Anda di halaman 1dari 1

RAMP ARRIVAL

PIPA PVC DARI STP GEDUNG GSE KE BAK KONTROL


+ 7.50

+ 8.00
+ 8.00

+ 8.00
+ 9.00 + 9.00
+ 8.00

6.
AREA GEDUNG PENUJANG SISI TIMUR
+ 8.00 + 8.00 + 8.00 + 9.00

PARKIR ROAD (A) & VIP ACCESS ROAD (A)


RAMP ARRIVAL
49 meter
R9
PIPA Ø 4"
+ 5.50 PIPA PVC DARI STP GEDUNG N/A KE BAK KONTROL
+ 9.00
+ 7.50
7. AREA GEDUNG PENUJANG SISI TIMUR 29 meter
+ 9.00
R1
+ 3.50 TAXI ROAD (A) + 3.50

PIPA Ø 4"

R6

85
5,8

5,
5

R1
S
+ 9.00

JJL PIPA PVC DARI STP GEDUNG SUB. PK-PPK KE BAK KONTROL
+ 3.50 + 3.50 + 4.50 + 9.00 + 4.50 + 3.50 + 3.50
+ 9.00

R1
3,0 PARKING ROAD (A) + 9.00

PARKING ROAD (A)

RAMP ARRIVAL
1 + 9.00 + 9.00

21.3
750 + 3.50

8. AREA GEDUNG PENUJANG SISI TIMUR 45 meter

R1
3963 6000
X=

3,5

0+125.00

12
182.

(72)
1
9127
Y=

MAIN ACCESS ARRIVAL (B)


MAIN ACCESS DEPARTURE (B)
PIPA Ø 4"
MOTOBIKE OUTLET MOTOBIKE INLET

DN DIRECT FR LT.03

CARS OUTLET
4 DN FR LT.01

R1

PARKING ROAD (B)


+ 9.00 + 9.00
+ 9.00

+ 9.00 + 9.00

+ 9.00
TOILET +0.130

JANITOR
14 JANITOR
TOILET +0.130

JANITOR
PIPA PVC DARI STP GEDUNG ATC KE BAK KONTROL -08
2018-10
FFL +0.150 FFL +0.150

LIFT LIFT LIFT LIFT LIFT LIFT


+ 9.00
9. AREA GEDUNG PENUJANG SISI TIMUR 31 meter

TRV.02

TRV.01
LIFT LIFT
LIFT LIFT LIFT LIFT

TAXI ROAD (A) & SUPPORT FACILITIES ROAD (B)


+ 9.00

TRV.02

TRV.01

TRV.02

TRV.01
1

PIPA Ø 4"
+ 9.00
1,9
FFL +0.150
FFL +0.150 FFL +0.150

+ 8.00

MAIN ACCESS DEPARTURE (C)


R1
LIFT LIFT LIFT LIFT LIFT LIFT

MAIN ACCESS ARRIVAL (C)


049
85.8
A
ART PIPA PVC DARI STP GEDUNG ADMIN BANDARA KE SWP-01
LIFT LIFT
LIFT LIFT LIFT LIFT

3962 8720
X= 084.
9127

YAK
Y=
FFL +0.150
FFL ±0.000 FFL ±0.000
JANITOR

000
JANITOR JANITOR

47.0
TOILET +0.130 TOILET +0.130

RAMP ARRIVAL
3959

OG
X= 0000
179.

R2
+ 9.00
9127

OY
Y=
DN FR LT.01
CARS OUTLET

0
UP TO LT. 1

+ 8.00

R1

TOILET
-0.10
CARS INLET

R. SECURITY
± 0.00
DN DIRECT FR LT.03
UP TO LT. 3

IN T 10. AREA GEDUNG PENUJANG SISI TIMUR


± 0.00
R. SECURITY

-0.10
TOILET
R. SECURITY R. PANEL ME R. PANEL ME R. SECURITY

+ 9.00
FLOOR FLOOR

meter
BSSEMENT BSSEMENT

+ 9.00
PARKING ROAD (B) PARKING ROAD (B)
UP fr, UP fr,

30
XX + 9.00 + 9.00

TRA

TRAIN TO YOGYAKARTA
+ 9.00 + 9.00 + 9.00

PIPA Ø 4"


<

BORDES
MASUK

±0.00
.
ELV

+3.00
POS JAGA

.0000

.
ELV

<
KELUAR

000
00
±0.00

40.0
AREA PARKIR MOTOR

3969
R. ISTIRAHAT KRU KA

000
R. RAPAT

3959

VIP ACCESS ROAD (A)


X= 0000

VIP ACCESS ROAD (A)


X=
176.
735.0
R. KEUANGAN

9127
Y=
RECEPTIONIST
R. UPT KRU KA

9126
& SECURITY
±0.00 R. CONTROL
AREA PARKIR MOBIL
R. KS

+ 9.00

Y=
R. PERALATAN

JLS
R. WKS
SERBAGUNA

215
23.3 TOILET PRIA TOILET WANITA

3962
X= 3657
13
±0.00 ±0.00
AREA PARKIR MOTOR

J
038.
AREA PARKIR MOTOR

+ 9.00
MUSHALA
PRIA MUSHALA
WANITA
PRIA SEPATU
SANDAL
RAK
& RAK
& SEPATU
SANDAL WANITA

9127
WUDHU WUDHU

Y=

SUPPORT FACILITIES ROAD (D)

STASIUN KERETA
ARRIVAL

RAMP
ARRIVAL
R3

RAMP
7 168 1,4

18
0,9 02.0 6 + 9.00
R3 3962
X= 0768
979. 00
86.00
9126
Y=
3968 000
VIP ACCESS ROAD (A) X=
+ 9.00

749.0
+ 3.70 + 3.70 + 3.70 + 3.70 + 3.70 + 9.00
9126
UP

DN
Y=
VIP ACCESS ARRIVAL
+ 9.00
0+025.00
(199)
VIP ACCESS DEPARTURE

STOP STOP STOP STOP

STOP STOP STOP STOP

STOP STOP STOP STOP


+ 8.00

R3
Tangki Air Hujan

0
+ 9.00 + 9.00

60m X 30m

STOP

STOP
+ 9.00

STOP
0+050.00 + 9.00
(200) + 9.00

STOP

STOP

STOP
TAXI ROAD (B)

SU
PPO
SUPPORT FACILITIES ROAD (D)

RT
LPN LPN LPN LPN

FA
+ 7.00 MSL + 7.00 MSL LAND SIDE SERVICE ROAD LPN LPN LPN LPN

+ 7.00 MSL + 7.00 MSL + 7.00 MSL

VIP ACCESS ROAD (B)


+ 7.00 MSL + 7.00 MSL + 7.00 MSL
451 884

CILI
64.4

13
94.1
3964

VIP ACCESS ROAD (C)


5 3963 3692 0213
+ 9.00
X= X=

TIES
502 .865 763. 738.
181 73.3 341 9126 9126
+ 9.00 MSL 55.1 3962 396 9874 Y= Y=
3962 X= 0480 X= 774.
X=

RO
2149 799. 9126
823. 9126 Y=
9126 Y= + 9.00 MSL

AD
+ 7.00
Y= + 9.00 MSL
485 + 9.25

(B)
68.8 -0.10 PRIA
DIFABLE -0.10

JANITOR

+ 9.00 MSL 3961


X=
01

3210
ANAK2
WHASTAFEL

ANAK2 WHASTAFEL ANAK2

WHASTAFEL

-0.10
837.
TOILET PRIA

7
EXIT

+ 9.00 MSL
PRIA TOILET
-0.10 -0.10

Shaft TOILET PRIA


-0.10

9126
Shower JANITOR
-0.10WANITA
TOILET

TOTO TV150NLJ
Y=
KORIDOR
± 0.00 pool
± 0.00

1
troley 2000 1000

-0.10
-0.10 ANAK2 KORIDOR
± 0.00

Shower
± 0.00
JANITOR WHASTAFEL JANITOR KORIDOR
± 0.00 KORIDOR
± 0.00 KORIDOR
± 0.00 KORIDOR
NURSERY
± 0.00

+ 9.00 MSL
-0.10

14

Shower
± 0.00
-0.10
KORIDOR
± 0.00 DIFABLE PRIA ± 0.00 JANITOR
-0.10 JANITOR ± 0.00 ± 0.00 JANITOR
-0.10 JANITOR
-0.10

± 0.00
-0.10 KORIDOR KORIDOR KORIDOR KORIDOR
TOILET WANITA KORIDOR

Shower
-0.10

-0.10
WHASTAFEL ANAK2

Shower JANITOR DIFABLE WANITA


-0.10WANITA
TOILET

-0.10
JANITOR

-0.10
-0.10PRIA
TOILET TOILET PRIA

X = 9126061.309
BATAS
Y SISI UDARA & DARAT
397649.470
-0.10
-0.10

TOILET WANITA TOILET WANITA

+ 9.00 MSL + 9.00 MSL 8783 WHASTAFEL


ANAK2 NURSERY
± 0.00

-0.10
DIFABLE WANITA

+ 9.00 MSL
+ 9.00 MSL
+ 9.00 MSL 807. 2555 + 9.00 MSL
9126 750.

PUMP

PUMP
C
L

C
L
+ 9.00 MSL
Y= 215
Y=
9126 795
15-3

672 49.4 04.1


48.0 3962
3948 8179 X= X=
3964
X=
17

286. 92
9127 5.68
Y=
23 11 X=
3955
66.1
014
6713 Y=
912
27.0
486
681
144 719 + 7.00 MSL
176
2 39.8

00
991. 3962 40.0
01.1
110 9126 X= 3963 0988 X=
3964 3508
X=
3949 +227. 4244
9.00 MSL 68.2 Y= X= 705. 670. + 7.00
9126
05

+ 9.00 MSL 388 Y=


SE2-TB

3949 3251 9126


SD2-TB

X=
SE1-TB

9127 Y=
SD1-TB

Y= 198. 43.8
529 3962 6651
3 Y=
9127
+ 9.00 MSL 95.9 X= 729.
SELASAR
FFL+0.500

.187 3961 + 7.00


X= 9502 9126 LAND SIDE
835 741. Y= SERVICE
ROAD
394 4211 9126
X= 251. + 9.00 MSL + 9.00 MSL Y= 972 RWT-02. 500m3

15-9
27.6
Y = 9127 3963 (20.000x12.500x3.000)mm, water level 2.000mm + 7.00 MSL
132 X= 3579
UP
UP UP UP

0 41.0
-0.10 PRIA
DIFABLE

699. SEWAGE PIT (SWP-02)

± 0.00
± 0.00

DN PERSIAPAN PRIA PERSIAPAN WANITA DN DN DN


KAP. 40m3
.220 + 9.00 MSL Debit total yang masuk ke RWT ++ 7.00
7.00 MSL

-0.10
3961
WHASTAFEL ANAK2 Shaft WHASTAFEL ANAK2 DIFABLE WANITA WHASTAFEL ANAK2 Shaft WHASTAFEL ANAK2

525 400 X= 7699 9126


Y=
± 0.00 ± 0.00

-0.10
UP DN MUSHOLA PRIA MUSHOLA WANITA -0.10 UP DN
TOILET PRIA TOILET WANITA R. SECURITY

2.532,48 l/s
± 0.00

395
-0.10 -0.10 ± 0.00

+ 9.00 MSL 760.

TOTO TV150NLJ
94.3 1765
WUDLU PRIA WUDLU WANITA ELV . -0.01 NURSERY NURSERY
± 0.00

JANITOR

GREASE TRAP
+ 9.00 MSL

-0.10
TOILET

X=
JANITOR
-0.10 JANITOR

3000
-0.10

RWT-01. 500m3
-0.10

3949 007. = 9126


TOILET WANITA
JANITOR
-0.10 -0.10

X= 0764 + 7.00 MSL


TOILET PRIA

2321

-0.10

PRIA -0.10
9127 (20.000x12.500x3.000)mm, Y
DIFABLE
WANITA DIFABLE

1000
152. water level 2.000mm 139
15-2

GREASE TRAP
683. F
9127 Y= + 9.00 MSL
9126 .8537 22.9 +9.00/±0.00
Y= Debit total yang masuk ke RWT Y= 3964 4959 + 7.00 MSL
342
DAPUR
±0.25 4295 377 X= 623. +9.00/±0.00
+ 9.00 MSL 92.4 + 9.00 MSL 2.277,7 l/s 726. 396 UP Fr. BASEMENT PARKING

9126 X= Y=
9126
12 + 9.00 MSL
X=
3953
010.
0103
CANTEEN
±0.25

Y= 35.5
602
049 + 9.00 MSL
+ 9.00 MSL

9 937 3962 64.6


+1.20
+ 9.00 MSL
X=
out out +1.20

9127
Y= 29.8 3963
X=
in in 10

1
1606
MUSHALLA

3961
03

LAP. UPACARA
19

±0.25

X= 7 E
NK

2192 647. dinding turap


NK

NK

NK
NK

NK

NK

NK

NK

NK

NK

730. 9126 .263 243 13 20 24

Y= 431 70.1

08
MULTIFUNCTION HALL
+ 9.00 MSL

09
+ 9.00 MSL
= 9126 396 4682 3964 00 ENTRANCE

Y X= X=
475 M2

052 593. 9.16 - 0.05


+ 9.00 MSL
657
+2.20

82.4 9126 912 + 7.00 MSL


5560 Y= Y=
25 30 38

+ 9.00 MSL
UP
3962
X=
UP

+ 9.00 MSL 710. 8805


DROP OFF

737-800NG

737-800NG

737-800NG

737-800NG

737-800NG

737-800NG

737-800NG

737-800NG

737-800NG

737-800NG
+2.20
+ 9.00 MSL
+0.20

15-10
+ 9.00 MSL 6 658. + 9.00 MSL
DN DN

9126 4028
.753 Y= 004 9126 660.
030 88.9 Y=
CHINALAVATORYPENNINGTONK-2196-8VITREOUS
CHINALAVATORYPENNINGTONK-2196-8VITREOUS
VITREOUS
CHINALAVATORYPENNINGTONK-2196-8VITREOUS
CHINALAVATORYPENNINGTONK-2196-8
UP UP
HALL ENTRANCE

9126
OUTER CORRIDOR +2.35

396 3961
5911 X= X=
DN

Y= 304
DN

4292 166. 1645 09.5

04A
191. 7 739. MEET ME ROOM
CHINALAVATORYPENNINGTONK-2196-8
CHINALAVATORYPENNINGTONK-2196-8VITREOUS
VITREOUS
CHINALAVATORYPENNINGTONK-2196-8VITREOUS
KOLOM 50X50 CM

+ 9.00 MSL SEWAGE PIT (SWP-03) +0.250


+ 9.00 MSL
9127 .661
10 X=
3963
15 + 7.00 MSL
KAP. 40m3
9127 812 Y= 9126 STAFF

Y=
MEETING ROOM

Y= 85.1 956 KOLOM 50X50 CM NAIK

1500
3948 394 + 9.00 MSL JANITOR

X=
02

X= 103 155

LIFT
49.5 70.6

LIFT
+ 9.00 MSL
GREASE TRAP
9728 GREASE TRAP

5 3972

dsp
721 707. 3971 8833
SELASAR TERRACE

8561

toy
-0.05

5 X= X=
OUTER CORRIDOR

.652 50.2 LP
9126 B 293. 249.
525 X=
3956 0570 Y= 315 252 086 744 MULTI FUNCTION WORKSHOP

9126 9126 + 9.00 MSL + 9.00 MSL


16.0 19.8 97.1 8 Y= Y=
SPAREPART R. PENYIMPANAN

60.1
+1.70 BAN

834.
+1.70

NK NK

395 1309 BUILDING 190 OUTER

.445 G
X= 3961 3962 3962 3962 5 + 9.00 MSL
CORRIDOR

876. 9126 X= X= 2397 X= 5778 X= 0870 70.1 002


Y=
± 0.00

106
± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00

± 0.00
622. 607. 594. .272
± 0.00 WANITA
MUSHOLA WHASTAFEL ANAK2 WHASTAFEL ANAK2 MUSHOLA WANITA OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE

800
800 2000

9126 3968 397


17
WHASTAFEL ANAK2

0824 0351
WHASTAFEL ANAK2

REFLECTING POOL REFLECTING POOL


+ 11.50 MSL 16.2 452
R. COMPRESSOR

+ 9.00 MSL

-0.10
Y= X= X=
±0.000

9126 9126 9126


WHASTAFEL ANAK2 WHASTAFEL ANAK2

26
TOILET WANITA -0.10WANITA
TOILET

Y= Y= Y=
+ 1.50
381. H 333.
4 396
CAZA
-0.10

3964
JANITOR

7837 X= 0089

- 0.10
X= 0.11
WUDLU WANITA
POMPA

+ 9.00 MSL + 9.00 MSL


BAHAN BAKAR

9126 9126
RAK SEPATU/SANDAL

+0.300

170
+ 11.50 MSL RAK SEPATU/SANDAL

-0.10

-0.10
599. 543. 653
± 0.00 -0.10 ± 0.00

13000
956

± 0.00
MAINTENANCE (ROW 4)

Y= Y=
JANITOR KORIDOR DIFABLE WANITA -0.10 WANITA
DIFABLE KORIDOR JANITOR MUSHOLA WANITA
-0.050
-0.10WANITA
TOILET

-0.10
16.3 833
-0.10WANITA
WUDLU

912
SMOKE HOUSE

133 95.9
-0.10PRIA
TOILET

9126
WUDLU WANITA

9126
RAK SEPATU/SANDAL

+1.70

Y= Y= Y=
18
± 0.00

KANTIN

3960 14.2
BENCH ± 0.00 BENCH

06.8
NURSERY

3971
NURSERY
± 0.00

X= 7927 5268
BENCH BENCH KORIDOR
± 0.00

1750
X= 069

- 0.10
3964
± 0.00 WUDLU PRIA
1700 3600
TR 1700

3962
-0.10 KORIDOR KORIDOR
± 0.00

-0.10
+ 9.00 MSL
250.
WUDLU PRIA WUDLU PRIA

699.

-0.10
X=
± 0.00

8 X= 32.0
TOILET WANITA MUSHOLA PRIA

-0.10
-0.10 PRIA
DIFABLE -0.10

9704

± 0.00
C1
JANITOR KORIDOR
± 0.00 DIFABLE PRIA -0.10

I
KORIDOR JANITOR

9126
-0.10 RAK SEPATU/SANDAL

483
= 9126
RAK SEPATU/SANDAL RAK SEPATU/SANDAL TOILET PRIA
P01

3975

11
626. + 9.00 MSL 4149
Y=
+ 10.00 MSL

9205
25.7 X=
-0.10

Y
JANITOR
NK

± 0.00

121.
MUSHOLA PRIA

9126
Y=
WHASTAFEL ANAK2 KORIDOR

3974
WHASTAFEL ANAK2 ± 0.00

x-ray

3509
± 0.00 PRIA
MUSHOLA

X=

9843,64
WHASTAFEL ANAK2

22 9126
WHASTAFEL ANAK2

± 0.00 ± 0.00 ± 0.00

OFFICE
WHASTAFEL ANAK2 WHASTAFEL ANAK2 OFFICE SMOKING ROOM

156.
16
PK01 PK01

AREA PENGEMBANGAN ULTIMATE Y=


-0.10

SISI DARAT

-0.10
D
TOILET PRIA TOILET PRIA ± 0.00 ± 0.00

to level 02 PANTRY PANTRY


UP

Mechine

+ 9.00 MSL
852 540 774 387 111 926 557 104 289 9126
Lift UP UP UP UP UP UP

155

UP
33.1 33.8 52.0 + 9.00 MSL 050 821 452
DN DN DN DN DN

49.7 45.4 30.0 86.3 99.1 61.4 30.0 Y= + 9.00 MSL

19
DN

DOWN
06 91.7 04.5 0129 + 9.00 MSL
X=
3949
705
1.52 X=
3950
014.
8942
846
6 X=
3953
899.
0648
X=
3956
36.3
4795 X=
3956 2875 X=
3958 2451
667.
6850

9126
6543 X=
3964
500.
5943 X=
3965
465.
7764 X=
3966
434.
9946 X=
3966
414.
4734 X=
3967
373.
4309 X=
3968
350.
7721 C2
+ 10.50 MSL + 9.00 MSL
X=
3973
180.
2088

20 21

9999,84

6000
912 9127 34.8 793. 773. 732. Y= 426 565. 9126 9126 9126 9126 9126 9126 + 10.00 MSL 9126
9126 9126 728 Y= Y= Y= Y= Y= Y= Y=
Y= Y= 3952 Y= 9126 9126 9126 95.2 Y=

2000
X= 3280 Y= Y= Y= 3960
12850

20.7 + 9.00 + 11.20 MSL


953. X= 3964 + 11.20 MSL
+ 9.00
X= 7423 + 10.00 MSL
+ 11.50 MSL SISI UDARA
07

16

177 9126
06

Y= 806 817 553. + 10.00 MSL

10
31.6 in 01.8 93.2 9126 997 + 10.00 + 12.20 MSL
3949 3960 Y= 20.1 + 9.00 MSL
X= 6871 X= 4208 X=
3961 1178 3964
050. 660. 590. X=
9127 9126
+ 9.00 MSL Y= + 9.00 MSL + 9.00 MSL + 9.00 MSL + 9.00 MSL + 9.00 MSL Y= Y=
9126 + 9.00 MSL
+ 9.00 MSL + 9.00 MSL + 9.00 MSL + 9.00 MSL
+ 9.00 MSL + 9.00 MSL
6 9946
9844 out
out 6163 210.
APPRON SERVICE ROAD 910. 651.
5 APPRON SERVICE ROAD 9126 584
APPRON SERVICE ROAD

9126 019 9126 Y= 45.4


Y= 15.3
410M SLOPE 0,5%
Y= 159 440M SLOPE 0,5% 400M SLOPE 0,5% 700M SLOPE 0,5%
3972
3953 24.3 2
X=
X= X=
3960
+ 9.00 MSL GATE-6 GATE-5 GATE-4 GATE-3 42 24 4764
4270 1240 0809
AREA PENUMPUKKAN/ STAGING AREA
2457 4802 2976 2552 7340 9522 2.82 3749 5220 1.52 4299
6527 108.
Q1 PARKIR 796.GSE
035. 984. 943. 871. 840. 7663 0785 9420 1991 8345 3363 2947 5561 1429 7704 4869 2033 0080 486. 2 445. 3 424. 8 393. 2 635 2 303. 9 251. 0 623 4 149. 2
Y=
9127
77.4
411
Y=
9126
18.3
950
Y=
9126
31.1
568 AREA YPENUMPUKAN/
= 9126 28.4864 Y=
9126
13.0
982 9126 .566
6
9126
752.
636
1
708. 2

9126
680. 1
9126
654. 3
299 620. 4
605. 5
585. 3 570. 6
557. 543. 7
528. 513. 500.8
3 Y=
9126
489
.057 9
Y=
9126
601
.820 10
Y=
9126
658
.201 11
Y=
9126
742
.774 Y=
912
855
.772 Y=
9126
991
.632 Y=
9126
134
.102 Y=
912
189
.092 Y=
9126
414
.602 Y=
9126
27.2
507

X=
3949
X=
3951
X=
3952
X=
3954
X=
3955 SATELITE Y=
395
629 Y= 48.1 Y=
9126
69.1
874 Y= 945
.499 Y= 18.7 Y=
9126
08.8
883
Y=
9126
51.4
694
Y=
9126
06.5
333
Y=
9126
47.0
271
Y=
9126
83.8
796
Y=
9126
20.6
201
Y=
9126
62.6
113
Y=
9126
04.6
025
Y=
9126
441
.150
X=
396
X=
396
X=
396
X=
396
X=
396
X=
396
X=
397
X=
397
X=
397
X=
3975

737-800NG

2W

737-800NG

2W

2W
395 3960

2V

2V

2V
3957 396

2U
N

2U
N

2U
N
STAGING AREA X= X= X=
3958 X= X= X=
3961
X=
3961
X=
3962
X=
3962
X=
3962
X=
3963
X=
3963
X=
3964
X=
04

OFFICE
4 1

+ 10.50 MSL

737-800NG

737-800NG
338.3997
338.3997
338.3997
338.3997
338.3997
338.3997
338.3997
338.3997
338.3997
338.3997
338.3997
3
800

800 2000

R. COMPRESSOR
±0.000

2623
865.
POMPA
BAHAN BAKAR
+0.300
MAINTENANCE (ROW 4)
-0.050
13000

9126 100
Y= 98.6
3952
1750

X=
1700

TR 1700

3600

+ 10.50 MSL

+ 9.00 MSL

737-800NG

Anda mungkin juga menyukai