DAFTAR HARGA SATUAN BAHAN BANGUNAN LAMPIRAN I : KEPUTUSAN BUPATI

DALAM KABUPATEN SIMEULUE NOMOR : 050.250/381/2007


TAHUN ANGGARAN 2008 TANGGAL : 25 OKTOBER 2007 M
13 SYAWAL 1428 H

HARGA
NO NAMA JENIS BARANG SATUAN
(Rp)
1 2 3 4
1 Acutic 30 x 60 Lembar 110,000
2 Agregate Halus (Pasir) M3 120,000
3 Agregate Kasar (Kerikil) M3 125,000
4 Arang Kg 5,600
5 arbocell Kg 30,000
6 Asbes Gelombang Besar Lembar 55,000
7 Asbes Gelombang Kecil Lembar 46,000
8 Asbes Quality 1 x 1m Lembar 15,000
9 Asphalt Kg 6,500
10 Asphalt Semen Pen 60/70 atau 80/100 Kg 6,500
11 Atap Harflek Lembar 53,000
12 Atap Multiroff / Emiral Lembar 98,000
13 Baja Profill Kg 24,500
14 Baja Gelombang Kg 12,500
15 Baja Prategang Kg 16,000
16 Baja Struktur Kg 12,500
17 Bak Cuci Piring Logam Buah 791,000
18 Bak Cuci Piring Teraso Buah 893,000
19 Bak Cuci Tangan / Wastafel Keramik Buah 752,000
20 Bak Mandi Fibre Buah 2,864,000
21 Bak Mandi Plastik Buah 1,907,000
22 Bak Mandi Porselin Buah 2,207,000
23 Bak Mandi Terase Buah 972,000
24 Balok (0.15 x 0.15 x 5 m) Batang 196,000
25 Bambu Batang 15,000
26 Batako Buah 3,200
27 Batu (1.000 - 1.500) Kg M3 160,000
28 Batu (250 - 400) Kg M3 141,000
29 Batu (5 - 50) Kg M3 120,000
30 Batu Bata Buah 800
31 Batu Kali / Batu Belah (Sungai / Gunung) M3 110,000
32 Batu Pecah 2 - 3 cm M3 350,000
33 Batu Tempel M2 100,000
34 Baut Kap ф /2 - 8
1
Buah 5,100
35 Besi Beton Polos (U - 24) Kg 12,500
36 Besi Beton Ulir (U - 32) Kg 14,500
37 Besi Boat (Kuda - kuda) 5/8 - 10" Buah 5,750
38 Beton Rooster / Kerawang Buah 8,100
39 Beton Tumbuk M3 668,800
40 Bubungan Genteng M1 38,300
41 Bubungan Seng M1 33,000
42 Buis Beton ф 10 cm Buah 31,600
43 Buis Beton ф 20 cm Buah 35,500
44 Buis Beton ф 30 cm Buah 45,900
45 Buis Tanah ф 10 cm Buah 19,600
46 Buis Tanah ф 20 cm Buah 22,900
47 Cat Kayu Dasar Kg 14,600
48 Cat Kayu Mengkilat Kg 30,400
49 Cat Marka (Non Thermoplas) Kg 42,000
50 Cat Marka (Termoplastic) Kg 52,000
51 Cat Menie Kg 16,700
52 Cat Tembok Kg/5Kg 19,600
53 Chipping M3 100,000
54 Dempul Kayu Kg 16,500
55 Engsel Jendela Buah 17,200
56 Engsel Pintu Buah 23,400
57 Espagnolet Buah 100,100
58 Flller 0 1,500
59 Floor Drain Buah 85,800
60 Genteng Beton Keping 4,600
61 Genteng Flan Keping 7,000
62 Genteng Keramik Keping 8,800
63 Genteng Kodok M2 44,000
64 Geo Tekstil M2 12,000
65 Glass Beat Kg 30,000
66 Gravel M3 93,000
67 Gitsum M2 75,000
68 Grendel Jendela / Pintu Buah 8,000
69 Hak Angin Buah 11,000
70 Ijuk Kg 16,000
71 Kaca Bening Ukr. 3 mm M2 58,000
72 Kaca Bening Ukr. 5 mm M2 70,000
73 Kaca Raiband Ukr. 5 mm M2 88,000
74 Kapur Batu M3 585,000
75 Kapur Sirih M3 618,000
76 Karpus Asbes Gelombang Besar M1 58,000
77 Karpus Asbes Gelombang Kecil M1 57,000
78 Karpus Genteng Beton M1 39,000
79 Karpus Genteng Flam M1 45,000
80 Karpus Genteng Keramik M1 58,000
81 Karpus Genteng Kodok M1 34,000
82 Kawat Beton Kg 12,000
83 Kawat Bronjong o 3 mm Kg 12,500
84 Kawat Bronjong o 4 mm Kg 15,000
85 Kawat Bronjong o 5 mm Kg 17,500
86 Kawat Bronjong Pabrikasi Ukr. (1,5 x 1x 1) Unit 250,000
87 Kawat Bronjong Pabrikasi Ukr. (2 x 1x 1) Unit 350,000
88 Kawat Bronjong Pabrikasi Ukr. (3 x 1x 0,5) Unit 250,000
89 Kawat Duri Rol 123,000
90 Kawat Harmonika M2 29,000
91 Kawat Las Dos 90,000
92 Kawat Nyamuk / Kasa Logam M2 33,000
93 Kawat Nyamuk / Kasa Plastik M2 11,000
94 Kayu Bahan Pintu M3 2,200,000
95 Kayu Bakar M3 260,000
96 Kayu Bakau ф 10 cm Batang 30,000
97 Kayu Beukisting Klas III M3 1,450,000
98 Kayu Dolken / Tiang Perancah Batang 30,000
99 Kayu Gelagar Ukr. 8/15 - 4 m Batang 63,000
100 Kayu Klas I (Semantok / Ulin/dll) M3 3,050,000
101 Kayu Klas II (Kamper / Kruing/dll) M3 2,500,000
102 Kayu Klas III (Borneo / dll) M3 1,900,000
103 Kayu Klas IV (Semgon / dll) M3 1,400,000
104 Kayu Rangka / Bouwplank M3 2,000,000
105 Kayu Rangka Plafond M3 2,700,000
106 Kayu Reng Ukr. 2/3 - 4 m Batang 4,000
107 Keramik Sisi Kulit Jeruk 20 x 20 cm M2 57,000
108 Keramik Ukr. 30 x 30 cm M2 54,000
109 Kertas Amplas Lembar 6,000
110 Kloset Duduk Keramik (Setara KIA) Buah 1,717,000
111 Kloset Jongkok Buah 175,000
112 Kloset Jongkok Keramik (Setara KIA) Buah 200,000
113 Kloset Monoblo Lokal Buah 125,000
114 Koral Beton Buah 90,000
115 Kosen Kayu Klas I (Semantok / Ulin / dll) M3 2,600,000
116 Kosen Kayu Klas II (Kamper / Kruing / dll) M3 2,200,000
117 Kosen Kayu Klas III (Borneo / dll) M3 1,900,000
118 Kuda - Kuda Kayu M3 2,600,000
119 Kunci - Kunci Lokal Buah 112,000
120 Lampu Pijar 40 Watt Buah 7,000
121 Lampu Tl 20 Watt Buah 92,000
122 Lampu Tl 40 Watt Buah 151,000
123 Lem Aibon Buah 17,000
124 Lempengan Rumput M2 14,000
125 List Eternit Kg 5,000
126 Marmer M2 348,000
127 Meja Dapur Buah 3,887,000
128 Minyak Bensin Liter 5,500
129 Minyak Cat Liter 12,000
130 Minyak Solar Liter 5,400
131 Minyak Tanah Liter 1,200
132 Minyak Pelumas (Oli) Liter 30,000
133 Multiplek 3 mm Lembar 52,000
134 Multiplek 4mm Lembar 61,000
135 Multiplek 6 mm Lembar 120,000
136 Multiplek 9 mm Lembar 160,000
137 Naco (Kerangka + Daun) M2 206,000
138 Nok / Rabung Seng 0.35 Cat Pabrik Lembar 46,000
139 Nok / Rabung Seng 0.35 tidak di Cat Lembar 33,000
140 Oksigen M3 230,000
141 Paku Asbes Kg 19,000
142 Paku Beton Ukr.8 cm Kotak 19,000
143 Paku Kait Kg 1,000
144 Paku Kayu Kg 27,000
145 Paku Reng Kg 27,000
146 Paku Seng Kg 31,000
147 Paku Sumbat Buah 1,000
148 Paku Ulir Primadek Buah 2,000
149 Papan Bekisting M3 1,275,000
150 Papan Kayu Bouwplank M3 1,405,000
151 Papan Kayu Klas I (Semantok / Ulir / dll) M3 2,600,000
152 Papan Kayu Klas II (Meuranti / Kruing / dll) M3 2,200,000
153 Papan Kayu Klas III (Borneo / dll) M3 190,000
154 Papan Lisplank Semantok 3/30 M1 19,000
155 Pasir Beton / Kerikil M3 125,000
156 Pasir Pasang M3 120,000
157 Pasir Urug M3 90,000
158 Paving Blok M2 60,000
159 Pemantul Cahaya (Reflector) Buah 30,000
160 Plat Baja Kg 10,500
161 Plat Rambu (Eng Grade) Buah 180,000
162 Plat Rambu (High I Grade) Buah 300,000
163 Pipa Leiding o 1" Galvanis Batang 114,000
164 Pipa Leiding o /2" Galvanis
1
Batang 61,000
165 Pipa Leiding o 1 /2" Galvanis
1
Batang 141,000
166 Pipa Leiding o 2" Galvanis Batang 198,000
167 Pipa Leiding o /4" Galvanis
3
Batang 87,000
168 Pipa Leiding o 4" Galvanis Batang 1,539,000
169 Pipa PVC o 1" Batang 35,000
170 Pipa PVC o /2" Kualitas AWE (United)
1
Batang 23,000
171 Pipa PVC o 1 /2"
1
Batang 95,000
172 Pipa PVC o 2" Batang 105,000
173 Pipa PVC o 3" Batang 116,000
174 Pipa PVC o /4"
3
Batang 27,000
175 Pipa PVC o 4" Batang 160,000
176 Plamur Tembok Kg 32,000
177 Plastik Filter M2 12,600
178 Plint Keramik 15 x 30 Buah 12,000
179 Plint Ubin Abu - abu 15 x 20 Buah 2,000
180 Plint Ubin Berwarna 15 x 20 Buah 2,000
181 Plint Ubin Teraso 10 x 30 Buah 4,000
182 Plywood 3 mm Lembar 52,000
183 Porselin 10 x 15 M2 84,000
184 Porselin 11 x 11 M2 84,000
185 Porselin 15 x 15 M2 84,000
186 Porselin 20 x 20 M2 45,000
187 Rel Pengaman M1 90,000
188 Residu Liter 5,000
189 Reservoir Air Rangka Baja 0,5 M3 Buah 9,860,000
190 Reservoir Air Rangka Baja 1 M3 Buah 14,306,000
191 Schakelar Merk Braco Buah 17,000
192 Semen Andalas @ 40 kg Zak 50,000
193 Semen Padang / Cibinong @ 50 Kg Zak 60,000
194 Semen Putih Zak 100,000
195 Seng BLJS 0,20 8" Lembar 50,000
196 Seng BLJS 0,20 Cat 8" Lembar 65,000
197 Seng Gelombang BJLS Lembar 63,000
198 Seng Gelombang BJLS 30 Cat Pabrik 8" Lembar 70,000
199 Seng Plat BJLS 20 Lembar 50,000
200 Seng Plat BJLS 30 Lembar 70,000
201 Septictank dan Rembesan 1 M3 Buah 4,807,000
202 Septictank dan Rembesan 1,5 M3 Buah 11,788,000
203 Septictank dan Rembesan 2 M3 Buah 17,395,000
204 Septictank dan Rembesan 6 M3 Buah 19,227,000
205 Stop Kontak + Instalansi Titik 103,000
206 Stut Werk M3 1,346,000
207 Sumur Pompa Tangan Terpasang Buah 792,000
208 Tanah Timbun Biasa M3 33,000
209 Tanah Timbun Pilihan M3 50,400
210 Terasi Besi Plat / Siku M2 266,000
211 Thinner Liter 26,400
212 Tiang Pancang Baja M1 3,055,000
213 Tiang Pancang Beton Pratekan M3 1,500,000
214 Titik Lampu + Instalansi Titik 100,000
215 Ubin Abu - abu 20 x 20 M2 26,000
216 Ubin Berwarna 20 x 20 M2 26,000
217 Ubin Teraso 20 x 20 M2 26,000
218 Ubin Wafel 20 x 20 M2 26,000
219 Urinoir Keramik (Setara KIA) Buah 809,000
220 Urinoir Teraso Buah 582,000
221 Vinyl M2 142,000
222 Zekering Kast Lokal 1 Group Buah 89,000
223 Zekering Kast Lokal 2 Group Buah 111,000
224 Zekering Kast Lokal 3 Group Buah 171,000

BUPATI SIMEULUE

DARMILI
DAFTAR HARGA UPAH DAN BAHAN

A. UPAH Satuan Harga

1 2 3 5
1 Pekerja Hari Rp 50,000.00
2 Tukang Hari Rp 70,000.00
3 Kepala Tukang Hari Rp 75,000.00
4 Mandor Hari Rp 75,000.00

B. BAHAN Satuan Harga

1 2 3 4
1 Tanah Urug M3 Rp 50,000.00
2 Pasir Urug M3 Rp 80,000.00
3 Pasir Pasang M 3
Rp 140,000.00
4 Pasir Beton M 3
Rp 160,000.00
5 Kerikil Beton M3 Rp 160,000.00
6 Koral Beton M 3
Rp 130,000.00
7 Batu Kali/Batu Belah (Sungai/Gunung) 15/20 cm M 3
Rp 160,000.00
8 Batu Apung Kg Rp 1,400.00
9 Batu Bata Buah Rp 1,000.00
10 Air Liter Rp 50.00
11 Roster batu kerawang Buah Rp 7,700.00
12 Glas block 20 x 20 cm M2 Rp 490,000.00
13 Semen Andalas @ 40 Kg Zak Rp 50,000.00
14 Semen Warna @ 50 Kg Zak Rp 135,000.00
15 Kayu Kelas I (Seumantok) M3 Rp 3,500,000.00
16 Kayu Kelas II M3 Rp 2,220,000.00
17 Kayu Balok M 3
Rp 2,500,000.00
18 Kayu Kasau 5/7 untuk Bouwplank M3 Rp 2,000,000.00
19 Kosen kayu 6/13 (jadi buatan industri kosen) M'
20 Ventilasi Jalusi papan M2
21 Papan Kayu Bouwplank 3/20 M3 Rp 2,000,000.00
22 Papan kayu Meuranti 3/20 M 3
Rp 1,879,970.00
23 Kayu untuk Perancah M3 Rp 2,199,900.00
24 Dolken Kayu ø 8-10/4 m Batang Rp 28,200.00
25 List Kayu Profil M' Rp 11,200.00
26 Lat Asbes 4 M' Batang Rp 3,250.00
27 Profil Aluminium Batang Rp 88,500.00
28 Profil Kaca M2 Rp 77,000.00
29 Papan Tombak layar M 2
Rp 1,500,000.00
30 Daun pintu 90 x 210 dan 80 x 210 cm Buah Rp 750,000.00
31 Daun Pintu 70 x 210 cm Buah Rp 650,000.00
32 Daun jendela ukuran 60 x 80 lengkap dengan kaca 5 mm Buah Rp 280,000.00
33 Jendela Naco Buah Rp 185,000.00
B. BAHAN Satuan Harga

1 2 3 4
34 Eterniet Superquality 1 x 1 m (asbes) Lembar Rp 9,975.00
35 Plywood Garuda form 12 mm Lembar Rp 262,500.00
36 Plywood Garuda form 9 mm Lembar Rp 189,000.00
37 Plywood 4 mm ukuran 1,2 x 2,40 m Lembar Rp 72,000.00
38 Gipsum tebal 6 mm Lembar Rp 78,750.00
39 Akustik 60 x 120 cm Lembar Rp 48.30
40 Akustik 30 x 30 cm Lembar Rp 49.35
41 Akustik 30 x 60 cm Lembar Rp 50.40
42 Ramset Buah Rp 12.60
43 Besi Beton Polos Kg Rp 11,550.00
44 Besi Beton Ulir Kg Rp 13,650.00
45 Kawat Beton Kg Rp 15,750.00
46 Kawat Duri Kg Rp 10,500.00
47 Kawat licin diameter 4 mm Kg Rp 12,600.00
48 Paku Kayu 2" - 5" Kg Rp 10,000.00
49 Paku 1/2" - 1" Kg Rp 14,000.00
50 Besi Strip Kg Rp 21,000.00
51 Besi WF Kg Rp 21,000.00
52 Besi C Kg Rp 21,000.00
53 Kawat Las Kg Rp 78,750.00
54 Alat bantu pengelasan Unit Rp 262,500.00
55 Wall Stud 64 mm M' Rp 12,600.00
56 Wall track mead 64 mm M' Rp 11,550.00
57 Wall track bottom M' Rp 12,075.00
58 Sekrup fisher Buah Rp 1,260.00
59 Paku skrup Kg Rp 131.25
60 Screw Buah Rp 288.75
61 Profil C 75.75 M' Rp 13,200.00
62 Reng U 0.5 M' Rp 13,500.00
63 Baut Truss Buah Rp 472.50
64 Baut Reng Buah Rp 262.50
65 Atap Seng Genteng Metal 0,30 Lembar Rp 75,000.00
66 Rabung Seng Genteng Metal 0,30 Lembar Rp 54,250.00
67 Seng Gelombang BJLs 0,20 Lembar Rp 48,300.00
68 Seng Plat BJLs 0,35 Lembar Rp 57,750.00
69 Keramik Sisi Kulit Jeruk 20 x 20 Buah Rp 2,400.00
70 Keramik 20 x 20 cm' Buah Rp 2,400.00
70 Keramik dinding 20 x 25 cm Buah Rp 2,600.00
71 Keramik 30 x 30 Homogenius polished Buah Rp 6,500.00
72 Keramik 30 x 30 Homogenius unpolished Buah Rp 7,100.00
73 Keramik 40 x 40 Homogenius polished Buah Rp 13,333.33
74 Keramik 40 x 40 Homogenius unpolished Buah Rp 14,166.67
75 Stepnoising 7,5 x 40 cm Buah Rp 9,975.00
76 Stepnoising 7,5 x 30 cm Buah Rp 8,925.00
77 Lis Keramik 5 x 20 cm Buah Rp 6,825.00
78 Plint Keramik 10 x 40 cm Buah Rp 1,443.75
79 Plint Keramik 10 x 30 cm Buah Rp 1,470.00
B. BAHAN Satuan Harga

1 2 3 4
80 Plamir Kg Rp 33,600.00
81 Dempul Kayu Kg Rp 25,000.00
82 Cat Dasar Kg Rp 35,000.00
83 Cat Menie Kg Rp 23,100.00
84 Cat Kayu/Minyak Kg Rp 33,600.00
85 Cat Dinding Acrylic Emultion Paint Kg Rp 45,000.00
86 Vernis Liter Rp 45,000.00
87 Teak Oil Liter Rp 15,750.00
88 Pelitur Liter Rp 17,850.00
89 Minyak Cat Liter Rp 22,500.00
90 Minyak Bekisting Liter Rp 23,100.00
91 Mnyak pelumas Liter Rp 23,100.00
92 Minyak Solar Liter Rp 4,515.00
93 Minyak Premium Liter Rp 4,725.00
94 Sealent tube Rp 12,600.00
95 Kertas Amplas Lembar Rp 1,000.00
96 Lem Kayu Kg Rp 2,310.00
97 Residu Liter Rp 3,570.00
98 Kuas cat/vernis Buah Rp 6,300.00
99 Kunci Tanam Buah Rp 122,850.00
100 Kunci Tanam Silinder Buah Rp 131,250.00
101 Engsel Pintu Buah Rp 27,300.00
102 Engsel Jendela Buah Rp 19,950.00
103 Kait Angin Buah Rp 14,700.00
104 Tarikan Jendela Buah Rp 15,750.00
105 Pacok Jendela Buah Rp 12,600.00
106 Pegangan pintu double Buah Rp 262,500.00
107 Slot pintu double Buah Rp 131,250.00
108 Kaca Bening Tebal 5 mm M2 Rp 122,850.00
109 Kaca Cermin Tebal 5 mm M2
Rp 157,500.00
110 Kaca Patri tebal 5 mm M2
Rp 1,890,000.00
111 Kloset duduk Buah Rp 1,617,000.00
112 Kloset Jongkok Buah Rp 123,900.00
113 Urinoir Buah Rp 1,039,500.00
114 Wastafel Buah Rp 1,575,000.00
115 Septick tank + Peresapan Buah Rp 5,775,000.00
116 Kran diameter 3/4" atau 1/2" Buah Rp 78,750.00
117 Seal tape Buah Rp 5,250.00
118 Floor Drain Buah Rp 18,900.00
119 Pipa beton diameter 5 - 20 cm Buah Rp 42,000.00
120 Pipa beton diameter 30 - 100 cm Buah Rp 42,000.00
121 Pipa PVC tipe AW Ø 1/2" Batang Rp 37,800.00
122 Pipa PVC tipe AW Ø 3/4" Batang Rp 31,500.00
123 Pipa PVC tipe AW Ø 1½" Batang Rp 99,750.00
124 Pipa PVC tipe AW Ø 2" Batang Rp 120,750.00
125 Pipa PVC tipe AW Ø 2½" Batang Rp 120,750.00
B. BAHAN Satuan Harga

1 2 3 4
126 Pipa PVC tipe AW Ø 3" Batang Rp 142,800.00
127 Pipa PVC tipe AW Ø 4" Batang Rp 283,500.00
128 Pipa Galvanis Ø 1/2" Batang Rp 68,250.00
129 Memasang 1 M' Pipa Galvanis Ø 3/4" Batang Rp 78,750.00
130 Memasang 1 M' Pipa Galvanis Ø 1" Batang Rp 131,250.00
131 Bak Cuci Stainles Steel Buah Rp 1,575,000.00
132 Water drain + Asesories bak cuci Set Rp 525,000.00
133 Jet waser standard Toto Buah Rp 3,150,000.00
134 Saluran Keliling Bangunan M' Rp 236,250.00
135 Teralis Penutup Saluran M' Rp 131,250.00
136 Cincin sumuran Ø 100cm Buah Rp 105,000.00
137 Pemasangan instalasi air bersih/kotor Titik Rp 157,500.00
138 Pembentukan kolom selasar depan (bentuk sesuai gambar) Unit Rp 1,207,500.00
139 Pembentukan kolom induk uk 30/40 cm, 4 sisi Unit Rp 787,500.00
140 Pembentukan kolom induk uk 30/30 cm, 4 sisi Unit Rp 735,000.00
141 Pembentukan balok 25/65 cm - 8 m', 3 sisi Unit Rp 840,000.00
142 Pembentukan balok 25/45 cm - 8 m', 3 sisi (Arah memanjang) Unit Rp 787,500.00
143 Pembentukan kolom L teras uk 30/90 cm, 4 sisi Unit Rp 1,575,000.00
144 Pembentukan dinding teras M' Rp 131,250.00
145 Relief plat level 10 x 50 cm' M' Rp 262,500.00
146 Reiling bata teras, t = 1 m' M' Rp 367,500.00
147 Railing tangga M' Rp 1,050,000.00
148 Plesteran tangga Unit Rp 1,050,000.00
149 Beton pantasi Tonjolan Buah Rp 157,500.00
150 Lampu TL 1 x 20 watt balk + reflektor Buah Rp 45,000.00
151 Lampu pijar 40 wtt Buah Rp 5,200.00
152 Lampu baret Buah Rp 68,250.00
153 Lampu dinding Buah Rp 131,250.00
154 Saklar lampu Merk setara Broco 1 seri Buah Rp 7,350.00
155 Saklar lampu Merk setara Broco 2 seri Buah Rp 8,400.00
156 Saklar lampu Merk Broco 3 seri Buah Rp 10,500.00
157 Stop kontak Buah Rp 15,750.00
158 Stop kontak tanam Buah Rp 52,500.00
158 Box Panel Distribusi Buah Rp 131,250.00
159 Pemasangan titik api/stop kontak Titik Rp 100,000.00
160 Penangkal petir 20 s Set Rp 31,500.00
161 Penyangga kabel bawah atap Buah Rp 15,750.00
162 Penyangga kabel daerah beton Buah Rp 52,500.00
163 Pipa galvanis 3/4" (untuk sparing) M' Rp 68,250.00
164 Klem pipa 3/4" Buah Rp 1,575.00
165 Kabel BC 70 mm M' Rp 78,750.00
166 Panel test 30 x 15 x 10 cm' Unit Rp 682,500.00
167 Ground road D 3/4" (tembaga) Buah Rp 157,500.00
168 Material sambungan Paket Rp 157,500.00
169 Box Gate stainless rangka hollow Buah Rp 4,200,000.00
170 Kaca tebal 8 mm pada samping pintu M2 Rp 315,000.00
B. BAHAN Satuan Harga

1 2 3 4
171 Daun Pintu Kaca framless tebal 9 mm (87x210 cm) Lembar Rp 12,600,000.00
172 Engsel tanam kaca framless/Floor Hinges Set Rp 1,575,000.00
173 Kunci pintu kaca framless Buah Rp 472,500.00
174 Pegangan Pintu kaca framlees Set Rp 840,000.00
175 Alat perakitan baja Jam Rp 1,260,000.00
176 Rolling door Alluminium Buah Rp 787,500.00
177 Kayu lis eternit m' Rp 2,100.00
178 Daun penutup meja lab lengkap engsel + kunci terpasang Lbr Rp 84,000.00
179 Resapan Lab. unit Rp 1,260,000.00

CV. NIRZA CIVIL ENGINEERING


CONSULTANT

ARIF ROESDI PURWONO


Site Engineering
DAFTAR ANALISA HARGA SATUAN

I. PEKERJAAN PERSIAPAN
RSNI T-12-2002-B1
1 M' Pagar Sementara dari Kayu Tinggi 2 M'
1.250 Batang Dolken Kayu Ǿ 8-10/400 cm @Rp 28,200.00 Rp. 35,250.00
0.005 M3 Pasir Beton @Rp 160,000.00 Rp. 800.00
0.009 M3 Koral Beton @Rp 130,000.00 Rp. 1,170.00
2.500 Kg Semen Portland @Rp 1,250.00 Rp. 3,125.00
0.072 M3 Kayu Kasau 5/7 @Rp 2,000,000.00 Rp. 144,000.00
0.060 Kg Paku 2" - 5" @Rp 10,000.00 Rp. 600.00
0.400 Liter Residu @Rp 3,570.00 Rp. 1,428.00
0.400 OH Pekerja @Rp 50,000.00 Rp. 20,000.00
0.200 OH Tukang @Rp 70,000.00 Rp. 14,000.00
0.020 OH Kepala Tukang @Rp 75,000.00 Rp. 1,500.00
0.020 OH Mandor @Rp 75,000.00 Rp. 1,500.00
Jumlah Rp. 223,373.00
Dibulatkan Rp. 223,373.00

RSNI T-12-2002-B2
1 M' Pagar Sementara dari Seng Gelombang Tinggi 2 M'
1.250 Batang Dolken Kayu Ǿ 8-10/400 cm @Rp 28,200.00 Rp. 35,250.00
0.005 M3 Pasir Beton @Rp 160,000.00 Rp. 800.00
0.009 M3 Koral Beton @Rp 130,000.00 Rp. 1,170.00
2.500 Kg Semen Portland @Rp 1,250.00 Rp. 3,125.00
0.072 M3 Kayu Kasau 5/7 @Rp 2,000,000.00 Rp. 144,000.00
0.060 Kg Paku 2" - 5" @Rp 10,000.00 Rp. 600.00
1.200 Lembar Seng Gelombang 3" - 5" @Rp 48,300.00 Rp. 57,960.00
0.450 Liter Meni Besi @Rp 23,100.00 Rp. 10,395.00
0.400 OH Pekerja @Rp 50,000.00 Rp. 20,000.00
0.200 OH Tukang @Rp 70,000.00 Rp. 14,000.00
0.020 OH Kepala Tukang @Rp 75,000.00 Rp. 1,500.00
0.020 OH Mandor @Rp 75,000.00 Rp. 1,500.00
Jumlah Rp. 290,300.00
Dibulatkan Rp. 290,300.00

RSNI T-12-2002-B3
1 M' Pagar Sementara dari Kawat Duri Tinggi 1,80 M'
1.000 Batang Dolken Kayu Ǿ 8-10/400 cm @Rp 28,200.00 Rp. 28,200.00
0.005 M3 Pasir Beton @Rp 160,000.00 Rp. 800.00
0.009 M3 Koral Beton @Rp 130,000.00 Rp. 1,170.00
2.000 Kg Semen Portland @Rp 1,250.00 Rp. 2,500.00
25.000 Kg Kawat Duri @Rp 10,500.00 Rp. 262,500.00
0.060 Kg Paku 2" - 5" @Rp 10,000.00 Rp. 600.00
0.300 OH Pekerja @Rp 50,000.00 Rp. 15,000.00
0.200 OH Tukang @Rp 70,000.00 Rp. 14,000.00
0.020 OH Kepala Tukang @Rp 75,000.00 Rp. 1,500.00
0.020 OH Mandor @Rp 75,000.00 Rp. 1,500.00
Jumlah Rp. 327,770.00
Dibulatkan Rp. 327,770.00
RSNI T-12-2002-B4
1 M' Pengukuran dan Pemasaangan Bowplank
0.012 M3 Kayu Kasau 5/7 @Rp 2,000,000.00 Rp. 24,000.00
0.007 M3 Papan 3/20 @Rp 2,000,000.00 Rp. 14,000.00
0.020 Kg Paku 2" - 5" @Rp 10,000.00 Rp. 200.00
0.100 OH Pekerja @Rp 50,000.00 Rp. 5,000.00
0.100 OH Tukang @Rp 70,000.00 Rp. 7,000.00
0.010 OH Kepala Tukang @Rp 75,000.00 Rp. 750.00
0.005 OH Mandor @Rp 75,000.00 Rp. 375.00
Jumlah Rp. 51,325.00
Dibulatkan Rp. 51,325.00

RSNI T-12-2002-B5
1 M2 Pembuatan Kantor Sementara, dengan lantai Plesteran
1.250 Batang Dolken Kayu Ǿ 8-10/400 cm @Rp 28,200.00 Rp. 35,250.00
0.180 M3 Kayu @Rp 2,220,000.00 Rp. 399,600.00
0.850 Kg Paku 2" - 5" @Rp 10,000.00 Rp. 8,500.00
1.100 Kg Besi Strip @Rp 21,000.00 Rp. 23,100.00
0.150 M3 Pasir Pasang @Rp 140,000.00 Rp. 21,000.00
0.100 M3 Pasir Beton @Rp 160,000.00 Rp. 16,000.00
0.150 M3 Koral Beton @Rp 130,000.00 Rp. 19,500.00
35.000 Kg Semen Portland @Rp 1,250.00 Rp. 43,750.00
30.000 Buah Bata Merah @Rp 1,000.00 Rp. 30,000.00
0.250 Lembar Seng Plat @Rp 57,750.00 Rp. 14,437.50
2.000 Buah Jendela Naco (rangka+ kaca 5 mm) @Rp 185,000.00 Rp. 370,000.00
0.080 M2 Kaca Polos @Rp 122,850.00 Rp. 9,828.00
0.150 Buah Kunci tanam @Rp 122,850.00 Rp. 18,427.50
0.060 Lembar Plywood 4 mm @Rp 72,000.00 Rp. 4,320.00
2.000 OH Pekerja @Rp 50,000.00 Rp. 100,000.00
3.000 OH Tukang @Rp 70,000.00 Rp. 210,000.00
0.300 OH Kepala Tukang @Rp 75,000.00 Rp. 22,500.00
0.050 OH Mandor @Rp 75,000.00 Rp. 3,750.00
Jumlah Rp. 1,349,963.00
Dibulatkan Rp. 1,349,963.00
RSNI T-12-2002-B6
1 M2 Pembuatan Gudang Semen dan Alat
1.700 Batang Dolken Kayu Ǿ 8-10/400 cm @Rp 28,200.00 Rp. 47,940.00
0.210 M3 Kayu @Rp 2,220,000.00 Rp. 466,200.00
0.300 Kg Paku 2" - 5" @Rp 10,000.00 Rp. 3,000.00
0.030 M3 Pasir Beton @Rp 160,000.00 Rp. 4,800.00
0.050 M3 Koral Beton @Rp 130,000.00 Rp. 6,500.00
10.500 Kg Semen Portland @Rp 1,250.00 Rp. 13,125.00
1.500 Lembar Seng gelombang @Rp 48,300.00 Rp. 72,450.00
1.000 OH Pekerja @Rp 50,000.00 Rp. 50,000.00
2.000 OH Tukang @Rp 70,000.00 Rp. 140,000.00
0.200 OH Kepala Tukang @Rp 75,000.00 Rp. 15,000.00
0.050 OH Mandor @Rp 75,000.00 Rp. 3,750.00
Jumlah Rp. 822,765.00
Dibulatkan Rp. 822,765.00
IV. PEKERJAAN BETON

SNI DT-91-0008-2007-6.1
1 M3 Beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87
869.000 Kg Pasir Beton @Rp 114.29 Rp. 99,314.29
999.000 Kg Kerikil Beton @Rp 118.52 Rp. 118,400.00
247.000 Kg Semen Portland @Rp 1,250.00 Rp. 308,750.00
215.000 Liter Air @Rp 50.00 Rp. 10,750.00
1.650 OH Pekerja @Rp 50,000.00 Rp. 82,500.00
0.275 OH Tukang @Rp 70,000.00 Rp. 19,250.00
0.028 OH Kepala Tukang @Rp 75,000.00 Rp. 2,100.00
0.083 OH Mandor @Rp 75,000.00 Rp. 6,225.00
Jumlah Rp. 647,289.29
Dibulatkan Rp. 647,289.00

SNI DT-91-0008-2007-6.5
1 M3 Beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,68
760.000 Kg Pasir Beton @Rp 114.29 Rp. 86,857.14
1,029.000 Kg Kerikil Beton (Maximum 30 mm) @Rp 118.52 Rp. 121,955.56
326.000 Kg Semen Portland @Rp 1,250.00 Rp. 407,500.00
215.000 Liter Air @Rp 50.00 Rp. 10,750.00
1.650 OH Pekerja @Rp 50,000.00 Rp. 82,500.00
0.275 OH Tukang @Rp 70,000.00 Rp. 19,250.00
0.028 OH Kepala Tukang @Rp 75,000.00 Rp. 2,100.00
0.083 OH Mandor @Rp 75,000.00 Rp. 6,225.00
Jumlah Rp. 737,137.70
Dibulatkan Rp. 737,138.00
SNI DT-91-0008-2007-6.8
1 M3 Beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
692.000 Kg Pasir Beton @Rp 114.29 Rp. 79,085.71
1,039.000 Kg Kerikil Beton (Maximum 30 mm) @Rp 118.52 Rp. 123,140.74
384.000 Kg Semen Portland @Rp 1,250.00 Rp. 480,000.00
215.000 Liter Air @Rp 50.00 Rp. 10,750.00
1.650 OH Pekerja @Rp 50,000.00 Rp. 82,500.00
0.275 OH Tukang @Rp 70,000.00 Rp. 19,250.00
0.028 OH Kepala Tukang @Rp 75,000.00 Rp. 2,100.00
0.083 OH Mandor @Rp 75,000.00 Rp. 6,225.00
Jumlah Rp. 803,051.46
Dibulatkan Rp. 803,051.00
SNI DT-91-0008-2007-6.9
1 M3 Beton mutu f'c = 24 Mpa (K275), slump (12 ± 2) cm, w/c = 0,53
684.000 Kg Pasir Beton @Rp 114.29 Rp. 78,171.43
1,026.000 Kg Kerikil Beton (Maximum 30 mm) @Rp 118.52 Rp. 121,600.00
406.000 Kg Semen Portland @Rp 1,250.00 Rp. 507,500.00
215.000 Liter Air @Rp 50.00 Rp. 10,750.00
1.650 OH Pekerja @Rp 50,000.00 Rp. 82,500.00
0.275 OH Tukang @Rp 70,000.00 Rp. 19,250.00
0.028 OH Kepala Tukang @Rp 75,000.00 Rp. 2,100.00
0.083 OH Mandor @Rp 75,000.00 Rp. 6,225.00
Jumlah Rp. 828,096.43
Dibulatkan Rp. 828,096.00

SNI DT-91-0008-2007-6.17
1 Kg Besi Polos
1.050 Kg Besi beton Polos @Rp 11,550.00 Rp. 12,127.50
0.050 Kg Kawat beton @Rp 15,750.00 Rp. 787.50
0.007 OH Pekerja @Rp 50,000.00 Rp. 350.00
0.007 OH Tukang @Rp 70,000.00 Rp. 490.00
0.0007 OH Kepala Tukang @Rp 75,000.00 Rp. 52.50
0.0004 OH Mandor @Rp 75,000.00 Rp. 30.00
Jumlah Rp. 13,837.50
Dibulatkan Rp. 13,838.00
SNI DT-91-0008-2007-6.18
1 Kg Besi Ulir
1.050 Kg Besi beton Ulir @Rp 13,650.00 Rp. 14,332.50
0.050 Kg Kawat beton @Rp 15,750.00 Rp. 787.50
0.007 OH Pekerja @Rp 50,000.00 Rp. 350.00
0.007 OH Tukang @Rp 70,000.00 Rp. 490.00
0.0007 OH Kepala Tukang @Rp 75,000.00 Rp. 52.50
0.0004 OH Mandor @Rp 75,000.00 Rp. 30.00
Jumlah Rp. 16,042.50
Dibulatkan Rp. 16,043.00

SNI DT-91-0008-2007-6.20
1 M2 Bekisting untuk Pondasi
0.040 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 100,000.00
0.300 Kg Paku 5 cm - 10 cm @Rp 10,000.00 Rp. 3,000.00
0.100 Liter Minyak bekisting @Rp 23,100.00 Rp. 2,310.00
0.520 OH Pekerja @Rp 50,000.00 Rp. 26,000.00
0.260 OH Tukang @Rp 70,000.00 Rp. 18,200.00
0.026 OH Kepala Tukang @Rp 75,000.00 Rp. 1,950.00
0.026 OH Mandor @Rp 75,000.00 Rp. 1,950.00
Jumlah Rp. 153,410.00
Digunakan 2 kali Pakai Rp. 76,705.00
Dibulatkan Rp. 76,705.00

SNI DT-91-0008-2007-6.21
1 M2 Bekisting untuk Sloof
0.045 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 112,500.00
0.300 Kg Paku 5 cm - 10 cm @Rp 10,000.00 Rp. 3,000.00
0.100 Liter Minyak bekisting @Rp 23,100.00 Rp. 2,310.00
0.520 OH Pekerja @Rp 50,000.00 Rp. 26,000.00
0.260 OH Tukang @Rp 70,000.00 Rp. 18,200.00
0.026 OH Kepala Tukang @Rp 75,000.00 Rp. 1,950.00
0.026 OH Mandor @Rp 75,000.00 Rp. 1,950.00
Jumlah Rp. 165,910.00
Digunakan 2 Kali Pakai Rp. 82,955.00
Dibulatkan Rp. 82,955.00

SNI DT-91-0008-2007-6.22
1 M2 Bekisting untuk Kolom
0.040 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 100,000.00
0.400 Kg Paku 5 cm - 12 cm @Rp 10,000.00 Rp. 4,000.00
0.200 Liter Minyak bekisting @Rp 23,100.00 Rp. 4,620.00
0.015 M3 Balok Kayu Kelas II @Rp 2,500,000.00 Rp. 37,500.00
0.350 Lembar Plywood Tebal 9 mm @Rp 189,000.00 Rp. 66,150.00
2.000 Batang Dolken Kayu ø 8-10 panjang 4 m @Rp 28,200.00 Rp. 56,400.00
0.660 OH Pekerja @Rp 50,000.00 Rp. 33,000.00
0.330 OH Tukang @Rp 70,000.00 Rp. 23,100.00
0.033 OH Kepala Tukang @Rp 75,000.00 Rp. 2,475.00
0.033 OH Mandor @Rp 75,000.00 Rp. 2,475.00
Jumlah Rp. 329,720.00
Digunakan 2 x Rp. 164,860.00
Dibulatkan Rp. 164,860.00

SNI DT-91-0008-2007-6.23
Memasang M2 Bekisting untuk Balok
0.020 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 50,000.00
0.400 Kg Paku 5 cm - 12 cm @Rp 10,000.00 Rp. 4,000.00
0.200 Liter Minyak bekisting @Rp 23,100.00 Rp. 4,620.00
0.011 M3 Balok Kayu Kelas II @Rp 2,500,000.00 Rp. 27,500.00
0.350 Lembar Plywood Tebal 9 mm @Rp 189,000.00 Rp. 66,150.00
0.660 OH Pekerja @Rp 50,000.00 Rp. 33,000.00
0.330 OH Tukang @Rp 70,000.00 Rp. 23,100.00
0.033 OH Kepala Tukang @Rp 75,000.00 Rp. 2,475.00
0.033 OH Mandor @Rp 75,000.00 Rp. 2,475.00
Jumlah Rp. 213,320.00
Dibulatkan Rp. 213,320.00
SNI DT-91-0008-2007-6.24
Memasang 1 M2 Bekisting untuk Lantai
0.040 M3 Kayu Kelas III @Rp 3,700,000.00 Rp. 148,000.00
0.400 Kg Paku 5 cm - 12 cm @Rp 10,000.00 Rp. 4,000.00
0.200 Liter Minyak bekisting @Rp 23,100.00 Rp. 4,620.00
0.015 M3 Balok Kayu Kelas II @Rp 3,700,000.00 Rp. 55,500.00
0.350 Lembar Plywood Tebal 9 mm @Rp 189,000.00 Rp. 66,150.00
6.000 Batang Dolken Kayu ø 8-10 panjang 4 m @Rp 28,200.00 Rp. 169,200.00
0.660 OH Pekerja @Rp 50,000.00 Rp. 33,000.00
0.330 OH Tukang @Rp 70,000.00 Rp. 23,100.00
0.033 OH Kepala Tukang @Rp 75,000.00 Rp. 2,475.00
0.033 OH Mandor @Rp 75,000.00 Rp. 2,475.00
Jumlah Rp. 508,520.00
Dibulatkan Rp. 508,520.00

SNI DT-91-0008-2007-6.26
Memasang 1 M2 Bekisting untuk Tangga
0.030 M3 Kayu Kelas III @Rp 3,700,000.00 Rp. 111,000.00
0.400 Kg Paku 5 cm - 12 cm @Rp 10,000.00 Rp. 4,000.00
0.150 Liter Minyak bekisting @Rp 23,100.00 Rp. 3,465.00
0.015 M3 Balok Kayu Kelas II @Rp 3,700,000.00 Rp. 55,500.00
0.350 Lembar Plywood Tebal 9 mm @Rp 189,000.00 Rp. 66,150.00
2.000 Batang Dolken Kayu ø 8-10 panjang 4 m @Rp 28,200.00 Rp. 56,400.00
0.660 OH Pekerja @Rp 50,000.00 Rp. 33,000.00
0.330 OH Tukang @Rp 70,000.00 Rp. 23,100.00
0.033 OH Kepala Tukang @Rp 75,000.00 Rp. 2,475.00
0.033 OH Mandor @Rp 75,000.00 Rp. 2,475.00
Jumlah Rp. 357,565.00
Dibulatkan Rp. 357,565.00
Pekerjaan Lain-lain
1.0000 Ls Membongkar dan Menyiram Beton @Rp 50,000.00 Rp. 50,000.00
Jumlah Rp. 50,000.00

REKAPITULASI PEKERJAAN BETON

Suplemen 1
Beton Bertulang Cincin Sumuran
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 803,051.00 Rp. 803,051.00
58.000 Kg SNI DT-91-0008-2007-6.17 @Rp 13,838.00 Rp. 802,604.00
Kg SNI DT-91-0008-2007-6.18 @Rp 16,043.00 Rp. 0.00
10.500 M2 SNI DT-91-0008-2007-6.20 @Rp 76,705.00 Rp. 805,402.50
1.000 Ls Pekerjaan Lain-lain @Rp 50,000.00 Rp. 50,000.00
Jumlah Rp. 2,461,057.50
Dibulatkan Rp. 2,461,058.00

Suplemen 2
1 M3 Beton Bertulang Pondasi Tapak
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 803,051.00 Rp. 803,051.00
105.190 Kg SNI DT-91-0008-2007-6.17 @Rp 13,838.00 Rp. 1,455,612.30
Kg SNI DT-91-0008-2007-6.18 @Rp 16,043.00 Rp. 0.00
2.800 M2 SNI DT-91-0008-2007-6.20 @Rp 76,705.00 Rp. 214,774.00
1.000 Ls Pekerjaan Lain-lain @Rp 50,000.00 Rp. 50,000.00
Jumlah Rp. 2,523,437.30
Dibulatkan Rp. 2,523,437.00

Suplemen 3
1 M3 Sloof Beton Bertulang Ukuran 18 x 25 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 803,051.00 Rp. 803,051.00
176.000 Kg SNI DT-91-0008-2007-6.17 @Rp 13,838.00 Rp. 2,435,488.00
Kg SNI DT-91-0008-2007-6.18 @Rp 16,043.00 Rp. 0.00
8.333 M2 SNI DT-91-0008-2007-6.23 @Rp 213,320.00 Rp. 1,777,659.56
1.000 Ls Pekerjaan Lain-lain @Rp 50,000.00 Rp. 50,000.00
Jumlah Rp. 5,066,198.56
Dibulatkan Rp. 5,066,199.00
Suplemen 4
1 M3 Kolom Beton Bertulang Ukuran 13 x 13 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 803,051.00 Rp. 803,051.00
261.000 Kg SNI DT-91-0008-2007-6.17 @Rp 13,838.00 Rp. 3,611,718.00
Kg SNI DT-91-0008-2007-6.18 @Rp 16,043.00 Rp. 0.00
6.154 M2 SNI DT-91-0008-2007-6.22 @Rp 164,860.00 Rp. 1,014,515.47
1.000 Ls Pekerjaan Lain-lain @Rp 50,000.00 Rp. 50,000.00
Jumlah Rp. 5,479,284.47
Dibulatkan Rp. 5,479,284.00

Suplemen 5
1 M3 Kolom Beton Bertulang Ukuran 18 x 25 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 803,051.00 Rp. 803,051.00
228.133 Kg SNI DT-91-0008-2007-6.17 @Rp 13,838.00 Rp. 3,156,908.61
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 16,043.00 Rp. 0.00
6.667 M2 SNI DT-91-0008-2007-6.22 @Rp 164,860.00 Rp. 1,099,072.16
1.000 Ls Pekerjaan Lain-lain @Rp 50,000.00 Rp. 50,000.00
Jumlah Rp. 5,109,031.77
Dibulatkan Rp. 5,109,032.00

Suplemen 6
1 M3 Kolom Beton Bertulang Ukuran 20 x 20 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 803,051.00 Rp. 803,051.00
141.000 Kg SNI DT-91-0008-2007-6.17 @Rp 13,838.00 Rp. 1,951,158.00
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 16,043.00 Rp. 0.00
8.000 M2 SNI DT-91-0008-2007-6.22 @Rp 164,860.00 Rp. 1,318,880.00
1.000 Ls Pekerjaan Lain-lain @Rp 50,000.00 Rp. 50,000.00
Jumlah Rp. 4,123,089.00
Dibulatkan Rp. 4,123,089.00

Suplemen 7
1 M3 Balok ukuran 13 x 20 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 803,051.00 Rp. 803,051.00
211.923 Kg SNI DT-91-0008-2007-6.17 @Rp 13,838.00 Rp. 2,932,590.47
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 16,043.00 Rp. 0.00
7.692 M2 SNI DT-91-0008-2007-6.23 @Rp 213,320.00 Rp. 1,640,921.44
1.000 Ls Pekerjaan Lain-lain @Rp 50,000.00 Rp. 50,000.00
Jumlah Rp. 5,426,562.91
Dibulatkan Rp. 5,426,563.00

Suplemen 8
1 M3 Plat Lantai tebal 12 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 803,051.00 Rp. 803,051.00
170.000 Kg SNI DT-91-0008-2007-6.17 @Rp 13,838.00 Rp. 2,352,460.00
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 16,043.00 Rp. 0.00
8.333 M2 SNI DT-91-0008-2007-6.24 @Rp 508,520.00 Rp. 4,237,649.72
1.000 Ls Pekerjaan Lain-lain @Rp 50,000.00 Rp. 50,000.00
Jumlah Rp. 7,443,160.72
Dibulatkan Rp. 7,443,161.00
Suplemen 9
1 M3 Balok Lantai ukuran 13 x 15 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 803,051.00 Rp. 803,051.00
190.000 Kg SNI DT-91-0008-2007-6.17 @Rp 13,838.00 Rp. 2,629,220.00
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 16,043.00 Rp. 0.00
7.180 M2 SNI DT-91-0008-2007-6.23 @Rp 213,320.00 Rp. 1,531,530.94
1.000 Ls Pekerjaan Lain-lain @Rp 50,000.00 Rp. 50,000.00
Jumlah Rp. 5,013,801.94
Dibulatkan Rp. 5,013,802.00
Suplemen 10
1 M3 Balok Latai ukuran 13 x 13 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 803,051.00 Rp. 803,051.00
210.000 Kg SNI DT-91-0008-2007-6.17 @Rp 13,838.00 Rp. 2,905,980.00
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 16,043.00 Rp. 0.00
7.180 M2 SNI DT-91-0008-2007-6.23 @Rp 213,320.00 Rp. 1,531,530.94
1.000 Ls Pekerjaan Lain-lain @Rp 50,000.00 Rp. 50,000.00
Jumlah Rp. 5,290,561.94
Dibulatkan Rp. 5,290,562.00

Suplemen 11
1 M3 Meja Lab
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 803,051.00 Rp. 803,051.00
177.000 Kg SNI DT-91-0008-2007-6.17 @Rp 13,838.00 Rp. 2,449,326.00
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 16,043.00 Rp. 0.00
10.000 M2 SNI DT-91-0008-2007-6.23 @Rp 213,320.00 Rp. 2,133,200.00
1.000 Ls Pekerjaan Lain-lain @Rp 50,000.00 Rp. 50,000.00
Jumlah Rp. 5,435,577.00
Dibulatkan Rp. 5,435,577.00
V. PEKERJAAN DINDING

SNI DT-91-0009-2007-6.3
1 M2 Pasangan bata merah tebal 1 bata adukan 1PC:4 PP
0.093 M3 Pasir Pasang @Rp 140,000.00 Rp. 13,020.00
140.000 Buah Batu Bata @Rp 1,000.00 Rp. 140,000.00
26.550 Kg Semen Portland @Rp 1,250.00 Rp. 33,187.50
0.600 OH Pekerja @Rp 50,000.00 Rp. 30,000.00
0.200 OH Tukang @Rp 70,000.00 Rp. 14,000.00
0.020 OH Kepala Tukang @Rp 75,000.00 Rp. 1,500.00
0.030 OH Mandor @Rp 75,000.00 Rp. 2,250.00
Jumlah Rp. 233,957.50
Dibulatkan Rp. 233,958.00

SNI DT-91-0009-2007-6.7
1 M2 Pasangan bata merah tebal 1/2 bata adukan 1PC : 2 PP
0.038 M3 Pasir Pasang @Rp 140,000.00 Rp. 5,320.00
70.000 Buah Batu Bata @Rp 1,000.00 Rp. 70,000.00
18.950 Kg Semen Portland @Rp 1,250.00 Rp. 23,687.50
0.300 OH Pekerja @Rp 50,000.00 Rp. 15,000.00
0.100 OH Tukang @Rp 70,000.00 Rp. 7,000.00
0.010 OH Kepala Tukang @Rp 75,000.00 Rp. 750.00
0.015 OH Mandor @Rp 75,000.00 Rp. 1,125.00
Jumlah 122,882.50
Dibulatkan 122,880.00
SNI DT-91-0009-2007-6.9
1 M2 Pasangan bata merah tebal 1/2 bata adukan 1PC : 4 PP
0.043 M3 Pasir Pasang @Rp 140,000.00 Rp. 6,020.00
70.000 Buah Batu Bata @Rp 1,000.00 Rp. 70,000.00
11.500 Kg Semen Portland @Rp 1,250.00 Rp. 14,375.00
0.300 OH Pekerja @Rp 50,000.00 Rp. 15,000.00
0.100 OH Tukang @Rp 70,000.00 Rp. 7,000.00
0.010 OH Kepala Tukang @Rp 75,000.00 Rp. 750.00
0.015 OH Mandor @Rp 75,000.00 Rp. 1,125.00
Jumlah Rp. 114,270.00
Dibulatkan Rp. 114,270.00
SNI DT-91-0009-2007-6.22
1 M2 Pasangan dinding roster/terawang campuran 1 PC : 3 PP
0.032 M3 Pasir Pasang @Rp 140,000.00 Rp. 4,480.00
25.000 Buah Roster/terawang @Rp 7,700.00 Rp. 192,500.00
14.000 Kg Semen Portland @Rp 1,250.00 Rp. 17,500.00
0.300 OH Pekerja @Rp 50,000.00 Rp. 15,000.00
0.100 OH Tukang @Rp 70,000.00 Rp. 7,000.00
0.010 OH Kepala Tukang @Rp 75,000.00 Rp. 750.00
0.015 OH Mandor @Rp 75,000.00 Rp. 1,125.00
Jumlah Rp. 238,355.00
Dibulatkan Rp. 238,355.00

VI. PEKERJAAN PLESTERAN

SNI DT-91-0010-2007-6.2
Memasang 1 M2 Plesteran 1 PC : 2 PP : tebal 15 mm
0.020 M3 Pasir Pasang @Rp 140,000.00 Rp. 2,800.00
10.224 Kg Semen Portland @Rp 1,250.00 Rp. 12,780.00
0.200 OH Pekerja @Rp 50,000.00 Rp. 10,000.00
0.150 OH Tukang @Rp 70,000.00 Rp. 10,500.00
0.015 OH Kepala Tukang @Rp 75,000.00 Rp. 1,125.00
0.010 OH Mandor @Rp 75,000.00 Rp. 750.00
Jumlah Rp. 37,955.00
Dibulatkan Rp. 37,960.00

SNI DT-91-0010-2007-6.3
Memasang 1 M2 Plesteran Beton 1 PC : 3 PP, tebal 15 mm
0.023 M3 Pasir Pasang @Rp 140,000.00 Rp. 3,220.00
7.776 Kg Semen Portland @Rp 1,250.00 Rp. 9,720.00
0.200 OH Pekerja @Rp 50,000.00 Rp. 10,000.00
0.150 OH Tukang @Rp 70,000.00 Rp. 10,500.00
0.015 OH Kepala Tukang @Rp 75,000.00 Rp. 1,125.00
0.010 OH Mandor @Rp 75,000.00 Rp. 750.00
Jumlah Rp. 35,315.00
Dibulatkan Rp. 35,315.00

SNI DT-91-0010-2007-6.4
Memasang 1 M2 Plesteran 1 PC : 4 PP : tebal 15 mm
0.024 M3 Pasir Pasang @Rp 140,000.00 Rp. 3,360.00
6.240 Kg Semen Portland @Rp 1,250.00 Rp. 7,800.00
0.200 OH Pekerja @Rp 50,000.00 Rp. 10,000.00
0.150 OH Tukang @Rp 70,000.00 Rp. 10,500.00
0.015 OH Kepala Tukang @Rp 75,000.00 Rp. 1,125.00
0.010 OH Mandor @Rp 75,000.00 Rp. 750.00
Jumlah Rp. 33,535.00
Dibulatkan Rp. 33,535.00

SNI DT-91-0010-2007-6.27
Memasang 1 M2 Acian
3.250 Kg Semen Portland @Rp 1,250.00 Rp. 4,062.50
0.150 OH Pekerja @Rp 50,000.00 Rp. 7,500.00
0.100 OH Tukang @Rp 70,000.00 Rp. 7,000.00
0.010 OH Kepala Tukang @Rp 75,000.00 Rp. 750.00
0.008 OH Mandor @Rp 75,000.00 Rp. 600.00
Jumlah Rp. 19,912.50
Dibulatkan Rp. 19,913.00
XIII. PEKERJAAN KUNCI DAN KACA

RSNI T-30-200-B.2
1 Buah Kunci Tanam Biasa
1.000 Buah Kunci Tanam Biasa @Rp 122,850.00 Rp. 122,850.00
0.010 OH Pekerja @Rp 50,000.00 Rp. 500.00
0.500 OH Tukang @Rp 70,000.00 Rp. 35,000.00
0.010 OH Kepala Tukang @Rp 75,000.00 Rp. 750.00
0.005 OH Mandor @Rp 75,000.00 Rp. 375.00
Jumlah Rp. 159,475.00
Dibulatkan Rp. 159,475.00

RSNI T-30-200-B.4
1 Buah Kunci Tanam Silinder
1.000 Buah Kunci Silinder @Rp 131,250.00 Rp. 131,250.00
0.005 OH Pekerja @Rp 50,000.00 Rp. 250.00
0.500 OH Tukang @Rp 70,000.00 Rp. 35,000.00
0.005 OH Kepala Tukang @Rp 75,000.00 Rp. 375.00
0.00025 OH Mandor @Rp 75,000.00 Rp. 18.75
Jumlah Rp. 166,893.75
Dibulatkan Rp. 166,894.00

RSNI T-30-200-B.5
1 Buah Engsel Pintu
1.000 Buah Engsel Pintu @Rp 27,300.00 Rp. 27,300.00
0.015 OH Pekerja @Rp 50,000.00 Rp. 750.00
0.150 OH Tukang @Rp 70,000.00 Rp. 10,500.00
0.015 OH Kepala Tukang @Rp 75,000.00 Rp. 1,125.00
0.00075 OH Mandor @Rp 75,000.00 Rp. 56.25
Jumlah Rp. 39,731.25
Dibulatkan Rp. 39,731.00

RSNI T-30-200-B.6
1 Buah Engsel Jendela Kupu - kupu
1.000 Buah Engsel Jendela @Rp 19,950.00 Rp. 19,950.00
0.010 OH Pekerja @Rp 50,000.00 Rp. 500.00
0.100 OH Tukang @Rp 70,000.00 Rp. 7,000.00
0.010 OH Kepala Tukang @Rp 75,000.00 Rp. 750.00
0.0005 OH Mandor @Rp 75,000.00 Rp. 37.50
Jumlah Rp. 28,237.50
Dibulatkan Rp. 28,238.00

RSNI T-30-200-B.9
1 Buah Kait Angin Jendela
1.000 Buah Kait Angin @Rp 14,700.00 Rp. 14,700.00
0.015 OH Pekerja @Rp 50,000.00 Rp. 750.00
0.150 OH Tukang @Rp 70,000.00 Rp. 10,500.00
0.015 OH Kepala Tukang @Rp 75,000.00 Rp. 1,125.00
0.00075 OH Mandor @Rp 75,000.00 Rp. 56.25
Jumlah Rp. 27,131.25
Dibulatkan Rp. 27,131.00

RSNI T-30-200-B.26
1 Buah Hak Tarikan Jendela
1.000 Buah Tarikan Jendela @Rp 15,750.00 Rp. 15,750.00
0.015 OH Pekerja @Rp 50,000.00 Rp. 750.00
0.150 OH Tukang @Rp 70,000.00 Rp. 10,500.00
0.015 OH Kepala Tukang @Rp 75,000.00 Rp. 1,125.00
0.00075 OH Mandor @Rp 75,000.00 Rp. 56.25
Jumlah Rp. 28,181.25
Dibulatkan Rp. 28,181.00

RSNI T-30-200-B.25
1 Buah Pacok Jendela
1.000 Buah Pacok Jendela @Rp 12,600.00 Rp. 12,600.00
0.020 OH Pekerja @Rp 50,000.00 Rp. 1,000.00
0.200 OH Tukang @Rp 70,000.00 Rp. 14,000.00
0.020 OH Kepala Tukang @Rp 75,000.00 Rp. 1,500.00
0.00075 OH Mandor @Rp 75,000.00 Rp. 56.25
Jumlah Rp. 29,156.25
Dibulatkan Rp. 29,156.00
RENCANA ANGGARAN BIAYA
PEKERJAAN REHABILTASI PUSTU DESA SUA - SUA KECAMATAN SIMEULUE TIMUR
KABUPATEN SIMEULUE

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME
SATUAN ANALISA SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6 7

A PEKERJAAN PERSIAPAN
1 Administrasi dan Dokumentasi 1.00 Ls Taksir 1,000,000.00 1,000,000.00
2 Pembersihan Lapangan 125.00 m2 RSNI T-12-2002-B8 8,750.00 1,093,750.00
3 Pembongkaran 1.00 Ls Taksir 1,500,000.00 1,500,000.00
4 Mobilisasi 1.00 Ls Taksir 1,557,800.00 1,557,800.00
5 Papan Nama Proyek 1.00 Ls Taksir 750,000.00 750,000.00
Sub Jumlah 5,901,550.00
B PEKERJAAN BETON BERTULANG
1 Balok latai 13/13 cm 1.28 M3 Suplemen 9 5,013,802.00 6,397,360.66
2 Cor Plat Teras 0.570 M3 SNI DT-91-0008-2007-6.5 737,138.00 420,168.66
3 Pemasangan Kawat Plat Dag Teras 11.400 m2 Taksir 100,000.00 1,140,000.00
Sub Jumlah 7,957,529.32
C PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan Trasram Bata 1 PC : 2 PP 6.25 M2 SNI DT-91-0009-2007-6.7 122,880.00 768,000.00
2 Plesteran Trasram Bata 1 PC : 2 PP 12.50 M2 SNI DT-91-0010-2007-6.2 37,960.00 474,500.00
3 Pasangan Dinding Bata 1 PC : 4 PP 113.49 M2 SNI DT-91-0009-2007-6.9 114,270.00 12,968,050.93
4 Plesteran Dinding Bata 1PC : 4 PP 226.97 M2 SNI DT-91-0010-2007-6.4 33,535.00 7,611,509.37
5 Pasangan Kawat Anyaman Dinding Lengkap Terpasang 40.00 Titik Taksir 215,000.00 8,600,000.00
Sub Jumlah 30,422,060.31
D PEKERJAAN ATAP DAN PLAFOND
1 Plafond Tripleks 4 mm (tritisan) 10.000 M2 SNI DT 91-0013-2007-6.5 40,470.00 404,700.00
2 Kayu lis eternit 202.000 m' Taksir 15,000.00 3,030,000.00
Sub Jumlah 3,434,700.00
E PEKERJAAN PENGECATAN
1 Cat Tembok 3 x (L/D) Lama 499.847 M2 PT. T-38-2000-C15 17,143.00 8,568,877.12
2 Cat Plafond dan List Plafond 101.500 M2 PT. T-38-2000-C-B14 24,630.00 2,499,945.00
3 Cat Mengkilat Lesplang Kayu 12.750 M2 PT. T-38-2000-C-B8 29,114.00 371,203.50
4 Cat Mengkilat Kosen, dan daun Pintu/Jendela/Jalusi 131.113 M2 PT. T-38-2000-C-B8 29,114.00 3,817,218.06
Sub Jumlah 15,257,243.68
F PEKERJAAN LAIN LAIN
1 Pengadaan Pipa PVC 4" dan Accsesories 7.000 M' Taksir 60,000.00 420,000.00
2 Pemasangan Talang Air 16.100 M' Taksir 102,550.00 1,651,055.00
3 Elbo 4.000 bh Taksir 30,000.00 120,000.00
4 Kunci slinder merk setara SES 11.000 Buah RSNI T-30-200-B.4 166,894.00 1,835,834.00

Sub Jumlah 4,026,889.00


REKAPITULASI BIAYA
PEKERJAAN REHABILTASI PUSTU DESA SUA - SUA KECAMATAN SIMEULUE TIMUR
A PEKERJAAN PERSIAPAN 5,901,550.00
B PEKERJAAN BETON BERTULANG 7,957,529.32
C PEKERJAAN PASANGAN DAN PLESTERAN 30,422,060.31
D PEKERJAAN ATAP DAN PLAFOND 3,434,700.00
E PEKERJAAN PENGECATAN 15,257,243.68
4,026,889.00
Jumlah 66,999,972.31
PPn 10% 6,699,997.23
Total 73,699,969.54
Dibulatkan 73,700,000.00
Terbilang : TUJUH PULUH TIGA RIBU TUJUH RATUS RUPIAH

………….., …………………….2010
CV. NIRZA CIVIL ENGINEERING
Penawar
PT / CV. ……………………..
CONSULTANT

(………………………………..)
Direktur

ARIF ROESDI PURWONO


Site Engineering
Perhitungan voluem pekerjaan Perpustakaan MTsS Darul Aitami
A PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Panjang Lebar
A B
18 10
2 Pengukuran dan Pemasangan Bowplank Panjang Lebar Jumlah sisi A Jumlah Sisi B
A B C D
18 10 2 2
B PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi menerus Lebar Bawah Lebar sisi tegak Panjang Pondasi
0.7 0.7 80
2 Galian tanah pondasi tapak
Lebar Pondasi Lebar pondasi Jml pondasi Tinggi galian
1 1 17 0.69
4 Urugan Pasir Alas Pondasi
Lebar Urugan Tebal urugan Panjang pondasi
a Pondasi menerus 0.7 0.05 80

b Pondasi tapak Lebar Urugan Tebal urugan Jml pondasi


1 0.05 17

5 Pasangan Batu Kosong Lebar Pasangan Tebal Pasangan Panjang Pasangan


0.7 0.1 80
Panjang
Lebar atas Lebar bawah Tinggi pasangan
8 Pasangan Pondasi batu belah pasangan
0.3 0.6 0.6 80
9 Plat Pondasi Tapak Lebar sisi 1 Lebar sisi 2 Tebal pondasi Jml Pondasi
1 1 0.25 17
B PEKERJAAN BETON BERTULANG
1 Sloof Beton 15/20 cm Lebar sisi 1 Lebar sisi 2 Panjang sloof
0.2 0.25 88
2 Kolom Beton Induk 20/25 cm Lebar sisi 1 Lebar sisi 2 Tinggi kolom Jumlah kolom
0.2 0.25 6 16
3 Kolom Beton Teras 15/15 cm Lebar sisi 1 Lebar sisi 2 Tinggi kolom Jumlah kolom
0.2 0.2 5 7
4 Kolom Praktis 13/13 cm Lebar sisi 1 Lebar sisi 2 Tinggi kolom Jumlah kolom
5 0
5 Ring balok 13/15 cm Lebar sisi 1 Lebar sisi 2 Panjang Ring balk
0.2 0.25 80
1 Balok latai 13/13 cm Lebar sisi 1 Lebar sisi 2 Panjang Ring balk
0.13 0.15 80
2 Balok top gevel 13/20 Lebar sisi 1 Lebar sisi 2 Panjang balok
0.13 0.2 26
3 Balok pinggang 13/13 Lebar sisi 1 Lebar sisi 2 Panjang Balok
0.13 0.13 3

C PEKERJAAN PASANGAN DAN PLESTERAN


1 Pasangan Trasram Bata 1 PC : 2 PP Tinggi pasangan Panjang pasangan
0.5 68
2 Plesteran Trasram Bata 1 PC : 2 PP Tinggi pasangan Panjang pasangan Jumlah sisi Plesteran
0.5 68 2
3 Pasangan Dinding Bata 1 PC : 4 PP Tinggi pasangan Panjang pasangan
3.75 68 40
4 Plesteran Dinding Bata 1PC : 4 PP Tinggi pasangan Panjang pasangan Jumlah sisi Plesteran
3.75 68 2 40
5 Plesteran beton bertulang 1 PC : 2 PP Kolom A KoloB
Luas permukaan
Tinggi kolom Jml kolom
kolom
4 0.05 16 1.0024
D PEKERJAAN LANTAI
Pekerjaan Timbunan dan Urugan
Luas Lantai Tebal timbunan Luas Panggung Tebal
timbunan
1 Timbunan Tanah Bawah Lantai Ruangan panggung
116 0.25 28 0.85
2 Timbunan Tanah dibawah Selasar Luas Selasar Tebal timbunan
32.4 0.2
3 Urugan Pasir Bawah Lantai Ruangan Luas lantai Tebal timbunan
144 0.1
4 Urugan Pasir Bawah Lantai Selasar Luas lantai Tebal timbunan
32.4 0.1
### #REF!
Pekerjaan Lantai Keramik
1 Beton Tumbuk Dibawah Lantai Keramik t = 5 cm Luas lantai tebal rabat
176.4 0.05
2 Lantai Keramik 40 x 40 cm polished pada ruangan Lebar ruangan Panjang ruangan
8 18
3 Lantai Keramik 30 x 30 cm polished pada ruangan Lebar selasar Panjang selasar
1.8 18
### #REF!
#REF!
### #REF!
D PEKERJAAN ATAP DAN PLAFOND
Lebar sisi atap Lebar sisi atap
Panjang atap
1 Rangka kuda-kuda dan gording baja ringan Multytruss depan belakang
7.02 5.67 20.2
Lebar sisi atap Lebar sisi atap
Panjang atap
2 Penutup Atap Seng BJLS 0,30 depan belakang
7.02 5.67 20.2
3 Rabung seng BJLS 0,30

Panjang atap sisi Panjang atap sisi Jumlah sisi


4 Lesplang Kayu 2,5/25 cm datar miring
20.2 12.69 2
5 Plafond Tripleks 4 mm (ruangan + selasar) Luas ruangan Luas selasar
116 32.4
Panjang atap sisi Lebar tritisan Jumlah sisi
1 Plafond Tripleks 4 mm (tritisan) miring
12.69 1 2
7 Rangka plafond Luas ruangan Luas selasar
116 32.4
2 Kayu lis eternit Ruangan Selasar tritisan
52 39.6 50.76

G PEKERJAAN PINTU, JENDELA DAN KUNCI


1 Pintu Type P1 & P2
- Kosen Kayu 6/13 Luas kusen Tebal kusen
0.506 0.13
- Daun Pintu Panel Ukuran 80 x 210 cm (siap pasang)
1.4 2.1
- Ventilasi Jalusi
0.4 1.4
- Kunci slinder merk setara SES

- Pegangan Pintu

- Slot pintu double

- Engsel Pintu

### #REF!
#REF!

#REF!

#REF!

#REF!

### #REF!
#REF!

#REF!

#REF!

#REF!

3 Jendela Type J2, V1


- Kosen Kayu 6/13 Luas kusen Tebal kusen
0.705 0.13
- Daun Jendela Ukuran 65 x 107 cm (siap pasang)
0.6 1.02
- Ventilasi Jalusi
0.4 1.8
- Engsel Jendela

- Grendel jendela

- Hak Penahan Angin Jendela

-Tarikan Jendela

- Kaca 5 mm
0.46 0.88
### #REF!
#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

#REF!

### #REF!
#REF!

#REF!

E PEKERJAAN PENGECATAN
1 Cat Tembok 3 x (L/D) Luas jendela Luas pintu
Luas dinding
Luas jendela Jml jendela Luas pintu Jml pintu
195
2 Cat Plafond dan List Plafond Luas plafon ruangan Luas Plafon selasar
180 36
3 Cat Mengkilat Lesplang Kayu Panjang list plank lebar list plank
65.78 0.25
4 Cat Mengkilat Kosen, dan daun Pintu/Jendela/Jalusi Pintu Jml pintu Jendela jml jendela
1.3156 2 1.833 10
5 0 Pintu Jml pintu Jendela jml jendela
2.94 2 0.056 10
= A*B
180.00

A*C+B*D
56.00

39.20

11.73

2.80

0.85
3.65

5.60

21.60

4.25

4.40

4.80

1.40

4.00

1.56

0.68

0.05

34.00

68.00

295.00

590.00

4.20

52.80

6.48

14.40

3.24

8.82

144.00

32.40
256.34

256.34

20.20

65.78

148.40

25.38

148.40

142.36

0.132

2.94

0.56

2.00

2.00

2.00

4.00

0.09

1.43

0.72

6.00

3.00

6.00

3.00

0.40
195.00

216.00

16.45

20.9612

6.44
JADWAL PELAKSANAAN PEKERJAAN
PEKERJAAN REHABILTASI PUSTU DESA SUA - SUA KECAMATAN SIMEULUE TIMUR
KABUPATEN SIMEULUE

BOBOT MASA PELAKSANAAN (45 HARI KALENDER)


NO URAIAN KEGIATAN JUMLAH HARGA BULAN I BULAN II KET
(%) M1 M2 M3 M4 M1 M2 M3

1 PEKERJAAN REHABILTASI PUSTU DESA SUA - SUA KECAMATAN SIMEULUE TIMUR

100

A PEKERJAAN PERSIAPAN 5,901,550.00 8.81 1.26 1.26 1.26 1.26 1.26 1.26 1.26

B PEKERJAAN BETON BERTULANG 7,957,529.32 11.88 5.94 5.94

C PEKERJAAN PASANGAN DAN PLESTERAN 30,422,060.31 45.41 11.35 11.35 11.35 11.35

D PEKERJAAN ATAP DAN PLAFOND 3,434,700.00 5.13 1.71 1.71 1.71

E PEKERJAAN PENGECATAN 15,257,243.68 22.77 11.39 11.39

F PEKERJAAN LAIN LAIN 4,026,889.00 6.01 3.01 3.01

TOTAL 66,999,972.31 100.00

Bobot Rencana / Minggu (%) 1.26 12.61 18.55 20.26 25.70 17.36 4.26

Jumlah Akumulasi Rencana 0 1.26 13.87 32.42 52.67 78.38 95.74 100.00
BACK UP DATA - PEKERJAAN PEMBERSIHAN LAH

PERHITUNGA
Pjg Sat Lebar

12.50 10.00

Disetujui Oleh
Staf Teknis PPTK
PEMBERSIHAN LAHAN

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

125.00 m2

Jumlah 125.00 m2
VOLUME
125.00 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN PEMBERSIHAN L

3800

PERHITUNG
Pjg Sat Lebar

1.00
pjg jml tot pnjg
4000 0.05 60 3.00

Disetujui Oleh
Staf Teknis PPTK
AN PEMBERSIHAN LAHAN

PERHITUNGAN VOLUME VOLUME SAT KET

Tinggi LUAS HARGA Jumlah Sat

7 7.00 20,000.00 140,000.00 0.00 m2 KAWAT

5000 15,000.00 BESI 6

20,000.00 paku

175,000.00
35000 50,000.00 ongkos bongkar +pasang

225,000.00

Jumlah 0.00 m2
VOLUME
0.00 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
ngkar +pasang
BACK UP DATA - PEKERJAAN PENGUKURAN BOWP

PERHITUNGA
Pjg Sat Tinggi

3.00 0.50
9.50 0.50

Pjg Tinggi jumlah


1.29 1.45
2.2 2.00
1.45 3.00
2.2 4.00
0.45 19.00
0.5 1.00

Pjg Sat Tinggi


3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50

Pjg Tinggi jumlah


1.45 1.00
2.2 4.00
0.45 1.00
0.5 1.00

Pjg Sat Tinggi


0.50
0.50
3.50
3.50
3.50
0.50
0.50

Disetujui Oleh
Staf Teknis PPTK
ENGUKURAN BOWPLANK

PERHITUNGAN VOLUME VOLUME SAT KET

Sat jumlah Luas Luas Total Sat

1.50
4.75
0.00 12.50
0.00 2.00
0.00 m2 2.00
0.00 12.50
6.25
Luas Luas Total
- J1 1.29
- P1 1.59
- J2 0.6
- P2 0.88
- V2 0.45
- V1 0.66
- 6.25
Sat jumlah Luas Luas Sat
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
0
Luas Luas Total
- J2
- P2 0.625
- V2
- V1
- 0.00
Sat jumlah Luas Luas Sat
1 0
1 0
2 0
1 0
3 0
2 0
1 0
0.00 0.00
Jumlah 6.25 m'
VOLUME
6.25 m'

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN

Arif Roesdi Purwono, ST


Site engineering
3.50 43.75
3.50 7.00
3.50 7.00
3.50 43.75

1.45 5.00 9.35


2.2 2.00 7.00
1.45 3.00 2.61
2.2 4.00 7.74
0.45 19.00 3.85
0.5 1.00 0.33
BACK UP DATA - PEKERJAAN PENGUKURAN BOWP

PERHITUNGA
Pjg Sat Tinggi

3.00 3.00
9.50 3.50
3.50
3.50
3.50
3.50

Pjg Tinggi jumlah


1.29 1.45 2.00
2.2 2.00
1.45 3.00
2.2 4.00
0.45 19.00
0.5 1.00

Pjg Sat Tinggi


3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50

Pjg Tinggi jumlah


1.45 1.00
2.2 4.00
0.45 1.00
0.5 1.00

Pjg Sat Tinggi


0.50
0.50
3.50
3.50
3.50
0.50
0.50

Disetujui Oleh
Staf Teknis PPTK
ENGUKURAN BOWPLANK

PERHITUNGAN VOLUME VOLUME SAT KET

Sat jumlah Luas Luas Total Sat

9.00
33.25
0.00 12.50
0.00 2.00
0.00 m2 2.00
0.00 12.50
42.25
Luas Luas Total
3.74 J1 1.29
- P1 1.59
- J2 0.6
- P2 0.88
- V2 0.45
- V1 0.66
3.74 38.51
Sat jumlah Luas Luas Sat
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
0
Luas Luas Total
- J2
- P2 3.8509
- V2
- V1
- 0.00
Sat jumlah Luas Luas Sat
1 0
1 0
2 0
1 0
3 0
2 0
1 0
0.00 0.00
Jumlah 38.51 m'
VOLUME
38.51 m'

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN

Arif Roesdi Purwono, ST


Site engineering
3.50 43.75
3.50 7.00
3.50 7.00
3.50 43.75

1.45 5.00 9.35


2.2 2.00 7.00
1.45 3.00 2.61
2.2 4.00 7.74
0.45 19.00 3.85
0.5 1.00 0.33
BACK UP DATA - PEKERJAAN PENGUKURAN BOWP

PERHITUNGA
Pjg Sat Tinggi

3.00 3.50
9.50 3.50
12.50 3.50
2.00 3.50
2.00 3.50
12.50 3.50

Pjg Tinggi jumlah


1.29 1.45 5.00
1.59 2.2 2.00
0.6 1.45 3.00
0.88 2.2 4.00
0.45 0.45 19.00
0.66 0.5 1.00

Pjg Sat Tinggi


7 3.50
1.5 3.50
4 3.50
3 3.50
6 3.50
6 3.50
3 3.50
6 3.50

Pjg Tinggi jumlah


0.6 1.45 1.00
0.88 2.2 4.00
0.45 0.45 1.00
0.66 0.5 1.00

Pjg Sat Tinggi


4.00 0.50
2.00 0.50
0.60 3.50
0.20 3.50
0.60 3.50
2.00 0.50
1.50 0.50

Disetujui Oleh
Staf Teknis PPTK
ENGUKURAN BOWPLANK

PERHITUNGAN VOLUME VOLUME SAT KET

Sat jumlah Luas Luas Total Sat

10.50
33.25
43.75
7.00
7.00 m2
43.75
145.25
Luas Luas Total
9.35 J1
7.00 P1
2.61 J2
7.74 P2
3.85 V2
0.33 V1
30.88 114.37
Sat jumlah Luas Luas Sat
1 24.5
1 5.25
1 14
1 10.5
1 21
1 21
1 10.5
1 21
127.75
Luas Luas Total
0.87 J2
7.74 P2 24.99235
0.20 V2
0.33 V1
9.15 118.60
Sat jumlah Luas Luas Sat
1 2
1 1
2 4.2
1 0.7
3 6.3
2 2
1 0.75
16.95 16.95
Jumlah 249.92 m'
VOLUME
249.92 m'

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN

Arif Roesdi Purwono, ST


Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

12.50 0.13
2.00 0.13
3.00 0.13
2.50 0.13
2.00 0.13
9.50 0.13
3.00 0.13

7.00 0.13
1.50 0.13
4.00 0.13
3.00 0.13
6.00 0.13
6.00 0.13
3.00 0.13
6.00 0.13

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.13 1.00 0.21


0.13 2.00 0.07
0.13 1.00 0.05
0.13 2.00 0.08
0.13 1.00 0.03
0.13 1.00 0.16
0.13 1.00 0.05

0.13 1.00 0.12


0.13 1.00 0.03
0.13 1.00 0.07
0.13 1.00 0.05
0.13 1.00 0.10
0.13 1.00 0.10
0.13 1.00 0.05
0.13 1.00 0.10

Jumlah 1.28 m3
VOLUME
1.28 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

25.00 15.00

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.35 131.25

Jumlah 131.25 m3
VOLUME
131.25 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

2.20
2.20

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

1.00 0.00 m3
0.00 m3
m3

Jumlah 0.00 m3
VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

1.00 0.00 m'


1.00 0.00 m'
1.00 0.00 m'
m'
m'

Jumlah 0.00 m'


VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

0.05
0.05
0.05
0.05

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.13 3.00 0.00 m3 j2


0.13 2.00 0.00 m3
0.13 6.00 0.00 m3 v1
0.13 9.00 0.00 m3

Jumlah 0.00 m3
VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

0.05
0.05

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.13 1.00 0.00 m3 p2


0.13 2.00 0.00 m3
m3
m3
m3
m3
m3
m3
m3

Jumlah 0.00 m3
VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

0.13
0.05
0.05
0.13
0.07
0.07
0.13
0.05
0.13
0.05
0.07
0.07
0.13
0.05
0.13
0.05
0.13
0.05
0.05
0.13
0.13
0.02
0.13
0.05
0.13
0.05
0.78
0.04
0.13
0.05
0.13
0.05
1.50
0.04
0.13
0.05
0.13
0.05
0.7
0.04

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

1.45 36.00 6.79 m2 j1, kusen


1.45 36.00 2.61 m2
1.29 24.00 1.55 m2
1.29 24.00 4.02 m2
1.37 48.00 4.60 m2 j1, daun
0.60 48.00 2.02 m2
1.45 16.00 3.02 m2 j2, kusen
1.45 16.00 1.16 m2
0.66 16.00 1.37 m2
0.66 16.00 0.53 m2
1.37 16.00 1.53 m2 j2, daun
0.60 16.00 0.67 m2
0.50 8.00 0.52 v1, kusen
0.50 8.00 0.20
0.66 8.00 0.69
0.66 8.00 0.26
0.45 120.00 7.02 m2 V2
0.45 120.00 2.70 m2
0.45 120.00 2.70 m2
0.45 120.00 7.02 m2
0.50 120.00 7.80 m2 V 2 diagonal
0.50 120.00 1.20 m2
2.20 32.00 9.15 m2 p2, kusen
2.20 32.00 3.52 m2
0.88 16.00 1.83 m2
0.88 16.00 0.70 m2
2.16 16.00 26.96 m2 p2, daun
2.16 16.00 1.38 m2
2.20 8.00 2.29 m2 p1, kusen
2.20 8.00 0.88 m2
1.60 4.00 0.83 m2
1.60 4.00 0.32 m2
2.16 4.00 12.96 m2 p1, daun
2.16 4.00 0.35 m2
2.20 8.00 2.29 p 3, kusen
2.20 8.00 0.88
0.8 4.00 0.42
0.8 4.00 0.16
2.10 4.00 5.88 p2, daun
2.10 4.00 0.34

Jumlah 131.11 m2
VOLUME
131.11 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN

Arif Roesdi Purwono, ST


Site engineering
BACK UP DATA - PEKERJAAN PENGUKURAN BOWP

PERHITUNGA
Pjg Sat lebar

12.50 7.00
3.00 1.00
4.00 2.00
2.00 1.50

Disetujui Oleh
Staf Teknis PPK Simeulue
ENGUKURAN BOWPLANK

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

1.00 87.50 m2
1.00 3.00 m2
1.00 8.00 m2
1.00 3.00 m2

Jumlah 101.50 m3
VOLUME
101.50 m3
m

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

0.13
0.13
0.13

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.15 1.00 0.00 m3 2


0.15 1.00 0.00 m3 3
0.15 1.00 0.00 m3 4

Jumlah 0.00 m3
VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

0.13
0.13
0.13

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.15 1.00 0.00 m3


0.15 1.00 0.00 m3
0.15 1.00 0.00 m3

Jumlah 0.00 m3
VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PON

P
Pjg

15.00
10.50

Disetujui Oleh
Staf Teknis PPK Simeulue
AAN GALIAN TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Lebar Sat Tinggi Sat Jumlah Sat

0.25 2.00 7.50 m2


0.25 2.00 5.25 m2
0.00 m2
0.00 m2
0.00 m2
0.00 m2
0.00 m2

Jumlah 12.75 m3
VOLUME
12.75 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

8.00
7.00
12.50
3.00

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

3.00 24.00 m' 2


9.00 63.00 m'
8.00 100.00 m'
5.00 15.00 m'

Jumlah 202.00 m'


VOLUME
202.00 m'

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

1.00 0.00 m3 2
1.00 0.00

Jumlah 0.00 m3
VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

4.20 2.00
2.00 1.50

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.05 0.42 m3 1
0.05 0.15

Jumlah 0.57 m3
VOLUME
0.57 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

15.00
1.10

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

1.00 15.00 m'


1.00 1.10 m'

Jumlah 16.10 m'


VOLUME
16.10 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

1.00
1.00
1.00

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.05 1.00 0.00 m3


0.05 2.00 0.00 m3
0.05 2.00 0.00 m3
m3

Jumlah 0.00 m3
VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

0.55
0.15

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.00 m2 Selasar
0.00 m2 Selasar
0.00 m2 Selasar
0.00 m2 Selasar

Jumlah 0.00 m2
VOLUME
0.00 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

-1.40 m2 2
0.00 m2 4
0.00 m2 A
0.00 m2 G

Jumlah -1.40 m3
VOLUME
-1.40 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.00 m2
0.00 m2
0.00 m2
0.00 m2
0.00 m2
0.00 m2
0.00 m2
0.00 m2
0.00 m2
0.00 m2
0.00 m2

Jumlah 0.00 m3
VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Kolom Teras

Kolom Praktis

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.00 m2

0.00 m2

Jumlah 0.00 m2
VOLUME
0.00 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.00 m3
0.00 m3

Jumlah 0.00 m3
VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.00 m3
0.00 m3
0.00 m3
0.00 m3
0.00 m3

Jumlah 0.00 m3
VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.00 m3
0.00 m3

Jumlah 0.00 m3
VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.00 m3
0.00 m3
0.00 m3
0.00 m3
0.00 m3

Jumlah 0.00 m3
VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.00 m3
0.00 m3
0.00 m3
0.00 m3
0.00 m3
0.00 m3
0.00 m3
0.00 m3

Jumlah 0.00 m3
VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.00 m2
0.00 m2

Jumlah 0.00 m3
VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.00 m2
0.00 m2
0.00 m2
0.00 m2
0.00 m2
0.00 m2

Jumlah 0.00 m3
VOLUME
0.00 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.000 m3
0.000 m3

Jumlah 0.000 m3
VOLUME
0.000 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.000 m3

Jumlah 0.000 m3
VOLUME
0.000 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.000 m2

Jumlah 0.000 m2
VOLUME
0.000 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.000 m3
0.000 m3

Jumlah 0.000 m3
VOLUME
0.000 m3

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.000 m2

Jumlah 0.000 m2
VOLUME
0.000 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.000 m2
0.000 m2

Jumlah 0.000 m2
VOLUME
0.000 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.000 m2

Jumlah 0.000 m2
VOLUME
0.000 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.000 m2
0.000 m2

Jumlah 0.000 m2
VOLUME
0.000 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.000 m2
0.000 m2

Jumlah 0.000 m2
VOLUME
0.000 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.000 m'

Jumlah 0.000 m'


VOLUME
0.000 m'

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

- m'
- m'
- m'
- m'

Jumlah 0.000 m'


VOLUME
0.000 m'

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.000 m2 Ruangan
0.000 m2 Selasar

Jumlah 0.000 m2
VOLUME
0.000 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.000 m2
0.000 m2
0.000 m2
0.000 m2

Jumlah 0.000 m2
VOLUME
0.000 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

- m2 Ruangan
- m2 Selasar
- m2 Tritisan
- m2 Tritisan
- m2 Tritisan
- m2 Tritisan

Jumlah 0.000 m2
VOLUME
0.000 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PON

PER
Pjg

Ruangan

Selasar

Tritisan

Disetujui Oleh
Staf Teknis PPK Simeulue
JAAN GALIAN TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Lebar Sat Tinggi Sat Jumlah Sat

Ruangan
- m1
- m1

Selasar
- m1
- m1

Tritisan
- m1 Depan
- m1
- m1 Belakang
- m1
- m1 Samping
- m1
- m1
- m1

Jumlah - m'
VOLUME
0.00 m1

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDAS

PERHITUNGA
Pjg Sat Lebar

Disetujui Oleh
Staf Teknis PPK Simeulue
AN TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

-37.45
-28.52
-11.66
0.00
-93.25
-45.63
-28.565
0.000
-14.994
-5.704
-5.760
-52.992
0.000
0.000
0.000

Jumlah -324.519 m2
VOLUME
-324.519 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Kusen Pintu

Kusen Jendela

Kusen Ventilasi Pintu

Kusen Ventilasi Jendela

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.000 m2
0.000 m2
0.000 m2
0.000 m2
0.000 m2

0.000 m2
0.000 m2
0.000 m2
0.000 m2
0.000 m2

0.000 m2

0.00 m2
0.00 m2
0.00 m2

Jumlah 0.000 m2
VOLUME
0.000 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering
BACK UP DATA - PEKERJAAN GALIAN TANAH PONDASI

PERHITUNGA
Pjg Sat Lebar

Daun Pintu

Daun Jendela

Disetujui Oleh
Staf Teknis PPK Simeulue
N TANAH PONDASI MENERUS

PERHITUNGAN VOLUME VOLUME SAT KET

Sat Tinggi Sat Jumlah Sat

0.000 m2

0.000 m2
0.000 m2

Jumlah 0.000 m2
VOLUME
0.000 m2

Dibuat Oleh
Konsultan Perencana
CV. DENAH MULTICON CONSULTAN
Arif Roesdi Purwono, ST
Site engineering