Table 1: Information from project site
Information
@ location Kangar, Perlis
Energy target To generate PY energy from the most optimum design,
Roof area (single side) Dimension 12.5m x 4.5m
Tilt angle and orientation | 20° from horizontal and facing South
See | imal rscistionyevaeb ero tilt angle facing South is
1,750kWm?
PV module available Q.Peak S-G3 215Wp oe
Inverter available Sunny Boy Model 1300TL, 160OTL, 2100TL, 2500TL, 3000TL,
Table 2: Design requirements and assumptions:
Design requirements / assumptions
Design shall comply with MS1837:2010 standard
Maximum cell effective temperature at site is 75°C
Minimum cell effective temperature at site is 20°C
‘Average maximum daily ambient temperature is 35°C
Gap spacing of 20 mm between PV modules
Offset spacing of 1.0m for PV array from all edges of roof
Power de-rating by dirt is 3%
Cabling efficiency from PV to inverter is 95%
Distance from inverter to grid-connection point is negligible
Zo. | All conductors are made of copper E
TF not available from datasheet, assume temperature coefficient of voltage at
maximum power to be equal to that of power at maximum power point
(alale le lala
olvlale|s|+(2
a
wo}
Based on the utilizable roof space, determine the maximum possible number of PV modules to meet
the enerey supply target.
From the choice of inverters, determine which one is the most optimum to match your answer from
(a).
petermine the optimum configuration that matches the selected inverter.
estimate total enerey generated, Speciic Yield and Performance Ratio of the PV system designed
stimmal
after one year
Calculate the payback period of the system2). Effective roofacea
Length : 12.5 m- (1.0m x 2) = 10.5 m, Width: 4.5 m- (1.0m x:
Total number of PV module e
The PV module used is Q.Peak S-G3 215Wp PV module with dimension 1348 mm x 1000 m
spacing is 30mm between each module.
Lengthwise across
roof _ _2500
Nup Wmaitgap 1000420 madiiles
bree 10500
Ries = s 7 modules
lacress 7+ gap 1348+20—
Neosat = 2X 7 = 14 modules
Lengthwise up
Wroor _ _ 2500
Ss er 1.83 = 1 modules
Doar. 10500
— 2" = 10.29 = 10 modules
Nota: = 1% 10 = 10 modules
The number of PV modules for Lengthwise Across arrangement is 14 modules (3,010Wp) while for .
lengthwise Up arrangement is 10 modules (2,150Wp) hence the Lengthwise Across arrangement
chosen.
b) Matching PV Array to inverter specification.
‘The total 14 modules will produce total array power of 14 x 215Wp = 3,010Wp. Since the
used fs erystalline type, the de-rating factor, ks between 0.90 to 1.00. ae
= 3,010 x 0.90 to 3,010 x 1.00
Prominal snv.oxpected¢)
Too Porray.ste = Fog
2500 % Parray. see S 2778
Estimated number of PV modules
2500 2778
das SNmoaue $ Sye
11.6 < Nynodute $12.9
The optimum number of PV modules based on the inverter size selected would be between 11 to 12
modules but the roof could place maximum of 14 modules in this arrangement.
Minimum number of PV per string
At 75°C
Yemp
i.
(-0.42)
Rees ee x(t x 5 —25)] =19.27v
Assigning 5% of voltage drop from cables
Vein mp aff = 9.95% Vein mp = 18.30V
Minimum allowable input window voltage
Warts othe gp seis = 0 Veale ine = 1 X 180 — 198
The minimum number of PV modules in series per string
Voxin win invaitow _ 198.0
Nain personage 1830 10.82 modules round up to11 modules
Maximum number of PV in series per string (based on Vmax_oc)
‘At 20°C
Vian po = Verse [2+ "528% (Toetyan Tr]
Vonage = 3082 {r+ (20 - 25)] =31.3V‘The minimum number of PV modules in series per string
V, 7125
Necman = Vnmsmesattow _ =
Is. v, 313 22.89 round down to 21 modules
Determine maximum number of parallel string
Given from datasheet lemox=15.0A therefore
‘Maximum number of parallel string
ax de ino aso
Taaivens oaseeas 1.27 round down to 1 strings per input
Nomex
Determine the optimum array configuration
From calculation,
Ns min per string = 11 modules
Ns max per string = 21 modules
Np = 1 strings per input
Nores Npootet Norey | Povay (WD k Status
10 a. 10 2,150 116% Undersize
1 1 1 2,365 | 106% | Undersize
12 i 12 2,580 97% ve aie
B A 13 2,795, 89% | Oversize |
14 1 14 3,010 _ 83% | Oversize
Therefore, the appropriate configuration that we could used is 1 x 12 configurations.
Checking maximum system voltage
Se he ook No = 90.02% 12 50
um system voltage which is 1OOOVde.
The value still far from miParray-aee = 12x 215Wp = 2,580Wp
PSHsexioa = 1,750kWh per annum ~at tilt angle 20° facing South
Fomupiorg # 1+ [EEPX (Tosu org — Tere]
ia a2? x (Teen avg ~25)|= 853
Where Tren.avg = Tamp.avg.maxt 25 = 35+ 25 = 60°C
Faire 0.97
Es 1.00 (positive power tolerance)
Nine = 0.97
pean 0.95
Hence
Le = 2,580 x 1,750 x 0.853 x 0.97 x 1.00 x 0.97 x 0.95
= 3,442 kWh per annum
Specific Yield
wh
Parray ee Fideal 120.215 kWp
334 kWh / kWp > value is accepted ( bigger than 1,000)
Esys
Performance Ratio
Fosse _ 3482 kWh
~ 12x 0.215 x 1750
PR= ——__
Eiaeat Parray ste X PSHpertoa
=0.76 or 76% ~ value is accepted ( bigger than 70%)is locally manufactured, then FiT rates will be:
1.0184 + 0.2153 + 0.0500 = RM 1.2837 per kWh.
The investment is 2.58 kW x RM 10,000 per kW = RM 25,800
Estimated energy produced by the system per year = 3442 kWh (Ex)
Payment of Fi per year = 3442 kWh x RM 1.2837 per kWh
= RM 4,418
Payback period = RM25,800 / RV4,418,
= 5.8 years (around 70 months)