Evaluasi Jalan
Evaluasi Jalan
NO URAIAN P L T QTY
1 Pekerjaan Stripping t.20cm 785.96
2 Pekerjaan Galian
3 Pekerjaan Urugan
4 Pekerjaan Pemadatan
5 Sirtu
- Pasir 36.27
- Upah 36.27
- Alat 1.00
6 Lantai kerja
- Beton K-100 181.35
- Upah 181.35
- Bekisting
- Alat 1.00
3,627.01 7 Pekerjaan Beton K-300
- Beton K300 1,088.10
- Upah Cor 1,088.10
- Bekisting
8 Pekerjaan Dowel
- Besi D22
- Kawat Bendrat
- Upah besi
- Alat
9 Aspal t=5cm 3,627.01
10
TOTAL
INTERNAL EXTERNAL
SAT HARGA SATUAN JUMLAH HARGA SATUAN JUMLAH
m2 - -
m3 - -
m3 - -
m3 - -
- -
m3 - -
m3 - -
ls - -
- -
m3 550,000.00 99,742,907.00 -
m3 - -
m' - -
ls - -
760,000.00 - 985,604.40 1,072,440,523.72
m3 730,000.00 794,316,241.20
m3 30,000.00 32,643,133.20 -
m' - -
- -
kg - -
kg - -
kg - -
ls - -
m2 - -
- -
-
985,604.40 -
-
926,702,281.40 1,072,440,523.72
ANALISA SATUAN PEKERJAAN
786,018.00
1,784.00 410,320.00
218,900.00 113,828.00
301,000.00 261,870.00
210.00 -
109,986.00
68,400.00 82,080.00
102,600.00 20,520.00
116,300.00 -
123,100.00 7,386.00
Jumlah : 896,004.00
Overhead & keuntungan 10% : 89,600.40
Jumlah : 985,604.40
300
0.2