task_code status_codwbs_id task_namestart_date end_date resource_lidelete_record_flag

Activity ID Activity St WBS CodeActivity N (*)Start (*)Finish (*)ResourcDelete This Row


A1000 In Progres INA Pekerjaan 04-Jan-21 10-Jun-21
A1010 In Progres INA.1 Pekerjaan 04-Jan-21 03-Sep-21 Uizet dan bouwplank, Galian Tanah, Urugan tanah kembali,
A1020 Not Starte INA.1 Pekerjaan 12-Jul-21 03-Sep-21 PEKERJAAN PASANGAN BATU DAN DINDING BATA
A1030 Not Starte INA.1 Pekerjaan S 06-Sep-21 12-Nov-21 PEKERJAAN STRUKTUR BETON DAN PONDASI MINI PILE
A1040 Not Starte INA.1 Pekerjaan 15-Nov-21 21-Jan-22 PEKERJAAN PLESTERAN DAN SPONENGAN
A1050 Not Starte INA.1 Pekerjaan 22-Nov-21 21-Jan-22 PEKERJAAN KUSEN PINTU DAN JENDELA
A1060 Not Starte INA.1 Pekerjaan L 24-Jan-22 18-Mar-22 PEKERJAAN LANTAI, PELAPIS DINDING REALING DAN P
A1070 Not Starte INA.1 Pekerjaan 21-Mar-22 29-Apr-22 PEKERJAAN PLAFON
A1080 Not Starte INA.1 Pekerjaan 02-May-2227-May-22PEKERJAAN ATAP
A1090 Not Starte INA.1 Pekerjaan 30-May-2201-Jul-22 PEKERJAAN CAT
A1100 Not Starte INA.1 Pekerjaan 04-Jul-22 19-Aug-22 PEKERJAAN DRANASE
A1110 Not Starte INA.1 Instalasi Ai22-Aug-22 16-Sep-22 INSTALASI AIR BERSIH
A1120 Not Starte INA.1 Pekerjaan I19-Sep-22 14-Oct-22 PEKERJAAN INSTALASI AIR KOTOR
A1130 Not Starte INA.1 Pekerjaan S 17-Oct-22 11-Nov-22 PEKERJAAN SANITAIR
A1140 Not Starte INA.1 Pekerjaan E 14-Nov-22 10-Feb-23 PEKERJAAN ELEKTRIKAL
A2010 Not Starte INA.2 Pekerjaan 13-May-2126-May-21PEKERJAAN TANAH DAN PASIR
A2020 Not Starte INA.2 Pasangan B 13-May-2107-Jul-21 PEKERJAAN PASANGAN BATU DAN DINDING BATA
A2030 Not Starte INA.2 Pekerjaan 13-May-2107-Jul-21 PEKERJAAN STRUKTUR BETON
A2040 Not Starte INA.2 Pekerjaan 13-May-2107-Jul-21 PEKERJAAN PLESTERAN DAN SPONENGAN
A2050 Not Starte INA.2 Pekerjaan 01-Jun-21 12-Jul-21 PEKERJAAN KUSEN PINTU DAN JENDELA
A2060 Not Starte INA.2 Pekerjaan L 22-Jun-21 09-Aug-21 PEKERJAAN LANTAI, PELAPIS DINDING DAN PLIN
A2070 Not Starte INA.2 Pekerjaan 22-Jun-21 09-Aug-21 PEKERJAAN PLAFON
A2080 Not Starte INA.2 Pekerjaan 22-Jun-21 19-Jul-21 PEKERJAAN ATAP
A2090 Not Starte INA.2 Pekerjaan 08-Jun-21 02-Aug-21 PEKERJAAN CAT
A2100 Not Starte INA.2 Pekerjaan 21-Jun-21 23-Jul-21 PEKERJAAN DRANASE
A2110 Not Starte INA.2 Instalasi Ai01-Jun-21 28-Jun-21 INSTALASI AIR BERSIH
A2120 Not Starte INA.2 Instalasi Ai01-Jun-21 28-Jun-21 PEKERJAAN INSTALASI AIR KOTOR
A2130 Not Starte INA.2 Pekerjaan S 29-Jun-21 12-Jul-21 PEKERJAAN SANITAIR
A2140 Not Starte INA.2 Electrical 07-Jun-21 23-Jul-21 PEKERJAAN ELEKTRIKAL
A3010 Not Starte INA.3 Pekerjaan 13-May-2126-May-21PEKERJAAN TANAH DAN PASIR
A3020 Not Starte INA.3 Pasangan B 13-May-2107-Jul-21 PEKERJAAN PASANGAN BATU DAN DINDING BATA
A3030 Not Starte INA.3 Pekerjaan 13-May-2107-Jul-21 PEKERJAAN STRUKTUR BETON
A3040 Not Starte INA.3 Pekerjaan 13-May-2107-Jul-21 PEKERJAAN PLESTERAN DAN SPONENGAN
A3050 Not Starte INA.3 Pekerjaan 01-Jun-21 12-Jul-21 PEKERJAAN KUSEN PINTU DAN JENDELA
A3060 Not Starte INA.3 Pekerjaan L 17-May-2102-Jul-21 PEKERJAAN LANTAI, PELAPIS DINDING DAN PLIN
A3070 Not Starte INA.3 Pekerjaan 17-May-2102-Jul-21 PEKERJAAN PLAFON
A3080 Not Starte INA.3 Pekerjaan 17-May-2111-Jun-21 PEKERJAAN ATAP
A3090 Not Starte INA.3 Pekerjaan 01-Jun-21 26-Jul-21 PEKERJAAN CAT
A3100 Not Starte INA.3 Pekerjaan 14-Jun-21 16-Jul-21 PEKERJAAN DRANASE
A3110 Not Starte INA.3 Instalasi Ai07-Jun-21 02-Jul-21 INSTALASI AIR BERSIH
A3120 Not Starte INA.3 Instalasi Ai07-Jun-21 02-Jul-21 PEKERJAAN INSTALASI AIR KOTOR
A3130 Not Starte INA.3 Sanitair 28-Jun-21 09-Jul-21 PEKERJAAN SANITAIR
A3140 Not Starte INA.3 Elektrikal 07-Jun-21 23-Jul-21 PEKERJAAN ELEKTRIKAL
A4010 Not Starte INA.4 Pekerjaan 13-May-2125-Aug-21 PEKERJAAN PAGAR DEPAN
A4020 Not Starte INA.4 Tulisan Met07-Jun-21 30-Jul-21 TULISAN BAHAN METAL FINISHING CAT DUCO
A4030 In Progres INA.6 MINGGU 112-May-2113-May-21Pembersihan lokasi dan perataan tanah
A4040 Not Starte INA.7 MINGGU 218-May-2126-May-21MINGGU 2
A4050 Not Starte INA.8 MINGGU 326-May-2103-Jun-21 MINGGU 3
A4060 Not Starte INA.9 MINGGU 402-Jun-21 10-Jun-21 MINGGU 4
A4070 Not Starte INA.10 MINGGU 509-Jun-21 17-Jun-21 MINGGU 5
anah, Urugan tanah kembali, Peninggian pail lantai 80 cm, Urugan peninggian pail menggunakan sirtu, Memadatkan tanah (per 20 cm), Ur
TU DAN DINDING BATA
TON DAN PONDASI MINI PILE
AN SPONENGAN
DAN JENDELA
IS DINDING REALING DAN PLIN

TU DAN DINDING BATA

AN SPONENGAN
DAN JENDELA
IS DINDING DAN PLIN

TU DAN DINDING BATA

AN SPONENGAN
DAN JENDELA
IS DINDING DAN PLIN

SHING CAT DUCO


adatkan tanah (per 20 cm), Urugan pasir bawah pondasi
rsrc_short rsrc_namersrc_title_name
Resource IResource Title
R Uizet dan bouwplank
R-1 Galian Tanah
R-2 Urugan tanah kembali
R-3 Peninggian pail lantai 80 cm
R-4 Urugan peninggian pail menggunakan sirtu
R-5 Memadatkan tanah (per 20 cm)
R-6 Urugan pasir bawah pondasi
B pekerjaan tanah
B-1 PEKERJAAN PASANGAN BATU DAN DINDING BATA
B-2 PEKERJAAN STRUKTUR BETON DAN PONDASI MINI PILE
B-3 PEKERJAAN PLESTERAN DAN SPONENGAN
B-4 PEKERJAAN KUSEN PINTU DAN JENDELA
B-5 PEKERJAAN LANTAI, PELAPIS DINDING REALING DAN PLIN
B-6 PEKERJAAN PLAFON
B-7 PEKERJAAN ATAP
B-8 PEKERJAAN CAT
B-9 PEKERJAAN DRANASE
B-10 INSTALASI AIR BERSIH
B-11 PEKERJAAN INSTALASI AIR KOTOR
B-12 PEKERJAAN SANITAIR
B-13 PEKERJAAN ELEKTRIKAL
R-7 SPKT GEDUNG
R-8 PEKERJAAN TANAH DAN PASIR
R-9 PEKERJAAN PASANGAN BATU DAN DINDING BATA
R-10 PEKERJAAN STRUKTUR BETON
R-11 PEKERJAAN PLESTERAN DAN SPONENGAN
R-12 PEKERJAAN KUSEN PINTU DAN JENDELA
R-13 PEKERJAAN LANTAI, PELAPIS DINDING DAN PLIN
R-14 PEKERJAAN PLAFON
R-15 PEKERJAAN ATAP
R-16 PEKERJAAN CAT
R-17 PEKERJAAN DRANASE
R-18 INSTALASI AIR BERSIH
R-19 PEKERJAAN INSTALASI AIR KOTOR
R-20 PEKERJAAN SANITAIR
R-21 PEKERJAAN ELEKTRIKAL
PRO GEDUNG PROPAM
R-22 PEKERJAAN TANAH DAN PASIR
R-23 PEKERJAAN PASANGAN BATU DAN DINDING BATA
R-24 PEKERJAAN STRUKTUR BETON
R-25 PEKERJAAN PLESTERAN DAN SPONENGAN
R-26 PEKERJAAN KUSEN PINTU DAN JENDELA
R-27 PEKERJAAN LANTAI, PELAPIS DINDING DAN PLIN
R-28 PEKERJAAN PLAFON
R-29 PEKERJAAN ATAP
R-30 PEKERJAAN CAT
R-31 PEKERJAAN DRANASE
R-32 INSTALASI AIR BERSIH
R-33 PEKERJAAN INSTALASI AIR KOTOR
R-34 PEKERJAAN SANITAIR
R-35 PEKERJAAN ELEKTRIKAL
FA GEDUNG FASUM
R-36 PEKERJAAN PAGAR DEPAN
R-37 TULISAN BAHAN METAL FINISHING CAT DUCO
R-38 Pajak bro
R-39 ppn 10%
R-40 PROGRESS MINGGUAN
R-41 MINGGU 1
R-42 MINGGU 2
R-43 MINGGU 3
R-44 MINGGU 4
R-45 MINGGU 5
R-46 MINGGU 5
R-47 Pembersihan lokasi dan perataan tanah
R-48 Sewa direksi keet
R-49 Listrik kerja
pred_proj_proj_id PREDTASK TASK__PRpred_task_task_id PREDTASK TASK__taspred_type lag_hr_cnt
(*)Predeces(*)Successo
(*)Predec (*)Succes PredecessoSuccessor (*)Predece(*)SuccessRelationshLag(d)
INA INA INA.1 Ged INA.1 Ged A1030 A1040 Pekerjaan Pekerjaan FS 0
INA INA INA.1 Ged INA.1 Ged A1050 A1060 Pekerjaan Pekerjaan FS 0
INA INA INA.1 Ged INA.1 Ged A1060 A1070 Pekerjaan Pekerjaan FS 0
INA INA INA.1 Ged INA.1 Ged A1070 A1080 Pekerjaan Pekerjaan FS 0
INA INA INA.1 Ged INA.1 Ged A1080 A1090 Pekerjaan Pekerjaan FS 0
INA INA INA.1 Ged INA.1 Ged A1090 A1100 Pekerjaan Pekerjaan FS 0
INA INA INA.1 Ged INA.1 Ged A1100 A1110 Pekerjaan Instalasi A FS 0
INA INA INA.1 Ged INA.1 Ged A1110 A1120 Instalasi A Pekerjaan FS 0
INA INA INA.1 Ged INA.1 Ged A1120 A1130 Pekerjaan Pekerjaan FS 0
INA INA INA.1 Ged INA.1 Ged A1130 A1140 Pekerjaan Pekerjaan FS 0
INA INA INA ProyekINA.1 Ged A1000 A1010 Pekerjaan Pekerjaan SS 0
INA INA INA.1 Ged INA.1 Ged A1010 A1020 Pekerjaan Pekerjaan FF 0
INA INA INA.1 Ged INA.1 Ged A1020 A1030 Pekerjaan Pekerjaan FS 0
INA INA INA.1 Ged INA.1 Ged A1040 A1050 Pekerjaan Pekerjaan FF 0
INA INA INA.2 Ged INA.2 Ged A2010 A2020 Pekerjaan Pasangan SS 0
INA INA INA.2 Ged INA.2 Ged A2010 A2030 Pekerjaan Pekerjaan SS 0
INA INA INA.2 Ged INA.2 Ged A2020 A2030 Pasangan Pekerjaan FF 0
INA INA INA.2 Ged INA.2 Ged A2030 A2040 Pekerjaan Pekerjaan SS -28
INA INA INA.2 Ged INA.2 Ged A2040 A2050 Pekerjaan Pekerjaan SS -10
INA INA INA.2 Ged INA.2 Ged A2050 A2060 Pekerjaan Pekerjaan SS 15
INA INA INA.2 Ged INA.2 Ged A2060 A2070 Pekerjaan Pekerjaan SS 0
INA INA INA.2 Ged INA.2 Ged A2070 A2080 Pekerjaan Pekerjaan SS 0
INA INA INA.2 Ged INA.2 Ged A2080 A2090 Pekerjaan Pekerjaan SS -10
INA INA INA.2 Ged INA.2 Ged A2090 A2100 Pekerjaan Pekerjaan SS -20
INA INA INA.2 Ged INA.2 Ged A2100 A2110 Pekerjaan Instalasi A SS -20
INA INA INA.2 Ged INA.2 Ged A2100 A2120 Pekerjaan Instalasi A SS -20
INA INA INA.2 Ged INA.2 Ged A2120 A2130 Instalasi A Pekerjaan FS 0
INA INA INA.2 Ged INA.2 Ged A2130 A2140 Pekerjaan Electrical SS -25
INA INA INA.3 Ged INA.3 Ged A3010 A3020 Pekerjaan Pasangan SS 0
INA INA INA.3 Ged INA.3 Ged A3010 A3030 Pekerjaan Pekerjaan SS 0
INA INA INA.3 Ged INA.3 Ged A3030 A3040 Pekerjaan Pekerjaan SS -15
INA INA INA.3 Ged INA.3 Ged A3040 A3050 Pekerjaan Pekerjaan SS -10
INA INA INA.3 Ged INA.3 Ged A3050 A3060 Pekerjaan Pekerjaan SS -20
INA INA INA.3 Ged INA.3 Ged A3060 A3070 Pekerjaan Pekerjaan SS 0
INA INA INA.3 Ged INA.3 Ged A3070 A3080 Pekerjaan Pekerjaan SS 0
INA INA INA.3 Ged INA.3 Ged A3080 A3090 Pekerjaan Pekerjaan SS -10
INA INA INA.3 Ged INA.3 Ged A3090 A3100 Pekerjaan Pekerjaan SS -10
INA INA INA.3 Ged INA.3 Ged A3100 A3110 Pekerjaan Instalasi A SS -10
INA INA INA.3 Ged INA.3 Ged A3110 A3120 Instalasi A Instalasi A SS 0
INA INA INA.3 Ged INA.3 Ged A3120 A3130 Instalasi A Sanitair SS -5
INA INA INA.3 Ged INA.3 Ged A3130 A3140 Sanitair Elektrikal SS -20
INA INA INA.4 FasilINA.4 FasilA4010 A4020 Pekerjaan Tulisan MeSS -30
PREDTASK_ TASK__staPREDTASK_ TASK__rsrdelete_record_flag
(*)Predeces(*)Successo(*)Predece(*)SuccessDelete This Row
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
In Progres In Progress
In Progres Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
Not Starte Not Started
task_id cost_nameTASK__statarget_costact_cost remain_costotal_cost delete_record_flag
Activity ID Expense It(*)Activity Budgeted CActual CosRemaining At CompletDelete This Row
A1000 pajak ppn In Progres 1134425600 0 0
A4030 minggu 1 In Progres 0 10409175 0 10409175
A4040 minggu 2 Not Starte 0 20818350 0 20818350
A4050 minggu 3 Not Starte 0 31227525 0 31227525
A4060 minggu 4 Not Starte 0 41636700 0 41636700
A4070 minggu 5 Not Starte 0 52045875 0 52045875
task_id TASK__starsrc_id role_id acct_id rsrc_type start_date end_date delete_record_flag
Activity ID (*)Activity Resource IRole ID Cost Accou(*)Resourc(*)Start (*)Finish Delete This Row
A1010 In Progres R Material 04-Jan-21 03-Sep-21
A1010 In Progres R-1 Material 04-Jan-21 03-Sep-21
A1010 In Progres R-2 Material 04-Jan-21 03-Sep-21
A1010 In Progres R-3 Material 04-Jan-21 03-Sep-21
A1010 In Progres R-4 Material 04-Jan-21 03-Sep-21
A1010 In Progres R-5 Material 04-Jan-21 03-Sep-21
A1010 In Progres R-6 Material 04-Jan-21 03-Sep-21
A1020 Not Starte B-1 Material 12-Jul-21 03-Sep-21
A1030 Not Starte B-2 Material 06-Sep-21 12-Nov-21
A1040 Not Starte B-3 Material 15-Nov-21 21-Jan-22
A1050 Not Starte B-4 Material 22-Nov-21 21-Jan-22
A1060 Not Starte B-5 Material 24-Jan-22 18-Mar-22
A1070 Not Starte B-6 Material 21-Mar-22 29-Apr-22
A1080 Not Starte B-7 Material 02-May-2227-May-22
A1090 Not Starte B-8 Material 30-May-2201-Jul-22
A1100 Not Starte B-9 Material 04-Jul-22 19-Aug-22
A1110 Not Starte B-10 Material 22-Aug-22 16-Sep-22
A1120 Not Starte B-11 Material 19-Sep-22 14-Oct-22
A1130 Not Starte B-12 Material 17-Oct-22 11-Nov-22
A1140 Not Starte B-13 Material 14-Nov-22 10-Feb-23
A2010 Not Starte R-8 Material 13-May-2126-May-21
A2020 Not Starte R-9 Material 13-May-2107-Jul-21
A2030 Not Starte R-10 Material 13-May-2107-Jul-21
A2040 Not Starte R-11 Material 13-May-2107-Jul-21
A2050 Not Starte R-12 Material 01-Jun-21 12-Jul-21
A2060 Not Starte R-13 Material 22-Jun-21 09-Aug-21
A2070 Not Starte R-14 Material 22-Jun-21 09-Aug-21
A2080 Not Starte R-15 Material 22-Jun-21 19-Jul-21
A2090 Not Starte R-16 Material 08-Jun-21 02-Aug-21
A2100 Not Starte R-17 Material 21-Jun-21 23-Jul-21
A2110 Not Starte R-18 Material 01-Jun-21 28-Jun-21
A2120 Not Starte R-19 Material 01-Jun-21 28-Jun-21
A2130 Not Starte R-20 Material 29-Jun-21 12-Jul-21
A2140 Not Starte R-21 Material 07-Jun-21 23-Jul-21
A3010 Not Starte R-22 Material 13-May-2126-May-21
A3020 Not Starte R-23 Material 13-May-2107-Jul-21
A3030 Not Starte R-24 Material 13-May-2107-Jul-21
A3040 Not Starte R-25 Material 13-May-2107-Jul-21
A3050 Not Starte R-26 Material 01-Jun-21 12-Jul-21
A3060 Not Starte R-27 Material 17-May-2102-Jul-21
A3070 Not Starte R-28 Material 17-May-2102-Jul-21
A3080 Not Starte R-29 Material 17-May-2111-Jun-21
A3090 Not Starte R-30 Material 01-Jun-21 26-Jul-21
A3100 Not Starte R-31 Material 14-Jun-21 16-Jul-21
A3110 Not Starte R-32 Material 07-Jun-21 02-Jul-21
A3120 Not Starte R-33 Material 07-Jun-21 02-Jul-21
A3130 Not Starte R-34 Material 28-Jun-21 09-Jul-21
A3140 Not Starte R-35 Material 07-Jun-21 23-Jul-21
A4010 Not Starte R-36 Material 13-May-2125-Aug-21
A4020 Not Starte R-37 Material 07-Jun-21 30-Jul-21
A4040 Not Starte R-42 Material 18-May-2126-May-21
A4050 Not Starte R-43 Material 26-May-2103-Jun-21
A4060 Not Starte R-44 Material 02-Jun-21 10-Jun-21
A4070 Not Starte R-45 Material 09-Jun-21 17-Jun-21
A4030 In Progres R-47 Material 12-May-2113-May-21
user_data
UserSettings Do Not Edit
DurationQtyType=QT_DayShowAsPercentage=0SmallScaleQtyType=QT_HourDateFormat=dd'-'mmm'-'yyCurrencyFormat=In
-'mmm'-'yyCurrencyFormat=Indonesia