Anda di halaman 1dari 12

RENCANA ANGGARAN BIAYA

RENOVASI RUMAH TINGGAL BAPAK IRWAN


PEKERJAAN RENOVASI BANGUNAN TAMBAHAN
KENDARI, 9 AGUSTUS 2014
No. Jenis Pekerjaan Vol./Sat H.Satuan Jumlah Total
1 2 3 4 5 6
I PEKERJAAN PONDASI
pasang pondasi batu gunung 18.9 m3 Rp 65,000 Rp 1,228,500 Rp 1,228,500
K

II PEK.BETON BERTULANG / STRUKTUR


1 Beton sloof 13.8 m3 Rp 35,000 Rp 483,000
- Uk. 15 x 20 ( Kpr )
2 Beton kolom
- Uk. 15 x 15 ( Kpr ) 15.3 m3 Rp 35,000 Rp 533,750
3 Beton balok konstruksi
- Uk. 15 x 20 ( Kpr ) 25.9 m3 Rp 40,000 Rp 1,036,000
4 Dak Beton teras
- tebal 10Cm 3 m2 Rp 250,000 Rp 750,000
Sub total II Rp 2,802,750 Rp 3,082,250
III PEKERJAAN DINDING
1 Pas. Dinding bata ruangan 3.3 m3 Rp 750,000 Rp 2,475,000
2 Plester Dinding 3.3 m3 Rp 350,000 Rp 1,155,000
Sub total III Rp 3,630,000 Rp 3,630,000
IV PEKERJAAN LANTAI
1 Pas.krmk Ruang kerja & Dinning room Uk. 40 x 40 16.6 m2 Rp 40,000 Rp 664,000
2 Pas.krmk Ruang dapur basah Uk. 30 x 30 4.6 m2 Rp 40,000 Rp 184,000
3 Pas.krmk teras tambahan Uk. 30 x 30 7.2 m2 Rp 40,000 Rp 288,000
Sub total IV Rp 1,136,000 Rp 1,136,000
V PEKERJAAN PASANG PINTU DAN JENDELA
1 pintu ruang kerja 1 unit Rp 85,000 Rp 85,000
2 pintu ruang dapur 1 unit Rp 85,000 Rp 85,000
3 jendela ruang kerja 2 unit Rp 55,000 Rp 110,000
4 jendela ruang dapur 1 unit Rp 55,000 Rp 55,000
5 lubang angin 6 lbg Rp 20,000 Rp 120,000
6 jebol dinding + les profil 4 m2 Rp 70,000 Rp 280,000
Sub total V Rp 735,000 Rp 735,000
VI PEKERJAAN ATAP & PLAFOND
1 pasang rangka atap kayu + Lesplank 16.6 m2 Rp 60,000 Rp 996,000
2 pasang atap multiroof 24.73 m2 Rp 35,000 Rp 865,550
3 pasang rangka kaso + triplex 16.6 m3 Rp 40,000 Rp 664,000
4 pasang les plafond 18.9 m2 Rp 15,000 Rp 283,500
Sub total VI Rp 2,809,050 Rp 2,809,050

VII PEK.INS.LISTRIK & Acc


1 Instalasi lampu penerangan 3 titik Rp 50,000 Rp 150,000
2 Instalasi stop kontak 3 titik Rp 50,000 Rp 150,000
3 teras 1 titik Rp 50,000 Rp 50,000
Sub total VII Rp 350,000 Rp 350,000
VIII PEKERJAAN PLAMIR PENGECATAN /
FINISHING
1 Pengecatan dinding 55.5 m2 Rp 15,000 Rp 832,500
2 Pengecatan plafond 16.6 m2 Rp 15,000 Rp 249,000
Sub Total VIII Rp 1,081,500 Rp 1,442,000
TOTAL PEKERJAAN BANGUNAN BARU Rp 14,412,800
UPAH PENGAWAS 85,000 HARI 37 Rp 3,145,000
Rp 17,557,800
No. Jenis Pekerjaan Vol. Sat. Harga Sat.
I. PEKERJAAN PONDASI DAN SLOF
1 papan cor 0.5 m3 1,250,000
2 balok 6/12 0.5 m3 1,280,000
3 batu gunung 1.0 ret 550,000
4 pasir halus 0.5 ret 550,000
5 pasir kasar 0.5 ret 600,000
6 pasir kerikil 0.5 ret 730,000
7 semen 7.0 sak 70,000
8 besi 8 10.0 btg 45,000
9 besi 6 6.0 btg 25,000
10 kawat benrat 1.0 kg 45,000
11 paku10/7/5/3 4.0 kg 30,000
Sub total
II. PEKERJAAN DINDING.
1 batu merah 4.0 m3 550,000
2 pasir halus 0.5 m3 550,000
3 semen 10.0 zak 70,000
Sub total
III PLESTERAN
1 pasir pohara 0.5 m2 550,000
2 semen 4.0 sak 70,000
Sub total
IV. PEKERJAAN KOLOM PRAKTIS
1 besi 8 6.0 btg 45,000
2 besi 6 3.0 btg 25,000
3 semen 2.0 sak 70,000
Sub total
V PEKERJAAN RING BALL
1 besi 8 10.0 btg 45,000
2 besi 6 6.0 btg 25,000
3 semen 3.0 sak 70,000
Sub total
VI PEKERJAAN BETON / DAK TERAS
1 besi 8 4.0 btg 45,000
2 besi 6 2.0 btg 25,000
3 semen 2.0 sak 70,000
Sub total
VII PEKERJAAN LANTAI
1 Keramik motiv kayu 20X60 17.0 dos 80,000
2 Keramik lantai 40X40 dapur 5.0 dos 60,000
3 semen 4.0 sak 70,000
Sub total
VIII PEKERJAAN KUSEN, PINTU DAN JENDELA
1 kusen dan daun jendela 3.0 bh 300,000
2 kusen dan daun pintu ruang kerja 1.0 bh 800,000
3 kusen dan daun pintu dapur 1.0 bh 800,000
4 Lubang angin 5.0 bh 30,000
Sub total
X PEKERJAAN ATAP
1 Rangka atap rank 0.5 m3 900,000
2 atap sakura roof 25.0 lbr 65,000
3 listplank woodplank 6.0 lbr 80,000
4 talang 2.0 lbr 70,000
Sub total
XI. PEKERJAAN PLAFOND
1 Rangka Plafond kaso 5/7 hollow 0.5 m3 1,200,000
2 List profil lebar 7 cm (terpasang) 7.0 btg 30,000
3 triplex 8.0 lbr 48,000
Sub total
XI. PEKERJAAN INSTALASI LISTRIK
1 Titik lampu EX panasonic 4.0 ttk 80,000
2 Stop Kontak EX panasonic 3.0 bh 35,000
3 Saklar tunggal 3.0 bh 25,000
4 saklar ganda 1.0 bh 45,000
5 kabel tunggal 0.5 m 300,000
6 pipa listrik / tdos 7.0 bh 10,000
Sub total
XII PLAMER DAN PENGECATAN RENOV
1 plamer byclayen 5.0 sak 60,000
2 cat tembok 5 kg 5.0 bh 135,000
3 cat kayu 5.0 klg 60,000
4 thiner 3.0 klg 25,000
5 kuas/roll set/kape 1.0 unit 250,000
Sub total
TOTAL
Jumlah

625,000
640,000
550,000
275,000
300,000
365,000
490,000
450,000
150,000
45,000
120,000
4,010,000

2,200,000
275,000
700,000
3,175,000

275,000
280,000
555,000

270,000
75,000
140,000
485,000

450,000
150,000
210,000
810,000

180,000
50,000
140,000
370,000

1,360,000
300,000
280,000
1,940,000
900,000
800,000
800,000
150,000
2,650,000

450,000
1,625,000
480,000
140,000
2,695,000

600,000
210,000
384,000
1,194,000

320,000
105,000
75,000
45,000
150,000
70,000
765,000

300,000
675,000
300,000
75,000
250,000
1,600,000
20,249,000
PEKERJAAN PAGAR
2014
No. Jenis Pekerjaan Vol./Sat H.Satuan Jumlah Total
1 2 3 4 5 6
I PEKERJAAN PONDASI
pasang pondasi batu gunung 14.0 m3 Rp 65,000 Rp 910,000 Rp 910,000

II PEK.BETON BERTULANG
1 Beton sloof 11.0 m3 Rp 35,000 Rp 385,000

2 Beton kolom Pagar 6.0 m3 Rp 100,000 Rp 600,000


Sub total II Rp 985,000 Rp 985,000
III PEKERJAAN DINDING
1 Pas. Dinding bata ruangan + plester (10 m3 ) 1.0 m3 Rp 850,000 Rp 850,000
2 Pas. Pagar ( besi holo + las ) 12.0 btg Rp 40,000 Rp 480,000
Sub total III Rp 1,330,000 Rp 1,330,000
IV PENGECATAN
1 biaya cat 10.0 m3
sub total IV
total Rp 3,225,000
MATERIAL PAGAR
No. Jenis Pekerjaan Vol. Sat. Harga Sat. Jumlah

I. PEKERJAAN PONDASI, SLOF , KOLOM


1 besi 8 7.0 btg 45,000 315,000
2 besi 6 3.0 btg 25,000 75,000
3 kawat benrat 1.0 kg 45,000 45,000
4 pasir halus 0.5 ret 550,000 275,000
5 pasir kasar 0.5 ret 600,000 300,000
6 pasir kerikil 0.5 ret 730,000 365,000
7 semen 2.0 sak 70,000 140,000
8 paku10/7/5/3 4.0 kg 30,000 120,000
Sub total 1,635,000
II. PENGERJAAN GERBANG PAGAR & LAS
1 pintu pagar 3mx1.5m 3.75 m2 1850000
2 pagar besi holo 3.45 m2 1750000
Sub total 3600000
III. PEKERJAAN DINDING.
1 batu merah 1.0 m3 550,000 550,000
2 pasir halus 0.5 m3 550,000 275,000
3 semen 2.0 zak 70,000 140,000

Sub total 965,000


IV PLESTERAN
1 semen 2.0 zak 70,000 140,000
Sub total 140,000
V LAMPU PAGAR
1 balon lampu 6.0 pcs
2 kabel 1.0 roll 300,000 300,000
Sub total 300,000
VI PENGECATAN
1 cat 5 kg 2.0 klg 150000 300000
2 kuas + kapi 2.0 set 35000 70000
3 plamir A+ 2.0 zak 75000 150000
Sub total 520,000
TOTAL 7,160,000
INTERIOR

No. Jenis Pekerjaan Vol./Sat H.Satuan Jumlah


1 2 3 4 5
I PEKERJAAN MEJA KERJA
1 multi plex 15mm
2 multi plex 12mm
3 HPL
4 lem taco
5 rail laci
biaya pengerjaan
sub total

II PEKERJAAN DINDING TABLE


1 multi plex 15mm
2 multi plex 12mm
3 HPL
4 lem taco
5 kursi bar
6 lampu hias
biaya pengerjaan
sub total

III PENGERJAAN RAK TV


1 multi plex 15mm
2 multi plex 12mm
3 HPL
4 lem taco
5 rail laci
biaya pengerjaan
sub total

IV PENGERJAAN PARTISI &


BOARDER RUANG TAMU
1 multi plex 15mm
2 besi siku 3 x 3
3 engsel
4 HPL
5 lem taco
biaya pengerjaan
sub total
Total
6
RENCANA ANGGARAN BIAYA
RENOVASI RUMAH TINGGAL BAPAK IRWAN

PEKERJAAN RENOVASI BANGUNAN TAMBAHAN


KENDARI, 9 AGUSTUS 2014

NO JENIS PENGERJAAN UPAH TUKANG MATERIAL JUMLAH HARGA

1 PEKERJAAN PONDASI Rp 1,228,500 Rp 4,010,000 Rp 5,238,500

2 PEK.BETON BERTULANG / STRUKTUR Rp 2,802,750 Rp 1,665,000 Rp 4,747,250

3 PEKERJAAN DINDING Rp 2,970,000 Rp 3,730,000 Rp 7,360,000

4 PEKERJAAN LANTAI Rp 852,000 Rp 1,940,000 Rp 3,076,000

5 PEKERJAAN PASANG PINTU DAN JENDELA Rp 620,000 Rp 2,650,000 Rp 3,385,000

6 PEKERJAAN ATAP & PLAFOND Rp 2,301,250 Rp 3,889,000 Rp 6,698,050

7 PEK.INS.LISTRIK & Acc Rp 350,000 Rp 765,000 Rp 1,115,000

8 PEKERJAAN PLAMIR PENGECATAN / Rp 1,081,500 Rp 1,600,000 Rp 3,042,000

9 PENGERJAAN PAGAR Rp 3,225,000 Rp 7,160,000 Rp 10,385,000

10 PENGERJAAN INTERIOR

9 UPAH PENGAWAS Rp 3,145,000 Rp 3,145,000

TOTAL Rp 18,576,000 Rp 27,409,000 Rp 48,191,800

Total Biaya Pekerjaan renovasi 48,191,800


fee design 10% 4,819,180
TOTAL 53,010,980

Anda mungkin juga menyukai