625,000
640,000
550,000
275,000
300,000
365,000
490,000
450,000
150,000
45,000
120,000
4,010,000
2,200,000
275,000
700,000
3,175,000
275,000
280,000
555,000
270,000
75,000
140,000
485,000
450,000
150,000
210,000
810,000
180,000
50,000
140,000
370,000
1,360,000
300,000
280,000
1,940,000
900,000
800,000
800,000
150,000
2,650,000
450,000
1,625,000
480,000
140,000
2,695,000
600,000
210,000
384,000
1,194,000
320,000
105,000
75,000
45,000
150,000
70,000
765,000
300,000
675,000
300,000
75,000
250,000
1,600,000
20,249,000
PEKERJAAN PAGAR
2014
No. Jenis Pekerjaan Vol./Sat H.Satuan Jumlah Total
1 2 3 4 5 6
I PEKERJAAN PONDASI
pasang pondasi batu gunung 14.0 m3 Rp 65,000 Rp 910,000 Rp 910,000
II PEK.BETON BERTULANG
1 Beton sloof 11.0 m3 Rp 35,000 Rp 385,000
10 PENGERJAAN INTERIOR