Anda di halaman 1dari 67

REKAPITULASI

RENCANA ANGGARAN BIAYA


(RAB)

PROGRAM : PENINGKATAN DAN PENGEMBANGAN FASILITAS


KEGIATAN : PEMBANGUNAN FASILITAS UMUM / BANGUNAN GEDUNG
PEKERJAAN : PERENCANAAN ISLAMIC CENTER SUKAMARA
: PEMBANGUNAN GEDUNG ASRAMA PUTRA / PUTRI
LOKASI : KAB. SUKAMARA
TAHUN : 2020

NO. PEKERJAAN HARGA

A PEMBANGUNAN ASRAMA ISLAMIC CENTER KABUPATEN SUKAMARA

A PEKERJAAN PERSIAPAN 195,232,704.31

B PEKERJAAN TANAH 55,800,524.92


C PEKERJAAN STRUKTUR 3,424,761,088.69
D PEKERJAAN PASANGAN 775,586,973.56
E PEKERJAAN PINTU JENDELA 198,173,797.63

F PEKERJAAN ATAP 176,079,990.83


G PEKERJAAN LANGIT - LANGIT 178,824,435.49
H PEKERJAAN PENGECATAN 124,320,876.24
I PEKERJAAN LANTAI 139,733,230.91
J PEKERJAAN MEKANIKAL / ELEKTRIKAL 76,374,690.00
K PEKERJAAN SANITASI 174,851,687.42
L PEKERJAAN LAIN-LAIN 40,260,000.00
TOTAL 5,560,000,000.00
5,560,000,000.00

TERBILANG : ## LIMA MILYAR LIMA RATUS ENAM PULUH JUTA RUPIAH##

PALANGKA RAYA, FEBRUARI 2020

DIPERIKSA : DIBUAT :
PENGAWAS LAPANGAN KONSULTAN PERENCANA
CV. MEGAH JAYA CONSULTANT
PUSAT PALANGKA RAYA

1. M. RIYANTO, A.Md …………………….


NIP. 19761030 201101 1 002

JOKO TRI SUSILO, ST


2. RIZKA PUTRI MAYATI …………… DIREKTUR

DISETUJUI : DIPERIKSA :
PEJABAT PELAKSANA TEKNIS KEGIATAN KOORDINATOR LAPANGAN
( PPTK )

M. ZULNAINI, A.Md YUSUF ANSHORI, ST


NIP. 19761209 200312 1 003 NIP. 19891227 201903 1 011

NIP.197305172006041022 NIP.19850115 201001 1 008


RENCANA ANGGARAN BIAYA
(RAB)

PROGRAM : PENINGKATAN DAN PENGEMBANGAN FASILITAS


KEGIATAN : PEMBANGUNAN FASILITAS UMUM / BANGUNAN GEDUNG
PEKERJAAN : PERENCANAAN ISLAMIC CENTER SUKAMARA
: PEMBANGUNAN GEDUNG ASRAMA PUTRA / PUTRI
LOKASI : KAB. SUKAMARA
TAHUN : 2020

NO. URAIAN PEKERJAAN ANALISA VOLUME SATUAN HARGA SATUAN (RP) JMLH HARGA (RP)

# PEMBANGUNAN ASRAMA ISLAMIC CENTER KABUPATEN SUKAMARA

A PEKERJAAN PERSIAPAN
1 Pembuatan papan nama kegiatan LS.Papan Nama 1.00 LS 482,704.31 482,704.31
2 Pengukuran Ls.Pengukuran 1.00 LS 2,000,000.00 2,000,000.00
3 Mobilisasi dan Demobilisasi LS 1.00 LS 192,750,000.00 192,750,000.00
TOTAL A 195,232,704.31

B PEKERJAAN TANAH
1 Galian tanah A.2.3.1.1 172.14 M3 107,953.13 18,583,051.80
2 Urugan kembali hasil galian A.2.3.1.9 57.38 M3 78,093.75 4,481,019.38
3 Timbunan tanah dengan tanah urug A.2.3.1.11 198.00 M3 157,526.25 31,190,197.50
4 Pemadatan tanah A.2.3.1.10 19.80 M3 78,093.75 1,546,256.25
TOTAL B 55,800,524.92

C PEKERJAAN STRUKTUR
1 Pengadaan Mini Pile 20x20 cm + handling, beton bertulang mutu K-400 LS. Pengadaan 3,014.00 M1 315,000.00 949,410,000.00
2 Pemancangan Mini Pile Ls. Pemancangan 3,014.00 M1 170,000.00 512,380,000.00
3 Sambungan las plat joint Ls. Las 137.00 Ttk 90,000.00 12,330,000.00
4 Bobokan tiang pancang Ls. Pembobokan 137.00 Ttk 120,000.00 16,440,000.00
5 Lantai kerja A.4.1.1.4 7.53 M3 1,429,138.22 10,765,698.21
6 Pekerjaan pondasi cakar ayam 120/120 cm
a Membuat beton mutu K-250 pondasi A.4.1.1.8 3.53 M3 1,777,641.55 6,271,519.39
b Pembesian pondasi dengan besi polos A.4.1.1.17 530.32 Kg 16,671.76 8,841,383.54
c Pemasangan beskisting untuk pondasi A.4.1.1.20 10.08 M2 222,604.13 2,243,849.63
7 Pekerjaan pondasi cakar ayam 150/150 cm
a Membuat beton mutu K-250 pondasi A.4.1.1.8 22.84 M3 1,777,641.55 40,596,888.90
b Pembesian pondasi dengan besi polos A.4.1.1.17 3,295.57 Kg 16,671.76 54,942,883.41
c Pemasangan beskisting untuk pondasi A.4.1.1.20 52.20 M2 222,604.13 11,619,935.59
8 Pekerjaan pedistal 30/30 cm
a Membuat beton mutu K-250 pedistal A.4.1.1.8 2.03 M3 1,777,641.55 3,599,724.14
b Pembesian pedistal dengan besi polos A.4.1.1.17 669.93 Kg 16,671.76 11,168,907.36
c Pemasangan beskisting untuk pedistal A.4.1.1.22 27.00 M2 364,540.70 9,842,598.90
9 Pekerjaan pedistal 40/40 cm
a Membuat beton mutu K-250 pedistal A.4.1.1.8 5.04 M3 1,777,641.55 8,959,313.41
b Pembesian pedistal dengan besi polos A.4.1.1.17 1,387.43 Kg 16,671.76 23,130,924.31
c Pemasangan beskisting untuk pedistal A.4.1.1.22 50.40 M2 364,540.70 18,372,851.28
10 Pekerjaan sloof 20/40 cm
a Membuat beton mutu K-250 sloof A.4.1.1.8 4.16 M3 1,777,641.55 7,394,988.85
b Pembesian sloof dengan besi polos A.4.1.1.17 629.19 Kg 16,671.76 10,489,686.48
c Pemasangan beskisting untuk sloof A.4.1.1.21 41.60 M2 234,038.63 9,736,007.01
11 Pekerjaan sloof 30/60 cm
a Membuat beton mutu K-250 sloof A.4.1.1.8 38.16 M3 1,777,641.55 67,834,801.55
b Pembesian sloof dengan besi polos A.4.1.1.17 3,934.78 Kg 16,671.76 65,599,702.63
c Pemasangan beskisting untuk sloof A.4.1.1.21 254.40 M2 234,038.63 59,539,427.47
12 Pekerjaan kolom 15/15 cm (tinggi 60 cm)
a Membuat beton mutu K-250 kolom A.4.1.1.8 0.24 M3 1,777,641.55 431,966.90
b Pembesian kolom dengan besi polos A.4.1.1.17 116.48 Kg 16,671.76 1,941,946.74
c Pemasangan beskisting untuk kolom A.4.1.1.22 6.48 M2 364,540.70 2,362,223.74
13 Pekerjaan kolom 15/15 cm (tinggi 7,8 m)
a Membuat beton mutu K-250 kolom A.4.1.1.8 2.46 M3 1,777,641.55 4,367,665.29
b Pembesian kolom dengan besi polos A.4.1.1.17 581.14 Kg 16,671.76 9,688,682.79
c Pemasangan beskisting untuk kolom A.4.1.1.22 65.52 M2 364,540.70 23,884,706.66
NO. URAIAN PEKERJAAN ANALISA VOLUME SATUAN HARGA SATUAN (RP) JMLH HARGA (RP)

14 Pekerjaan kolom 15/15 cm (tinggi 10 m)


a Membuat beton mutu K-250 kolom A.4.1.1.8 0.45 M3 1,777,641.55 799,938.70
b Pembesian kolom dengan besi polos A.4.1.1.17 101.01 Kg 16,671.76 1,684,073.05
c Pemasangan beskisting untuk kolom A.4.1.1.22 12.00 M2 364,540.70 4,374,488.40
15 Pekerjaan kolom 15/20 cm (tinggi 7,8 m)
a Membuat beton mutu K-250 kolom A.4.1.1.8 0.94 M3 1,777,641.55 1,663,872.49
b Pembesian kolom dengan besi polos A.4.1.1.17 174.25 Kg 16,671.76 2,905,026.02
c Pemasangan beskisting untuk kolom A.4.1.1.22 21.84 M2 364,540.70 7,961,568.89
16 Pekerjaan kolom 30/30 cm (tinggi 7,8 m)
a Membuat beton mutu K-250 kolom A.4.1.1.8 6.32 M3 1,777,641.55 11,231,139.31
b Pembesian kolom dengan besi polos A.4.1.1.17 977.57 Kg 16,671.76 16,297,847.23
c Pemasangan beskisting untuk kolom A.4.1.1.22 84.24 M2 364,540.70 30,708,908.57
17 Pekerjaan kolom 30/30 cm (tinggi 10 m)
a Membuat beton mutu K-250 kolom A.4.1.1.8 5.40 M3 1,777,641.55 9,599,264.37
b Pembesian kolom dengan besi polos A.4.1.1.17 822.78 Kg 16,671.76 13,717,219.07
c Pemasangan beskisting untuk kolom A.4.1.1.22 72.00 M2 364,540.70 26,246,930.40
18 Pekerjaan kolom 40/40 cm (tinggi 7,8 m)
a Membuat beton mutu K-250 kolom A.4.1.1.8 26.21 M3 1,777,641.55 46,588,429.74
b Pembesian kolom dengan besi polos A.4.1.1.17 3,320.51 Kg 16,671.76 55,358,803.40
c Pemasangan beskisting untuk kolom A.4.1.1.22 262.08 M2 364,540.70 95,538,826.66
19 Pekerjaan Ringbalk 15/15 cm
a Membuat beton mutu K-250 ringbalk A.4.1.1.8 2.12 M3 1,777,641.55 3,759,711.88
b Pembesian ringbalk dengan besi polos A.4.1.1.17 358.09 Kg 16,671.76 5,969,907.41
c Pemasangan beskisting untuk ringbalk A.4.1.1.23 42.30 M2 373,307.15 15,790,892.45
20 Pekerjaan Ringbalk 15/20 cm
a Membuat beton mutu K-250 ringbalk A.4.1.1.8 1.77 M3 1,777,641.55 3,146,425.54
b Pembesian ringbalk dengan besi polos A.4.1.1.17 302.80 Kg 16,671.76 5,048,272.12
c Pemasangan beskisting untuk ringbalk A.4.1.1.23 32.45 M2 373,307.15 12,113,817.02
21 Pekerjaan Ringbalk 20/30 cm
a Membuat beton mutu K-250 ringbalk A.4.1.1.8 27.12 M3 1,777,641.55 48,209,638.84
b Pembesian ringbalk dengan besi polos A.4.1.1.17 4,498.18 Kg 16,671.76 74,992,644.76
c Pemasangan beskisting untuk ringbalk A.4.1.1.23 361.60 M2 373,307.15 134,987,865.44
22 Pekerjaan Ringbalk 30/50 cm
a Membuat beton mutu K-250 ringbalk A.4.1.1.8 34.80 M3 1,777,641.55 61,861,925.94
b Pembesian ringbalk dengan besi polos A.4.1.1.17 5,824.76 Kg 16,671.76 97,109,054.85
c Pemasangan beskisting untuk ringbalk A.4.1.1.23 301.60 M2 373,307.15 112,589,436.44
23 Pekerjaan tangga
a Membuat beton mutu K-250 tangga A.4.1.1.8 4.99 M3 1,777,641.55 8,863,320.77
b Pembesian tangga dengan besi polos A.4.1.1.17 355.40 Kg 16,671.76 5,925,174.22
c Pemasangan beskisting untuk tangga A.4.1.1.26 27.30 M2 306,543.20 8,368,629.36
24 Pekerjaan Plat lantai dak elv. +4,00 (tebal 12 cm)
a Membuat beton mutu K-250 plat lantai dak A.4.1.1.8 43.20 M3 1,777,641.55 76,794,114.96
b Pembesian plat lantai dak dengan besi polos A.4.1.1.17 5,933.56 Kg 16,671.76 98,922,845.93
c Pemasangan beskisting untuk plat lantai dak A.4.1.1.24 360.00 M2 426,527.18 153,549,784.80
25 Pekerjaan Plat lantai dak elv. +7,80 (tebal 12 cm)
a Membuat beton mutu K-250 plat lantai dak A.4.1.1.8 5.40 M3 1,777,641.55 9,599,264.37
b Pembesian plat lantai dak dengan besi polos A.4.1.1.17 739.85 Kg 16,671.76 12,334,519.44
c Pemasangan beskisting untuk plat lantai dak A.4.1.1.24 45.00 M2 426,527.18 19,193,723.10
26 Pekerjaan Plat kenopi ventilasi (tebal 8 cm)
a Membuat beton mutu K-250 plat kenopi A.4.1.1.8 3.37 M3 1,777,641.55 5,984,252.51
b Pembesian plat kenopi dengan besi polos A.4.1.1.17 367.70 Kg 16,671.76 6,130,256.16
c Pemasangan beskisting untuk plat kenopi A.4.1.1.24 42.08 M2 426,527.18 17,948,263.73
27 Pekerjaan Plat kenopi atas elv. +7,80 (tebal 8 cm)
a Membuat beton mutu K-250 plat kenopi A.4.1.1.8 8.62 M3 1,777,641.55 15,330,380.73
b Pembesian plat kenopi dengan besi polos A.4.1.1.17 918.39 Kg 16,671.76 15,311,250.14
c Pemasangan beskisting untuk plat kenopi A.4.1.1.24 107.80 M2 426,527.18 45,979,630.00
28 Cor tumbuk untuk lantai A.4.1.1.1 39.60 M3 1,517,208.72 60,081,465.31
TOTAL C 3,424,761,088.69

D PEKERJAAN PASANGAN
1 Pemasangan dinding 1/2 bata A.4.4.1.11 1,364.48 M2 213,704.76 291,595,870.92
2 Plesteran dinding A.4.4.2.6 2,728.96 M2 79,629.08 217,304,574.16
3 Acian dinding A.4.4.2.27 2,728.96 M2 51,915.16 141,674,395.03
4 pemasangan kerawang (rooster) A. 4.4.1.23 69.60 M2 560,172.65 38,988,016.44
5 Pemasangan batu alam A.4.4.3.58 29.60 M2 523,213.45 15,487,118.12
6 Pemasangan keramik dinding 30x60 cm (KM/WC) A.4.4.3.54a 144.00 M2 212,027.77 30,531,998.88
7 Pemasangan list profil beton Ls 228.60 M1 175,000.00 40,005,000.00
TOTAL D 775,586,973.56
NO. URAIAN PEKERJAAN ANALISA VOLUME SATUAN HARGA SATUAN (RP) JMLH HARGA (RP)

E PEKERJAAN PINTU JENDELA


1 Pemasangan kusen pintu kayu kelas I A.4.6.1.1 0.71 M3 13,343,019.38 9,486,886.78
2 Pemasangan kusen pintu jendela kelas I A.4.6.1.1 1.58 M3 13,343,019.38 21,095,313.64
3 Pemasangan daun pintu kayu kelas II A.4.6.1.5 52.08 M2 778,622.25 40,550,646.78
4 Pemasangan daun jendela kaca kayu kelas II A.4.6.1.6 53.22 M2 596,979.60 31,771,254.31
5 Pemasangan daun pintu geser plywood lapis HPL + aksesoris Ls 4.00 Buah 5,250,000.00 21,000,000.00
6 Pemasangan kaca 5mm A.4.6.2.17 29.82 M2 251,698.76 7,505,657.02
7 Pemasangan handle pintu A.4.6.2.2 24.00 Buah 276,543.76 6,637,050.24
8 Pemasangan pegangan jendela A.4.6.2.9 a 138.00 Buah 63,577.51 8,773,696.38
9 Pemasangan engsel pintu A.4.6.2.5 108.00 Buah 102,275.26 11,045,728.08
10 Pemasangan engsel jendela A.4.6.2.6 276.00 Buah 62,671.89 17,297,441.64
11 Pemasangan kait angin jendela A.4.6.2.9 276.00 Buah 47,696.26 13,164,167.76
12 Pemasngan kunci slot jendela A.4.6.2.11 138.00 Buah 71,347.50 9,845,955.00
TOTAL E 198,173,797.63

F PEKERJAAN ATAP
1 Pemasangan rangka atap baja ringan LS- baja ringan 431.74 M2 264,316.72 114,117,065.17
2 Pemasangan penutup atap spandeks A.4.5.2.32a 431.74 M2 133,294.94 57,549,243.78
3 Pemasangan nok atap A.4.5.2.41 49.80 M1 88,628.15 4,413,681.87
TOTAL F 176,079,990.83

G PEKERJAAN LANGIT - LANGIT


1 Pemasangan rangka plafond hollow A.4.2.1.21 740.80 M2 141,874.70 105,100,777.76
2 Pemasangan plafond gupsumboard 9 mm A.4.5.1.7 740.80 M2 65,870.35 48,796,755.28
3 Pemasangan list gypsum 10 cm A.4.5.1.8 660.80 M' 37,722.31 24,926,902.45
TOTAL G 178,824,435.49

H PEKERJAAN PENGECATAN
1 Pengecatan dinding A.4.7.1.10 2,728.96 M2 35,829.82 97,778,145.59
3 Pengecatan plafond A.4.7.1.10 740.80 M2 35,829.82 26,542,730.66
TOTAL H 124,320,876.24

I PEKERJAAN LANTAI
1 Pemasangan lantai keramik 30x30 cm A.4.4.3.35 67.20 M2 166,550.22 11,192,174.78
2 Pemasangan lantai keramik 50x50 cm A.4.4.3.35 a 66.00 M2 168,561.19 11,125,038.54
3 Pemasangan lantai keramik 60x60 cm A.4.4.3.35 b 673.60 M2 174,311.19 117,416,017.58
TOTAL I 139,733,230.91

J PEKERJAAN MEKANIKAL / ELEKTRIKAL


1 Lampu downlight 12 watt ME.RML 108.00 Buah 316,250.00 34,155,000.00
3 Titik lampu + instalasi beton M.009 108.00 Buah 298,567.50 32,245,290.00
4 Stop kontak+ instalasi beton M.001 64.00 Titik 15,000.00 960,000.00
5 Schakelar tunggal M.005 12.00 Buah 16,700.00 200,400.00
6 Schakelar ganda M.005 20.00 Buah 16,700.00 334,000.00
7 MCB Ls 4.00 Buah 350,000.00 1,400,000.00
8 kWh meteran Ls 4.00 Buah 270,000.00 1,080,000.00
9 Penyambungan listrik Ls 1.00 Buah 6,000,000.00 6,000,000.00
TOTAL J 76,374,690.00

K PEKERJAAN SANITASI
1 Pembuatan dudukan septick tank Ls.septictank 2.00 Unit 8,350,000.00 16,700,000.00
2 Septick tank biofil LS 2.00 Buah 20,000,000.00 40,000,000.00
3 Pemasangan kloset jongkok A.5.1.1 2 12.00 set 671,248.21 8,054,978.52
4 Pembuatan sumur bor Ls 1.00 Titik 15,000,000.00 15,000,000.00
5 Tandon air 1200 L (stainlist) Ls 2.00 Buah 5,500,000.00 11,000,000.00
6 Pemasangan bak air plastik Ls 12.00 Buah 192,000.00 2,304,000.00
7 Pemasangan wastafel + cermin A.5.1.1.5 8.00 set 7,031,493.84 56,251,950.72
8 kran air A.5.1.1 19 12.00 set 90,832.88 1,089,994.56
9 Floor drain A.5.1.1 14 12.00 set 50,793.76 609,525.12
10 Pipa air PVC Ø 3/4 " (air bersih) A.5.1.1.26 150.00 M1 32,600.54 4,890,081.00
11 Pipa air PVC Ø 1 " (air bekas) A.5.1.1 27 50.00 M1 37,523.73 1,876,186.50
12 Pipa air PVC Ø 4 " (air kotor) A.5.1.1 31 100.00 M1 170,749.71 17,074,971.00
TOTAL K 174,851,687.42

L PEKERJAAN LAIN-LAIN
1 Pemasangan railing tangga besi stainlist Ls 22.00 M2 1,380,000.00 30,360,000.00
2 Pemasangan huruf stainlist Ls 330.00 Cm 30,000.00 9,900,000.00
TOTAL L 40,260,000.00
DAFTAR ANALISA SNI
PEKERJAAN TANAH
A.2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m Satuan M3
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
tukang gali tanah L.13 Orang/hari 0.7500 137,812.50 103,359.38
Mandor L.01 Orang/hari 0.0250 183,750.00 4,593.75
.........................................................................................
Jumlah- 1 107,953.13
2 BAHAN
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 107,953.13
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 107,953.13

A.2.3.1.9 Pengurugan kembali 1 m3 galian tanah Satuan M3


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
tukang gali tanah L.13 Orang/hari 0.5000 137,812.50 68,906.25
Mandor L.01 Orang/hari 0.0500 183,750.00 9,187.50
.........................................................................................
Jumlah- 1 78,093.75
2 BAHAN
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 78,093.75
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 78,093.75

A.2.3.1.11 Pengurugan dengan pasir urug Satuan M3


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.3000 137,812.50 41,343.75
Mandor L.01 Orang/hari 0.0100 183,750.00 1,837.50
.........................................................................................
Jumlah- 1 43,181.25
2 BAHAN
Pasir Urug M3 1.2000 95,287.50 114,345.00
.........................................................................................
Jumlah- 2 114,345.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 157,526.25
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 157,526.25

A.2.3.1.10 Pemadatan tanah ( per 20 cm) Satuan M3


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.5000 137,812.50 68,906.25
Mandor L.01 Orang/hari 0.0500 183,750.00 9,187.50
.........................................................................................
Jumlah- 1 78,093.75
2 BAHAN
.........................................................................................
Jumlah- 2 -
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 78,093.75
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 78,093.75

PEKERJAAN BETON
Ls. Galam Pengadaan + Pemancangan cerucuk galam Satuan M1
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
.........................................................................................
Jumlah- 1 -
2 BAHAN
Dolken kayu φ 8-10/400 cm K-2 Batang 1.1000 1,588.13 1,746.94
.........................................................................................
Jumlah- 2 1,746.94
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 1,746.94
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 1,746.94
A.4.1.1.1 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 Satuan M3
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 1.6500 137,812.50 227,390.63
Tukang batu L.06 Orang/hari 0.2750 150,937.50 41,507.82
Kepala tukang batu L.02 Orang/hari 0.0280 164,062.50 4,593.75
Mandor L.01 Orang/hari 0.0830 183,750.00 15,251.25
.........................................................................................
Jumlah- 1 288,743.45
2 BAHAN
Semen portland C-2 Kg 247.0000 1,778.70 439,338.90
Pasir beton B-2 M3 0.6207 95,287.50 59,146.32
Batu pecah 2-3 cm B-1 M3 0.7400 971,932.50 719,230.05
Air A.1 Liter 215.0000 50.00 10,750.00
.........................................................................................
Jumlah- 2 1,228,465.27
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 1,517,208.72
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 1,517,208.72

A.4.1.1.4 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 Satuan M3
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 1.2000 137,812.50 165,375.00
Tukang batu L.06 Orang/hari 0.2000 150,937.50 30,187.50
Kepala tukang batu L.02 Orang/hari 0.0200 164,062.50 3,281.25
Mandor L.01 Orang/hari 0.0600 183,750.00 11,025.00
.........................................................................................
Jumlah- 1 209,868.75
2 BAHAN
Semen portland C-2 Kg 230.0000 1,778.70 409,101.00
Pasir beton B-2 M3 0.6379 95,287.50 60,779.82
Batu pecah 2-3 cm B-1 M3 0.7607 971,932.50 739,388.65
Air A.1 Liter 200.0000 50.00 10,000.00
.........................................................................................
Jumlah- 2 1,219,269.47
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 1,429,138.22
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 1,429,138.22

A.4.1.1.5 Membuatbeton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 Satuan M3
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 1.6500 137,812.50 227,390.63
Tukang batu L.06 Orang/hari 0.2750 150,937.50 41,507.82
Kepala tukang batu L.02 Orang/hari 0.0280 164,062.50 4,593.75
Mandor L.01 Orang/hari 0.0830 183,750.00 15,251.25
.........................................................................................
Jumlah- 1 288,743.45
2 BAHAN
Semen portland C-2 Kg 326.0000 1,778.70 579,856.20
Pasir beton B-2 M3 0.5429 95,287.50 51,727.50
Batu pecah 2-3 cm B-1 M3 0.7622 971,932.50 740,828.55
Air A.1 Liter 215.0000 50.00 10,750.00
.........................................................................................
Jumlah- 2 1,383,162.25
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 1,671,905.70
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 1,671,905.70

A.4.1.1.6 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 Satuan M3
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 1.6500 137,812.50 227,390.63
Tukang batu L.06 Orang/hari 0.2750 150,937.50 41,507.82
Kepala tukang batu L.02 Orang/hari 0.0280 164,062.50 4,593.75
Mandor L.01 Orang/hari 0.0830 183,750.00 15,251.25
.........................................................................................
Jumlah- 1 288,743.45
2 BAHAN
Semen portland C-2 Kg 352.0000 1,778.70 626,102.40
Pasir beton B-2 M3 0.5221 95,287.50 49,753.69
Batu pecah 2-3 cm B-1 M3 0.7637 971,932.50 742,268.45
Air A.1 Liter 215.0000 50.00 10,750.00
.........................................................................................
Jumlah- 2 1,428,874.54
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 1,717,617.99
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 1,717,617.99

A.4.1.1.7 Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 Satuan M3
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 1.6500 137,812.50 227,390.63
Tukang batu L.06 Orang/hari 0.2750 150,937.50 41,507.82
Kepala tukang batu L.02 Orang/hari 0.0280 164,062.50 4,593.75
Mandor L.01 Orang/hari 0.0830 183,750.00 15,251.25
.........................................................................................
Jumlah- 1 288,743.45
2 BAHAN
Semen portland C-2 Kg 371.0000 1,778.70 659,897.70
Pasir beton B-2 M3 0.4986 95,287.50 47,507.63
Batu pecah 2-3 cm B-1 M3 0.7756 971,932.50 753,787.65
Air A.1 Liter 215.0000 50.00 10,750.00
.........................................................................................
Jumlah- 2 1,471,942.98
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 1,760,686.43
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 1,760,686.43

A.4.1.1.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12± 2) cm, w/c = 0,56 Satuan M3
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 1.6500 137,812.50 227,390.63
Tukang batu L.06 Orang/hari 0.2750 150,937.50 41,507.82
Kepala tukang batu L.02 Orang/hari 0.0280 164,062.50 4,593.75
Mandor L.01 Orang/hari 0.0830 183,750.00 15,251.25
.........................................................................................
Jumlah- 1 288,743.45
2 BAHAN
Semen portland C-2 Kg 384.0000 1,778.70 683,020.80
Pasir beton B-2 M3 0.4943 95,287.50 47,099.25
Batu pecah 2-3 cm B-1 M3 0.7696 971,932.50 748,028.05
Air A.1 Liter 215.0000 50.00 10,750.00
.........................................................................................
Jumlah- 2 1,488,898.10
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 1,777,641.55
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 1,777,641.55
A.4.1.1.17 Pembesian dengan 1 kg besi polos Satuan Kg
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang besi L.12 Orang/hari 0.0070 137,812.50 964.69
Tukang besi L.09 Orang/hari 0.0070 150,937.50 1,056.57
Kepala tukang besi L.04 Orang/hari 0.0007 164,062.50 114.85
Mandor L.01 Orang/hari 0.0004 183,750.00 73.50
.........................................................................................
Jumlah- 1 2,209.61
2 BAHAN
Besi beton polos E-1 Kg 1.0500 13,319.72 13,985.71
Kawat bindrat E-2 Kg 0.0150 31,762.50 476.44
.........................................................................................
Jumlah- 2 14,462.15
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 16,671.76
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 16,671.76

A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.5200 137,812.50 71,662.50
Tukang kayu L.07 Orang/hari 0.2600 150,937.50 39,243.75
Kepala tukang batu L.02 Orang/hari 0.0260 164,062.50 4,265.63
Mandor L.01 Orang/hari 0.0260 183,750.00 4,777.50
.........................................................................................
Jumlah- 1 119,949.38
2 BAHAN
Papan bekisting K-11 M3 0.0400 2,286,900.00 91,476.00
Paku kayu E-5 Kg 0.3000 31,762.50 9,528.75
Minyak bekisting G-3 Ltr 0.1000 16,500.00 1,650.00
.........................................................................................
Jumlah- 2 102,654.75
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 222,604.13
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 222,604.13

A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.5200 137,812.50 71,662.50
Tukang kayu L.07 Orang/hari 0.2600 150,937.50 39,243.75
Kepala tukang batu L.02 Orang/hari 0.0260 164,062.50 4,265.63
Mandor L.01 Orang/hari 0.0260 183,750.00 4,777.50
.........................................................................................
Jumlah- 1 119,949.38
2 BAHAN
Papan bekisting K-11 M3 0.0450 2,286,900.00 102,910.50
Paku kayu E-5 Kg 0.3000 31,762.50 9,528.75
Minyak bekisting G-3 Ltr 0.1000 16,500.00 1,650.00
.........................................................................................
Jumlah- 2 114,089.25
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 234,038.63
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 234,038.63
A.4.1.1.22 Pemasangan bekisting untuk kolom Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.6600 137,812.50 90,956.25
Tukang kayu L.07 Orang/hari 0.3300 150,937.50 49,809.38
Kepala tukang batu L.02 Orang/hari 0.0330 164,062.50 5,414.07
Mandor L.01 Orang/hari 0.0330 183,750.00 6,063.75
.........................................................................................
Jumlah- 1 152,243.45
2 BAHAN
Papan bekisting K-11 M3 0.0400 2,286,900.00 91,476.00
Paku kayu E-5 Kg 0.4000 31,762.50 12,705.00
Minyak bekisting G-3 Ltr 0.2000 16,500.00 3,300.00
Balok kayu kelas II K-1 M3 0.0150 2,922,150.00 43,832.25
Plywood tebal 9 mm K-4 Lbr 0.3500 165,165.00 57,807.75
Dolken kayu φ 8-10/400 cm K-2 Batang 2.0000 1,588.13 3,176.25
.........................................................................................
Jumlah- 2 212,297.25
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 364,540.70
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 364,540.70

A.4.1.1.24 Pemasangan bekisting untuk lantai Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.6600 137,812.50 90,956.25
Tukang kayu L.07 Orang/hari 0.3300 150,937.50 49,809.38
Kepala tukang batu L.02 Orang/hari 0.0330 164,062.50 5,414.07
Mandor L.01 Orang/hari 0.0330 183,750.00 6,063.75
.........................................................................................
Jumlah- 1 152,243.45
2 BAHAN
Papan kayu kelas III K-3 M3 0.0400 2,286,900.00 91,476.00
Paku kayu E-5 Kg 0.4000 31,762.50 12,705.00
Minyak bekisting G-3 Ltr 0.2000 16,500.00 3,300.00
Balok kayu kelas II K-1 M3 0.0150 2,922,150.00 43,832.25
Plywood tebal 9 mm K-4 Lbr 0.3500 165,165.00 57,807.75
Dolken kayu φ 8-10/400 cm K-2 Batang 6.0000 1,588.13 9,528.75
.........................................................................................
Jumlah- 2 218,649.75
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 370,893.20
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 55,633.98
6 HARGA SATUAN PEKERJAAN (4+5) 426,527.18

A.4.1.1.23 Pemasangan bekisting untuk balok Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.6600 137,812.50 90,956.25
Tukang kayu L.07 Orang/hari 0.3300 150,937.50 49,809.38
Kepala tukang batu L.02 Orang/hari 0.0330 164,062.50 5,414.07
Mandor L.01 Orang/hari 0.0330 183,750.00 6,063.75
.........................................................................................
Jumlah- 1 152,243.45
2 BAHAN
Papan bekisting K-11 M3 0.0400 2,286,900.00 91,476.00
Paku kayu E-5 Kg 0.4000 31,762.50 12,705.00
Minyak bekisting G-3 Ltr 0.2000 16,500.00 3,300.00
Balok kayu kelas II K-1 M3 0.0180 2,922,150.00 52,598.70
Plywood tebal 9 mm K-4 Lbr 0.3500 165,165.00 57,807.75
Dolken kayu φ 8-10/400 cm K-2 Batang 2.0000 1,588.13 3,176.25
.........................................................................................
Jumlah- 2 221,063.70
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 373,307.15
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 373,307.15
A.4.1.1.26 Pemasangan 1 m2 bekisting untuk tangga Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.6600 137,812.50 90,956.25
Tukang kayu L.07 Orang/hari 0.3300 150,937.50 49,809.38
Kepala tukang batu L.02 Orang/hari 0.0330 164,062.50 5,414.07
Mandor L.01 Orang/hari 0.0330 183,750.00 6,063.75
.........................................................................................
Jumlah- 1 152,243.45
2 BAHAN
Papan kayu kelas III K-3 M3 0.0300 2,286,900.00 34,303.50
Paku kayu E-5 Kg 0.4000 31,762.50 12,705.00
Minyak bekisting G-3 Ltr 0.1500 16,500.00 2,475.00
Balok kayu kelas II K-1 M3 0.0150 2,922,150.00 43,832.25
Plywood tebal 9 mm K-4 Lbr 0.3500 165,165.00 57,807.75
Dolken kayu φ 8-10/400 cm K-2 Batang 2.0000 1,588.13 3,176.25
.........................................................................................
Jumlah- 2 154,299.75
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 306,543.20
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 306,543.20

A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm Satuan M1


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.1800 137,812.50 24,806.25
Tukang batu L.06 Orang/hari 0.0200 150,937.50 3,018.75
Tukang kayu L.07 Orang/hari 0.0200 150,937.50 3,018.75
Tukang besi L.09 Orang/hari 0.0200 150,937.50 3,018.75
Kepala tukang batu L.02 Orang/hari 0.0060 164,062.50 984.38
Mandor L.01 Orang/hari 0.0090 183,750.00 1,653.75
.........................................................................................
Jumlah- 1 36,500.63
2 BAHAN
Papan bekisting K-11 M3 0.0020 2,286,900.00 2,286.90
Paku kayu E-5 Kg 0.0100 31,762.50 317.63
Besi beton polos E-1 Kg 3.0000 13,319.72 39,959.16
Kawat bindrat E-2 Kg 0.4500 31,762.50 14,293.13
Semen portland C-2 Kg 4.0000 1,778.70 7,114.80
Pasir beton B-2 M3 0.0060 95,287.50 571.73
Kerikil B-5 M3 0.0090 971,932.50 8,747.40
.........................................................................................
Jumlah- 2 73,290.75
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 109,791.38
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 109,791.38

A.4.1.1.36 Membuat ring balok beton bertulang (10 x 15) cm Satuan M1


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.2970 137,812.50 40,930.32
Tukang batu L.06 Orang/hari 0.0330 150,937.50 4,980.94
Tukang kayu L.07 Orang/hari 0.0330 150,937.50 4,980.94
Tukang besi L.09 Orang/hari 0.0330 150,937.50 4,980.94
Kepala tukang batu L.02 Orang/hari 0.0100 164,062.50 1,640.63
Mandor L.01 Orang/hari 0.0150 183,750.00 2,756.25
.........................................................................................
Jumlah- 1 60,270.02
2 BAHAN
Papan bekisting K-11 M3 0.0030 2,286,900.00 3,430.35
Paku kayu E-5 Kg 0.0200 31,762.50 635.25
Besi beton polos E-1 Kg 3.6000 13,319.72 47,950.99
Kawat bindrat E-2 Kg 0.0500 31,762.50 1,588.13
Semen portland C-2 Kg 5.5000 1,778.70 9,782.85
Pasir beton B-2 M3 0.0090 95,287.50 857.59
Kerikil B-5 M3 0.0150 971,932.50 14,578.99
.........................................................................................
Jumlah- 2 78,824.15
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 139,094.17
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 139,094.17
PEKERJAAN PLAFOND
A.4.6.1.19 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II atau III Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu Tukang Kayu L.11 Orang/hari 0.1500 137,812.50 20,671.88
Tukang Kayu L.07 Orang/hari 0.3000 150,937.50 45,281.25
Kepala Tukang Kayu L.03 Orang/hari 0.0300 164,062.50 4,921.88
Mandor L.01 Orang/hari 0.0750 183,750.00 13,781.25
.........................................................................................
Jumlah- 1 84,656.26
2 BAHAN
Balok Kayu Kelas II K-1 M3 0.0154 2,922,150.00 45,001.11
Paku Kayu E-5 Kg 0.2000 31,762.50 6,352.50
.........................................................................................
Jumlah- 2 51,353.61
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 136,009.87
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 136,009.87

A.4.2.1.21 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu Tukang Kayu L.11 Orang/hari 0.3500 137,812.50 48,234.38
Tukang Kayu L.07 Orang/hari 0.3500 150,937.50 52,828.13
Kepala Tukang Kayu L.03 Orang/hari 0.0350 164,062.50 5,742.19
Mandor L.01 Orang/hari 0.0180 183,750.00 3,307.50
.........................................................................................
Jumlah- 1 110,112.20
2 BAHAN
Rangka plafond baja ringa (zincalume) hollow 40 E-21 M1 4.0000 6,352.50 25,410.00
Assesoris rangka hollow (perkuatan, las dll) Ls 1.0000 6,352.50 6,352.50
.........................................................................................
Jumlah- 2 31,762.50
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 141,874.70
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 141,874.70

A.4.5.1.5a Pemasangan langit-langit kalsiboard ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.1000 137,812.50 13,781.25
Tukang kayu L.07 Orang/hari 0.1000 150,937.50 15,093.75
Kepala tukang kayu L.03 Orang/hari 0.0100 164,062.50 1,640.63
Mandor L.01 Orang/hari 0.0050 183,750.00 918.75
.........................................................................................
Jumlah- 1 31,434.38
2 BAHAN
Kalsiboard K-7 Lembar 0.3750 83,853.00 31,444.88
Paku kayu E-5 Kg 0.0300 31,762.50 952.88
.........................................................................................
Jumlah- 2 32,397.76
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 63,832.14
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 63,832.14
A.4.5.1.7 Pemasangan langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.1000 137,812.50 13,781.25
Tukang kayu L.07 Orang/hari 0.0500 150,937.50 7,546.88
Kepala tukang kayu L.03 Orang/hari 0.0050 164,062.50 820.32
Mandor L.01 Orang/hari 0.0050 183,750.00 918.75
.........................................................................................
Jumlah- 1 23,067.20
2 BAHAN
Gypsum 9 mm K-12 Lembar 0.3640 107,992.50 39,309.27
Paku kayu E-5 Kg 0.1100 31,762.50 3,493.88
.........................................................................................
Jumlah- 2 42,803.15
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 65,870.35
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 65,870.35

A.4.5.1.8 Pemasangan list langit-langit gypsum Satuan M'


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.0600 137,812.50 8,268.75
Tukang kayu L.07 Orang/hari 0.0060 150,937.50 905.63
Kepala tukang kayu L.03 Orang/hari 0.0060 164,062.50 984.38
Mandor L.01 Orang/hari 0.0030 183,750.00 551.25
.........................................................................................
Jumlah- 1 10,710.01
2 BAHAN
List gipsum profil 10 cm C-4 M1 1.0500 25,000.00 26,250.00
Semen gipsum C-5 Kg 0.1500 5,082.00 762.30
.........................................................................................
Jumlah- 2 27,012.30
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 37,722.31
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 37,722.31

A.4.5.1.10 Pemasangan list langit-langit kayu profil Satuan M'


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.0500 137,812.50 6,890.63
Tukang kayu L.07 Orang/hari 0.0500 150,937.50 7,546.88
Kepala tukang kayu L.03 Orang/hari 0.0050 164,062.50 820.32
Mandor L.01 Orang/hari 0.0030 183,750.00 551.25
.........................................................................................
Jumlah- 1 15,809.08
2 BAHAN
List kayu profil K-10 M1 1.0500 6,352.50 6,670.13
Paku kayu E-5 Kg 0.0100 31,762.50 317.63
.........................................................................................
Jumlah- 2 6,987.76
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 22,796.84
5 JUMLAH (1+2+3) 15% x Jumlah 4 3,419.53
6 HARGA SATUAN PEKERJAAN (4+5) 26,216.37

PEKERJAAN PASANGAN
A.4.4.1.7 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.3000 137,812.50 41,343.75
Tukang batu L.06 Orang/hari 0.1000 150,937.50 15,093.75
Kepala tukang batu L.02 Orang/hari 0.0100 164,062.50 1,640.63
Mandor L.01 Orang/hari 0.0150 183,750.00 2,756.25
.........................................................................................
Jumlah- 1 60,834.38
2 BAHAN
Batu bata merah C-1 Bh 70.0000 1,905.75 133,402.50
Semen portland C-2 Kg 18.9500 1,778.70 33,706.37
Pasir Pasang B-3 M3 0.0380 95,287.50 3,620.93
Jumlah- 2 ............................................................................... 170,729.80
3 PERALATAN
Jumlah- 3 ............................................................................... -
4 JUMLAH (1+2+3) 231,564.18
5 OVERHEAD + KEUNTUNGAN 0 x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 231,564.18
A.4.4.1.11 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.3000 137,812.50 41,343.75
Tukang batu L.06 Orang/hari 0.1000 150,937.50 15,093.75
Kepala tukang batu L.02 Orang/hari 0.0100 164,062.50 1,640.63
Mandor L.01 Orang/hari 0.0150 183,750.00 2,756.25
.........................................................................................
Jumlah- 1 60,834.38
2 BAHAN
Batu bata merah C-1 Bh 70.0000 1,905.75 133,402.50
Semen portland C-2 Kg 8.3200 1,778.70 14,798.79
Pasir Pasang B-3 M3 0.0490 95,287.50 4,669.09
Jumlah- 2 ............................................................................... 152,870.38
3 PERALATAN
Jumlah- 3 ............................................................................... -
4 JUMLAH (1+2+3) 213,704.76
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 213,704.76

Ls. ACP Pemasangan m2 dinding ACP Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang besi L.12 Orang/hari 0.3900 137,812.50 53,746.88
Tukang besi L.09 Orang/hari 0.7000 150,937.50 105,656.25
Kepala tukang besi L.04 Orang/hari 0.0700 164,062.50 11,484.38
Mandor L.01 Orang/hari 0.0070 183,750.00 1,286.25
.........................................................................................
Jumlah- 1 172,173.76
2 BAHAN
ACP C-13 Lembar 0.3640 1,050,000.00 382,200.00
Besi hollow galvanis 3x3x1 mm E-20 Btg 0.8000 37,500.00 30,000.00
Skrup fixer E-18 Bh 0.1100 1,000.00 110.00
Sealant G-5 tube 0.2500 15,500.00 3,875.00
.........................................................................................
Jumlah- 2 416,185.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 588,358.76
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 588,358.76

A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.3000 137,812.50 41,343.75
Tukang batu L.06 Orang/hari 0.1000 150,937.50 15,093.75
Kepala tukang batu L.02 Orang/hari 0.0100 164,062.50 1,640.63
Mandor L.01 Orang/hari 0.0150 183,750.00 2,756.25
.........................................................................................
Jumlah- 1 60,834.38
2 BAHAN
Bata rooster C-14 Bh 25.0000 19,057.50 476,437.50
Semen portland C-2 Kg 11.0000 1,778.70 19,565.70
Pasir Pasang B-3 M3 0.0350 95,287.50 3,335.07
Jumlah- 2 ............................................................................... 499,338.27
3 PERALATAN
Jumlah- 3 ............................................................................... -
4 JUMLAH (1+2+3) 560,172.65
5 OVERHEAD + KEUNTUNGAN 0 x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 560,172.65

A.4.4.3.58 Pemasangan 1 m2 dinding batu tempel hitam Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.7000 137,812.50 96,468.75
Tukang batu L.06 Orang/hari 0.3500 150,937.50 52,828.13
Kepala tukang batu L.02 Orang/hari 0.0350 164,062.50 5,742.19
Mandor L.01 Orang/hari 0.0350 183,750.00 6,431.25
.........................................................................................
Jumlah- 1 161,470.32
2 BAHAN
Batu alam C-15 M2 1.1000 306,825.75 337,508.33
Semen portland C-2 Kg 11.7500 1,778.70 20,899.73
Pasir Pasang B-3 M3 0.0350 95,287.50 3,335.07
Jumlah- 2 ............................................................................... 361,743.13
3 PERALATAN
Jumlah- 3 ............................................................................... -
4 JUMLAH (1+2+3) 523,213.45
5 OVERHEAD + KEUNTUNGAN 0 x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 523,213.45

A.4.4.1.21a Pemasangan dinding conblock HB10 campuran 1SP :4PP Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.3000 137,812.50 41,343.75
Tukang batu L.06 Orang/hari 0.1000 150,937.50 15,093.75
Kepala tukang batu L.02 Orang/hari 0.0100 164,062.50 1,640.63
Mandor L.01 Orang/hari 0.0150 183,750.00 2,756.25
.........................................................................................
Jumlah- 1 60,834.38
2 BAHAN
Batako C-17 Bh 12.5000 3,303.30 41,291.25
Semen portland C-2 Kg 2.4000 1,778.70 4,268.88
Pasir Pasang B-3 M3 0.0075 95,287.50 714.66
Jumlah- 2 ............................................................................... 46,274.79
3 PERALATAN
Jumlah- 3 ............................................................................... -
4 JUMLAH (1+2+3) 107,109.17
5 OVERHEAD + KEUNTUNGAN 0 x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 107,109.17

Ls. Batako Pemasangan 1 m2 dinding batako Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.3000 137,812.50 41,343.75
Tukang batu L.06 Orang/hari 0.1000 150,937.50 15,093.75
Kepala tukang batu L.02 Orang/hari 0.0100 164,062.50 1,640.63
Mandor L.01 Orang/hari 0.0150 183,750.00 2,756.25
.........................................................................................
Jumlah- 1 60,834.38
2 BAHAN
Batako C-17 Bh 25.0000 3,303.30 82,582.50
Semen portland C-2 Kg 0.2300 1,778.70 409.11
Pasir Pasang B-3 M3 0.0430 95,287.50 4,097.37
Jumlah- 2 ............................................................................... 87,088.98
3 PERALATAN
Jumlah- 3 ............................................................................... -
4 JUMLAH (1+2+3) 147,923.36
5 OVERHEAD + KEUNTUNGAN 0 x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 147,923.36

A.4.6.1.25 Pemasangan dinding pemisah gypsum rangkap, rangka kayu kelas II Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.2000 137,812.50 27,562.50
Tukang kayu L.07 Orang/hari 0.6000 150,937.50 90,562.50
Kepala tukang kayu L.03 Orang/hari 0.0600 164,062.50 9,843.75
Mandor L.01 Orang/hari 0.0100 183,750.00 1,837.50
.........................................................................................
Jumlah- 1 129,806.25
2 BAHAN
Balok kayu kelas II K-1 M3 0.0280 2,922,150.00 81,820.20
Paku kayu E-5 Kg 0.1500 31,762.50 4,764.38
Gypsum 9 mm K-12 Lembar 0.8600 107,992.50 92,873.55
Lem kayu G-13 Buah 0.5600 25,410.00 14,229.60
Jumlah- 2 ............................................................................... 193,687.73
3 PERALATAN
Jumlah- 3 ............................................................................... -
4 JUMLAH (1+2+3) 323,493.98
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 323,493.98

A.4.4.3.60 Pemasangan wallpaper lebar 50 cm Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.3500 137,812.50 48,234.38
Tukang batu L.06 Orang/hari 0.1750 150,937.50 26,414.07
Kepala tukang batu L.02 Orang/hari 0.0170 164,062.50 2,789.07
Mandor L.01 Orang/hari 0.0020 183,750.00 367.50
.........................................................................................
Jumlah- 1 77,805.02
2 BAHAN
wallpaper G-16 M2 2.2000 75,000.00 165,000.00
lem wallpaper G-17 Kg 0.2500 10,000.00 2,500.00
Jumlah- 2 ............................................................................... 167,500.00
3 PERALATAN
Jumlah- 3 ............................................................................... -
4 JUMLAH (1+2+3) 245,305.02
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 245,305.02

LS. HPL Pemasangan Panel HPL Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
.........................................................................................
Jumlah- 1 -
2 BAHAN
HPL G-18 M2 1.0000 350,000.00 350,000.00
Aksesoris #N/A #N/A 0.1500 350,000.00 52,500.00
Jumlah- 2 ............................................................................... 402,500.00
3 PERALATAN
Jumlah- 3 ............................................................................... -
4 JUMLAH (1+2+3) 402,500.00
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 402,500.00

LS. Pintu lapis HPL Pemasangan daun pintu lapis HPL Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
.........................................................................................
Jumlah- 1 -
2 BAHAN
Daun pintu plywood lapis HPL K-13 M2 1.0000 1,200,000.00 1,200,000.00
Aksesoris #N/A #N/A 0.0300 1,200,000.00 36,000.00
Jumlah- 2 ............................................................................... 1,236,000.00
3 PERALATAN
Jumlah- 3 ............................................................................... -
4 JUMLAH (1+2+3) 1,236,000.00
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 1,236,000.00

PEKERJAAN PLESTERAN
A.4.4.2.6 Pemasangan plesteran 1SP : 6PP tebal 15 mm. Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.3000 137,812.50 41,343.75
Tukang batu L.06 Orang/hari 0.1500 150,937.50 22,640.63
Kepala tukang batu L.02 Orang/hari 0.0150 164,062.50 2,460.94
Mandor L.01 Orang/hari 0.0150 183,750.00 2,756.25
.........................................................................................
Jumlah- 1 69,201.57
2 BAHAN
Semen portland C-2 Kg 4.4160 1,778.70 7,854.74
Pasir Pasang B-3 M3 0.0270 95,287.50 2,572.77
.........................................................................................
Jumlah- 2 10,427.51
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 79,629.08
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 79,629.08

A.4.4.2.4 Pemasangan plesteran 1pc : 4ps Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.3000 137,812.50 41,343.75
Tukang batu L.06 Orang/hari 0.1500 150,937.50 22,640.63
Kepala tukang batu L.02 Orang/hari 0.0150 164,062.50 2,460.94
Mandor L.01 Orang/hari 0.0150 183,750.00 2,756.25
.........................................................................................
Jumlah- 1 69,201.57
2 BAHAN
Semen portland C-2 Kg 6.2400 1,778.70 11,099.09
Pasir Pasang B-3 M3 0.0240 95,287.50 2,286.90
.........................................................................................
Jumlah- 2 13,385.99
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 82,587.56
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 82,587.56
A.4.4.2.27 Pemasangan acian Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.2000 137,812.50 27,562.50
Tukang batu L.06 Orang/hari 0.1000 150,937.50 15,093.75
Kepala tukang batu L.02 Orang/hari 0.0100 164,062.50 1,640.63
Mandor L.01 Orang/hari 0.0100 183,750.00 1,837.50
.........................................................................................
Jumlah- 1 46,134.38
2 BAHAN
Semen portland C-2 Kg 3.2500 1,778.70 5,780.78
.........................................................................................
Jumlah- 2 5,780.78
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 51,915.16
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 51,915.16

PEKERJAAN PENUTUP LANTAI & PENUTUP DINDING


A.4.4.3.34a Pemasangan lantai ukuran 40cm x 40cm Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.7000 137,812.50 96,468.75
Tukang batu L.06 Orang/hari 0.3500 150,937.50 52,828.13
Kepala tukang batu L.02 Orang/hari 0.0350 164,062.50 5,742.19
Mandor L.01 Orang/hari 0.0350 183,750.00 6,431.25
.........................................................................................
Jumlah- 1 161,470.32
2 BAHAN
Keramik 40x40 cm C-9 Bh 1.0500 12,500.00 13,125.00
Semen portland C-2 Kg 8.1900 1,778.70 14,567.56
Pasir Pasang B-3 M3 0.0450 95,287.50 4,287.94
Semen warna C-3 Kg 1.6200 -
.........................................................................................
Jumlah- 2 31,980.50
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 193,450.82
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 193,450.82

A.4.4.3.34.b Pemasangan lantai ukuran 60cm x 60cm Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.2400 137,812.50 33,075.00
Tukang batu L.06 Orang/hari 0.1200 150,937.50 18,112.50
Kepala tukang batu L.02 Orang/hari 0.0120 164,062.50 1,968.75
Mandor L.01 Orang/hari 0.0120 183,750.00 2,205.00
.........................................................................................
Jumlah- 1 55,361.25
2 BAHAN
Granito 60x60 cm C-6 Bh 3.1000 83,333.33 258,333.34
Semen portland C-2 Kg 9.6000 1,778.70 17,075.52
Pasir Pasang B-3 M3 0.0450 95,287.50 4,287.94
Semen warna C-3 Kg 1.5000 25,410.00 38,115.00
.........................................................................................
Jumlah- 2 317,811.80
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 373,173.05
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 373,173.05

A.4.4.3.35 Pemasangan lantai keramik ukuran 30cm x 30cm Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.2400 137,812.50 33,075.00
Tukang batu L.06 Orang/hari 0.1200 150,937.50 18,112.50
Kepala tukang batu L.02 Orang/hari 0.0120 164,062.50 1,968.75
Mandor L.01 Orang/hari 0.0120 183,750.00 2,205.00
.........................................................................................
Jumlah- 1 55,361.25
2 BAHAN
Keramik 30x30 cm C-10 Bh 11.8700 7,507.50 89,114.03
Semen portland C-2 Kg 10.0000 1,778.70 17,787.00
Pasir Pasang B-3 M3 0.0450 95,287.50 4,287.94
Semen warna C-3 Kg 1.5000 -
.........................................................................................
Jumlah- 2 111,188.97
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 166,550.22
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 166,550.22
A.4.4.3.35 a Pemasangan lantai keramik ukuran 50cm x 50cm Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.2400 137,812.50 33,075.00
Tukang batu L.06 Orang/hari 0.1200 150,937.50 18,112.50
Kepala tukang batu L.02 Orang/hari 0.0120 164,062.50 1,968.75
Mandor L.01 Orang/hari 0.0120 183,750.00 2,205.00
.........................................................................................
Jumlah- 1 55,361.25
2 BAHAN
Keramik 50x50 cm C-8 Bh 4.0500 22,500.00 91,125.00
Semen portland C-2 Kg 10.0000 1,778.70 17,787.00
Pasir Pasang B-3 M3 0.0450 95,287.50 4,287.94
Semen warna C-3 Kg 1.5000 -
.........................................................................................
Jumlah- 2 113,199.94
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 168,561.19
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 168,561.19

A.4.4.3.35 b Pemasangan lantai keramik ukuran 60cm x 60cm Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.2400 137,812.50 33,075.00
Tukang batu L.06 Orang/hari 0.1200 150,937.50 18,112.50
Kepala tukang batu L.02 Orang/hari 0.0120 164,062.50 1,968.75
Mandor L.01 Orang/hari 0.0120 183,750.00 2,205.00
.........................................................................................
Jumlah- 1 55,361.25
2 BAHAN
Keramik 60x60 cm C-7 Bh 3.1000 31,250.00 96,875.00
Semen portland C-2 Kg 10.0000 1,778.70 17,787.00
Pasir Pasang B-3 M3 0.0450 95,287.50 4,287.94
Semen warna C-3 Kg 1.5000 -
.........................................................................................
Jumlah- 2 118,949.94
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 174,311.19
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 174,311.19

A.4.4.3.36 Pemasangan 1m2 lantai keramik ukuran 20cm x 20cmm Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.7000 137,812.50 96,468.75
Tukang batu L.06 Orang/hari 0.3500 150,937.50 52,828.13
Kepala tukang batu L.02 Orang/hari 0.0350 164,062.50 5,742.19
Mandor L.01 Orang/hari 0.0350 183,750.00 6,431.25
.........................................................................................
Jumlah- 1 161,470.32
2 BAHAN
Keramik 20x20 cm C-11 Bh 26.5000 2,800.00 74,200.00
Semen portland C-2 Kg 10.4000 1,778.70 18,498.48
Pasir Pasang B-3 M3 0.0450 95,287.50 4,287.94
Semen warna C-3 Kg 1.6200 -
.........................................................................................
Jumlah- 2 96,986.42
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 258,456.74
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 258,456.74

A.4.4.3.54 Pemasangan 1 m2 dinding keramik 20cm x 20cm Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.9000 137,812.50 124,031.25
Tukang batu L.06 Orang/hari 0.4500 150,937.50 67,921.88
Kepala tukang batu L.02 Orang/hari 0.0450 164,062.50 7,382.82
Mandor L.01 Orang/hari 0.0450 183,750.00 8,268.75
.........................................................................................
Jumlah- 1 207,604.70
2 BAHAN
Keramik 20x20 cm C-11 Bh 26.5000 2,800.00 74,200.00
Semen portland C-2 Kg 9.3000 1,778.70 16,541.91
Pasir Pasang B-3 M3 0.0180 95,287.50 1,715.18
Semen warna C-3 Kg 1.9400 25,410.00 49,295.40
.........................................................................................
Jumlah- 2 141,752.49
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 349,357.19
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 349,357.19

A.4.4.3.54a Pemasangan 1 m2 dinding keramik 30cm x 30cm Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.2400 137,812.50 33,075.00
Tukang batu L.06 Orang/hari 0.1200 150,937.50 18,112.50
Kepala tukang batu L.02 Orang/hari 0.0120 164,062.50 1,968.75
Mandor L.01 Orang/hari 0.0120 183,750.00 2,205.00
.........................................................................................
Jumlah- 1 55,361.25
2 BAHAN
Keramik 30x30 cm C-10 Bh 11.8700 7,507.50 89,114.03
Semen portland C-2 Kg 9.3000 1,778.70 16,541.91
Pasir Pasang B-3 M3 0.0180 95,287.50 1,715.18
Semen warna C-3 Kg 1.9400 25,410.00 49,295.40
.........................................................................................
Jumlah- 2 156,666.52
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 212,027.77
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 212,027.77

A.4.4.3.43 Pemasangan lantai marmer ukuran 100cm x 100cm Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.7000 137,812.50 96,468.75
Tukang batu L.06 Orang/hari 0.3500 150,937.50 52,828.13
Kepala tukang batu L.02 Orang/hari 0.0350 164,062.50 5,742.19
Mandor L.01 Orang/hari 0.0350 183,750.00 6,431.25
.........................................................................................
Jumlah- 1 161,470.32
2 BAHAN
Marmer C-12 Bh 1.0600 600,000.00 636,000.00
Semen portland C-2 Kg 8.1900 1,778.70 14,567.56
Pasir Pasang B-3 M3 0.0450 95,287.50 4,287.94
Semen warna C-3 Kg 0.6500 - -
.........................................................................................
Jumlah- 2 654,855.50
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 816,325.82
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 816,325.82

A.4.4.3.55 Pemasangan dinding marmer 100cm x 100cm Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 1.3000 137,812.50 179,156.25
Tukang batu L.06 Orang/hari 0.6500 150,937.50 98,109.38
Kepala tukang batu L.02 Orang/hari 0.0650 164,062.50 10,664.07
Mandor L.01 Orang/hari 0.0650 183,750.00 11,943.75
.........................................................................................
Jumlah- 1 299,873.45
2 BAHAN
Marmer C-12 Bh 1.0600 600,000.00 636,000.00
Semen portland C-2 Kg 12.4400 1,778.70 22,127.03
Pasir Pasang B-3 M3 0.0250 95,287.50 2,382.19
Semen warna C-3 Kg 0.6500 - -
Paku kayu E-5 Kg 3.0300 - -
.........................................................................................
Jumlah- 2 660,509.22
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 960,382.67
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 960,382.67

A.4.4.3.44 Pemasangan lantai karpet Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.1700 137,812.50 23,428.13
Tukang batu L.06 Orang/hari 0.1700 150,937.50 25,659.38
Kepala tukang batu L.02 Orang/hari 0.0170 164,062.50 2,789.07
Mandor L.01 Orang/hari 0.0090 183,750.00 1,653.75
.........................................................................................
Jumlah- 1 53,530.33
2 BAHAN
Karpet G-14 M2 1.0500 235,000.00 246,750.00
Lem karpet G-15 Kg 0.3500 - -
.........................................................................................
Jumlah- 2 246,750.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 300,280.33
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 300,280.33
PEKERJAAN PENUTUP ATAP
LS- baja ringan Memasang rangka baja ringan untuk atap metal/ genteng biasa Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang besi L.12 Orang/hari 0.2000 137,812.50 27,562.50
Tukang besi L.09 Orang/hari 0.4500 150,937.50 67,921.88
Kepala tukang besi L.04 Orang/hari 0.1000 164,062.50 16,406.25
Mandor L.01 Orang/hari 0.0500 183,750.00 9,187.50
.........................................................................................
Jumlah- 1 121,078.13
2 BAHAN
Batang C-75x35x0,75 E-8 M1 1.4880 11,646.25 17,329.62
Batang C-75x35x0,65 E-9 M1 2.2320 19,057.50 42,536.34
Baut screw driver E-10 Bh 38.0000 1,000.00 38,000.00
Dinabolt dia 12mm (10-15cm) E-11 Bh 1.6000 4,500.00 7,200.00
Roof batten reng T=0,60 mm E-12 M1 3.6000 9,166.67 33,000.00
Talang jurai E-13 M1 0.1240 41,714.75 5,172.63
.........................................................................................
Jumlah- 2 143,238.59
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 264,316.72
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 264,316.72

A.4.5.2.32a Pemasangan Atap spandeks Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.2000 137,812.50 27,562.50
Tukang kayu L.07 Orang/hari 0.1000 150,937.50 15,093.75
Kepala tukang batu L.02 Orang/hari 0.0100 164,062.50 1,640.63
Mandor L.01 Orang/hari 0.0010 183,750.00 183.75
.........................................................................................
Jumlah- 1 44,480.63
2 BAHAN
Atap spandeks E-3 Lembar 1.4290 57,172.50 81,699.51
Paku genteng metal E-6 Kg 0.2000 35,574.00 7,114.80
.........................................................................................
Jumlah- 2 88,814.31
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 133,294.94
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 133,294.94

A.4.5.2.32 Pemasangan Atap metal Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.2000 137,812.50 27,562.50
Tukang kayu L.07 Orang/hari 0.1000 150,937.50 15,093.75
Kepala tukang batu L.02 Orang/hari 0.0100 164,062.50 1,640.63
Mandor L.01 Orang/hari 0.0010 183,750.00 183.75
.........................................................................................
Jumlah- 1 44,480.63
2 BAHAN
Atap Metal E-3 Lembar 1.0200 53,500.00 54,570.00
Paku genteng metal E-6 Kg 0.2000 35,574.00 7,114.80
.........................................................................................
Jumlah- 2 61,684.80
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 106,165.43
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 106,165.43

A.4.5.2.41 Pemasangan nok alumunium Satuan M1


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.1500 137,812.50 20,671.88
Tukang kayu L.07 Orang/hari 0.0700 150,937.50 10,565.63
Kepala tukang batu L.02 Orang/hari 0.0070 164,062.50 1,148.44
Mandor L.01 Orang/hari 0.0060 183,750.00 1,102.50
.........................................................................................
Jumlah- 1 33,488.45
2 BAHAN
Bubungan zincalume E-4 M 1.2000 44,467.50 53,361.00
Paku genteng metal E-6 Kg 0.0500 35,574.00 1,778.70
.........................................................................................
Jumlah- 2 55,139.70
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 88,628.15
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 88,628.15

A.4.5.2.36 Pemasangan 1 m' nok genteng metal Satuan M1


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.2500 137,812.50 34,453.13
Tukang kayu L.07 Orang/hari 0.1500 150,937.50 22,640.63
Kepala tukang batu L.02 Orang/hari 0.0150 164,062.50 2,460.94
Mandor L.01 Orang/hari 0.0130 183,750.00 2,388.75
.........................................................................................
Jumlah- 1 61,943.45
2 BAHAN
Bubungan Genteng Metal E-4 Bh 1.1000 26,400.00 29,040.00
Paku genteng metal E-6 Kg 0.0500 35,574.00 1,778.70
.........................................................................................
Jumlah- 2 30,818.70
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 92,762.15
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 92,762.15

A.4.6.1.21a List Plang nusaplank Satuan M1


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.1000 137,812.50 13,781.25
Tukang kayu L.07 Orang/hari 0.2000 150,937.50 30,187.50
Kepala tukang kayu L.03 Orang/hari 0.0200 164,062.50 3,281.25
Mandor L.01 Orang/hari 0.0050 183,750.00 918.75
.........................................................................................
Jumlah- 1 48,168.75
2 BAHAN
Papan plank nusaplank K-6 Lembar 0.4000 75,000.00 30,000.00
Paku kayu E-5 Kg 0.1000 31,762.50 3,176.25
.........................................................................................
Jumlah- 1 63,168.75
3 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 9,475.31
4 HARGA SATUAN PEKERJAAN (4+5) 72,644.06

PEKERJAAN ALUMUNIUM
A.4.2.1.11 Pemasangan 1 m kusen pintu dan jendela alluminium Satuan M1
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang besi L.12 Orang/hari 0.0430 137,812.50 5,925.94
Tukang besi L.09 Orang/hari 0.0430 150,937.50 6,490.32
Kepala tukang besi L.04 Orang/hari 0.0043 164,062.50 705.47
Mandor L.01 Orang/hari 0.0021 183,750.00 385.88
.........................................................................................
Jumlah- 1 13,507.61
2 BAHAN
Profil alumunium E-19 M1 1.1000 46,333.33 50,966.67
Skrup fixer E-18 Bh 2.0000 1,000.00 2,000.00
Sealant G-5 tube 1.0000 15,500.00 15,500.00
.........................................................................................
Jumlah- 2 68,466.67
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 81,974.28
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 81,974.28

Ls. Panel alumuniumPemasangan m2 daun pintu jendela Satuan M2


alumunium
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang besi L.12 Orang/hari 0.0850 137,812.50 11,714.07
Tukang besi L.09 Orang/hari 0.0850 150,937.50 12,829.69
Kepala tukang besi L.04 Orang/hari 0.0085 164,062.50 1,394.54
Mandor L.01 Orang/hari 0.0050 183,750.00 918.75
.........................................................................................
Jumlah- 1 26,857.05
2 BAHAN
Profil alumunium E-19 M1 4.4000 46,333.33 203,866.67
Alumunium T E-17 M1 4.5000 15,000.00 67,500.00
Sealant G-5 tube 0.2700 15,500.00 4,185.00
.........................................................................................
Jumlah- 2 275,551.67
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 302,408.72
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 302,408.72
PEKERJAAN KAYU

A.4.6.1.23 Pemasangan rangka dinding pemisah (60 x 120) cm kayu kelas II atau III Satuan M3

No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.1500 137,812.50 20,671.88
Tukang kayu L.07 Orang/hari 0.4500 150,937.50 67,921.88
Kepala tukang kayu L.03 Orang/hari 0.0450 164,062.50 7,382.82
Mandor L.01 Orang/hari 0.0080 183,750.00 1,470.00
.........................................................................................
Jumlah- 1 97,446.58
2 BAHAN
Balok kayu kelas Ii K-1 M3 0.0280 2,922,150.00 81,820.20
Paku kayu E-5 Kg 0.1500 31,762.50 4,764.38
.........................................................................................
Jumlah- 2 86,584.58
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 184,031.16
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 184,031.16

A.4.6.1.1 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas I Satuan M3

No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 7.0000 137,812.50 964,687.50
Tukang kayu L.07 Orang/hari 21.0000 150,937.50 3,169,687.50
Kepala tukang kayu L.03 Orang/hari 2.1000 164,062.50 344,531.25
Mandor L.01 Orang/hari 0.3500 183,750.00 64,312.50
.........................................................................................
Jumlah- 1 4,543,218.75
2 BAHAN
Balok kayu kelas I K-8 M3 1.1000 7,940,625.00 8,734,687.50
Paku kayu E-5 Kg 1.2500 31,762.50 39,703.13
Lem kayu G-13 Buah 1.0000 25,410.00 25,410.00
.........................................................................................
Jumlah- 2 8,799,800.63
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 13,343,019.38
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 13,343,019.38

A.4.6.1.5 Pembuatan dan pemasangan daun pintu panel, kayu kelas I Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 1.0000 137,812.50 137,812.50
Tukang kayu L.07 Orang/hari 3.0000 150,937.50 452,812.50
Kepala tukang kayu L.03 Orang/hari 0.3000 164,062.50 49,218.75
Mandor L.01 Orang/hari 0.0500 183,750.00 9,187.50
.........................................................................................
Jumlah- 1 649,031.25
2 BAHAN
Papan kayu kelas II K-5 M3 0.0400 2,922,150.00 116,886.00
Lem kayu G-13 Buah 0.5000 25,410.00 12,705.00
.........................................................................................
Jumlah- 2 129,591.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 778,622.25
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 778,622.25

A.4.6.1.6 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.8000 137,812.50 110,250.00
Tukang kayu L.07 Orang/hari 2.4000 150,937.50 362,250.00
Kepala tukang kayu L.03 Orang/hari 0.2400 164,062.50 39,375.00
Mandor L.01 Orang/hari 0.0400 183,750.00 7,350.00
.........................................................................................
Jumlah- 1 519,225.00
2 BAHAN
Papan kayu kelas II K-5 M3 0.0240 2,922,150.00 70,131.60
Lem kayu G-13 Buah 0.3000 25,410.00 7,623.00
.........................................................................................
Jumlah- 2 77,754.60
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 596,979.60
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 596,979.60

BOW F.1 MENGERJAKAN RANGKA BAWAH KAYU KLAS I Satuan M3


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 5.0000 137,812.50 689,062.50
Tukang kayu L.07 Orang/hari 7.5000 150,937.50 1,132,031.25
Kepala tukang kayu L.03 Orang/hari 0.7500 164,062.50 123,046.88
Mandor L.01 Orang/hari 0.2500 183,750.00 45,937.50
.........................................................................................
Jumlah- 1 1,990,078.13
2 BAHAN
Balok kayu kelas I K-8 M3 1.1000 7,940,625.00 8,734,687.50
Paku kayu E-5 Kg 5.0000 31,762.50 158,812.50
.........................................................................................
Jumlah- 2 8,893,500.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 10,883,578.13
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 10,883,578.13

BOW E.13 MEMANCANG TIANG KEDALAM TANAH Satuan M1


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.1500 137,812.50 20,671.88
Tukang kayu L.07 Orang/hari 0.0400 150,937.50 6,037.50
Kepala tukang kayu L.03 Orang/hari 0.0040 164,062.50 656.25
Mandor L.01 Orang/hari 0.0450 183,750.00 8,268.75
.........................................................................................
Jumlah- 1 35,634.38
2 BAHAN
.........................................................................................
Jumlah- 2 -
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 35,634.38
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 35,634.38
PEKERJAAN PENGECATAN
A.4.7.1.10 Pengecatan tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang cat L.13 Orang/hari 0.0200 137,812.50 2,756.25
Tukang Cat L.08 Orang/hari 0.0630 150,937.50 9,509.07
Kepala Tukang Cat L.05 Orang/hari 0.0063 164,062.50 1,033.60
Mandor L.01 Orang/hari 0.0030 183,750.00 551.25
.........................................................................................
Jumlah- 1 13,850.17
2 BAHAN
Plamir Tembok G-4 Kg 0.1000 82,582.50 8,258.25
Cat tembok dasar G-1 Kg 0.1000 38,115.00 3,811.50
Cat Tembok G-2 Kg 0.2600 38,115.00 9,909.90
.........................................................................................
Jumlah- 2 21,979.65
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 35,829.82
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 35,829.82

A.4.7.1.11 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang cat L.13 Orang/hari 0.0280 137,812.50 3,858.75
Tukang Cat L.08 Orang/hari 0.0420 150,937.50 6,339.38
Kepala Tukang Cat L.05 Orang/hari 0.0042 164,062.50 689.07
Mandor L.01 Orang/hari 0.0030 183,750.00 551.25
.........................................................................................
Jumlah- 1 11,438.45
2 BAHAN
Cat tembok dasar G-1 Kg 0.1200 38,115.00 4,573.80
Cat Tembok G-2 Kg 0.1800 38,115.00 6,860.70
.........................................................................................
Jumlah- 2 11,434.50
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 22,872.95
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 22,872.95

Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A.4.7.1.4 Satuan M2

No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang cat L.13 Orang/hari 0.0700 137,812.50 9,646.88
Tukang Cat L.08 Orang/hari 0.0090 150,937.50 1,358.44
Kepala Tukang Cat L.05 Orang/hari 0.0060 164,062.50 984.38
Mandor L.01 Orang/hari 0.0030 183,750.00 551.25
.........................................................................................
Jumlah- 1 12,540.95
2 BAHAN
Cat menie kayu G-6 Kg 0.2000 63,525.00 12,705.00
Plamir Kayu G-7 Kg 0.1500 63,525.00 9,528.75
Cat Kayu Dasar G-8 Kg 0.1700 78,771.00 13,391.07
Cat Kayu G-9 Kg 0.2600 81,312.00 21,141.12
Kuas G-10 Buah 0.0100 30,000.00 300.00
Thinner G-11 Kg 0.0300 76,230.00 2,286.90
Ampelas G-12 Lembar 0.2000 8,893.50 1,778.70
.........................................................................................
Jumlah- 2 61,131.54
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 73,672.49
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 73,672.49

PEKERJAAN KUNCIAN
A.4.6.2.2 Pemasangan kunci tanam biasa Satuan Buah
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.0100 137,812.50 1,378.13
Tukang kayu L.07 Orang/hari 0.5000 150,937.50 75,468.75
Kepala tukang kayu L.03 Orang/hari 0.0500 164,062.50 8,203.13
Mandor L.01 Orang/hari 0.0050 183,750.00 918.75
.........................................................................................
Jumlah- 1 85,968.76
2 BAHAN
Kunci tanam biasa I-3 Bh 1.0000 190,575.00 190,575.00
.........................................................................................
Jumlah- 2 190,575.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 276,543.76
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 276,543.76
A.4.6.2.5 Pemasangan engsel pintu Satuan Buah
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.0150 137,812.50 2,067.19
Tukang kayu L.07 Orang/hari 0.1500 150,937.50 22,640.63
Kepala tukang kayu L.03 Orang/hari 0.0150 164,062.50 2,460.94
Mandor L.01 Orang/hari 0.0008 183,750.00 147.00
.........................................................................................
Jumlah- 1 27,315.76
2 BAHAN
Engsel pintu I-1 Bh 1.0000 74,959.50 74,959.50
.........................................................................................
Jumlah- 2 74,959.50
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 102,275.26
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 102,275.26

A.4.6.2.6 Pemasangan engsel jendela Satuan Buah


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.0100 137,812.50 1,378.13
Tukang kayu L.07 Orang/hari 0.1000 150,937.50 15,093.75
Kepala tukang kayu L.03 Orang/hari 0.0100 164,062.50 1,640.63
Mandor L.01 Orang/hari 0.0005 183,750.00 91.88
.........................................................................................
Jumlah- 1 18,204.39
2 BAHAN
Engsel Jendela I-2 Bh 1.0000 44,467.50 44,467.50
.........................................................................................
Jumlah- 2 44,467.50
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 62,671.89
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 62,671.89

A.4.6.2.9 Pemasangan kait angin Satuan Buah


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.0150 137,812.50 2,067.19
Tukang kayu L.07 Orang/hari 0.1500 150,937.50 22,640.63
Kepala tukang kayu L.03 Orang/hari 0.0150 164,062.50 2,460.94
Mandor L.01 Orang/hari 0.0080 183,750.00 1,470.00
.........................................................................................
Jumlah- 1 28,638.76
2 BAHAN
Kait angin I-4 Bh 1.0000 19,057.50 19,057.50
.........................................................................................
Jumlah- 2 19,057.50
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 47,696.26
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 47,696.26

A.4.6.2.9 a Pemasangan pegangan jendela Satuan Buah


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.0150 137,812.50 2,067.19
Tukang kayu L.07 Orang/hari 0.1500 150,937.50 22,640.63
Kepala tukang kayu L.03 Orang/hari 0.0150 164,062.50 2,460.94
Mandor L.01 Orang/hari 0.0080 183,750.00 1,470.00
.........................................................................................
Jumlah- 1 28,638.76
2 BAHAN
Handle jendela I-5 Bh 1.0000 34,938.75 34,938.75
.........................................................................................
Jumlah- 2 34,938.75
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 63,577.51
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 63,577.51
A.4.6.2.11 Pemasangan kunci slot Satuan Buah
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.0200 137,812.50 2,756.25
Tukang kayu L.07 Orang/hari 0.2000 150,937.50 30,187.50
Kepala tukang kayu L.03 Orang/hari 0.0200 164,062.50 3,281.25
Mandor L.01 Orang/hari 0.0010 183,750.00 183.75
.........................................................................................
Jumlah- 1 36,408.75
2 BAHAN
Kunci slot I-7 Bh 1.0000 34,938.75 34,938.75
.........................................................................................
Jumlah- 2 34,938.75
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 71,347.50
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 71,347.50

A.4.6.2.12 Pemasangan Door closer Satuan Pasang


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.0500 137,812.50 6,890.63
Tukang kayu L.07 Orang/hari 0.5000 150,937.50 75,468.75
Kepala tukang kayu L.03 Orang/hari 0.0500 164,062.50 8,203.13
Mandor L.01 Orang/hari 0.0030 183,750.00 551.25
.........................................................................................
Jumlah- 1 91,113.76
2 BAHAN
Door closer I-8 Bh 1.0000 150,000.00 150,000.00
.........................................................................................
Jumlah- 2 150,000.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 241,113.76
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 241,113.76

A.4.6.2.17a Pemasangan kaca oneway tebal 5 mm Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.0150 137,812.50 2,067.19
Tukang kayu L.07 Orang/hari 0.1500 150,937.50 22,640.63
Kepala tukang kayu L.03 Orang/hari 0.0150 164,062.50 2,460.94
Mandor L.01 Orang/hari 0.0008 183,750.00 147.00
.........................................................................................
Jumlah- 1 27,315.76
2 BAHAN
Kaca oneway tebal 5 mm E-16 M2 1.1000 1,000,000.00 1,100,000.00
Sealant G-5 tube 0.0500 15,500.00 775.00
.........................................................................................
Jumlah- 2 1,100,775.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 1,128,090.76
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 1,128,090.76

A.4.6.2.17 Pemasangan kaca tebal 5 mm Satuan M2


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.11 Orang/hari 0.0150 137,812.50 2,067.19
Tukang kayu L.07 Orang/hari 0.1500 150,937.50 22,640.63
Kepala tukang kayu L.03 Orang/hari 0.0150 164,062.50 2,460.94
Mandor L.01 Orang/hari 0.0008 183,750.00 147.00
.........................................................................................
Jumlah- 1 27,315.76
2 BAHAN
Kaca tebal 5 mm E-15 M2 1.1000 203,280.00 223,608.00
Sealant G-5 tube 0.0500 15,500.00 775.00
.........................................................................................
Jumlah- 2 224,383.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 251,698.76
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 251,698.76

PEKERJAAN MEKANIKAL
M.001 Stop kontak + instalasi beton Satuan Titik
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
.........................................................................................
Jumlah- 1 -
2 BAHAN
Stop kontak + instalasi beton EL-01 Titik 1.0000 15,000.00 15,000.00
.........................................................................................
Jumlah- 2 15,000.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 15,000.00
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 15,000.00

M.005 Schakelar (standar) Satuan Buah


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
.........................................................................................
Jumlah- 1 -
2 BAHAN
Schakelar (standar) EL-02 Buah 1.0000 16,700.00 16,700.00
.........................................................................................
Jumlah- 2 16,700.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 16,700.00
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 16,700.00

M.006 Lampu TL bambu 2x18 watt + armatur Satuan Buah


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
.........................................................................................
Jumlah- 1 -
2 BAHAN
Lampu TL bambu 20 watt + armatur #N/A #N/A 1.0000 #N/A #N/A
.........................................................................................
Jumlah- 2 #N/A
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) #N/A
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 #N/A
6 HARGA SATUAN PEKERJAAN (4+5) #N/A

M.007 Lampu sl 14 watt Satuan Buah


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
.........................................................................................
Jumlah- 1 -
2 BAHAN
Lampu sl 14 watt EL-04 Buah 1.0000 47,000.00 47,000.00
.........................................................................................
Jumlah- 2 47,000.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 47,000.00
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 47,000.00
M.009 Titik lampu + instalasi beton Satuan Buah
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
.........................................................................................
Jumlah- 1 -
2 BAHAN
Titik lampu + instalasi beton EL-05 Titik 1.0000 298,567.50 298,567.50
.........................................................................................
Jumlah- 2 298,567.50
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 298,567.50
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 298,567.50

M.034 MCB 1P, 6A, 10A, dan 16A Satuan Unit


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
.........................................................................................
Jumlah- 1 -
2 BAHAN
MCB 1P, 6A, 10A, dan 16A EL-01 Unit 1.0000 80,000.00 80,000.00
.........................................................................................
Jumlah- 2 80,000.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 80,000.00
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 80,000.00

ME.RML Lampu Downlight Led 18 watt + armatur Satuan Buah


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
.........................................................................................
Jumlah- 1 -
2 BAHAN
Lampu Downlight Led 18 watt + armatur EL-06 Buah 1.0000 275,000.00 275,000.00
.........................................................................................
Jumlah- 2 275,000.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 275,000.00
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 41,250.00
6 HARGA SATUAN PEKERJAAN (4+5) 316,250.00

PEKERJAAN SANITASI
Ls.septictank Membuat dan memasang septictank + resapan Satuan Unit
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
.........................................................................................
Jumlah- 1 -
2 BAHAN
septictank + resapan D-17 Set 1.0000 8,350,000.00 8,350,000.00
.........................................................................................
Jumlah- 2 8,350,000.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 8,350,000.00
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 8,350,000.00

A.5.1.1.1 Pemasangan closet duduk/monoblock Satuan set


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 3.3000 137,812.50 454,781.25
Tukang batu L.06 Orang/hari 1.1000 150,937.50 166,031.25
Kepala tukang batu L.02 Orang/hari 0.0100 164,062.50 1,640.63
Mandor L.01 Orang/hari 0.1600 183,750.00 29,400.00
.........................................................................................
Jumlah- 1 651,853.13
2 BAHAN
Closet duduk D-12 Bh 1.0000 3,938,550.00 3,938,550.00
Aksesoris #N/A #N/A 0.0600 3,938,550.00 236,313.00
.........................................................................................
Jumlah- 2 4,174,863.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 4,826,716.13
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 4,826,716.13

A.5.1.1 2 Pemasangan 1 buah closet jongkok porslen Satuan set


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 1.0000 137,812.50 137,812.50
Tukang batu L.06 Orang/hari 1.5000 150,937.50 226,406.25
Kepala tukang batu L.02 Orang/hari 0.1500 164,062.50 24,609.38
Mandor L.01 Orang/hari 0.1600 183,750.00 29,400.00
.........................................................................................
Jumlah- 1 418,228.13
2 BAHAN
Closet jongkok D-9 Buah 1.0000 241,395.00 241,395.00
Semen Portland C-2 Kg 6.0000 1,778.70 10,672.20
Pasir pasang B-3 M3 0.0100 95,287.50 952.88
.........................................................................................
Jumlah- 2 253,020.08
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 671,248.21
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 671,248.21
A.5.1.1.5 Pemasangan wastafel Satuan set
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 1.2000 137,812.50 165,375.00
Tukang batu L.06 Orang/hari 1.4500 150,937.50 218,859.38
Kepala tukang batu L.02 Orang/hari 0.1500 164,062.50 24,609.38
Mandor L.01 Orang/hari 0.0600 183,750.00 11,025.00
.........................................................................................
Jumlah- 1 419,868.76
2 BAHAN
Wastefel + cermin D-13 Set 1.2000 5,000,000.00 6,000,000.00
Semen Portland C-2 Kg 6.0000 1,778.70 10,672.20
Pasir pasang B-3 M3 0.0100 95,287.50 952.88
Aksesoris #N/A #N/A 0.1200 5,000,000.00 600,000.00
.........................................................................................
Jumlah- 2 6,611,625.08
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 7,031,493.84
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 7,031,493.84

A.5.1.1.5 a Pemasangan shower box Satuan set


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
.........................................................................................
Jumlah- 1 -
2 BAHAN
Shower box D-14 Set 1.0000 22,000,000.00 22,000,000.00
.........................................................................................
Jumlah- 2 22,000,000.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 22,000,000.00
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 22,000,000.00

A.5.1.1.10 Pemasangan bak air fibreglass vol 1 m3 Satuan Buah


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.3000 137,812.50 41,343.75
Tukang batu L.06 Orang/hari 0.4500 150,937.50 67,921.88
Kepala tukang batu L.02 Orang/hari 0.0450 164,062.50 7,382.82
Mandor L.01 Orang/hari 0.0150 183,750.00 2,756.25
.........................................................................................
Jumlah- 1 119,404.70
2 BAHAN
Bak Mandi Fibreglass uk 60x60 (120 Liter) D-15 Bh 1.0000 317,625.00 317,625.00
Aksesoris #N/A #N/A 0.1200 317,625.00 38,115.00
.........................................................................................
Jumlah- 2 355,740.00
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 475,144.70
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 475,144.70

A.5.1.1 14 Pemasangan 1 buah floor drain Satuan set


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.0100 137,812.50 1,378.13
Tukang batu L.06 Orang/hari 0.1000 150,937.50 15,093.75
Kepala tukang batu L.02 Orang/hari 0.0100 164,062.50 1,640.63
Mandor L.01 Orang/hari 0.0050 183,750.00 918.75
.........................................................................................
Jumlah- 1 19,031.26
2 BAHAN
Floor drain D-10 Bh 1.0000 31,762.50 31,762.50
.........................................................................................
Jumlah- 2 31,762.50
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 50,793.76
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 50,793.76

A.5.1.1 19 Pemasangan 1 buah kran diameter ½” atau 3/4” Satuan set


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.0100 137,812.50 1,378.13
Tukang batu L.06 Orang/hari 0.4000 150,937.50 60,375.00
Kepala tukang batu L.02 Orang/hari 0.0400 164,062.50 6,562.50
Mandor L.01 Orang/hari 0.0050 183,750.00 918.75
.........................................................................................
Jumlah- 1 69,234.38
2 BAHAN
Kran air D-11 Bh 1.0000 21,598.50 21,598.50
.........................................................................................
Jumlah- 2 21,598.50
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 90,832.88
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 90,832.88
A.5.1.1 27 Pemasangan 1 m’ pipa PVC tipe AW diameter 1” Satuan M1
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.0360 137,812.50 4,961.25
Tukang batu L.06 Orang/hari 0.0600 150,937.50 9,056.25
Kepala tukang batu L.02 Orang/hari 0.0060 164,062.50 984.38
Mandor L.01 Orang/hari 0.0020 183,750.00 367.50
.........................................................................................
Jumlah- 1 15,369.38
2 BAHAN
Pipa PVC 1” D-3 M1 1.2000 14,293.13 17,151.75
Pipa PVC 1” (perlengkapan) D-4 Btg 35% 14,293.13 5,002.60
.........................................................................................
Jumlah- 2 22,154.35
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 37,523.73
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 37,523.73

A.5.1.1 31 Pemasangan 1 m’ pipa PVC tipe AW diameter 4” Satuan M1


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.0540 137,812.50 7,441.88
Tukang batu L.06 Orang/hari 0.0900 150,937.50 13,584.38
Kepala tukang batu L.02 Orang/hari 0.0090 164,062.50 1,476.57
Mandor L.01 Orang/hari 0.0030 183,750.00 551.25
.........................................................................................
Jumlah- 1 23,054.08
2 BAHAN
Pipa PVC 4” D-7 M1 1.2000 95,287.50 114,345.00
Pipa PVC 4” (perlengkapan) D-8 Btg 35% 95,287.50 33,350.63
.........................................................................................
Jumlah- 2 147,695.63
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 170,749.71
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 170,749.71

A.5.1.1.26 Pemasangan pipa PVC tipe AW Ø 3/4” Satuan M1


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.10 Orang/hari 0.0360 137,812.50 4,961.25
Tukang batu L.06 Orang/hari 0.0600 150,937.50 9,056.25
Kepala tukang batu L.02 Orang/hari 0.0060 164,062.50 984.38
Mandor L.01 Orang/hari 0.0020 183,750.00 367.50
.........................................................................................
Jumlah- 1 15,369.38
2 BAHAN
Pipa PVC 3/4” D-1 M1 1.2000 11,116.88 13,340.25
Pipa PVC 3/4” (perlengkapan) D-2 Btg 35% 11,116.88 3,890.91
.........................................................................................
Jumlah- 2 17,231.16
3 PERALATAN
.........................................................................................
Jumlah- 3 -
4 JUMLAH (1+2+3) 32,600.54
5 OVERHEAD + KEUNTUNGAN 0% x Jumlah 4 -
6 HARGA SATUAN PEKERJAAN (4+5) 32,600.54

Ls.Papan Nama Papan nama kegiatan Satuan LS


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
Papan nama kegiatan LS-01 Buah 1.0000 350,000.00 350,000.00
.........................................................................................
Jumlah- 1 350,000.00
2 OVERHEAD + KEUNTUNGAN x Jumlah 4 -
3 HARGA SATUAN PEKERJAAN (4+5) 350,000.00

Ls.Pembersihan Pembersihan Awal dan Akhir Satuan LS


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN
Pembersihan Awal dan Akhir LS-02 Set 1.0000 1,500,000.00 1,500,000.00
.........................................................................................
Jumlah- 1 1,500,000.00
2 HARGA SATUAN PEKERJAAN (4+5) 1,500,000.00

Pengukuran dan Pemasangan Bouwplank


Ls.Pengukuran Satuan LS

No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
Pengukuran dan Pemasangan Bouwplank LS-03 Set 1.0000 1,300,000.00 1,300,000.00
.........................................................................................
Jumlah- 1 1,300,000.00
2 HARGA SATUAN PEKERJAAN (4+5) 1,300,000.00

Ls. Bangsal Bangsal Kerja Satuan LS


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN
Bangsal Kerja LS-04 Set 1.0000 2,000,000.00 2,000,000.00
.........................................................................................
Jumlah- 1 2,000,000.00
2 HARGA SATUAN PEKERJAAN (4+5) 2,000,000.00

Ls.Pembongkaran Pembongkaran Satuan LS


No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
Pembongkaran LS-05 Set 1.0000 10,000,000.00 10,000,000.00
.........................................................................................
Jumlah- 1 10,000,000.00
2 HARGA SATUAN PEKERJAAN (4+5) 10,000,000.00
Anlisa harga satuan pekerjaan struktur

ANALISA HARGA SATUAN PEKERJAAN STRUKTUR

1 Item Pekerjaan : Pengadaan tiang pancang 20x20 cm 1


Satuan Pembayaran : m1
Harga
No. Uraian Pekerjaan Satuan Koefisien Satuan Total
(Rp) (Rp)

A TENAGA KERJA
1 Pekerja org/hari 0.180 137,812.50 24,806.25
2 Tukang Batu org/hari 0.090 150,937.50 13,584.38
3 Kepala Tukang org/hari 0.045 164,062.50 7,382.81
4 Mandor org/hari 0.018 183,750.00 3,307.50

Sub total tenaga kerja 49,080.94

B BAHAN
1 Tiang pancang bulat 20 x 20 cm m1 1.000 596,250.00 596,250.00

Sub total bahan 596,250.00

C PERALATAN
1 Crane 10 - 15 ton jam 0.045 778,375.00 35,026.88
2 Trailer jam 0.045 833,000.00 37,485.00

Sub total peralatan 72,511.88


D JUMLAH (A + B + C) 717,842.81
E HARGA SATUAN PEKERJAAN (Dibulatkan) 717,800.00

2 Item Pekerjaan : Pemancangan tiang pancang 20x20 cm 2


Satuan Pembayaran : m1
Harga
No. Uraian Pekerjaan Satuan Koefisien Satuan Total
(Rp) (Rp)

A TENAGA KERJA
1 Pekerja org/hari 0.270 137,812.50 37,209.38
2 Tukang Batu org/hari 0.135 150,937.50 20,376.56
3 Kepala Tukang org/hari 0.090 164,062.50 14,765.63
4 Mandor org/hari 0.045 183,750.00 8,268.75

Sub total tenaga kerja 80,620.31

B BAHAN

Sub total bahan -

C PERALATAN
1 Crane 10 - 15 ton jam 0.045 778,375.00 35,026.88
2 Pile Driver + hammer jam 0.045 2,955,750.00 133,008.75

Sub total peralatan 168,035.63


D JUMLAH (A + B + C) 248,655.94
E HARGA SATUAN PEKERJAAN (Dibulatkan) 248,600.00

38 / 67
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR

3 Item Pekerjaan : Bobok kepala tiang pancang 20x20 cm 3


Satuan Pembayaran : ttk
Harga
No. Uraian Pekerjaan Satuan Koefisien Satuan Total
(Rp) (Rp)

A TENAGA KERJA
1 Pekerja org/hari 0.600 137,812.50 82,687.50
2 Tukang Batu org/hari 0.300 150,937.50 45,281.25
3 Kepala Tukang org/hari 0.200 164,062.50 32,812.50
4 Mandor org/hari 0.100 183,750.00 18,375.00

Sub total tenaga kerja 179,156.25

B BAHAN

Sub total bahan -

C PERALATAN

Sub total peralatan -


D JUMLAH (A + B + C) 179,156.25
E HARGA SATUAN PEKERJAAN (Dibulatkan) 179,100.00

39 / 67
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK = 30.289 %


Lembar 1.2-1
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

A. Sewa Tanah

B. PERALATAN
Periksa lembar 1.2-2 100,500,000.00

C. FASILITAS KONTRAKTOR
1 Base Camp / Bangsal kerja Ls 1 5,000,000.00 5,000,000.00
2 Kantor
3 Barak
4 Bengkel
5 Gudang, dan lain-lain
6 ......................

D. FASILITAS LABORATORIUM
1 Pengujian sondir Pkt/titik 3 3,000,000.00 9,000,000.00

E. MOBILISASI LAINNYA
1 Perkuatan Jembatan Lama
2 Pemeliharaan Jalan Kerja / Samping
3 Pembuatan Jembatan Darurat
5 ......................

E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap
2 ......................
3 ......................

F. PERLENGKAPAN K3
1 Topi Pelindung (Safety Helmet) Bh 10 110,000.00 1,100,000.00
2 Sarung Tangan (Safety Gloves) Psg 10 50,000.00 500,000.00
3 Sepatu Keselamatan (Safety Shoes) Psg 10 200,000.00 2,000,000.00
4 Rompi Keselamatan (Safety Vest) Bh 10 100,000.00 1,000,000.00
5 Kotak P3K Unit 1 300,000.00 300,000.00
6 Rambu - rambu peringatan Pkt 1 3,000,000.00 3,000,000.00

G. DEMOBILISASI LS 1 70,350,000.00 70,350,000.00

Total Biaya Mobilisasi 192,750,000.00

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 EXCAVATOR 80-140 HP E10 Unit 1 7,000,000.00 7,000,000.00


3 PILE DRIVER + HAMMER E30 Unit 1 45,000,000.00 45,000,000.00
4 CRANE ON TRACK E31 Unit 1 40,000,000.00 40,000,000.00
5 ALAT SONDIR Pkt 1 8,500,000.00 8,500,000.00

Total untuk Item B pada Lembar 1 100,500,000.00


DAFTAR HARGA BAHAN DAN UPAH

NO JENIS TENAGA / BAHAN KODE HARGA SATUAN

0 1 2 3 4
A. TENAGA
1 Mandor L.01 183,750.00 Orang/hari
2 Kepala tukang batu L.02 164,062.50 Orang/hari
3 Kepala tukang kayu L.03 164,062.50 Orang/hari
4 Kepala tukang besi L.04 164,062.50 Orang/hari
5 Kepala Tukang Cat L.05 164,062.50 Orang/hari
6 Tukang batu L.06 150,937.50 Orang/hari
7 Tukang kayu L.07 150,937.50 Orang/hari
8 Tukang Cat L.08 150,937.50 Orang/hari
9 Tukang besi L.09 150,937.50 Orang/hari
10 Pembantu tukang batu L.10 137,812.50 Orang/hari
11 Pembantu tukang kayu L.11 137,812.50 Orang/hari
12 Pembantu tukang besi L.12 137,812.50 Orang/hari
13 Pembantu tukang cat L.13 137,812.50 Orang/hari
14 Tukang gali tanah L.13 137,812.50 Orang/hari

B BAHAN
- BAHAN AIR
1 Air A.1 50.00 Liter

- BAHAN GALIAN
1 Batu pecah 2-3 cm B-1 971,932.50 M3
2 Pasir beton B-2 95,287.50 M3
3 Pasir Pasang B-3 95,287.50 M3
4 Pasir Urug B-4 95,287.50 M3
5 Kerikil B-5 971,932.50 M3

- BAHAN CETAKAN DAN SEMEN


1 Batu bata merah C-1 1,905.75 Bh
2 Semen portland C-2 1,778.70 Kg
3 Semen warna C-3 25,410.00 Kg
4 List gipsum profil 10 cm C-4 25,000.00 M1
5 Semen gipsum C-5 5,082.00 Kg
7 Keramik 60x60 cm C-7 31,250.00 Bh
8 Keramik 50x50 cm C-8 22,500.00 Bh
10 Keramik 30x30 cm C-10 7,507.50 Bh
14 Bata rooster C-14 19,057.50 Bh
15 Batu alam C-15 306,825.75 M2
16 Semen portland 40 kg C-16 71,148.00 Zak
17 Semen portland 50 kg C-16 88,935.00 Zak
18 Batako C-17 3,303.30 Bh

- BAHAN PIPA DAN SANITARI


1 Pipa PVC 3/4” D-1 11,116.88 M1
2 Pipa PVC 3/4” (perlengkapan) D-2 11,116.88 Btg
3 Pipa PVC 1” D-3 14,293.13 M1
4 Pipa PVC 1” (perlengkapan) D-4 14,293.13 Btg
5 Pipa PVC 2” D-5 28,586.25 M1
6 Pipa PVC 2” (perlengkapan) D-6 28,586.25 Btg
7 Pipa PVC 4” D-7 95,287.50 M1
8 Pipa PVC 4” (perlengkapan) D-8 95,287.50 Btg
9 Closet jongkok D-9 241,395.00 Buah
10 Floor drain D-10 31,762.50 Bh
11 Kran air D-11 21,598.50 Bh
12 Closet duduk D-12 3,938,550.00 Bh
NO JENIS TENAGA / BAHAN KODE HARGA SATUAN

0 1 2 3 4
13 Wastefel + cermin D-13 5,000,000.00 Set
15 Bak Mandi Fibreglass uk 60x60 (120 Liter) D-15 317,625.00 Bh
17 septictank + resapan D-17 8,350,000.00 Set

- BAHAN BESI
1 Besi beton polos E-1 13,319.72 Kg
2 Kawat bindrat E-2 31,762.50 Kg
2 Atap Spandeks E-3 57,172.50 Lembar
5 Bubungan zincalume E-4 44,467.50 M
5 Paku kayu E-5 31,762.50 Kg
6 Paku genteng metal E-6 35,574.00 Kg
7 Paku skrup E-7 1,500.00 biji
8 Batang C-75x35x0,75 E-8 11,646.25 M1
9 Batang C-75x35x0,65 E-9 19,057.50 M1
10 Baut screw driver E-10 1,000.00 Bh
11 Dinabolt dia 12mm (10-15cm) E-11 4,500.00 Bh
12 Roof batten reng T=0,60 mm E-12 9,166.67 M1
13 Talang jurai E-13 41,714.75 M1
14 Besi Strip E-14 20,000.00 Ls
15 Kaca tebal 5 mm E-15 203,280.00 M2
20 Besi hollow galvanis 3x3x1 mm E-20 37,500.00 Btg
21 Rangka plafond baja ringa (zincalume) hollo E-21 6,352.50 M1

- BAHAN CAT, FINISHING LANTAI DAN DINDING


1 Cat Tembok Dasar G-1 38,115.00 Kg
2 Cat Tembok G-2 38,115.00 Kg
3 Minyak bekisting G-3 16,500.00 Ltr
4 Plamir Tembok G-4 82,582.50 Kg
5 Sealant G-5 15,500.00 tube
6 Cat menie kayu G-6 63,525.00 Kg
7 Plamir Kayu G-7 63,525.00 Kg
8 Cat Kayu Dasar G-8 78,771.00 Kg
9 Cat Kayu G-9 81,312.00 Kg
10 Kuas G-10 30,000.00 Buah
11 Thinner G-11 76,230.00 Kg
12 Ampelas G-12 8,893.50 Lembar
13 Lem kayu G-13 25,410.00 Buah

- BAHAN KAYU
1 Balok kayu kelas II K-1 2,922,150.00 M3
2 Dolken kayu φ 8-10/400 cm K-2 1,588.13 Batang
3 Papan kayu kelas III K-3 2,286,900.00 M3
4 Plywood tebal 9 mm K-4 165,165.00 Lbr
5 Papan kayu kelas II K-5 2,922,150.00 M3
6 Papan plank nusaplank K-6 75,000.00 Lembar
7 Kalsiboard K-7 83,853.00 Lembar
8 Balok kayu kelas I K-8 7,940,625.00 M3
9 Papan kayu kelas I K-9 11,910,937.50 M3
10 List kayu profil K-10 6,352.50 M1
11 Papan bekisting K-11 2,286,900.00 M3
12 Gypsum 9 mm K-12 107,992.50 Lembar

- BAHAN KUNCI
1 Engsel pintu I-1 74,959.50 Bh
2 Engsel jendela I-2 44,467.50 Bh
3 Kunci tanam biasa I-3 190,575.00 Bh
4 Kait angin I-4 19,057.50 Bh
NO JENIS TENAGA / BAHAN KODE HARGA SATUAN

0 1 2 3 4
5 Handle jendela I-5 34,938.75 Bh
6 Handle pintu I-6 190,575.00 Bh
7 Kunci slot I-7 34,938.75 Bh
8 Door closer I-8 150,000.00 Bh

- BAHAN ELEKTRIKAL
1 MCB 1P, 6A, 10A, dan 16A EL-01 80,000.00 Unit
1 Stop kontak + instalasi beton EL-01 15,000.00 Titik
2 Schakelar (standar) EL-02 16,700.00 Buah
3 Lampu tl 18 watt lengkap EL-03 65,500.00 Buah
4 Lampu sl 14 watt EL-04 47,000.00 Buah
5 Titik lampu + instalasi beton EL-05 298,567.50 Titik
6 Lampu Downlight Led 18 watt + armatur EL-06 275,000.00 Buah

Catatan :
Harga sudah termasuk Overhead + PPN 10 %
PERHITUNGAN VOLUME
PROGRAM : PENINGKATAN DAN PENGEMBANGAN FASILITAS
KEGIATAN : PEMBANGUNAN FASILITAS UMUM / BANGUNAN GEDUNG
PEKERJAAN : PERENCANAAN ISLAMIC CENTER SUKAMARA
: PEMBANGUNAN GEDUNG ASRAMA PUTRA / PUTRI
LOKASI : KAB. SUKAMARA
TAHUN : 2020

NO. URAIAN PEKERJAAN Panjang Lebar Tinggi Jmlh-1 Jmlh-2 Luas


# PEMBANGUNAN ASRAMA ISLAMIC CENTER KABUPATEN SUKAMARA
A PEKERJAAN PERSIAPAN Panjang Lebar Tinggi Jmlh-1 Jmlh-2 Luas
1 Pembuatan papan nama kegiatan 1.00

2 Pengukuran 1.00

3 Pembuatan bangsal kerja 1.00

4 Pembersihan Awal dan Akhir 1.00

5 Pengujian sondir 3.00

6 Mobilisasi & Demobilisasi alat 1.00

7 Perlengkapan K3 1.00

B PEKERJAAN TANAH Panjang Lebar Tinggi Jmlh-1 Jmlh-2 Luas


1 Galian tanah
Pekerjaan pondasi cakar ayam 120/120 cm 1.30 x 1.30 x 2.00 x 7.00
Pekerjaan pondasi cakar ayam 150/150 cm 1.60 x 1.60 x 2.00 x 29.00

2 Urugan kembali hasil galian 1/3 dari galian tanah 57.38

3 Timbunan tanah dengan tanah urug 36.00 x 11.00 x 0.50

4 Pemadatan tanah 36.00 x 11.00 x 0.05

C PEKERJAAN STRUKTUR Panjang Lebar Tinggi Jmlh-1 Jmlh-2 Luas


1 Pengadaan Mini Pile 20x20 cm + handling, beton bertulang mutu K-400
Pekerjaan pondasi cakar ayam 120/120 cm 22.00 x 7.00 x 3.00
Pekerjaan pondasi cakar ayam 150/150 cm 22.00 x 29.00 x 4.00

2 Pemancangan Mini Pile


Pekerjaan pondasi cakar ayam 120/120 cm 22.00 x 7.00 x 3.00
Pekerjaan pondasi cakar ayam 150/150 cm 22.00 x 29.00 x 4.00

3 Sambungan las plat joint


Pekerjaan pondasi cakar ayam 120/120 cm 7.00 x 3.00
Pekerjaan pondasi cakar ayam 150/150 cm 29.00 x 4.00

4 Bobokan tiang pancang


Pekerjaan pondasi cakar ayam 120/120 cm 7.00 x 3.00
Pekerjaan pondasi cakar ayam 150/150 cm 29.00 x 4.00

5 Lantai kerja
Pekerjaan pondasi cakar ayam 120/120 cm 1.20 x 1.20 x 0.10 x 7.00
Pekerjaan pondasi cakar ayam 150/150 cm 1.50 x 1.50 x 0.10 x 29.00

6 Pekerjaan pondasi cakar ayam 120/120 cm


a Membuat beton mutu K-250 pondasi 1.20 x 1.20 x 0.35 x 7.00
b Pembesian pondasi dengan besi polos
Tulangan melintang X Ø 16 - 150 3.00 x 7.00 x 8.00 x
Tulangan membujur Y Ø 16 - 150 3.00 x 7.00 x 8.00 x
c Pemasangan beskisting untuk pondasi 4.80 0.30 x 7.00 x
NO. URAIAN PEKERJAAN Panjang Lebar Tinggi Jmlh-1 Jmlh-2 Luas
7 Pekerjaan pondasi cakar ayam 150/150 cm
a Membuat beton mutu K-250 pondasi 1.50 x 1.50 x 0.35 x 29.00
b Pembesian pondasi dengan besi polos
Tulangan melintang X Ø 16 - 150 3.60 x 29.00 x 10.00 x
Tulangan membujur Y Ø 16 - 150 3.60 x 29.00 x 10.00 x
c Pemasangan beskisting untuk pondasi 6.00 x 0.30 x 29.00 x

8 Pekerjaan pedistal 30/30 cm


a Membuat beton mutu K-250 pedistal 0.30 x 0.30 x 1.50 x 15.00
b Pembesian pedistal dengan besi polos
Tulangan pokok 8 Ø 16 3.00 x 15.00 x 8.00 x
Beugel Ø 10 - 150 1.10 x 15.00 x 10.00 x
c Pemasangan beskisting untuk pedistal 1.20 x 1.50 x 15.00 x

9 Pekerjaan pedistal 40/40 cm


a Membuat beton mutu K-250 pedistal 0.40 x 0.40 x 1.50 x 21.00
b Pembesian pedistal dengan besi polos
Tulangan pokok 10 Ø 16 3.00 x 21.00 x 12.00 x
Beugel Ø 10 - 150 1.50 x 21.00 x 10.00 x
c Pemasangan beskisting untuk pedistal 1.60 x 1.50 x 21.00 x

10 Pekerjaan sloof 20/40 cm


a Membuat beton mutu K-250 sloof 52.00 x 0.20 x 0.40
b Pembesian sloof dengan besi polos
Tulangan pokok 7 Ø 13 54.00 x 7.00 x
Beugel Ø 10 - 150 1.10 x 347.00 x
c Pemasangan beskisting untuk sloof 52.00 x 0.80 x

11 Pekerjaan sloof 30/60 cm


a Membuat beton mutu K-250 sloof 212.00 x 0.30 x 0.60
b Pembesian sloof dengan besi polos
Tulangan pokok 11 Ø 13 214.00 x 11.00 x
Beugel Ø 10 - 150 1.70 x 1,414.00 x
c Pemasangan beskisting untuk sloof 212.00 x 1.20 x

12 Pekerjaan kolom 15/15 cm (tinggi 60 cm)


a Membuat beton mutu K-250 kolom 0.15 x 0.15 x 0.60 x 18.00
b Pembesian kolom dengan besi polos
Tulangan pokok 4 Ø 12 1.60 x 18.00 x 4.00 x
Beugel Ø 8 - 150 0.50 x 18.00 x 4.00 x
c Pemasangan beskisting untuk kolom 0.60 x 0.60 x 18.00 x

13 Pekerjaan kolom 15/15 cm (tinggi 7,8 m)


a Membuat beton mutu K-250 kolom 0.15 x 0.15 x 7.80 x 14.00
b Pembesian kolom dengan besi polos
Tulangan pokok 4 Ø 12 8.80 x 14.00 x 4.00 x
Beugel Ø 8 - 150 0.50 x 14.00 x 52.00 x
c Pemasangan beskisting untuk kolom 0.60 x 7.80 x 14.00 x

14 Pekerjaan kolom 15/15 cm (tinggi 10 m)


a Membuat beton mutu K-250 kolom 0.15 x 0.15 x 10.00 x 2.00
b Pembesian kolom dengan besi polos
Tulangan pokok 4 Ø 12 10.50 x 2.00 x 4.00 x
Beugel Ø 8 - 150 0.50 x 2.00 x 67.00 x
c Pemasangan beskisting untuk kolom 0.60 x 10.00 x 2.00 x

15 Pekerjaan kolom 15/20 cm (tinggi 7,8 m)


a Membuat beton mutu K-250 kolom 0.15 x 0.20 x 7.80 x 4.00
b Pembesian kolom dengan besi polos
Tulangan pokok 4 Ø 12 8.80 x 4.00 x 4.00 x
Beugel Ø 8 - 150 0.60 x 4.00 x 52.00 x
c Pemasangan beskisting untuk kolom 0.70 x 7.80 x 4.00 x
NO. URAIAN PEKERJAAN Panjang Lebar Tinggi Jmlh-1 Jmlh-2 Luas
16 Pekerjaan kolom 30/30 cm (tinggi 7,8 m)
a Membuat beton mutu K-250 kolom 0.30 x 0.30 x 7.80 x 9.00
b Pembesian kolom dengan besi polos
Tulangan pokok 8 Ø 13 8.80 x 9.00 x 8.00 x
Beugel Ø 10 -150 1.10 x 9.00 x 52.00 x
c Pemasangan beskisting untuk kolom 1.20 x 7.80 x 9.00 x

17 Pekerjaan kolom 30/30 cm (tinggi 10 m)


a Membuat beton mutu K-250 kolom 0.30 x 0.30 x 10.00 x 6.00
b Pembesian kolom dengan besi polos
Tulangan pokok 8 Ø 13 11.00 x 6.00 x 8.00 x
Beugel Ø 10 -150 1.10 x 6.00 x 67.00 x
c Pemasangan beskisting untuk kolom 1.20 x 10.00 x 6.00 x

18 Pekerjaan kolom 40/40 cm (tinggi 7,8 m)


a Membuat beton mutu K-250 kolom 0.40 x 0.40 x 7.80 x 21.00
b Pembesian kolom dengan besi polos
Tulangan pokok 10 Ø 13 8.80 x 21.00 x 12.00 x
Beugel Ø 10 -150 1.50 x 21.00 x 52.00 x
c Pemasangan beskisting untuk kolom 1.60 x 7.80 x 21.00 x

19 Pekerjaan Ringbalk 15/15 cm


a Membuat beton mutu K-250 ringbalk 4.70 x 0.15 x 0.15 x 20.00
b Pembesian ringbalk dengan besi polos
Tulangan pokok 4 Ø 10 4.70 x 20.00 x 4.00 x
Beugel Ø 8 - 150 0.50 x 20.00 x 32.00 x
c Pemasangan beskisting untuk ringbalk 4.70 x 0.45 x 20.00 x

20 Pekerjaan Ringbalk 15/20 cm


a Membuat beton mutu K-250 ringbalk 59.00 x 0.15 x 0.20
b Pembesian ringbalk dengan besi polos
Tulangan pokok 4 Ø 12 59.00 x 4.00 x
Beugel Ø 8 - 150 0.60 x 394.00 x
c Pemasangan beskisting untuk ringbalk 59.00 x 0.55 x

21 Pekerjaan Ringbalk 20/30 cm 299.00


a Membuat beton mutu K-250 ringbalk 452.00 x 0.20 x 0.30
b Pembesian ringbalk dengan besi polos
Tulangan pokok 6 Ø 13 452.00 x 6.00 x
Beugel Ø 10 - 150 0.90 x 3,014.00 x
c Pemasangan beskisting untuk ringbalk 452.00 x 0.80 x

22 Pekerjaan Ringbalk 30/50 cm 212.00


a Membuat beton mutu K-250 ringbalk 232.00 x 0.30 x 0.50
b Pembesian ringbalk dengan besi polos
Tulangan pokok 12 Ø 16 232.00 x 12.00 x
Beugel Ø 10 -150 1.50 x 1,547.00 x
c Pemasangan beskisting untuk ringbalk 232.00 x 1.30 x

23 Pekerjaan tangga
a Membuat beton mutu K-250 tangga
Anak tangga 1.50 x 0.03 x 19.00 x 2.00
Plat lantai tangga 1.50 x 7.60 x 0.12 x 2.00
Bagian Bordes 1.50 x 1.50 x 0.12 x 2.00
b Pembesian tangga dengan besi polos
Tulangan besi dia 10 anak tangga 1.50 x 2.00 x 38.00 x
Begel besi dia 8 anak tangga 0.80 x 8.00 x 38.00 x
Tulangan besi dia 10 plat tangga melintang X 3.40 x 8.00 x 4.00 x
Tulangan besi dia 10 plat tangga membujur Y 1.50 x 17.00 x 4.00 x
Tulangan besi dia 10 bordes melintang X 1.50 x 8.00 x 4.00 x
Tulangan besi dia 10 bordes membujur Y 1.50 x 8.00 x 4.00 x
c Pemasangan beskisting untuk tangga
Begisting untuk tangga 1.50 x 7.60 x 2.00 x
Bekisting bordes 1.50 x 1.50 x 2.00 x

24 Pekerjaan Plat lantai dak elv. +4,00 (tebal 12 cm)


a Membuat beton mutu K-250 plat lantai dak 36.00 x 10.00 x 0.12
b Pembesian plat lantai dak dengan besi polos
Tulangan melintang X Ø 10 - 150 36.00 x 2.00 x 67.00 x
Tulangan membujur Y Ø 10 - 150 10.00 x 2.00 x 240.00 x
c Pemasangan beskisting untuk plat lantai dak 36.00 x 10.00 x

25 Pekerjaan Plat lantai dak elv. +7,80 (tebal 12 cm)


a Membuat beton mutu K-250 plat lantai dak 15.00 x 3.00 x 0.12
b Pembesian plat lantai dak dengan besi polos
Tulangan melintang X Ø 10 - 150 15.00 x 2.00 x 20.00 x
Tulangan membujur Y Ø 10 - 150 3.00 x 2.00 x 100.00 x
c Pemasangan beskisting untuk plat lantai dak 15.00 x 3.00 x

26 Pekerjaan Plat kenopi ventilasi (tebal 8 cm)


a Membuat beton mutu K-250 plat kenopi 52.60 x 0.80 x 0.08
b Pembesian plat kenopi dengan besi polos
Tulangan melintang X Ø 10 - 150 52.60 x 6.00 x
Tulangan membujur Y Ø 10 - 150 0.80 x 351.00 x
c Pemasangan beskisting untuk plat kenopi 52.60 x 0.80 x
NO. URAIAN PEKERJAAN Panjang Lebar Tinggi Jmlh-1 Jmlh-2 Luas

27 Pekerjaan Plat kenopi atas elv. +7,80 (tebal 8 cm)


a Membuat beton mutu K-250 plat kenopi 77.00 x 1.40 x 0.08
b Pembesian plat kenopi dengan besi polos
Tulangan melintang X Ø 10 - 150 77.00 x 10.00 x
Tulangan membujur Y Ø 10 - 150 1.40 x 514.00 x
c Pemasangan beskisting untuk plat kenopi 77.00 x 1.40 x

28 Cor tumbuk untuk lantai 36.00 x 11.00 x 0.10

D PEKERJAAN PASANGAN Panjang Lebar Tinggi Jmlh-1 Jmlh-2 Luas


1 Pemasangan dinding 1/2 bata
Dinding elv. ± 0,00 186.00 x 4.00
Dinding elv. + 4,00 186.00 x 3.80
Dinding elv. + 7,80 23.00 x 2.00
Dinding pagar 2.50 x 1.00 x 18.00
Dikurangi luasan Pintu utama 1.50 x 2.55 x 12.00
Dikurangi luasan Pintu kamar mandi 0.80 x 2.05 x 12.00
Dikurangi luasan Pintu geser 1.00 x 2.00 x 4.00
Dikurangi luasan jendela 0.60 x 2.00 x 48.00
Dikurangi luasan ventilasi kusen 0.60 x 0.45 x 18.00
Dikurangi luasan ventilasi 0.10 x 0.20 x 134.00
Dikurangi luasan pasangan kerawang 4.00 x 9.65

2 Plesteran dinding sama dengan luasan pasangan bata x 2 1,364.48

3 Acian dinding sama dengan luasan pasangan bata x 2 1,364.48 -

4 pemasangan kerawang (rooster)


Bagian tangga 4.00 x 9.65
Bagian teras depan 20.00 x 1.55

5 Pemasangan batu alam 3.70 x 2.00 x 4.00

6 Pemasangan keramik dinding 30x60 cm (KM/WC) 6.00 x 2.00 x 12.00

7 Pemasangan list profil beton


Lis bagian kerawang 15.15 x 4.00
Lis variasi 42.00 x 4.00

E PEKERJAAN PINTU JENDELA Panjang Lebar Tinggi Jmlh-1 Jmlh-2 Luas


1 Pemasangan kusen pintu kayu kelas I
Pintu kamar utama 6.95 x 0.05 x 0.10 x 12.00
Pintu kamar mandi 4.90 x 0.05 x 0.10 x 12.00

2 Pemasangan kusen pintu jendela kelas I


Jendela 5.80 x 0.05 x 0.10 x 48.00
Ventilasi 2.10 x 0.05 x 0.10 x 18.00

3 Pemasangan daun pintu kayu kelas II


Pintu kamar utama 0.70 x 2.10 x 24.00
Pintu kamar mandi 0.70 x 2.00 x 12.00

4 Pemasangan daun jendela kaca kayu kelas II


Jendela 0.50 x 1.50 x 48.00
Ventilasi jendela 0.50 x 0.35 x 48.00
Ventilasi pintu 0.68 x 0.35 x 24.00
Ventilasi 0.50 x 0.35 x 18.00

5 Pemasangan daun pintu geser plywood lapis HPL + aksesoris 4.00

6 Pemasangan kaca 5mm


Jendela 0.35 x 1.35 x 48.00
Ventilasi jendela 0.35 x 0.20 x 48.00
Ventilasi pintu 0.53 x 0.20 x 24.00
Ventilasi 0.35 x 0.20 x 18.00

7 Pemasangan handle pintu 24.00 x 1.00

8 Pemasangan pegangan jendela 138.00 x 1.00

9 Pemasangan engsel pintu 36.00 x 3.00

10 Pemasangan engsel jendela 138.00 x 2.00

11 Pemasangan kait angin jendela 138.00 x 2.00

12 Pemasngan kunci slot jendela 138.00 x 1.00


NO. URAIAN PEKERJAAN Panjang Lebar Tinggi Jmlh-1 Jmlh-2 Luas
F PEKERJAAN ATAP Panjang Lebar Tinggi Jmlh-1 Jmlh-2 Luas
1 Pemasangan rangka atap baja ringan 36.30 x 10.30 ; cos 30˚

2 Pemasangan penutup atap spandeks sama dengan luasan pasangan rangka atap baja ringan 431.74

3 Pemasangan nok atap 49.80

4 Pemasangan lisplank nusaplank

G PEKERJAAN LANGIT - LANGIT Panjang Lebar Tinggi Jmlh-1 Jmlh-2 Luas


1 Pemasangan rangka plafond hollow
Kamar utama 5.00 x 8.00 x 12.00
KM / WC 1.50 x 2.00 x 12.00
Selasar KM / WC 7.80 x 1.00 x 4.00
Selasar teras 25.00 x 2.00 x 2.00
Selasar teras 7.80 x 3.00 x 4.00

2 Pemasangan plafond gupsumboard 9 mm sama dengan luasan pasangan rangka plafond 740.80

3 Pemasangan list gypsum 10 cm


Kamar utama 26.00 12.00
KM / WC 7.00 12.00
Selasar KM / WC 17.60 4.00
Selasar teras 54.00 2.00
Selasar teras 21.60 4.00

H PEKERJAAN PENGECATAN Panjang Lebar Tinggi Jmlh-1 Jmlh-2 Luas


1 Pengecatan dinding Sama dengan luasan acian dinding 2,728.96

2 Pengecatan bidang kayu Sama dengan luasan daun pintu jendela 106.44

3 Pengecatan plafond Sama dengan luasan plafond 740.80

I PEKERJAAN LANTAI Panjang Lebar Tinggi Jmlh-1 Jmlh-1 Luas


1 Pemasangan lantai keramik 30x30 cm
KM / WC 1.50 x 2.00 x 12.00
Selasar KM / WC 7.80 x 1.00 x 4.00

2 Pemasangan lantai keramik 50x50 cm


Anak tangga 1.50 x 0.50 x 4.00 x 19.00
Bordes 1.50 x 1.50 x 4.00

3 Pemasangan lantai keramik 60x60 cm


Kamar utama 5.00 x 8.00 x 12.00
Selasar teras 25.00 x 2.00 x 2.00
Selasar teras 7.80 x 3.00 x 4.00

J PEKERJAAN MEKANIKAL / ELEKTRIKAL Panjang Lebar Tinggi Jmlh-1 Jmlh-1 Luas


1 Lampu downlight 12 watt 108.00

2 Lampu SL 14 watt 12.00

3 Titik lampu + instalasi beton 108.00

4 Stop kontak+ instalasi beton 64.00

5 Schakelar tunggal 12.00

6 Schakelar ganda 20.00

7 MCB 4.00

8 kWh meteran 4.00

9 Penyambungan listrik 1.00

K PEKERJAAN SANITASI Panjang Lebar Tinggi Jmlh-1 Jmlh-1 Luas


1 Pembuatan dudukan septick tank 2.00

2 Septick tank biofil 2.00

3 Pemasangan kloset jongkok 12.00

4 Pembuatan sumur bor 1.00

5 Tandon air 1200 L (stainlist) 2.00

6 Pemasangan bak air plastik 12.00

7 Pemasangan wastafel + cermin 8.00


NO. URAIAN PEKERJAAN Panjang Lebar Tinggi Jmlh-1 Jmlh-2 Luas
8 kran air 12.00

9 Floor drain 12.00

10 Pipa air PVC Ø 3/4 " (air bersih) 150.00

11 Pipa air PVC Ø 1 " (air bekas) 50.00

12 Pipa air PVC Ø 4 " (air kotor) 100.00


NO. URAIAN PEKERJAAN Panjang Lebar Tinggi Jmlh-1 Jmlh-2 Luas
L PEKERJAAN LAIN-LAIN Panjang Lebar Tinggi Jmlh-1 Jmlh-1 Luas
1 Pemasangan railing tangga besi stainlist 11.00 x 1.00 x 2.00

2 Pemasangan huruf stainlist 30.00 x 11.00


ITUNGAN VOLUME

Berat Total Vol Sat Ket

Berat Total Vol Vol Ket


= 1.00 1.00 LS

= 1.00 1.00 LS

= 1.00 1.00 LS

= 1.00 1.00 LS

= 3.00 3.00 Titik

= 1.00 1.00 LS

= 1.00 1.00 LS

Berat Total Vol Vol Ket


= 172.14 172.14 M3
= 23.66
= 148.48

= 57.38 57.38 M3

= 198.00 198.00 M3

= 19.80 19.80 M3

Berat Total Vol Vol Ket


= 3,014.00 3,014.00 M1
= 462.00
= 2,552.00

= 3,014.00 3,014.00 M1
= 462.00
= 2,552.00

= 137.00 137.00 Ttk


= 21.00
= 116.00

= 137.00 137.00 Ttk


= 21.00
= 116.00

= 7.53 7.53 M3
= 1.01
= 6.53

= 3.53 3.53 M3
= 530.32 530.32 Kg
1.58 = 265.16
1.58 = 265.16
= 10.08 10.08 M2
Berat Total Vol Sat Ket

= 22.84 22.84 M3
= 3,295.57 3,295.57 Kg
1.58 = 1,647.78
1.58 = 1,647.78
= 52.20 52.20 M2

= 2.03 2.03 M3
= 669.93 669.93 Kg
1.58 = 568.20
0.62 = 101.73
= 27.00 27.00 M2

= 5.04 5.04 M3
= 1,387.43 1,387.43 Kg
1.58 = 1,193.22
0.62 = 194.21
= 50.40 50.40 M2

= 4.16 4.16 M3
= 629.19 629.19 Kg
1.04 = 393.86
0.62 = 235.33
= 41.60 41.60 M2

= 38.16 38.16 M3
= 3,934.78 3,934.78 Kg
1.04 = 2,452.75
0.62 = 1,482.03
= 254.40 254.40 M2

= 0.24 0.24 M3
= 116.48 116.48 Kg
0.89 = 102.28
0.39 = 14.21
= 6.48 6.48 M2

= 2.46 2.46 M3
= 581.14 581.14 Kg
0.89 = 437.51
0.39 = 143.63
= 65.52 65.52 M2

= 0.45 0.45 M3
= 101.01 101.01 Kg
0.89 = 74.58
0.39 = 26.44
= 12.00 12.00 M2

= 0.94 0.94 M3
= 174.25 174.25 Kg
0.89 = 125.00
0.39 = 49.24
= 21.84 21.84 M2
Berat Total Vol Sat Ket

= 6.32 6.32 M3
= 977.57 977.57 Kg
1.04 = 660.18
0.62 = 317.39
= 84.24 84.24 M2

= 5.40 5.40 M3
= 822.78 822.78 Kg
1.04 = 550.15
0.62 = 272.63
= 72.00 72.00 M2

= 26.21 26.21 M3
= 3,320.51 3,320.51 Kg
1.04 = 2,310.62
0.62 = 1,009.89
= 262.08 262.08 M2

= 2.12 2.12 M3
= 358.09 358.09 Kg
0.62 = 231.82
0.39 = 126.27
= 42.30 42.30 M2

= 1.77 1.77 M3
= 302.80 302.80 Kg
0.89 = 209.52
0.39 = 93.28
= 32.45 32.45 M2

= 27.12 27.12 M3
= 4,498.18 4,498.18 Kg
1.04 = 2,825.76
0.62 = 1,672.42
= 361.60 361.60 M2

= 34.80 34.80 M3
= 5,824.76 5,824.76 Kg
1.58 = 4,394.09
0.62 = 1,430.68
= 301.60 301.60 M2

= 4.99 4.99 M3
= 1.71
= 2.74
= 0.54
= 355.40 355.40 Kg
0.62 = 70.29
0.39 = 95.96
0.62 = 67.08
0.62 = 62.89
0.62 = 29.59
0.62 = 29.59
= 27.30 27.30 M2
= 22.80
= 4.50

= 43.20 43.20 M3
= 5,933.56 5,933.56 Kg
0.62 = 2,974.18
0.62 = 2,959.38
= 360.00 360.00 M2

= 5.40 5.40 M3
= 739.85 739.85 Kg
0.62 = 369.92
0.62 = 369.92
= 45.00 45.00 M2

= 3.37 3.37 M3
= 367.70 367.70 Kg
0.62 = 194.58
0.62 = 173.12
= 42.08 42.08 M2
Berat Total Vol Sat Ket

= 8.62 8.62 M3
= 918.39 918.39 Kg
0.62 = 474.73
0.62 = 443.66
= 107.80 107.80 M2

= 39.60 39.60 M3

Berat Total Vol Vol Ket


= 1,364.48 1,364.48 M2
= 744.00
= 706.80
= 46.00
= 45.00
= (45.90)
= (19.68)
= (8.00)
= (57.60)
= (4.86)
= (2.68)
= (38.60)

= 2,728.96 2,728.96 M2

= 2,728.96 2,728.96 M2

= 69.60 69.60 M2
= 38.60
= 31.00

= 29.60 29.60 M2

= 144.00 144.00 M2

= 228.60 228.60 LS
= 60.60
= 168.00

Berat Total Vol Vol Ket


= 0.71 0.71 M3
= 0.42
= 0.29

= 1.58 1.58 M3
= 1.39
= 0.19

= 52.08 52.08 M2
= 35.28
= 16.80

= 53.22 53.22 M2
= 36.00
= 8.40
= 5.67
= 3.15

= 4.00 4.00 LS

= 29.82 29.82 M2
= 22.68
= 3.36
= 2.52
= 1.26

= 24.00 24.00 Buah

= 138.00 138.00 Buah

= 108.00 108.00 Buah

= 276.00 276.00 Buah

= 276.00 276.00 Buah

= 138.00 138.00 Buah


Berat Total Vol Sat Ket
Berat Total Vol Vol Ket
= 431.74 431.74 M2

= 431.74 431.74 M2

= 49.80 49.80 M1

= - - M1

Berat Total Vol Vol Ket


= 740.80 740.80 M2
= 480.00
= 36.00
= 31.20
= 100.00
= 93.60

= 740.80 740.80 M2

= 660.80 660.80 M'


= 312.00
= 84.00
= 70.40
= 108.00
= 86.40

Berat Total Vol Vol Ket


= 2,728.96 2,728.96 M2

= - M2

= 740.80 740.80 M2

Berat Total Vol Vol Ket


= 67.20 67.20 M2
= 36.00
= 31.20

= 66.00 66.00 M2
= 57.00
= 9.00

= 673.60 673.60 M2
= 480.00
= 100.00
= 93.60

Berat Total Vol Vol Ket


= 108.00 108.00 Buah

= - Buah

= 108.00 108.00 Buah

= 64.00 64.00 Titik

= 12.00 12.00 Buah

= 20.00 20.00 Buah

= 4.00 4.00 LS

= 4.00 4.00 LS

= 1.00 1.00 LS

Berat Total Vol Vol Ket


= 2.00 2.00 Unit

= 2.00 2.00 Buah

= 12.00 12.00 set

= 1.00 1.00 LS

= 2.00 2.00 LS

= 12.00 12.00 LS

= 8.00 8.00 set


Berat Total Vol Sat Ket
= 12.00 12.00 set

= 12.00 12.00 set

= 150.00 150.00 M1

= 50.00 50.00 M1

= 100.00 100.00 M1
Berat Total Vol Sat Ket
Berat Total Vol Vol Ket
= 22.00 22.00 LS

= 330.00 330.00 LS
TIME SCHEDULE

PROGRAM : PENINGKATAN DAN PENGEMBANGAN FASILITAS


KEGIATAN : PEMBANGUNAN FASILITAS UMUM / BANGUNAN GEDUNG
#NAME? ### #NAME?

#NAME? ### #NAME?


LOKASI : KAB. SUKAMARA

JADWAL PELASANAAN PEKERJAAN ___ HARI KALENDER MASA


NO. PEKERJAAN HARGA BOBOT MG MG MG MG MG MG MG MG MG MG MG MG MG MG MG MG MG MG MG MG MG MG MG MG MG MG PEMELIHARAAN 120
% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 HARI KALENDER
A PEKERJAAN PERSIAPAN 195,232,704.31 #NAME?
#NAME? #NAME? #NAME? #NAME?
B PEKERJAAN TANAH 55,800,524.92 #NAME?
C PEKERJAAN STRUKTUR 3,424,761,088.69 #NAME?
D PEKERJAAN PASANGAN 775,586,973.56 #NAME?
E PEKERJAAN PINTU JENDELA 198,173,797.63 #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
TOTAL #NAME? #NAME?
BOBOT RENCANA MINGGUAN - - - - - - - - - - - - - - - - - - - - - - - - - -
BOBOT RENCANA KOMULATIF - - - - - - - - - - - - - - - - - - - - - - - - - -
RENCANA ANGGARAN BIAYA
(RAB)
PROGRAM :
KEGIATAN :
PEKERJAAN :

LOKASI :
TAHUN :

JADWAL PELASANAAN PEKERJAAN ___ HARI KALENDER


BOBOT
MASA PEMELIHARAAN
NO. URAIAN PEKERJAAN ANALISA VOLUME SATUAN HARGA SATUAN (RP) JMLH HARGA (RP) MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG
120 HARI KALENDER

% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
I 0 0 PEKERJAAN LANTAI 0 - - - - #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
0 0 0 0 0 TOTAL I - 139,733,230.91 #NAME?
0 0 0 0 0 - - - - #NAME?
G 0 0 PEKERJAAN LANGIT - LANGIT 0 - - - - #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
0 0 0 0 0 TOTAL G - 178,824,435.49 #NAME?
0 0 0 0 0 - - - - #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME?
BOBOT RENCANA MINGGUAN - - - - - - - - - - - - - - - - - - - - - - - - - -
BOBOT RENCANA KOMULATIF - - - - - - - - - - - - - - - - - - - - - - - - - -

Anda mungkin juga menyukai