+0.35
r-

Skala
AIR

=
EL
SALURAN

Bogo
BT

+0.30
=
EL
AIR Raya

1 : 70

BT
SALURAN
Jalan

50
+3ATAN
BT

AIR

SALURAN
A:8JEMB
AIR

= +0.35
BT SALURAN
EL

AIR
AIR

SALURAN
ST
SALURAN

= +0.30
EL

+0.30
25

=
EL
AIR

+3
SALURAN

A:8
AIR

SALURAN

ST
AIR

SALURAN

+0.30
=
AIR

EL
00
SALURAN

+3
AIR

A:8
SALURAN

ST
Digambar
AIR

SALURAN

Adzin Fairuz, S.Ars.


+0.30
=
EL

+0.35
=
EL

75
BT

+2
AIR +0.30
=
BT EL
SALURAN

A:8
rta

SPBU

BT
AIR
Jaka
r-
STA:7+700

ST
SALURAN

250
= +0.35
BT

EL
Bogo

AKSES
AIR
Raya
5

:8+
SALURAN
STA:7+72

Jalan
= +0.30
EL

STA
0

AIR
STA:7+75

SALURAN
5

25
STA AKSES SPBU
STA:7+77

+/-0.00
=

:8+2
EL
0

SALURAN
AIR
STA:7+80

EL = +0.30
SALURAN
AIR
SALURAN
AIR
SALURAN
AIR
5

SALURAN
AIR
EL = +0.30
STA:7+82

SALURAN AIR
JEMBATAN

AIR
SALURAN
AIR
SALURAN = +0.30
EL
SALURAN
AIR
50

SALURAN
EL = +0.30 AIR AIR
SALURAN SALURAN
AIR

00
SALURAN
= +0.30
STA:7+8

AIR
EL
Jalan Raya SALURAN
AIR
5

EL = +0.30
Bogor - SALURAN

:8+2
AIR

Jakarta
STA:7+87

SALURAN
0

AIR
SALURAN
AIR
STA:7+90

SALURAN
EL = +0.30 AIR
SALURAN
JEMBATAN

AIR

STA
5

= +/-0.00

175
STA:7+92

EL
AIR
SALURAN
EL = +0.30 AIR SALURAN

Muhammad Saiful
- Jakarta
SALURAN
AIR
0

AIR
SALURAN SALURAN
Jalan Raya

STA:8+
AIR
Bogor
STA:7+95

SALURAN
Bogor - AIR

Raya
Jakarta EL = +0.30
SALURAN
AIR SALURAN
AIR

Jalan

+150
SALURAN
AIR
AIR +0.30
SALURAN EL =
AIR SALURAN
SALURAN
AIR
5

EL = +0.30 SALURAN AIR


AIR SALURAN
STA:7+97

STA:8
EL = +0.35
AIR

STA:8+125
Jalan Raya EL =
+0.35
SALURAN
0

SALURAN
Bogor -
BT
AIR
AIR

Jakarta
BT

EL = +0.30 SALURAN EL = +0.35


STA:8+00

BT
AIR SALURAN +0.30
EL =
BT

BT BT

SALURAN
Jalan Tegar Beriman

AIR AIR

0
SALURAN +0.35
JEMBATAN

SALURAN
EL =
BT
AIR
STA:8+025

STA:8+10
SALURAN BT

EL = +0.30 AIR
STA:8+050
AIR
SALURAN SALURAN
AIR

STA:8+075
AIR
SALURAN
AIR SALURAN
SALURAN
AIR
EL = +0.30 AIR
EL = +0.30
SALURAN SALURAN
AIR

STA:8+070
SALURAN AIR
AIR SALURAN
SALURAN
AIR
AIR

Jalan Raya EL = +0.30


SALURAN
AIR
SALURAN

Bogor - SALURAN ING SALURAN


AIR

Jakarta AIR
EL = +0.30

DPT EXIST DPT EXISTING SALURAN


AIR
SALURAN
AIR

Raya
Bogor
- Jakarta
DPT EXISTING AIR
SALURAN
AIR

EL = +0.30
SALURAN
AIR
Jalan
SALURAN
AIR
SALURAN
SALURAN AIR

EL = +0.30

Jalan Raya
Bogor -
Jakarta Jalan Raya
Bogor - Jakarta
Bogor - Jakarta
Jalan Raya

Tanggal 02 Januari 2024

No. Gambar
ARS-2009 A

Anda mungkin juga menyukai